Routing - Create
Use this process when a new routing for material is needed.
A routing is a description of which operations (process steps) and the order in which they have to be
carried out to produce a material (item). In addition to the information about the operations and their order,
a routing also contains details about the work centers where the work is to be performed as well as any
required production specifications and tooling (ie text and fixturing). Standard values for the execution of
individual operations are also saved in routings.
Activity
1. Follow the SAP menu as shown, or type the transaction code CA01 in the command field.

Created on: July 29, 2014


Changed on: March 15, 2016

Page 1 of 23

Business Process

CA01- Create Routing

End User
Procedures

Results: The Create Routings: Initial Screen display.


1. Enter the required data in all fields.

2. Enter the applicable information from the table below.


Field Name

Description

R/O/C

User Action and


Values

Material

Material Number

Enter Material Number

Plant

Plant Where Routing Is


Valid

Sales Document

Sales Order Number

Sales Document
Item
WBS Element

Sales Order Line Item


Number
WBS Element Number

R
O

Enter Plant Number or


Select from Pull-Down
Window
Enter Sales Order
Number
Enter Sales Order Line
Item Number
Leave Blank

Group

Automatically Created
by System. This is the
unique Routing Number
Section Heading
Number used to
uniquely identify a
change master record
Identifies the validity
Date of the Routing

Leave Blank

Identifies Revision of
this Routing
Section Heading
Key to group of default

Leave Blank during


creation. May be used
during Change.
Defaults to Current date.
Enter validity date if not
Current date.
Leave Blank

Enter Profile Key or

Validity
Change Number
Key Date
Revision Level
Additional Data
Profile
Created on: July 29, 2014
Changed on: March 15, 2016

Comments
Required for Material
Routing
Required for Material
Routing
Required for KMAT
Materials only
Required for KMAT
Materials only
Not Used for Material
Routing

Page 2 of 23

Business Process

CA01- Create Routing

Field Name

Description

R/O/C

User Action and


Values

settings

End User
Procedures

Comments

select from Pull Down


menu if desired

3. Click Enter.
Results: The Create Routing: Header Details screen Display.

Field Name
Task list
Group
Created on: July 29, 2014
Changed on: March 15, 2016

Description
Section Heading
Unique Identifier of the

R/O/C
R

User Action and


Values
None

Comments
Assigned by System
Page 3 of 23

Business Process

CA01- Create Routing

Field Name
Group Counter
Plant
Production Line
Line hierarchy

General data

Description
Routing
Identifies the
Occurrence of the
Routing
Identifies the Plant
Where the Routing is
Used
Section Heading
The uppermost level of
the hierarchy, if
hierarchies are being
used.
Section Heading

R/O/C

User Action and


Values

Comments

None Automatically
Assigned by the system

Enter only if you wish to


force a sequence
number

Copied from the Header


Screen

None

Enter 1 (Production) or
select from Pull Down
Menu
Enter 4 (Release general) or select from
Pull Down Menu
Enter Responsible group
or select from pull down
menu.
Leave Blank

Leave Blank

Enter only if desired


quantity is different than
the default
Enter only if desired
quantity is different than
the default
Enter only if desired
UOM is different than
the default
Enter as appropriate
Section Heading

Usage

Identifies how a Routing


will be used

Status

Identifies the current


status of the routing

Planner Group

Identifies the Planner


Group responsible for
the Routing
Identifies Critical work
center for capacity
leveling
Defines when Standard
Values are Recalculated
using CAPP
Lowest quantity for
which this Routing will
be used
Largest quantity for
which this Routing will
be used
Unit of measure used for
the material to be
produced in the task list
Routing in old system
For Dynamic
Modification /
Inspection Points
Set if task list will be
used to process
inspection on the basis
of points
Use this indicator to set
the detailing level for the
assignment of
manufactured quantities.
QM sample
management containing
instructions for physicalsample drawing.
Set level for dynamic
modification

Rules for changes in


inspection stages
Section Heading
Specifies external
numbering of inspection
results

Planning Work Center


CAPP Order
From Lot Size
To Lot Size
Field with no label
Old task list no.
Parameters
Inspection Points

Partial Lot Assignment

Sample drawing
procedure
Dynamic mod. Level
Modification Rule
Further QM data
Ext. numbering

Created on: July 29, 2014


Changed on: March 15, 2016

End User
Procedures

O
O
O

Used for all production


Routings

Use if one work center in


the routing will be a
bottleneck
Use if CAPP desired and
all keys have been
properly defined.
Defaults to 1
Defaults to 99,999,999
Defaults to EA
Default Leave Blank

Select if desired

Default Leave Blank

Enter value as desired

Default is Partial Lot


assignment according to
plant default

Enter value as desired

Default Leave Blank

Enter level as desired

Default Leave Blank

Display only

Default Leave Blank

Enter value as desired

Default Leave Blank

Page 4 of 23

Business Process

CA01- Create Routing

Field Name

Description

Administrative Data

Section Heading

Change number

Number that uniquely


identifies a change
master record

Valid from

Start date for the validity


period of an object
End of validity period of
an object in R/3
Date on which the
record was created
User name of user who
created the record
Date on which the
record was changed
User name of user who
changed the record
Key date for the
archiving run

Valid to
Created on
Created by
Changed on
Changed by
Archive Date
Last call
No. of calls

4. Click

Date on which the last


order was opened using
this routing.
Number indicating how
often this task list has
been called up when
orders are created

R/O/C

End User
Procedures

User Action and


Values

Defaults from Create


Routing: Header Details
screen if change number
is entered there
Defaults from validity
period in R/3
Defaults from validity
period in R/3
Defaults from R/3

Comments
Select Green arrow
check to display this
section
Display only

Display only
Display only
Display only

Defaults from R/3

Display only

Defaults from R/3

Display only

Defaults from R/3

Display only

Defaults if this task list is


affected by an archiving
run.
Defaults from R/3

Display only

Defaults the number of


times task list has been
called up

Display only

Display only

to view the Operation Overview screen.

Result: The Create Routing: Operation Overview screen displays.

Created on: July 29, 2014


Changed on: March 15, 2016

Page 5 of 23

Business Process

CA01- Create Routing

End User
Procedures

5. Enter data as applicable per the following table.

NOTE:

It is common to enter only those fields that are required on this screen, and then add
additional detail information in the next step.

Field Name

Description

R/O/C

User Action and


Values

Operation

Sequence Number of
the Activity or Operation

Sop

Sub Operation
Sequence Number

Work Center

Work Center where this


operation will occur

No Entry Use prenumbering unless resequencing


Enter sequence number
if this entry is for suboperation.
Enter Work Center
Number

Plnt

Plant where Work will


Occur
Control Key

Standard Text Key

Identifies the process


being preformed in this
operation

Description

Text that describing this


operation
Long Text Indicator

Control Key

Long Text

Classification

Indicates classification
exists

Object Deps

Indicates whether object


dependencies exist for
an operation
This flag indicates that
time dependent
standard values are
maintained to the

Period-dependent
operation parameters

Created on: July 29, 2014


Changed on: March 15, 2016

Comments

Default Leave Blank

Std Text Keys as 10 Mill


Cirt. / 591 Return to Eng
enter XXXXXX for the
work center.
Enter Plant or select from Pull
Defaulted plant is 3000
Down
Will default from the
Last operation must
Work Center other than
enter ZP03
the last operation
May default from the
Std Text Keys as 10 Mill
Work Center or select
Cirt. / 591 Return to Eng
from Pull Down Menu
enter XXXXXX for the
work center.
Defaults from the
Standard Text Key
Click on if you want to
enter additional
operational information
No entry required box
Display only
will be checked if
classification exists
No entry required box
Display only
will be checked if object
dependencies exist
Set flag as required
Display only

Page 6 of 23

Business Process

CA01- Create Routing

Field Name
Cumulation type

Sub-oper.
Base quantity

Unit of Measure

Runtime value
Unit
Activity Type

Setup value
Unit
Activity Type

Fixed Overhead
Unit
Activity Type

Variable Overhead
Standard Value
Activity Type

Scrap

User field key

Created on: July 29, 2014


Changed on: March 15, 2016

Description
operation.
Indicates whether the
standard values of the
sub operations are
cumulated onto the
operation and whether
this only occurs in the
order or also in the
routing
Indicates that suboperations are not
transferred
Quantity of the material
to be produced to which
the standard values of
the operation refer
Unit of measure used in
the operation for the
material to be produced
Total time required for
the process operation.
Unit of time measure for
the runtime value
Describes the activity
produced by a cost
center and is measured
in units of time
Total time required for
the setup operation.
Unit of time measure for
the setup value
Describes the activity
produced by a cost
center and is measured
in units of time
Accounting value for the
operation time
Unit of time measure for
the fixed overhead
Describes the activity
produced by a cost
center and is measured
in units of time
Accounting value for the
operation time
Unit of time measure for
the variable overhead
Describes the activity
produced by a cost
center and is measured
in units of time
Material scrap factor is
the amount of scrap (in
percent) for the
operation
Key that determines the
key words (field names)
for key words (field
names) for user defined
fields.

End User
Procedures

R/O/C

User Action and


Values

Enter cumulation type or


use drop down menu

Check box if required

Defaulted, but can be


changed by user

Default Qty. 1

Defaulted from Create


Routing: Header Details
screen, but can be
changed by user
Enter operation time

Default Unit EA

R
O
O

O
O
O

O
O
O

O
O
O

Comments

Defaults from the Work


Center
Defaults from the Work
Center
Defaults from the Work
Center
Defaults from the Work
Center
Defaults from the Work
Center

No entry required

Defaults from the Work


Center
Defaults from the Work
Center
Defaults from the Work
Center

No entry required

Defaults from the Work


Center
Defaults from the Work
Center
Defaults from the Work
Center

No entry required

Enter scrap factor using


a percentage

Not used

Choose from pull down


menu

Not used

Page 7 of 23

Business Process

CA01- Create Routing

Field Name
Non-value added
indicator
Change number

Valid from
Valid to
Created on
Created by
Changed on
Changed by
Ref. Task list
Ref. Task list
Std value
Calc. type
Std. Value Calc. date
Std. Value Calc. basis
Std. Value Code

Description
Indicates an operation
that is not part of the
value-added chain.
Number that uniquely
identifies a change
master record
Start date for the validity
period of an object
End date of validity
period of an object
Date on which the
record was created
User name of user who
created the record
Date on which the
record was changed
User name of user who
changed the record
Group counter of the
operation set referred to
Group counter of the
operation set referred to
Key which controls how
the std values are
calculated.
Year in which std.value
was calculated
Number which refers to
the basis used for
calculating std. values
Number of the std. value
code used in calculating
std values.

R/O/C

End User
Procedures

User Action and


Values

Comments
Not used

No entry required

Defaults from Create


Routing: Header Details
screen if change number
is entered there
Defaults from validity
period in R/3
Defaults from validity
period in R/3
Defaults from R/3

Defaults from R/3

No entry required

Defaults from R/3

No entry required

Defaults from R/3

No entry required

No entry required
No entry required
No entry required

Not used

Not used

Not used

Not used

Not used

Not used

6. From the Create Routing: Operation Overview select an operation by double-clicking on the
operation number. For example, select operation 0010 a screen with additional detailed
information will appear.

Created on: July 29, 2014


Changed on: March 15, 2016

Page 8 of 23

Business Process

CA01- Create Routing

Created on: July 29, 2014


Changed on: March 15, 2016

End User
Procedures

Page 9 of 23

Business Process

CA01- Create Routing

End User
Procedures

Define Interoperation times fields:

Note: Entering data into the fields described below will override any Interoperation times
for work center from std. queue time enter in the work center.

Field Name
Reduction strategy

Teardown/wait simul.

Maximum wait time

Minimum wait time

Std. queue time

Created on: July 29, 2014


Changed on: March 15, 2016

Description
Key which specifies the
strategy for reducing the
lead time of an operation
or activity
Indicator you use to
specify that teardown
and wait times are
carried out in parallel.
Longest time that may
pass before the material
is processed in the next
operation or order.
Shortest time that must
pass before the material
can be processed in the
next operation or order.
Time an order normally
waits at the work center
before it is processed.

R/O/C

User Action and


Value

For each reduction


strategy you can define
up to six reduction levels

Comments
Enter only if you wish to
use reduction strategy

Enter only if needed

Enter desired time value

The minimum wait time


must not exceed the
maximum wait time.
Enter desired time value

Enter only if needed

Enter only if needed

Enter only if needed

Page 10 of 23

Business Process

CA01- Create Routing

Minimum queue time

Std. move time

Minimum move time

Created on: July 29, 2014


Changed on: March 15, 2016

Shortest queue time an


order waits at the work
center before it is
processed.

Time normally needed


between the current
operation and the next
one for the move from
one Work center
(location group) to
another.
Shortest time needed
between the current
operation and the next
one for the move from
one work center (location
group) to another.

End User
Procedures

If the queue time is


reduced in scheduling,
the standard queue time
can be reduced to this
value.
Enter desired time value

When the lead times are


reduced in scheduling,
the standard move time
can be reduced to this
time.

Enter only if needed

Enter only if needed

Enter only if needed

Page 11 of 23

Business Process

CA01- Create Routing

Created on: July 29, 2014


Changed on: March 15, 2016

End User
Procedures

Page 12 of 23

Business Process

CA01- Create Routing

Field Name

Description

Operation

Section Heading

Created on: July 29, 2014


Changed on: March 15, 2016

R/O/C

User Action and


Values

End User
Procedures

Comments

Page 13 of 23

Business Process

CA01- Create Routing

Field Name

Description

R/O/C

Operation

Activity or Operation
Sequence Number

Sub-Operation

Sub-operation sequence
Number

Work Center / Plant

Work center / plant where


operation will occur

User Action and


Values

Comments

Supplied by system From Operation


Overview
Supplied by system From Operation
Overview
Supplied by system From Operation
Overview
Supplied by system From Operation
Overview
Supplied by system From Operation
Overview
Supplied by system From Operation
Overview

No entry required

Supplied by system from MM Cost View

No entry required

Defaults form Header

No entry required

From Work Center

Not used

From Work Center

Defaulted from operation


overview
Defaulted from operation
overview
Defaulted from operation
overview

Control Key

Standard Text Key

Long Text Exists

Standard Values
Base Quantity
Act./Operation UoM
Break
UOM
Runtime value
Runtime: Un
Runtime: Activ type
Runtime: Efficiency
Setup value
Setup: Un
Setup: Activ type
Setup: Efficiency
Fixer Overhead: Std
value
Fixer Overhead: Un
Fixer Overhead: Activ
type
Fixer Overhead:
Efficiency
Variable Overhead: Std
value
Variable Overhead: Un

Created on: July 29, 2014


Changed on: March 15, 2016

Section Heading
Quantity upon which all
standard values are
based
Unit of Measure for
operation
Break Time available
during operation
Break Time Unit of
Measure
Total time required for
the process operation.
Unit of time measure for
the runtime value
Describes the type of
activity produced by a
work center
Key for performance
efficiency rate
Total time required for
the setup operation.
Unit of time measure for
the setup value
Describes the type of
activity produced by a
work center
Key for performance
efficiency rate

End User
Procedures

R
R
C
O
O
O

Not used
No entry required
No entry required
No entry required
No entry required

No entry required
No entry required
No entry required
Not used

Defaulted from operation


overview
Defaulted from operation
overview
Defaulted from operation
overview

No entry required
No entry required
No entry required
Not used

Accounting value for the


operation time
Unit of time measure for
the Fixer Overhead
value
Describes the type of
activity produced by a
work center
Key for performance
efficiency rate
Accounting value for the
operation time

Defaulted from operation


overview

No entry required

Unit of time measure for


the Variable Overhead

Defaulted from
configuration

No entry required

O
O

Defaulted from operation


overview
Defaulted from operation
overview

No entry required

Defaulted from operation


overview

No entry required

No entry required

Not used

Page 14 of 23

Business Process

CA01- Create Routing

Field Name
Variable Overhead:
Activ type
Variable Overhead:
Efficiency
Business Process
Unit of measure
conversion
Header
Un
Op.
Un
Transfer to orders
Cumul. Type
Suboper do not apply
Standard Value
Calculation
Calculation Type
Calculation Date
Calculation Basis
Standard Value Code
CAPP
CAPP Prod. Order
CAPP Text Created
Interoperation Times
Reduction Strategy
Tear down/Wait Simul
Max Wait Time
Unit of Measure
Min Wait Time
Unit of Measure
Std Queue Time
Unit of Measure
Min Queue Time
Unit of Measure
Std Move Time

Created on: July 29, 2014


Changed on: March 15, 2016

Description
value
Describes the type of
activity produced by a
work center
Key for performance
efficiency rate
Key identifying a
business process
Section Heading
Number for converting
header to operation
UOM
Header Unit of measure
Denominator for
converting to Operation
Uom
Operation UOM
Section Heading
Cumulation type for
standard values
If box is checked, then
sub-operations are not
transferred to the order
Section Heading
Key for Standard value
calculation parameters
Year in which the
standard value was
determined
Pointer to base formula
Key point to reference
value table
Section Heading
Key pointing to how
standard values will be
calculated via CAPP
Flag indicating CAPP
text has been created
Section Heading
Key identifying the
reduction strategy to be
used
Flag identifying tear
down and waiting occur
simultaneously
Longest time that can
pass before the next
processing step
Minimum time that must
pass before next
operation
Normal Waiting period
Minimum waiting period
Normal time required for
moving material to next
operation

R/O/C
O

End User
Procedures

User Action and


Values

Comments

Defaults, or select from


pull down menu

No entry required

Not used

Not used

Defaulted from Header

No entry required

R
R

Defaulted from Header


Defaulted from
Operation

No entry required
No entry required

Defaulted

No entry required

Enter value or select


from pull-down menu

Not used

C
C

Not used

Select from Pull down if


configured
Enter year if key entered

C
C

Not used
Not used
Not used
Not used

Select from pull down


menu if CAPP is to be
active
Set by system

Not used

Select from Pull Down


Menu if desired

Not used

Click on if desired

Not used

Enter max time if


desired

Not used

C
O

Enter H if time entered


Enter Minimum time if
desired

Not used
Not used

C
O
C
O
C
O

Enter H if time entered


Enter if desired
Enter H if time entered
Enter if applicable
Enter H if time entered
Enter if applicable

Not used
Not used
Not used
Not used
Not used
Not used

Not used

Page 15 of 23

Business Process

CA01- Create Routing

Field Name

Description

R/O/C

User Action and


Values

Comments

Enter H if time entered

Not used

Enter if applicable

Not used

Enter H if time entered

Not used

R
C
O
C

Default form work center


Default form work center

No entry required
No entry required
Not used
Not used

Set if you want the


operation to split

Not used

Must be > 1 for splitting


to occur

Not used

Enter if you wish splitting


to occur only if
economical.
Enter H if time entered
Select overlapping type
(reqd, optional,
Continuous, or No)
Enter only if required
Overlapping
dependencies are met
Enter if the operation
can be overlapped with
the next one
Enter only if the required
dependencies are met

Not used

Default system setting

No entry required

Must enter if min overlap


times are used
The minimum sendahead quantity must not
exceed the maximum lot
size.

Not used

Enter if applicable

Not used

Defaults from Work


Center - change if
desired
Defaults from Work
Center - change if
desired
Defaults from Work
Center - change if
desired

Not used

Unit of Measure
Min Move Time
Unit of Measure
Interoperation times
for work center
Std queue time
Unit of Measure
Min Queue Time
Unit of Measure
Splitting
Required Splitting
No. of Splits
Min Processing Time
UOM
Overlapping

Minimum time to move


material
Section Heading
Normal Waiting period
Minimum waiting period
Section Heading
Flag allowing splitting of
the quantity across
capacities
Number of partial lots or
capacities over which
the quantity is to be split
Time quantity below
which the system will not
split the operation

O
Section Heading

Required overlapping

Used to indicate
mandatory overlapping

Optional Overlapping

Used to indicate that the


operation can be
overlapped
Use this indicator to
stipulate that the
operation always
(irrespective of the
operation) overlap, if the
conditions for the
overlap are fulfilled.

Indicator that specifies


that the operation should
not overlap with the
following operation.
Enter unit of measure

Continuous flow
production

No Overlapping

Blank box
Min send-ahead qty

Minimum quantity that


must be sent ahead to
the next operation when
operations overlap.

General Data
Scrap in %

Section Heading
Expected scrap during
operation
Number of time tickets
to be printed

No. Time Tickets

O
O

No. Confirm. Slips

Number of confirmation
slips to be printed

Wage Group

Wage Group used when


valuing the work

Created on: July 29, 2014


Changed on: March 15, 2016

End User
Procedures

Not used

Not used
Not used
Not used

Not used

Not used
Not used

Page 16 of 23

Business Process

CA01- Create Routing

Field Name

Description

Wage Type

Ex. Piecework, premium


wage etc

Suitability

Key pointing to
qualifications
requirements
Number needed to carry
out operation
Key identifying setup
parameters

Classification of
categories of setup
groups
Key grouping operations
with same or similar
conditions
Key determining where
and how a BOM item is
relevant to costing
Indicates an operation
that is not part of the
value-added chain.

Number of Employees
Setup Key Type
Setup Group Category
Setup Group Key
Costing Relevancy
Non-value added

Required Qualification
Qualification regarding
capacity cat.
Qualifications

Section Heading
Capacity category
requiring qualification
Section Heading

Requirements profile
(LO), Job, position
Qualification

Select appropriate type


of qualification
Term used in the
Personnel System to
search for objects to
define quality
requirements.
Section Heading
Indicates that
subcontracting is
provided for
Key identifying the
Purchasing info rec to
be used

External Processing
Subcontracting
Purchasing Info Rec

Created on: July 29, 2014


Changed on: March 15, 2016

R/O/C

End User
Procedures

User Action and


Values

Comments

Defaults from Work


Center - change if
desired
Defaults from Work
Center - change if
desired
Enter if desired

Not used

Defaults from Work


Center - change if
desired
select from Pull down
menu if desired

Not used

Select from pull down


menu if desired

Not used

Default setting X

Select from Pull down


menu if different from
default
Set indicator as required

Enter if desired

Not used

Select requirements
profile, job, or position.
Enter search criterion for
qualifications
requirements.
Enter appropriate value

Not used

O
O

Not used
Not used

Not used

Not used

The entry depends on


the object type chosen

Not used

Check box if
subcontracting operation
will be used.
Default Info Record will
be 5500000000. Enter
in field.

Do Not Check for


external routing
operation
Select the search button
to start the Info Record
recovery process

Page 17 of 23

Business Process

CA01- Create Routing

Search Screen

Search data base

Search Screen

Material Group

Search Screen

Short Term

Search Screen

Green Check (Enter)

Search Results Screen

Shows all Info Records


attached to the material

Created on: July 29, 2014


Changed on: March 15, 2016

End User
Procedures

Select the Info Record


per Material Group
(Non-Stock Material)
Select drop down and
insert ZEXT-PROC in
the field
Enter Material number
requiring the Info Record

Enter required data

Enter to search for


Material Info Record
Select (double click) on
required info record

Enter required data

Enter required data


Enter required data

Data will enters into the


External processing
fields

Page 18 of 23

Business Process

CA01- Create Routing

Purchasing Org
Outline Agreement
Item, outline agreement
Sort String
Material Group
Purchasing Group
Vendor
Plnd Delivery Time
Price Unit
Cost Element
Net Price
Currency
Inspection type

Org responsible for


purchasing this
operation
Key which identifies a
purchasing document

End User
Procedures

Default form Info Record

Enter if desired

No entry Required
Note: In it does not
default enter 3000
Not used

Key which identifies a


specific line item on a
purchasing document
Allows grouping of nonstock item info records
Key identifying materials
with similar
characteristics
Group responsible for
purchasing an external
operation
Seller of the service
performed in this
operation
Number of days required
for procurement of this
operation
Number of units to which
price applies
Key identifying a cost
element

Enter if desired

Not used

Default form Info Record

No entry Required

Default form Info Record

No entry Required

Default form Info Record

No entry Required

Default form Info Record

No entry Required

Default form Info Record

No entry Required

Default form Info Record

No entry Required

Enter required data

Price after discounts &


Surcharges
Currency of purchase
price
Determines how an
inspection is to be
carried out

Enter No. 510050 for all


External Processed
materials
Default form Info Record

Default form Info Record

No entry Required

Select from pull down


menu if desired

Enter data as required

No entry Required

Result: Create Routing: Operations Overview display screen.

Created on: July 29, 2014


Changed on: March 15, 2016

Page 19 of 23

Business Process

CA01- Create Routing

7.

End User
Procedures

The Material Number must be entered in the Standard Text Key Description
field as shown above when an External Process Info Record is created.
Quality Management:
Recording View

User Defined Fields;


Key
Administrative data
Change number

Valid from
Valid to
Created on
Created by
Changed on
Changed by
Admin data for
Allocation/
Operation/
Task list
Change number

Valid from

Created on: July 29, 2014


Changed on: March 15, 2016

Key specifying the


screen structure for
recording values of
inspection
characteristics
Key for user defined
fields
Section Heading
Number that uniquely
identifies a change
master record

Start date for the validity


period of an object
End of validity period of
an object in R/3
Date on which the
record was created
User name of user who
created the record
Date on which the
record was changed
User name of user who
changed the record
Section Heading

Enter if specific view


desired

System defaults to a
standard recording
screen
Not used

No entry required

Defaults from Create


Routing: Header Details
screen if change number
is entered there
Defaults from validity
period in system
Defaults from validity
period in system
Defaults from system

Defaults from system

No entry required

Defaults from system

No entry required

Defaults from system

No entry required

Number that uniquely


identifies a change
master record

No entry required

Start date for the validity


period of an object

Defaults from Create


Routing: Header Details
screen if change number
is entered there
Defaults from validity
period in system

No entry required
No entry required
No entry required

No entry required

Page 20 of 23

Business Process

CA01- Create Routing

Created on
Created by
Changed on
Changed by

Date on which the


record was created
User name of user who
created the record
Date on which the
record was changed
User name of user who
changed the record

End User
Procedures

Defaults from system

No entry required

Defaults from system

No entry required

Defaults from system

No entry required

Defaults from system

No entry required

1. On screen Create Routing: Material Component Overview, display information in the fields as
specified in the below table (accessed via CompAlloc Overview button):

This procedure is not required to complete the routing. The material will be
allocated automatically to the first operation when the routing is saved

Result: The Material Component Overview screen displays.

Ph
L
Path
Item
Component
Quantity

Un
Item cat
Material description
Comp.BOM

Created on: July 29, 2014


Changed on: March 15, 2016

Phantom item
indicator
Level in multi-level
BOM explosion
Path in multi-level
BOM explosion
Item number in BOM
BOM part number
Quantity of
component needed to
make the base
quantity
Unit of measure from
BOM master
Item category
Description of
material
Number used in
combination with the
BOM categoryto
uniquely identify a

Defaults from system

No entry required

Defaults from system

No entry required

Defaults from system

No entry required

Defaults from system


Defaults from system
Defaults from system

No entry required
No entry required
No entry required

Defaults from system

No entry required

Defaults from system


Defaults from system

No entry required
No entry required

Defaults from system

No entry required

Page 21 of 23

Business Process

CA01- Create Routing

End User
Procedures

BOMor a BOM group


Al
BOM header
material

Alternative BOM
BOM item for the
uppermost level

Defaults from system


Defaults from system

No entry required
No entry required

2. On screen Create Routing: Material Component Overview, select the desired BOM components.
3. Click on the New Assignment button to link BOM components to the desired operation. In most
cases, it is preferable to select all of the components and allocate them to the first operation.

Created on: July 29, 2014


Changed on: March 15, 2016

Page 22 of 23

Business Process

CA01- Create Routing

End User
Procedures

4. Enter the operation number the components are to be assigned to and click the green check to
complete the assignment.
5. Click

to save the completed routing.

Created on: July 29, 2014


Changed on: March 15, 2016