AMPLIACION Y REMODELACIN DE OFICINAS - PURINA


Inicio
TRABAJOS PROVISIONALES
CERCO PROVISIONAL CON PANELES DE MADERA H = 2.45
TRANSPORTE DE MATERIALES , MOVILIZACION DE EQUIPOS Y
HERRAMIENTAS A OBRAS

PROTECCIN DE ZONA DE TRABAJO

LIMPIEZA MANUAL DEL TERRENO

TRAZO Y REPLANTEO DURANTE TODA LA OBRA

9
10

DEMOLICIONES
DEMOLICION DE ALBAILERIA Y OTROS

11

DEMOLICION DE TABIQUE DE DRYWALL D:13CM

12

DEMOLICION DE TABIQUE DE DRYWALL D:10CM

13

DEMOLICION DE PISO PORCELANATO EXISTENTE

14

DEMOLICION DE SARDINEL DE CONCRETO EXISTENTE

15
16

RETIRO DE PISO EXISTENTE Y ESCARIFICADO DE SUPERFICIE PARA


RECIBIR NUEVO ENCHAPE PORCELANATO
DESMONTAJES

17

DESMONTAJE DE TOMACORRIENTES

18

DESMONTAJES DE ARTEFACTOS DE ALUMBRADO

19

DESMONTAJES DE PUERTAS DE VIDRIO

20

DESMONTAJES BALDOSAS

21

DESMONTAJES DE VENTANAS DE VIDRIO

22

DESMONTAJE DE PISO ALFOMBRADO

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

Duracin

Comienzo

Fin

17.5 das
0 das
4 das
1 da
1 da

01/03/16 08:00 a.m.


01/03/16 08:00 a.m.
01/03/16 08:00 a.m.
02/03/16 08:00 a.m.
02/03/16 08:00 a.m.

1 da
1 da
1 da
2.5 das
2.5 das
1 da
1 da
2 das
1 da
2 das

01/03/16 08:00 a.m.


03/03/16 08:00 a.m.
04/03/16 08:00 a.m.
05/03/16 08:00 a.m.
05/03/16 08:00 a.m.
07/03/16 08:00 a.m.
07/03/16 08:00 a.m.
07/03/16 08:00 a.m.
05/03/16 08:00 a.m.
07/03/16 08:00 a.m.

0.5 das
2 horas
2 horas
2 horas
2 horas
2 horas
2 horas

05/03/16 08:00 a.m.


05/03/16 08:00 a.m.
05/03/16 10:00 a.m.
05/03/16 08:00 a.m.
05/03/16 08:00 a.m.
05/03/16 08:00 a.m.
05/03/16 10:00 a.m.

22/03/16 05:00 p.m


01/03/16 08:00 a.m.
04/03/16 05:00 p.m
02/03/16 05:00 p.m.
02/03/16 05:00
p.m.
01/03/16 05:00 p.m.
03/03/16 05:00 p.m.
04/03/16 05:00 p.m.
08/03/16 05:00 p.m
08/03/16 05:00 p.m
07/03/16 05:00 p.m.
07/03/16 05:00 p.m.
08/03/16 05:00 p.m.
07/03/16 12:00 p.m.
08/03/16 05:00
p.m.
05/03/16 12:00 p.m
05/03/16 10:00 a.m.
05/03/16 12:00 p.m.
05/03/16 10:00 a.m.
05/03/16 10:00 a.m.
05/03/16 10:00 a.m.
05/03/16 12:00 p.m.

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 1

sb 27/02

Id

Modo de Nombre de tarea


tarea
23

MOVIMIENTOS DE TIERRAS

24

RELLENO CON MATERIAL DE AFIRMADO EN ESTACIONAMIENTO

25

NIVELACIN, RIEGO Y APISONADO, MANUAL

26

ACARREO MANUAL DE MATERIAL

27
28
29

ESTRUCTURAS
CONCRETO SIMPLE
FALSO PISO 4" CON MEZCLA 1:8 C:H , ACABADO PULIDO PARA
EXTERIORES

30

ENCOFR. Y DESENC.NORMAL

31

SARDINEL DE CONCRETO H:37CM

32

RAMPA DE CONCRETO , ACABADO PULIDO BRUADO

33

TABIQUERIA LIGERA (DRYWALL)

34

TABIQUE SIMPLE C/ PLACA STD. DOS CARAS e=0,17 M

35

TABIQUE SIMPLE C/ PLACA STD. DOS CARAS e=0,12 M

36

DINTELES CON SISTEMA DRYWALL STD. GYPLAC 1/2" e= 0,15 m

37

DINTELES CON SUPERBOARD 8MM e= 0,15 m

38
39
40
41

FALSO CIELO RASO (DRYWALL)


CIELO RASO CON BALDOSAS ACUSTICAS OLIMPICUS OWA

Duracin

Comienzo

Fin

3 das
1 da
1 da
1 da
5 das
5 das
1 da

05/03/16 08:00 a.m.


08/03/16 01:00 p.m.
05/03/16 08:00 a.m.
07/03/16 01:00 p.m.
07/03/16 01:00 p.m.
07/03/16 01:00 p.m.
07/03/16 01:00 p.m.

1 da
1 da
2 das
3 das
1 da
1 da
1 da
2 das
2 das
2 das

08/03/16 01:00 p.m.


09/03/16 01:00 p.m.
10/03/16 01:00 p.m.
11/03/16 08:00 a.m.
11/03/16 08:00 a.m.
11/03/16 08:00 a.m.
12/03/16 08:00 a.m.
12/03/16 08:00 a.m.
15/03/16 01:00 p.m.
15/03/16 01:00 p.m.

09/03/16 12:00 p.m


09/03/16 12:00 p.m.
07/03/16 12:00 p.m.
08/03/16 12:00 p.m.
12/03/16 12:00 p.m
12/03/16 12:00 p.m
08/03/16 12:00
p.m.
09/03/16 12:00 p.m.
10/03/16 12:00 p.m.
12/03/16 12:00 p.m.
15/03/16 12:00 p.m
11/03/16 05:00 p.m.
11/03/16 05:00 p.m.
14/03/16 12:00 p.m.
15/03/16 12:00 p.m.
17/03/16 12:00 p.m
17/03/16 12:00
p.m.
18/03/16 12:00 p.m
18/03/16 12:00
p.m.
18/03/16 12:00
p.m.

ESTRUCTURA DE SISTEMA DE DRYWALL

1 da
ESTRUCTURA SIMPLE CON VIGUETAS PERFIL 90 PESADO, PARA NUEVO EN 1 da

17/03/16 01:00 p.m.


17/03/16 01:00 p.m.

ESTRUCTURA METALICA DE 4"X2" PARA NUEVO TECHO EN RECEPCION

17/03/16 01:00 p.m.

RECEPCION
42

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

1 da

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 2

sb 27/02

Id

Modo de Nombre de tarea


tarea
43
44
45
46
47

PISOS Y PAVIMENTOS
PORCELANATO EN PISO. SILVER PULIDO 0.60X0.60
CONTRAZOCALO
PORCELANATO SILVER PULIDO 0.60X0.10
CUBIERTAS

48

CUBIERTA MANTO ASFALTICO EN NUEVO TECHO DE RECEPCION

49

CUBIERTA SUPERIOR CON SUPERBOARD DE 12MM

50
51
52
53
54

CUBIERTA POLICARBONATO MAKROLON BAYER, CON MARCO DE


ALUMINIO DE 4"X1 1/2", CON SELLO SIKAFLEX Y PERNOS DE FIJACION
CARPINTERIA METALICA
BARANDA METALICA EN HALL DE INGRESO CON PASAMANOS DE 2"
CARPINTERIA DE MADERA
MOBILIARIO

Duracin

Comienzo

Fin

2 das
2 das
2 das
2 das
3 das
1 da
1 da
1 da

09/03/16 08:00 a.m.


09/03/16 08:00 a.m.
11/03/16 08:00 a.m.
11/03/16 08:00 a.m.
18/03/16 01:00 p.m.
18/03/16 01:00 p.m.
21/03/16 08:00 a.m.
22/03/16 08:00 a.m.

1 da
1 da
1 da
1 da
1 da

16/03/16 08:00 a.m.


16/03/16 08:00 a.m.
18/03/16 01:00 p.m.
18/03/16 01:00 p.m.
18/03/16 01:00 p.m.

10/03/16 05:00 p.m


10/03/16 05:00 p.m.
14/03/16 12:00 p.m
14/03/16 12:00 p.m.
22/03/16 05:00 p.m
19/03/16 12:00 p.m.
21/03/16 05:00 p.m.
22/03/16 05:00
p.m.
16/03/16 05:00 p.m
16/03/16 05:00 p.m.
19/03/16 12:00 p.m
19/03/16 12:00 p.m
19/03/16 12:00
p.m.

sb 27/02

55

MUEBLE DE CREDENZA INFERIOR, MELAMINE DE 18MM , INCLUYE


TIRADORES DE ACERO INOX, BRAZO HIDRAULICOS Y VISAGRAS TIPO
CANGREJO

56

MUEBLE DE CREDENZA SUPERIOR, MELAMINE DE 18MM , INCLUYE


TIRADORES DE ACERO INOX, BRAZO HIDRAULICOS Y VISAGRAS TIPO
CANGREJO

1 da

18/03/16 01:00 p.m. 19/03/16 12:00


p.m.

57

ESCRITORIOS, MELAMINE DE 18MM , INCLUYE TIRADORES DE ACERO


INOX, PASACABLES Y SEPARADORES METALICOS

1 da

18/03/16 01:00 p.m. 19/03/16 12:00


p.m.
12/03/16 08:00 a.m. 16/03/16 12:00 p.m
14/03/16 01:00 p.m. 15/03/16 12:00
p.m.
15/03/16 01:00 p.m. 16/03/16 12:00 p.m.

58
59
60

VIDRIOS, CRISTALES Y SIMILARES


VIDRIO TEMPLADO 10MM CLS COLOR INCOLORO, CON MARCO DE
ALUMINIO.
COLOCACION DE LAMINAS POLARIZADAS

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

3 das
1 da
1 da

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 3

Id

Modo de Nombre de tarea


tarea
61

FRENO HIDRAULICO SEVAX 80 KG

62

CERRADURA DE ACERO INOXIDABLE

63

BANDEJA DE ACERO INOX PARA VENTANILLAS

64
65

PINTURA
MUROS INTERIORES AMERICAN COLOR 2 MANOS + EMPASTADO

66

INSTALACIONES ELECTRICAS

67

SALIDA PARA LUMINARIAS

68
69

SALIDA DE TECHO C/TUB. SEL (3/4) CABLE TW12


SALIDA PARA TOMACORRIENTES

70

SALIDA P/ TOMAC. BIP. COMERCIAL SIMPLE TUB. SEL 3/4

71

SALIDA P/ TOMAC. BIP. SIMPLE TUB. ESTABILIZADO

72

SALIDA P/ TELEFONO Y DATA

73

PLACAS MODELO UNIVERSAL BTICINO MODELO PVC

74

ENTUBADO Y CABLEADO

75

RESANE EN MUROS POR PICADO DE NUEVAS TUBERIAS

76

SALIDA PARA INTERRUPTORES

77

SALIDA P/ INTERRUPTOR. SIMPLE TUB. SEL 3/4

78

ENTUBADO Y CABLEADO

79

PLACAS MODELO UNIVERSAL BTICINO MODELO PVC

80
81
82
83

SALIDA DE PASE
CAJAS DE PASE GALVANIZADA 100X100
ARTEFACTOS
INSTALACION DE LUMINARIAS

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

Duracin

Comienzo

Fin

1 da
1 da
1 da
3 das
3 das
4 das
1 da
1 da
2.5 das
2 horas
4 horas
4 horas
4 horas
1 da
4 horas
3 das
1 da
1 da
1 da
1 da
1 da
1 da
1 da

14/03/16 01:00 p.m.


15/03/16 01:00 p.m.
12/03/16 08:00 a.m.
15/03/16 01:00 p.m.
15/03/16 01:00 p.m.
17/03/16 01:00 p.m.
17/03/16 01:00 p.m.
17/03/16 01:00 p.m.
18/03/16 01:00 p.m.
21/03/16 01:00 p.m.
21/03/16 01:00 p.m.
21/03/16 01:00 p.m.
21/03/16 08:00 a.m.
18/03/16 01:00 p.m.
22/03/16 08:00 a.m.
18/03/16 01:00 p.m.
21/03/16 08:00 a.m.
18/03/16 01:00 p.m.
22/03/16 08:00 a.m.
21/03/16 08:00 a.m.
21/03/16 08:00 a.m.
17/03/16 01:00 p.m.
17/03/16 01:00 p.m.

15/03/16 12:00 p.m.


16/03/16 12:00 p.m.
14/03/16 12:00 p.m.
18/03/16 12:00 p.m
18/03/16 12:00 p.m.
22/03/16 05:00 p.m
18/03/16 12:00 p.m
18/03/16 12:00 p.m.
22/03/16 12:00 p.m
21/03/16 03:00 p.m.
21/03/16 05:00 p.m.
21/03/16 05:00 p.m.
21/03/16 12:00 p.m.
19/03/16 12:00 p.m.
22/03/16 12:00 p.m.
22/03/16 05:00 p.m
21/03/16 05:00 p.m.
19/03/16 12:00 p.m.
22/03/16 05:00 p.m.
21/03/16 05:00 p.m
21/03/16 05:00 p.m.
18/03/16 12:00 p.m
18/03/16 12:00 p.m

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 4

sb 27/02

Id

Modo de Nombre de tarea


tarea
84
85
86
87
88
89

INSTALACION DE LUMINARIAS EMPOTRADAS- EXISTENTES


VARIOS, LIMPIEZA, JARDINERIA
LIMPIEZA FINAL DE OBRA
ELIMINACION DE DESMONTE, VOLQUETES DE 20M3, D 10KM
SSMA.
EXAMENES MEDICOS PRE-OCUPACIONAL

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

Duracin

Comienzo

Fin

1 da
1 da
1 da
1 da
1 da
1 da

17/03/16 01:00 p.m.


18/03/16 01:00 p.m.
18/03/16 01:00 p.m.
18/03/16 01:00 p.m.
01/03/16 08:00 a.m.
01/03/16 08:00 a.m.

18/03/16 12:00 p.m.


19/03/16 12:00 p.m
19/03/16 12:00 p.m.
19/03/16 12:00 p.m.
01/03/16 05:00 p.m
01/03/16 05:00 p.m.

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 5

sb 27/02

lun 29/02
12

12

mi 02/03
12

12

vie 04/03
12

12

dom 06/03
12

12

mar 08/03
12

12

jue 10/03
12

12

sb 12/03
12

12

lun 14/03
12

01/03

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 6

12

mi 16/03
12

vie
12

lun 29/02
12

12

mi 02/03
12

12

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

vie 04/03
12

12

dom 06/03
12

12

mar 08/03
12

12

jue 10/03
12

12

sb 12/03
12

12

lun 14/03
12

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 7

12

mi 16/03
12

vie
12

lun 29/02
12

12

mi 02/03
12

12

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

vie 04/03
12

12

dom 06/03
12

12

mar 08/03
12

12

jue 10/03
12

12

sb 12/03
12

12

lun 14/03
12

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 8

12

mi 16/03
12

vie
12

lun 29/02
12

12

mi 02/03
12

12

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

vie 04/03
12

12

dom 06/03
12

12

mar 08/03
12

12

jue 10/03
12

12

sb 12/03
12

12

lun 14/03
12

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 9

12

mi 16/03
12

vie
12

lun 29/02
12

12

mi 02/03
12

12

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

vie 04/03
12

12

dom 06/03
12

12

mar 08/03
12

12

jue 10/03
12

12

sb 12/03
12

12

lun 14/03
12

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 10

12

mi 16/03
12

vie
12

vie 18/03
12

12

dom 20/03
12

12

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

mar 22/03
12

12

jue 24/03
12

12

sb 26/03
12

12

lun 28/03
12

12

mi 30/03
12

12

vie 01/04
12

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 11

12

dom 03/04
12

mar
12

vie 18/03
12

12

dom 20/03
12

12

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

mar 22/03
12

12

jue 24/03
12

12

sb 26/03
12

12

lun 28/03
12

12

mi 30/03
12

12

vie 01/04
12

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 12

12

dom 03/04
12

mar
12

vie 18/03
12

12

dom 20/03
12

12

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

mar 22/03
12

12

jue 24/03
12

12

sb 26/03
12

12

lun 28/03
12

12

mi 30/03
12

12

vie 01/04
12

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 13

12

dom 03/04
12

mar
12

vie 18/03
12

12

dom 20/03
12

12

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

mar 22/03
12

12

jue 24/03
12

12

sb 26/03
12

12

lun 28/03
12

12

mi 30/03
12

12

vie 01/04
12

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual

Pgina 14

12

dom 03/04
12

mar
12

vie 18/03
12

12

dom 20/03
12

12

Proyecto: Ampliacin de oficina


Fecha: 23/02/16 06:01 p.m.

mar 22/03
12

12

jue 24/03
12

12

sb 26/03
12

12

lun 28/03
12

12

mi 30/03
12

12

vie 01/04
12

Tarea

Resumen inactivo

Tareas externas

Divisin

Tarea manual

Hito externo

Hito

solo duracin

Fecha lmite

Resumen

Informe de resumen manual

Tareas crticas

Resumen del proyecto

Resumen manual

Divisin crtica

Tarea inactiva

solo el comienzo

Progreso

Hito inactivo

solo fin

Progreso manual