Escolar Documentos
Profissional Documentos
Cultura Documentos
Pre-Installation
Questionnaire
AA83262
No AA83262-05
PRE-INSTALLATION QUESTIONNAIRE
ARL X-RAY SERIES
Report
No
Language
Date
AA83262-05
QUESTIONNAIRE
AA83262-05
E
February 2011
Department
Doc
Author
Kah
AA83262-05
los
PAGE DE MODIFICATION
NDERUNGSANGABEN
REVISION CONTROL SHEET
Date
Datum
Date
AA83262-05
Modification Description
nderung Beschreibung
Revision
Description
2000
August
01
2002
April
02
2004
December
03
2005
June
04
2011
February
05
PRE-INSTALLATION
QUESTIONNAIRE
INTRODUCTION
The purpose of this pre-installation questionnaire is to help the user to prepare the installation of his ARL
spectrometer. Please provide precise answers to the following questions and return the questionnaire as soon
as possible, but by no means before your laboratory is completely prepared. By doing so, you will ensure that
our engineer arrives on the expected date and that the installation is completed in the best possible conditions
and without loss of time.
Any loss of time due to wrong information or bad preparation of the laboratory will be charged according to
our tariff.
The Pre-Installation Manual indicates all necessary information for the preparation of the laboratory in order
to ensure an installation without delays and the proper functioning of your instrument.
Once this form completed, please sign and send it back to your local Thermo Fisher representative.
AA83262-05
Pre-Installation Questionnaire
GENERAL INFORMATION
Date of installation
By which date will your laboratory be ready to receive the spectrometer
(DD-MM-YYYY)?
Expected starting date of installation by our Service Engineer?
(DD-MM-YYYY)?
Yes
No
Comments:
Important: You have to confirm this date by letter or fax at least one month before the
installation.
No:
City:
Zip code:
State:
Country:
Indicate the nearest airport:
International airport
Local airport
km
AA83262-05
Pre-Installation Questionnaire
Fax:
E-Mail:
Cellular:
Mr / Mrs
Phone:
Extension:
E-Mail:
Fax:
Operator:
Mr / Mrs
Phone:
Extension:
Laboratory:
Phone:
Extension:
Zip code:
Phone:
Fax:
AA83262-05
Pre-Installation Questionnaire
Yes
No
CERTIFICATION ISO
Yes
No
ISO 14001
ISO 17025
OHSAS
STORAGE
Yes
No
Yes
No
Yes
No
If YES, when?
Are you aware of the conditions for storage?
(For details, refer to the Pre-installation manual)
INSTRUMENT CONFIGURATION
AA83262-05
Pre-Installation Questionnaire
LABORATORY PREPARATION
For the installation, maintenance and repairs, we need a free access of minimum 80 cm around the
spectrometer. The recommended laboratory dimensions are 2.5 m x 2.5 m.
Do you have unusual severe vibrations in your laboratory?
Yes
No
Yes
No
Yes
No
Recommended value
Instrument type OPTIMX
ADVANTXP
ADVANTX
ADVANTXP+
9900 Oasis
9900 XP
PERFORMX
2500
9900 XP+
Condition
PERFORMX 4200
Customer value
Temperature limits
in C
Min. 18
Max. 28
Min.
Max.
Temperature variation
C/
hour
Relative humidity
Min. 20 % / Max. 80 %
Min. 18
Max. 32
m
Yes
No
AA83262-05
Pre-Installation Questionnaire
POWER SUPPLY
Mains connection
Yes
No
Yes
No
Yes
No
Cable section
Cable section
Note:
9900 XP(+)
1 line
16 mm2
10 mm2
2.5 mm2
2 lines
10 mm2
6 mm2
2.5 mm2
Instrument is connected on
PERFORMX series
The maximum Mains cable section for ARL PERFORMX series, ARL 9900
and ADVANTX series instruments is 16 mm2
Yes
No
If NO please comment:
AA83262-05
Pre-Installation Questionnaire
Yes
Customer
value
Recommended value
Instrument type
Condition
9900 XP+/
9900 XP/
AdvantXP+/ AdvantXP
PERFORMX 3600
4200
6 kVA
No
9900 X+/
AdvantX+/
PERFORMX
2500
9900
OptimX
Oasis/
AdvantX
1200
5 kVA
3.5 kVA
2 kVA
kVA
Voltage
Frequency
50 Hz or 60 Hz 1%
Hz
Voltage between
Neutral and Earth
<1V
Earth impedance
<2
Note:
If the conditions mentioned above cannot be met, you might need to install an insulation
transformer, voltage stabiliser or UPS (see section 10 of the present questionnaire).
General comments:
AA83262-05
Pre-Installation Questionnaire
You need P10 gas only if your instrument is equipped with a flow proportional counter!
Yes
No
Yes
No
CH4
35
Quality
99.95%
Purity
< 10 ppm
Impurity O2
H2O
< 5 ppm
N2
< 200 ppm
H2
< 20 ppm
CO2
< 10 ppm
C2H6
< 200 ppm
CnHm
< 50 ppm
If NO, please comment and contact your local Thermo Fisher representative for a local supplier:
Helium
Note:
You need Helium only if you have chosen the option for analysis of liquid samples!
Yes
No
Yes
No
46
99.996%
O2
< 5 ppm
H2O
< 10 ppm
N2
< 15 ppm
H2
< 1 ppm
CO2
< 10 ppm
CH4 + CnHm
< 1 ppm
If NO, please comment and contact your local Thermo Fisher representative for a local supplier:
Quality
Purity
Impurity
AA83262-05
Pre-Installation Questionnaire
Pressure reducer
You need a pressure reducer only if you have chosen a gas option and if the reducer is not
supplied by Thermo Fisher.
Note:
0.05 1 bar
If NO, did you order a pressure reducer with a setting range 0.05 1 bar?
Yes
No
Yes
No
Yes
No
WATER SUPPLY
(only ARL PERFORMX 4200, ARL 9900 XP/XP+ and ARL ADVANTXP/XP+)
The instruments ARL PERFORMX 4200, ARL 9900 XP/ XP+ and ARL ADVANTXP/ XP+ need to be
cooled down with water.
Is your tap water within the following specifications?
Condition
Recommended value
Yes
No
Customer value
Minimum flow
4.5 l/min
l/min
bar
5 C / 18 C
Acceptable hardness
5 to 25 French degrees
5 to 15 French degrees
(gypseous water)
French
degrees
Is your tap water dirty and do you need to add a water filter?
Note:
AA83262-05
Yes
No
If the tap water is not available, if its quality does not meet the specifications above or if
you want to reduce water consumption, you need to install a water cooler (see section 10
of the present questionnaire).
Pre-Installation Questionnaire
10 ACCESSORIES
Insulation transformer, Voltage stabiliser and UPS
Yes
No
Are you aware that these devices should be installed in a separate machine
room?
Yes
No
Is this machine room equipped with all electrical, gas and water supplies
necessary for the installation of these devices?
Yes
No
Yes
No
Yes
No
If supplied locally,
Does your insulation transformer, voltage stabiliser or UPS comply with
the specifications indicated in the Pre-Installation Manual ?
AA83262-05
Pre-Installation Questionnaire
10
Water cooler
Is a water cooler needed?
Yes
No
Are you aware that water coolers should be installed in a separate machine
room?
Yes
No
Is this machine room equipped with all electrical, gas and water supplies
necessary for the installation of the device?
Yes
No
ARL
Locally
Yes
No
Does your water cooler comply with the specifications for water mentioned
in section 9 ?
Yes
No
Yes
No
If YES,
1 phase: 36 A breaker
If supplied locally,
AA83262-05
Pre-Installation Questionnaire
11
Yes
No
Yes
No
If NO please comment:
When receiving the instrument, carefully look at the wooden panels for any visible
damage. If you detect any damage, please inform us immediately. Contact your insurance
company as well and inform on the seen damage.
Yes
No
Yes
No
AA83262-05
Pre-Installation Questionnaire
12
12 INSTALLATION
The installation of the instrument consists of four important parts:
Yes
No
Yes
No
Yes
No
If NO please comment:
Training
The service engineer will give the laboratory personnel a short instruction in the instrument operation and
maintenance as well as in the software.
Did you buy an additional on-site training (at your factory, during
installation) ?
Yes
No
Did you buy an additional training, which will take place at Thermo Fisher
in Ecublens / Switzerland?
Yes
No
If NO, would you like us to submit you a quotation for the following topic:
OXSAS software
Sample preparation
UniQuant software
Analytical assistance
Maintenance
AA83262-05
Pre-Installation Questionnaire
13
13 SAMPLES
Sample preparation machine
Ensure that all sample preparation machines are ready for using before the arrival of our
service engineer.
Are you aware that it is the users responsibility to install the sample
preparation machines?
Yes
No
Are you familiar with the procedures for preparing samples with your
installed machines or with those delivered with the spectrometer?
Yes
No
Yes
No
If NO please comment:
Note:
Standard samples
Standard samples are needed for the calibration of the instrument. If you did not order an instrument
calibrated at factory, you will have to calibrate your spectrometer after installation. If you do not have any
experience in calibrating an ARL instrument, the service engineer will show you a typical example of
calibration with his own standard samples.
Are you aware that the calibration of the spectrometer is not included in the
installation procedure?
Yes
No
Yes
No
Yes
No
Yes
No
If YES, please indicate the type and serial number of the instrument.
Do you need an analytical assistance or a full calibration of your
spectrometer on site?
Note:
AA83262-05
Pre-Installation Questionnaire
14
Phone:
Fax:
Name and function of the signatory:
Name:
Function:
Stamp and date:
AA83262-05
Signature:
Pre-Installation Questionnaire
15