REGULATION ON
COORDINATING WIND FARM
ACTIVITIES
WIND FARM:
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
CONTENTS
1. PRIMARY CONTRACTOR REPRESENTATIVE (GAMESA ELICA)
2. CONTRACTOR HEALTH AND SAFETY REPRESENTATIVE
3. CONTRACTOR PERSONNEL
4. QUALIFIED PERSONNEL NOT UNDER GAMESA ELICAS SUPERVISION
5. OCCUPATIONAL HEALTH AND SAFETY FOR RISKS SPECIFIC TO THE LOCATION
6. HEALTH AND SAFETY GENERATED BY CONTRACTED ACTIVITIES
7. PROCEDURES IN CASE OF ACCIDENTS
8. PROCEDURES IN CASE OF EMERGENCY
9. RESPONSIBILITIES
ANNEX POINT 1.
ANNEX POINT 2.
ANNEX POINT 3.
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
ii.
Control of the interactions of the different activities carried out in the workplace, in particular
when these may generate risks classified as serious or very serious or when activities that
are not compatible with each other through their incidence on the health and safety of the
workers are carried out ; and
iii. Adaptation between risks existing in the workplace that may affect the workers of the
concurrent companies and measures applied for their prevention.
b) To serve as a channel for the exchange of information by the concurrent companies in the
workplace.
Before commencement of the contracted activity, the Contractor will communicate the appointment of its
CHSR in writing to GEOL, indicating a telephone number for the purpose of locating this person in case of
urgent necessity. This Regulation (Form RCA-01) may be used for this purpose.
If this CHSR foresees that he cannot assume his functions, the Contractor will name a substitute who will
fully assume his functions and responsibilities during this period.
The CHSR is obliged to ensure correct compliance by the Contractor of its obligation to carry out the
health and safety risk assessment in all the phases of work under his responsibility, including all activities
delegated to Subcontractors. In particular, this evaluation must include a local assessment of each specific
task and establish the measures necessary to be observed for this specific situation. If, after this
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
assessment, the existence of a risk to the Contractors employees or to other Wind Farm staff is identified,
he will paralyse the work until the necessary health and safety measures have been taken.
Likewise, it is compulsory that the CHSR communicates to the employees of the Contractor responsible
for the contracted work (and/or those of its subcontractors) the relevant Health and Safety Instructions that
must be observed in order to comply with GEOLs health and safety requirements or those derived from the
specific circumstances of each task.
3. PREVENTIVE RESOURCES
Depending on the type of activity, the Contractor may need to have a Preventive Resource available at all
times. The functions and Responsibilities of this figure are described in ANNEX POINT 1 of this Regulation,
as are the circumstances where the appointment of this Preventive Resource becomes obligatory.
In all cases, the presence of preventive resources in the workplace will be necessary when the risks are
aggravated or modified, in the course of the process or activity, because of the concurrence of varied
operations which take place simultaneously and which make controlling the correct application of the working
methods necessary.
In these cases where the presence of a Preventive Resource is necessary, before commencing the
activity, the Contractor will communicate in writing the appointment of this person to GEOL. This Regulation
(Form RCA-03) may be used for this purpose.
4. CONTRACTOR PERSONNEL
The CHSR, through the PCR, will provide GEOL with a list of his Subcontractor's staff appointed for the
contracted activity. This Regulation (Form RCA-03) may be used for this purpose.
All personnel of the Contractor and his Subcontractors must identify themselves whenever they enter and
leave the Wind Farm.
All staff of the Contractor and its Subcontractors will be duly insured, registered with the Social Security
and must be accredited with documents at the commencement of the activity providing copies of documents
that certify it to the PCR.
Depending on the activity these persons are to perform within the site of the Property, they must accredit
with documents, amongst others, their training, professional capacity, aptitude and medical certificate for
carrying out this work, and must provide the PCR with the records required by this Regulation (Forms RCA04, RCA-05 and RCA-06).
In those cases where the Contractor wishes in turn to subcontract the work to another company, he must
certify in writing his commitment to demand from this third company all the requirements with regard to
Workplace Health and Safety established by GEOL. This Regulation (Form RCA-03) may be used for this
purpose
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
The PCR will require the company requesting a visit to provide written evidence that said companys
profile is that of a qualified worker (if the task to be performed requires this), at least similar to that of GEOLs
own workers or those of its subcontractors carrying out the activity. This Regulation (Form RCA-14) may be
used for this purpose
The presence of this Qualified Personnel from Outside of GEOL will not imply the adoption of preventive
measures additional to those adopted for the normal staff who perform the operation, but they must
demonstrate that they are trained in the Health and Safety Plan prepared for the assembly of the wind farm
to be visited if this is undergoing construction, or in risk assessment of the activities being carried out if the
farm is in exploitation phase.
The use of safety footwear to guard against electrical and mechanical risks, with non-slip soles,
whenever the person is inside the farm.
The use of safety harnesses (duly anchored to a safe point) whenever there exists a risk of
falling more than 2 metres.
The use of safety glasses whenever there is a risk of flying particles, including tasks such as
grinding, cutting, air-blowing etc.
The use of mechanical safety gloves whenever handling blades, spatulas, hammers etc., which
involve a risk of accident to the hands, and chemical safety gloves whenever using products
which sensitise, irritate, corrode etc.
The use of a reflective waistcoat at work when visibility conditions are affected by bad weather
or on jobs outside daily working hours.
The use of any other garments or individual protection equipment that is required by the
legislation in force on Workplace Health and Safety or GAMESAs internal regulations.
The suitable use and storage of all materials and tools used by the Contractor and its
Subcontractors. These must be kept in good condition and in accordance with the legislation in
force. This Regulation (Form RCA-08) may be used to certify this compliance.
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
The correct use and upkeep in good condition of the vehicles to be used on the wind farm. This
Regulation (Form RCA-09) may be used to control the identification and condition of the vehicles
being used.
Ensuring correct disconnection and blocking of the power supply of the equipment or installations
where intervention is possible, with particular care to follow the procedures or specific instructions
applied in this wind farm. In all cases, intervention may only be carried out on previously authorised
equipment or installations.
The request for however many GEOL authorisations that may be necessary when carrying out
activities with special risks, such as welding permits, use of telescopic baskets, back loaders etc.
Proper signs to warn that personnel are working in areas of risk and cordoning-off of dangerous
areas, according to the regulations required by GEOL.
Daily cleaning of the working areas and removal of rubble and waste materials to locations on the
worksite assigned for this purpose.
Immediate communication to the PCR of damage caused to equipment or to work carried out, as
well as immediate signposting of the location of the accident when this represents any danger to
the safety of persons or objects.
In addition to these aforementioned regulations, in the worksite or during the contracted activity, it is
strictly forbidden:
To allow visits to the site without the express, written authorisation of GEOL.
To use equipment belonging to GEOL without prior authorisation and without signing a document
assuming the responsibilities derived from its use.
In the case of non-compliance of any of these Prohibitions, the PCR will take the appropriate decisions,
including the expulsion from the site of the CHSR and/or his staff, as well as paralysing the contracted job or
activity.
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
He will attend to the person who has suffered the accident and cooperate in evacuating him, where
appropriate, to the nearest Assistance Centre, as established in the Promoter's Emergency Plan.
He will document the analysis and investigation of the incident, and he may use this Regulation
(Form RCA-12) for this purpose.
The PCR will inform the Promoter and GEOL's Prevention Service of the incident, so that they can
consider whether a more exhaustive investigation of the accident is appropriate, and he will ensure that the
Contractor communicates the incident to the authority.
Every month, the CHSR will provide the PCR with the summary of accidents suffered by his employees on
this wind farm, and he may use this Regulation (Form RCA-13) for this purpose.
10. RESPONSIBILITIES
The Contractor will be obliged to comply the legal dispositions of the Social Security and Workplace
Health and Security for the staff at his service.
Non-compliance of the aforementioned general regulations, as well as non-observance of the obligations
stipulated in this Regulation, will permit GEOL to rescind the contract with the Contractor, without prejudice
to the proceeding demand for damages and losses.
The Contractor will further accredit to having covered the general risks through civil liability for personal
and material damage in general, for accidents to his own staff or third parties, including among these the
Promoter of the wind farm or GEOL and its employees, with sufficient coverage for the assumed risk, taking
into account what is stipulated in ANNEX POINT 2 of this Regulation.
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
ANNEX POINT 1
FUNCTIONS OF THE PREVENTIVE RESOURCE
With regard to range of jobs contracted by GEOL, Preventive Resource will be understood to be the
person designated by his own company, responsible for leading the prevention during the operations on the
wind farm, which are required through their risk, and who has the necessary knowledge, qualifications and
experience, which includes at least basic certified training in prevention.
Functions of the Contractors Preventive Resource:
Generally speaking, the aim of the presence of Preventive Resources is to supervise the compliance of
the preventive activities with regard to the risks derived from the situation which determines the need to
achieve appropriate control of these risks.
This supervision will include checking the efficiency of the preventive activities for the risks they wish to
prevent or the appearance of unforeseen risks, derived from the situation that determines the need for the
presence of the Preventive Resources.
Specifically, the Preventive Resources obligations will be:
o
To supervise the compliance of the preventive measures included in the Health and safety Plan,
or specific Safety Instructions, for those jobs carried out by the Contractor which involve special
risks and/or are required by the legislation in force.
To participate in however many safety meetings called on site in order to deal with those risks
which the special conditions of the wind farm may entail.
To paralyse the Contractors work if an imminent serious risk to the health of the workers is
detected.
To communicate whatever deviations or risks are found while the Contractor is carrying out the
work.
To participate in the investigation of all incidents and accidents on the wind farm in which the
Contractors staff have been or may have been involved.
To cooperate with GEOLs Preventive Resource in all that he may require with regard to health
and safety.
Activities, operations and processes which determine the obligatory presence of Preventive
Resources of the Contractor:
o
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
b) When the work requires the presence of a worker on the roof of the cabin of a lift or hoist,
when this is moving upwards.
c) Or when the work is being carried out in the pit and one or several of the pieces of
equipment that move in the same shaft are not earthed (normally it is required that
equipment in battery is physically separated in different shafts). When the equipment
presents a risk through moving simultaneously in the same shaft where the work is being
done, the lifting equipment has a system for shutting down its functioning in the shaft (Shaft
shutdown kit).
o
CONFINED SPACES
Work carried out in confined spaces, understanding as such those places or work areas where, in
their interior, an accumulation of dangerous gases or toxic products may arise, or the creation of a
low-oxygen atmosphere.
In these cases, access to these places will be restricted, and only authorised qualified workers will
be permitted. It will also be obligatory to have a written work procedure and supervision by
preventive resources.
To this effect, this concept specially includes the service galleries, the shafts, tunnels and sewers,
the silos, tanks, large earthen jars, recipients, containers, cisterns and steam boilers, storage or
mixing hoppers, as well as the dumps and residual water tanks, and any other interior work zone
where fermentation processes take place or vapours or poisonous gases are present.
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
- Scaffolding and mobile work towers on which the work is done at over 6 metres in height from
the operating point to the ground.
C) Underground work in shafts or galleries
When workers are sent into an underground gallery or to the bottom of a shaft, they must have
the presence of duly qualified preventive resources on the outside, who must be constantly
present while the work is being carried out, directing the operations and raising and lowering
manoeuvres.
d) Demolition work
At least those demolition operations which are estimated to last more than 30 working days, or in
those which involve the use of more than 12 workers at any time, must be carried out under the
direct supervision of a worker assigned as a preventive resource presence, who must have
helpers for every twelve workers
o
ELECTRICITY
a) Work with installations under voltage (high and medium voltage)
The procedure applied for work carried out under voltage in this case, will be adapted to the
following:
- The manoeuvres, measurements, tests and checks, either in the proximity of installations in
operation or continuity of power supply, will be carried under the supervision and observation of
a work chief, who will be the qualified worker who can assume the direct functions of preventive
resources. If the extension of the zone does not permit permanent supervision, he must be
assisted by qualified helpers.
- The work chief or supervisor must have direct communication with the person responsible for
the installations, so that the installation conditions and the demands of the work can be
prepared.
b) Work in the proximity of elements under voltage
Works carried out in the proximity of elements under voltage will be considered as work under
voltage. The work will be carried out under the supervision of one of these, which must assume
the presence of preventive resources, except when the work is being carried out outside the zone
of proximity or in installations of low voltage.
c) Access to service areas and covers for electrical material.
Access to independent areas designated to electrical service or the performance of electrical tests
or trials (power stations, substations, transformation centres, control rooms or laboratories) will be
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
restricted to authorised skilled workers or to personnel under their continuous supervision, who
will act as the presence of preventive resources.
Such access may only be made with the knowledge and permission of the owner of the
installation, when this person is not the company head for whom they are working.
d) Work on jobs and other activities in which movements are carried out of equipment or materials in
the proximity of overhead or underground lines or other electrical installations.
For the prevention of risk of electric shock in these activities, they will be performed according to
Gamesa especifications, and under the supervision of preventive resources
e) On-site work with risk of fire or explosion
This will be performed according to that set out in Gamesa especifications, and the work must be
carried out by authorised skilled workers in the case of fire risk, or by qualified workers in the case
of explosive atmosphere. There must also be a previously-studied, written procedure in the latter
case, and preventive resources must be present.
o
WORKING IN HEAT
This denomination includes all operations with heat generation, production of sparks, flames or
high temperatures in the proximity of inflammable liquids or gases, or in recipients that contain or
have contained liquefied gases. For example, welding and flame cutting, leading, grinding, drilling
etc.
In these types of jobs, there must be a written work procedure, qualified preventive resources must
be present where necessary, and the personnel carrying out the work must be sufficiently skilled and
have the owners authorisation.
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
ANNEX POINT 2
CIVIL LIABILITY INSURANCE
1. CONTRACT
All Contractors, Subcontractors and any person or body that is going to work for GEOL, will be required
to sign a written contract (or GEOLs general conditions for contracting services together with an order),
where there appear the terms and conditions of the work or service they are going to provide.
This contract, will mention the obligation of the Contractor or Subcontractor to subscribe to a civil liability
insurance policy, in accordance with the terms related below, and with which damages caused to Third
Parties may be confronted.
A copy of this Insurance Policy will be attached to the contract, along with a copy of the receipt paid up
to date corresponding to the period they are going to work for GEOL.
2. TERMS OF THE CIVIL LIABILITY POLICY
The aforementioned Insurance Policy must have as a minimum the following characteristics with
regard to coverage, Insurance Deductible and limits.
2.1. Coverage
2.1.1. Civil Liability Exploitation
Third Party coverage for personal, material damages and liabilities, caused to Third Parties,
during the exercise of the activity they are going to perform for GEOL. It is important to verify
that this activity is that which appears declared in the text of the Policy. With regard to this
coverage, any other Contractor, Subcontractor, Supplier, the Proprietor and his
representatives, GEOL and any other outside person who is not linked to any of the previously
named bodies must be considered to be Third Parties.
2.1.2. Employers Civil Liability Insurance
Coverage against the pecuniary consequences of the civil liability insurance which may be
incumbent upon the Insured Party (Contractor or Subcontractor working for GEOL) may be due
to claims which may be presented by:
o the persons working in his service or persons who act on the insured parties account.
o the Bodies or Organisations assumed by the Accident at Work Insurance.
2.1.3. Civil liability insurance of Products
Coverage against the pecuniary consequences of the Civil liability insurance that may be
incumbent upon the Insured Party (Contractor or Subcontractor working for GEOL) due to
claims by Third Parties based on damages and/or liabilities caused by goods or services after
they have been issued by the Insured Party. It is important to verify that the goods and services
provided to us are those derived from the activity declared in the text of the Policy.
2.2. Insurance Deductible
The Insurance Deductible must be the lowest possible, and it must be valued according to the
degree of solvency of the Contractor or Subcontractor and therefore of the part which this company
can withstand from its own net worth in the case of an accident being produced.
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
ANNEX POINT 3
INSTRUCTIONS FOR COMPLETION OF THE FORMS OF THIS REGULATION
In the case where the Contractor or Subcontractor is going to use other different Forms to those attached to
this Regulation, these must include the same fields and must also be previously validated by GEOLs
Prevention Service.
Both the Regulation and the Forms attached to it will have a maximum validity of 1 year and must be
renewed if the conditions that motivated their signing are maintained.
With regard to the signing of all the forms, the Person Responsible for the Contractor, Subcontractor or
Self-employed Worker will be understood to be the person with the necessary capacity who acts in
representation of the company concerned. This capacity need not necessarily be supported in legal
powers.
Form RCA-01: CERTIFICATE OF ACCCEPTANCE OF THE REGULATION
The Contractors Health and Safety Representative (CHSR) is the Contractors maximum authority with
regard to prevention at this wind farm, as well as the valid representative between GEOL and the Contractor
with regard to providing effective compliance of its requirements. The CHSRs presence is not required at all
times and at all the activities carried out, but he must be a person who is aware of the situation of the work
and perfectly locatable in case of incidents or particular circumstances of the task. Examples of personnel of
the Contractor who may be named as CHSR are Team Leaders, Charge-hands, Installation Supervisors etc.
The figure of the PCR must not be confused with that of Preventive Resource, although in certain cases
they could be the same person.
The Primary Contractors Coordinator (PCR) is GEOLs maximum authority with regard to applying this
Regulation on this wind farm. The PCRs permanent presence on the wind farm is not required, but he must
be a person who is aware of the situation of the work and perfectly locatable in case of incidents or particular
circumstances of the task.
The validity of this form for a wind farm in construction phase will be until the operations are completed and it
must be revised if the maximum of 1 year is exceeded.
In exploitation phase, this Form must be signed for every wind farm and by job to be carried out if the
activity is not included in the Safety Plan (e.g. retrofit, special repairs etc.). In all cases, its validity will be of a
maximum of 1 year.
Before commencing the activity, the Contractor will attach to this Form:
The Risks Evaluation of the contracted activity if this is not included in the Safety Plan prepared by
GEOL for that wind farm.
A justification of the preventive methods established by the Contractor (internal certificate of the
Internal Prevention Service, if that is the case, or certificate of the External Prevention Service,
indicating the validity period of the contract).
A copy of the Civil liability insurance Policy in the terms mentioned in ANNEX POINT 2 of this
Regulation.
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
period of the Health and Safety Plan, when the workers are the regular ones of the wind farm (prevention
personnel, corrective personnel, operators etc.)
The documents related to the personnel listed and the work to be carried out will be attached with Form
RCA-02:
Documents that certifies social security payments from employer, payments to freelance workers or
similar documents when they come from other countries, corresponding to persons who are going to
work on account of the Contractor and/or Subcontractors, must be presented for the current month.
Certificates of medical aptitude for these persons in which there appear the signature and the
collegiate number of the doctor certifying the aptitude, indicating that the recognition includes
protocol for working at height, if access to high areas (>2 m) is included among the activities.
Professional qualification certificates of the staff of the Contractor and /or Subcontractor, where
necessary.
REGULATION ON COORDINATING
WIND FARM ACTIVITIES
A copy of the vehicle in questions official documentation will be attached to the form. Vehicle log, M.O.T.
certificate, obligatory third-party insurance etc.
Form RCA-10: SUBCONTRACTING NOTIFICATION
This Form will be completed and delivered by the Contractor only in those cases where he is going to
subcontract his activities, or part of these, to a third company.
In these cases, the Contractor will be responsible for requiring this third company everything set out in this
Regulation, including the signing and acceptance of his Forms. In the same manner, he is responsible for
delivering all this documentation to GEOL, before commencement of the subcontracted work.
Form RCA-11: NOTIFICATION OF NEW HEALTH AND SAFETY RISKS OR PROBLEMS
This Form is not applied before commencement of activities. Its purpose is to document the action of
communicating those risks which have not been previously contemplated and/or the possible anomalies
detected with regard to health and safety while the work is being carried out.
Registration of these anomalies by the Notifier, as well as his proposal for action, does not signify on the
part of GEOL that it is in agreement with these or that it is committed to the direct execution of the proposal,
but that it is given to be known and to commence a process of analysis of the situation and to subsequently
take the action it considers appropriate,
Form RCA-12: ANALYSIS AND INVESTIGATION OF ACCIDENTS AND WORK-RELATED ILLNESSES
FORM
This Form will be completed and delivered by the Contractor only in the case of having suffered an Incident
(there are no injuries to persons nor any damage to things), Work-related Accident, Work-related Illness or
Mishap (only damage to things).
In the assumptions of Accidents, the Contractor is obliged to inform GEOL immediately of these and proceed
to investigate them and propose the corresponding preventive actions.
Form RCA-13: ACCIDENT AND OCCUPATIONAL DISEASE ANALYSIS AND INVESTIGATION REPORT
This form will be completed and delivered by the Contractor before the third calendar day of the month
following that which is the subject of the information.
If the real values are not available for this date (e.g. the real hours worked are not available), an estimate of
these will be delivered, in such a way that when the final figures become available, the corrected form will be
presented.
For wind farms in construction phase, the information included will only refer to the work carried out in that
wind farm.
For wind farms in exploitation phase, the information included may be that of the combination of the
Contractors activities agreed with GEOL.
With regard to this Form, Accumulated value is understood to be the sum of the values from January to the
current month. In the case of Average Number of Employees, this accumulated value will be the
arithmetical average of the number of employees from January to the current month.
In order to calculate the Hours Worked the real hours will be considered, i.e. without hours of leave,
holidays etc.
In order to calculate the Lost Calendar days, the calendar days of the month in question will be considered
from the date of beginning the Sick Leave to the Return to Work date.
Form RCA-14: COORDINATION OF QUALIFIED PERSONNEL NOT UNDER GAMESA ELICAS
SUPERVISION
This Form is only applicable for cases where a Company not directly contracted by GEOL or by any of its
Contractors is going to be present during the carrying out of the work in the wind farm.
Attach Contractors
Risk Assesment and
Health and safety Plan
Attach medical
certificates of workers
Is it needed the
appointment of
Preventive
Resources?
YES
YES
Attach copy of
Liability
insurance
Attach workers
TCs
NO
Edit and sign RCA -04
NO
Will performed
electrical works?
NO
Edit and sign RCA -07
YES
NO
Will be used
vehicles on site?
YES
YES
NO
Will be contracted
another company?
NO
Mr.
acts with the necessary capacity on behalf and representation of the company:
TAX ID NO.:
whose
are at:
premises
Street:
defined as Contractor, signs as proof of conformity with this Regulation of Coordination of Activities on the Wind Farm and certifies
that he has received the Health and Safety Instructions or the Health and Safety Plan for the work to be carried out on the following
Wind Farm, and adheres to aforementioned Plan and promises to comply with and respect the health and safety regulations
established therein. Likewise, he promises to Assess the Risks of each of the jobs, before their execution, and to suspend those tasks
that represent a risk for his employees or those of others Contractors until health and safety information and measures that are not
included in the Health and Safety Plan have been undertaken.
Name of the Wind
Farm:
Customer
Location:
He also informs that the Contractors Health and Safety Representative (CHSR) for this work during the indicated period is:
Mr.
Contact telephone number in case of
emergency:
At
,on
of
At
, on
of
Form RCA-02
CONTRACTOR INFORMATION:
COMPANY NAME:
Registered domicile:
Tel:
(Indicate organisation)
Safety
Health surveillance
Combined
Prevention Service
Assigned
Worker
Completion date.
Tel:
Tel:
Tel:
ID Card:
RCA-04
RCA-05
RCA-06
RCA-07
RCA-08
RCA-09
RCA-10
(*) In those cases where the form is not applicable, put N/A
At
, on
Of
CONTRACTOR INFORMATION:
COMPANY NAME:
Contracted by:
Brief description of the work:
NAME:
According to stipulated in this Regulation in regard to Presence of preventive resources in construction/maintenance works:
with ID Number
Mr.
Is assigned as PREVENTIVE RESOURCE of the company
during the execution of this work, and to this effect, he attests with his signature at the bottom of the page his acceptance of this
appointment, with the attributions and functions established in the annexe 1 of this Regulation..
Said person certifies to being in possession, at least, of the preventive training corresponding to the basic level functions.
Equally, the worker must be continuously physically present on site while functions as a preventive resource are being carried out.
This appointment will be communicated to the workers in the first moment they work on site. And will be exhibited in the
corresponding announcements board on site.
At
on
of
CONTRACTOR INFORMATION:
COMPANY NAME:
Contracted by:
Brief description of the work:
DATE.
Health and Safety Plan applicable for work to be carried out on the Wind Farm.
Indicate name of W.F.:
Risk Assessment of the occupation or activity to be carried out on the Wind Farm (if not included in the Plan)
Indicate name of occupation or activity:
Safe Practices or Health and Safety Instructions of the work to be carried out on the Wind Farm (if not included in the
Plan).
Indicate name of the Practices or Instructions:
Instructions for use of lift in wind turbines.
Instructions for use of emergency descender in wind turbines.
OTHERS:
DOCUMENTATION ISSUED (Relating directly to the Subjects Covered):
Health and Safety Plan applicable for work to be carried out on the Wind Farm.
Risk assessment of the work position or activity to be carried out on the Wind Farm (if not included in the Plan)
Safe Practices or Safety Instructions of the work to be carried out on the Wind Farm (if not included in the Plan).
Instructions for use of lift in wind turbines.
Instructions for use of emergency descender in wind turbines.
OTHERS:
The Representative of the company to which the worker belongs declares that the latter has received the information and training on
the workplace risks to which he is exposed in the work carried out, as well as on the content of the Health and Safety Plan, if such
exists.
At
on
of
CONTRACTOR INFORMATION:
COMPANY NAME:
Contracted by:
Brief description of the work:
Training courses
YES
NO
(1) This form must specify the training received by the personnel who carry out the following operations:
- A. Crane-operator; B. Driver of self-driven equipment; C. Explosives handler; D. Driver of earth-moving machinery; E. Operator of radioactive installation; F. Basket work; G. Work with
hanging platforms; H. Vertical work; I. Installation of scaffolding.
The Representative of the company to which the workers on this list belong declares that the workers listed here possess the qualifications and aptitude necessary in order to occupy their positions,
either by being in possession of a licence or a certificate form an authorised organisation (necessary when the legislation so demands and attaching it to this form) or through having experience of
more than two years in carrying out the task for which his services have been contracted.
The person signing below takes responsibility for the veracity of the information in this declaration.
At
on
of
CONTRACTOR INFORMATION:
COMPANY NAME:
Contracted by:
Brief description of the work:
The worker is authorised by the owner of the company to carry out determined tasks with risk of electric shock (low voltage),
based on his capacity to do this correctly
2.
The worker is qualified due to possessing documentation that verifies that he/she has undergone professional training in the
field of electrical installations.
3.
The worker is qualified due to possessing documentation that verifies that he/she has undergone university training in the
field of electrical installations.
4.
The worker is qualified due to possessing documentation that verifies that he/she has at least two years of certified
experience in the field of electrical installations.
The workers listed below are AUTHORISED to carry out the tasks marked with an x on electrical installations or in their proximity
which have RISK OF ELECTRIC SHOCK.
ID card:
Jobs requiring to be
Authorised
Signature:
Jobs requiring to be
Qualified
This authorization is initially valid for 2 years and may be annulled by the company at any time due to incompliance with health and
safety measures, incorrect use of equipment or any change that modifies the initial conditions of authorization.
Nevertheless, as a general rule and whenever possible all work will be carried out with the electrical power supply switched off at the
installations, thereby eliminating the risk of electrical shock by following the steps below:
1. Disconnect: the area of the installation where the work is going to be carried out must be disconnected from all power
supplies.
2. Prevent any possible feedback: The switching equipment used to disconnect the installation must be safeguarded from
any possible reconnection, preferably by locking the switching devices. In the absence of mechanical locks, equivalent
protective measures must be adopted.
3. Check that there is NO voltage in all the active elements of the electrical installation.
4. Earth wire and short circuit the parts of the installation to be worked on.
5. Protect against nearby live elements and put up safety signs to demarcate the work area.
Until the five steps above have been carried out, the area of the installation in question will be considered LIVE.
At
on
of
CONTRACTOR INFORMATION:
COMPANY NAME:
Contracted by:
Brief description of the work:
WORKERS STATEMENT:
Mr.
the company
the
Individual Protection Equipment in the attached table and certifies having received the training for the correct use of this safety
material.
Quantity
Serial
No.
Work clothes
Hardhat.
Harness
Anti-fall device
Anchor cable + buffer
Gloves
Safety Footwear
Goggles
Earmuffs
Dielectric gloves
Face shield with filter
Mask with filter
Emergency descender
Fire extinguisher
OTHERS:
OTHERS:
With the issue of these PPEs (and the corresponding signature of receipt, the worker accepts the commitment to:
Use this equipment during the working day when the Health and Safety Regulations establish this, at all times following the
instructions for use.
To use it properly, consulting any doubt on the subject, and maintaining it in perfect condition.
Form RCA-08
CONTRACTOR INFORMATION:
COMPANY NAME:
Contracted by:
Brief description of the work:
Type of Equipment
Last revision
date
Yes
Self-driven cranes
Electrical panels.
Load-moving equipment
OTHERS:
(1) This documentation must be available for the contracting company or the owner of the wind farm if these so require.
At
on
of
NO
Task
Brand
Licence Number
Log number
(Classification)
Validity period of
insurance
A copy of the vehicle in questions official documentation will be attached to this form. Vehicle log number, M.O.T. Certificate, Vehicle insurance
At
on
of
Validity period of
M.O.T.
Other special
documentation
SUBCONTRACTING NOTIFICATION
CONTRACTOR INFORMATION:
COMPANY NAME:
Contracted by:
Brief description of the work:
CONTRACTORS DECLARATION:
Mr.
in his capacity
as
of the company
, communicates his desire to
Furthermore, he promises to require this company to provide the safety documentation in this Regulation of Coordination of Activities
on Wind Farm and to present this, before commencement of the work, to Gamesa Elica for approval.
Likewise, he will assume all responsibility for paralysing the work of aforementioned subcontractor through non-compliance of this
procedure.
At
on
of
NAME OF NOTIFIER:
Notification date:
COMPANY NAME:
Contracted by:
Work Centre:
Location:
PROPOSED MEASURES
At
o
n
of
RECEIVERS COMMENTS
At
on
of
Page 1 of 1
Form RCA-12
CONTRACTOR INFORMATION:
COMPANY NAME:
Contracted by:
Time:
Location of
incident:
Task being performed at moment of incident:
Names of possible witnesses:
Consequences:
Incident
Accident without Sick Leave
At
on
of
Page 1 of 1
Form RCA-13
CONTRACTOR INFORMATION:
COMPANY NAME:
Contracted by:
Brief description of the work:
Work Centre:
Location:
YEAR:
AVERAGE NUMBER OF OPERATIVES
MONTHLY
CUMULATIVE
NUMBER OF ACCIDENTS
WITH SICK LEAVE
MONTHLY
CUMULATIVE
CUMULATIVE
MONTHLY
MONTHLY
CUMULATIVE
CUMULATIVE
DATE OF RETURN
MONTHLY
CUMULATIVE
MONTHLY
GRAVITY INDEX
MONTHLY
CUMULATIVE
MONTHLY
(1) Hours worked: Total number of real man-hours worked (without leave hours, holidays, sick leave etc.)
on
(IG)
At
CUMULATIVE
of
CUMULATIVE
Version 01:20/10/06
Page 1 of 1
Regulation 016.02.1
That the personnel attending will be composed of the persons listed below, who will attend duly accredited:
Name and surnames:
2.
3.
Preventive
Resource
YES NO
ID card:
Signature:
Medical aptitude to carry out the work, with protocol for working at heights.
In possession of the PPEs necessary for the work to be carried out, as well as the training necessary for their use and the
commitment of the worker to use it.
To be a QUALIFIED worker according to Form RCA-06 of this regulation if work is to be carried out on electrical installations
or if a risk is to be incurred due to the participation of others.
To be trained in the safety measures detailed in the Health and safety and Safety Plan for the installation of the Wind Farm.
It adheres to the Health and Safety Plan prepared by GAMESA ELICA, S.AU., for the installation of this Wind Farm, it
assumes the responsibility for giving its workers the specific training in it, and certifies that the workers listed in Point 1 have
received it before attending the Start-up.
To designate a Preventive Resource from among workers listed in Point 1 who will act as Preventive Resource during the
operations, and he or they will have the necessary knowledge, qualifications and experience, as well as at least basic level
preventive training.
It assumes complete responsibility for accidents that may occur as a result of its own acts.
That prior to the issue of this document, it has received from GAMESA ELICA, S.A.U. the following documentation, of which
the workers listed in Point 1 have been duly trained and informed.
At
Company:
Health and Safety Plan for the installation of this Wind farm.
Risk Assessment and Safe Practices for the operations to be carried out.
It hereby recognises having received and understood the documentation indicated in the previous section, it promises by
means of the persons listed in Point 1 to respect the safety regulations detailed in these documents and assumes the
responsibility for the consequences derived from non-compliance of these against the inherent risks existing in these types of
machine and the special characteristics of their condition during the operations to be carried out.