Você está na página 1de 8

izfrosnu

dk;Z dk

55@2059 en ds vUrxZr izeq[k vfHk;Urk dk;kZy; fLFkr


mRrjh foax izFke ry rd fLFkr prqFkZ o`Rr dk;kZy; dk
lkSUn;hZdj.kA

izfo/kku vkx.ku esa fuEufyf[kr dk;ksZ dk izkfo/kku fd;k x;k gSA

njsa
%&
fof'kf"V;
kWa%&

;g vkx.ku njvuqlwph ,oa U;wure cktkj njksa ij vk/kkfjr


fo'ksysf"kr njksa ij xfBr fd;k x;k gSA

leLr dk;Z yksd fuekZ.k foHkkx ds foLr`r fof'kf"V;ksa ,oa


izeq[k vfHk;Urk yksd fuekZ.k foHkkx ds uohure ifji=ks ds
vuqq:i lEikfnr djk;s tk;saxsA

mijksDr dk;Z gsrq vkx.ku :0


yk[k ek= dk iz'kkldh; ,oa
foRrh; Lohd`fr rFkk /kukoUVu gsrq izLrqr gSA

voj vfHk;Urk
lgk;d vfHk;Urk
vf/k'kklh vfHk;Urk
vuq0 [k.M ua0&1flfoy
vuq0 [k.M ua0&1flfoy
vuq0 [k.M ua0&1flfo
yks0fu0fo0] y[ku
yks0fu0fo0] y[ku
yks0fu0fo0] y[ku

Urk dk;kZy; fLFkr


o`Rr dk;kZy; dk

/kku fd;k x;k gSA

ktkj njksa ij vk/kkfjr

oLr`r fof'kf"V;ksa ,oa


ds uohure ifji=ks ds

k ek= dk iz'kkldh; ,oa


Lrqr gSA

vf/k'kklh vfHk;Urk
uq0 [k.M ua0&1flfoy
yks0fu0fo0] y[ku

Summarey of Estimated Cost


NAME OF WORK- 55@2059 en ds vUrxZr izeq[k vfHk;Urk dk;kZy;

fLFkr mRrjh foax izFke ry rd fLFkr prqFkZ o`Rr dk;kZy; dk


lkSUn;hZdj.kA

Sl. No.

Particulars

Amount

As Per Bill of Quantity

0.00

1% Labour sess

0.00

6.875 Estiblishment chrages

0.00

1.5% Rate Depriciation of Machinery


& instrument charges

0.00

Total

Or Say Rs.

Junior Engineer
Maint. Div. No. 1(Civil)
P.W.D. Lucknow

Assistant Engineer
Maint. Div. No. 1(Civil)
P.W.D. Lucknow

0.00

1.72 Lac

Exeautive Engineer
Maint. Div. No. 1(Civil)
P.W.D. Lucknow

ESTIMATE
Details of Measurements & Bill of Quantities

NAME OF WORK- 55@2059 en ds vUrxZr izeq[k vfHk;Urk dk;kZy; fLFkr

mRrjh foax izFke ry rd fLFkr prqFkZ o`Rr dk;kZy; dk lkSUn;hZdj.kA


SL.
No.

ITEM OF WORK

1 P/L of wooden panneling


Ded w
D
Ded Al.
Extra
Extra
Jemes
Jemes
Jemes

Ded D
Extra
Jemes
Ded D
Antiroom
Ded W
Ded W
Ded Al.
Extra
Jemes

Passage
Office
Antiroom

3 ALUMINIUM WORK
D
Passage

4 DOOR CLOSER
5 WOODEN PANNLED D/WINDOW
Window shutter
D

Measurement

Qty.

Unit

28.51
24.95
-0.99
-2.11
-2.23
0.95
0.26
0.21
0.29
0.39
2.38
8.67
-1.25
0.38
0.07
1.22
0.44
0.10
-1.74
24.65
12.77
-2.01
-1.02
-2.23
0.53
0.39
0.81
0.53
0.36
0.07
95.34

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

No.
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X
1 X

2
2
1
1
1
2
1
1
1
1
1
2
1
2
1
1
2
1
1
2
2
1
1
1
2
2
2
2
2
1

L.
4.8
4.20
0.85
1.07
1.22
0.24
0.24
0.25
0.25
0.32
1.22
1.46
0.66
0.10
0.10
1.22
0.11
0.11
0.87
4.15
2.15
1.75
0.85
1.22
0.23
0.23
0.23
0.23
0.09
0.09

B.
2.97
2.97
1.16
1.97
1.83
1.97
1.07
0.85
1.16
1.22
1.95
2.97
1.90
1.90
0.66
1.00
2.00
0.87
2.00
2.97
2.97
1.15
1.20
1.83
1.16
0.85
1.75
1.16
2.00
0.82

1
1
1
1

1
1
1
1

7.10
4.80
1.46
4.15

2.00
4.20
1.15
2.15

14.20
20.16
1.68
8.92
44.96

Sqm
Sqm
Sqm
Sqm
Sqm

1 X 1
1 X 1
1 X 1

1.10
2.00
1.83

2.00
2.95
2.95

2.20
5.90
5.40
13.50

Sqm
Sqm
Sqm
Sqm

4.00

No.

2.00
2.09
1.32

Sqm
Sqm
Sqm

X
X
X
X

H.

1 X 4
1 X 4
1 X 4
1 X 1

0.43
0.45
0.66

1.16
1.16
2.00

Rate

AMOUNT

6 WOODEN POLISHING

2 X 1

0.82

2.00

1 X 2

7.07

14.08

7 REPLACEMENT OF TOILET FITTING


C.P. bib cock
1 X 1
C.P. Angle valve
1 X 1
C.P. piller cock
1 X 1

3.28 Sqm
8.68 Sqm
199.09 Sqm

1.00
2.00
1.00

No
No
No

8 Replacement of window glass


with wooden 4.7 to 5mm thick
9 BILIND

10 P/L OF GLASS FILM (WHITE&


11 Repairing ot floor tiles

1 X 12

0.40

0.70

3.36

1 X 1
1 X 2
1 X 2

1.75
1.40
1.80

1.16
1.40
1.90

2.03
3.92
6.84
12.79

Sqm
Sqm
Sqm
Sqm

1.00
1.00

Job
Job

41.89
6.20
2.00
6.48
33.30
24.66
19.43
-2.40
-4.14
-6.48
120.93

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

1 X 1
1 X 1

12 Scrappingh of old white wash or


colour wash including disposal of
refuse tpto distance of 60mtr as
directed by E/I. (SI. No. 708)

Ded d
W

Ded d
W
Ded opening

1
1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X
X

2
1
1
2
1
1
1
1
2
2

7.10
2.10
1.00
1.80
9.25
6.85
9.25
1.20
1.80
1.80

2.95
2.95
2.00
1.80
3.60
3.60
2.10
2.00
1.15
1.80

13 Providing and applying white


cement based putty of average
thickness 1mm of approved brand
and
manufactrer,
over
the
plastedred wall surface to prepare
the surfae even and smooth
complete.
Qty. same as item no. 12

120.93 Sqm

14 Plastic paint
Qty. same as item no. 13

120.93 Sqm

15 Painting two coat with synthetic


enamel paint of approved quality
on old painted doors & windows
including thoroughly brooming,
brushing and the surface to
remove all dirt & dust complete
work including cost of all material,
labour, T&P etc.(SI. No. 646+646)
D

1 X 2

1.00

2.00

4.00

Sqm

W
D
W

1 X 2
1 X 2
1 X 4

1.80
1.20
1.80

1.80
2.00
1.15

6.48
4.80
8.28
23.56

Sqm
Sqm
Sqm
Sqm
Total

0.00

Você também pode gostar