Preparation, review and approval of documents about InspectionTest Plan of the project
to ensure inspection shall be in accordance with the requiredQuality Standard and
Procedures.
Execute and develop quality audit of Sub-contractorsinspection documentation works for
Static and Rotating Equipments to assurethat the required forms used in testing submitted
are approved by clientrepresentative as per ITP such as:
-
Ensure to have a preservation log for all theequipments checked and monitor daily /
weekly for easily tracking the status.
Confirm that all instruments used foralignment and leveling by subcontractor are
calibrated with stickers indicatedthe date of calibration and re-calibration.
Check and monitor the grouting preparation ofall equipments ready for grouting
and verify the preparation requirements suchas pre-watering of foundation, chipping,
cleaning and form works requirements.
-
Ensure that inspection areas are safe forworking with required level of safety.
Witness the leveling / verticality checking ofhorizontal and vertical equipment prior
for grouting and for piping erection.Verification of anchor bolt tightening prior for
grouting. Issue a release noteto civil and piping respectively after alignment / leveling
and verify againthe anchor bolt final tightening.
Preliminary alignment of rotating equipmentssuch as pumps, compressors, gear
box, turbine, blowers, diesel engine andothers. Check the soft foot of motors shimming
condition. Check the axial /radial alignment (angular alignment) or shaft alignment @
cold condition usingdial gauge or laser equipment. Check the distance shaft ends (DBSE)
@ coldcondition and pre stretch especially for rotating equipments with gearbox.
Checkthe skid leveling in regards to base of motors and pumps. Check the anchor
bolttightening of skid prior for grouting, piping installation to suction anddischarge.
Verify the parallelism on suction / discharge pipingconnection if stress free
condition. Checked before and after suction anddischarge pipe are assembled to pump or
compressor.
Internal inspection of vessels horizontal / verticalequipments and check the internal
attachment required such as demister, trays(odd / even trays) valve caps, down comer
plate, filter cartridge, distributorsand others. Check internal cleanliness of vertical and
horizontal vessel priorfor equipment temporary or final box-up. Verify the final gasket to
beinstalled during final box-up.
Checked external attachment such as platforms,ladders, support and instruments are
installed and inspected.
Reviewed Method of Statement prepared bysubcontractors regarding construction
activities that will guide them to ConstructionActivities.
Provide early warning of potential quality problemof Static/Rotating and HVAC
equipments during fabrication and installation.
Support contractor to maximum extent, possible tomake contractor successful.
Input contractors daily accomplishment aboutconstruction and inspection activities of
Static/Rotating and HVAC equipments.
Coordinate and engage the support services ofengineering and vendors for some cases
encountered at fabrication / site whichrequired their immediate decision and action.