4.12 IS Pilecap 1
4.12.1 Reference
4.12.2 Problem
Design pilecap foundation with the given data: Load Fy = 800 KN, fc = 25 MPa, fy = 415
MPa, Column Dimension = 250 mm x 250 mm. Pedestal ht= 500 mm
Pile Data- Dia of pile= 400 mm.
Vertical capacity = 250 KN,
Horizontal capacity = 100 KN
Uplift capacity = 80 KN

182 STAAD.foundation V8i (SELECTseries 4)

Section 4 Indian Code (IS 456 -2000)


4.12 IS Pilecap 1
Figure 4-20: Plan and Elevation

4.12.3 Solution
depth of pilecap= 1.5xpiledia, D = 600 mm
Take D=650 mm
c/c pile diatance = 3xpile dia =1200 mm. Edge diatance = 350 mm
Assuming 4 pile combination, Coordinates of piles (considering pedestal at 0,0,0)
Table 4-12: Pile Locations in Plan
Pile No
1
2
3
4

X Coordinate
(mm
-600
-600
600
600

Z Coordinate
(mm)
-600
600
600
-600

pilecap dimension is 1900 mm x1900 mm x 650 mm


Weight of footing = 1.9 x1.9 x 0.65 x 25 KN = 58.66 KN

Verification Manual 183

Chapter 4
4.12 IS Pilecap 1

Weight of pedestal = 0.25 x 0.25 x 0.5 x 25 KN = 0.78 KN


Therefore, total load on the pilecap = (800+58.66 +0.78) KN = 859.44 KN
So Pile reaction = 859.44 /4= 214.86 KN<250 KN
Hence OK
As there is no lateral load , moment or uplift force, so each pile is safe in lateral & uplift
capacity.

Factored Design
Load factor for self wt is taken =1
Load factor for axial load is taken 1.5
So, Load on pilecap = 1.5 x 800 + 58.66 x 1 + 0.78 x 1 = 1259.44 KN
Load on each pile = 1259.44 /4 = 314.86 KN

Calculation of Moment about Z Axis

For moment wrt X1X1


Contribution from pile 1 = from pile 2 = 314.86 x 0.475 = 149.56 KN
So Total Mz X1X1 = 299.12 KNm
For moment wrt X2X2
Contribution from pile 3 = from pile 4 = 314.86 x 0.475 = 149.56 KNm
So Total Mz X2X2 = 299.12 KNm
So Max value of Mz = 299.12 KNm

Calculation of Moment about X Axis


For moment wrt Z1Z1
184 STAAD.foundation V8i (SELECTseries 4)

Section 4 Indian Code (IS 456 -2000)


4.12 IS Pilecap 1

Contribution from pile 1 = from pile 4 = 314.86 x 0.475 = 149.56 KNm


So Total Mx Z1Z1 = 299.12 KNm
For moment wrt Z2Z2
Contribution from pile 2 = from pile 3 = 314.86 x 0.475 = 149.56 KNm
So Total Mx Z2Z2 = 299.12 KNm
So Max value of MX = 299.12 KNm

Check For Trial Depth against moment


About Z Axis
Bending moment at critical section
Muz = 299.12 KN-m
Assuming 50 mm clear cover, 50 mm pile in pilecap & and 12 mm bar, effective depth
deff = 532 mm
K = 700/(1100+0.87x fy ) = 0.479107
Ru = 0.36 .fck. Kumax .(1-0.42Kumax) = 3.4442 N/mm2
B =1900 mm , deff = 532 mm
Resisting Moment =Ru. B deff2 = 1852 KNm
Hence OK

AboutX Axis
Bending moment at critical section
Mux = 299.12 KN-m
Assuming 50 mm clear cover, 50 mm pile in pilecap & and 12 mm bar, effective depth
deff = 532 mm K=700/(1100+0.87x
fy )= 0.479107
Ru = 0.36 .fck. Kumax .(1-0.42Kumax) = 3.4442 N/mm2 B
=1900 mm , D = 532 mm
Resisting Moment =Ru. B deff2 = 1852 KNm
Hence OK

Area of Steel Required


Along X Direction
From IS -456-2000 Annex G, G-1, b:

Verification Manual 185

Chapter 4
4.12 IS Pilecap 1

Mu =0.87.fy.Ast.d.(1-Ast.fy/b.d.fck)
So solving equation for Ast,

2
Astx = 1558 m m
2
Minimum area of steel Astmin = 0.0012 x B x D = 1482 mm ( as fy>250)
2
Provided area = 1558 m m

Along Z Direction
From IS -456-2000 Annex G, G-1, b:
Mu =0.87.fy.Ast.d.(1-Ast.fy/b.d.fck)
So solving equation for Ast,

2
AstZ = 1558 m m
2
Minimum area of steel Astmin = 0.0012 x B x D = 1482 mm ( as fy>250)
2
Provided area = 1558 m m

Calculation of Shear

Parallel to X Axis
For shear wrt X1X1
Contribution from pile 1 = pile 2 = 317.116 x 0.375 = 113.37 KN
So Total V X1X1 = 226.74 KN
For shear wrt X2X2
Contribution from pile 3 = pile 4 = 317.116 x 0.375 = 113.37 KN

186 STAAD.foundation V8i (SELECTseries 4)

Section 4 Indian Code (IS 456 -2000)


4.12 IS Pilecap 1

So Total V X2X2 = 226.74 KN


So Maximum V parallel to X direction = 226.74 KN

Parallel to Z Axis
For shear wrt Z1Z1
Contribution from pile 1 = pile 4 = 317.116 x 0.375 = 113.37 KN
So Total V Z1Z1 = 226.74 KN
For shear wrt Z2Z2
Contribution from pile 2 = pile 3 = 317.116 x 0.375 = 113.37 KN
So Total V Z2Z2 = 226.74 KN
So Max V parallel to Z direction = 226.74 KN

Check for One-Way Shear


Along X Direction

Percentage of steel pt =

= 0.154

Vumax = 226.74 KN
226.74 x 1000 / 1900 x 532 = 0.224 N/mm
2
Now allowable stress = 0.293 N/mm
Developed shear stress V =

V < c, Hence Safe

Along Z Direction

Percentage of steel pt =

= 0.154

Vumax = 226.74 KN
Developed shear stress V = 226.74 x 1000 / 1900 x 532 = 0.224 N/mm
2
Now allowable stress = 0.293 N/mm

V < c, Hence Safe

Verification Manual 187

Chapter 4
4.12 IS Pilecap 1

Punching Shear

Punching shear is checked on a perimeter 0.5d =266 mm from the column face.
Contribution from pile 1 = from pile 2 = from pile 3 = from pile 4 = 317.12
KN
So total punching shear Vmax= 1268.464 KN
4x(250+532/2+532/2)=3128 mm
v =

= 0.76 N/mm

=L/B =1900/1900 =1
k=0.5 +=1.5 , k<=1
Hence, k=1
Now allowable stress= c =k.0.25.fck = 1.25 N/mm

v < c , Hence safe

4.12.4 Comparison
Table 4-13: IS verification example 12 comparison
Reference
STAAD.foundation
Percent DifValue of
Result
Result
ference
Governing
299.12 KNm 229.112 KN-m
None
Moment
Shear Force(One- 226.74 KN
222 KN
Negligible
Way)
Shear Force(Two- 1268.464 KN 1259.44 KN
None
Way)

188 STAAD.foundation V8i (SELECTseries 4)

Section 4 Indian Code (IS 456 -2000)


4.13 IS Pilecap 2

4.13 IS Pilecap 2
4.13.1 Reference
4.13.2 Problem
Design pilecap foundation with the given data: Load Fy = 1100 KN, Mx= 50 KNm, Fz= 50
KN,fc = 25 MPa, fy = 415 MPa, Column Dimension = 250 mm x 250 mm. Pedestal ht= 500
mm
Pile Data- Dia of pile= 400 mm.
Vertical capacity =300 KN,
Horizontal capacity = 100 KN
Uplift capacity = 80 KN
Figure 4-21: Plan, Elevation, and Pedestal dimensions

4.13.3 Solution
depth of pilecap= 1.5 x pile dia, D=600 mm
Take D=800 mm
Verification Manual 189

Chapter 4
4.13 IS Pilecap 2
c/c pile diatance = 3xpile dia =1200 mm. Edge diatance =350 mm
Assuming 5 pile combination,
Coordinates of piles considering pedestal at 0,0,0)

Table 4-14: Pile Coordinates in Plan


Pile X Coordinate Z Coordinate
No
1
2
3
4
5

(mm)
-849
-849
0
849
849

(mm)
-849
849
0
-849
-849

pilecap dimension is 2397 mm x2397 mm x 800 mm


Weight of footing = 2.397 x 2.397 x 0.8 x 25 KN = 114.9 KN
Weight of pedestal = 0.25 x 0.25 x 0.5 x 25 KN = 0.78 KN
Therefore, total load on the pilecap = (1100+114.9 +0.78) KN = 1215.69 KN
So Pile reaction from axial load= 1215.69 /5= 243.136KN
Moment from lateral load = (0.8+0.5) x 50= 65 KNm
Moment Mx ( from input) = 50 KNm
So Total moment = 115 KNm
Using Rivet theory2
Reaction from moment= +/- 115x0.849/(4x0.849 ) = +/-33.86 KNm
So

Reaction at Pile 2= reaction at pile 5 = 243.136+33.86 =276.996 KN


Reaction at Pile 1= reaction at pile 4 = 243.136-33.86 =209.276 KN
Reaction at Pile 3= 243.136 KN
So Critical vertical reaction= 277 KN< 300 KN
Lateral reaction = 50/5 = 10 KN < 50 KN, Hence OK
As there is no net uplift load, so each pile is safe in uplift capacity.

190 STAAD.foundation V8i (SELECTseries 4)

Section 4 Indian Code (IS 456 -2000)


4.13 IS Pilecap 2

Factored Design
Load factor for self wt is taken =1
Load factor for axial load is taken 1.5
So, Axial Load on pilecap = 1.5x1100+114.9 x1+0.78x1= 1765.68 KN
Moment on pilecap = 1.5x115= 172.5 KNm
Load on each pile from axial reaction =1765.68 /5=353.136 KN Reaction
2
from moment= +/- 172.5x0.849/(4x0.849 ) = +/-50.795 KNm

So
Reaction at Pile 2= reaction at pile 5 = 353.136 +50.795 =403.931 KN
Reaction at Pile 1= reaction at pile 4 = 353.136 -50.795 =302.341 KN
Reaction at Pile 3= 353.136 KN

Calculation of Moment

About Z Axis
For moment wrt X1X1
Contribution from pile 1=302.341 x 0.724=218.89 KNm
Contribution from pile 2=403.931 x 0.724=292.446 KNm
Contribution from pile 3=1.4 KNm
So Total Mz X1X1 = 512.74 KNm

Verification Manual 191

Chapter 4
4.13 IS Pilecap 2
For moment wrt X2X2
Contribution from pile 4=302.341 x 0.724=218.89 KNm
Contribution from pile 5=403.931 x 0.724=292.446 KNm
Contribution from pile 3=1.4 KNm
So Total Mz X2X2 = 512.74 KNm
So Max value of Mz = 512.74 KNm

About X Axis
For moment wrt Z1Z1
Contribution from pile 1=302.341 x 0.724=218.89 KNm
Contribution from pile 4=302.341 x 0.724=218.89 KNm
Contribution from pile 3=1.4 KNm
So Total Mx Z1Z1 = 439.18 KNm
For moment wrt Z2Z2
Contribution from pile 2 = 403.931 x 0.724=292.446 KNm
Contribution from pile 5 = 403.931 x 0.724=292.446 KNm
Contribution from pile 3=1.4 KNm
So Total Mx Z2Z2 = 586.292 KNm
So Max value of MX = 586.292 KNm

Check For Trial Depth


Moment About Z Axis
Bending moment at critical section
Muz = 512.74 KN-m
Assuming 50 mm clear cover, 50 mm pile in pilecap & and 12 mm bar, effective depth
deff = 695 mm K=700/(1100+0.87x
fy )= 0.479107
Ru = 0.36 .fck. Kumax .(1-0.42Kumax) = 3.4442 N/mm2 B
=2397 mm , deff = 532 mm
Resisting Moment =Ru. B deff2 = 3987.7 KNm
Hence OK

Moment AboutX Axis


Bending moment at critical section

192 STAAD.foundation V8i (SELECTseries 4)

Section 4 Indian Code (IS 456 -2000)


4.13 IS Pilecap 2

Mux = 586.292 KN-m


Assuming 50 mm clear cover, 50 mm pile in pilecap & and 12 mm bar, effective depth
deff = 695 mm K=700/(1100+0.87x
fy )= 0.479107
Ru = 0.36 .fck. Kumax .(1-0.42Kumax) = 3.4442 N/mm2 B
=2397 mm , deff = 532 mm
Resisting Moment =Ru. B deff2 = 3987.7 KNm
Hence OK

Area of Steel Required


Along X Direction
From IS -456-2000 Annex G, G-1, b:
Mu =0.87.fy.Ast.d.(1-Ast.fy/b.d.fck)
So solving equation for Ast,

2
Astx = 2046 m m
2
Minimum area of steel Astmin = 0.0012 x B x D = 2300 mm ( as fy>250)
2
Provided area = 2300 m m

Along Z Direction
From IS -456-2000 Annex G, G-1, b:
Mu =0.87.fy.Ast.d.(1-Ast.fy/b.d.fck)
So solving equation for Ast,

2
AstZ = 2341 m m
2
Minimum area of steel Astmin = 0.0012 x B x D = 2300 mm ( as fy>250)
2
Provided area = 2341 m m

Verification Manual 193

Chapter 4
4.13 IS Pilecap 2

Calculation of Shear
Parallel to X Axis

For shear wrt X1X1


Contribution from pile 1 =302.341 x0.572=173 KN
Contribution from pile 2=403.931 x0.572=231KN

So Total V X1X1 = 404 KN


For shear wrt X2X2
Contribution from pile 4 =302.341 x0.572=173 KN
Contribution from pile 5=403.931 x0.572=231KN
So Total V X2X2 = 404 KN
So Max V parallel to X direction = 404 KN

Parallel to Z Axis
For shear wrt Z1Z1
Contribution from pile 1 =302.341 x0.572=173 KN
Contribution from pile 4 =302.341 x0.572=173 KN
So Total V Z1Z1 = 346 KN
For shear wrt Z2Z2
194 STAAD.foundation V8i (SELECTseries 4)

Section 4 Indian Code (IS 456 -2000)


4.13 IS Pilecap 2

Contribution from pile 2=403.931 x0.572=231KN


Contribution from pile 5=403.931 x0.572=231KN
So Total V Z2Z2 = 462 KN
So Max V parallel to Z direction = 462 KN

Check for One-Way Shear


Along X Direction

Percentage of steel pt =

= 0.138

Vumax = 404 KN
404 x 1000 / (2397 x 695) = 0.24 N/mm
2
Now allowable stress = 0.29 N/mm
Developed shear stress V =

V < c, Hence Safe

Along Z Direction

Percentage of steel pt =

= 0.141

Vumax = 462 KN
462 x 1000 / (2397 x 695) = 0.277 N/mm
2
Now allowable stress = 0.29 N/mm
Developed shear stress V =

V < c, Hence Safe

Punching Shear

Punching shear is checked on a perimeter 0.5d =347.5 mm from the column face.

Verification Manual 195

Chapter 4
4.14 IS Mat Combined Foundation 1

Contribution from pile 1 = from pile 4 = 302.34 KN


Contribution from pile 2 = from pile 5 = 403.93 KN
Contribution from pile 3 =0 KN
So total punching shear Vmax= 1412.544 KN
4x(250+347.5 +347.5)=3780 mm
v =

= 0.538 N/mm

=L/B =2397/2397 =1
k=0.5 +=1.5 ,
k2397<=1 Hence, k=1
Now allowable stress= c =k.0.25.fck = 1.25 N/mm

v < c , Hence safe

4.13.4 Comparison
Table 4-15: IS verification example 13 comparison
Reference
STAAD.foundation
Percent DifValue of
Result
Result
ference
Governing
586 KNm
570 KNm
Negligible
Moment
512.74 KNm 512.5 KNm
Shear Force(One- 462 KN
461 KN
Negligible
Way)
404 KN
415 KN
Shear Force(Two- 1412.544 KN 1412 KN
None
Way)
Depth
800 mm
800 mm
None

5.12 US Pilecap Foundation 1


5.12.1 Reference
5.12.2 Problem
Design pilecap foundation with the given data: Load Fy = 330 kip, fc = 4 ksi, fy = 60 ksi,
Column Dimension = 12 in x 12 in. Pedestal ht= 20 in.
Dia of pile= 18 in
Vertical capacity = 65 kip
Horizontal capacity = 20 kip
Uplift capacity = 15 kip

264 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.12 US Pilecap Foundation 1
Figure 5-24: Elevation and Plan

5.12.3 Solution
Depth of pilecap= 1.5 x pile diameter, D = 27 in.
Take D = 31 in.
c/c pile distance = 3 x pile diameter =54 mm
Edge distance =18 inch
Assuming 6 pile combination, coordinates of piles (considering pedestal at 0,0,0):

Verification Manual 265

Chapter 5
5.12 US Pilecap Foundation 1
Table 5-12: Pile Coordinates in Plan
Pile X Coordinate Z Coordinate
No
(in)
(in)
1
-54
-27
2
-54
27
3
0
-27
4
0
27
5
54
-27
6
54
27
Pilecap Length = 2(54)+2(18) = 144 inch
Pilecap Width = 54+2(18) = 90 inch
pilecap dimension is 144 inch x90 inch x 31 inch Weight of
3
footing = 144 x 90 x 31 x 0.16/12 = 37.2 kip Weight of
3
pedestal = 12 x 12 x 20 x 0.16 /12 = 0.267 kip
Therefore, total load on the pilecap = (330+37.2 +0.267) =367.467 kip
So Pile reaction = 367.467 /6= 61.244 kip < 65 kip
Hence OK
As there is no lateral load , moment or uplift force, so each pile is safe in lateral & uplift
capacity.

Factored Design
Load factor for self wt is taken = 1
Load factor for axial load is taken = 1.4
So, Load on pilecap = 1.4(330) + 1(37.2)+0 1(.267) = 499.467
Load on each pile =499.467/6=83.245 kip

266 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.12 US Pilecap Foundation 1

Punching Shear
Figure 5-25: Section considered for punching shear

Punching shear is checked on a perimeter 0.5d =13inch from the column face.
Contribution from pile 1 = from pile2 = from pile5 = from pile 6 = 83.245 kip
Contribution from pile 3 = from pile4 = 0.944 x 83.245 = 78.58 kip
So total punching shear Vm= 490.14 kip
Pm = 4 (12+13+13) =152 inch
= L/B =12/12 =1

3
V = (2 + 4/ )(f ) b d = (2+4/1) (4000) 152 26 =1499.6 (10) lb
1

V2

3
2210 (10) lb
V = 4.(f ) b
3

= (40 d/b + 2)(fc) bc d =

c c

(40 26/152 + 2) (4000) 152 26 =


3

d = 4 (4000) 152 26= 999.78 (10) lb


e

Vc = min(V1, V2, V3) = 999.78 kip


So, 0.75 Vc = 749.8 kip
Vm< 0.75 Vc , Hence safe

Punching Shear Check for Corner Piles


Corner piles are 1,2,5,6
Verification Manual 267

Chapter 5
5.12 US Pilecap Foundation 1
Each pile is taking reaction 83.245 kip
d critical = 5.486 inch Effective
depth = 26 inch
d critical< Effective depth, Hence Safe

Calculation of Shear
Parallel to X Axis
For shear wrt X1X1
Contribution from pile 1 =pile2=83.245 Kip
Contribution from pile 3,4,5,6 =0 Kip
So Total V X1X1 = 166.49 Kip
For shear wrt X2X2
Contribution from pile 5 =pile6=83.245 Kip
Contribution from pile 1,2,3,4 =0 Kip
So Total V X2X2 = 166.49 Kip
So V parallel to X direction = 166.49 Kip
Now allowable shear = Vc1 =2(fc) bc d =2 (4000) 90 26 lb
3
=295.99 (10) lb
0.75 Vc1=222 Kip
V < Vc1, Hence Safe

Parallel to Z Axis
For shear wrt Z1Z1
Contribution from pile 1 =pile 6 =pile 7 =83.245 x0.222=18.498 Kip
Contribution from pile 2 =pile 4 =pile 6 =0 Kip
So Total V Z1Z1 = 55.5 Kip
For shear wrt Z2Z2
Contribution from pile 2 =pile 4 =pile 6 =83.245 x0.167=18.498 Kip
Contribution from pile 1 =pile 3 =pile 5 =0 Kip
So Total V Z2Z2 = 55.5 Kip
So V parallel to Z direction = 55.5 Kip
Now allowable shear = Vc1 =2(fc) bc d =2 (4000) 90 26 lb
3
=295.99 (10) lb
0.75 Vc1 = 222 Kip
V < Vc1, Hence Safe
268 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.12 US Pilecap Foundation 1

Calculation of Moment
For either direction:
m = fy/0.85 fc= 60/(0.85 4)
= 17.65 1 = 0.85 (as fc =
4)
bal = 0.85 1 fc 87/fy (87 + fy) =
0.028507 max = 0.75 bal =
0.02138
min = 0.0018 ( as fy= 60 Ksi)

Calculation of Moment about Z Axis


Calculation of Mz-For
moment wrt X1X1
Contribution from pile 1=from pile2=83.245 x 48=3995.76 in kip
Contribution from pile 3=from pile 4=12 in kip
Contribution from pile 5,6=0 in kip So
Total Mz X1X1 = 8014 in kip = 670 ft kip For
moment wrt X2X2
Contribution from pile 5=from pile6=83.245 x 48=3995.76 in kip
Contribution from pile 3=from pile 4=12 in kip

Verification Manual 269

Chapter 5
5.12 US Pilecap Foundation 1

Contribution from pile 5,6=0 in kip


So Total Mz X2X2 = 8014 in kip = 670 ft kip
So Resisting Moment = Mnz= Muz/ = 744.44 ft kip
2
R = M /b d = 0.147 Ksi
n

nz

2 m Rn/fy = 0.0864 <1 , Hence OK


= 1/m (1-1-2m Rn/fy) = 0.0025
min< < max, Hence OK

Calculation of Moment about X Axis


Calculation of MxFor moment wrt Z1Z1
Contribution from pile 1=from pile 3=from pile 5= 83.245 x 21=1748.145
in kip
So Total Mx Z1Z1 = 437 ft kip
For moment wrt Z2Z2
Contribution from pile 2=from pile 4=from pile 6= 83.245 x 21=1748.145
in kip
So Total Mx Z2Z2 = 437 ft kip
So Max value of MX = 437 ft kip
So Resisting Moment = Mnx= Mxux/ = 485.55 ft kip
2
Rn = Mnz/b d = 0.06 Ksi
2 m Rn/fy = 0.035 <1 , Hence OK
= 1/m (1-1-2m Rn/fy) = 0.001 So
= min=0.0018
< max, Hence OK

Area of Steel Required


Along X Direction
= 0.0025
b = 90 in, d=26 in
Therefore, Astx = 5.85 in

Along Z Direction
= 0.0018

270 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.13 US Pilecap Foundation 2

b = 144 in , d=26 in
Therefore, Astxz = 6.74 in

5.12.4 Comparison
Table 5-13: US verification example 10 comparison
Reference STAAD.foundation Percent DifValue of
Result
Result
ference
Pile Reaction (kip)
83.245
83.244
None
Governing Moment
670
718
15%
(ft kip)
437
502.6
Shear Force, One166.49
166.49
None
Way (kip)
55.5
55.5
Shear Force, Two490.14
490.217
Negligible
Way (kip)

5.13 US Pilecap Foundation 2


5.13.1 Reference
5.13.2 Problem
Design pilecap foundation with the given data: Load Fy = 150 kip, Mx= 50 ft kip. fc = 4 ksi,
fy = 60 ksi, Column Dimension = 12 inchx12 inch. Pedestal ht= 20 inch
Pile Data- Dia of pile= 18 inch
Vertical capacity = 65 kip,
Horizontal capacity = 20 kip
Uplift capacity = 15 kip

Verification Manual 271

Chapter 5
5.13 US Pilecap Foundation 2
Figure 5-26: Elevation and Plan

272 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.13 US Pilecap Foundation 2

5.13.3 Solution
depth of pilecap= 1.5xpiledia, D=27 inch
Take D=27 inch
c/c pile diatance = 3xpile dia =54 mm. Edge diatance =18 inch
Assume a 4 pile combination.
Coordinates of piles; considering pedestal at 0,0,0
Table 5-14: Pile Coordinates in Plan
Pile X Coordinate Z Coordinate
No
(in)
(in)
1
-27
-27
2
-27
27
3
27
27
4
27
-27
Pilecap Length = 54+2x18 = 90 inch
Pilecap Width = 54+2x18 = 90 inch
pilecap dimension is 90 inch x90 inch x 27 inch
3
Weight of footing = 90 x 90 x 27 x 0.16/12 = 20.25 kip
3
Weight of pedestal = 12 x 12 x 20 x 0.16 /12 = 0.267 kip
Therefore, total load on the pilecap = (150+20.25 +0.267) =170.517 kip

So Pile reaction from axial load = 170.517 /4= 42.629 kip


Moment Mx ( from input) = 50 ft kip =600 in kip
Using Rivet theory2
Reaction from moment= +/- 600x0.27/(4x27 ) = +/-5.55 Kip
So,

Reaction at Pile 2= reaction at pile 3 = 42.629 +5.55 = 48.185 Kip


Reaction at Pile 1= reaction at pile 4 = 42.629 -5.55 = 37.085Kip
So Critical vertical reaction= 48.185 Kip < 65 kip
As there is no net uplift/lateral load, so each pile is safe in uplift & lateral capacity.

Factored Design
Load factor for self wt is taken =1
Load factor for axial load is taken 1.4
So, Axial Load on pilecap = 1.4x150+20.25 x1+0.267x1= 230.517 Kip
Moment on pilecap = 1.4x50 ft kip = 840 in kip
Load on each pile from axial reaction =230.517 /4=57.629 Kip
2
Reaction from moment= +/- 840x27/(4x27 ) = +/-7.78 Kip

Verification Manual 273

Chapter 5
5.13 US Pilecap Foundation 2
So,
Reaction at Pile 2= reaction at pile 3 = 57.629 +7.78 = 65.409 Kip
Reaction at Pile 1= reaction at pile 4 = 57.629 -7.78 = 49.849 Kip

Punching Shear
Figure 5-27: Section considered for two-way shear

Punching shear is checked on a perimeter 0.5d =11.5 inch from the column face.
Contribution from pile 1=from pile 4= 49.849 Kip
Contribution from pile 2=from pile 3= 65.409 Kip
So total punching shear Vm= 230.516 kip
Pm = 4x(12+11+11) =136 inch
=L/B =12/12 =1

274 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.13 US Pilecap Foundation 2

V1

fc.bc.d = (2+4/1).(4000) x136 x 22 =1135.4 x1000 lb

V2
= 1602.9 x 1000 lb

fc.bc.d = (40x22/136+2).(4000) x136x22

V3 = 4.fc.bc.de = 4.(4000) x 136 x 22= 756.9 x 1000 lb


Vc = min{V1, V2, V3} = 756.9 kip
So, 0.75Vc = 567.7 Kip
Vm< 0.75.Vc , Hence safe

Punching Shear Check for Corner Piles


Corner piles are 1,2,3,4
Pile 1/4 are taking reaction 49.849 Kip & Pile 2/3 are taking reaction 65.409 Kip d
critical = 4.46 inch
Effective depth = 22 inch
d critical< Effective depth, Hence Safe

Verification Manual 275

Chapter 5
5.13 US Pilecap Foundation 2

Calculation of Shear
Figure 5-28: Section considered for one-way shear

Parallel to X Axis
For shear wrt X1X1
Contribution from pile 1 =49.849 x 0.444=22.155 Kip
Contribution from pile 2 =65.409 x 0.444=29.04 Kip
Contribution from pile 3,4 =0 KN
So Total V X1X1 = 51.195 Kip
For shear wrt X2X2
Contribution from pile 4 =49.849 x 0.444=22.155 Kip
Contribution from pile 3 =65.409 x 0.444=29.04 Kip
Contribution from pile 1,2 =0 KN
So Total V X2X2 = 51.195 Kip

276 STAAD.foundation V8i

(SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.13 US Pilecap Foundation 2

So V parallel to X direction = 51.195 Kip


Now allowable shear = Vc1 =
1000 lb

= 2x(4000) x 90 x 22 lb = 250.4 x

0.75.Vc1=187.84 Kip
V < Vc1, Hence Safe

Parallel to Z Axis
For shear wrt Z1Z1
Contribution from pile 1 =49.849 x 0.444=22.155 Kip
Contribution from pile 4 =49.849 x 0.444=22.155 Kip
Contribution from pile 2,3 =0 KN
So Total V Z1Z1 = 44.31 Kip
For shear wrt Z2Z2
Contribution from pile 2 =65.409 x 0.444=29.04 Kip
Contribution from pile 3 =65.409 x 0.444=29.04 Kip
Contribution from pile 1,4 =0 KN
So Total V Z2Z2 = 58.08 Kip
So V parallel to Z direction = 58.08 kip
Now allowable shear = Vc1 =
1000 lb

= 2x(4000) x 90 x 22 lb = 250.4 x

0.75.Vc1 = 187.8 Kip


V < Vc1, Hence Safe

Verification Manual 277

Chapter 5
5.13 US Pilecap Foundation 2

Calculation of Moment
Figure 5-29: Section considered for bending

About Z Axis
Calculation of Mz-For
moment wrt X1X1
Contribution from pile 1=49.849 x21/12=87.24 ft kip
Contribution from pile 4=65.409 x21/12=114.46 ft kip
Contribution from pile 3,4=0 in kip
So Total Mz X1X1 = 207.1 ft kip
For moment wrt X2X2
Contribution from pile 4=49.849 x21/12=87.24 ft kip

278 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.13 US Pilecap Foundation 2
Contribution from pile 3=65.409 x21/12=114.46 ft kip
Contribution from pile 1,2=0 in kip
So Total Mz X2X2 = 207.1 ft kip
So max Mz = 207.1 ft kip
So Resisting Moment =Mnz= Muz/ =224.11 ft kip
m=fy/0.85.fc=60/(0.85x4) = 17.6471
1 = 0.85 ( as fc=4)
bal = 0.85.1.fc.87/fy.(87+fy) = 0.028507
max = 0.75. bal = 0.02138
min = 0.0018 ( as fy=60)
2
Rn = Mnz/b.d =0.0617 Ksi 2m.Rn/fy

= 0.0363 <1 , Hence OK


= 1/m. (1-1-2m.Rn/fy) = 0.001
So, =min = 0.0018
< max Hence OK

About X Axis
Calculation of MxFor moment wrt Z1Z1
Contribution from pile 1=from pile 4=49.849 x 21/12=87.24 ft kip
Contribution from pile 2=from pile 3=0 ft kip
So Total Mx Z1Z1 = 174.47 ft kip
For moment wrt Z2Z2
Contribution from pile 2=from pile 3=65.409 x 21/12=114.465 ft kip
Contribution from pile 1=from pile 4=0 ft kip
So Total Mx Z2Z2 = 228.93 ft kip So
Max value of MX = 228.93 ft kip
So Resisting Moment =Mnz= Muz/ =254.37 ft kip
m=fy/0.85.fc=60/(0.85x4) = 17.6471
1 = 0.85 ( as fc=4)
bal = 0.85.1.fc.87/fy.(87+fy) = 0.028507
max = 0.75. bal = 0.02138
min = 0.0018 ( as fy=60
2
Rn = Mnz/b.d =0.07 Ksi
2m.Rn/fy = 0.0412 <1 , Hence OK

Verification Manual 279

Chapter 5
5.14 US Pilecap Foundation 3

= 1/m. (1-1-2m.Rn/fy) = 0.0012


So = min=0.0018
< max Hence OK

Area of Steel Required


Along X Direction
= 0.0018
b= 90 inch , d=22 inch
Therefore, Astx = 3.6 in

Along Z Direction
= 0.0018
b= 90 inch , d=22 inch
Therefore, AstZ = 3.6 in

5.13.4 Comparison
Table 5-15: US verification example 11 comparison
Value of
Pile Reaction

Reference Result STAAD.foundation Percent DifResult


ference
49.849 Kip
49.851 Kip
None

Governing
Moment

65.409 Kip
207.1 ft kip
228.93 ft kip

Shear
51.195 Kip 58.08
Force(One-Way) Kip
Shear
Force(TwoWay)

230.516 kip

65.407 Kip
219.654 ft kip

Negligible

294.254 ft kip
51.226 Kip

None

58.14 Kip
230.517 kip

None

5.14 US Pilecap Foundation 3


5.14.1 Reference
5.14.2 Problem
Design pilecap foundation with the given data: Load Fy = 1000 KN, fc = M 25, fy = Fe 415
Column Dimension = 250 mm x 250 mm, Pedestal ht= 500 mm

280 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.14 US Pilecap Foundation 3

Dia of pile= 300 mm


Vertical capacity = 250 KN
Horizontal capacity = 50 KN
Uplift capacity = 100 KN
Figure 5-30: Elevation and Plan

5.14.3 Solution
Depth of pilecap= 1.5 x pile diameter, D = 450 mm
Take D = 655 mm
c/c pile distance = 3 x pile diameter =1200 mm
Edge distance =350 mm
Assuming five pile combination, coordinates of piles (considering pedestal at 0,0,0):
Table 5-16: Pile Coordinates in Plan
Pile
No
1
2
3
4
5

X Coordinate Z Coordinate
(mm)
(mm)
-848.528
-848.528
-848.528
848.528
0
0
848.528
-848.528
848.528
848.528

Verification Manual 281

Chapter 5
5.14 US Pilecap Foundation 3

Pilecap Length = 2(850)+2(350) = 2400 mm


Pilecap Width = 2(850)+2(350) = 2400 mm
pilecap dimension is 2400 mm x 2400 mm x 740 mm
Weight of footing = 2.4 x 2.4 x 0.74 x 25 = 106.56 KN
Weight of pedestal = 0.25 x 0.25 x 0.5 x 25 = 0.78 KN
Therefore, total load on the pilecap= (1000+106.56 +0.78) =1107.34 KN
So Pile reaction = 1107.34 /5 = 221.47 KN < 250 KN
Hence OK
As there is no lateral load , moment or uplift force, so each pile is safe in lateral & uplift
capacity.

Factored Design
Load factor for self wt is taken = 1 Load
factor for axial load is taken = 1.4
So, Load on pilecap = 1.4(1000) + 1(106.56)+0 1(0.78) = 1507.34 KN
Load on each pile = 1507.34/5 = 301.468 KN
deff = 740 - 50 - 50 - 25 = 615 mm

Punching Shear
Figure 5-31: Section considered for punching shear

Punching shear is checked on a perimeter 0.5d =307.5 mm from the column face.
Contribution from pile 1 = from pile2 = from pile4 = from pile 5 = 301.468
KN
Contribution from pile 3 = 0 KN
So total punching shear Vm= 1205.9 KN
Pm = 4 (250 + 307.5 + 307.5) =3460 mm
= L/B = 250/250 = 1

282 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.14 US Pilecap Foundation 3

V1= (2 + 4/c)(fc) bc d = 5298.5 KN


V2 = (40 d/b + 2)(fc) bc d = 5530.9 KN
V3= 4.(fc) bc de = 3532 KN
Vc = min(V1, V2, V3) = 3532 KN
So, 0.75 Vc =2649 KN
Vm< 0.75 Vc , Hence safe

Punching Shear Check for Corner Piles


Corner piles are 1, 2, 4, & 5
Each pile is taking reaction 301.47 KN B1
= 1418.27 mm & B2 =2025 mm d1
= 151 mm
d2 = 211 mm
d critical =212 mm
Effective depth = 615 mm
d critical < Effective depth, Hence Safe

Calculation of Shear
Figure 5-32: Section considered for one-way shear

Parallel to X Axis
Shear Plane is at a distance d (615 mm from face of column)
For shear wrt X1X1
Contribution from pile 1 = pile 2 = 0.8667 x 301.47 = 261.27 KN
Contribution from pile 3,4,5 =0 KN
So Total V X1X1 = 522.548 KN
Verification Manual 283

Chapter 5
5.14 US Pilecap Foundation 3
For shear wrt X2X2
Contribution from pile 4 = pile 5 = 0.8667 x 301.47=261.27 KN
Contribution from pile 3,2,1 =0 KN
So, Total V X2X2 = 522.548 KN
Shear, V, parallel to X direction = 522.548 KN
Now allowable shear = Vc1 =2(fc) bc d = 1225 KN
0.75 Vc1= 918.8 KN
V < Vc1, Hence Safe

Parallel to Z Axis
For shear wrt Z1Z1
Contribution from pile 1 =pile 4 = 0.8667 x 301.47 = 261.27 KN
Contribution from pile 2 = pile 3 = pile 5 = 0 KN
So Total V Z1Z1 = 522.548 KN
For shear wrt Z2Z2
Contribution from pile 2 = pile 5 = 0.8667 x 301.47 = 261.27 KN
Contribution from pile 1 = pile 3 = pile 4 =0 KN
So Total V Z2Z2 = 522.548 KN
Shear, V, parallel to Z direction = 522.548 KN
Now allowable shear = Vc1 =2(fc) bc d = 1225 KN
0.75 Vc1= 918.8 KN
V < Vc1, Hence Safe

Calculation of Moment
For either direction:
m = fy/0.85 fc= 415/(0.85 25) = 19.529
1 = 0.85 (as fc = M 25)
bal = 0.85 1 fc 87/fy (87 + fy) =
0.025729 max = 0.75 bal =
0.019297
2
min = 0.0018 (as fy= 415 N/mm )

284 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.14 US Pilecap Foundation 3
Figure 5-33: Section considered for moment

Calculation of Moment about Z Axis


Calculation of MzFor moment wrt X1X1
Contribution from pile 1 = pile 2 = 301.47 x 0.725 = 218.56 KNm
Contribution from pile 3 = 0.083 x 301.47 x 0.0083 = 0.21 KNm
Contribution from pile 4= pile 5 = 0 KNm
So Total Mz X1X1 = 437.34 KNm = 440 KNm
For moment wrt X2X2
Contribution from pile 4 = pile 5 = 301.47 x 0.725 = 218.56 KNm
Contribution from pile 3 = 0.083 x 301.47 x 0.0083 = 0.21 KNm
Contribution from pile 4 = pile 5 =0 KNm
So Total Mz X2X2 = 437.34 KNm = 440 KNm
So Resisting Moment = Mnz= Muz/ = 488.89 KNm = 490 KNm
2
2
Rn = Mnz/b d = 0.5398 N/mm
2 m Rn/fy = 0.0508 <1 , Hence OK
= 1/m (1-1-2m Rn/fy) =0.00132 =
min=0.0018
< max, Hence OK

Calculation of Moment about X Axis


Calculation of MxFor moment wrt Z1Z1
Contribution from pile 1= pile 4 = 301.47 x 0.725 = 218.56 KNm
Contribution from pile 3=0.083 x 301.47 x 0.0083 = 0.21 KNm
Verification Manual 285

Chapter 5
5.14 US Pilecap Foundation 3

Contribution from pile 2 = pile 5 = 0 KNm


So Total Mx Z1Z1 = 437.34 KNm = 440 KNm
For moment wrt Z2Z2
Contribution from pile 2= pile 5 = 301.47 x 0.725 = 218.56 KNm
Contribution from pile 3 = 0.083 x 301.47 x 0.0083 = 0.21 KNm
Contribution from pile 1 = pile 4 = 0 KNm
So Total Mx Z2Z2 = 437.34 KNm = 440 KNm
So Max value of MX = 440 KNm
So Resisting Moment = Mnx= Mxux/ = 488.89 KNm =490 KNm
2
2
Rn = Mnz/b d = 0.5398 N/mm
2 m Rn/fy = 0.0508 <1 , Hence OK
= 1/m (1-1-2m Rn/fy) = 0.00132 So
= min=0.0018
< max, Hence OK

Area of Steel Required


Along X Direction
= 0.0018
b = 2400 mm, d = 615 mm
Therefore, Astx = 2657 mm

Along Z Direction
= 0.0018
b = 2400 mm, d = 615 mm
Therefore, Astz = 2657 mm

286 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.15 US Pilecap Foundation 4

5.14.4 Comparison
Table 5-17: US verification example 11 comparison
Reference STAAD.foundation Percent DifValue of
Result
Result
ference
Pile Reaction, Service
221.5
221.4
Negligible
(KN)
Pile Reaction, Ulti301.5
301.4
Negligible
mate (KN)
Governing Moment
489
485
Negligible
(KNm)
489
485
Shear Force, One523
520
Negligible
Way (KN)
523
520
Shear Force, Two1206
1206
None
Way (KN)

5.15 US Pilecap Foundation 4


5.15.1 Reference
5.15.2 Problem
Design pilecap foundation with the given data: Load Fy = -1200 KN & Mz = 100 KNm, fc =
M 25, fy = Fe 415
Column Dimension = 250 mm x 250 mm, Pedestal ht= 500 mm
Dia of pile= 300 mm
Vertical capacity = 250 KN
Horizontal capacity = 50 KN
Uplift capacity = 50 KN

Verification Manual 287

Chapter 5
5.15 US Pilecap Foundation 4
Figure 5-34: Elevation and Plan

5.15.3 Solution
Depth of pilecap= 1.5 x pile diameter, D = 450 mm
Take D = 780 mm
c/c pile distance = 3 x pile diameter = 900 mm
Edge distance =350 mm
Assuming six pile combination, coordinates of piles (considering pedestal at 0,0,0):

288 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.15 US Pilecap Foundation 4
Table 5-18: Pile Coordinates in Plan
Pile X Coordinate Z Coordinate
No
(mm)
(mm)
1
-900
-450
2
-900
450
3
0
-450
4
0
450
5
900
-450
6
900
450
Pilecap Length =2(900) + 2(350) = 2500 mm
Pilecap Width = 900 + 2(350) = 1600 mm
pilecap dimension is 2500 mm x 1600 mm x 780 mm
Weight of footing = 2.5 x 1.6 x 0.78 x 25 = 78 KN
Weight of pedestal = 0.25 x 0.25 x 0.5 x 25 = 0.78 KN
Therefore, total load on the pilecap = 1200 + 78 + 0.78 = 1278.78 KN
So Pile reaction from axial load = 1278.78/6= 213.13 KN
So Pile reaction at Pile1 /Pile 2 = 213.13 +100 0.9/(4 0.9 0.9) = 240.91 KN So
Pile reaction at Pile3 /Pile 4 = 213.13 KN
So Pile reaction at Pile5 /Pile 6 = 213.13 - 100 0.9/(4 0.9 0.9) = 185.35 KN So
Critical Pile reaction = 240.91 KN < 250 KN
Hence OK
As there is no lateral load , moment or uplift force, so each pile is safe in lateral & uplift
capacity. Similarly, as there is no tension pile case so each pile is safe again uplift.

Factored Design
Load factor for self wt is taken = 1 Load
factor for axial load is taken = 1.4
So, Load on pilecap = 1.4(1200) + 1(78) + 1(0.78) = 1758.78 KN
So Pile reaction from axial load = 1758.78/6 = 293.13 KN
Moment (Mz) = 1.4(100) = 140 KNm
So Pile reaction at Pile 1 /Pile 2 = 293.13 + 140 0.9/(4 0.9 0.9) = 332.02 KN So
Pile reaction at Pile 3 /Pile 4 = 293.13 KN
So Pile reaction at Pile 5 /Pile 6 = 293.13 -140 0.9/(4 0.9 0.9) = 254.24 KN
deff = 780 - 50 - 50 - 25 = 655 mm

Punching Shear
Punching shear is checked on a perimeter 0.5d =327.5 mm from the column face.

Verification Manual 289

Chapter 5
5.15 US Pilecap Foundation 4
Figure 5-35: Section considered for punching shear

Contribution from pile 1 = pile 2 = 1(332.02) =332.02 KN


Contribution from pile 3 = pile 4= 0.492(293.13) = 144.22 KN
Contribution from pile 5 = pile 6 = 1(254.24) = 254.24 KN
So total punching shear Vm= 2(333.02 + 144.22 + 254.24) = 1462.96 KN
Pm = 4 (250 + 327.5 + 327.5) = 3620 mm
= L/B = 250/250 = 1
V1= (2 + 4/c)(fc) bc d = 5904 KN V2 =
(40 d/b + 2)(fc) bc d = 9090 KN
V3= 4.(fc) bc de = 3936 KN Vc
= min(V1, V2, V3) = 3936 KN So,
0.75 Vc = 2952 KN
Vm< 0.75 Vc , Hence safe

Punching Shear Check for Corner Piles


Corner piles are 1, 2, 5, & 6
Critical Pile 1 & 2 with axial Reaction 333.02 KN
B1 = 1450 mm & B2 =2105 mm
d1 = 163 mm
d2 = 225 mm
d critical =225 mm

290 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.15 US Pilecap Foundation 4

Effective depth = 655 mm


d critical < Effective depth, Hence Safe

Calculation of Shear
Figure 5-36: Section considered for one-way shear

Parallel to X Axis
Shear Plane is at a distance d (655 mm from face of column)
For shear wrt X1X1
Contribution from pile 1 = pile 2 =0.9x 333.03 = 299.72 KN
Contribution from piles 3, 4, 5, & 6 =0 KN
So Total V X1X1 = = 2(299.72) KN= 599.4 KN
For shear wrt X2X2
Contribution from pile 5 = pile 6 = 0.9(254.24) = 228.82 KN
Contribution from piles 1, 2, 3, & 4 = 0 KN
So, Total V X2X2 = 2(228.82) = 457.63 KN
Shear, V, parallel to X direction = 599.4 KN

Verification Manual 291

Chapter 5
5.15 US Pilecap Foundation 4

Now allowable shear = Vc1 =2(fc) bc d = 869.8 KN


0.75 Vc1= 652 KN
V < Vc1, Hence Safe

Parallel to Z Axis
For shear wrt Z1Z1
Contribution from all piles = 0 KN
So Total V Z1Z1 = 0 KN
For shear wrt Z2Z2
Contribution from all piles =0 KN
So Total V Z2Z2 = 0 KN
Shear, V, parallel to Z direction = 0 KN No
shear parallel to the Z axis, Hence Safe

Calculation of Moment
For either direction:
m = fy/0.85 fc= 415/(0.85 25) = 19.529
1 = 0.85 (as fc = M 25)
bal = 0.85 1 fc 87/fy (87 + fy) =
0.025729 max = 0.75 bal =
0.019297
2
min = 0.0018 (as fy= 415 N/mm )

292 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)


5.15 US Pilecap Foundation 4
Figure 5-37: Section considered for moment

Calculation of Moment about Z Axis


Calculation of Mz
For moment wrt X1X1
Contribution from pile 1 = pile 2 = 333.02(0.775) = 258.1 KNm
Contribution from pile 3 = pile 4 = 0.083(293.13 0.0083) = 0.2 KNm
Contribution from pile 5 = pile 6 = 0 KNm
So Total Mz X1X1 = 516.6 KNm = 520 KNm
For moment wrt X2X2
Contribution from pile 5 = pile 6 = 254.24(0.775) = 197 KNm
Contribution from pile 3 = pile 4 = 0.083(293.13 0.0083) = 0.2 KNm
Contribution from pile 1 = pile 2 =0 KNm
So Total Mz X2X2 = 394.4 KNm = 395 KNm
So Critical value of Mz =520 KNm
So Resisting Moment = Mnz= Muz/ = 577.78 KNm = 580 KNm
2
2
Rn = Mnz/b d = 0.845 N/mm
2 m Rn/fy = 0.0795 <1 , Hence OK
= 1/m (1-1-2m Rn/fy) = 0.002 =
min=0.0018
min < < max, Hence OK
Verification Manual 293

Chapter 5
5.15 US Pilecap Foundation 4

Calculation of Moment about X Axis


Calculation of Mx
For moment wrt Z1Z1
Contribution from pile 1 = 332.02(0.325) = 107.9 KNm
Contribution from pile 3 = 293.13(0.325) = 95.27 KNm
Contribution from pile 5 = 254.24(0.325) = 82.63 KNm
Contribution from piles 2, 4, & 6 = 0 KNm
So Total Mx Z1Z1 =285.8 KNm = 286 KNm
For moment wrt Z2Z2
Contribution from pile 2 = 332.02(0.325) = 107.9 KNm
Contribution from pile 4 = 293.13(0.325) = 95.27 KNm
Contribution from pile 6 = 254.24(0.325) = 82.63 KNm
Contribution from piles 1, 3, & 5 = 0 KNm
So Total Mx Z2Z2 = 285.8 KNm = 286 KNm
So Max value of Mx = 286 KNm
So Resisting Moment = Mnx= Mxux/ = 317.78 KNm =318 KNm
2
2
Rn = Mnz/b d = 0.2964 N/mm
2 m Rn/fy = 0.0279 <1 , Hence OK
= 1/m (1-1-2m Rn/fy) = 0.00072 So
= min=0.0018
< max, Hence OK

Area of Steel Required


Along X Direction
= 0.0020
b = 1600 mm, d = 655 mm
Therefore, Astx = 2096 mm

Along Z Direction
= 0.0018
b = 2500 mm, d = 655 mm
Therefore, Astz = 2948 mm

294 STAAD.foundation V8i (SELECTseries 4)

Section 5 United States Code (ACI 318 -2005)

Section 7

Drilled Pier Foundations


7.1 Drilled Pier Foundation 1 API
7.1.1 Reference
API RP 2A-WSD

7.1.2 Problem
Design axial capacity for drilled pier with the given data: Design Method: API
Load Fy= 100 kip, fc= 4 ksi, fy= 60 ksi, Straight pier, pier diameter= 2 ft, pier height= 30 ft,
water level at 40 ft.
Soil Profile by Layer
3
1. Sand, 8 ft deep, angle of friction 30 deg, Avg Density 108 lb/ft ,
Density- Loose
3
2. Sand, 13 ft deep, angle of friction 34 deg, Avg Density 110 lb/ft ,
Density- Medium
2
3
3. Clay - , 9 ft deep, cohesion 2 kip/ft , Avg Density 110 lb/ft ,
Density- Dense

Elasticity of Soil 0.3 ksi

Verification Manual 357

Chapter 7
7.1 Drilled Pier Foundation 1 API
Figure 7-1: Pier Elevation

Factor of safety
End bearing - 3
Skin Friction - 3
% of Capacity Used
End bearing - 100%
Skin Friction - 100%
Neglected zone for skin friction
Top - 5ft
Bottom - Pier Dia = 2ft
Concrete Properties
fc= 4ksi Ec=
3605ksi

358 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.1 Drilled Pier Foundation 1 API

Density= 150lb/ft

Rebar Properties
fy= 60ksi
Es= 29000ksi

7.1.3 Solution
Critical Depth
Critical depth is set to be calculated by program

Effective Overburden Pressure


Po= (Soil Density of respective layer x Depth to the center of the layer)
Effects of water and critical depth are also considered calculating Po
Layer Effective Overburden Pres2

sure (lb/ft )

Layer1
Layer2
Layer3

432
1579
2789

Skin Friction
Factor from API RP 2A-WSD 6.4.2
= Cohesion / Effective Overburden Pressure
Layer
Layer1
Layer2
Layer3

0
0
0.7171

Factor from API RP 2A-WSD 6.4.2


= 0.5 x -0.5
= 0.5 x
-0.25

<=1.0
>1.0
Layer
Layer1
Layer2
Layer3

0
0
0.59045
Verification Manual 359

Chapter 7
7.1 Drilled Pier Foundation 1 API
K Coefficient of lateral earth pressure from API RP 2A-WSD 6.4.3
K=0.8 (for straight pier)
Friction angle between soil and pier Calculated
based on API RP 2A-WSD Table 6.4.3-1
Shaft friction (f), from API RP 2A-WSD 6.4.2 & 6.4.3
For cohesive soil layerf = x c
For cohesionless soil layerf = K xPo x tan
Layer
Layer1
Layer2
Layer3

Shaft Friction (psf)


125.788
589.040
1180.889

Skin Friction Resistance (Qf), from API RP 2A-WSD 6.4.1


Qf = f x As
Qf (kip)
6.3228
48.1136
66.7777
121.214

Layer
Layer1
Layer2
Layer3
Total Skin Friction

Modified Skin Friction Based on Neglected Zones for Skin Friction


Qf (modified) is calculated by considering top and bottom neglect layer
Layer
Layer1
Layer2
Layer3
Total Modified Skin
Friction

f_modified

(kip)
2.3711
48.1136
51.9382
102.423

Base Resistance
Unit end bearing (q), from API RP 2A-WSD 6.4.2 & 6.4.3
For cohesive soil layer q = 9 x c
For cohesionless soil layer q =po x Nq
Layer
Layer1
Layer2
Layer3

q (kip)
5.184
31.58
18.0

End Bearing for each layer (Qp), from API RP 2A-WSD 6.4.1
Qp = q x Ap

360 STAAD.foundation V8i


(SELECTseries 4)

Section 7 Drilled Pier Foundations


7.2 Drilled Pier Foundation 2 API

Layer
Layer1
Layer2
Layer3

Qp (kip)
16.286
99.211
56.549

End Bearing for bottom Layer, Qp_bott = 56.549 kips

Unfactored Capacity

Factored Capacity

7.1.4 Comparison
Table 7-1: Drilled Pier (API) verification example 1 comparison
Value of
UnfactoredTip
Resistance
Unfactored Skin
Resistance
Unfactored Total Axial
Capacity
FactoredTip Resistance
Factored Skin Resistance
Factored Total Axial
Capacity

STAAD.foundation
Result
56.571 kip

Reference
Result
56.549 kip

Difference

102.487 kip

102.423 kip

Negligible

144.916 kip

144.834 kip

Negligible

18.857 kip
34.162 kip
48.305 kip

18.849 kip
34.141 kip
48.278 kip

Negligible
Negligible
Negligible

Negligible

7.2 Drilled Pier Foundation 2 API


7.2.1 Reference
API RP 2A-WSD

7.2.2 Problem
Design axial capacity for drilled pier with the given data: Design Method:API
Load Fy= 100kip, fc= 4ksi, fy= 60ksi, Straight pier, pier diameter= 4ft, pier height= 39ft,
water level at 50ft.
Verification Manual 361

Chapter 7
7.2 Drilled Pier Foundation 2 API
Soil Profile by Layer
2
3
1. Clay - , 6ft deep, cohesion 1kip/ft , Avg Density 105lb/ft , Density- Very Loose
2
3
2. Clay - , 13ft deep, cohesion 1.1kip/ft , Avg Density 110lb/ft , Density- Medium
2
3
3. Clay - , 8ft deep, cohesion 2kip/ft , Avg Density 111lb/ft , Density- Dense
2
3
4. Clay - , 12ft deep, cohesion 3kip/ft , Avg Density 113lb/ft , Density- Very Dense
Elasticity of Soil 0.3ksi

K = 0.8
Factor of safety
End bearing - 3
Skin Friction - 3
% of Capacity Used
End bearing - 100%
Skin Friction - 100%
Neglected zone for skin friction
Top - 5ft
Bottom - Pier Dia = 4ft
Concrete Properties
fc= 4ksi Ec=
3605ksi
Density= 150lb/ft

Rebar Properties
fy= 60ksi
Es= 29000ksi

362 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.2 Drilled Pier Foundation 2 API
Figure 7-2: Pier Elevation

7.2.3 Solution
Critical Depth
Critical depth is set to be calculated by program

Effective Overburden Pressure


Po= (Soil Density of respective layer x Depth to the center of the layer)
Effects of water and critical depth are also considered calculating Po

Verification Manual 363

Chapter 7
7.2 Drilled Pier Foundation 2 API

Layer Effective Overburden Pres2

sure (lb/ft )

Layer1
Layer2
Layer3
Layer4

315
1345
1874
1566

Skin Friction
Factor from API RP 2A-WSD 6.4.2
= Cohesion / Effective Overburden Pressure
Layer
Layer1
Layer2
Layer3
Layer4

3.1746
0.8178
1.0672
1.9157

Factor
Layer

0.55
0.55
0.55
0.55

Layer1
Layer2
Layer3
Layer4

K Coefficient of lateral earth pressure from API RP 2A-WSD 6.4.3


K=0.8 (for straight pier)
Friction angle between soil and pier
Calculated based on API RP 2A-WSD Table 6.4.3-1
Shaft friction (f), from API RP 2A-WSD 6.4.2 & 6.4.3
For cohesive soil layerf = x c
For cohesionless soil layerf = K xPo x
tan
Layer
Layer1
Layer2
Layer3
Layer4

Shaft Friction (psf)


550
605
1100
1650

Skin Friction Resistance (Qf), from API RP 2A-WSD 6.4.1


Qf = f x As
Layer
Layer1
Layer2

Qf (psf)
41.469
98.835

364 STAAD.foundation V8i


(SELECTseries 4)

Section 7 Drilled Pier Foundations


7.2 Drilled Pier Foundation 2 API
Qf (psf)
110.584
248.814
499.702

Layer
Layer3
Layer4
Total Skin Friction

Modified Skin Friction Based on Neglected Zones for Skin Friction


Qf (modified) is calculated by considering top and bottom neglect layer
Layer
Layer1
Layer2
Layer3
Layer4
Total Skin Friction

f_modified

(psf)
6.9115
98.835
110.584
165.876
382.206

Base Resistance
Unit end bearing (q), from API RP 2A-WSD 6.4.2 & 6.4.3
For cohesive soil layerq = 9 x c
For cohesionless soil layerq =po x Nq
Layer
Layer1
Layer2
Layer3
Layer4

q (psf)
9000
9900
18000
27000

End Bearing for each layer (Qp), from API RP 2A-WSD 6.4.1
Qp = q x Ap
Layer
Layer1
Layer2
Layer3
Layer4

Qp (psf)
113.097
124.407
226.195
339.292

End Bearing for bottom Layer


Qp_bott = 339.292 kip

Unfactored Capacity

Verification Manual 365

Chapter 7
7.3 Drilled Pier Foundation 3 FHWA

Factored Capacity

7.2.4 Comparison
Table 7-2: Drilled Pier (API) verification example 2 comparison
Value of
UnfactoredTip
Resistance
Unfactored Skin
Resistance
Unfactored Total Axial
Capacity
FactoredTip Resistance
Factored Skin
Resistance
Factored Total Axial
Capacity

STAAD.foundation Reference
Result
Result
339.429 kip
339.292 kip

Difference

382.486 kip

382.206 kip

Negligible

648.371 kip

647.985 kip

Negligible

113.143 kip
127.495 kip

113.097 kip
127.402 kip

Negligible
Negligible

216.124 kip

215.995 kip

Negligible

Negligible

7.3 Drilled Pier Foundation 3 FHWA


7.3.1 Reference
FHWA-IF-99-025

7.3.2 Problem
Design axial capacity for drilled pier with the given data: Design Method:FHWA
Load Fy= 100kip, fc= 4ksi, fy= 60ksi, Straight pier, pier diameter= 2ft,
pier height= 30ft, water level at 40ft.
Soil Profile
3
1. Sand, 8ft deep, angle of friction 30deg, Avg Density 108lb/ft , N60- 11
3
2. Sand, 13ft deep, angle of friction 34deg, Avg Density 110lb/ft , N60- 14
2
3
3. Clay - , 9ft deep, cohesion 2kip/ft , Avg Density 110lb/ft , N60- 16
Elasticity of Soil 0.3ksi

366 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.3 Drilled Pier Foundation 3 FHWA
Factor of safety
End bearing - 3
Skin Friction - 3
% of Capacity Used
End bearing - 100%
Skin Friction - 100%
Neglected zone for skin friction
Top - 5ft
Bottom - Pier Dia = 2ft
Concrete Properties
fc= 4ksi Ec=
3605ksi
Density= 150lb/ft

Rebar Properties
fy= 60ksi
Es= 29000ksi

Verification Manual 367

Chapter 7
7.3 Drilled Pier Foundation 3 FHWA
Figure 7-3: Pier Elevation

7.3.3 Solution
Critical Depth
Critical depth is set to be calculated by program

Effective Overburden Pressure


Po= (Soil Density of respective layer x Depth to the center of the layer)
Effects of water and critical depth are also considered calculating Po

368 STAAD.foundation V8i

(SELECTseries 4)

Section 7 Drilled Pier Foundations


7.3 Drilled Pier Foundation 3 FHWA
Layer Effective Overburden Pres2

sure (lb/ft )

Layer1
Layer2
Layer3

432
1579
1925

Skin Friction
Factor from FHWA-IF-99-025 Eqn 11.6
= 0.55
Layer

0
0
0.55

Layer1
Layer2
Layer3

Dimensionless correlation factor from FHWA-IF-99-025 Eqn 11.18


Layer
Layer1
Layer2
Layer3

0.9017
0.8536
0

Friction angle between soil and pier


Assumed to be same as soil friction angle
Shaft friction (f), from FHWA-IF-99-025 Eqn 11.16 & 11.17
For cohesive soil layerf = x su
For cohesionless soil layerf = x vi
Layer
Layer1
Layer2
Layer3

Shaft Friction (psf)


389.50
1347.86
1100.0

Skin Friction Resistance (Qf), from FHWA-IF-99-025 Eqn 10.2


Rs = f x As
Layer
Layer1
Layer2
Layer3
Total Skin Friction

Rs (kip)
19.578
110.095
62.204
191.877

Modified Skin Friction Based on Neglected Zones for Skin Friction


Qf (modified) is calculated by considering top and bottom neglect layer

Verification Manual 369

Chapter 7
7.3 Drilled Pier Foundation 3 FHWA

Layer

s_modified

(kip)
7.342
110.095
48.381
165.817

Layer1
Layer2
Layer3
Total Modified Skin
Friction

Base Resistance
Unit end bearing (q), from FHWA-IF-99-025 Eqn 11.1, 11.2 & 11.4a
For cohesive soil layerq = 9 x c
For cohesionless soil layerq =po x Nq
Layer
Layer1
Layer2
Layer3

q (kip)
13.2
15.6
5.611

End Bearing for each layer (Qp), from FHWA-IF-99-025 Eqn 10.2
RB = q x Ap
Layer
Layer1
Layer2
Layer3

RB (kip)
41.469
49.009
17.628

End Bearing for bottom Layer, RB-bott = 17.628 kips

Un-factored Capacity

Factored Capacity

370 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.4 Drilled Pier Foundation 4 FHWA

7.3.4 Comparison
Table 7-3: Drilled Pier (FHWA) verification example 3 comparison
Value of
UnfactoredTip
Resistance
Unfactored Skin
Resistance
Unfactored Total Axial
Capacity
FactoredTip Resistance
Factored Skin Resistance
Factored Total Axial
Capacity

STAAD.foundation
Result
17.635 kip

Reference
Result
17.628 kip

Difference

165.884 kip

165.817 kip

Negligible

169.376 kip

169.308 kip

Negligible

5.878 kip
55.295 kip
56.459 kip

5.876 kip
55.272 kip
56.436 kip

Negligible
Negligible
Negligible

Negligible

7.4 Drilled Pier Foundation 4 FHWA


7.4.1 Reference
FHWA-IF-99-025

7.4.2 Problem
Design axial capacity for drilled pier with the given data: Design Method:FHWA
Load Fy= 100kip, fc= 4ksi, fy= 60ksi, Straight pier, pier diameter= 4ft, pier height= 39ft,
water level at 50ft.
Soil Profile
2
3
1. Clay - , 6ft deep, cohesion 1kip/ft , Avg Density 105lb/ft , N60 10
2
3
2. Clay - , 13ft deep, cohesion 1.1kip/ft , Avg Density 110lb/ft , N60 12
2
3
3. Clay - , 8ft deep, cohesion 2kip/ft , Avg Density 111lb/ft , N60 14
2
3
4. Clay - , 12ft deep, cohesion 3kip/ft , Avg Density 113lb/ft , N60 15
Elasticity of Soil 0.3ksi

Factor of safety
End bearing - 3
Skin Friction - 3
% of Capacity Used
End bearing - 100%
Skin Friction - 100%
Neglected zone
for skin frictionTop - 5ft
Bottom - Pier Dia = 4ft
Verification Manual 371

Chapter 7
7.4 Drilled Pier Foundation 4 FHWA
Concrete Properties
fc= 4ksi
Ec= 3605ksi
Density= 150lb/ft

Rebar Properties
fy= 60ksi
Es= 29000ksi
Figure 7-4: Pier Elevation

7.4.3 Solution
Critical Depth
Critical depth is set to be calculated by program

372 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.4 Drilled Pier Foundation 4 FHWA

Effective Overburden Pressure


Po= (Soil Density of respective layer x Depth to the center of the layer)
Effects of water and critical depth are also considered calculating Po
Layer Effective Overburden Pres2

sure (lb/ft )

1
2
3
4

315
1345
1874
1380

Skin Friction
Factor from FHWA-IF-99-025 Eqn 11.6
= 0.55 (for all layers)
Layer
1
2
3
4

0.55
0.55
0.55
0.55

Dimensionless correlation factor from FHWA-IF-99-025 Eqn 11.18


= 0 (for all layers)
Friction angle between soil and pier
Assumed to be same as soil friction angle
Shaft friction (f), from FHWA-IF-99-025 Eqn 11.16 & 11.17
For cohesive soil layerf = x su
For cohesionless soil layerf = x vi
Layer
1
2
3
4

Shaft Friction (psf)


550
605
1100
1650

Skin Friction Resistance (Qf), from FHWA-IF-99-025 Eqn 10.2


Rs = f x As

Verification Manual 373

Chapter 7
7.4 Drilled Pier Foundation 4 FHWA

Rs (kip)
41.469
98.835
110.584
248.814
499.702

Layer
1
2
3
4
(Total Skin Friction)

Modified Skin Friction Based on Neglected Zones for Skin Friction


Qf (modified) is calculated by considering top and bottom neglect layer
Layer

s_modified

(kip)
6.912
98.835
110.584
165.876
382.206

1
2
3
4
(Total Modified Skin
Friction)

Base Resistance
Unit end bearing (q), from FHWA-IF-99-025 Eqn 11.1, 11.2 & 11.4a
For cohesive soil layerq = 9 x c
For cohesionless soil layerq =po x Nq
Layer
1
2
3
4

q (kip)
3.646
3.880
5.611
27

End Bearing for each layer (Qp), from FHWA-IF-99-025 Eqn 10.2
RB = q x Ap
Layer
1
2
3
4

RB (kip)
45.815
48.759
70.510
339.292

End Bearing for bottom Layer, RB-bott = 339.292 kips

Un-factored Capacity

374 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.5 Drilled Pier Foundation 5 VESIC

Factored Capacity

7.4.4 Comparison
Table 7-4: Drilled Pier (FHWA) verification example 4 comparison
Value of
Unfactored Tip
Resistance
Unfactored Skin
Resistance
Unfactored Total Axial
Capacity
FactoredTip Resistance
Factored Skin Resistance
Factored Total Axial
Capacity

STAAD.foundation
Result
339.429 kip

Reference
Result
339.292 kip

Difference

382.360 kip

382.206 kip

Negligible

648.246 kip

647.985 kip

Negligible

113.143 kip
127.453 kip
216.082 kip

113.097 kip
127.453 kip
213.658 kip

Negligible
Negligible
Negligible

Negligible

7.5 Drilled Pier Foundation 5 VESIC


7.5.1 Reference
Alternate Vesic Method

7.5.2 Problem
Design axial capacity for drilled pier with the given data: Design Method: Alternate Vesic
Method
Load Fy= 100kip, fc= 4ksi, fy= 60ksi, Straight pier, pier diameter= 2ft,
pier height= 30ft, water level at 40ft.
Soil Profile
3
1. Sand, 8ft deep, angle of friction 30deg, Avg Density 108lb/ft ,
3
2. Sand, 13ft deep, angle of friction 34deg, Avg Density 110lb/ft ,
2
3
3. Clay, 9ft deep, cohesion 2kip/ft , Avg Density 110lb/ft ,

Verification Manual 375

Chapter 7
7.5 Drilled Pier Foundation 5 VESIC
Elasticity of Soil 0.3ksi
Factor of safety
End bearing - 3
Skin Friction - 3
% of Capacity Used
End bearing - 100% Skin
Friction - 100% Neglected zone
for skin friction
Top - 5ft
Bottom - Pier Dia = 2ft
Concrete Properties
fc= 4ksi Ec=
3605ksi
Density= 150lb/ft

Rebar Properties
fy= 60ksi
Es= 29000ksi

376 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.5 Drilled Pier Foundation 5 VESIC
Figure 7-5: Pier Elevation

7.5.3 Solution
Critical Depth
Critical depth is set to be calculated by program

Effective Overburden Pressure


Po= (Soil Density of respective layer x Depth to the center of the layer)
Effects of water and critical depth are also considered calculating Po

Verification Manual 377

Chapter 7
7.5 Drilled Pier Foundation 5 VESIC
Effective Overburden PresLayer

sure (psf)

1
2
3

432
1579
1925

Skin Friction
Adhesion Factor for Drilled Pier in Cohesive Soil
= 0.55
Layer

0
0
0.55

1
2
3
K Coefficient of lateral earth pressure
K=0.8 (for straight pier)
Lateral Earth Pressure and Friction Angle Factor
Layer

0.462
0.540
0

1
2
3
Friction angle between soil and pier
Assumed to be same as soil friction angle
Shaft friction (f), from Alpha or Beta Method
For cohesive soil layerf = x c
For cohesionless soil layerf = K xPo x tan
Layer
1
2
3

Shaft Friction (psf)


199.532
852.039
1100

tan(1) = 0.675
Skin Friction Resistance (Qf), from FHWA-IF-99-025 Eqn 10.2
Rs = f x As
Layer
1
2
3
(Total Skin Friction)

Rs (kip)
10.030
69.596
62.204
141.829

Modified Skin Friction Based on Neglected Zones for Skin Friction

378 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.5 Drilled Pier Foundation 5 VESIC
Qf (modified) is calculated by considering top and bottom neglect layer

Layer

s_modified

(kip)
3.761
69.596
48.381
121.737

1
2
3
(Total Modified Skin
Friction)

Base Resistance
Cohesive Soil (Bottom Layer)
Factor Fr = 1
Factor Ncp = 9
Cohesionless Soil (Bottom Layer)
Factor Nqp = 0
Unit end bearing (q), from FHWA-IF-99-025 Eqn 11.1, 11.2 & 11.4a
For cohesive soil layer q = Fr x Nqp x c
For cohesionless soil layer q =po x Nqp
Layer
1
2
3

q (psf)
0
0
18000

End Bearing for each layer (Qp), from FHWA-IF-99-025 Eqn 10.2
RB = q x Ap
Layer
1
2
3

RB (kip)
0
0
56.549

End Bearing for bottom Layer, RB_bott = 56.549 kip

Un-factored Capacity

Verification Manual 379

Chapter 7
7.6 Drilled Pier Foundation 6 Vesic

Factored Capacity

7.5.4 Comparison
Table 7-5: Drilled Pier (Vesic) verification example 5 comparison
Value of
UnfactoredTip
Resistance
Unfactored Skin
Resistance
Unfactored Total Axial
Capacity
FactoredTip Resistance
Factored Skin
Resistance
Factored Total Axial
Capacity

STAAD.foundation Reference
Result
Result
56.571 kip
16.549 kip

Difference

121.824 kip

121.737 kip

Negligible

164.253 kip

164.149 kip

Negligible

18.857 kip
40.608kip

5.516 kip
40.579 kip

Negligible
Negligible

54.751 kip

54.716 kip

Negligible

Negligible

7.6 Drilled Pier Foundation 6 Vesic


7.6.1 Reference
Alternate Vesic Method

7.6.2 Problem
Design axial capacity for drilled pier with the given data: Design Method: Alternate Vesic
Method
Load Fy= 100kip, fc= 4ksi, fy= 60ksi, Straight pier, pier diameter= 4ft, pier height= 39ft,
water level at 50ft.
Soil Profile
2
3
1. Clay - , 6ft deep, cohesion 1kip/ft , Avg Density 105lb/ft , Density- Very Loose
2
3
2. Clay - , 13ft deep, cohesion 1.1kip/ft , Avg Density 110lb/ft , Density- Medium
2
3
3. Clay - , 8ft deep, cohesion 2kip/ft , Avg Density 111lb/ft , Density- Dense
2
3
4. Clay - , 12ft deep, cohesion 3kip/ft , Avg Density 113lb/ft , Density- Very Dense
Elasticity of Soil 0.3ksi

Factor of safety
End bearing - 3
Skin Friction - 3
380 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.6 Drilled Pier Foundation 6 Vesic
% of Capacity Used
End bearing - 100%
Skin Friction - 100%
Neglected zone for skin friction
Top - 5ft
Bottom - Pier Dia = 4ft
Concrete Properties
fc= 4ksi Ec=
3605ksi
Density= 150lb/ft

Rebar Properties
fy= 60ksi
Es= 29000ksi

Verification Manual 381

Chapter 7
7.6 Drilled Pier Foundation 6 Vesic
Figure 7-6: Pier Elevation

7.6.3 Solution
Critical Depth
Critical depth is set to be calculated by program

Effective Overburden Pressure


Po= (Soil Density of respective layer x Depth to the center of the layer)
Effects of water and critical depth are also considered calculating Po

382 STAAD.foundation V8i (SELECTseries 4)

Section 7 Drilled Pier Foundations


7.6 Drilled Pier Foundation 6 Vesic
Effective Overburden PresLayer

sure (psf)

1
2
3

315
1345
1874

Skin Friction
Adhesion Factor for Drilled Pier in Cohesive Soil
= 0.55 (All layers)
K Coefficient of lateral earth pressure
K=0.8 (for straight pier)
Lateral Earth Pressure and Friction Angle Factor, = 0 (All layers)
Friction angle between soil and pier
Assumed to be same as soil friction angle
Shaft friction (f), from Alpha or Beta Method
For cohesive soil layerf = x c
For cohesionless soil layerf = K xPo x tan
Layer
1
2
3
4

Shaft Friction (psf)


550
605
1100
1650

tan(1) = 0
Skin Friction Resistance (Qf), from FHWA-IF-99-025 Eqn 10.2
Rs = f x As
Layer
1
2
3
4
(Total Skin Friction)

Rs (kip)
41.469
98.835
110.584
248.814
499.702

End Bearing for each layer (Qp), from FHWA-IF-99-025 Eqn 10.2
RB = q x Ap
Layer
1
2
3
4

RB (kip)
0
0
0
339.292

Verification Manual 383

Chapter 7
7.6 Drilled Pier Foundation 6 Vesic

End Bearing for bottom Layer, RB_bott = 339.292 kip

Un-factored Capacity

Factored Capacity

7.6.4 Comparison
Table 7-6: Drilled Pier (Vesic) verification example 6
comparison
Value of
UnfactoredTip
Resistance
Unfactored Skin
Resistance
Unfactored Total Axial
Capacity
FactoredTip Resistance
Factored Skin
Resistance
Factored Total Axial
Capacity

STAAD.foundation Reference
Result
Result
339.429 kip
339.292 kip

Difference

382.360 kip

382.206 kip

Negligible

648.246 kip

164.149 kip

Negligible

113.143 kip
127.453 kip

113.097 kip
127.402 kip

Negligible
Negligible

216.082 kip

54.716 kip

Negligible

384 STAAD.foundation V8i (SELECTseries 4)

Negligible