Escolar Documentos
Profissional Documentos
Cultura Documentos
4
5
1
2
3
8
9
B1
B2
Description
10
1
4
5
B3
B4
1
2
3
4
5
6
7
9
10
11
12
13
B5
2
3
B5
1
2
3
4
5
6
2
3
B6
G1
G2
G2
4
5
10
11
12
G3
G4
4
5
6
1
2
3
Piping Incomplete
2.2
2.1
12
2.1
Piping Incomplete
13
14
4
1
4
5
4.1
5.1
Reason/Action Plan
Materials Shortage
01 day
3/4" Dielectric union not available
Material Shortage, Drawings not updated, pumps not
installed, support details not shown in drawings
BKG/GS
04 days
BKG
GS
GS
GS
BKG
BKG
BKG
BKG
BKG/ GS
List attached
03 days
01 day
01 day
03 days
01 day
01 day
List attached
1/2" Drain Valve - 05 No.s
1/2" DRV -01No.s
01 day
01 day
GS
01 day
BKG/GS
GS
GS
BKG/GS
1) OP -6" -1 No.
2)
to be installed
to be installed
GS
GS
01 day
01 day
01 day
BKG/GS
to be rectified
GS
Alignment completed
cleaning & painting to be done
GS
01 day
BKG/GS
BKG/GS
05 days
List attached
03 days
03 days
BKG/GS
GS
BKG/GS
BKG/GS
BKG/GS
to be installed
GS
1)
2)
1)
1)
01 day
01 day
BKG
BKG/GS
BKG/GS
GS
BKG/GS
to be installed
BKG/GS
BKG
BKG/GS
01
01
01
01
day
day
day
day
6 days
01 day
8 days
BKG
BKG
List attached
GS
10 days
GS
01 day
2) OP - 3"-05 no.s
3) OP - 2 1/2"-04 no.s
4) OP - 5"-01 no.s
5) DRV -4" - 01 No.
6) STR - 3" - 03 No.s
7)Dielectric flange -2 1/2"- 02 No.s
8)Dielectric Union - 2"- 02 No.s
9) Flexible Coupling 2" - 02 No.s
10) Flexible Coupling 2 1/2" -08 No.s
11) Ecc.Red 3"x21/2" - 06no.s
12) Drain Valve 1/2" -15 No.s
13) Insert Block-4"-22 no.s
14) Insert Block-21/2"-16 no.s
15) Insert Block-5"-10 no.s
GS
04 days
1) STR -4"-01no.s
2) Flexible Coupling 21/2" - 04No.s
3) Flexible Coupling 2" - 06 No.s
4)OP-6"-01 no.
5) Butterfly valve - 4" - 03 no.s
01 day
3/4" Dielectric union not available
Material Shortage, Drawings not updated, pumps not
installed, support details not shown in drawings
BKG/GS
BKG
List attached
01 day
BKG/GS
BKG/GS
GS
GS
BKG/GS
01 day
01 day
02 day
01 day
01 day
BKG/GS
05 days
GS
BKG/GS
02 days
01 day
04 days
BKG
List attached
BKG/GS
01 day
BKG/GS
BKG/GS
BKG/GS
BKG/GS
01 day
BKG
04 days
03 days
01 day
01 day
List attached
GS
BKG/GS
BKG/GS
GS
BKG/GS
02 days
01 day
01 day
01 day
06 days
1)
2)
3)
4)
5)
6)
7)
8)
9)
BKG
03 days
BKG/GS
BKG/GS
12 days
BKG/GS
BKG/GS
12 days
2) OP - 3" - 01no.
3) Drain Valve -1/2" -03no.s
03 days
BKG
BKG/GS
02 days
List attached
1) STR -4"-01no.s
2) Flexible Coupling -3" - 02 no.s
02 days
GS
BKG/GS
01 day
04 days
BKG/GS
BKG/GS
01 day
BKG/GS
03days
material shortage
BKG/GS
02 days
BKG/GS
BKG/GS
material shortage
01 day
01 day
1)
1)
1)
2)
3)
1)
Remarks
Dielectric union with 3/4" male connection
(brass) & 3/4" Female connection (MS) required