Escolar Documentos
Profissional Documentos
Cultura Documentos
P 1331
B.E/B.Tech.DEGREE EXAMINATION, NOVEMBER/DECEMBER 2007.
Seventh Semester
Mechanical Engineering
ME 432 - POWER PI"ANT ENGINEERING
Time : Three hours
x2=Z}marks)
N.
PARTA-(10
co
m
2.
3.
4.
5,
6.
7.
8.
9.
ww
w.
aa
na
va
1"
PARTB-(5x16=80marks)
11.
(a)
Or
(b)
(i)
(a)
Give the layout of a diesel power plant showing clearly all the
(8)
components.
(i)
Draw a neat sketch of a Volex boiler and discuss its merits and
(8)
demerits over Benson boiler.
(ii)
co
m
12.
(ii)
Steam at 100 bar and 500"C expands in the turbine upto 8.5 bar
va
(b)
N.
Or
aa
na
w.
the
lower part
an isentropic
ww
13.
(a)
(i)
(ii)
Draw a neat line diagram of inplant coal handling and indicate the
(8)
(8)
Or
(b)
(i)
(ii)
P 1331
L4.
(a)
(i)
(ii)
(8)
Or
(b)
(i)
= 60Vo
Capacity factor
= 40Vo
Use factor
= 45Vo
(i)
(ii)
va
aa
na
(a)
Or
( i i)
(i)
w.
(b)
ww
15.
N.
co
m
(ii)
P 133 1