Insider 8/26 10/30 Mary Frances Project kicked off 8/26. Team status meeting scheduled for 9/2.
Tagline options sent to Denise on 8/13, again on 8/27. Once she approves, determine scope of changing tagline on all materials,
Tagline roll-out TBD Mary Frances
identify resource plan and timeline. Robin to determine drop dead deadline for new business card shells.
Talk to Denise about boiling down initial SuperComm presentation to use as corporate presentation for use by anyone in the
Verso corporate presentation TBD Mary Frances
company in the short term.
Awaiting feedback / approval from Denise prior to being routed to a larger audience (Steve and Gary?). Addition of customer
Verso corporate brochure TBD Mary Frances testimonials may require support from sales team to coordinate customer approvals. This piece will not be ready for SuperComm is
originally planned.
Connect-World By-line article for Steve Odom 8/13 Mary Frances Complete. Magazine to provide preview of layout in late September.
Catalyst Top 50 Award August Robin Complete. Steve appeared in Catalyst magazine as top 4 entreprenuer and attended breakfast event
Redirect of www.mck.com 8/16 Mary Frances Complete.
TRADEMARK FILINGS
Management of ongoing corporate filings for Verso and Review status of all marks with MM&M this week. Determine plan for resolving issues and proceeding with new filings asap. Don
Ongoing Mary Frances
subsidiaries Brown to advise of usage of Clarent marks in Argentina, Australia and Switzerland in order to prevent challenges in those countries.
NetAuditor area on web Deb/Gary/Greg Creat graphics for NetAuditor Section for the Website.(diagram, buttons, ect.)
Text for existing pages are created and approved by Mary Frances. Working on "above the fold" display issues that occur as a result
of the new added text. Also expanding NetPerfromer section to include individual pages for each model of NetPerformer. Writing
Phase 1: Search Engine Optimization program 8/30 Gary
content for pages for approval. Targets still in place. Pages using keyword should land in the top 30 for each keyword used, 75% in
the top 20, 50% top 20, 10% top 10, 5% top 5. Results will show after page is re-indexed by Google (allow 3-6 weeks for re-indexing)
www.nact.com TBD Mary Frances Subject to input and approval to proceed from Denise.
Provide Verso web frames/template to Sean O’Shea as
? Greg Need new banner graphic for this template. It will be the landing page for all email campaigns.
Zip file
MCK Intranet evaluation & migration. (Mike Jacobs) ? Greg Received several replies from MCK people regarding what they use. I need to compile the responses to determine their needs.
Sept/Oct e-Briefs 9/27 Greg Initial work begun. Updates are slowly rolling in.
Updated Verso-branded NetPerformer diagrams ? Deb Not sure of the status.
Benoit's NetPerformer Partner updates PROCESS 8/30 9/2 Greg Greg to make process recommendation by Thursday 9/2.
I need to email Chris a list of all sites that need a proper redirection. (i.e., MCK is redirected, but the search bots can still index the
PROPER redirect of all legacy sites 9/13 9/21 Greg/Chris
other pages because they were not removed.)
Better 404 page ? Greg We need a place to put people that stumble onto a bad link. Gary suggested the sitemap page.
ADMINISTRATIVE
Tradeshow inventory & closet organization 10/1 10/10 Robin Inventory management system drafted and being tested. Room organization underway.
Tradeshow materials 10/1 10/10 Deb Sent Sharon info about new hardware and requetsed a quote, need to follow up.
Deborah to work with Access to assemble clear, complete instructions for assembly and display of all display materials, to be
Tradeshow assembly instructions 10/1 10/1 Deb
laminated an packed in all materials cases.
Shoot scheduled for 9/28 at 1pm. Sending email to execs and adding to calendars on 8/31. Formal shoot w/ grey background, attire is
Headshots 8/1 9/28 Robin
dark suit; informal shoot w/ colorful, fuzzy background, attire is business shirt w/ light color (not white).
Jeff has reporting the following problems with the tabletop display: - The
glass panel on the light is broken - light still works
- There is a channel bar missing, in all I think there are supposed to be 12, but there were only 11.
Tabletop Display Booth 10/1 10/10 Robin/Deb - The double sided tape that is holding up one of the panels to its hanger has slipped about ½” making the line across the two
graphics appear uneven Display
is in house and ready to be worked on. Will call Sharon to see if she can rework tabletop display. We purchased it originally from
Spectrum.
Robin is getting quote from Tabledrapes.com and will be ordering 2 more tabledrapes for shows. Michael is to keep one in Europe,
Additional Tabledrapes 8/30 9/15 Robin
that will leave 3 in stock.