Date:

Project:

August 10, 2011


Sea Residences Phase 3

Subject:

COST EVALUATION

COST BREAKDOWN

NO. 001
DCI Evaluate

ITEM

DESCRIPTION

DEDUCTIVE
QTY

UNIT

ADDITIVE

UNIT COST

DEDUCTIVE

QTY

UNIT

1.36

sqm

Formworks - Stiffener column

5.04

sqm

and lintel beam


Painting to stiffener column, lintel beam

1.72

sqm

1.89

sqm

0.09

sqm

3.24

sqm

IN BETWEEN UNIT 1411F & 1412F


1
Provide door opening
between units 1412F and 1411F
1.1
1.2

Deletion of CHB Wall


Painting to CHB wall

1.3

Rectification of demolished wall


Stiffener column

1.89

sqm

3.78

sqm

Php
Php

710.00
160.00

Php

1,341.90

Php

604.80

and lintel beam

1.4

600x600mm homogenous tiles to


demolished partition area

UNIT 1412F
1
Deletion of Floor and Wall Tiles at T&B
300mmx300mm Vitrified Ceramic Tiles (FF8)

3.24

300mmx300mm Glazed Ceramic Tiles (WF13)

12.49

sqm
sqm

Php
Php

770.00
770.00

Php

2,494.80

Php

9,617.30

Additional tiles at removed structures


600x600mm homogenous tiles to
removed T&B
2

Deletion of T&B Walls


2.1 4" CHB Wall
2.2 Painting to CHB Wall

17.41

sqm

Php

710.00

24.72

sqm

Php

160.00

Php
Php

12,361.10
3,955.20

Deletion of plumbing fixtures


and accessories
3.1
Water closet (labor only)

1.00

unit

Php

400.00

Php

400.00

1.00
1.00

unit
unit

Php
Php

200.00
350.00

Php

200.00

Php

350.00

Soap holder (labor only)


Facial Mirror (labor only)

1.00

unit

Php

300.00

1.00

unit

Php

400.00

Php
Php

300.00
400.00

Tissue Holder (labor only)

1.00

unit

Php

300.00

Php

300.00

3.2

Lavatory(labor only)

3,3

Shower Set (labor only)

3,4
3,5
3,6
4

Deletion of T&B Door (D-14)

1.00

unit

Php

1,000.00

Php

1,000.00

Deletion of Floor and Shower Drain

2.00

unit

Php

667.00

Php

1,334.00

Deletion of outlets
6.1

Outlet for heater

1.00

unit

6.2

Outlet for Washing Machine

1.00

unit

1.00

unit

Php

785.00

Php

785.00

unit
unit

Php
Php

1,200.00
1,078.00

Php

1,200.00

Php

1,078.00

unit

Php

1,131.90

Php

1,131.90

Php
Php

600.00
500.00

Php

350.00

Php

800.00

Deletion of Hose Bibb

Deletion of Furnitures, Fittings &


Plumbing Fixtures (labor only)
7.1

kitchen counter (K -1) (labor only)

1.00

7.3

overhead cabinets (labor only)

7.4

under counter cabinet (labor only)

1.00
1.00

7.5
7.6

kitchen sink (for turnover to unit buyer)


cook top 2-burner (for turnover to uit buyer)

1.00

unit

Php

600.00

1.00

unit

Php

500.00

7.7

rangehood - Elba model AL-D601 X (labor only)

7.8

Grease Trap (labor only)

1.00
1.00

unit
unit

Php
Php

350.00
800.00

600x600mm homogenous tiles to


demolished kitchen area
9

1.58

sqm

1.36
3.78

sqm
sqm

Deletion of Sliding Door (D-16)


(for turnover to unit buyer)

1.00

unit

Php

2,397.51

Php

2,397.51

1.89

sqm

710.00
160.00

1,341.90

sqm

Php
Php

Php

3.78

Php

604.80

UNIT 1412F & 1414F


1

Provide door opening


between units 1412F and 1414F
1.1
1.2
1.3

Deletion of CHB Wall


Painting to CHB wall
Rectification of demolished wall
Stiffener column and lintel beam
Formworks

1.4

Painting to stiffener column, lintel beam

6.76

sqm

600x600mm homogenous tiles to


demolished partition area (for 1412F)

0.09

sqm

1.58

sqm

UNIT 1414F
1

Deletion of Furnitures, Fittings &


Plumbing Fixtures (labor only)
7.1

kitchen counter (K-1) (labor only)

1.00

7.3

overhead cabinets (labor only)

7.4

under counter cabinet (labor only)

1.00
1.00

7.5
7.6

kitchen sink (for turnover to unit buyer)


cook top 2-burner (labor only)

7.7
7.8

unit
unit

Php
Php

1,200.00
1,078.00

Php

1,200.00

Php

1,078.00

unit

Php

1,131.90

Php

1,131.90

1.00

unit

Php

450.00

1.00

unit

Php

500.00

Php
Php

450.00
500.00

rangehood - Elba model AL-D601 X (labor only)

1.00

Php
Php

400.00
793.00

400.00

1.00

unit
unit

Php

Grease Trap (labor only)

Php

793.00

Additional 600x600mm homogenous tiles to


demolished kitchen area

Total Amount

Php

51,001.11
TOTAL DEDUCTIVE AMOUNT

note:

unit cost was based on the approved BOQ for Phase 3

Prepared by:

checked by:

Proceso Palacio Jr.

Cid V. Orbeta

Construction Project Architect


Design Coordinates, Inc.

Construction Project Manager


Design Coordinates, Inc.

ate
ADDITIVE
UNIT COST

ADDITIVE

Php

600.00

Php

816.00

Php

460.00

Php

2,318.40

Php
Php

600.00
160.00

Php
Php

1,032.00
302.40

Php

1,250.00

Php

112.50

Php

1,050.00

Php

3,402.00

Php

1,050.00

Php

1,659.00

Php

600.00

Php

816.00

Php

600.00

Php

2,268.00

Php

160.00

Php

1,081.60

Php

1,050.00

Php

94.50

Php

1,050.00

Php

1,659.00

DEDUCTIVE AMOUNT

Php

15,561.40
35,439.71

Date:

May 23, 2011

Project:

Sea Residences Phase 3

Subject:

COST EVALUATION
PER WAO NO. SRP3-WAO-CP01-002 dated 14 August 2010

COST BREAKDOWN BASED ON APPROVED WORK AUTHORIZATION ORDER NO. 002


RECONCILED COST
ITEM

DESCRIPTION

DEDUCTIVE
QTY

0411D and 0412D-Provide door opening only (41" width x 88"


hieght) in between units.
1.1
1.2

Deletion of CHB Wall


Painting to CHB wall

1.3

Rectification of demolished wall

###
###

Stiffener column and lintel beam

###

Formworks

###

Additional CHB wall


Painting to stiffener column, lintel beam
1.4

###

600x600mm homogenous tiles to


demolished partition area
Total Amount
Total Net

note:

unit cost was based on the approved BOQ for Phase 3

Prepared by:

Proceso Palacio Jr.


Construction Project Architect
Design Coordinates, Inc.

###
DEDUCTIVE

Date:

May 20, 2011

Project:

Sea Residences Phase 3

Subject:

COST EVALUATION
PER WAO NO. SRP3-WAO-CP01-003 dated 07 September 2010

COST BREAKDOWN BASED ON APPROVED WORK AUTHORIZATION ORDER NO. 003


DCI EVALUATION
ITEM

DESCRIPTION

DEDUCTIVE
QTY

UNIT

DEDUCTIVE

1511F and 1512F -deletion of wall partition between units; Not to install kitchen
counter, under cabinets, sink, cook top and range hood at 1512F.
1.1

Deletion of CHB Wall


Painting to CHB wall

6.94

sqm

Php

800.00

Php

5,552.00

13.87

sqm

Php

160.00

Php

2,219.20

1.2

Deletion of Furnitures, Fittings & Plumbing Fixtures

1.2.1

Kitchen Sink (labor only)

1.00

unit

Php

600.00

Php

600.00

1.2.2

Rangehood - Elba model AL-D601 X (labor only)

1.00

unit

Php

400.00

Php

400.00

1.2.3

Cook top 2-burner (labor only)

1.00

unit

Php

500.00

Php

500.00

1.2.4

Modular Under Cabinet and Counter (labor only)

1.00

unit

Php

1,543.50

Php

1,543.50

1.2.5

Deletion of Grease Trap (labor only)

1.00

unit

Php

793.00

Php

793.00

Php

11,607.70

Total Amount
Total Net Amount
note:

AD

UNIT COST

unit cost were based on approved BOQ for Phase 3

Prepared by:;

checked by:

Proceso Palacio Jr.

Cid V. Orbeta

Construction Project Architect

Construction Project Manager

Design Coordinates, Inc.

Design Coordinates, Inc.

QTY

Cost Breakdown
Per SRP2-WAO-CP01-003

EVALUATION

RECONCILED COST
ADDITIVE
UNIT

DEDUCTIVE

UNIT COST

ADDITIVE

Php
DEDUCTIVE

UNIT

UNIT COST

1.89

sqm

Php

800.00

Php

1,512.00

3.78

sqm

Php

160.00

Php

604.80

Php

2,116.80

Php

(11,607.70)

DEDUCTIVE

QTY

UNIT

DEDUCTIVE

Noted by:

ADDITIVE

QTY

Lowell G. Cortez
Project Manager
Megawide Construction Corp.

UNIT COST

akdown

O-CP01-003

ADDITIVE
ADDITIVE

Php
Php

(2,116.80)

Cost Breakdown
Per SRP2-WAO-CP01-004

Cost Breakdown
Per SRP2-WAO-CP01-001

Date:

May 23, 2011

Project:

Sea Residences Phase 3

Subject:

COST EVALUATION
PER WAO NO. SRP3-CO-CP01-004 dated 05 August 2010

COST BREAKDOWN BASED ON APPROVED WORK AUTHORIZATION ORDER NO. 001

NO. 001
DCI Estimate

ITEM

DESCRIPTION
UNIT

UNIT COST

DEDUCTIVE

QTY

1.95
3.90

sqm

Php
Php

800.00
160.00

Php

1,560.32

sqm

Php

624.00

2.1.1 kitchen counter of 0911F, 0915F and 0916F (labor only)

3.00

units

Php

1,200.00

Php

2.1.2 overhead cabinets of 0911F, 0915F and 0916F (labor only)

3.00

units

Php

1,078.00

Php

2.1.3 kitchen countertop of 0914F and 0915F (labor only)

2.00

units

Php

1,200.00

Php

2,400.00

2.1.4 kitchen sink (for turnover to unit buyer)

1.00

unit

Php

600.00

Php

600.00

2.1.5 cook top (for turnover to uit buyer)

unit

Php

500.00

Php

500.00

2.1.6 rangehood - Elba model AL-D601 X (labor only)

1.00
1.00

Php

350.00

Php

350.00

2.1.7 sliding door and partition of 0914F and 0916F (labor only)

2.00

unit
units

UNIT

DEDUCTIVE

UNIT COST

ADDITIVE

QTY

UNIT

ADDITIVE

UNIT COST

DEDUCTIVE

QTY

UNIT

3,600.00

1.36

sqm

3,234.00

1.02

sqm

1.98

sqm

There will be a 212 cm x 92 cm door opening only in between 1520D and 1521D
Deletion of CHB Wall
Painting to CHB wall

1.89
3.78

sqm

Php

800.00

Php

1,512.00

sqm

Php

160.00

Php

604.80

CHB partitions between the said units shall not be installed


2.1

2.2

Deletion of Furnitures, Fittings & Plumbing Fixtures

Php

T&B's of 0914B and 0915F (labor only)


Total Amount

note:

ADDITIVE

QTY

1.1
2

RECONCILED COST

DEDUCTIVE

Php

12,868.32

Php

Php

unit cost was based on the approved BOQ for Phase 3

Noted by:
Prepared by:

checked by:

Proceso Palacio Jr.

Cid V. Orbeta

Project Manager

Construction Project Architect

Construction Project Manager

Megawide Construction Corp.

Design Coordinates, Inc.

Design Coordinates, Inc.

Lowell Cortez

2,116.80

Date:
Project:
Subject:

May 23, 2011


Sea Residences Phase 3
COST EVALUATION
PER WAO NO. SRP3-CO-CP01-005 dated 05 August 2010

COST BREAKDOWN BASED ON APPROVED WORK AUTHORIZATION ORDER NO. 001


ITEM

DESCRIPTION
QTY

0424F and 0425F -Provide door opening only in between units.


1.1
1.2
1.3

1.4

Deletion of CHB Wall


Painting to CHB wall
Rectification of demolished wall
Stiffener column and lintel beam
Formworks
Additional CHB wall
Painting to stiffener column, lintel beam
600x600mm homogenous tiles to

1.89
3.78

demolished partition area


Total Amount
note:

unit cost was based on the approved BOQ for Phase 3

Prepared by:

checked by:

Proceso Palacio Jr.


Construction Project Architect
Design Coordinates, Inc.

Cid V. Orbeta
Construction Project
Design Coordinates

ORDER NO. 001

NO. 001
DCI Estimate

UNIT

sqm
sqm

DEDUCTIVE
UNIT COST

Php
Php

checked by:

Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.

800.00
160.00

ADDITIVE
DEDUCTIVE

Php
Php

1,512.00
604.80

Php

2,116.80

QTY

UNIT

e
ADDITIVE
UNIT COST

DEDUCTIVE
ADDITIVE

QTY

1.89
3.78

Php

UNIT

sqm
sqm

Noted by:

Lowell Cortez
Project Manager
Megawide Construction Corp.

Cost Breakdown
Per SRP2-WAO-CP01-001

RECONCILED COST
DEDUCTIVE
UNIT COST

Php
Php

e Construction Corp.

800.00
160.00

DEDUCTIVE

Php
Php

Php

ADDITIVE
UNIT COST

QTY

UNIT

1.36
1.02

sqm
sqm

Php
Php

600.00
600.00

1.98

sqm

Php

160.00

1,512.00
604.80

2,116.80

eakdown

AO-CP01-001

DITIVE
ADDITIVE

Php
Php

816.00
612.00

Php

316.80

Php

1,744.80

Date:
Project:
Subject:

May 23, 2011


Sea Residences Phase 3
COST EVALUATION
PER WAO NO. SRP3-CO-CP01-008 dated 05 August 2010

COST BREAKDOWN BASED ON APPROVED WORK AUTHORIZATION ORDER NO. 001


ITEM

DESCRIPTION
QTY

0918D and 0919D-Provide door opening only in between units.


1.1
1.3

1.4

Deletion of CHB Wall


Painting to CHB wall
Rectification of demolished wall
Stiffener column and lintel beam
Formworks
Additional CHB wall
Painting to stiffener column, lintel beam
600x600mm homogenous tiles to

1.89
3.78

demolished partition area


Total Amount
note:

unit cost was based on the approved BOQ for Phase 3

Prepared by:

checked by:

Proceso Palacio Jr.


Construction Project Architect
Design Coordinates, Inc.

Cid V. Orbeta
Construction Project
Design Coordinates

ORDER NO. 001

NO. 001
DCI Estimate

UNIT

sqm
sqm

DEDUCTIVE
UNIT COST

Php
Php

checked by:

Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.

800.00
160.00

ADDITIVE
DEDUCTIVE

Php
Php

1,512.00
604.80

Php

2,116.80

QTY

UNIT

e
ADDITIVE
UNIT COST

DEDUCTIVE
ADDITIVE

QTY

1.89
3.78

Php

UNIT

sqm
sqm

Noted by:

Lowell Cortez
Project Manager
Megawide Construction Corp.

Cost Breakdown
Per SRP2-WAO-CP01-001

RECONCILED COST
DEDUCTIVE
UNIT COST

Php
Php

e Construction Corp.

800.00
160.00

DEDUCTIVE

Php
Php

Php

ADDITIVE
UNIT COST

QTY

UNIT

1.36
1.02

sqm
sqm

Php
Php

600.00
600.00

1.98

sqm

Php

160.00

1,512.00
604.80

2,116.80

eakdown

AO-CP01-001

DITIVE
ADDITIVE

Php
Php

816.00
612.00

Php

316.80

Php

1,744.80

Date:
Project:
Subject:

May 23, 2011


Sea Residences Phase 3
COST EVALUATION
PER WAO NO. SRP3-CO-CP01-009 dated 05 August 2010

COST BREAKDOWN BASED ON APPROVED WORK AUTHORIZATION ORDER NO. 001


ITEM

DESCRIPTION
QTY

0724D and 0725D-Provide door opening only in between units.


1.1
1.2
1.3

1.4

Deletion of CHB Wall


Painting to CHB wall
Rectification of demolished wall
Stiffener column and lintel beam
Formworks
Additional CHB wall
Painting to stiffener column, lintel beam
600x600mm homogenous tiles to
demolished partition area

1024F and 1025F -Provide door opening only 1.2 m wide in


between units.
2.1
2.2
2.3

2.4
2.5

Deletion of CHB Wall


Painting to CHB wall
Rectification of demolished wall
Stiffener column and lintel beam
Formworks
Additional CHB wall
Painting to stiffener column, lintel beam
600x600mm homogenous tiles to
demolished partition area
sliding doors and partitions (labor only)

3.78

1402F and 1403F-Provide door opening only in between units.


3.1
3.2
3.2

3.4

Deletion of CHB Wall


Painting to CHB wall
Rectification of demolished wall
Stiffener column and lintel beam
Formworks
Additional CHB wall
Painting to stiffener column, lintel beam
600x600mm homogenous tiles to
demolished partition area

1431F and 1432F -Provide door opening only in between units.


4.1
4.2
4.3

4.4

Deletion of CHB Wall


Painting to CHB wall
Rectification of demolished wall
Stiffener column and lintel beam
Formworks
Additional CHB wall
Painting to stiffener column, lintel beam
600x600mm homogenous tiles to
demolished partition area

Total Amount
note:

unit cost was based on the approved BOQ for Phase 3

Prepared by:

Checked by:

Proceso Palacio Jr.


Construction Project Architect
Design Coordinates, Inc.

Cid V. Orbeta
Construction Project
Design Coordinates

ORDER NO. 001


MCC PROPOSAL
DEDUCTIVE
UNIT COST

UNIT

sqm

Php

160.00

ADDITIVE
DEDUCTIVE

Php

QTY

UNIT

2.42
1.82
0.43
2.41

sqm
sqm
sqm
sqm

0.14

sqm

604.80

Php

Checked by:

Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.

604.80

NO. 001

L
ADDITIVE
UNIT COST

ADDITIVE

QTY

Php
Php
Php
Php

600.00
600.00
710.00
160.00

Php
Php
Php
Php

1,452.00
1,092.00
305.30
385.60

Php

1,250.00

Php

175.00

UNIT

1.89
3.78

sqm

2.54
5.04

DEDUCTIVE
UNIT COST

sqm

Php
Php

800.00
800.00

sqm
sqm

Php
Php

800.00
800.00

Php

1.89
3.78

sqm

1.89
3.78

sqm

sqm

sqm

Php
Php

800.00
160.00

Php
Php

800.00
160.00

3,409.90

Approved by:;

checked by:

Ranie B. Montenegro
Cost Engineer
Megawide Construction Corp.

Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.

DCI Estimate

UCTIVE
DEDUCTIVE

Php
Php

1,512.00
3,024.00

Php
Php

2,032.00
4,032.00

QTY

UNIT

ADDITIVE
UNIT COST

Php
Php

1,512.00
604.80

Php
Php

1,512.00
604.80

Php

4,536.00

RECO

DITIVE
ADDITIVE

QTY

1.89
3.78

DEDUCTIVE
UNIT COST

UNIT

sqm
sqm

Php
Php

800.00
160.00

Php

Noted by:

Lowell Cortez
Project Manager
Megawide Construction Corp.

Cost Breakdown
Per SRP2-WAO-CP01-001

RECONCILED COST

CTIVE
DEDUCTIVE

Php
Php

ADDITIVE
UNIT COST

QTY

UNIT

ADDITIVE

1.36
1.02

sqm
sqm

Php
Php

600.00
600.00

Php
Php

816.00
612.00

1.98

sqm

Php

160.00

Php

316.80

1,512.00
604.80

Php

2,116.80

Php

1,744.80

Date:
Project:
Subject:

May 23, 2011


Sea Residences Phase 3
COST EVALUATION
PER WAO NO. SRP3-CO-CP01-011 dated 05 August 2010

COST BREAKDOWN BASED ON APPROVED WORK AUTHORIZATION ORDER NO. 001


ITEM

DESCRIPTION
QTY

0802D and 0803D -Provide door opening only in between


units.
1.1
1.3

1.4

Deletion of CHB Wall


Painting to CHB wall
Rectification of demolished wall
Stiffener column and lintel beam
Formworks
Additional CHB wall
Painting to stiffener column, lintel beam
600x600mm homogenous tiles to

1.89
3.78

demolished partition area


Total Amount
note:

unit cost was based on the approved BOQ for Phase 3

Prepared by:

checked by:

Proceso Palacio Jr.


Construction Project Architect
Design Coordinates, Inc.

Cid V. Orbeta
Construction Project
Design Coordinates

ORDER NO. 001

NO. 001
DCI Estimate

UNIT

sqm
sqm

DEDUCTIVE
UNIT COST

Php
Php

checked by:

Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.

800.00
160.00

ADDITIVE
DEDUCTIVE

Php
Php

1,512.00
604.80

Php

2,116.80

QTY

UNIT

e
ADDITIVE
UNIT COST

DEDUCTIVE
ADDITIVE

QTY

1.89
3.78

Php

UNIT

sqm
sqm

Noted by:

Lowell Cortez
Project Manager
Megawide Construction Corp.

Cost Breakdown
Per SRP2-WAO-CP01-001

RECONCILED COST
DEDUCTIVE
UNIT COST

Php
Php

e Construction Corp.

800.00
160.00

DEDUCTIVE

Php
Php

Php

ADDITIVE
UNIT COST

QTY

UNIT

1.36
1.02

sqm
sqm

Php
Php

600.00
600.00

1.98

sqm

Php

160.00

1,512.00
604.80

2,116.80

eakdown

AO-CP01-001

DITIVE
ADDITIVE

Php
Php

816.00
612.00

Php

316.80

Php

1,744.80

Date:
Project:
Subject:

May 23, 2011


Sea Residences Phase 3
COST EVALUATION
PER WAO NO. SRP3-CO-CP01-012 dated 05 August 2010

COST BREAKDOWN BASED ON APPROVED WORK AUTHORIZATION ORDER NO. 001


ITEM

DESCRIPTION
QTY

0302D and 0303D -Provide door opening only in between


units.
1.1
1.3

1.4

Deletion of CHB Wall


Painting to CHB wall
Rectification of demolished wall
Stiffener column and lintel beam
Formworks
Additional CHB wall
Painting to stiffener column, lintel beam
600x600mm homogenous tiles to

1.89
3.78

demolished partition area


Total Amount
note:

unit cost was based on the approved BOQ for Phase 3

Prepared by:

checked by:

Proceso Palacio Jr.


Construction Project Architect
Design Coordinates, Inc.

Cid V. Orbeta
Construction Project
Design Coordinates

ORDER NO. 001

NO. 001
DCI Estimate

UNIT

sqm
sqm

DEDUCTIVE
UNIT COST

Php
Php

checked by:

Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.

800.00
160.00

ADDITIVE
DEDUCTIVE

Php
Php

1,512.00
604.80

Php

2,116.80

QTY

UNIT

e
ADDITIVE
UNIT COST

DEDUCTIVE
ADDITIVE

QTY

1.89
3.78

Php

UNIT

sqm
sqm

Noted by:

Lowell Cortez
Project Manager
Megawide Construction Corp.

Cost Breakdown
Per SRP2-WAO-CP01-001

RECONCILED COST
DEDUCTIVE
UNIT COST

Php
Php

e Construction Corp.

800.00
160.00

DEDUCTIVE

Php
Php

Php

ADDITIVE
UNIT COST

QTY

UNIT

1.36
1.02

sqm
sqm

Php
Php

600.00
600.00

1.98

sqm

Php

160.00

1,512.00
604.80

2,116.80

eakdown

AO-CP01-001

DITIVE
ADDITIVE

Php
Php

816.00
612.00

Php

316.80

Php

1,744.80

Você também pode gostar