1.
2.
CONTRACT STATUS.............................................................................................5
PROJECT PARTIES................................................................................................5
INSURANCES AND BONDS...................................................................................6
VALUATION.......................................................................................................... 7
CONTRACTOR SITE ORGANIZATION CHART....................................................................8
CHAPTER 2: OVERVIEW..........................................................................9
2.0.
2.1.
2.2.
2.3.
PROJECT SCOPE..................................................................................................9
PROGRESS UP TO 01/25/2016...........................................................................10
REASONS OF DELAY............................................................................................... 10
PROJECT LOCATION........................................................................................... 11
NOTIFICATIONS................................................................................................. 12
SITE INSTRUCTIONS.......................................................................................... 14
CLAIMS.............................................................................................................. 15
VARIATION ORDER............................................................................................ 16
4.3.1.
4.3.2.
4.4.
4.5.
4.6.
4.7.
4.8.
5.
ACTIVITIES PERFORMED....................................................................................24
ACTIVITIES TO PERFORM NEXT MONTH.............................................................24
HOT POINTS...................................................................................................... 24
BLOCKING POINTS............................................................................................. 24
CHAPTER 6 MATERIAL...........................................................................25
6.0.
6.1.
6.2.
6.3.
7.
CHAPTER 5 ENGINEERING......................................................................24
5.0.
5.1.
5.2.
5.3.
6.
HIGHLIGHTS:........................................................................................................ 17
STATUS OF H & S ACTIVITIES DONE IN JANUARY 2016.................................................17
H & S ACTION PLAN FOR NEXT MONTH FEBRUARY 2016..............................................18
RECORD OF INCIDENTS / ACCIDENTS DETAILS OF INCIDENTS..........................................19
ACTIVITIES PEFORMED......................................................................................25
ACTIVITIES TO PERFORM NEXT MONTH.............................................................25
HOT POINTS...................................................................................................... 25
BLOCKING POINTS............................................................................................. 25
CHAPTER 7: CONSTRUCTION..................................................................26
7.0.
7.1.
ACTIVITIES PERFORMED....................................................................................26
ACTIVITIES TO PERFORM NEXT MONTH.............................................................27
7.2.
7.3.
7.4.
7.5.
7.6.
7.7.
7.8.
7.9.
7.10.
7.11.
8.
HOT POINTS...................................................................................................... 27
BLOCKING POINTS............................................................................................. 27
AREA OF CONCERN........................................................................................... 28
PROGRESS........................................................................................................ 29
QUANTITIES PROGRESS........................................................................................... 30
PROGRESS S CURVE.......................................................................................... 31
DIRECT MANPOWER DISTRIBUTION...................................................................32
MANPOWER HISTOGRAM...................................................................................33
EQUIPMENT DISTRIBUTION................................................................................34
EQUIPMENT HISTOGRAM...................................................................................35
CHAPTER 8 QUALITY.............................................................................36
8.0.
8.1.
8.2.
8.3.
9.
ACTIVITY PERFORMED.......................................................................................36
ACTIVITY TO PERFORM NEXT MONTH................................................................37
HOT POINTS...................................................................................................... 39
BLOCKING POINTS............................................................................................. 39
10.
10.0.
10.1.
10.2.
10.3.
10.4.
APPENDIX B.......................................................................................56
1.
1.1.
CONTRACT STATUS
ORIGINAL PROJECT
COMPLETION DATE
PROJECT COMPLETION
DATE AS PER VARIATION
No 3
PROJECT DURATION:
REVISED PROJECT
DURATION:
MAINTENANCE PERIOD:
313,000,000.00 QAR
REVISED PROJECT
BUDGET AS PER
BASELINE REV 6.0
327,653,158.00 QAR
1.2.
th
January 2014
PROJECT PARTIES
CLIENT:
CONSULTANT:
CONTRACTOR
1.3.
Documents
Contractors All Risks Insurance Policy
Performance Bond
Retention Guarantee
Validity
1.4.
VALUATION
1.5.
2.
CHAPTER 2: OVERVIEW
2.1.
PROJECT SCOPE
PROGRESS UP TO 01/25/2016
2.2.
TITLES
PREVIOUS
CURRENT
Overall Progress %
Act %
68.21%
Pl %
72.06%
Act %
3.47%
Overall Progress *%
67.16%
99.48%
4.63%
Variance %
Variance *%
Delay (days )
Delay *(days )
-24.39%
-32.84%
-138
-219
Pl %
7.40
%
0.39
%
Act %
71.68%
7.94
%
0.47
%
71.89%
16.61%
4.76%
-50
4
Construction
Progress %
68.20%
72.35%
3.69%
Construction
Progress* %
67.05%
99.52%
5.08%
Variance %
-24.50%
16.10%
Variance *%
-32.95%
5.09%
Expected Delay
-138
-50
(days)
Expected Delay*
-219
15
(days)
Expected
3-Jul-16
Completion date
Expected
16-Oct-16
Completion date*
*The symbol (*) indicates the progress & delay from the Original Baseline
2.3.
TOTAL
Pl %
79.46
%
71.79%
99.87
%
-7.78%
-28.08%
-188
-215
80.29
%
72.13%
99.99
%
-8.40%
-27.86%
-188
-204
22-Aug-16
18-Sep-16
REASONS OF DELAY
10
2.4.
PROJECT LOCATION
11
3.
3.1.
#
1
CONTENT
LETTER REFERENCE
DATE
DN07-P01-CGC-SACYRHYD-LET-00169-14
DN071-P01-CGC-SACYRHYD-LET-00179-14
11/05/2014
DN071-P01-CGC-SACYRHYD-LET-00255
02/08/2014
DN071-P01-CGC-SACYRHYD-LET-00265
08/08/2014
DN071-P01-CGC-SACYRHYD-LET-00274
13/09/2014
DN071-P01-CGC-SACYRHYD-LET-00346
09/09/2014
DN071-P01-CGC-HYDLET-A10071
11/19/2014
DN071-P01-CGC-HYDLET-A10071
11/22/2014
DN071-P01-CGC-HYDLET-A10094
12/04/2014
Road 55
DN071-P01-CGC-HYDLET-A10098
12/06/2014
1
0
1
1
Provisional Sum
LDN071-P01-CGC-HYDLET-A10102
12/07/2014
DN071-P01-CGC-HYDLET-A10103
12/08/2014
1
4
DN071-P01-CGC-HYDLET-A10119
20/12/2014
DN071-P01-CGC-HYDLET-A10121
12/21/2014
DN071-P01-CGC-HYDLET-A10153
01/03/2015
DN071-P01-CGC-HYDLET-A10163
01/07/2015
DN071-P01-CGC-HYDLET-A10171
01/10/2015
DN071-P01-CGC-HYDLET-A10200
01/28/2015
1
5
1
7
1
8
1
9
2
0
06/08/2014
12
2
1
2
2
2
3
2
4
2
6
2
7
2
8
2
9
3
0
3
4
3
5
3
6
3
7
3
8
3
9
DN071-P01-CGC-HYDLET-A10204
LETTER REFERENCE
01/30/2015
DATE
DN071-P01-CGC-HYDLET-A10205
01/31/2015
DN071-P01-CGC-HYDLET-A10206
01/31/2015
DN071-P01-CGC-HYDLET-A10222
02/09/2015
DN071-P01-CGC-HYDLET-A10489
06/08/2015
DN071-P01-CGC-HYDLET-A10294
03/12/2015
DN071-P01-CGC-HYDLET-A10376
DN071-P01-CGC-HYDLET-A10424
05/13/2015
DN071-P01-CGC-HYDLET-A10428
05/14/2015
DN071-P01-CGC-HYDLET-A10463
05/28/2015
DN071-P01-CGC-HYDLET-A10464
05/28/2015
DN071-P01-CGC-HYDLET-A10504
06/14/2015
DN071-P01-CGC-HYDLET-A10526
06/28/2015
DN071-P01-CGC-HYDLET-A10663
10/18/2015
DN071-P01-CGC-HYDLET-A10678
26/10/2015
D65 5
th
reminder
23/04/2015
13
3.2.
CONTENT
SITE INSTRUCTIONS
LETTER REF.
DN071-P01-CGCSACYR-HYD-LET00350
DN071-P01-CGCSACYR-HYD-LET00397
DN071-P01-CGCSACYR-HYD-LET00257
DATE
CGCSACYR
REPLY
2/25/2014
9/11/2014
6/14/2014
10/2/2014
7/3/2014
8/3/2014
Cancelled
DN071-P01-CGC-HYDLET-A10435
1/28/2015
8/19/2015
DN071-P01-CGC-HYDLET-A10540
1/28/2015
7/5/2015
DN071-P01-CGC-HYDLET-A10589
10/21/2014
8/13/2015
DN071-P01-CGC-HYDLET-A10688
5/17/2015
11/2/2015
DN071-P01-CGC-HYDLET-A10356
12/29/2015
4/13/2015
1
0
Cancelled
Cancelled
1
2
1
3
1
4
1
5
1
6
DN071-P01-CGC-HYDLET-A10802
3/1/2015
1/21/2016
DN071-P01-CGC-HYDLET-A10242
2/4/2015
2/17/2015
DN071-P01-CGC-HYDLET-A10502
5/21/2015
6/14/2015
DN071-P01-HYD-CGCLET-A10531
5/23/2015
8/26/2015
DN071-P01-CGC-HYDLET-A10483
5/23/2015
6/8/2015
14
3.3.
#
CLAIMS
CONTENT
SUBMITTED
DATE
Balancing tank
11/29/2014
Not submitted
6/20/2015
Sikkat lighting
Not submitted
11/23/2015
12/20/2014
Not submitted
6/20/2015
3/19/2015
3/29/2015
Not submitted
Not submitted
6/21/2015
Not submitted
1
0
1
1
1
2
1
3
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
2
3
2
4
2
5
Tack Coat missing quantity in Bill No.4 for 2nd Layer of Asphalt
Base Course
Additional Cost of Project Insurances, Bonds Renewed for
Extended Period
COMMEN
TS
5/20/2015
Not submitted
Not submitted
11/23/2015
10/9/2014
Unit rate of the Item's not included in the BOQ of storm water
9/6/2014
12/21/2014
2/7/2015
3/23/2015
Not submitted
Unit rate of the Item's not included in the BOQ of Foul Sewer
6/9/2014
15
2
6
2
7
2
8
2
9
3
0
Not submitted
2/3/2015
4/21/2015
8/27/2015
5/30/2015
VARIATION ORDER
3.4.
CONTENT
DATE
COSTS
07/05/2015
28273.82
21/10/2014
77102.99
09/11/2014
401,270.02
23/11/2015
4565924.09
20/05/2015
92610.75
09/10/2014
398791.63
23/03/2015
249,930.36
09/06/2014
291,899.39
10
21/12/2014
350000.00
11
07/02/2015
139463.76
12
17/02/2015
3785993.25
13
14/06/2015
924,505.84
08/09/2015
288,738.94
14
16
15
16
17
18
19
23/11/2015
499,648.51
06/07/2015
1,287,320.06
23/11/2015
499,648.51
21/06/2015
4,565,924.09
17
4.
HIGHLIGHTS:
4.1.
4.2.
2016.
Sl #
Objectives
STATUS
OF ACTION TAKEN
(MARCH
2016)
HSE Inspection of site were carried out by
HSE Officers, lapses will be discussed
with Foremen and corrective actions
ensured.
Inspection Reports submitted on major
issues to Project Director, and Ensure
corrective actions.
HSE Meetings for Construction staff
conducted on weekly basis.
Safety Inductions for all New employees,
and visitors.
Safety training as per training matrix.
Tool box meetings - weekly
Regular Inspections conducted.
Regular Inspections conducted.
Conducted through monitoring.
18
Sl #
Objectives
Conducted.
10
11
13
14
12
4.3.
for
24
staff
and
Conducted.
Conducted through monitoring and
daily/weekly inspections.
And scafftag
systems implemented.
On-going.
2 foremen and 2 workers were selected
for monthly HSE award system.
Conducted.
2016
Sl #
1
Objectives
To identify and control unsafe acts, unsafe
conditions, hazards and risks on site
during on-going activities.
4
5
6
19
Sl #
Objectives
To be conducted.
To be conducted.
9
10
11
12
13
14
4.4.
OF INCIDENTS
Description of incidents /
accidents
Man-hours worked till date
First Aid injuries
Sickness spells
Loss Time Injuries
Fatalities
Near Miss
Property Damage
Fire Incidents
Environmental incidents
Reported / Recorded.
3124265
202
03
1
0
22
4
0
0
20
4.4.1.
Nature
of
Injury
Nos
1. Head
05
4. Right hand
thump
0
2
0
3
0
4
Laceratio
n
Bruising
1.
2.
02
01
02
2. Right leg foot
21
1. Head
0
5
Others
02
2. Right leg
4.4.2.
Incident
Vehicle accidents
Property Damage
Fatal Accident
First Aid cases
Recorded Incidents
0
0
0
12
4.5.
THE MONTH:
Sr. No
8.5.1
1
2
3
4
5
6
7
8
Equipment
Heavy Mobile Equipment
Excavator equipment(Jack hammer / bucket)
Loader / shovel
Backhoe
Drum Cutter
Truck mounted crane
Equipment
Roller
Bobcat
Mobile Crane
Quantity
00
02
02
00
00
Quantity
05
04
02
8.5.2
Generators
Welding Machine
Tower light
Plate Compactor
Power tools
Fire Extinguishers
Inspection of Site clinic and welfare facilities
Site Inspection (observation) Reports
Total number of inspections during the month
1
2
3
4
5
6
7
8
9
01
01
02
20
44
4 times
10
106
22
23
4.6.
1
2
3
4
5
7
8
9
10
11
12
13
14
15
16
17
18
19
Description
1
1
2
3
4
5
2995961
This
Month
Total
3124265
12
128304
1
13
1
2
197
3
0
0
20
0
5
4
0
0
5
0
0
0
2
0
0
0
1
2
202
3
0
0
22
0
5
4
0
0
1
0
0
0
0
0
1
0.0350
1.158
1989854
0
0
0.0320
1.056
2118158
128304
SAFETY TRAININGS
4.7.
Sl #
Till last
month
Description
Till last
month
This
Month
Total
1625
12
1637
65
68
22
25
10
223
28
1
4
1
11
227
29
24
4.8.
SAFETY VIOLATIONS:
58
4.9.
61
The company will continue to ensure compliance with legal and other
requirements and update them referring government orders and
websites.
Prepared By
Reviewed By
Approved By
Mr.Faizal Butt
Eng.Loveson
Glariyans
25
5.
CHAPTER 5 ENGINEERING
ACTIVITIES PERFORMED
5.1.
5.2.
HOT POINTS
5.3.
BLOCKING POINTS
NIL
26
6.
CHAPTER 6 MATERIAL
6.1.
ACTIVITIES PEFORMED
HOT POINTS
NIL
6.4.
BLOCKING POINTS
NIL
27
7.
CHAPTER 7: CONSTRUCTION
ACTIVITIES PERFORMED
7.1.
MANHOLES WORKS
1. Blinding/Waterproofing Membrane/protective screed
2. Concrete casting (Fix Forms, Rebars & Water stop) - Manhole Base
3. Concrete casting (Fix Forms, Rebars & Water stop) - Wall (1st. Lift)
HOUSE CONNECTION WORKS :RD86, RD27, RD37 ;RD107
RD86
DUCTS WORKS
RD37; RD29; RD32, RD24; RD27; RD30; RD25, RD28; RD86
RD104; RD105; RD106; RD118, RD119, RD113; RD58
SUBGRADE WORKS
RD37; RD58; RD26; RD86; RD31; RD32; RD25
RD29; RD35; RD28; RD25; RD24; RD30
SUBBASE FOR ROAD :
RD37; RD58; RD26;
RD29; RD35; RD28; RD30
ASPHALT FOR ROAD BASE :
RD64, RD63, RD37, RD29; RD35, RD58
PARKING TILES WORKS (ON HOLD )
EDGE KERBSTONE WORKS (ON HOLD)
STREET LIGTHING WORKS
KERBSTONE.WORKS
FOOTWAY TILES (ON HOLD)
SHAFT WORKS
MANHOLES CLEANING
ATTENUATION TANKS WORKS 47 : WATERPROOFING
28
TANKS WORKS
HOT POINTS
7.3.
BLOCKING POINTS
NIL
29
7.4.
MANHOLES WORKS
4. Blinding/Waterproofing Membrane/protective screed
5. Concrete casting (Fix Forms, Rebars & Water stop) - Manhole Base
6. Concrete casting (Fix Forms, Rebars & Water stop) - Wall (1st. Lift)
HOUSE CONNECTION WORKS :RD86, RD27, RD37
RD27;
RD
61;
RD35;
RD28;
RD25;
RD24;
RD30,RD110,RD58
PARKING TILES WORKS
EDGE KERBSTONE WORKS (ON HOLD)
STREET LIGTHING WORKS
KERBSTONE.WORKS
FOOTWAY TILES (ON HOLD)
SHAFT WORKS
ATTENUATION TANKS WORKS 63 : LEAKAGE TEST
ATTENUATION TANKS WORKS 4 : LEAKAGE TEST
ATTENUATION TANKS WORKS 39 : LEAKAGE TEST
ATTENUATION TANKS WORKS ACCESSORIES
7.5.
HOT POINTS
NIL
30
7.6.
BLOCKING POINTS
NIL
31
7.7.
AREA OF CONCERN
32
PROGRESS
7.8.
Progress %
Previous month
GROUPS
GROUP 01
GROUP 02
GROUP 03
GROUP 04
GROUP 05
GROUP 06
GROUP 07
Overall
Act*.
%
54.6
1%
47.7
0%
56.5
0%
37.6
3%
43.8
8%
49.2
9%
90.1
7%
67.0
5%
Act. %
55.48
%
48.17
%
59.04
%
36.85
%
47.28
%
50.72
%
90.26
%
68.20
%
P.l. %
63.6
6%
60.8
7%
64.0
5%
43.8
6%
55.7
0%
58.5
3%
91.6
0%
72.3
5%
Current month
Act*.
%
7.72
%
5.58
%
5.05
%
1.65
%
0.00
%
6.01
%
0.00
%
5.08
%
Act. %
6.42
%
4.66
%
3.88
%
1.92
%
4.72
%
3.13
%
0.00
%
3.69
%
P.l. %
12.5
3%
10.6
9%
5.24
%
8.52
%
12.5
5%
7.42
%
2.30
%
7.94
%
Total Completed
Act*.
%
62.3
3%
53.2
8%
61.5
5%
39.2
8%
43.8
8%
55.3
0%
90.1
7%
72.1
3%
Act. %
61.9
0%
52.8
3%
62.9
2%
38.7
7%
52.0
0%
53.8
5%
90.2
6%
71.8
9%
P.l. %
76.1
9%
71.5
6%
69.2
9%
52.3
8%
68.2
5%
65.9
5%
93.9
0%
80.2
9%
Delay
(**)
14.29
%
18.73
%
6.37%
13.61
%
16.25
%
12.10
%
3.64%
8.40%
(*) the symbol indicates the progress based on the baseline programme
33
QUANTITIES PROGRESS
7.9.
Previous
Month
January
Storm water
Foul Sewer
TSE
House
connections
Gullies
Manholes Storm
water
Manholes Foul
sewer
Chamber
QAf Duct
Electrical Duct
Pipelaying
Subgrade
Kerbs LayingKerbs
Subbase
HardscapingInstal
ling Edgine kerbs
Paving - Laying
200x100x80mm
Precast Concrete
Block Pavers
Laying of Precast
Concrete Blocks@
Verges
Road Base - Apply
Prime Coat &
Asphalt
Current
Month
Completed
total
Trade
Excavation
Pipe
laying
Backfilling
Excavation
Pipe
laying
Backfilling
Excavation
Pipe
laying
Backfilling
Excavation
Act
95.85%
95.24%
Pl
100.00%
100.00%
Act
0.53%
1.23%
Pl
0.00%
0.00%
Act
96.38%
96.47%
Pl
100.00%
100.00%
93.02%
99.68%
99.40%
100.00%
100.00%
100.00%
0.18%
0.08%
0.00%
0.00%
0.00%
0.00%
93.20%
99.76%
99.40%
100.00%
100.00%
100.00%
99.41%
87.21%
70.59%
100.00%
100.00%
100.00%
0.00%
2.69%
5.84%
0.00%
0.00%
0.00%
99.41%
89.90%
76.43%
100.00%
100.00%
100.00%
68.97%
88.38%
100.00%
100.00%
5.95%
0.39%
0.00%
0.00%
74.92%
88.77%
100.00%
100.00%
Excavation
Walls
67.94%
94.90%
100.00%
100.00%
3.09%
0.55%
0.00%
0.00%
71.03%
95.45%
100.00%
100.00%
Walls
94.94%
100.00%
0.00%
0.00%
94.94%
100.00%
Walls
Laying
Laying
52.56%
49.06%
50.75%
100.00%
100.00%
100.00%
9.03%
5.66%
1.68%
0.00%
0.00%
0.00%
61.59%
54.72%
52.43%
100.00%
100.00%
100.00%
Laying
79.60%
50.08%
100.00%
100.00%
1.02%
4.34%
0.00%
0.00%
80.62%
54.42%
100.00%
100.00%
Laying
45.82%
20.28%
100.00%
100.00%
11.10%
1.75%
0.00%
0.00%
56.92%
22.03%
100.00%
100.00%
Laying
21.64%
100.00%
2.33%
0.00%
23.97%
100.00%
Laying
9.85%
100.00%
8.77%
0.00%
18.62%
100.00%
45.35%
100.00%
1.91%
0.00%
47.26%
100.00%
34
0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%
100.00%
35
7.10.
PROGRESS S CURVE
See Appendix A
36
7.11.
37
7.12.
MANPOWER HISTOGRAM
38
7.13.
EQUIPMENT DISTRIBUTION
39
7.14.
EQUIPMENT HISTOGRAM
40
8.
CHAPTER 8 QUALITY
8.1.
ACTIVITY PERFORMED
Inspection Request for the following activities for Foul Sewer, Storm water
& House connection, attenuation tanks concrete, Balancing Tank, TSE &
Roadwork.
Inspection Request for the following activities for Foul Sewer, Storm water & House
connection, attenuation tanks concrete, Balancing Tank, TSE & Roadwork.
1. Trench Excavation
2. Formation level
3. Installation of Geotextile
4. Gravel bedding
5. VC pipe laying
6. Air Test
7. Gravel surround pipe
8. Back filling works for trenches
9. Compaction Test (FDT)
10. Manholes Excavation for house connection
11. Blinding Concrete
12. Bitumen Primer
13. Tanking Membrane
14. Protection Board
15. Formworks and Reinforcement
16. Concrete of base slab & Wall Manhole
17. Backfilling works for manholes
18. Installation of manhole cover
19. Rocker Pipes Connection
20. Backdrop Pipe Installation
21. House Connection Pipeline
22. Roadwork (Sub-grade, Formation, Sub-base)
23. Kerbstone foundation
24. Installation of Kerbstone
Micro-Tunneling shaft concrete blinding
Micro-Tunneling shaft formworks & reinforcement installation
Micro-Tunneling shaft Concrete Manhole
Manholes base and wall concrete with cover slab (Group 1,2,3,4,5 & 6)
TSE Pipeline (Road D-20, 21, 22, 23, 24, 27, 28, 29, 31, 32, 37, 40, 51,55, 56, 58, 60, 62, ,
63, ,64, 65, 86, 103, 113, 114)
1. Excavation/Formation Level
2. Geotextile Installation
3. Gravel Bedding
4. Pipe Laying
5. Granular surround
6. Pressure testing of pipeline
7. Backfill visual checking
41
8. Compaction (FDT)
TSE Chamber (Road D-20, 21, 22, 23, 24, 27, 28, 29, 31, 32, 37, 40, 51, 56, 58, 60, 62, ,63,
64, 65, 86, 103, 113, 114)
1. Excavation
2. Blinding Concrete
3. Water proofing
4. Concrete screed
5. Base slab
6. Concrete wall
7. Cover slab
8. Protection board Cover Slab)
9. Compaction test (FDT)
Gully Pot & Pipe connection (Group 1, 2, 3, 4 & 5)
1. Excavation
2. Precast gully pot installation
3. Precast manhole cover slab installation
4. Backfilling
Street Lighting (D-45, 50, D-49, D-48, D-51, D-53, D-56, D-54, D-57, 108, 109, 111,103,
115, 107, 114, 116, 119, )
1. Excavation
2. Bedding, Cable laying, Dune sand surround
3. Precast Foundation Installation
4. Electrical pole installation
Asphalting Works (Sub-grade, Sub-base & Base coarse) D-20, 21, 22, 39, 40, 41, 45, 46, 47,
48, 49, 50, 51, 53, 54, 56, 57, 103, 105, 106, 107, 108, 109, 111, 112, 113, 114, 115, 116,
118, 119
Cube Crushing at QIL Lab.
Installation of Precast Manholes Concrete Cover
Balancing Tank
Dewatering
House Keeping
Attenuation Tank (Activities)
AT - 23/000
Grout filling for tie rod hole
Application for joint sealant for construction joint
Water filling
AT 4/000
Grout filling for tie rod hole
Application of joint sealant for construction joint
Water filling
AT 75/000
Water tightness test
AT 63/000
Water filling
AT 39/000
Water filling
AT 47/000
42
8.2.
8.3.
HOT POINTS
NIL
44
8.4.
BLOCKING POINTS
NIL
45
9.
46
9.1.
47
9.2.
48
9.3.
49
9.4.
50
9.5.
CORRESPONDENCES REGISTER
51
9.6.
52
9.7.
NCR REGISTER
53
9.8.
54
10. APPENDIX A
55
10.1.
56
10.2.
PROGRAMME
57
10.3.
58
10.4.
59
10.5.
PROGRESS S-CURVE
60
10.6.
61
11.
APPENDIX B
62
11.1.
63