Noise Hazard
Equipment Preparation
(Servicing of Engine/Water
pumps Gearbox changing
of engine/gear oil)
Bodily injuries
Noise induced
deafness
Environment
Hazard - oil
spill to the
drain ways
Contaminate
waterways
F-SP-HSE06-01 Rev. 03
Possible injury/
Ill-health
Bodily injuries/
Noise induced
deafness/ Cuts
& bruises/
Contaminate
waterways
Risk
level
4
Low
All crew
4
Low
All crew
12
Medium
All crew
4
Low
All crew
24
Medium
Project
Supervisor
Additional Controls
Risk
Level
Responsible
person
Remarks
Page 1 of 18
Approved by:
(Signature)
Slipping of
hand tool due
to oiliness and
cost hand
injury
Equipment Preparation
(Servicing of Engine
changing of oil filters)
Environment
Hazard - oil
spill to the
drain ways
Equipment Preparation
(Test running of water
F-SP-HSE06-01 Rev. 03
Noise Hazard
due to engine
Possible injury/
Ill-health
Contaminate
waterways
Bodily injuries/
Cuts & bruises/
Contaminate
waterways
Noise induced
deafness
Risk
level
8
Low
All crew
8
Low
All crew
4
Low
All crew
12
Medium
Project
Supervisor
4
Low
All crew
Additional Controls
Risk
Level
Responsible
person
Remarks
Page 2 of 18
Approved by:
(Signature)
pump)
F-SP-HSE06-01 Rev. 03
Additional Controls
Risk
Level
Responsible
person
8
Low
All crew
12
Medium
Project
Supervisor
4
Low
All crew
24
Medium
All crew
Remarks
running
Mobilisation/demobilisation
from yard to & fro client
site/ lifting of pigging
machine to trailer
Possible injury/
Ill-health
Bodily injuries
Whipping
reaction from
pressurised
hose may
cause injuries
Bodily injuries
Crane
dropping
Machine
container to
24
Medium
All crew
Page 3 of 18
Approved by:
(Signature)
Possible injury/
Ill-health
the ground
Human Factor
lack of
competency
and
coordination
error
Mobilisation/demobilisation
from yard to & fro client
site/ crane and trailer
driving in/out the yard
F-SP-HSE06-01 Rev. 03
Crane/trailer
can damage
equipment or
injuring
personnel
while driven
Pinch Point
Hazard while
mobilising &
Bodily injuries
Damage to
equipment or
injuring
personnel
Risk
level
Additional Controls
16
Medium
Project
Supervisor
16
Medium
Crane
operator
8
Low
All crew
Risk
Level
Responsible
person
Remarks
contractor by doing a
spot check on his
equipments
Check the physical
condition of the lifting
slings and lugs
Barricade off area of
operation
Ensure every part of
Machine container is
well secured prior to
lifting operation
Control the movement
of the container
machine via ropes
while it sling in the air
Page 4 of 18
Approved by:
(Signature)
Possible injury/
Ill-health
demobilising
from crane &
trailer
Risk
level
Additional Controls
16
Medium
Driver &
project
Supervisors
16
Medium
Crane/
Trailer driver
8
Low
Lifting
Supervisor
8
Low
Lifting
Supervisor
Risk
Level
Responsible
person
Remarks
applicable
Human Factor
lack of
competency
and
coordination
error
Damage to
equipment /
Cuts & bruises
Crane/trailer
movement can
damage plant
equipment and
injuring person
Damage to
equipment or
injuring
personnel
Mobilise/demobilise
equipment in & out job
site/driving to site/lifting
operation
Equipment or
material falling
from height
causing injury
to personnel or
damage to
client property
and our
equipment
Crane topple
due to soft
ground or
overloading
F-SP-HSE06-01 Rev. 03
Bodily injuries /
damage to
equipments
damaging our
equipment &
client property
Lifting crew or
personal is to
barricade the lifting
zone and display
signage before lifting
work start.
All personal to keep
a safe distance and
not to walk under
any load.
Page 5 of 18
Approved by:
(Signature)
Possible injury/
Ill-health
Pinch Point
Hazard
Human Factor
lack of
competency
and
coordination
error
F-SP-HSE06-01 Rev. 03
Bodily injuries/
damaging our
equipment &
client property
Risk
level
8
Low
All crew
16
Medium
Project
Supervisor &
Lifting
Supervisor
Additional Controls
Risk
Level
Responsible
person
Remarks
Page 6 of 18
Approved by:
(Signature)
Hoses can
break loose
due to not
securing
properly
causing
property
damage and
bodily injury.
7
Frames where
the hoses are
secured may
break
Human Factor
lack of
knowledge
Falling through
the opening in
the handrail
that is used to
access the cat
ladder.
Poor visibility
at night may
fall from
vertical ladder
F-SP-HSE06-01 Rev. 03
Possible injury/
Ill-health
Bodily injuries
Bodily injuries
Bodily injuries
Bodily injuries
Bodily injuries
Risk
level
4
Low
Lifting
Supervisor
24
Medium
All crew
4
Low
Project
Supervisor
16
Medium
All crew
16
Medium
All crew
Additional Controls
Risk
Level
Responsible
person
Remarks
Page 7 of 18
Approved by:
(Signature)
Possible injury/
Ill-health
Risk
level
Additional Controls
16
Medium
4
Low
16
Medium
All crew
16
Medium
All crew
16
Medium
Project
Supervisor
Risk
Level
Responsible
person
Remarks
Working during
dangerous
working
conditions,
getting hit by
lightning. Slip
and fall on wet
surface.
Unauthorised
people
entering area
of operation
Human Factor
- Accident
caused by miscommunication
between
operator and
the helpers
Fall from
height when
working on the
scaffolding
platform
Human factor
lack of focus
on assigned
task
F-SP-HSE06-01 Rev. 03
Fatal/ Bodily
injuries
Bodily injuries
Bodily injuries
Bodily injuries
Bodily injuries
Barricade area of
operation
Place signboards
Must have a briefing
to all the personnel
onsite and ensure
they understand CDT
Furnace decoking
procedure
All working at height
above 1.8m from
ground level must don
safety harness
Must obtain Permit To
Work before start
work
Conduct safety talk
Must check the
scaffoldings validity
Health & Safety brief
performed prior to
commencement of job
Attended the in-house
All crew
Page 8 of 18
Approved by:
(Signature)
Possible injury/
Ill-health
Risk
level
Additional Controls
16
Medium
All crew
24
Medium
All crew
Risk
Level
Responsible
person
Remarks
SIC
Hazards
arising from
external
activities
Hoses may
burst and
cause injury to
personnel
F-SP-HSE06-01 Rev. 03
Bodily injuries
Bodily injuries
Receive all
information from client
on the expected
works that are
performed together
with our task and
keep our staff inform
of those.
Staff to ensure they
are vigilant at all times
and report any
abnormal activities
sighted at site
Stop work if sighted
unsafe activities
Perform physical
inspection on the
hoses prior to utilising
it
Always maintain a
safe distance from the
pressurised hose
Maintain
communication with
rest of the staff thru
walkie talkie and hand
signals
Alert and warn staff to
keep clear if needed
to increase pressure
on the pump
Page 9 of 18
Approved by:
(Signature)
Hoses may
burst and
cause injury to
personnel
9
Bodily injuries
10
Possible injury/
Ill-health
Non-routine activits
(maintenance work)
Removing Water
pump/Gearbox/other
equipment from the
Pigging Container (using
Forklift)
F-SP-HSE06-01 Rev. 03
Forklift
damaging
other
equipment and
facilities
Bodily injuries
Bodily injuries/
damaging our
equipment &
client property
Injuring
personnel by
wrong
operation
Bodily injuries
Injuring
personnel
when dropping
load
Bodily injuries/
damaging our
equipment &
client property
Risk
level
8
Low
All crew
24
Medium
Project
Supervisor
16
Medium
Forklift
Operator
16
Medium
Forklift
Operator
24
Medium
Forklift
Operator
Additional Controls
Risk
Level
Responsible
person
Remarks
Page 10 of 18
Approved by:
(Signature)
Possible injury/
Ill-health
Risk
level
Additional Controls
24
Medium
Project
Supervisor
24
Medium
All crew
16
Medium
All crew
Risk
Level
Responsible
person
Remarks
operation a re
donning the
appropriate PPE
Human Factor
lack of focus
and
coordination
error
Hazards
arising from
external
activities
11
Non-routine activits
(maintenance work on job
site)
Removing Water
pump/Gearbox/other
equipment from the
Pigging Container (using
chainblock)
F-SP-HSE06-01 Rev. 03
Dropping load
- damaging
equipment &
injuring
personnel
Bodily injuries/
damaging our
equipment &
client property
Bodily injuries/
damaging our
equipment &
client property
Bodily injuries/
damaging our
equipment &
client property
Page 11 of 18
Approved by:
(Signature)
Ergonomic
hazard (Heavy
load)
Pinch point
Hazards
12
Non-routine activits
(maintenance work)
Using grinding power tool
during repair
activities/cleaning part
activity
F-SP-HSE06-01 Rev. 03
Electrical
hazard
Possible injury/
Ill-health
Body strains
Bodily injuries/
damaging our
equipment &
client property
Burns
Ensure correct
posture are used to
carry heavy items
Put up signs to
remind staff of correct
lifting posture
Staffs are advised to
stay focus
Wear gloves where
applicable
Health & Safety brief
performed prior to
commencement of job
Only the competent
staff are allowed to
choose the type of
chainblock for the
operation
Ensure electrical tool
has its inspection tag
updated before using.
Ensure hand is not
wet before using the
tool
Ensure the tool do not
get in contact with
water
Ensure proper PPE is
donned before start
work
Remind staff on
electric hazard via
safety meeting
Risk
level
8
Low
All crew
16
Medium
All crew
16
Medium
Project
Supervisor
8
Low
All crew
Additional Controls
Risk
Level
Responsible
person
Remarks
Page 12 of 18
Approved by:
(Signature)
Dust inhalant
F-SP-HSE06-01 Rev. 03
Respiratory
problems
Grinding disc
may break and
cause severe
injury
Chemical
contact (using
chemical for
cleaning)
Skin irritation
Hazards
arising from
external
activities
Bodily injuries
Human Factor
lack of focus
13
Possible injury/
Ill-health
Fire hazard
due to usage
of gas cutter to
expand the
tight fittings
Burns/
Respiratory
Health & Safety brief
problems/ Cuts
performed prior to
& Bruises/ Skin
commencement of job
irritation/ Bodily
injuries
Use the appropriate
PPE
Adequate ventilation
Burns
provided
Perform physical
check on gas cutter
Risk
level
8
Low
All crew
16
Medium
All crew
8
Low
All crew
16
Medium
All crew
16
Medium
Project
Supervisor
8
Low
All crew
Additional Controls
Risk
Level
Responsible
person
Remarks
Page 13 of 18
Approved by:
(Signature)
Possible injury/
Ill-health
Risk
level
Additional Controls
4
Low
All crew
8
Low
Project
Supervisor
8
Low
All crew
8
Low
All crew
16
Medium
All crew
8
Low
All crew
Risk
Level
Responsible
person
Remarks
equipment
14
15
16
Non-routine activits
(maintenance work)
Painting work
Awareness of the
emergency call points
such as fire assembly
area, Fire & emergency
control room number,
emergency telephone
points & etc
Placement of stowage
items
F-SP-HSE06-01 Rev. 03
Pinch point
hazard
Human factor
lack of focus
Chemical
contact
Toxic Fume
hazard
Human Factor
Lack of
knowledge
Pinch point
hazards
Skin Irritation
Respratory
problems
Burns / Fatal
Page 14 of 18
Approved by:
(Signature)
17
18
19
20
Communication between
DDT team members
during operation
Temporary recruitment of
foreign General workers
from manpower agencies.
F-SP-HSE06-01 Rev. 03
Human Factor
Lack of coordination
Physical
hazard Pig
can burst out
from luancher
if the launcher
cover isnt
closed
properly
Physical
hazard Hose
may burst due
to over
pressure or
due to wear &
tear
Human factor
Lack of
knowledge on
task
Possible injury/
Ill-health
Risk
level
Bodily injuries
16
Medium
All crew
Bodily injuries
8
Low
All crew
Bodily injuries/
damage to
equipments
8
Low
All crew
Bodily injuries
Advise manpower
agencies to provide
all their deployed
workers to CR with
proper PPE
Employment agencies
to ensure the workers
know general safety
CDT Team to brief the
workers on process of
their activity and its
safety requirement
24
Medium
Project
Supervisor
Additional Controls
Risk
Level
Responsible
person
Remarks
Page 15 of 18
Approved by:
(Signature)
No
21
Dangerous
driving by taxi
drivers
22
Physical
hazard items
from the
toolbag can fall
down from
height if it isnt
properly
zipped or
secured to a
rope
23
Ergonomic
hazard
24
Laying of hoses at
worksite
25
F-SP-HSE06-01 Rev. 03
Hazard
Falling from
height
Possible injury/
Ill-health
Bodily injuries /
fatal
Risk
level
24
Medium
All crew
8
Low
All crew
8
Low
All crew
8
Low
All crew
24
Med
Additional Controls
All project
supervisors must
attend the MOM
Work at Height
for Supervisors
course
Goh SP, Tint
Zaw & Manny
have attended
Risk
Level
Responsible
person
Remarks
All crew
Page 16 of 18
Approved by:
(Signature)
Possible injury/
Ill-health
F-SP-HSE06-01 Rev. 03
Risk
level
Additional Controls
Risk
Level
Responsible
person
Remarks
point eg 4 process
pipe or secured
scaffold pipe)
All workers put on
the appropriate
PPE(eg Safety
helmet with chin
strap, safety
harness) at areas
which has spelled for
such requirement.
Self retractable
Lanyard(SRL)be
utilized when working
at height which are
less than 5.6 meters
from the ground
Guardrails are
provided at work
areas where chances
of falling is evident
Ladders, fall
prevention and fall
protection
equipments& tools
are inspected prior to
use
Check on the
scaffoldings(7day)
validity status
Check the suitability
of safety harness
based on F-CRASHSE-04 Rev 00
Safety harrness
Lanyard Shock
Absorber Daily
Checklist