ICE 3005A: claims of achievement

Development
Objectives
for Eng Tech TMICE/ AMICE / MICE and IEng MICE / CEng MICE

Introduction
This word document contains the tables extracted from ICE 3005A to allow for the recording of the
claims of achievement electronically.
Reference should be made to the full ICE 3005A document for details of the whole document
including guidance on its use.

Use your engineering* knowledge and understanding to make the most of


existing and emerging technology

A1

Broaden and deepen your engineering knowledge

Eng Tech
TMICE

For example: Identify limits of own personal knowledge and skills. Acquisition of
engineering knowledge in chosen field of operations. Knowledge of engineering
principles. Codes, standards and specifications.

A1

Broaden and deepen your engineering* knowledge

AMICE*
MICE
IEng MICE

For example: Identify limits of own personal knowledge and skills. Acquisition of
engineering knowledge in chosen field of operations. Knowledge of engineering
principles. Codes, standards and specifications.

CEng MICE

For example: Identify limits of own personal knowledge and skills. Acquisition of
engineering knowledge in chosen field of operations. Knowledge of engineering
principles. Codes, standards and specifications. Technological developments in
the construction industry.
Achievement
Rating
Level

Claim of
Achievement

Date achieved Sept 11, Sept Sept 11,


12
Sept 12

Eng Tech TMICE


AMICE*, MICE
IEng MICE

CEng MICE

July 10- Dec 12

A, K
As a postgraduate student, I attended courses in Hydrology, Water Resources Metrics,
Environmental Engineering, Accounting and Management, Contract and Construction Law. These
enhanced the knowledge gained at undergraduate level and also added to my knowledge base
with respect to hydrological statistics, watershed modelling, model calibration, use of various
instrumentation in water resources.
E
While employed with FRP Gratings & Composites Ltd, I was not always required to actively use the
skills learnt during undergraduate and post graduate studies, but I increased my knowledge in the
use of fiberglass reinforced plastic (frp) and adhesives in structural applications. I learnt shop
fabrication of ladders, piping and fittings, tanks, handrails and stairs using frp structurals and raw
materials. I produced shop drawings in AutoCad and carried out fabrication at the workshop. I
learnt how to size various structurals (I beams, channel in frp) based on loadings and material
properties. I also learnt the skill of hdpe fusion welding and operation of the equipment, and was
involved in the fabrication of a machine based on the principle of operation (Appendix A1).
I also prepared calculations for determining design flows for wastewater treatment plants and sized
units based on these calculations for project proposals (Appendix A1).

If your intention is to seek membership as AMICE, you should substitute technical/scientific for engineering

Apply appropriate theoretical and practical methods to the analysis and


solution of engineering* problems

B1

Contribute to the identification of problems and the production of solutions

Eng Tech
TMICE

For example: Application of engineering principles. Possible solutions. Links to


codes, standards and specifications. Produce drawings.

B1

Identify engineering* problems and define possible solutions

AMICE*
MICE
IEng MICE

For example: Client/user needs. Feasibility. Constraints and opportunities. Links


to codes, standards, specifications and contract conditions. Application of
engineering principles. Specific solutions.

CEng MICE

For example: Client/user needs. Feasibility. Constraints and opportunities. Links


to codes, standards, specifications and contract conditions. Application of
engineering principles. Specific solutions. Departures from established practice,
where appropriate.
Achievement
Rating

Claim of
Achievement

Level
Date achieved

Eng Tech TMICE


AMICE*, MICE
IEng MICE

CEng MICE

July 10- Dec 12

E
While working at FRP Gratings and Composites Ltd, I was involved in product development to
solve issues encountered in engineering practice. One such instance was the development of a
fiberglass electrical pullbox for use in construction. The established method of practice is that
electrical pullboxes are made of concrete block work with PVC inserts to allow for cables. However,
this method has the issue of water entering the pullbox and shorting off the electricals, resulting in
increased costs for repair. As such, it was determined that we should attempt to produce a
fiberglass electrical pullbox which would be leak proof and so eliminate the issue of shorting off of
electricals. I produced shop drawings for a prototype of the pullbox and supervised the fabrication
of the unit for demonstration to prospective clients (see Schematic of Electrical Pullbox in Appendix
B1).
On another project, we were contracted to fabricate 24" HDPE pipe spools for underground
drainage by HDPE fusion welding. However, the fusion equipment which the company purchased
would not have arrived in time to coincide with our start date so we (myself, Mechanical Engineer,
Chief Engineer and work crew) designed and built a machine, based on the principle of operation
of the HDPE fusion equipment, to be used in the interim. The machine was designed to be
manually operated and used a hydraulic jack to apply pressure during heating and fusion of the
piping (see image of Fusion Equipment in use in Appendix B1).

* If your intention is to seek membership as AMICE, you should substitute technical/scientific for engineering

B2

Review and select appropriate techniques, procedures and methods to


undertake tasks

Eng Tech
TMICE

For example: Link your knowledge of core engineering principles to codes,


standards, specifications and tasks within your chosen field of operations.
Consider Health, Safety and Welfare, quality, cost, time, buildability,
sustainability.

B2

Conduct appropriate research and analysis relating to engineering*


problems

AMICE*
MICE
IEng MICE

For example: Apply and know the limitations of established best practice as
defined by codes, standards and specifications. Links to contract conditions.
Feasibility assessments, surveys and costing. Risk analysis. Present solutions
and secure acceptance. Consider Health, Safety and Welfare, quality, cost, time,
buildability, sustainability.

CEng MICE

For example: Apply and know the limitations of established best practice as
defined by codes, standards and specifications. Links to contract conditions.
Feasibility assessments, surveys and costing. Risk analysis. Presentation of
solutions and secure acceptance. Consider Health, Safety and Welfare, quality,
cost, time, buildability, sustainability. Value engineering. Whole life costing.

Claim of
Achievement

Achievement
Rating

Eng Tech TMICE


AMICE*, MICE
IEng MICE

CEng MICE

Level

Date achieved

July 10- Dec 12

E
During my time at FRP Gratings & Composites, I assisted in the preparation of Job Safety
Analyses for various projects, taking into account both fabrication and installation of items
(Appendix B2).
The company also markets a range of packaged water and wastewater treatment systems. I
assisted in researching various brands of package wastewater systems which had a reputation for
quality, had vast experience in the design and implementation of wastewater systems and which
would meet local effluent quality standards. I was responsible for presenting my recommendations
to the MD who would then make a decision on which brand the company would represent.

* If your intention is to seek membership as AMICE, you should substitute technical/scientific for engineering

B3

Contribute to the implementation of solutions to problems

Eng Tech
TMICE

For example: Health, Safety and Welfare, quality, cost, time, buildability, risk
assessment. Link to standards, drawings and specifications.

B3

Implement solutions to problems and evaluate their effectiveness

AMICE
MICE
IEng MICE

For example: Health, Safety and Welfare, quality, cost, time, buildability, risk
assessment. Link to codes, standards, specifications and contract conditions.
Monitoring outputs and results.

CEng MICE

For example: Health, Safety and Welfare, quality, cost, time, buildability, risk
assessment. Link to codes, standards, specifications and contract conditions.
Monitoring outputs and results.
Achievement
Rating

Claim of
Achievement

Level
Date achieved

Eng Tech TMICE


AMICE, MICE
IEng MICE

CEng MICE

July 10- Dec 12

July 10- Dec 12

E, B
While employed with FRP Gratings & Composites Ltd, I was involved in the fabrication and
installation of a 3" frp firewater pipeline for Petrotrin's New Acid Plant. When the system was put
into operation and pressured up, a leak developed at one of the joints. I, along with one member of
the crew, was required to assess the leak and repair it. Upon investigation, I realized that the leak
had occurred due to a space at the joint which could not have been sealed internally using
adhesive. To resolve the issue, we removed the existing fiberglass weld, sealed the joint externally
using putty and installed a new fiberglass weld. I advised the plant operators to allow the weld to
cure properly and to apply pressure to the line 12 hours after completion of the repair. I contacted
the client the next day to ensure that the repair was able to withstand design pressures and was
informed that no further problems had occurred.
I also worked on another project which involved the fabrication of frp headers, troughs and feed
pipes for Petrotrin's Acid Plant Cooling Tower. However, when the headers and troughs were
installed, they were not properly positioned inside the vessel and as a result, the headers were not
aligned with the flanged elbows of the feed pipes. The client insisted that we perform the
adjustments on site which we attempted to do but our efforts proved futile. As such, I took the
flanged elbows back to the workshop where I directed the crew on the repairs to be made. After the
items had been reworked, I returned them to the client for installation. The client found the items
acceptable and had no further issues with the installation (see invoices for completed works in
Appendix B3).

Provide technical and commercial management

C1

Plan, organise and supervise resources to complete tasks

Eng Tech
TMICE

For example: Programmes. Plans. Surveys. Method statements. Progress


monitoring. Records.
A project can be whatever you are responsible for eg a design, some research work, a
feasibility study, a site-based project, etc.

C1

Plan for effective project implementation

AMICE
MICE
IEng MICE

For example: Planning and resourcing. Programming. Method statements.


Tenders. Fees. Contractual obligations. Information and administration systems.
Instructions. Records.
A project can be whatever you are responsible for eg a design, some research work, a
feasibility study, a site-based project, etc.

CEng MICE

For example: Planning and resourcing. Programming. Method statements.


Contractual obligations. Tenders. Fees. Information and administration systems.
Instructions. Records. Project risk and opportunities.
A project can be whatever you are responsible for eg a design, some research work, a
feasibility study, a site-based project, etc

Claim of

Achievement

Eng Tech TMICE

CEng MICE

Rating

AMICE, MICE
IEng MICE

Level
Achievement

Date achieved

July 10- Dec 12

E
During my time at FRP Gratings & Composites Ltd, I was responsible for some administrative
duties. This involved
the development and maintenance of a client database,
the development and maintenance of an information database of products and services
offered by the company,
resource planning, in terms of manpower, equipment and materials, to ensure that deadlines
in terms of delivery to clients were met
accurate record keeping of ongoing projects, in terms of deliverables accomplished and
work remaining
While at FRP Gratings & Composites Ltd, I spent 2 months at NGC Caroni Loading Facility as part
of a team responsible for HDPE Fusion Welding for drain pipes. I was specifically responsible for
quantifying and recording of number and locations of welds done. I was also responsible for
tracking the amount of material used so as to inform the Main Contractor when materials should be
ordered. The team was also responsible for fabrication and installation of catchpit covers and drain
grates. I was specifically responsible for quantifying the number of catchpits and lengths of drain to
be covered and determining quantities of material required for completion of the project.
During my employment with FRP, I was also responsible for the fabrication and installation of a 3"
fiberglass fire water piping system at Petrotrin's Acid Plant. I was required to determine and record
quantities of pipe and fittings required for completion. I was also required to source materials from
Petrotrin's Material Stores as well as order materials from foreign suppliers to be shipped for timely
completion of the project (see emails sent to suppliers in Appendix C1).
C2

Eng Tech
TMICE

Not applicable

C2

Control budgets, tasks, people and resources

AMICE,
MICE
IEng MICE

For example: Management systems. Team working. Competences. Co-ordination


of project activities: programme, quality, cost, labour or staff, other contractors,
suppliers, supply chains, plant/equipment, materials. Monitoring. Payment
processes. Project funding and financing.

CEng MICE

For example: Management systems. Team working. Competences. Co-ordination


of project activities: programme, quality, cost, labour or staff, other contractors,
suppliers, supply chains, plant/equipment, materials. Monitoring. Payment
processes. Project funding and financing. Influence work teams.
Achievement
Rating

Claim of
Achievement

Level
Date achieved

AMICE, MICE
IEng MICE

CEng MICE

July 10- Dec 12

E
As Assistant Chief Engineer at FRP Gratings & Composites Ltd, I was responsible for a work crew
of three at the company's workshop. I gained experience in team motivation, guidance and
management to achieve project deliverables. I was responsible for keeping track of stock, tools
(maintenance, repair, replacement) and consumables.
When required, I was responsible for determining extended work hours to ensure clients' orders
were completed and delivered on time. I was also responsible for daily reporting of work hours to
administration for preparation of wages (see email of daily work hours in Appendix C2).
When there was limited stock available at the shop, I controlled the procedures associated with
fabrication of items (usage of resin and epoxy, fiberglass mat and woving, frp structurals) to
maximise the output from the stock and limit wastage of material. I encouraged the work crew to be
mindful of fabrication activities so as to avoid mistakes resulting in loss of time, wastage of
materials and increased production costs.
I was also responsible, upon completion of projects, to submit invoices to Clients and regularly
follow up on receivables (see email to Client in Appendix C2).

C3

Take responsibility for your work and the work of others

Eng Tech
TMICE

For example: Work effectively without close supervision. Help others to develop.
Lead by example.

C3

Develop people to meet changing technical and managerial needs

AMICE, MICE For example: Objectives and work plans. Help others to develop. Lead by
IEng MICE
example.
CEng MICE

For example: Objectives and work plans. Lead by example. Support other
individuals training and development.

Claim of
Achievement

Achievement
Rating

Level
Date

Eng Tech TMICE


AMICE, MICE
IEng MICE
CEng MICE
A

E
July 10- Dec 12

achieved
E
During my employment with FRP Gratings & Composites Ltd, I was responsible for a work crew of
three fabricators. In this role, I was responsible for preparing work schedules to ensure clients'
projects were completed on time. When there were no external jobs to be completed, I was
responsible for setting tasks for the crew, to improve the internal operation (cleanup of workshop
facilities, stock count, tool maintenance).
I was responsible for appropriate safety and fabrication training for the new fabricator. I was
responsible for outlining the hazards associated with raw materials and ensuring that PPE was
used at all times during fabrication. I was also responsible for training in proper procedures of
preparation and methodology when fabricating. This was particularly important as the new trainee
had no previous knowledge of fabricating fiberglass and was therefore new to the hazards and
procedures of working with the materials.
I also took the responsibility of educating the team, on an informal basis, so that they would be
aware of the products offered by the company.

C4

Contribute to quality systems

Eng Tech
TMICE

For example: Follow quality processes and procedures.

C4

Bring about continuous improvement through quality management

AMICE, MICE For example: Quality plans and systems. Maintain quality standards. Quality
IEng MICE
records. Recommend improvements.
CEng MICE

For example: Quality plans and systems. Maintain quality standards. Quality
records. Recommend improvements. Contribute to the improvement of quality
systems.

Claim of
Achievement

Achievement
Rating
Level
Date

Eng Tech TMICE

AMICE, MICE
IEng MICE
CEng MICE

July 10- Dec 12

achieved
E
During my employment with FRP, I was part of a team responsible for the fabrication of a 3"
fiberglass fire water piping system at Petrotrin's Acid Plant. I carried out the measurement and
marking of piping and fittings for cutting and fabrication. I supervised the fiberglass welding
process to ensure that quality was not compromised- adhesives were mixed using correct
proportions, fiberglass mat and woving were "wetted out" using sufficient epoxy to ensure strength
of the weld, and that sufficient layers of mat and woving were used (in correct combination) to
ensure weld thickness.
I was also responsible for the fabrication of a 36" diameter, 1 1/2" thick fiberglass blind flange. I
was responsible for ensuring adhesives were mixed using correct proportions, fiberglass mat and
woving were "wetted out" using sufficient epoxy, and that sufficient layers of mat and woving were
used (in correct combination) to achieve the required flange thickness. I was also responsible for
monitoring the temperature of the flange during the curing (exothermic) process to avoid potential
burns within the fiberglass layers, compromising the quality of the flange.
While at FRP Gratings & Composites Ltd, I spent 2 months at NGC Caroni Loading Facility as part
of a team responsible for HDPE Fusion Welding. I was specifically responsible for quality control
during the welding exercise, which involved monitoring and maintaining temperature and pressures
during heating and fusion (Appendix C4).

C5

Demonstrate commercial awareness

Eng Tech
TMICE

For example: Relationship between budget and cost. Record keeping. Instructions
and variations.

C5

Manage contractual issues

AMICE, MICE For example: Forms of contract. Responsibility of parties to a contract.


IEng MICE
Procurement methods. Forms of payment. Contractual records. Insurances.
Instructions and variations.
CEng MICE

For example: Forms of contract. Responsibility of parties to a contract.


Procurement methods. Forms of payment. Contractual records. Insurances.
Instructions and variations.

Claim of
Achievement

Achievement
Rating
Level

Eng Tech TMICE


AMICE, MICE
IEng MICE

CEng MICE

Date
achieved

July 10- Dec 12

E
While employed with FRP Gratings & Composites Ltd, I spent 2 months as part of a team
responsible for HDPE Fusion welding of pipe for underground drainage. During execution there
were some issues which required resolution. In one such instance, our team was not provided the
required fittings, as specified by the drawings for construction, for completion of a particular spool. I
notified my superior of the issue via telephone and we were able to propose an engineered
solution, using the fittings which were available. We met with the site's Chief Engineer and
representatives of the Main Contractor with whom our company was contracted, presented our
idea and had it approved. The approved changes were also documented on the Daily Report and
copied to the Client Representative and the Main Contractor (see Daily Report in Appendix C5).
While at the NGC Caroni Loading Facility, I was managing the team responsible for the supply and
installation of high load drain grates and manhole covers. I was responsible for measuring all
works onsite and quantifying the amount of material to be supplied for installation. Upon
determining my as built quantities, I found that they differed from those agreed upon in the original
contract. I verbally notified my superior of the issue and he in turn notified the Main Contractor via
telephone and email. It was resolved that we would carry out the extra works and would invoice for
those works separately.

Demonstrate effective interpersonal skills

D1

Communicate with others

Eng Tech
TMICE

For example: Communicate effectively with others, orally, in writing, graphically.


Contribute to meetings. Consult with others. Knowledge and use of IT.

D1

Communicate with others at all levels

AMICE
MICE
IEng MICE

For example: Reports. Letters. Drawings. Presentations. Exchange of


information. Advice to technical and non-technical colleagues. Contribute to
meetings. Consider the views of others. Consultation. Knowledge and use of IT.
Present your case and defend it.

CEng MICE

For example: Reports. Letters. Drawings. Presentations. Exchange of


information. Advice to technical and non-technical colleagues. Contribute to
meetings. Consider the views of others. Consultation. Knowledge and use of IT.
Present your case and defend it. Conduct discussions.

Claim of
Achievement

Achievement
Rating

Eng Tech TMICE


AMICE, MICE

CEng MICE

IEng MICE
Level

Date achieved

July 10- Dec 12 July 10- Dec 12

K, E
During my employment with FRP Gratings & Composites Ltd (2.5 years), I produced quotes for the
supply of goods and services to several local clients. I prepared brochures for marketing of various
products which the company offers. I was also involved in producing the draft Proposed
Interconnection Documents for Trinidad & Tobago (see quote in Appendix D1).
I spent 2 months at NGC Caroni Loading Facility as part of a team responsible for HDPE Fusion
Welding. I was specifically responsible for producing and delivering Daily Reports and Weld Log
Reports to the Client and Main Contractor (Appendix D1) and for obtaining daily Work Permits. I
met regularly with the Client's Quality Control Representative to discuss any concerns with
procedures and to formulate plans for resolution.
I spent 2-3 months at Trinmar Jetty as part of a team responsible for the repair of an ethanol line
using structural pipe wraps (welds). I was specifically responsible for documenting and tracking of
welds done in terms of number of welds, location and length, along with a picture reference and
number.
I produced shop drawings for the fabrication and installation of two frp (fiberglass reinforced
plastic) ladders and frp handrails on a cooling tower (Appendix D1).

D2

Work effectively with others

Eng Tech
TMICE

For example: Develop good working relationships with colleagues, clients,


suppliers and the public to achieve collective goals. Equal opportunities and
diversity. Set an example for others to follow.

D2

Demonstrate personal and social skills

AMICE
MICE
IEng MICE

For example: Awareness of the needs and concerns of others. Develop good
working relationships to achieve collective goals. Equal opportunities and diversity.
Set an example for others to follow.

CEng MICE

For example: Awareness of the needs and concerns of others. Develop good
working relationships to achieve collective goals. Equal opportunities and diversity.
Set an example for others to follow. Identify, and agree collective goals.

Claim of
Achievement

Achievement
Rating
Level

Eng Tech TMICE

AMICE, MICE
IEng MICE
CEng MICE

Date
achieved

July 10- Dec 12

July 10- Dec


12

E, B
During my time at FRP Gratings & Composites, I was able to develop good working relationships
with colleagues at all levels in the organization- directors, office administration and work crew- as
well as clients. I was aware of my role in the company (Junior Engineer then Assistant Chief
Engineer) and I strived to achieve high results in all activities delegated to me and to promote the
proper functioning of the organization. I was also aware of my professional responsibility toward
my colleagues and clients and ensured that I always delivered best performance to all parties.
Even after having left the company, I have maintained good relationships with all persons.
With respect to clients, I always made myself available for site visits at their convenience and
regularly consulted with them (via phone or correspondence) to discuss changes/concerns/general
follow up on projects that I would be executing on behalf of the company. Whenever clients brought
concerns/problems to my attention, I would work to resolve them in the shortest possible time and
to the client's satisfaction, to ensure that the client could proceed with their work.
With respect to administrative staff and the company's managing director (also Chief Engineer), I
was efficient in carrying out my duties, including daily consultation with the MD on various ongoing
projects, upcoming work and potential jobs for the company, prompt delivery of times to the Office
Manager for preparation of weekly wages, and ensuring that the Office Manager was regularly
made aware of completed jobs to update and follow up on company receivables.
With respect to the work crew of three for which I was responsible, I tried to encourage healthy
work relationships within the group. I sought to advise, correct and guide in all workshop activities,
but also sought advice from the crew, as I knew that some of them were well experienced in
fabrication and would have ideas on how best to carry out a task. I always invited ideas from the
crew which allowed for efficient execution of tasks and also enhanced my learning experience.

Demonstrate a personal commitment to professional standards,


recognising obligations to society, the profession and the environment

E1

Comply with relevant codes of conduct

Eng Tech
TMICE

For example: Purpose and history of ICE. Comply with ICE Codes of Conduct.
Current developments and issues affecting the construction industry. Ethical and
professional behaviour. Promotion of the construction industry.

E1

Comply with relevant codes of conduct

AMICE
MICE
IEng MICE

For example: Purpose and history of ICE. Comply with ICE Codes of Conduct.
Current developments and issues affecting the construction industry. Ethical and
professional behaviour. Promotion of the construction industry.

CEng MICE

For example: Purpose and history of ICE. Comply with ICE Codes of Conduct.
Current developments and issues affecting the construction industry. Ethical and
professional behaviour. Promotion of the construction industry.

Claim of
Achievement

Achievement
Rating

Eng Tech TMICE


AMICE, MICE
IEng MICE

CEng MICE
Level
Date achieved

July 10- Dec 12

E
While employed at FRP Gratings & Composites Ltd, I was, on two separate occasions, faced with
the issue of bribery where our company was asked to give payoffs to the representatives of
prospective clients in order to secure specific projects. It was my first time experiencing these
practices which are considered a norm, locally, in the industry. Given my personal beliefs I told my
employer and MD of the company that while the jobs would do us well in the slow economic times,
this was not the way to achieve and the company should not allow the development of such
practice.
During my time with FRP Gratings & Composites Ltd, I was also involved in widening the
company's scope, in terms of the products and services which it provided. One innovative product
which the company chose to market was fiberglass manhole covers, manufactured to the
standards of their steel counterparts. This product was chosen to be promoted as it solved the
local problem of theft of the steel covers by scrap metal dealers, and prior to my resignation,
several clients had shown interest in purchasing the product (see brochure for fiberglass manhole
cover in Appendix E1).
While there, I was also involved in the company's mission to promote the use of renewable energy
locally given the government's promise of a 150% tax return on solar panels and wind turbines. As
such, the company's MD and myself developed the draft Proposed Interconnection Documents for
Trinidad & Tobago and placed them on the company's website for discussion and comment by
stakeholders. This was an effort to take a proactive approach to fast tracking grid
interconnection by encouraging all stakeholders to combine efforts in developing the
governing legislation, rules and procedures to yield positive benefits to our society and the
environment (see sample pages from draft Proposed Interconnection Documents in Appendix E1).

E2
Eng Tech
TMICE

E2
AMICE
MICE
IEng MICE

CEng MICE

Manage and apply safe systems of work


For example: Identify and take responsibility for own obligations for Health, Safety
and Welfare issues. Implement Health, Safety and Welfare systems. Current Health,
Safety and Welfare codes and legislation. CDM Regulations. Risk assessments.
Method statements. Recommend improvements. Have detailed knowledge of the
hazards applicable to your field of work. Proactive approach to Health, Safety and
Welfare practice. Safety briefings.
Manage and apply safe systems of work
For example: Identify and take responsibility for own obligations for Health, Safety
and Welfare issues. Implement Health, Safety and Welfare systems. Current Health,
Safety and Welfare codes and legislation. CDM Regulations. Risk assessments.
Method statements. Recommend improvements. Recognise compliance costs.
Have detailed knowledge of the hazards applicable to your field of work. Apply risk
management techniques appropriate to your field of work. Safety briefings,
inductions. Prepare and review risk assessments and method statements. Proactive
approach to Health, Safety and Welfare practice and management.
For example: Identify and take responsibility for own obligations for Health, Safety
and Welfare issues. Implement Health, Safety and Welfare systems. Current Health,
Safety and Welfare codes and legislation. CDM Regulations. Risk assessments.
Method statements. Recommend improvements. Contribute to the development and

improvement of systems. Understand compliance costs. Have detailed knowledge


of the hazards applicable to your field of work. Apply risk management techniques
appropriate to your field of work. Safety briefings, inductions. Prepare and review
risk assessments and method statements. Proactive approach to Health, Safety and
Welfare practice and management.
Achievement
Eng Tech TMICE
Rating
AMICE, MICE
IEng MICE
CEng MICE
Level
A
K
E
B
Date achieved Sept 12
Sept 12
July 10- Dec 12 July 10- Dec 12

Claim of
Achievement
A, K
As a postgraduate student, I took a course in Contract and Construction Law for which the
coursework assignment was focused on local HSE legislation. This enhanced my knowledge of
current safety legislation and developed my understanding of the role of both the employer and
employee with respect to HSE in the workplace (see extract from coursework in Appendix E2).

E, B
While working at FRP Gratings and Composites Ltd I was introduced to the specialised skill of
fabrication using fiberglass reinforced plastic products as well as raw materials- fiberglass mat and
woving, epoxies, resin, acetone. This skill had particular hazards associated with it, such as skin
irritation and dust inhalation due to the dust generated when cutting and grinding frp products and
burns to clothes and skin from chemicals and adhesives being used.
By being aware of the hazards associated with the job, I was able to instruct the work crew for which
I was responsible on the potential hazards and as such demanded that they wear the necessary
protective equipment which the company provided at all times. I encouraged the crew to inform me
of when consumables required for their safety needed to be restocked (latex gloves, dust masks) so
that I could obtain them in timely manner. I particularly encouraged good housekeeping in and
around the workshop to minimize the potential for accidents to occur. When on job sites, I ensured
that the crew and I always had the required PPE and used it when carrying out tasks, in addition to
ensuring safe practices during execution of tasks.
E3

Contribute to sustainable development through engineering activities

Eng Tech
TMICE

For example: Comply with environmental legislation and best practice. Awareness
of sustainability issues.

E3

Contribute to sustainable development through engineering* activities

AMICE*
MICE
IEng MICE

For example: Comply with legislation and codes. Environmental impact.


Environmental management (interaction between design, construction and
operation). Social and economic issues in implementing solutions. Project whole
life cycles. Appreciation of sustainable development tools.

CEng MICE

For example: Comply with legislation and codes. Environmental impact.


Environmental management (interaction between design, construction and
operation). Social and economic issues in implementing solutions. Project whole
life cycles. Knowledge of sustainable development tools.

Claim of
Achievement

Achievement
Rating

Eng Tech TMICE


AMICE*, MICE
IEng MICE

CEng MICE

Level

Date
achieved

Jan 12

Jan 12

July 10- Dec 12

A,K
As a postgraduate student, I took a course in Environmental Impact Assessment (EIA) for
Environmental Engineering for which the assessment required me to prepare the terms of
reference of an EIA for a project of my choice- a wastewater treatment plant. I found this course to
be useful in developing my understanding of the EIA process and my knowledge of the necessary
environmental considerations when carrying out an EIA/project (see extract from coursework in
Appendix E3).
E
Working at FRP Gratings & Composites Ltd involved the use of potentially hazardous chemicals
and materials (resin, epoxy, acetone) which required proper storage and disposal techniques to
mitigate potential harm to the environment- both human and natural. I always encouraged the work
crew to ensure that waste materials (especially chemicals) were disposed of in the barrels
provided.

* If your intention is to seek membership as AMICE , you should substitute technical/scientific for engineering

E4

Manage your own continuing professional development

Eng Tech
TMICE

For example: Review of your own development needs. Development Action Plans.
Record CPD activities (Personal Development Record). Evaluate CPD outcomes.
Company appraisals. See ICE 3006A.

E4

Manage your own continuing professional development,


and assist others

AMICE
MICE
IEng MICE

For example: Review of your own development needs. Development Action Plans.
Record CPD activities (Personal Development Record). Evaluate CPD outcomes.
Company appraisals. See ICE 3006A.

CEng MICE

For example: Review of your own development needs. Development Action Plans.
Record CPD activities (Personal Development Record). Evaluate CPD outcomes.
Company appraisals. See ICE 3006A.

Claim of
Achievement

Achievement
Rating

Eng Tech TMICE


AMICE, MICE
IEng MICE

CEng MICE
Level

Date
achieved

July 10- Dec 12

E
While working at FRP Gratings & Composites Ltd, I was introduced to a new and highly specialised
skill in engineering- fabrication of fiberglass reinforced plastic- which was apart from anything I had
learnt during my undergraduate program. As such, I was required to develop my knowledge of the
procedures and techniques involved, which I was able to do through reading publications focused
on fiberglass fabrication and standards for fabrication, as well as through practical training.
Structural fiberglasss and composite products are predominantly used in the petro-chemical
industry. As such, I obtained my PLEA Passport as part of my Health, Safety, Environment and
Quality training in order to work as a contractor at those companies within the energy/oil and gas
and industrial sector. I also obtained site specific orientations for Methanex Trinidad, PCS Nitrogen
Trinidad and Petrotrin (see photograph in Appendix E4).
Also, FRP Gratings and Composites Ltd was also focused on promoting the use of renewable
energy locally- both solar and wind. In keeping with this, I attended the first National Conference
for Environmental Management at the University of the West Indies, St. Augustine Campus and I
attended the Port of Spain Session of the National Energy Policy Consultations hosted by the
Ministry of Energy in 2011.

Development Objectives Personal Record of Achievement

Name

ICE Membership No.

This summary sheet should be used by you in conjunction with your mentor (Supervising Civil
Engineer or Delegated Engineer) to record your progressive achievement and sign-off the
Development Objectives. The dates achieved should be entered on the individual Objective sheet.
Those endorsing this record should complete the lower section with their personal details.
Objective
A1
B1
B2
B3

C1
C2
C3
C4
C5
D1
D2
E1
E2
E3
E4
Details of those endorsing satisfactory achievement above.
Name (print)

Signature
(as used in DO
sign off)

Qualifications

Employer
Organisation

Job title