Você está na página 1de 57

iManager U2000

V100R006

GUI and Function Delta Training


Issue

01

Date

2015

HUAWEI TECHNOLOGIES CO., LTD.

Copyright Huawei Technologies Co., Ltd. 2012. All rights reserved.


No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions


and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address:

Huawei Industrial Base


Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website:

http://www.huawei.com

Email:

support@huawei.com

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

1 Main Menu

Main
Menu

1.1 Main Menu


Description

The main menu is the same between the U2000 V100R005C00 and U2000
V100R006C00 but the menu items and submenus are a little different.

Application
Scope

All NEs

Navigation Path

Main Topology

U2000
V100R006C00
U2000
V100R005C00
Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

2 Fault

Fault

2.1 Alarm Browsing


2.1.1 New Function
Filtering Alarms in an Alarm Browsing Window
Description

On the U2000 V100R006C00, the Template and Filter buttons are available for filtering
alarms after you switch to an alarm browsing window.

Application
Scope

All NEs

Navigation Path

1.

In the Main Topology, double-click an NE.

2.

In the NE Panel, right-click a board and choose Browse Current Alarms, Browse
Alarm, or View Alarms from the shortcut menu, depending on the NE type.

U2000
V100R006C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

2 Fault

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

3 Inventory

Invent
ory

3.1 Fiber/Cabel Management


3.1.1 New Function
Adding the Rate (bit/s) Parameter
Description

On the U2000 V100R006C00, the Rate (bit/s) parameter is added to the Fiber/Cable
Management window.

Application
Scope

All IP NEs

Navigation Path

Choose Inventory > Fiber/Cable > Fiber/Cable Management from the main menu.

U2000
V100R006C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

3 Inventory

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

3 Inventory

Setting Fiber/Cable Rates When Creating Fibers/Cables in the Main Topology


Description

The U2000 V100R006C00 automatically calculates and displays the fiber/cable rate based
on the port rates after you select the source and sink ports in the Create Link dialog box.

Application
Scope

All IP NEs

Navigation Path

In the Main Topology, right-click in a blank area and choose New > Link from the
shortcut menu.

U2000
V100R006C00

U2000
V100R005C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

Remarks

3 Inventory

N/A

Setting Fiber/Cable Rates When Creating Fibers/Cables in the Fiber/Cable


Management Window
Description

On the U2000 V100R006C00, the Rate column is added to the Bulk Create
Fibers/Cables dialog box.

Application
Scope

All IP NEs

Navigation Path

1.

Choose Inventory > Fiber/Cable > Fiber/Cable Management from the main
menu.

2.

In the Fiber/Cable Management window, click Create to create fibers.

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

3 Inventory

Setting Fiber/Cable Rates When Modifying Fibers/Cables in the Fiber/Cable


Management Window
Description

On the U2000 V100R006C00, the Rate column is added to the Modify Fiber/Cable
dialog box.

Application
Scope

All IP NEs

Navigation Path

1.

Choose Inventory > Fiber/Cable > Fiber/Cable Management from the main
menu.

2.

In the Fiber/Cable Management window, click Filter to display the desired fibers.

3.

Select fibers and click Modify Fiber/Cable to modify them.

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

3 Inventory

Viewing the Rate in Fiber/Cable Attributes in the Main Topology


Description

On the U2000 V100R006C00, the Rate field is added to the Attribute dialog box.

Application
Scope

All NEs

Navigation Path

In the Main Topology, right-click in a blank area and choose New > Link from the
shortcut menu.

U2000
V100R006C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

3 Inventory

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

10

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

3 Inventory

Adding the Alarm Generation Time Parameter


Description

On the U2000 V100R006C00, the Alarm Generation Time parameter is added to the
Fiber/Cable Management window.

Application
Scope

All NEs

Navigation Path

Choose Inventory > Fiber/Cable > Fiber/Cable Management from the main menu.

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

11

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

3 Inventory

Setting Fiber/Cable Direction to Single-Fiber Bidirectional When Creating


Fibers/Cables in the Main Topology
Description

On the U2000 V100R006C00, Single-Fiber Bidirectional is added as a value of the


Direction field in the Create Link dialog box.

Application
Scope

All NEs

Navigation Path

In the Main Topology, right-click in a blank area and choose New > Link from the
shortcut menu.

U2000
V100R006C00

U2000
V100R005C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

12

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

Remarks

3 Inventory

N/A

Setting Fiber/Cable Direction to Single-Fiber Bidirectional When Creating


Fibers/Cables in the Fiber/Cable Management Window
Description

On the U2000 V100R006C00, Single-Fiber Bidirectional is added as a value of the


Direction field in the Bulk Create Fibers/Cables dialog box.

Application
Scope

All NEs

Navigation Path

1.

Choose Inventory > Fiber/Cable > Fiber/Cable Management from the main
menu.

2.

In the Fiber/Cable Management window, click Create.

3.

In the Bulk Create Fibers/Cables dialog box, click New.

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

13

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

4 IP Address Management

IP
Address
Managemen
t
4.1 IP Address Management
4.1.1 New Function
Adding the Use for Auto Port IP Allocation Column
Description

On the U2000 V100R006C00, the Use for Auto Port IP Allocation column is added to
the IP Address Management dialog box for you to preconfigure an IP address range for
NEs or ports.

Application
Scope

Transport PTN,RTN 900,MSTP+ NEs

Navigation Path

Choose Configuration > IP Address Management from the main menu.

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

14

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

4 IP Address Management

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

15

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

5 Statistics of Service Ports

Statisti
cs of Service
Ports

5.1 Statistics of Service Ports


5.1.1 New Function
Adding the Statistics of Service Ports Menu Item
Description

On the U2000 V100R006C00, the Statistics of Service Ports menu item is added to the
License Management menu for you to view the consumption of service ports controlled
by licenses.

Application
Scope

IP and transport NEs

Navigation Path

Choose Help > License Management > Statistics of Service Ports from the main menu.

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

16

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

5 Statistics of Service Ports

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

17

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

6 Maintenance Status Configuration

Mainte
nance
Status
Configurati
on

6.1 New Function


6.1.1 Adding the Configure Construction Task Dialog Box
Description

On the U2000 V100R006C00, the Configure Construction Task dialog box is added to
display the status of current construction tasks.

Application
Scope

All transport and IP NEs

Navigation Path

Choose Fault > Configure Construction Task from the main menu.

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

18

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

6 Maintenance Status Configuration

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

19

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

6 Maintenance Status Configuration

Adding the Create Construction Task Dialog Box


Description

On the U2000 V100R006C00, the Create Construction Task dialog box is added to
create construction tasks.

Application
Scope

All transport and IP NEs

Navigation Path

1.

Choose Fault > Configure Construction Task from the main menu.

2.

In the Configure Construction Task window, click Create.

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

20

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

6 Maintenance Status Configuration

Adding the Modify Construction Task Dialog Box


Description

On the U2000 V100R006C00, the Modify Construction Task dialog box is added to
modify construction tasks except the default one.

Application
Scope

All transport and IP NEs

Navigation Path

1.

Choose Fault > Configure Construction Task from the main menu.

2.

In the Configure Construction Task window, select a construction task except the
default one and click Modify.

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

21

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

6 Maintenance Status Configuration

Adding the Set Filter Criteria Dialog Box


Description

On the U2000 V100R006C00, the Set Filter Criteria dialog box is added to set filter
criteria and display the desired construction tasks.

Application
Scope

All transport and IP NEs

Navigation Path

1.

Choose Fault > Configure Construction Task from the main menu.

2.

In the Configure Construction Task window, click Filter.

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

22

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

6 Maintenance Status Configuration

Adding the Construction Task Object List Dialog Box


Description

On the U2000 V100R006C00, the Construction Task Object List dialog box is added to
set filter criteria and display the desired construction tasks.

Application
Scope

All transport and IP NEs

Navigation Path

1.

Choose Fault > Configure Construction Task from the main menu.

2.

In the Configure Construction Task window, click Object list.

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

23

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

6 Maintenance Status Configuration

Adding the Maintenance Status Attribute in the Properties Dialog Box


Description

On the U2000 V100R006C00, the Maintenance Status attribute is added to the


Properties dialog box to filter alarms by maintenance status.

Application
Scope

All transport and IP NEs

Navigation Path

1.

Choose Fault > Browse Current Alarm from the main menu.

2.

In the Filter window, click Advanced.

3.

In the Advanced window, click Properties or Values.

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

24

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

6 Maintenance Status Configuration

U2000
V100R006C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

25

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

6 Maintenance Status Configuration

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

26

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

Transp
ort Service
Managemen
t

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

27

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.1 IF 1+1 Protection


7.1.1 New Function
Adding the Enable Switching upon ETH_LOS Alarm Column to the Protection
Group Area
Description

On the U2000 V100R006C00, the Enable Switching upon ETH_LOS Alarm


column is added to the Protection Group area.

Application Scope

All RTN NEs

Navigation Path

1.

In the Main Topology, right-click an NE and choose NE Explorer from the


shortcut menu.

2.

In the NE Explorer, choose Configuration > IF 1+1 Protection from the


navigation tree.

U2000
V100R006C00

U2000
V100R005C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

28

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

Remarks

Issue 01 (2012-02-28)

7 Transport Service Management

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

29

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.2 BPDU Comment in the E-Line Service Window


7.2.1 New Function
Adding (STP Packet) to the Column Header BPDU
Description

On the U2000 V100R006C00, (STP Packet) is added next to the column header
BPDU as a comment in the E-Line service window.

Application Scope

All MSTP+ NEs

Navigation Path

1.

In the Main Topology, right-click an NE in an MSTP subnet and choose NE


Explorer from the shortcut menu.

2.

In the NE Explorer, choose Configuration > Packet Configuration > Ethernet


Service Management > E-Line Service from the navigation tree.

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

30

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.3 E-LAN Service for the OptiX RTN 900


7.3.1 New Function
Adding the Loopback Tab to the E-LAN Service Window
Description

On the U2000 V100R006C00, the Loopback tab is added to the E-LAN service
window.

Application Scope

OptiX RTN 900 V100R003C03

Navigation Path

1.

In the Main Topology, right-click an OptiX RTN 900 and choose NE Explorer
from the shortcut menu.

2.

In the NE Explorer, choose Configuration > Packet Configuration > Ethernet


Service Management > E-LAN Service from the navigation tree.

U2000
V100R006C00

U2000
V100R005C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

31

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

Remarks

Issue 01 (2012-02-28)

7 Transport Service Management

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

32

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.4 Path View Management


7.4.1 New Function
Adding Alarm Reversion and Alarm Suppression to the Shortcut Menu in the
Path View
Description

On the U2000 V100R006C00, Alarm Reversion and Alarm Suppression are added
to the shortcut menu in the Path View.

Application Scope

All NEs

Navigation Path

1.

In the Main Topology, right-click an NE and choose NE Panel from the shortcut
menu.

2.

In the NE Panel, right-click a board and choose Path View from the shortcut
menu.

3.

In the Path View, right-click a port.

U2000
V100R006C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

33

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

34

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.5 NE Maintenance Status Management


7.5.1 New Function
Adding Query Construction Task to the Shortcut Menu of an NE
Description

On the U2000 V100R006C00, Query Construction Task is added to the shortcut


menu of an NE in the Main Topology.

Application Scope

All NEs

Navigation Path

In the Main Topology, right-click an NE.

U2000
V100R006C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

35

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

36

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.6 Radio Link Performance Statistics


7.6.1 Modified Function
Changing the Radio Link Performance Statistics Window
Description

U2000 V100R006C00:
The Radio Link Performance Statistics window is a web LCT interface.
U2000 V100R005C00:
The Radio Link Performance Statistics is not a web LCT interface.

Application Scope

RTN NEs

Navigation Path

In the Main Topology, right-click a radio link and choose Radio Link Performance
Statistics from the shortcut menu.

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

37

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.7 NE Discovery
7.7.1 New Function
Setting the Connection Mode for the NEs to Be Created After a Search
Description

On the U2000 V100R006C00, you can set the connection mode for the NEs to be
created after a search.

Application
Scope

Transport NEs

Navigation Path

1.

Choose File > Discovery > NE from the main menu.

2.

In the NE Discovery dialog box, click the Transport NE Search tab.

U2000
V100R006C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

38

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

39

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.8 Ethernet Virtual Interface


7.8.1 New Function
Setting the ARP Aging Time for Ethernet Virtual Interfaces
Description

On the U2000 V100R006C00, the ARP Aging Time (min) column is available on the
Basic Attributes tab when the Ethernet virtual interface is a Layer 3 interface.

Application Scope

OptiX PTN 910/950 V100R002C00, and OptiX PTN 1900/3900/3900-8


V100R002C00 NEs or later

Navigation Path

1.

In the Main Topology, right-click an NE and choose NE Explorer from the


shortcut menu.

2.

In the NE Explorer, choose Configuration > Interface Management >


Ethernet Virtual Interface from the navigation tree.

U2000 V100R006C00

U2000 V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

40

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

Remarks

Issue 01 (2012-02-28)

7 Transport Service Management

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

41

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.9 Browsing Current Alarms


7.9.1 Modified Function
Filtering Alarms by Clicking Template or Filter
Description

U2000 V100R006C00:
The Template and Filter buttons are available in the Browse Current Alarms
window.
U2000 V100R005C00:
The Template and Filter buttons are dimmed in the Browse Current Alarms
window.

Application Scope

All OptiX PTN 910/950/1900/3900/3900-8 NEs

Navigation Path

In the Main Topology, right-click an NE and choose Browse Current Alarms from
the shortcut menu.

U2000 V100R006C00

U2000 V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

42

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

Remarks

7 Transport Service Management

N/A

7.10 Native Ethernet Service Management


7.10.1 New Function
Creating an E-LAN Service
Description

On the U2000 V100R006C00, you can create an E-LAN service.

Application Scope

RTN and PTN NEs

Navigation Path

Choose Service > Native Ethernet Service > Create E-LAN Service from the main
menu.

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

43

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

Displaying Service Types in the Manage Native Ethernet Service Window


Description

On the U2000 V100R006C00, the Service Type column is added to the Manage Native
Ethernet Service window.

Application Scope

RTN and PTN NEs

Navigation Path

Choose Service > Native Ethernet Service > Manage Native Ethernet Service from
the main menu.

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

44

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

Displaying Service Types in Service Details


Description

On the U2000 V100R006C00, the Service Type field is added to the Detail dialog box
for a native Ethernet service.

Application Scope

RTN and PTN NEs

Navigation Path

1.

Choose Service > Native Ethernet Service > Manage Native Ethernet Service
from the main menu.

2.

In the Manage Native Ethernet Service window, right-click a service and choose
Details from the shortcut menu.

U2000 V100R006C00

U2000 V100R005C00 N/A


Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

45

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

Viewing More E-LAN Service Information in the Manage Native Ethernet


Service Window
Description

On the U2000 V100R006C00, the NE, Interface, and Split Horizon Group tabs are
added to the Manage Native Ethernet Service window.

Application Scope

RTN and PTN NEs

Navigation Path

1.

Choose Service > Native Ethernet Service > Manage Native Ethernet Service
from the main menu.

2.

In the Manage Native Ethernet Service window, select a service and view the
tabs in the lower pane.

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

46

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

Performing Ethernet OAM in the Manage Native Ethernet Service Window


Description

On the U2000 V100R006C00, Ethernet OAM and its submenu are added to the
shortcut menu of a service in the Manage Native Ethernet Service window.

Application Scope

RTN and PTN NEs

Navigation Path

1.

Choose Service > Native Ethernet Service > Manage Native Ethernet Service
from the main menu.

2.

In the Manage Native Ethernet Service window, right-click a service.

U2000
V100R006C00

U2000
V100R005C00

N/A

Remarks

N/A

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

47

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

7.10.2 Modified Function


Submenu of Native Ethernet Service
Description

U2000 V100R006C00:
Create E-Line Service, Create E-LAN Service, Manage Native Ethernet Service,
Manage Native Ethernet Discrete Service, and Search for Native Ethernet Service
are on the submenu of Native Ethernet Service.
U2000 V100R005C00:
Create E-Line Service, Manage E-Line Service, Manage E-Line Discrete Service,
and Search for E-Line Service are on the submenu of Native Ethernet Service.

Application Scope

RTN and PTN NEs

Navigation Path

Choose Service > Native Ethernet Service from the main menu.

U2000
V100R006C00

U2000
V100R005C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

48

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

Remarks

Issue 01 (2012-02-28)

7 Transport Service Management

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

49

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

Set Filter Criteria Dialog Box


Description

U2000 V100R006C00:
In the Set Filter Criteria dialog box displayed together with the Manage Native
Ethernet Service window, the Service Type field is added, and the layout of the
Service Name, Customer, Custom Attribute 1, and Custom Attribute 2 fields is
modified. In addition, the Subnet Settings tab is added to support filtering by subnet.
U2000 V100R005C00:
In the Set Filter Criteria dialog box displayed together with the Manage E-Line
Service window, the U2000 does not provide the Service Type field or support filtering
by subnet.

Application Scope

RTN and PTN NEs

Navigation Path

Choose Service > Native Ethernet Service > Manage Native Ethernet Service from
the main menu.

U2000
V100R006C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

50

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

51

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

Create E-Line Service Window


Description

U2000 V100R006C00:
In the Create E-Line Service window, the Deploy check box is at the left bottom, and
the ETH OAM CC check box is provided.
U2000 V100R005C00:
In the Create E-Line Service window, the Deploy check box is in the middle of the left
pane, and the ETH OAM CC check box is not provided.

Application Scope

RTN and PTN NEs

Navigation Path

Choose Service > Native Ethernet Service > Create E-Line Service from the main
menu.

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

52

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

Search for Native Ethernet Service Dialog Box


Description

U2000 V100R006C00:
In the Search for Native Ethernet Service dialog box, E-LAN and E-Line_E-LAN are
added as new service types, and the layout of this dialog box is modified. In addition, the
U2000 supports search by NE.
U2000 V100R005C00:
In the Search for E-Line Service dialog box, the U2000 supports only E-Line services
and does not support search by NE.

Application Scope

RTN and PTN NEs

Navigation Path

Choose Service > Native Ethernet Service > Search for Native Ethernet Service
from the main menu.

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

53

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

7 Transport Service Management

Create Button
Description

U2000 V100R006C00:
In the Manage Native Ethernet Service window, you can click Create and choose
Create E-Line Service and Create E-LAN Service to create an E-Line or E-LAN
service.
U2000 V100R005C00:
In the Manage E-Line Service window, you can click Create to create an E-Line
service.

Application Scope

RTN and PTN NEs

Navigation Path

1.

Choose Service > Native Ethernet Service > Manage Native Ethernet Service
from the main menu.

2.

Click Create.

U2000
V100R006C00

U2000
V100R005C00

Remarks

Issue 01 (2012-02-28)

N/A

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

54

iManager U2000
GUI and Function Comparison Between iManager U2000
V100R006C00SPC200 and U2000 V100R005C00

Issue 01 (2012-02-28)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd...

7 Transport Service Management

55

Você também pode gostar