IA 13/14 C 40 M-5
Activity Name
BL Project
Duration
Original
Duration
Start
Finish
2015
Sep
Oct
Nov
Dec
1169
1184
04-Oct-15 A 30-Dec-18
DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02) (DRAFT BASELINE PROGRAMME)
1169
1184
04-Oct-15 A 30-Dec-18
GENERAL
CONTRACTUAL DATES
G-GN-CD-D101
Project duration
INTERFACE ISSUES
COORDINATION WITH INTERFACING PARTIES
MTS-02 CONTRACT AND WORK AT SHAFT WS7
1169
1169
04-Oct-15 A
30-Dec-18
1169
1169
04-Oct-15 A
30-Dec-18
90
90
30-Nov-15
27-Feb-16
90
90
30-Nov-15
27-Feb-16
90
90
30-Nov-15
27-Feb-16
G-IF-WS07-D100
Coordinating with MTS-02 Contractor to confirm the vertical and horizontal alignment
between two contracts
90
90
30-Nov-15
27-Feb-16
G-IF-WS07-D101
Coordinating with MTS-02 contractor to allow scheduled access to shaft location WS7
90
90
30-Nov-15
27-Feb-16
90
90
30-Nov-15
27-Feb-16
Coordinating with MTS-03 Contractor to confirm the vertical and horizontal alignment
between two contracts
90
90
30-Nov-15
27-Feb-16
G-IF-WS07-D104
Coordinating with MTS-03 Contractor to minimise potential work shaft usage conflicts
90
90
30-Nov-15
27-Feb-16
90
90
30-Nov-15
27-Feb-16
90
90
30-Nov-15
27-Feb-16
CONTRACT TPS/STW-01 (OCF-2) AT THE INDUSTRIAL AREA LAT ERAL SEWER - SH8/60
G-IF-WS07-D106
Coordinating with TPS/STW-01 Contractor to confir m the vertical and hori zontal
alignment between two contracts
1141
1156
01-Nov-15 A
30-Dec-18
28
28
01-Nov-15 A
28-Nov-15
28-Nov-15, SUBMISSION
G-SO-LIS02-D100
28
28
01-Nov-15 A
28-Nov-15
G-SO-LIS02-D101
28
28
01-Nov-15 A
28-Nov-15
14
14
29-Nov-15
12-Dec-15
12-Dec-15, REV
G-SO-LIS02-D104
14
14
29-Nov-15
12-Dec-15
G-SO-LIS02-D105
14
14
29-Nov-15
12-Dec-15
Laydown area a
1107
20-Dec-15
30-Dec-18
28
20-Dec-15
16-Jan-16
1092
ESTABLISHMENT
G-SO-LIS02-D109
G-SO-LIS02-D110
INSURANCES
28
1092
1107
20-Dec-15
30-Dec-18
90
121
04-Oct-15 A
01-Feb-16
G-IN-LIS02-D100
90
90
04-Oct-15 A
01-Feb-16
G-IN-LIS02-D105
90
90
04-Oct-15 A
01-Feb-16
G-IN-LIS02-D101
90
90
04-Nov-15
01-Feb-16
Actual Work
Milestone
Remaining Work
Baseline Milestone
PAGE 1 OF 9
IA 13/14 C 40 M-5
Activity Name
BL Project
Duration
Original
Duration
Start
Finish
2015
Sep
Oct
Nov
Dec
G-IN-LIS02-D102
90
90
04-Nov-15
01-Feb-16
G-IN-LIS02-D103
90
90
04-Nov-15
01-Feb-16
G-IN-LIS02-D104
90
90
04-Nov-15
01-Feb-16
28
59
04-Oct-15 A
01-Dec-15
28
28
04-Oct-15 A
01-Dec-15
G-BG-LIS02-D103
PROJECT ASSURANCES
PROJECT QUALITY PLAN
28
04-Nov-15
01-Dec-15
1169
28
1184
04-Oct-15 A
30-Dec-18
100
100
18-Oct-15 A
11-Jan-16
Submission of Quality Organisation Plan to QCE
G-QP-LIS02-G010
14
14
18-Oct-15 A
04-Nov-15
G-QP-LIS02-G020
42
42
18-Oct-15 A
14-Nov-15
G-QP-LIS02-H010
30
30
18-Oct-15 A
16-Nov-15
G-QP-LIS02-H020
30
30
15-Nov-15
14-Dec-15
Review of Pro
G-QP-LIS02-J010
28
28
17-Nov-15
14-Dec-15
QCE Submiss
G-QP-LIS02-J020
QCE Submission Project quality plan to the Engineer and obtaining no-objection
28
28
15-Dec-15
11-Jan-16
100
100
04-Oct-15 A
11-Jan-16
100
100
04-Oct-15 A
11-Jan-16
G-CEMP-LIS02-G010
42
42
18-Oct-15 A
14-Nov-15
G-CEMP-LIS02-H010
30
30
15-Nov-15
14-Dec-15
Review of Con
G-CEMP-LIS02-J010
28
28
15-Dec-15
11-Jan-16
28
28
28-Oct-15 A
04-Nov-15
28
28
28-Oct-15 A
04-Nov-15
86
89
04-Oct-15 A
31-Dec-15
28
28
04-Oct-15 A
04-Nov-15
G-ERA-LIS02-G020
28
28
04-Oct-15 A
04-Nov-15
G-ERA-LIS02-H010
30
30
04-Nov-15
03-Dec-15
Review of Environmenta
G-ERA-LIS02-H020
30
30
04-Nov-15
03-Dec-15
Review of Environmenta
G-ERA-LIS02-J010
28
28
04-Dec-15
31-Dec-15
G-ERA-LIS02-J020
28
28
04-Dec-15
31-Dec-15
100
100
04-Oct-15 A
11-Jan-16
Actual Work
Milestone
Remaining Work
Baseline Milestone
PAGE 2 OF 9
IA 13/14 C 40 M-5
Activity Name
BL Project
Duration
Original
Duration
Start
Finish
2015
Sep
Oct
G-WMP-LIS02-G010
42
42
04-Oct-15 A
14-Nov-15
Nov
Dec
Submission of Draft Waste Manangement
G-WMP-LIS02-H010
30
30
15-Nov-15
14-Dec-15
Review of Wa
G-WMP-LIS02-J010
28
28
15-Dec-15
11-Jan-16
84
104
25-Oct-15 A
15-Jan-16
G-WAP-LIS02-G010
42
42
25-Oct-15 A
14-Nov-15
G-WAP-LIS02-G101
56
56
25-Oct-15 A
18-Dec-15
Submissio
G-WAP-LIS02-J100
28
28
18-Dec-15
15-Jan-16
42
42
18-Oct-15 A
04-Nov-15
42
42
18-Oct-15 A
04-Nov-15
1184
18-Oct-15 A
30-Dec-18
42
18-Oct-15 A
14-Nov-15
1169
ENGAGING QCE
G-QCE-LIS02-D010
G-QCE-LIS02-D020
METHOD STATEMENTS
SUBMISSION
42
1127
1142
15-Nov-15
30-Dec-18
79
79
05-Nov-15
22-Jan-16
63
63
05-Nov-15
06-Jan-16
G-MS-LIS02-G010
21
21
05-Nov-15
25-Nov-15
G-MS-LIS02-G011
Submission of detailed method statement for the temporary shaft construction using
diaphragm wall method
21
21
26-Nov-15
16-Dec-15
Submission
G-MS-LIS02-G012
Submission of detailed method statement for the temporary shaft construction works
using VSM method
21
21
26-Nov-15
16-Dec-15
Submission
G-MS-LIS02-G013
Submission of detailed method statement for the temporary shaft construction using
Seacant pile method
21
21
26-Nov-15
16-Dec-15
Submission
G-MS-LIS02-G014
Submission of detailed method statement for the temporary shaft construction using
shotcrete method
21
21
17-Dec-15
06-Jan-16
51
51
26-Nov-15
15-Jan-16
G-MS-LIS02-H010
Review and approval of detailed method statement for utility diversion by QCE
30
30
26-Nov-15
25-Dec-15
G-MS-LIS02-H011
Review and approval of detailed method statement for the temporary shaft
construction using diaphragm wall method by QCE
30
30
17-Dec-15
15-Jan-16
G-MS-LIS02-H012
Review and approval of detailed method statement for the temporary shaft
construction using using VSM method
30
30
17-Dec-15
15-Jan-16
G-MS-LIS02-H013
Review and approval of detailed method statement for the temporary shaft
construction using Seacant pile method
30
30
17-Dec-15
15-Jan-16
28
28
26-Dec-15
22-Jan-16
28
28
26-Dec-15
22-Jan-16
114
145
04-Oct-15 A
25-Feb-16
APPROVAL BY QCE
Obtaining no objection from the Engineer for the submitted detailed method
statement for utility diversion
Actual Work
Milestone
Remaining Work
Baseline Milestone
PAGE 3 OF 9
Rev
IA 13/14 C 40 M-5
Activity Name
BL Project
Duration
COMMUNICATION PLAN
Original
Duration
Start
Finish
114
114
04-Oct-15 A
25-Jan-16
2015
Sep
Oct
Nov
Dec
G-CP-LIS02-G010
56
56
04-Oct-15 A
28-Nov-15
Submission of Communicatio
G-CP-LIS02-H010
30
30
29-Nov-15
28-Dec-15
G-CP-LIS02-J010
28
28
29-Dec-15
25-Jan-16
114
114
04-Nov-15
25-Feb-16
G-SMP-LIS02-G010
56
56
04-Nov-15
29-Dec-15
G-SMP-LIS02-H010
30
30
30-Dec-15
28-Jan-16
G-SMP-LIS02-J010
28
28
29-Jan-16
25-Feb-16
98
98
04-Oct-15 A
09-Jan-16
98
98
04-Oct-15 A
09-Jan-16
42
42
04-Oct-15 A
14-Nov-15
G-TMP-LIS02-H010
28
28
15-Nov-15
12-Dec-15
G-TMP-LIS02-J010
28
28
13-Dec-15
09-Jan-16
100
100
04-Oct-15 A
11-Jan-16
42
42
04-Oct-15 A
14-Nov-15
G-UDP-LIS02-H010
30
30
15-Nov-15
14-Dec-15
G-UDP-LIS02-J010
QCE Submission Utilities Diversion Plan to the Engineer and obtaining no-objection
28
28
15-Dec-15
11-Jan-16
100
100
04-Oct-15 A
11-Jan-16
G-CMP-LIS02-G010
42
42
04-Oct-15 A
14-Nov-15
G-CMP-LIS02-H010
30
30
15-Nov-15
14-Dec-15
G-CMP-LIS02-J010
28
28
15-Dec-15
11-Jan-16
98
98
18-Oct-15 A
23-Jan-16
51
51
15-Nov-15
04-Jan-16
21
21
15-Nov-15
05-Dec-15
05-Dec-15, SUBMISSION
PROCUREMENT - GENERAL
GENERAL AND BULK MATERIALS
SUBMISSION
P-MA-LIS02-G010
Safety Barriers
21
21
15-Nov-15
05-Dec-15
Safety Barriers
P-MA-LIS02-G011
21
21
15-Nov-15
05-Dec-15
P-MA-LIS02-G012
Cement
21
21
15-Nov-15
05-Dec-15
Cement
P-MA-LIS02-G013
21
21
15-Nov-15
05-Dec-15
P-MA-LIS02-G014
Concrete (C30/37-Materials)
21
21
15-Nov-15
05-Dec-15
Concrete (C30/37-Materials)
P-MA-LIS02-G015
Concrete (C40/50-Materials)
21
21
15-Nov-15
05-Dec-15
Concrete (C40/50-Materials)
Actual Work
Milestone
Remaining Work
Baseline Milestone
PAGE 4 OF 9
IA 13/14 C 40 M-5
Activity Name
BL Project
Duration
Original
Duration
Start
Finish
2015
P-MA-LIS02-G016
Concrete (C50/60-Precast Concrete Tunnel Lining Segments and other precast items)
21
21
15-Nov-15
05-Dec-15
Dec
Concrete (C50/60-Prec
P-MA-LIS02-G017
Steel reinforcement
21
21
15-Nov-15
05-Dec-15
Steel reinforcement
P-MA-LIS02-G018
Concrete additives
21
21
15-Nov-15
05-Dec-15
Concrete additives
P-MA-LIS02-G019
21
21
15-Nov-15
05-Dec-15
P-MA-LIS02-G020
21
21
15-Nov-15
05-Dec-15
P-MA-LIS02-G024
Backfill
21
21
15-Nov-15
05-Dec-15
Backfill
30
30
06-Dec-15
04-Jan-16
APPROVAL BY QCE
Sep
P-MA-LIS02-H010
Safety Barriers
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H011
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H012
Cement
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H013
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H014
Concrete (C30/37-Materials)
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H015
Concrete (C40/50-Materials)
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H016
Concrete (C50/60-Precast Concrete Tunnel Lining Segments and other precast items)
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H017
Steel reinforcement
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H018
Concrete additives
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H019
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H020
30
30
06-Dec-15
04-Jan-16
P-MA-LIS02-H024
Backfill
30
30
06-Dec-15
04-Jan-16
98
98
18-Oct-15 A
23-Jan-16
84
84
18-Oct-15 A
09-Jan-16
SUB CONTRACTORS
PROPOSAL
Oct
Nov
G-SC-LIS02-G010
Proposal of Sub contractor for carring out Geo technical investigation works
14
14
18-Oct-15 A
04-Nov-15
G-SC-LIS02-G011
14
14
18-Oct-15 A
04-Nov-15
G-SC-LIS02-G012
14
14
01-Nov-15 A
14-Nov-15
G-SC-LIS02-G013
Proposal of Sub contractor for carring out Utility diversion works (Electrical works)
28
28
15-Nov-15
12-Dec-15
G-SC-LIS02-G014
Proposal of sub contractor for carring out Seacent pile, Diaphragm wall and VSM
works for making temporary shafts
28
28
13-Dec-15
09-Jan-16
Proposal of Sub
56
53
04-Nov-15
26-Dec-15
26
G-SC-LIS02-H010
Approval of Sub contractor for carring out Geo technical investigation works
14
14
04-Nov-15
17-Nov-15
G-SC-LIS02-H011
14
14
04-Nov-15
17-Nov-15
G-SC-LIS02-H012
14
14
15-Nov-15
28-Nov-15
G-SC-LIS02-H013
Approval of Sub contractor for carring out Utility diversion works (Electrical works)
14
14
13-Dec-15
26-Dec-15
Ap
70
67
18-Nov-15
23-Jan-16
APPROVAL BY QCE
Actual Work
Milestone
Remaining Work
Baseline Milestone
PAGE 5 OF 9
IA 13/14 C 40 M-5
Activity Name
BL Project
Duration
Original
Duration
Start
Finish
2015
G-SC-LIS02-J010
Obtaining no-objection from the Engineer for the proposed Sub contractor for Geo
technical investigation works
28
28
18-Nov-15
15-Dec-15
Dec
Obtaining no
G-SC-LIS02-J011
Obtaining no-objection from the Engineer for the proposed Sub contractor for carring
out Site survey works
28
28
18-Nov-15
15-Dec-15
Obtaining no
G-SC-LIS02-J012
Obtaining no-objection from the Engineer for the proposed Sub contractor for carring
out material testing works
28
28
29-Nov-15
26-Dec-15
Ob
G-SC-LIS02-J013
Obtaining no-objection from the Engineer for the proposed Sub contractor for Utility
diversion works (Electrical works)
28
28
27-Dec-15
23-Jan-16
51
51
29-Nov-15
18-Jan-16
21
21
29-Nov-15
19-Dec-15
19-Dec-1
21
21
29-Nov-15
19-Dec-15
Submissi
30
30
20-Dec-15
18-Jan-16
PRECAST SEGMENTS
SUBMISSION
P-MA-LIS02-G025
APPROVAL BY QCE
P-MA-LIS02-H025
EXECUTION
EXECUTION GENERAL
COORDINATION & DATA COLLECTION
EXPRESSWAYS PROGRAMME
30
Sep
30
20-Dec-15
18-Jan-16
1169
1169
04-Oct-15 A
30-Dec-18
1169
1169
04-Oct-15 A
30-Dec-18
120
120
05-Nov-15
03-Mar-16
120
120
05-Nov-15
03-Mar-16
C-DC-LIS02-C010
Coordination with the Third Parties undertaking design & construction Project No.15
and finalising LIS-02 alignment
120
120
05-Nov-15
03-Mar-16
C-DC-LIS02-C011
Coordination with the Third Parties undertaking design & construction Project No.17
and finalising LIS-02 alignment
120
120
05-Nov-15
03-Mar-16
C-DC-LIS02-C012
Coordination with the Third Parties undertaking design & construction Project No. 23
and finalising LIS-02 alignment
120
120
05-Nov-15
03-Mar-16
C-DC-LIS02-C013
Coordination with theThird Party engaged by the Authority to finalise shaft location at
Junction 11, Project No. 15
120
120
05-Nov-15
03-Mar-16
120
120
05-Nov-15
03-Mar-16
120
120
05-Nov-15
03-Mar-16
60
60
05-Nov-15
03-Jan-16
60
60
05-Nov-15
03-Jan-16
90
90
05-Nov-15
02-Feb-16
90
90
05-Nov-15
02-Feb-16
100
100
04-Nov-15
11-Feb-16
100
100
04-Nov-15
11-Feb-16
15-Dec-15
Liasoning with QRC to confirm all interface points on Al Wakrah Main Road
QATAR PETROLEUM
C-DC-LIS02-C021
Coordinating with QP to carry the works at shaft SH 8/1 and between MTS shaft W7
and shaft SH 8/2
Coordinating with Qatar General Electricity and Water Company (Kahr amaa) for the
Water Security Mega Reservoirs project
Submission of Key Sub contractor for Topogr aphic Survey works to the Engineer
42
42
04-Nov-15
C-SW-LIS02-H010
30
30
16-Dec-15
14-Jan-16
C-SW-LIS02-J010
28
28
15-Jan-16
11-Feb-16
Actual Work
Milestone
Remaining Work
Baseline Milestone
PAGE 6 OF 9
Oct
Nov
Submission o
IA 13/14 C 40 M-5
Activity Name
BL Project
Duration
Original
Duration
Start
Finish
1169
1169
04-Oct-15 A
30-Dec-18
1169
1169
18-Oct-15 A
30-Dec-18
100
100
18-Oct-15 A
11-Jan-16
2015
Sep
Oct
Nov
Dec
C-DMP-LIS02-G010
Submit breakdown of design services into design packages (work element) to QCE
42
42
18-Oct-15 A
14-Nov-15
C-DMP-LIS02-G011
42
42
18-Oct-15 A
14-Nov-15
C-DMP-LIS02-G012
Submit Design Method statement with a description of the design processes and
management system to QCE
42
42
18-Oct-15 A
14-Nov-15
C-DMP-LIS02-G013
42
42
18-Oct-15 A
14-Nov-15
C-DMP-LIS02-G014
Submit Design Assurance system to the Engineer (Design Calculation and Checking
of Documents, Document Control, etc)
42
42
18-Oct-15 A
14-Nov-15
C-DMP-LIS02-H014
Review and Approval of Design management Plan by QCE and forwarding to the
Engineer
30
30
15-Nov-15
14-Dec-15
Review and Ap
C-DMP-LIS02-J014
Review and Approval by the Engineer and obtaining no-objection to the Contractor
28
28
15-Dec-15
11-Jan-16
100
100
18-Oct-15 A
11-Jan-16
C-DAS-LIS02-G010
42
42
18-Oct-15 A
14-Nov-15
C-DAS-LIS02-G011
42
42
18-Oct-15 A
14-Nov-15
C-DAS-LIS02-G012
42
42
18-Oct-15 A
14-Nov-15
C-DAS-LIS02-G013
42
42
18-Oct-15 A
14-Nov-15
C-DAS-LIS02-G014
42
42
18-Oct-15 A
14-Nov-15
C-DAS-LIS02-G015
42
42
18-Oct-15 A
14-Nov-15
C-DAS-LIS02-H010
30
30
15-Nov-15
14-Dec-15
C-DAS-LIS02-J010
Review and Approval by the Engineer and obtaining no-objection to the Contractor
28
28
15-Dec-15
11-Jan-16
86
89
18-Oct-15 A
31-Dec-15
C-DCR-LIS02-G010
28
28
18-Oct-15 A
04-Nov-15
C-DCR-LIS02-H010
30
30
04-Nov-15
03-Dec-15
C-DCR-LIS02-J010
Review and approval by the Engineer and obtaining no-objection to the contractor
28
28
04-Dec-15
31-Dec-15
1139
1139
02-Nov-15 A
30-Dec-18
1139
1139
02-Nov-15 A
30-Dec-18
114
114
18-Oct-15 A
25-Jan-16
MONTHLY REPORT
C-MR-LIS02-D010
Monthly Reporting
Approval of De
C-CIA-LIS02-G010
56
56
18-Oct-15 A
28-Nov-15
C-CIA-LIS02-G011
30
30
29-Nov-15
28-Dec-15
C-CIA-LIS02-G012
28
28
29-Dec-15
25-Jan-16
114
114
18-Oct-15 A
25-Jan-16
56
56
18-Oct-15 A
28-Nov-15
C-PHD-LIS02-G011
56
56
18-Oct-15 A
28-Nov-15
Actual Work
Milestone
Remaining Work
Baseline Milestone
PAGE 7 OF 9
IA 13/14 C 40 M-5
Activity Name
BL Project
Duration
Original
Duration
Start
Finish
2015
Sep
C-PHD-LIS02-G012
56
56
18-Oct-15 A
28-Nov-15
Dec
Develop Plan and Profile dwgs
C-PHD-LIS02-G013
56
56
18-Oct-15 A
28-Nov-15
C-PHD-LIS02-H010
30
30
29-Nov-15
28-Dec-15
C-PHD-LIS02-J010
28
28
29-Dec-15
25-Jan-16
58
58
29-Nov-15
25-Jan-16
C-CFD-LIS02-G010
28
28
29-Nov-15
26-Dec-15
C-CFD-LIS02-H010
30
30
27-Dec-15
25-Jan-16
CFD MODELLING
58
58
29-Nov-15
25-Jan-16
C-PMD-LIS02-G010
28
28
29-Nov-15
26-Dec-15
C-PMD-LIS02-H010
30
30
27-Dec-15
25-Jan-16
160
160
18-Oct-15 A
11-Mar-16
PHYSICAL MODELLING
Oct
Nov
Pre
Pre
C-BIM-LIS02-G010
14
14
18-Oct-15 A
04-Nov-15
C-BIM-LIS02-G011
21
21
18-Oct-15 A
04-Nov-15
C-BIM-LIS02-G012
21
21
18-Oct-15 A
04-Nov-15
C-BIM-LIS02-G013
28
28
01-Nov-15 A
21-Nov-15
C-BIM-LIS02-G014
22-Nov-15
22-Nov-15
C-BIM-LIS02-H010
110
110
23-Nov-15
11-Mar-16
70
70
18-Oct-15 A
12-Dec-15
C-DAR-LIS02-G010
42
42
18-Oct-15 A
14-Nov-15
C-DAR-LIS02-G020
Durability Specification
42
42
18-Oct-15 A
14-Nov-15
Durability Specification
C-DAR-LIS02-J010
28
28
15-Nov-15
12-Dec-15
60
60
01-Nov-15 A
31-Dec-15
PRELIMINARY DESIGN
C-PD-LIS02-G010
Preliminary design
60
60
01-Nov-15 A
31-Dec-15
114
114
04-Oct-15 A
25-Jan-16
84
90
04-Oct-15 A
01-Jan-16
70
70
04-Oct-15 A
12-Dec-15
C-RSP-LIS02-G010
42
42
04-Oct-15 A
14-Nov-15
C-RSP-LIS02-J010
Review and approval of Monitoring and Reporting System plan by the Engineer
28
28
15-Nov-15
12-Dec-15
Submit DAR to E
12-Dec-15, MON
Submission of Monitoring and Reporting System plan
Review and app
84
90
04-Oct-15 A
01-Jan-16
C-BP-LIS02-G010
21
21
04-Oct-15 A
04-Nov-15
C-BP-LIS02-G020
56
56
04-Oct-15 A
04-Dec-15
Submission of prelimina
C-BP-LIS02-J010
14
14
26-Oct-15 A
13-Nov-15
C-BP-LIS02-J020
13-Nov-15
20-Nov-15
C-BP-LIS02-G030
20-Nov-15
27-Nov-15
C-BP-LIS02-J030
BASELINE PROGRAMME
Actual Work
Milestone
Remaining Work
Baseline Milestone
28
28
04-Dec-15
01-Jan-16
114
114
02-Nov-15 A
25-Jan-16
PAGE 8 OF 9
IA 13/14 C 40 M-5
Activity Name
BL Project
Duration
Original
Duration
Start
Finish
2015
Sep
Oct
Nov
Dec
Submission of Preliminary Risk register to QCE
C-RMP-LIS02-G010
42
42
02-Nov-15 A
14-Nov-15
C-RMP-LIS02-G011
56
56
02-Nov-15 A
28-Nov-15
Submission of Preliminary Ri
C-RMP-LIS02-H010
30
30
15-Nov-15
14-Dec-15
Review of Pre
C-RMP-LIS02-H011
30
30
29-Nov-15
28-Dec-15
C-RMP-LIS02-J010
28
28
15-Dec-15
11-Jan-16
C-RMP-LIS02-J011
QCE Submission Preliminary Risk Mananagemet Plan to the Engineer and obtaining
no-objection
28
28
29-Dec-15
25-Jan-16
88
89
04-Oct-15 A
31-Dec-15
C-HSP-LIS02-G010
30
30
18-Oct-15 A
04-Nov-15
C-HSP-LIS02-H010
Review of Occupational Health and Safety plan by QCE and forwarding it to the
Engineer
30
30
04-Nov-15
03-Dec-15
C-HSP-LIS02-J010
Review of Occupational Health and Safety plan by the Engineer and obtaining
no-objection
28
28
04-Dec-15
31-Dec-15
52
52
04-Oct-15 A
24-Nov-15
24-Nov-15, REQUIREMENTS
52
52
04-Oct-15 A
24-Nov-15
Implementation of occupational h
REQUIREMENTS
C-HSP-LIS02-D010
91
91
04-Oct-15 A
02-Jan-16
C-LMP-LIS02-G010
56
56
04-Oct-15 A
28-Nov-15
C-LMP-LIS02-H010
30
30
29-Nov-15
02-Jan-16
105
105
18-Oct-15 A
16-Jan-16
C-CP-LIS02-G010
42
42
18-Oct-15 A
14-Nov-15
C-CP-LIS02-H010
30
30
15-Nov-15
19-Dec-15
C-CP-LIS02-J010
28
28
20-Dec-15
16-Jan-16
CONSENTS PLAN
Actual Work
Milestone
Remaining Work
Baseline Milestone
PAGE 9 OF 9