Escolar Documentos
Profissional Documentos
Cultura Documentos
At AG, we are :
Contributing to Smart Grids standardization
convergence efforts worldwide
A world leader in critical Grid Power Electronics,
Automation & Control Room IT
Participating to several demonstration projects
across the world
Want to make Smart Grid a reality today
Are sharing a Joint IT architecture with IBM SAFE
TC69
Electrical Vehicule
ETSI
European
Commission
ENTSOe
T&D Europe
TC205
PV Converters
CEN/Cenelec
EFET
ERGEG
Organlime
Gridwise
Alliance
TC65
Process Control
Eurelectric
TC205
Home Automation
TC247
Building Automation
TODA
P
S
F
CIM
E
UCTE
E
S
I
TODA
June 2007
April 2008
June 2008
Interop Test
April 2006
March 2007
September 2008
October 2008
March 2009
December 2009
March 2011
Operations efficiency
Key Features of joint approach
Financial gain
CAPEX reduction: a few percents improvement
represent a huge saving for TSO
E
CIM
L
D
DER MS
IEC
EMS
D
D EMS
EMS
E
G
S
C
A
6
G
D EMS
D EMS
D EMS
ETL service
Grid Applications
Analytics Engine
Geo-spatial Data
Mining
Statistics/KPIs
Third party Apps
Complex Event
Processing
Correlation
Reporting/Workflow
Portals
Asset Mgt
Remote Asset Mtrg.
Remote Device Mgt
Planning
Enterprise Content Mgt
Mobile Workforce
Operational
Monitoring
& Security
Maximo
EAM
Operational
Monitoring and Security
WebSphere
Enterprise Service
Bus ESB
ESB
Data Historian
Complex Event
Processing,
High Performance
Analytics
High-performance archiver
(Time-series data, SoE)
e-terra
EMS-DMS
e-terra
platform
Operational
Monitoring and Security
Local Intelligence
Field Network
Substation (IED relays, servers, video,
security, local weather, Comm
SG Asset
IBM Confidential
Equipment
sensors
Line mounted
sensors
Smart
metering
Field Force
PHEVs
Distributed
Generation
Network Operations
CIM (*)
CIM
CIM
WebSphere ESB
(*) IEC 61970 / 61968
Benefits :
- Optimized Reaction to abnormal Conditions
- Reduced Outages
- Lower operational Cost
- Consistent and up-to-date Information across
Grid Operations and EAM
Grid Operations
2
4
Tag
Information
Request
Work
Demonstration
Example
Sequence :
1. A Transformer Alarm is reported
2. Operator retrieves Work History, planned
Work and/or Asset Information from EAM
3. Operator decides to de-energize the
Transformer and to request Work into EAM
4. A Tag with Work Order Information is placed
on DMS/EMS screen
5. Maintenance is carried out
6. EAM notifies DMS/EMS on ongoing Work
progresses
7. DMS/EMS generates an Alarm when Work is
completed.
8. Operator re-energize the Transformer
Request
Alarm
Completed !
Work Update
6
3
Re-energize
De-energize
8
Work
Assign
Work
Update
10
Thank You
11