Escolar Documentos
Profissional Documentos
Cultura Documentos
Theft of Diesel
Lack of Remote Monitoring Systems
Primary Focus = Reduce Operating Expenses
3
Fluctuating Voltage
Phase Failure
Excessive Generator runtime
BTS
Battery
Backup
Unreliable, brownout conditions
1. Off-Grid Solution:
PURE Hybrid Platform
1.
2.
3.
4.
5.
Line Conditioning
Phase balancing
Ready For Hybrid/Renewable Upgrades
Single Unit Platform
Remote Performance Monitoring &
Mgmt
Fuel consumption
3. Intelligent Controller
1. Generator Start/Stop
2. Maximize Site Uptime on AC Mains during
Brownout conditions/events
10
Tower Leasing
Customers
Minimize OPEX,
Maximize profits
Single/Double Phase Failure
Auto Load Sharing
Up to 4 Carriers
Dual GenSet + Mains Capability
AMF/ATS for 25KVA Gensets
Multi Tenant AC Distribution
11
Solar irradiation
Wiring Losses
Conversion losses
CAPEX and RoI
Standard Flat PV
Panels for sites with
plenty of space for
structure
Wind fluctuation
CAPEX and RoI
Tower Mount
14
Fast Lead-times
Local Sales & Support
Local Installation
Local Financing Options
Local Maintenance
Strategic Stock Holding
16
18