Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

SAP PP ( Master Data )


Define Bill Of Material :
I ) It is a complete formally structured list of the components that make up a product

II) THE LIST CONTAINS ;


a ) A Description ,
b ) Object number for each component ,
c ) Together with the quantity ,
d ) Unit of Measure .

The BOM in the following Area;


a ) MRP explodes BOMs to Determine Economical order Quantities at a particular point in

time.

b) Work scheduling makes BOMs the basis for planning operation and shop floor control .
c ) The departments responsible for
i ) handling reservations ,
ii ) Good issues ,
iii ) sales order use BOMs as an aid to enter an Data ,
d ) Product costing uses BOMs To calculate material usage cost for a Product

BOM Categories:
A ) Material BOM

T Code - CS01

B ) Order BOM

T code - CS61

C ) Document Structure

T code - CS11

D ) Equipment BOM

T Code - IB01

E ) Functional Location BOM

T code - IB11

A) Material BOM;
It represents the structure of the Manufactured Product in SCM.
B) Order BOM;
It produces a product for a Specific Sales Order
C) Document Structure;
a) It consists of several documents such as ,
1. A program,

2. Technical Drawings,

3. Paper Documents,

4. Photographs.

copyright all rights reserved

Page 1

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

b) You need to create Document information records for these Documents.


D) Equipment BOM;
It is used in plant maintenance to describe the structure of a piece of equipment
F) Functional Location BOM;
It is used in plant maintenance to link equipment to specific locations.

BOM Usage:
It allows you to create separate BOMs for various areas within the company.
Examples of BOM usage:
A)

Engineering BOM

B)

Production BOM

C)

Costing BOM

A) Engineering BOM;
It is the combination of all the components of the products from an Engineering perspective.
It contains all the Technical Data.
B) Production BOM;
It is set from a Manufacturing Perspective.
E.g. process Data is required for assembly Purposes
C) Costing BOM:
It is for automatically calculating the material usage and cost of a Product

copyright all rights reserved

Page 2

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Creation of Bill Of material; (CS01)


Step I
Create Material BOM

1.

Enter T-code CS01 in the command field. ( SAP Easy access Screen )

2.

Enter Material / Plant / BOM usage .

Enter Item Code,


Material component
and Quantity.

Step-3
Click on save button. A Message as

copyright all rights reserved

will be displayed.

Page 3

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Configuration of Bill OF Material :


In customizing Choose ,
Production

BASIC DATA

BOM

CONTROL DATA FOR BOM

DEFINE MODIFICATION PARAMETERS

On the change view Modification parameter For BOMs :


Details Screen
Select the Low date check box under validity

copyright all rights reserved

Page 4

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Press F1

The Above screen Appears.

In the technical type Screen Area Select the Multilevel BOM inactive checkbox :

In customizing Choose,
Production

BASIC DATA

BOM

CONTROL DATA FOR BOM

DEFINE MODIFICATION PARAMETERS

On the change view modification parameters for BOMs

copyright all rights reserved

Page 5

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Details screen select the multilevel BOM inactive Checkbox under Technical type

Press F1
The above Screen appears

copyright all rights reserved

Page 6

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

WORK CENTER;
A WORK CENTER IS A LOCATION WHERE A PERTICULAR OPERATION IS EXECUTED.

EXAMPLES;
THE FOLLOWING CAN BE DEFINED AS A WORK CENTER
A ) INDIVIDUAL WORK CENTER
B ) STATISTICAL WORK CENTER
C ) PRODUCTION LINE

WORK CENTER CREATION; (T CODE CR01)


STEP I)

copyright all rights reserved

Page 7

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

b ) ENTER THE FOLLOWING DATA ;


FIELD
PLANT
WORK CENTER
WORK CENTER CATEGORY

copyright all rights reserved

VALUE
1000
CENTER 07
0003

Page 8

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

On The Basic Data Page Enter The Following Data;


Field
Description
Person responsible
Usage
Standard value key
Rules for maintenance

copyright all rights reserved

value
Pump assembly
007
009 ( all task list types )
sap1 (Normal production )
set up
should be entered
Matchine -- must be entered
Labour
--- no checking

Page 9

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

I ) on the Default value tab page choose the control key


(Between pp01 and pp99 )
II ) minutes as the unit of measure.
III ) Select the ref . Ind. Checkbox for the control key.

Now save your Entries .


Work CENTER center007 IN PLANT 1000 WAS CREATED .
THE ABOVE MSG YOU WILL GET WHEN ALL THE ENTRIES SAVED IN THE SYSTEM.

copyright all rights reserved

Page 10

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

1) Scheduling
When a production order is created, the duration of an operation can be calculated based on operating times in routing
and formulas which are entered in the Work Centre.
2) Costing
The costs of an operation can be calculated in the production Order based on the formulas which are entered in the
Work Centre. Work Centre is also linked to a cost centre.
3 ) Capacity Planning
The available capacity and formulas for calculating capacity requirements are stored in the Work Center.

Work Centres are used in routing operation data.

Work Centre is created for a manufacturing plant and is identified by a code.

Group of similar machines can also be created as a single Work Centre. For example, 5 similar machines can be created
as 1 Work Centre with a number of capacities as 5.

copyright all rights reserved

Page 11

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

How to create Work Centre

Step I )
1) From SAP Easy access open TRANSACTION CODE CR01
Enter your manufacturing Plant code where Work Centre needs to be created.
Enter Work Centre code.
Enter the Work Centre category as "0001" which means Work Centre would be categorized as machines.

After filling in all the fields, click

copyright all rights reserved

or press Enter to go to the next screen.

Page 12

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Step 2)
In this Screen, Work Centre basic data would be entered as given below.
Input Work Centre description.
Enter person responsible code for that Work Centre.
Enter physical location where Work Centre is located in the plant.
Enter usage as "009" which means Work Centre is valid for all task list types such as production routing, maintenance task
list, etc.
Enter standard Value key which contains different activity types used for standard cost calculation.

Step 3)
In this Screen under "Capacities Tab."
Enter Capacity category as "001" which represents machine category.
Input processing formula as "SAP006" - It is used to calculate the available capacity of Work Centre.
SAP006 =( Operation quantity* machine time )/ base quantity
After filling in the capacity category and processing formula, click on the

copyright all rights reserved

button:

Page 13

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

It will open another screen.

copyright all rights reserved

Page 14

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Step 4)
In this Screen under capacities Tab, capacity data will be entered.
Enter Capacity description.
Enter details about "Input capacity planner group", which is responsible for machine capacity.
Enter factory calendar ID, which has public holidays listed for your plant. So, on holidays, capacity for that Work Center
would be zero.
Input base unit of measure as "MIN" which means work centre available capacity will be measured in time i.e. min.
Enter the time period (start and finish time) for which Work Centre would be available for operation.
Enter capacity utilization percentage %( how much time it is utilized out of the standard available working time) of the Work
Centre considering the breakdown and preventive maintenance of the machine. Input number of capacities which means a
number of similar Work Centre.
Check "relevant for finite scheduling and "long term planning" flags which indicate if there is a capacity constraint, then the
operation is moved to a certain date where it can be processed without capacity constraints.

After filling in all the fields, click

to go back to the Work Center capacity overview.

Then click on the tab "Scheduling" tab from the menu, the system will show the following screen:
Step 5) In Scheduling Tab,

copyright all rights reserved

Page 15

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Enter Capacity category as "001" which represents machine category and hence machine time would be the basis for
calculating schedule time in production order.
Input processing formula as "SAP002" which is used to calculate scheduling time.
SAP002 = (Operation quantity* machine time)/ base quantity/no. of splits.

After filling in all the fields, click on the tab "Costing."


Step 6) In Costing Tab
Enter Start and Finish date which represents validity date of the cost centre.
Input cost centre to which operational costs would be booked.
Input all activity types along with the formulae, which would be used for calculating the activity costs.

copyright all rights reserved

Page 16

Training Manual

Click button

SAP PP

TechVantage IT Solutions Pvt Ltd

to save the new Work Center. The system will show

message

copyright all rights reserved

at the lower left corner.

Page 17

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

CREATING CAPACITIES IN THE WORK CENTER


A ) POOLED CAPACITY
b ) REFERENCE CAPACITY

POOLED CAPACITY;
1 ) A pooled capacity can be assigned to several work centers.
2 ) It is created and edited independently of the work center.
3)This is useful if, for instance, a group of employees works in several work centers.

Reference Capacity:
1) A reference capacity is used to simplify the maintenance of work center capacities.
2 ) It is used to copy or reference an available capacity from.
3 ) Reference capacities are created and maintained separately from work centers.

copyright all rights reserved

Page 18

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Routing;

Definition
A routing is a description of which operations (process steps) have to be carried out and in which order to produce
a material (product).
As well as information about the operations and the order in which they are carried out, a routing also contains details about
the work centres at which they are carried out as well as about the required production resources and tools (includes jigs
and fixtures).
Standard values for the execution of individual operations are also saved in routings.
Routings (generic) consist of the following objects:

Routing
Rate routing
Reference operation set
Reference rate routing

Use :
A routing is used as a source for creating a production order or a run schedule header by copying.

Structure

1) A routing is composed of a header and one or more sequences.


2) The header contains data that is valid for the whole routing.
3) A sequence is a series of operations.
4) Operations describe individual process steps, which are carried out during production (see routing graphic)
5) A routing is identified by its group and group counter.

copyright all rights reserved

Page 19

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Routing

Integration:

Group and Group counter


A)

Routings within a group are distinguished by their group counter.

B)

In the graphic the three routings in group A are identified by their group counter

copyright all rights reserved

1,2 or 3.

Page 20

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Group

copyright all rights reserved

Page 21

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Step 1)
From SAP Easy access menu, open Transaction code CA01
1.

Enter parent material for which routing needs to be created.

2.

Enter Plant Code.

3.

Enter the Key date (valid from date) which means that routing would be valid from that date.

After filling in all the fields, click

or press Enter to go to the next screen.

"Header Details"

copyright all rights reserved

Page 22

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Step 2)
In this step, we will maintain routing header data as given below.
1.

Enter Usage as "1" which is meant for Production routing and will be used in Production Order. There are other task list
usages which are meant for Plant maintenance and inspection plan.

2.

Enter Status as "4" which is a released status. It indicates that routing is valid for material requirement planning and
costing.

3.

Enter Lot Size as "99999999" which means that routing is valid for order quantity between 0 and 99999999.

4.

Press Operation button to add the sequence of operation and follow next step 3.

Some information such as Description, Group Counter and Basic Unit Measure will be populated by system automatically.

Click Operation tab and it will open "Operation Overview" screen.

Step 3)

copyright all rights reserved

Page 23

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

In this step, we will maintain operation data.


1.

Enter Work Centre code at which operation is carried out.

2.

Input Control Key which determines whether operation should be scheduled, costed and if auto goods receipt is possible
while doing production confirmation. It is generally configured depends upon your business process.

3.

Input the operation description.

4.

Input the base quantity or output quantity of the material which indicates how much quantity of material would be
produced in machine and labour time mentioned at point no. 5 & 6.

5.

Enter set up time in minutes required for the base quantity.

6.

Enter Machine time in minutes required for the base quantity.

Click

to save the new routing, system will show

message

copyright all rights reserved

at the lower left corner.

Page 24

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

How to Change Routing


We would change routing if we have replaced old with new work centres or added one more operation to our manufacturing
process. If our machine productivity is increased then we need to change the machine time or base quantity.
Step 1) From SAP Easy access menu, open Transaction CA02
1.

Enter parent material for which routing needs to be changed.

2.

Enter Plant Code.

3.

Key date (valid from date) which means that routing would be valid from that date is set to current date automatically.

copyright all rights reserved

Page 25

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Step 2)
After filling in all the fields, click (right mark sign)
1.

from the top menu to go to the next screen.

Change the control key from PP01 (without auto GR indicator) to PP03 (Auto GR indicator).Auto Goods Receipt means
when you do production confirmation, Goods receipt of material will happen automatically.

2.

Change the Machine time.

After finishing all modifications, click

copyright all rights reserved

to save Routing.

Page 26

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

How to display Routing


To display the routing we will follow the following steps.
Step 1) From SAP Easy access screen open in transaction CA03
1.

Enter parent material for which routing needs to be displayed.

2.

Enter Plant Code.

3.

Key date (valid from date) which means that routing would be valid from that date is set to current date
automatically.

After filling in all the fields, click

copyright all rights reserved

sign from top menu to go to the next screen and display the routing.

Page 27

Training Manual

SAP PP

TechVantage IT Solutions Pvt Ltd

Step 2) In this screen we will see, how the operation data of routing is displayed.
1.

The screen will display the operation data of routing like operation carried out by the work center, base
quantity (100 EA), set up time (10 minutes) and machine time (35 minutes.)

Troubleshooting

There might be the case wherein material master record does not exist. For this, you need to create the material master
for the material before creating routing.

Some users might get error "work centre does not exist". In this case, work centre should be created beforehand.

copyright all rights reserved

Page 28

Training Manual

copyright all rights reserved

SAP PP

TechVantage IT Solutions Pvt Ltd

Page 29

Você também pode gostar