Project:
Subject:
COST EVALUATION
COST BREAKDOWN
NO. 001
DCI Evaluate
ITEM
DESCRIPTION
DEDUCTIVE
QTY
UNIT
ADDITIVE
UNIT COST
DEDUCTIVE
QTY
UNIT
1.36
sqm
5.04
sqm
1.72
sqm
1.89
sqm
0.09
sqm
3.24
sqm
1.3
1.89
sqm
3.78
sqm
Php
Php
710.00
160.00
Php
1,341.90
Php
604.80
1.4
UNIT 1412F
1
Deletion of Floor and Wall Tiles at T&B
300mmx300mm Vitrified Ceramic Tiles (FF8)
3.24
12.49
sqm
sqm
Php
Php
770.00
770.00
Php
2,494.80
Php
9,617.30
17.41
sqm
Php
710.00
24.72
sqm
Php
160.00
Php
Php
12,361.10
3,955.20
1.00
unit
Php
400.00
Php
400.00
1.00
1.00
unit
unit
Php
Php
200.00
350.00
Php
200.00
Php
350.00
1.00
unit
Php
300.00
1.00
unit
Php
400.00
Php
Php
300.00
400.00
1.00
unit
Php
300.00
Php
300.00
3.2
Lavatory(labor only)
3,3
3,4
3,5
3,6
4
1.00
unit
Php
1,000.00
Php
1,000.00
2.00
unit
Php
667.00
Php
1,334.00
Deletion of outlets
6.1
1.00
unit
6.2
1.00
unit
1.00
unit
Php
785.00
Php
785.00
unit
unit
Php
Php
1,200.00
1,078.00
Php
1,200.00
Php
1,078.00
unit
Php
1,131.90
Php
1,131.90
Php
Php
600.00
500.00
Php
350.00
Php
800.00
1.00
7.3
7.4
1.00
1.00
7.5
7.6
1.00
unit
Php
600.00
1.00
unit
Php
500.00
7.7
7.8
1.00
1.00
unit
unit
Php
Php
350.00
800.00
1.58
sqm
1.36
3.78
sqm
sqm
1.00
unit
Php
2,397.51
Php
2,397.51
1.89
sqm
710.00
160.00
1,341.90
sqm
Php
Php
Php
3.78
Php
604.80
1.4
6.76
sqm
0.09
sqm
1.58
sqm
UNIT 1414F
1
1.00
7.3
7.4
1.00
1.00
7.5
7.6
7.7
7.8
unit
unit
Php
Php
1,200.00
1,078.00
Php
1,200.00
Php
1,078.00
unit
Php
1,131.90
Php
1,131.90
1.00
unit
Php
450.00
1.00
unit
Php
500.00
Php
Php
450.00
500.00
1.00
Php
Php
400.00
793.00
400.00
1.00
unit
unit
Php
Php
793.00
Total Amount
Php
51,001.11
TOTAL DEDUCTIVE AMOUNT
note:
Prepared by:
checked by:
Cid V. Orbeta
ate
ADDITIVE
UNIT COST
ADDITIVE
Php
600.00
Php
816.00
Php
460.00
Php
2,318.40
Php
Php
600.00
160.00
Php
Php
1,032.00
302.40
Php
1,250.00
Php
112.50
Php
1,050.00
Php
3,402.00
Php
1,050.00
Php
1,659.00
Php
600.00
Php
816.00
Php
600.00
Php
2,268.00
Php
160.00
Php
1,081.60
Php
1,050.00
Php
94.50
Php
1,050.00
Php
1,659.00
DEDUCTIVE AMOUNT
Php
15,561.40
35,439.71
Date:
Project:
Subject:
COST EVALUATION
PER WAO NO. SRP3-WAO-CP01-002 dated 14 August 2010
DESCRIPTION
DEDUCTIVE
QTY
1.3
###
###
###
Formworks
###
###
note:
Prepared by:
###
DEDUCTIVE
Date:
Project:
Subject:
COST EVALUATION
PER WAO NO. SRP3-WAO-CP01-003 dated 07 September 2010
DESCRIPTION
DEDUCTIVE
QTY
UNIT
DEDUCTIVE
1511F and 1512F -deletion of wall partition between units; Not to install kitchen
counter, under cabinets, sink, cook top and range hood at 1512F.
1.1
6.94
sqm
Php
800.00
Php
5,552.00
13.87
sqm
Php
160.00
Php
2,219.20
1.2
1.2.1
1.00
unit
Php
600.00
Php
600.00
1.2.2
1.00
unit
Php
400.00
Php
400.00
1.2.3
1.00
unit
Php
500.00
Php
500.00
1.2.4
1.00
unit
Php
1,543.50
Php
1,543.50
1.2.5
1.00
unit
Php
793.00
Php
793.00
Php
11,607.70
Total Amount
Total Net Amount
note:
AD
UNIT COST
Prepared by:;
checked by:
Cid V. Orbeta
QTY
Cost Breakdown
Per SRP2-WAO-CP01-003
EVALUATION
RECONCILED COST
ADDITIVE
UNIT
DEDUCTIVE
UNIT COST
ADDITIVE
Php
DEDUCTIVE
UNIT
UNIT COST
1.89
sqm
Php
800.00
Php
1,512.00
3.78
sqm
Php
160.00
Php
604.80
Php
2,116.80
Php
(11,607.70)
DEDUCTIVE
QTY
UNIT
DEDUCTIVE
Noted by:
ADDITIVE
QTY
Lowell G. Cortez
Project Manager
Megawide Construction Corp.
UNIT COST
akdown
O-CP01-003
ADDITIVE
ADDITIVE
Php
Php
(2,116.80)
Cost Breakdown
Per SRP2-WAO-CP01-004
Cost Breakdown
Per SRP2-WAO-CP01-001
Date:
Project:
Subject:
COST EVALUATION
PER WAO NO. SRP3-CO-CP01-004 dated 05 August 2010
NO. 001
DCI Estimate
ITEM
DESCRIPTION
UNIT
UNIT COST
DEDUCTIVE
QTY
1.95
3.90
sqm
Php
Php
800.00
160.00
Php
1,560.32
sqm
Php
624.00
3.00
units
Php
1,200.00
Php
3.00
units
Php
1,078.00
Php
2.00
units
Php
1,200.00
Php
2,400.00
1.00
unit
Php
600.00
Php
600.00
unit
Php
500.00
Php
500.00
1.00
1.00
Php
350.00
Php
350.00
2.1.7 sliding door and partition of 0914F and 0916F (labor only)
2.00
unit
units
UNIT
DEDUCTIVE
UNIT COST
ADDITIVE
QTY
UNIT
ADDITIVE
UNIT COST
DEDUCTIVE
QTY
UNIT
3,600.00
1.36
sqm
3,234.00
1.02
sqm
1.98
sqm
There will be a 212 cm x 92 cm door opening only in between 1520D and 1521D
Deletion of CHB Wall
Painting to CHB wall
1.89
3.78
sqm
Php
800.00
Php
1,512.00
sqm
Php
160.00
Php
604.80
2.2
Php
note:
ADDITIVE
QTY
1.1
2
RECONCILED COST
DEDUCTIVE
Php
12,868.32
Php
Php
Noted by:
Prepared by:
checked by:
Cid V. Orbeta
Project Manager
Lowell Cortez
2,116.80
Date:
Project:
Subject:
DESCRIPTION
QTY
1.4
1.89
3.78
Prepared by:
checked by:
Cid V. Orbeta
Construction Project
Design Coordinates
NO. 001
DCI Estimate
UNIT
sqm
sqm
DEDUCTIVE
UNIT COST
Php
Php
checked by:
Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.
800.00
160.00
ADDITIVE
DEDUCTIVE
Php
Php
1,512.00
604.80
Php
2,116.80
QTY
UNIT
e
ADDITIVE
UNIT COST
DEDUCTIVE
ADDITIVE
QTY
1.89
3.78
Php
UNIT
sqm
sqm
Noted by:
Lowell Cortez
Project Manager
Megawide Construction Corp.
Cost Breakdown
Per SRP2-WAO-CP01-001
RECONCILED COST
DEDUCTIVE
UNIT COST
Php
Php
e Construction Corp.
800.00
160.00
DEDUCTIVE
Php
Php
Php
ADDITIVE
UNIT COST
QTY
UNIT
1.36
1.02
sqm
sqm
Php
Php
600.00
600.00
1.98
sqm
Php
160.00
1,512.00
604.80
2,116.80
eakdown
AO-CP01-001
DITIVE
ADDITIVE
Php
Php
816.00
612.00
Php
316.80
Php
1,744.80
Date:
Project:
Subject:
DESCRIPTION
QTY
1.4
1.89
3.78
Prepared by:
checked by:
Cid V. Orbeta
Construction Project
Design Coordinates
NO. 001
DCI Estimate
UNIT
sqm
sqm
DEDUCTIVE
UNIT COST
Php
Php
checked by:
Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.
800.00
160.00
ADDITIVE
DEDUCTIVE
Php
Php
1,512.00
604.80
Php
2,116.80
QTY
UNIT
e
ADDITIVE
UNIT COST
DEDUCTIVE
ADDITIVE
QTY
1.89
3.78
Php
UNIT
sqm
sqm
Noted by:
Lowell Cortez
Project Manager
Megawide Construction Corp.
Cost Breakdown
Per SRP2-WAO-CP01-001
RECONCILED COST
DEDUCTIVE
UNIT COST
Php
Php
e Construction Corp.
800.00
160.00
DEDUCTIVE
Php
Php
Php
ADDITIVE
UNIT COST
QTY
UNIT
1.36
1.02
sqm
sqm
Php
Php
600.00
600.00
1.98
sqm
Php
160.00
1,512.00
604.80
2,116.80
eakdown
AO-CP01-001
DITIVE
ADDITIVE
Php
Php
816.00
612.00
Php
316.80
Php
1,744.80
Date:
Project:
Subject:
DESCRIPTION
QTY
1.4
2.4
2.5
3.78
3.4
4.4
Total Amount
note:
Prepared by:
Checked by:
Cid V. Orbeta
Construction Project
Design Coordinates
UNIT
sqm
Php
160.00
ADDITIVE
DEDUCTIVE
Php
QTY
UNIT
2.42
1.82
0.43
2.41
sqm
sqm
sqm
sqm
0.14
sqm
604.80
Php
Checked by:
Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.
604.80
NO. 001
L
ADDITIVE
UNIT COST
ADDITIVE
QTY
Php
Php
Php
Php
600.00
600.00
710.00
160.00
Php
Php
Php
Php
1,452.00
1,092.00
305.30
385.60
Php
1,250.00
Php
175.00
UNIT
1.89
3.78
sqm
2.54
5.04
DEDUCTIVE
UNIT COST
sqm
Php
Php
800.00
800.00
sqm
sqm
Php
Php
800.00
800.00
Php
1.89
3.78
sqm
1.89
3.78
sqm
sqm
sqm
Php
Php
800.00
160.00
Php
Php
800.00
160.00
3,409.90
Approved by:;
checked by:
Ranie B. Montenegro
Cost Engineer
Megawide Construction Corp.
Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.
DCI Estimate
UCTIVE
DEDUCTIVE
Php
Php
1,512.00
3,024.00
Php
Php
2,032.00
4,032.00
QTY
UNIT
ADDITIVE
UNIT COST
Php
Php
1,512.00
604.80
Php
Php
1,512.00
604.80
Php
4,536.00
RECO
DITIVE
ADDITIVE
QTY
1.89
3.78
DEDUCTIVE
UNIT COST
UNIT
sqm
sqm
Php
Php
800.00
160.00
Php
Noted by:
Lowell Cortez
Project Manager
Megawide Construction Corp.
Cost Breakdown
Per SRP2-WAO-CP01-001
RECONCILED COST
CTIVE
DEDUCTIVE
Php
Php
ADDITIVE
UNIT COST
QTY
UNIT
ADDITIVE
1.36
1.02
sqm
sqm
Php
Php
600.00
600.00
Php
Php
816.00
612.00
1.98
sqm
Php
160.00
Php
316.80
1,512.00
604.80
Php
2,116.80
Php
1,744.80
Date:
Project:
Subject:
DESCRIPTION
QTY
1.4
1.89
3.78
Prepared by:
checked by:
Cid V. Orbeta
Construction Project
Design Coordinates
NO. 001
DCI Estimate
UNIT
sqm
sqm
DEDUCTIVE
UNIT COST
Php
Php
checked by:
Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.
800.00
160.00
ADDITIVE
DEDUCTIVE
Php
Php
1,512.00
604.80
Php
2,116.80
QTY
UNIT
e
ADDITIVE
UNIT COST
DEDUCTIVE
ADDITIVE
QTY
1.89
3.78
Php
UNIT
sqm
sqm
Noted by:
Lowell Cortez
Project Manager
Megawide Construction Corp.
Cost Breakdown
Per SRP2-WAO-CP01-001
RECONCILED COST
DEDUCTIVE
UNIT COST
Php
Php
e Construction Corp.
800.00
160.00
DEDUCTIVE
Php
Php
Php
ADDITIVE
UNIT COST
QTY
UNIT
1.36
1.02
sqm
sqm
Php
Php
600.00
600.00
1.98
sqm
Php
160.00
1,512.00
604.80
2,116.80
eakdown
AO-CP01-001
DITIVE
ADDITIVE
Php
Php
816.00
612.00
Php
316.80
Php
1,744.80
Date:
Project:
Subject:
DESCRIPTION
QTY
1.4
1.89
3.78
Prepared by:
checked by:
Cid V. Orbeta
Construction Project
Design Coordinates
NO. 001
DCI Estimate
UNIT
sqm
sqm
DEDUCTIVE
UNIT COST
Php
Php
checked by:
Cid V. Orbeta
Construction Project Manager
Design Coordinates, Inc.
800.00
160.00
ADDITIVE
DEDUCTIVE
Php
Php
1,512.00
604.80
Php
2,116.80
QTY
UNIT
e
ADDITIVE
UNIT COST
DEDUCTIVE
ADDITIVE
QTY
1.89
3.78
Php
UNIT
sqm
sqm
Noted by:
Lowell Cortez
Project Manager
Megawide Construction Corp.
Cost Breakdown
Per SRP2-WAO-CP01-001
RECONCILED COST
DEDUCTIVE
UNIT COST
Php
Php
e Construction Corp.
800.00
160.00
DEDUCTIVE
Php
Php
Php
ADDITIVE
UNIT COST
QTY
UNIT
1.36
1.02
sqm
sqm
Php
Php
600.00
600.00
1.98
sqm
Php
160.00
1,512.00
604.80
2,116.80
eakdown
AO-CP01-001
DITIVE
ADDITIVE
Php
Php
816.00
612.00
Php
316.80
Php
1,744.80