Escolar Documentos
Profissional Documentos
Cultura Documentos
FOR
DOCUMENTS & RECORD CONTROL
QUALITY MANAGEMENT
SYSTEM
ISO 9001:2008
SYSTEM PROCEDURE
Prepared By
Manager Representative
Approved By
Chief Executive
Owner: M R
Authorized by: C E
Page 0
QUALITY PROCEDURE
Issue No.
Owner: M R
01
Issue Date :
Rev. No.
00
Authorized by: C E
Page 1
DISTRIBUTION LIST
Copy No.
Owner: M R
Issued to (Designation)
Authorized by: C E
Page 2
AMENDMENT SHEET
Revision
No.
Date
Owner: M R
Issue No.
Page No
Nature of
Amendment
Authorized by: C E
Approved by
Page 3
1. Purpose
The purpose of this procedure is to establish and maintain a system
to control all documents that relate to Company quality system.
2. Scope
This procedure applies to all the documents, which comprise
quality system documentation of Company.
3. References
Quality System Manual
4. Procedure
Procedure Owner
Quality Management Representative (QMR)
5. Numbering the Documents
Each document or procedure is identified by a
unique number, which indicates the procedure number, issue
number, issue date and the procedure title.
The issue number is used to show that the
complete procedure has been issued or re-issued.
The revision number is used to show that an
individual page has been revised.
Step - I.
Step - II.
Step - III.
Owner: M R
Authorized by: C E
Page 4
Step - IV.
Preparation of Draft
The draft of the proposed revision is prepared by the
individual who requested the change, passes a copy of the revision
to the Manager concerned who passes the same to the process
Owner.
Step - V.
Step - VI.
Step - VII.
Step - VIII.
Training
If considered necessary, QMR will consult the Training
Officer and arrange training for all staff affected by the proposed
document changes. The QMR will ensure that the training is
recorded; and that the staffs training records are updated.
Owner: M R
Authorized by: C E
Page 5
Step - IX.
Step - X.
6. Associated Documentation
F-1 Document Change Request Form
List of Records.
Training Form Record.
Obsolete Documents File.
Master List of Documents.
Owner: M R
Authorized by: C E
Page 6
F1
Department:
Date:
Revision #:
Issue #:
Date:
Approval of the Manager:
Signatures
Date:
Approval by the Process Owner
Signatures
Date:
Approval by the QMR
Signatures
Date:
Rev. No. Of Document After Change (to be given by MR):
Signatures
Date:
Signatures
Owner: M R
Authorized by: C E
Page 7