PROJECT: REPAIR OF PERIMETER WALL (MJT Kobil depot) & PLASTERING OF PERIMETER WALL (MJT Changamwe)
LOCATION: MJT CHANGAMWE/KOBIL
DATE: May-15
1
2
3
5
6
7
8
CONTRACTOR:_______________
SUMMARY OF WORKS
Demolition (63mtrs long by 2.5mtrs high masonry wall)
Erection of Substructure & Reinforced Concrete Superstructure (strip footing, colum bases and colums)
Superstructure walling (63mtrs long by 3mtrs high masonry wall)
Finishes (63mtrs long by 3mtrs high masonry wall)
Replacement of Chain link fence (139mtrs long by 3mtrs high)
Plastering of MJT Changamwe perimeter wall (Along Ashton Apparel road)
Repair of gates in both depots
Item
Description
Unit
Qty
Rate
Amount
DEMOLITION
200mm thick 2.5m high superstructure wall (rate to include loading,
carting away all arising debris to a destination authorised by the Local
authority). Allow for deomlishing existing barbed wire fence on top of
200mm boundary wall including angle line post embeded into wall
and existing pre cast copings
200mm thick 1.5m high substructure wall (rate to include
excavation, loading, carting away all arising debris to a destination
authorised by the Local authority).
SM
158
SM
95
WALL CONSTRUCTION
SUBSTRUCTURE (ALL PROVISIONAL)
Excavation:
E
CM
57
CM
33
CM
63
CM
27
Item
Item
Allow for keeping excavation free from all water (use diesel powered
pump where necessary)
Concrete work
Plain Concrete Class 15 (1:3:6)
sm
42
sm
22
311676166.xls
Page 1
Carried to collection
311676166.xls
Page 2
cm
cm
cm
5
7
2
kgs
kgs
kgs
68
282
491
sm
sm
sm
25
26
27
Carried to collection
COLLECTION
Brought forward from page 1
Brought forward from page 2
TOTAL CARRIED TO BILL SUMMARY
311676166.xls
Page 3
cm
kgs
159
12mm ditto
kgs
226
sm
64
311676166.xls
Page 4
SUPERSTRUCTURE WALLING
A
sm
189
63
63
no.
22
sm
378
lm
139
1.2
no.
47
1.3
lm
417
sm
sm
sm
sm
888
69
628
676
Supply and install IT5 roofing sheets to all gates at Kobil depot to
match existing. Allow for painting the gates using Jotamastic 87
primer (2 coats) and 1 coat of Jotun hard top
item
item
Contigency
item
1.0
Repair of gate
311676166.xls
Page 5
PAGE
1&2
Superstructure walling
Finishes
311676166.xls
Page 6
DESCRIPTION
DATA /SPECIFICATION
1
1.1)
STAFF
Indicate Number of staff on site for project duration
2
2.1)
SCHEDULE OF EQUIPMENT
Scaffold
NO.
lot
RANKING
ATTACHMENTS AND
DOCUMENTATION REQUIRED
GISA
SECO
3
3.1)
3.2)
Overalls
3.3)
Safety Helmets
3.4)
Eye Googles
3.5)
3.6)
Harnesses
4
4.1)
Y/N
Item
Critical
4.2)
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
No subcontracting
No subcontracting
5
5.1)
EXPERIENCE
Indicate experience in executing similar civil works
within the last 3 years.
6
6.1)
ONGOING WORKS
Indicate total value of outstanding works for current
ongoing contracts
7
7.1)
OTHER REQUIREMENTS
Submit project work plan / charts for bill of quantities
attached
Submitted - 56 days.
Submitted - 82 days.
7.2)
Done
Done
Critical
Ranking Criteria
1 Least importance
2 Moderate importance
3 Very Important
Critical Bid disqualified
RECOMMENDATION
GISA ENGINEERING best technically. Have better workplan having gained experience in scrapping exercise in scrapping Ex chevron NBI LPG Plant,
Nanyuki and Nakuru depots with zero incidents. Are also likely to mobilise faster to site due to less running projects.