GOBIERNO REGIONAL DE

AYACUCHO

ESTUDIO A NIVEL DE FACTIBILIDAD


ESTUDIO HIDROLOGICO
PROYECTO ACARI-BELLA UNIN II ETAPA DE LA
CONSTRUCCIN DE LA REPRESA DE IRURO

UBICACIN:

DEPARTAMENTO

AYACUCHO-AREQUIPA

PROVINCIA

: LUCANAS-CARAVELI

DISTRITO

LUCANAS

2010

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

INDICE

1.

INTRODUCCIN.

1.1 OBJETO DEL ESTUDIO.

INFORMACION BASICA.

2.

2.1

UBICACIN.

2.2

ACCESOS Y VIAS DE COMUNICACIN.

2.3
3.

RECOPILACION DE INFORMACION BASCIA:

HIDROGRAFIA.
3.1

DELIMITACION DE LA CUENCA HIDROGRFICA.

4. GEOMORFOLOGIA

4.1 ASPECTOS GENERALES.

4.2 CARACTERISTICAS FISIOGRAFICAS DE LAS CUENCAS:

4.2.1 AREA DE LA CUENCA

4.2.2 FORMA DE LA CUENCA

4.2.3 RELIEVE DE LA CUENCA

4.2.4 MEDICIONES LINEALES

4.2.5 CURVA HIPSOMETRICA.

15

4.2.6 DETERMINACION DEL TIEMPO DE CONCENTRACION (Tc)

32

5.0

ANALISIS DE LOS PARAMETROS METEOROLOGICOS

39

5.1

PRECIPITACIN PLUVIAL

39

5.2

TEMPERATURA

39

5.3

PRESION ATMOSFERICA

40

5.4

HUMEDAD RELATIVA

40

5.5

EVAPORACION

41

6.0

TRATAMIENTO DE LA INFORMACION METEOROLOGICA E PLUVIOMETRICA.

41

6.1

PRECIPITACION

41

6.2

REGISTRO HISTRICO

43

6.3

ANALISIS DE CONSISTENCIA

43

6.3.1

ANALISIS GRAFICO.

44

6.3.2

ANALISIS DOBLE MASA.

44

6.3.3

ANALISIS ESTADISTICO DE SALTOS Y TENDENCIAS.

45

6.4

COMPLETACIN Y EXTENSIN DE LA INFORMACIN PLUVIOMETRA.

46

6.5

ANALISIS PLUVIOMETRICO DE LAS CUENCAS.

46

6.5.1

PRECIPITACIN AREAL MEDIA DE LA CUENCA.

GOBIERNO REGIONAL DE AYACUCHO

46
CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

7. ANALISIS Y TRATAMIENTO DE LA INFORMACION HIDROMETRICA

49

7.1 REGISTRO HISTORICO

49

8. DETERMINACIN DE LA DISPONIBILIDAD DE AGUA

49

8.1 MODELO DETERMINISTICO-ESTOCASTICO DE LUTZ SCHOLZ

50

8.1.1

ECUACIN DEL BALANCE HIDRICO

50

8.1.2

COEFICIENTE DE ESCURRIMIENTO

51

8.1.3

PRECIPITACIN EFECTIVA

53

8.1.4

RETENCIN DE LA CUENCA

54

8.1.5

RELACIN ENTRE DESCARGAS Y RETENCIN

55

8.1.6

COEFICIENTE DE AGOTAMIENTO

56

8.1.7

ALMACENAMIENTO HIDRICO

57

8.1.8

ABASTECIMIENTO DE LA RETENCIN

58

8.1.9

DETERMINACIN DEL CAUDAL MENSUAL PARA EL AO PROMEDIO

59

8.2

INGRESO DE DATOS.

59

8.3

CALIBRACION DEL MODELO

59

8.4

SIMULACION

60

8.5

GENERACIN DE CAUDALES MENSUALES PARA PERODOS EXTENDIDOS

60

8.6

RESTRICCIONES DEL MODELO

61

8.7

INVENTARIO DE LAS FUENTES DE AGUA EXISTENTES EN LA CUENA ACARI

62

9.0 ANLISIS DE MXIMAS AVENIDAS

86

9.1 METODOS ESTADISTICOS EN LA DETERMINACION DEL CAUDAL MAXIMO

86

9.2 SELECCIN DEL PERIODO DE RETORNO

88

10.0 ANLISIS DE CAPACIDAD DEL EMBALSE IRURO

89

11.0 ESQUEMA DE SIMULACION

91

12.0 CONCLUSIONES Y RECOMENDACIONES

92

12.1 CONCLUSIONES

92

12.2 RECOMENDACIONES

93

ANEXO I

- Informacin Meteorolgica Disponible

ANEXO II

- Tratamiento de la Informacin Hidrolgica.

102

ANEXO III

- Anlisis de Mximas Avenidas

154

ANEXO IV

- Anlisis de Capacidad de embalse y Aprovechamiento

190

ANEXO V

- Lminas

226

ANEXO VI

- Batimetra de Lagunas: Taccracocha 1 y Taccracocha 2

227

ANEXO VII

- Modelamiento Hidrulico de la Represa Iruro.

228

GOBIERNO REGIONAL DE AYACUCHO

94

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

ESTUDIO A NIVEL DE FACTIBILIDAD DEL PROYECTO: ACARI BELLA UNION II


ETAPA DE CONSTRUCCION DE LA REPRESA IRURO
HIDROLOGIA

1.

INTRODUCCIN.

Los distritos de Lucanas y San Juan de Lucanas de la provincia de Lucanas - Ayacucho


y los distritos de Acari y Bella Unin de la provincia de Caraveli - Arequipa , en la
actualidad atraviesa problemas de baja produccin agrcola y pecuaria, debido a que la
inadecuada infraestructura tradicional no permite la conduccin y distribucin eficiente
del agua, siendo deficiente en los meses de estiaje y aun mas critico por el sistema y
manejo de riego tradicional, pues, los escasos servicios solo se abastece el
autoconsumo, siendo precaria el desarrollo de las reas agrcolas y poblacin
ganadera.
En ese sentido, mediante la realizacin y formulacin del Estudio de Factibilidad, se
contribuye a la realizacin del proyecto que est orientado a satisfacer la demanda de
agua de las zonas de los distritos mencionados en los prrafos precedentes, a travs
de la captacin y almacenamiento de dicho recurso hdrico que permita incrementar sus
bajos niveles de produccin y productividad agrcola en beneficio de los productores y
de la poblacin del sector mediante la generacin de empleo y comercializacin de los
productos agrcolas con la regin de Ayacucho y Arequipa y toda la Regin Sur del
Per.
El mbito del presente Proyecto comprende la cuenca del ro Iruro las zonas agrcolas
de Lucanas y san Juan de Lucanas y los valles costeros de Bella Unin y Acar,
polticamente ubicado en la Provincia de Lucanas en el Departamento de Ayacucho, y
Caravel en el Departamento de Arequipa.
La construccin de la Presa Iruro, que forma parte del Proyecto Irrigacin Acar-Bella
Unin Segunda Etapa, consiste en la regulacin del ro Iruro, con la finalidad de
disponer reserva de agua para el perodo de estiaje. Aguas debajo de la represa se
plantea una bocatoma de captacin de las aguas reguladas del ro Iruro, hacia la
margen izquierda, luego mediante un canal de Derivacin se conduce las aguas hacia
las reas agrcolas de Lucanas y San Juan de Lucanas. As mismo, las aguas
reguladas de la Represa Iruro son aprovechadas en la provincia de Caravel en los
valles de Acar y Bella Unin con un sistema hidrulico independiente al sistema
hidrulico de Lucanas.
1.1 OBJETO DEL ESTUDIO.
El objetivo del presente estudio es determinar las disponibilidades hdricas
de la Cuenca del Ro Iruro, Cceroracra, Callcac, Azuljaja, Jachjalla y
Descomulgado.
Determinar la capacidad de almacenamiento de la cuenca Iruro.
Determinar los caudales de mximas avenidas.
Realizar el balance
sectores de riego.

GOBIERNO REGIONAL DE AYACUCHO

hdrico dentro de la cuenca del rio Acar para los

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

2.

INFORMACION BASICA.

2.1

UBICACIN.

El rea del Proyecto, est ubicado en los distritos de Lucanas y san Juan de Lucanas
de la Provincia de Lucanas Ayacucho, y los distritos de Acar y Bella Unin en la
Provincia de Caravel arequipa.
Geogrficamente est comprendido entre las siguientes coordenadas:

CUADRO N 1
UBICACIN GEOGRAFICA
SISTEMAS

DATUM

COORDENADAS
GEOGRAFICAS

HORIZONTAL WGS
1984

COORDENADAS UTM
(ZONA 18)

HORIZONTAL WGS
1984

ALTITUD

VERTICAL NIVEL
MEDIO DEL MAR

2.2

COMPONENTES

VALOR
MINIMO

VALOR
MAXIMO

LONGITUD
OESTE

7411'49''

7417'03''

LATITUD SUR

1432'35''

1416'04''

METROS ESTE

586507

577234

METROS NORTE

8392034

8422636

msnm

3800

5500

ACCESOS Y VIAS DE COMUNICACIN.

El acceso desde la ciudad de Lima es a travs de la carretera Panamericana Sur hasta


las ciudades de Ica y Nazca, luego a travs una carretera transversal de penetracin
(asfaltada) hasta la ciudad de Puquio, y luego mediante carreteras vecinales se llega al
lugar del Proyecto. El recorrido es como sigue (Cuadro N 2).

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 2
RECORRIDO DE ACCESO AL PROYECTO

2.3

TRAMO

LONGITUD

HORAS
RECORRIDAS

TIPO DE VIA

Lima Nazca

440 Km

7 hr

Carretera
Asfaltada

Nazca Desvio
Mina

85.3 Km

2.0 hr

Carretera
Asfaltada

Desvio Mina
Desvio Iruro

52 Km

2.0 hr

Carretera
Afirmada

Desvio Iruro
Represa Iruro

10 Km

1.0 hr

Trocha

total

587.3 Km

12.0 hr

RECOPILACION DE INFORMACION BASCIA:

Se ha usado la informacin cartografa indicada a continuacin:


El Mapa fsico y Poltico del Per a escala 1: 1000,000.
Hojas de la Carta Nacional del IGN a escala 1: 100,000:
- Santa Ana

29-.

- Puquio

30-.

Expedientes tcnicos, publicados y estudios anteriores realizadas por las


diferentes instituciones relacionadas con el uso de los recursos hdricos:

3.

1.

Inventario, evaluacin y uso racional de los recursos naturales de la


costa, cuantas de los rio Acari, Yauca, Chala y Chaparra, publicados
por la ONERN.

2.

Estudio hidrolgico de la cuenca del rio Acari, publicado por la


administracin tcnica del distrito de riego Acari Yauca Puquio.

3.

Perfil del proyecto Acari Bella Unin II etapa de la construccin de


la represa de Iruro publicado por MINAG, INRENA, IRH.

HIDROGRAFIA.

La cuenca del ro Iruro constituye una Sub cuenca del Ro Acari, cuyo aporte principal
se da aguas abajo de la confluencia del Ro Pallpo, en la cuenca media del mismo
(Lamina HI-01). El rea de la sub cuenca del ro Iruro-Chacarangra es de 185.53 Km2,
y representa un 17.22% de la cuenca del Ro Iruro cuya rea es 1076.9 Km2 (L- HI 02).
La cuenca del rio Iruro presenta la forma general circular ensanchado en la parte
superior, cuyo patrn de drenaje es de tipo dendrtica, su ancho vara entre 18km y
12km, el rea total de drenaje es de 185.53km2, contando con una longitud mxima de
recorrido desde sus nacientes de 19.1km . El rio Iruro nace en las alturas de la laguna
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Huancaccocha, adoptando su primera denominacin como Ro Intoncca, luego adopta


el nombre de rio Iruro para posteriormente tomar el nombre de ro Acari.
La cuenca del ro Callcac y Azuljaja presentan la forma general alargada, ensanchado
en la parte superior, cuyo patrn de drenaje es de tipo dendrtica, su ancho vara entre
8km y 9km, el rea total de drenaje es de 18.33 km2 y 30.66 Km2 respectivamente,
contando con una longitud mxima de recorrido desde sus nacientes de 6.59km y
6.38km respectivamente para posteriormente aportar al ro Iruro.
La cuenca del rio Cceroracra, Jachjalla y Descomulgado presentan la forma general
alargado ensanchado en la parte superior, cuyo patrn de drenaje es de tipo dendrtica,
su ancho vara entre 4.8km y 2.2km en ambos casos, el rea total de drenaje es de
8.54km2, 12.61km2 y 23.71km2 respectivamente, contando con una longitud mxima
de recorrido desde sus nacientes de 3.8 km, 7.41 km y 8.24 km. El ro Cceroracra nace
en las alturas del cerro Chaupipata, adoptando el nombre de ro Callcac para
posteriormente aportar al ro Iruro al igual que los ros Jachjalla y Descomulgado.
El Ro Iruro pertenece a la vertiente Occidental del Ocano Pacfico, nace en la laguna
Huancaccocha, su curso va de Noreste a Suroeste con un alineamiento casi recto, y se
une con el Ro Pallpo aguas abajo.
La delimitacin de la Cuenca del Ro Iruro (LAMINA HI-03), as como los principales
cursos de agua y las subcuencas se muestran en (LMINA HI-04 y HI-05).
3.1

DELIMITACION DE LA CUENCA HIDROGRFICA.

La cuenca del Ro Iruro pertenece a la vertiente del Pacifico y tiene una direccin SurOeste, limitando por el Oeste con la cuenca del rio Pallpo por el Norte con la cuenca del
Ro pampas, por el Sur con la Cuenca media del Ro Acari y por el Este con la Cuenca
del rio Santa Ana.

4. GEOMORFOLOGIA
4.1

ASPECTOS GENERALES.

La fuente hdrica vinculada al proyecto es la escorrenta de la cuenca alta del ro Iruro,


hasta el punto de almacenamiento (Represa Iruro), esta subcuenca forman parte de la
cuenca del ro Acar.
La sub cuenca de ro Iruro corresponde a una zona hmeda donde las precipitaciones
alcanzan 510 a 690 mm anuales en promedio (por encima de los 3,700 msnm).
4.2

CARACTERISTICAS FISIOGRAFICAS DE LAS CUENCAS:

Una cuenca puede variar desde tan pequeo como una hectrea a cientos de miles de
kilmetros cuadrados. Cuencas pequeas son aquellos donde la escorrenta es
controlada por procesos de flujo sobre el terreno (overland flow). Cuencas grandes son
aquellas donde la escorrenta es controlada por procesos de almacenamiento en los
cauces de ros. Las caractersticas hidrolgicas de una cuenca son descritas en
trminos de la siguiente propiedad (1) rea, (2) forma, (3) relieve, (4) medidas lineales y
(5) patrones de drenaje que se muestran a continuacin.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

4.2.1 AREA DE LA CUENCA


Subcuencas

Area de Drenaje

Rio Iruro-Chacarangra
Rio Cceroracra
Rio Callcac
Rio Azuljaja
Rio Jachjalla
Descomulgado
Rio Acari

185.53 km2
8.54 km2.
18.33 km2.
30.66 km2.
12.61 km2.
23.71 km2.
3761.51km2.

El rea de la cuenca es la propiedad ms importante, sta determina el potencial del


volumen de escorrenta, proporcionando la tormenta que cubre el rea completa.
Debido al efecto de flujo subsuperficial (interflujo y flujo subterrneo). La divisin
hidrogrfica no podr coincidir con la divisin topogrfica de la cuenca. La divisin
hidrogrfica, sin embargo, es menos tratable que la divisin topogrfica.
En general a mayor rea de cuenca, mayor cantidad de escorrenta superficial y
consecuentemente, mayor flujo superficial.
4.2.2 FORMA DE LA CUENCA
La forma de la cuenca es el contorno descrito por la proyeccin horizontal de una
cuenca. Horton describi el contorno de una cuenca normal como un ovoide en forma
de pera, por lo que podra mencionarse que la cuenca del Rio, Iruro, Callcac,
Cceroracra, Azuljaja, Jachjalla y Descomulgado son cuencas normales.
Una descripcin cuantitativa de la forma de una cuenca es proporcionada por la
siguiente frmula:

Kf

A
L2

Donde: Kf factor de forma, A es el rea de la cuenca y L es la longitud de la cuenca,


medido a lo largo del curso de agua amas largo. El rea y longitud son dadas en
unidades consistentes tal como kilmetros cuadrados y kilmetros respectivamente.
El coeficiente de compacidad es una descripcin alternativa de la forma de una cuenca
est basado sobre la razn del permetro de la cuenca al rea. Para este propsito un
crculo equivalente es definido como un crculo de igual rea a aquella de la cuenca. El
coeficiente de compacidad es la razn del permetro de cuenca a aquella del crculo
equivalente:

Kc

0.282P
A1 / 2

Donde Kc es coeficiente de compacidad.


P es permetro de la cuenca.
A es el rea de la cuenca.
La respuesta de la cuenca se refiere al tiempo de concentracin de la escorrenta. El rol
de la forma de cuenca en la respuesta de la cuenca no ha sido claramente establecido,

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

podra mencionarse que un factor de forma alto o un coeficiente de compacidad


cercana a 1 describen una cuenca que tiene una respuesta de cuenca rpida y
empinada. Contrariamente, un factor de forma bajo o un coeficiente de compacidad
mucho mayor que 1 describe una cuenca con una respuesta de escorrenta retardado.
Sin embargo muchos otros factores incluyendo al relieve de la cuenca cobertura
vegetativa y densidad de drenaje con usualmente ms importantes que la forma de
cuenca. En los cuadros 3, 4, 5, 3a ,4a y 5a se presentan los valores para las cuencas
en estudio.
4.2.3 RELIEVE DE LA CUENCA
Relieve es la diferencia de elevacin entre dos puntos referenciales. El relieve mximo
de la cuenca es la diferencia de elevacin entre el punto ms alto de la divisoria de la
cuenca y salida de la cuenca. La razn de relieve es la razn del relieve mximo de la
cuenca a la distancia recta horizontal ms larga de la cuenca medida en una direccin
paralela a aquella del curso de agua principal. La razn de relieve es una medida de la
intensidad del proceso erosional activo en la cuenca. El relieve total de la cuenca es
descrito por anlisis hipsomtrico que mas delante se detalla (4.2.5).
4.2.4 MEDICIONES LINEALES
Las mediciones lineales son utilizadas para describir la caracterstica unidimensional de
una cuenca. En los cuadros 3, 4, 5, 3a ,4a y 5a se presentan los valores para las
cuencas en estudio.
La longitud de cuenca o longitud hidrulica, es la longitud medida a lo largo del curso de
agua principal. El curso de agua principal es el curso de agua ms largo de la cuenca.
La longitud al centroide de la cuenca es la longitud medida a lo largo del curso de agua
principal, desde la salida de la cuenca hasta un punto localizado cercano al centroide.
Orden de ros, Una corriente de de primer orden es aquella que describe flujo de
corriente de orden cero, es decir flujo sobre terreno. Dos corrientes de primer orden se
combinan para formar una corriente de segundo orden, en general una corriente de
orden m se forman para formar una corriente de orden m+1. El orden de corriente est
directamente relacionado a su tamao.
As la cuenca del Rio Iruro es de orden 3, la Subcuenca del Rio Callcac es de orden 1,
las Subcuencas del Rio Azuljaja y Cceroracra son de orden 2, la Sub cuenca del rio
Jachjalla y Descomulgado son de orden 2.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 3
PARAMETROS GEOMORFOLOGICOS
CUENCA IRURO - REPRESA IRURO

CUENCA IRURO

AREA DE LA CUENCA

Km2

185.53

PERIMETRO

Km

67.82

1.40

Longitud ( // al curso ms largo)

Km

19.01

Ancho Medio

Km

9.76

Radio de Circularidad

0.51

Factor de Forma

0.51

Lado Mayor

Km

27.05

Lado Menor

Km

6.86

Orden 1

Km

37.09

Orden 2

Km

27.86

Orden 3

Km

7.00

Curva Hipsomtrica

Polgono de Frecuencia

Altitud Mxima de la Cuenca

m.s.n.m.

4550

Altitud Mnima de la Cuenca

m.s.n.m.

4000

Desnivel total de la Cuenca

Km

0.55

Altitud de Frecuencia Media

m.s.n.m.

4275

Altitud Media de la Cuenca

m.s.n.m.

4266.1

Altura Mxima del cauce

m.s.n.m.

4400

Altura ms frecuente

m.s.n.m.

4200-4250

2.0

Perenne

Km/Km2

0.39

m/m

0.0216

Altura Mxima del cauce

m.s.n.m.

4400

Altitud Mnima del cauce

m.s.n.m.

3990

Tiempo de concentracion

Hr.

4.00

PARAMETROS DE RELIEVE

Coeficiente de Compacidad (Gravelius)


FACTOR DE
FORMA

FACTOR DE
CUENCA

UNIDAD

PARAMETROS DE FORMA

PARAMETROS

RECTANGULO EQUIVALENTE

Longitud total de los ros de


diferentes grados

PARAMETROS DE LA RED
HIDROGRAFICA DE LA
CUENCA

Pendiente de la cuenca (sist. del rectngulo equivalente)


Tipo de corriente
Densidad de drenaje
Pendiente media del ro principal

Grado de ramificacion

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 4
PARAMETROS GEOMORFOLOGICOS
CUENCA CALLCACC - BOCATOMA CALLCACC

CUENCA CALLCACC

AREA DE LA CUENCA

Km2

18.33

PERIMETRO

Km

20.31

1.34

Longitud ( // al curso ms largo)

Km

6.59

Ancho Medio

Km

2.78

Radio de Circularidad

0.56

Factor de Forma

0.42

Lado Mayor

Km

7.81

Lado Menor

Km

2.35

Orden 1

Km

6.59

Orden 2

Km

0.00

Orden 3

Km

0.00

Curva Hipsomtrica

Polgono de Frecuencia

Altitud Mxima de la Cuenca

m.s.n.m.

4400

Altitud Mnima de la Cuenca

m.s.n.m.

3900

Desnivel total de la Cuenca

Km

0.50

Altitud de Frecuencia Media

m.s.n.m.

4250

Altitud Media de la Cuenca

m.s.n.m.

4240.5

Altura Mxima del cauce

m.s.n.m.

4240

Altura ms frecuente

m.s.n.m.

4250-4300

6.4

Perenne

Km/Km2

0.36

m/m

0.0759

Altura Mxima del cauce

m.s.n.m.

4240

Altitud Mnima del cauce

m.s.n.m.

3740

Tiempo de concentracion

Hr.

1.00

PARAMETROS DE RELIEVE

Coeficiente de Compacidad (Gravelius)


FACTOR DE
FORMA

FACTOR DE
CUENCA

UNIDAD

PARAMETROS DE FORMA

PARAMETROS

RECTANGULO EQUIVALENTE

Longitud total de los ros de


diferentes grados

PARAMETROS DE LA RED
HIDROGRAFICA DE LA
CUENCA

Pendiente de la cuenca (sist. del rectngulo equivalente)


Tipo de corriente
Densidad de drenaje
Pendiente media del ro principal

Grado de ramificacion

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 5
PARAMETROS GEOMORFOLOGICOS
CUENCA CCERORACRA - BOCATOMA CCERORACRA

PARAMETROS

UNIDAD

CUENCA
CCERORACRA
8.54

PERIMETRO

Km

12.91

1.25

Longitud ( // al curso ms largo)

Km

3.80

Ancho Medio

Km

2.25

Radio de Circularidad

0.64

Factor de Forma

0.59

Lado Mayor

Km

4.60

Lado Menor

Km

1.86

Orden 1

Km

2.50

Orden 2

Km

2.03

Orden 3

Km

0.00

Curva Hipsomtrica

Polgono de Frecuencia

Altitud Mxima de la Cuenca

m.s.n.m.

4500

Altitud Mnima de la Cuenca

m.s.n.m.

3750

Desnivel total de la Cuenca

Km

0.75

Altitud de Frecuencia Media

m.s.n.m.

4130

Altitud Media de la Cuenca

m.s.n.m.

4123.4

Altura Mxima del cauce

m.s.n.m.

4060

Altura ms frecuente

m.s.n.m.

4000-4100

16.3

Perenne

Km/Km2

0.53

m/m

0.0816

Altura Mxima del cauce

m.s.n.m.

4060

Altitud Mnima del cauce

m.s.n.m.

3750

Tiempo de concentracion

Hr.

1.00

PARAMETROS DE RELIEVE

Coeficiente de Compacidad (Gravelius)


FACTOR DE
FORMA

FACTOR DE
CUENCA

Km2

PARAMETROS DE FORMA

AREA DE LA CUENCA

RECTANGULO EQUIVALENTE

Longitud total de los ros de


diferentes grados

PARAMETROS DE LA RED
HIDROGRAFICA DE LA
CUENCA

Pendiente de la cuenca (sist. del rectngulo equivalente)


Tipo de corriente
Densidad de drenaje
Pendiente media del ro principal

Grado de ramificacion

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 3a
PARAMETROS GEOMORFOLOGICOS
CUENCA AZULJAJA - BOCATOMA AZULJAJA

CUENCA AZULJAJA

AREA DE LA CUENCA

Km2

30.66

PERIMETRO

Km

23.28

1.19

Longitud ( // al curso ms largo)

Km

6.38

Ancho Medio

Km

4.81

0.71

PARAMETROS DE RELIEVE

Coeficiente de Compacidad (Gravelius)


FACTOR DE
FORMA

FACTOR DE
CUENCA

UNIDAD

PARAMETROS DE FORMA

PARAMETROS

Radio de Circularidad
Factor de Forma

0.75

Lado Mayor

Km

7.61

Lado Menor

Km

4.03

Orden 1

Km

4.83

Orden 2

Km

6.38

Orden 3

Km

0.00

Curva Hipsomtrica

Polgono de Frecuencia

Altitud Mxima de la Cuenca

m.s.n.m.

4500

Altitud Mnima de la Cuenca

m.s.n.m.

3900

Desnivel total de la Cuenca

Km

0.60

Altitud de Frecuencia Media

m.s.n.m.

4300

Altitud Media de la Cuenca

m.s.n.m.

4287.8

Altura Mxima del cauce

m.s.n.m.

4240

Altura ms frecuente

m.s.n.m.

4250-4300

7.9

Perenne

Km/Km2

0.37

m/m

0.0533

Altura Mxima del cauce

m.s.n.m.

4240

Altitud Mnima del cauce

m.s.n.m.

3900

Tiempo de concentracion

Hr.

1.00

RECTANGULO EQUIVALENTE

Longitud total de los ros de


diferentes grados

PARAMETROS DE LA RED
HIDROGRAFICA DE LA
CUENCA

Pendiente de la cuenca (sist. del rectngulo equivalente)


Tipo de corriente
Densidad de drenaje
Pendiente media del ro principal

Grado de ramificacion

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 4a
PARAMETROS GEOMORFOLOGICOS
CUENCA RIO JACHJALLA- BOCATOMA JACHJALLA

UNIDAD

CUENCA JACHJALLA

AREA DE LA CUENCA

Km2

12.61

PERIMETRO

Km

16.78

PARAMETROS DE RELIEVE

Coeficiente de Compacidad (Gravelius)

1.33

Km

7.41

Ancho Medio

Km

1.70

Radio de Circularidad

0.56

Factor de Forma

0.23

Lado Mayor

Km

6.43

Lado Menor

Km

1.96

Orden 1

Km

5.87

Orden 2

Km

4.37

Orden 3

Km

0.00

Curva Hipsomtrica

Polgono de Frecuencia

Altitud Mxima de la Cuenca

m.s.n.m.

4350

Altitud Mnima de la Cuenca

m.s.n.m.

3900

Desnivel total de la Cuenca

Km

0.45

Altitud de Frecuencia Media

m.s.n.m.

4200

Altitud Media de la Cuenca

m.s.n.m.

4189.2

Altura Mxima del cauce

m.s.n.m.

4300

Altura ms frecuente

m.s.n.m.

4200-4300

7.0

Perenne

Km/Km2

0.81

m/m

0.0540

Altura Mxima del cauce

m.s.n.m.

4300

Altitud Mnima del cauce

m.s.n.m.

3900

Tiempo de concentracion

Hr.

1.00

FACTOR DE
FORMA

Longitud ( // al curso ms largo)

FACTOR DE
CUENCA

PARAMETROS DE FORMA

PARAMETROS

RECTANGULO EQUIVALENTE

Longitud total de los ros de


diferentes grados

PARAMETROS DE LA RED
HIDROGRAFICA DE LA
CUENCA

Pendiente de la cuenca (sist. del rectngulo equivalente)


Tipo de corriente
Densidad de drenaje
Pendiente media del ro principal

Grado de ramificacion

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 5a
PARAMETROS GEOMORFOLOGICOS
CUENCA RIO DESCOMULGADO - BOCATOMA DESCOMULGADO

UNIDAD

CUENCA
DESCOMULGADO

AREA DE LA CUENCA

Km2

23.71

PERIMETRO

Km

23.02

PARAMETROS DE RELIEVE

Coeficiente de Compacidad (Gravelius)

1.33

Km

8.24

Ancho Medio

Km

2.88

Radio de Circularidad

0.56

Factor de Forma

0.35

Lado Mayor

Km

8.82

Lado Menor

Km

2.69

Orden 1

Km

8.65

Orden 2

Km

7.05

Orden 3

Km

0.00

Curva Hipsomtrica

Polgono de Frecuencia

Altitud Mxima de la Cuenca

m.s.n.m.

4400

Altitud Mnima de la Cuenca

m.s.n.m.

3550

Desnivel total de la Cuenca

Km

0.85

Altitud de Frecuencia Media

m.s.n.m.

4150

Altitud Media de la Cuenca

m.s.n.m.

4096.5

Altura Mxima del cauce

m.s.n.m.

4100

Altura ms frecuente

m.s.n.m.

4150-4250

9.6

Perenne

Km/Km2

0.66

m/m

0.0667

Altura Mxima del cauce

m.s.n.m.

4100

Altitud Mnima del cauce

m.s.n.m.

3550

Tiempo de concentracion

Hr.

1.00

FACTOR DE
FORMA

Longitud ( // al curso ms largo)

FACTOR DE
CUENCA

PARAMETROS DE FORMA

PARAMETROS

RECTANGULO EQUIVALENTE

Longitud total de los ros de


diferentes grados

PARAMETROS DE LA RED
HIDROGRAFICA DE LA
CUENCA

Pendiente de la cuenca (sist. del rectngulo equivalente)


Tipo de corriente
Densidad de drenaje
Pendiente media del ro principal

Grado de ramificacion

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

4.2.5 CURVA HIPSOMETRICA.


La curva hipsomtrica describe la distribucin porcentual de las reas comprendidas
entre las curvas de nivel equidistantes en la cuenca. Esto refiere a una curva
dimensional que muestra la variacin con la elevacin de la cuenca. La curva
hipsomtrica muestra el porcentaje de rea en la abscisa y el porcentaje de elevacin
en a ordenada. La elevacin media de la cuenca es obtenida del porcentaje de altura
correspondiente al 50% del rea.
Usamos la curva hipsomtrica cuando una variable hidrolgica tal como la precipitacin,
cobertura vegetativa, o nevados muestra una tendencia marcada a variar, con la altitud,
en lates casos la curva hipsomtrica proporciona los medios cuantitativos para evaluar
los efectos de altitud. A continuacin se muestran la curva hipsomtrica de las cuencas
en estudio, cuadro N 7, 9, 11, 7a, 9a y 11a.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 7

CURVA HIPSOMETRICA
CUENCA IRURO - REPRESA IRURO
Cota

Area Km2

msnm

Area
Acumulada

Area que quedan


sobre las altitudes
(Km2)

% de Area
Acumulada

4000

4050

4.76

4.76

180.77

0.00
2.56

4050

4100

8.14

12.90

172.63

6.95

4100

4150

4.94

17.84

167.69

9.62

4150

4200

5.93

23.77

161.76

12.81

4200

4250

45.32

69.10

116.43

37.24

4250

4300

54.93

124.03

61.50

66.85

4300

4350

38.63

162.65

22.88

87.67

4350

4400

14.79

177.44

8.09

95.64

4400

4450

5.72

183.17

2.36

98.73

10

4450

4500

1.74

184.91

0.62

99.67

11

4500
4550
SUMATORIA

0.62

185.53

0.00

100.00

185.53

CURVA HIPSOMETRICA - CUENCA IRURO (REPRESA IRURO)

Altitud (m.s.n.m.)

4800

4400

4000

Altitud de
frecuencia media
: 4275 m.s.n.m.

3600

3200

10

20

30

40

50

60

70

80

90 100 110 120 130 140 150 160 170 180 190 200 210 220
Area Acumulada(%)

Hmax.= 4550.0

Hmn.=

m.s.n.m.

GOBIERNO REGIONAL DE AYACUCHO

4000.00
m.s.n.m.

Hmedia =

4266
m.s.n.m.

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N

POLIGONO DE FECUENCIA
CUENCA IRURO - REPRESA IRURO
N

Cota
msnm

1
2
3
4
5
6
7
8
9
10
11

4000
4050
4050
4100
4100
4150
4150
4200
4200
4250
4250
4300
4300
4350
4350
4400
4400
4450
4450
4500
4500
4550
SUMATORIA

Area
Km 2
4.76
8.14
4.94
5.93
45.32
54.93
38.63
14.79
5.72
1.74
0.62
185.53

Porcentaje
del Area
2.56
4.39
2.66
3.20
24.43
29.61
20.82
7.97
3.08
0.94
0.33
100.00

% de Area
Acumulada
0.00
2.56
6.95
9.62
12.81
37.24
66.85
87.67
95.64
98.73
99.67
100.00

POLIGONO DE FRECUENCIAS
35.00
30.00
25.00
20.00
15.00
10.00
5.00

GOBIERNO REGIONAL DE AYACUCHO

4500

4450

4400

4350

4300

4250

4200

4150

4100

4050

4000

0.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 9

CURVA HIPSOMETRICA
CUENCA CCERORACRA - BOCATOMA CCERORACRA
Cota
msnm

3750
3800
3800
3900
3900
4000
4000
4100
4100
4200
4200
4300
4300
4400
4400
4500
SUMATORIA

1
2
3
4
5
6
7
8

Area Km2

Area
Acumulada

0.17
0.53
1.09
2.04
1.83
1.75
0.96
0.17
8.54

0.17
0.70
1.79
3.83
5.66
7.41
8.37
8.54

Area que quedan


sobre las altitudes
(Km2)
8.37
7.84
6.75
4.71
2.88
1.13
0.17
0.00

% de Area
Acumulada
0.00
1.98
8.19
20.99
44.88
66.32
86.75
98.04
100.00

CURVA HIPSOMETRICA - CUENCA CCERORACRA


(BOCATOMA CCERORACRA)
Altitud (m.s.n.m.)

4800

4400

4000

Altitud de
frecuencia
media : 4130
m.s.n.m.

3600

3200
0

10

Area Acumulada(Km)

Hmax.= 4500.0
Hmn.=
m.s.n.m.

GOBIERNO REGIONAL DE AYACUCHO

3750.00
m.s.n.m.

Hmedia =

4123
m.s.n.m.

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N

10

POLIGONO DE FECUENCIA
CUENCA CCERORACRA - BOCATOMA CCERORACRA
N

Cota
msnm

1
2
3
4
5
6
7
8

3750
3800
3800
3900
3900
4000
4000
4100
4100
4200
4200
4300
4300
4400
4400
4500
SUMATORIA

Area
Km 2
0.17
0.53
1.09
2.04
1.83
1.75
0.96
0.17
8.54

Porcentaje
del Area
1.98
6.21
12.80
23.88
21.44
20.44
11.28
1.96
100.00

% de Area
Acumulada
0.00
1.98
8.19
20.99
44.88
66.32
86.75
98.04
100.00

POLIGONO DE FRECUENCIAS
30.00
25.00
20.00
15.00
10.00
5.00

GOBIERNO REGIONAL DE AYACUCHO

4400

4300

4200

4100

4000

3900

3800

3750

0.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 11

CURVA HIPSOMETRICA
CUENCA CALLCACC - BOCATOMA CALLCACC
Cota
msnm

Area Km2

Area
Acumulada

0.15
0.23
0.53
0.86
1.29
1.84
3.54
4.26
4.33
1.30
18.33

0.15
0.37
0.91
1.77
3.06
4.90
8.44
12.70
17.03
18.33

3900
3950
3950
4000
4000
4050
4050
4100
4100
4150
4150
4200
4200
4250
4250
4300
4300
4350
4350
4400
SUMATORIA

1
2
3
4
5
6
7
8
9
10

Area que quedan


sobre las altitudes
(Km2)
18.19
17.96
17.43
16.56
15.28
13.44
9.90
5.63
1.30
0.00

% de Area
Acumulada
0.00
0.81
2.04
4.95
9.66
16.68
26.71
46.03
69.27
92.89
100.00

CURVA HIPSOMETRICA - CUENCA CALLCACC (BOCATOMA


CALLCACC)

4800

Altitud (m.s.n.m.)

4400

4000

Altitud de
frecuencia media
: 4240 m.s.n.m.

3600

3200
0

Hmax.= 4400.0
m.s.n.m.

GOBIERNO REGIONAL DE AYACUCHO

10
Area Acumulada(%)

Hmn.= 3900.0
m.s.n.m.

20

Hmedia =

4240
m.s.n.m.

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N

12

POLIGONO DE FECUENCIA
CUENCA CALLCACC - BOCATOMA CALLCACC
N

Cota
msnm

1
2
3
4
5
6
7
8
9
10

3900
3950
3950
4000
4000
4050
4050
4100
4100
4150
4150
4200
4200
4250
4250
4300
4300
4350
4350
4400
SUMATORIA

Area
Km 2
0.15
0.23
0.53
0.86
1.29
1.84
3.54
4.26
4.33
1.30
18.33

Porcentaje
del Area
0.81
1.23
2.90
4.72
7.02
10.02
19.32
23.24
23.62
7.11
100.00

% de Area
Acumulada
0.00
0.81
2.04
4.95
9.66
16.68
26.71
46.03
69.27
92.89
100.00

POLIGONO DE FRECUENCIAS
25.00
20.00
15.00
10.00
5.00

GOBIERNO REGIONAL DE AYACUCHO

4350

4300

4250

4200

4150

4100

4050

4000

3950

3900

0.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 7a

CURVA HIPSOMETRICA
CUENCA AZULJAJAC - BOCATOMA AZULJAJA
Cota
msnm

N
1
2
3
4
5
6
7
8
9
10
11
12

3900
3950
3950
4000
4000
4050
4050
4100
4100
4150
4150
4200
4200
4250
4250
4300
4300
4350
4350
4400
4400
4450
4450
4500
SUMATORIA

Area Km2
0.01
0.12
0.39
0.69
1.46
2.17
3.78
7.30
7.32
4.48
2.23
0.73
30.66

Area
Area que
Acumulada quedan sobre
las altitudes
0.01
30.65
0.13
30.52
0.52
30.14
1.21
29.45
2.66
27.99
4.83
25.83
8.61
22.05
15.91
14.74
23.23
7.43
27.70
2.95
29.93
0.73
30.66
0.00

% de Area
Acumulada
0.00
0.03
0.44
1.70
3.94
8.69
15.76
28.08
51.91
75.77
90.37
97.63
100.00

CURVA HIPSOMETRICA - CUENCA AZULJAJA (BOCATOMA


AZULJAJA)

4800

Altitud (m.s.n.m.)

4400

Altitud de
frecuencia
media : 4300
m.s.n.m.

4000

3600

3200

10

20

30

Area Acumulada(%)

Hmax.= 4500.0
m.s.n.m.

GOBIERNO REGIONAL DE AYACUCHO

Hmn.=

3900.00
m.s.n.m.

Hmedia = 4288
m.s.n.m.

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N

8a

POLIGONO DE FECUENCIA
CUENCA AZULJAJA - BOCATOMA AZULJAJA
N

Cota
msnm

1
2
3
4
5
6
7
8
9
10
11
12

3900
3950
3950
4000
4000
4050
4050
4100
4100
4150
4150
4200
4200
4250
4250
4300
4300
4350
4350
4400
4400
4450
4450
4500
SUMATORIA

Area
Km 2
0.01
0.12
0.39
0.69
1.46
2.17
3.78
7.30
7.32
4.48
2.23
0.73
30.66

Porcentaje
del Area
0.03
0.40
1.26
2.24
4.75
7.07
12.32
23.83
23.86
14.60
7.26
2.37
100.00

% de Area
Acumulada
0.00
0.03
0.44
1.70
3.94
8.69
15.76
28.08
51.91
75.77
90.37
97.63
100.00

POLIGONO DE FRECUENCIAS
8.00
7.00
6.00

5.00
4.00
3.00

2.00
1.00

GOBIERNO REGIONAL DE AYACUCHO

4450

4400

4350

4300

4250

4200

4150

4100

4050

4000

3950

3900

0.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 9a

CURVA HIPSOMETRICA
CUENCA RIO JACHJALLA- BOCATOMA JACHJALLA
Cota
msnm

Area Km2

3900
3950
3950
4000
4000
4050
4050
4100
4100
4150
4150
4200
4200
4250
4250
4300
4300
4350
SUMATORIA

1
2
3
4
5
6
7
8
9

0.18
0.32
0.84
1.44
1.75
1.65
2.12
2.16
2.15
12.61

Area
Area que quedan
Acumulada sobre las altitudes
(Km2)
0.18
12.43
0.50
12.11
1.34
11.27
2.78
9.83
4.52
8.08
6.17
6.43
8.30
4.31
10.45
2.15
12.61
0.00

% de Area
Acumulada
0.00
1.40
3.93
10.62
22.04
35.89
48.96
65.81
82.92
100.00

CURVA HIPSOMETRICA - CUENCA JACHJALLA


(BOCATOMA JACHJALLA)

4800

Altitud (m.s.n.m.)

4400

4000

Altitud de
frecuencia
media : 4200
m.s.n.m.

3600

3200

Hmax.= 4350.0
m.s.n.m.

GOBIERNO REGIONAL DE AYACUCHO

Hmn.=

6
7
8
9
Area Acumulada(Km)

3900.0
m.s.n.m.

10

11

12

13

14

Hmedia = 4189.2
m.s.n.m.

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N

10a

POLIGONO DE FECUENCIA
CUENCA RIO JACHJALLA- BOCATOMA JACHJALLA

Cota
msnm

1
2
3
4
5
6
7
8
9

3900
3950
3950
4000
4000
4050
4050
4100
4100
4150
4150
4200
4200
4250
4250
4300
4300
4350
SUMATORIA

Area
Km 2
0.18
0.32
0.84
1.44
1.75
1.65
2.12
2.16
2.15
12.61

Porcentaje
del Area
1.40
2.54
6.68
11.43
13.85
13.07
16.85
17.11
17.08
100.00

% de Area
Acumulada
0.00
1.40
3.93
10.62
22.04
35.89
48.96
65.81
82.92
100.00

POLIGONO DE FRECUENCIAS
18.00
16.00

14.00
12.00
10.00

8.00
6.00

4.00
2.00

GOBIERNO REGIONAL DE AYACUCHO

4300

4250

4200

4150

4100

4050

4000

3950

3900

0.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 11a

CURVA HIPSOMETRICA
CUENCA RIO DESCOMULGADO - BOCATOMA DESCOMULGADO
Cota
msnm

Area Km2

Area
Acumulada

0.50
1.60
1.85
1.77
2.63
3.48
5.06
5.50
1.34
23.71

0.50
2.09
3.94
5.71
8.33
11.81
16.88
22.38
23.71

3550
3650
3650
3750
3750
3850
3850
3950
3950
4050
4050
4150
4150
4250
4250
4350
4350
4400
SUMATORIA

1
2
3
4
5
6
7
8
9

Area que quedan


sobre las altitudes
(Km2)
23.22
21.62
19.77
18.01
15.38
11.90
6.84
1.34
0.00

% de Area
Acumulada
0.00
2.09
8.82
16.62
24.06
35.14
49.81
71.17
94.37
100.00

CURVA HIPSOMETRICA - CUENCA DESCOMULGADO


(BOCATOMA DESCOMULGADO
4800

Altitud (m.s.n.m.)

4400

4000

Altitud de
frecuencia
media : 4150
m.s.n.m.

3600

3200

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Area Acumulada(Km)

Hmax.= 4400.0
m.s.n.m.

GOBIERNO REGIONAL DE AYACUCHO

Hmn.= 3550.0
m.s.n.m.

Hmedia = 4096.5
m.s.n.m.

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N

12a

POLIGONO DE FECUENCIA
CUENCA RIO DES COMULGADO - BOCATOMA DES COMULGADO

Cota
msnm

1
2
3
4
5
6
7
8
9

3550
3650
3650
3750
3750
3850
3850
3950
3950
4050
4050
4150
4150
4250
4250
4350
4350
4400
SUMATORIA

Area
Km 2
0.50
1.60
1.85
1.77
2.63
3.48
5.06
5.50
1.34
23.71

Porcentaje
del Area
2.09
6.73
7.80
7.45
11.07
14.68
21.36
23.20
5.63
100.00

% de Area
Acumulada
0.00
2.09
8.82
16.62
24.06
35.14
49.81
71.17
94.37
100.00

POLIGONO DE FRECUENCIAS
25.00
20.00
15.00
10.00
5.00

4350

4250

4150

4050

3950

3850

3750

3650

3550

0.00

Otras medidas de relieve de cuenca estn basadas sobre las caractersticas de


corriente y cauce. En ausencia de controles geolgicos (afloramientos rocosos), el perfil
longitudinal de un Rio es usualmente cncava, hacia arriba, es decir, muestra un
decremento persistente en la gradiente del cauce en la direccin aguas abajo. La razn
para este decremento aguas abajo en la gradiente del cauce no es fcilmente aparente,
sin embargo se conoce que la gradiente del cauce est directamente relacionado a la
friccin del fondo e inversamente relacionado al tirante del flujo.
Pendiente, La gradiente del cauce de una Rio es una medida conveniente del relieve de
cuenca. La gradiente del cauce obtenida de las elevaciones mximas y mnimas es
referida como la pendiente S1. En los cuadros 3, 4, 5, 3a, 4a y 5a Se presentan los
valores para las cuencas en estudio. Una medida algo ms representativa de la

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

gradiente del cauce es la pendiente S2, definido como la pendiente constante que corta
el perfil longitudinal en dos reas iguales.
Una medida de la gradiente del cauce que toma en cuenta el tiempo de respuesta de la
cuenca es la pendiente equivalente o S3, para calcular est pendiente el cauce es
dividida en n substratos y una pendiente es calculado para cada subtrato basado en la
ecuacin de Manning.

Li
S3

i 1
n

( Li / S i1 / 2 )
i 1

En el que S3 = pendiente equivalente.


Li es cada longitud i de n subtratos.
Si es cada pendiente i de n subtratos.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

PERFIL LONGITUDINAL - CUENCA AZULJAJA


4,300
4,250

ELEVACION (m)

4,200
4,150
4,100

4,050
4,000
3,950
3,900
3,850
0

DISTANCIA (Km)

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Rectngulo Equivalente, es el rectngulo que tiene la misma rea y el mismo permetro


que la cuenca, en estas condiciones tendr el mismo coeficiente de compacidad Kc de
Gravelius as como tambin igual parmetros de distribucin de alturas, igual curva
hipsomtrica, etc. Se deber tener considerado L y l las dimensiones del rectngulo
equivalente:

A L.l
P
2

2( L 1) 2k c A
LK c A

A 0

De donde se tiene:

Kc

A
2

1 4 / k c2

En los cuadros 3, 4, 5, 3a ,4a y 5a se presentan los valores para las cuencas en


estudio.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

4.2.6 DETERMINACION DEL TIEMPO DE CONCENTRACION (Tc)


El tiempo que demora una gota agua desde el punto hidrulicamente ms distante al
punto de inters se denomina Tiempo de Concentracin. La determinacin de este
parmetro se realiz en funcin a diferentes ecuaciones planteadas, cada una con sus
caractersticas propias.
La importancia de la determinacin de este parmetro radica en el clculo de los periodos
de retorno para cada micro cuenca y para la generacin de caudales medios y para
eventos futuros, las cuales se muestran en los cuadros 13,13a ,13b, 14, 14a y 14b.
Los mtodos utilizados para el clculo del Tc (dados en Hr) fueron los siguientes:
GIANDIOTTI

Tc

4 A 1.5 L
0.8 Dm

Donde:
A

rea de la cuenca (Km).

Longitud del cauce principal (Km.).

Dm

Desnivel medio (m).

HATAWAY

Tc

0.606 * ( L * n) 0.4678 S

0.243

Donde:
L

Longitud del cauce principal (Km.).

Rugosidad.

Pendiente de la cuenca.

Pendiente de la cuenca.

KIRPICH

Tc

0.06628* L0.77 S 0.385

Donde:
L

Longitud del cauce principal (Km.).

Pendiente de la cuenca.

CALIFORNIA (U.S.B.R.)

Tc

0.066*

L
J 0.5

0.77

Donde:
L

Longitud del cauce principal (Km).

Pendiente promedio del cauce principal.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Asumir una de las ecuaciones presentadas, es muy relativo. Cada una de estas se ha
usado en diferentes zonas geogrficas. Para el caso del presente estudio, se ha utilizado a
criterio un valor mayor al promedio, puesto que no hay un estudio especfico para la
realidad peruana.
Cuadro N 13

TIEMPO DE CONCENTRACION (Tc)


CUENCA

UNIDAD

IRURO

Km

185.53

Cota Mxima

msnm

4550

Cota Mnima

msnm

4000

m/m

0.020

Desnivel del Curso Principal (H)

Km

0.55

Longitud del curso principal (L)

Km

22.84

Pendiente del Curso Princ. (S)

m/m

0.02

550

Area de la cuenca

Pendiente de la Cuenca

Desnivel Medio (Dm)


Rugosidad (n)

0.40

GIANDIOTTI

Hr

4.73

HATHAWAY

Hr

4.24

KIRPICH

Hr

3.30

CALIFORNIA (U.S.B.R.)

Hr

3.08

Promedio

Hr

3.84

Desviacin Estndar

0.78

Varianza

0.61

TIEMPO DE CONCENTRACION ASUMIDO

GOBIERNO REGIONAL DE AYACUCHO

Hr

4.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Cuadro N 13a

TIEMPO DE CONCENTRACION (Tc)


CUENCA

UNIDAD

CALLCACC

Km

18.33

Cota Mxima

msnm

4400

Cota Mnima

msnm

3900

m/m

0.064

Desnivel del Curso Principal (H)

Km

0.50

Longitud del curso principal (L)

Km

6.59

Pendiente del Curso Princ. (S)

m/m

0.08

500

Area de la cuenca

Pendiente de la Cuenca

Desnivel Medio (Dm)


Rugosidad (n)

0.05

GIANDIOTTI

Hr

1.51

HATHAWAY

Hr

0.69

KIRPICH

Hr

0.82

CALIFORNIA (U.S.B.R.)

Hr

0.76

Promedio

Hr

0.94

Desviacin Estndar

0.38

Varianza

0.15

TIEMPO DE CONCENTRACION ASUMIDO

GOBIERNO REGIONAL DE AYACUCHO

Hr

1.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Cuadro N 13b

TIEMPO DE CONCENTRACION (Tc)


CUENCA CCERORACRA

UNIDAD

CCERORACRA

Km

8.54

Cota Mxima

msnm

4500

Cota Mnima

msnm

3750

Pendiente de la Cuenca

m/m

0.163

Desnivel del Curso Principal (H)

Km

0.75

Longitud del curso principal (L)

Km

3.80

Pendiente del Curso Princ. (S)

m/m

0.20

750

Area de la cuenca

Desnivel Medio (Dm)


Rugosidad (n)

0.40

GIANDIOTTI

Hr

0.79

HATHAWAY

Hr

1.13

KIRPICH

Hr

0.37

CALIFORNIA (U.S.B.R.)

Hr

0.34

Promedio

Hr

0.66

Desviacin Estndar

0.37

Varianza

0.14

TIEMPO DE CONCENTRACION
ASUMIDO

GOBIERNO REGIONAL DE AYACUCHO

Hr

1.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Cuadro N 14

TIEMPO DE CONCENTRACION (Tc)


CUENCA

UNIDAD

AZULJAJA

Km

30.66

Cota Mxima

msnm

4500

Cota Mnima

msnm

3900

m/m

0.079

Desnivel del Curso Principal (H)

Km

0.60

Longitud del curso principal (L)

Km

6.38

Pendiente del Curso Princ. (S)

m/m

0.09

600

Area de la cuenca

Pendiente de la Cuenca

Desnivel Medio (Dm)


Rugosidad (n)

0.06

GIANDIOTTI

Hr

1.62

HATHAWAY

Hr

0.70

KIRPICH

Hr

0.73

CALIFORNIA (U.S.B.R.)

Hr

0.68

Promedio

Hr

0.93

Desviacin Estndar

0.46

Varianza

0.21

TIEMPO DE CONCENTRACION ASUMIDO

GOBIERNO REGIONAL DE AYACUCHO

Hr

1.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Cuadro N 14a

TIEMPO DE CONCENTRACION (Tc)


CUENCA

UNIDAD

JACHJALLA

Km

12.61

Cota Mxima

msnm

4350

Cota Mnima

msnm

3900

m/m

0.070

Desnivel del Curso Principal (H)

Km

0.45

Longitud del curso principal (L)

Km

7.41

Pendiente del Curso Princ. (S)

m/m

0.06

450

Area de la cuenca

Pendiente de la Cuenca

Desnivel Medio (Dm)


Rugosidad (n)

0.05

GIANDIOTTI

Hr

1.49

HATHAWAY

Hr

0.71

KIRPICH

Hr

0.86

CALIFORNIA (U.S.B.R.)

Hr

0.91

Promedio

Hr

0.99

Desviacin Estndar

0.34

Varianza

0.12

TIEMPO DE CONCENTRACION ASUMIDO

GOBIERNO REGIONAL DE AYACUCHO

Hr

1.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Cuadro N 14b

TIEMPO DE CONCENTRACION (Tc)


CUENCA

UNIDAD

DESCOMULGADO

Km

23.71

Cota Mxima

msnm

4400

Cota Mnima

msnm

3550

m/m

0.096

Desnivel del Curso Principal (H)

Km

0.85

Longitud del curso principal (L)

Km

8.24

Pendiente del Curso Princ. (S)

m/m

0.10

850

Area de la cuenca

Pendiente de la Cuenca

Desnivel Medio (Dm)


Rugosidad (n)

0.05

GIANDIOTTI

Hr

1.37

HATHAWAY

Hr

0.69

KIRPICH

Hr

0.83

CALIFORNIA (U.S.B.R.)

Hr

0.80

Promedio

Hr

0.92

Desviacin Estndar

0.30

Varianza

0.09

TIEMPO DE CONCENTRACION ASUMIDO

GOBIERNO REGIONAL DE AYACUCHO

Hr

1.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

5.0
5.1

ANALISIS DE LOS PARAMETROS METEOROLOGICOS


PRECIPITACIN PLUVIAL

De acuerdo a la informacin disponible, la precipitacin pluvial en la regin vara desde


escasos milmetros en pocas de estiaje hasta un promedio de 900 milmetros en el
sector de puna con una altitud aproximada de 4,500 m.s.n.m. En los anexo se presenta
el resumen de datos pluviomtricos al nivel de promedios mensuales y anuales
adquiridas del SENAMHI.
La Cuenca seca no cuenta con escorrenta superficial y su aporte efectivo hacia el
caudal de los ros es prcticamente nulo. El otro sector, denominado "cuenca Hmeda",
comprendido entre el lmite superior de la "cuenca seca" y la divisoria de aguas,
variando sus parmetros pluviales entre 350 mm, en el nivel altitudinal inferior y
alrededor de 700 mm, en el nivel altitudinal superior, constituyndose de esta manera
en el rea de verdadero aporte de escorrenta superficial y subterrnea es donde
pertenece las cuencas en estudio.
Las estaciones ubicadas en los sectores andinos presentan un rgimen pluvial
netamente de verano, ya que las lluvias tienen sus inicios en los meses primaverales y
van cobrando mayor intensidad (mes de Febrero), para luego decrecer casi
bruscamente durante el mes de Abril, en que se inicia un periodo de estiaje que se
caracteriza por la ocurrencia de precipitaciones muy escasas o por la ausencia
definitiva de estas en algunos meses, especialmente durante los meses ms fros de
Junio y Agosto.
En lo que respecta a los valores mximos y mnimos extremos mensuales, es
interesante resaltar la existencia de notables oscilaciones, que en algunas estaciones
alcanzan a los 300 mm, promedio (caso de Puquio). Se podra considerar que estas
oscilaciones excesivas son producto de la alternancia de aos muy abundantes en
lluvias con aos de escasez extrema y, en cierta forma, esto es indicativo de que en el
rea es de esperarse una variacin anual muy marcada que no est sujeta a
periodicidades, resultando ello muy perjudicial para las actividades agropecuarias de
estas cuencas.
5.2

TEMPERATURA

La temperatura es el elemento ms ligado en sus variaciones al factor altitudinal. En la


cuenca, se ha podido apreciar que vara desde (17 C aproximadamente) a (5 C
aproximadamente) en el sector de puna, quedando comprendida entre estos extremos
una serie de variaciones trmicas que se caracterizan a cada uno de estos pisos
altitudinales apreciados en las cuencas.
De la red meteorolgica existen 2 estaciones que se encuentran en Puquio,
Palcachacra y Cecchapampa, en el que se aprecia el rgimen de las temperaturas
medas mensuales, as como tambin el rgimen de sus valores mensuales mximos y
mnimos extremos.
En lo que respecta a los valores mensuales mximos y mnimos extremos, puede
decirse, que la oscilacin entre estos dos valores extremos es relativamente alta en las
estaciones ubicadas hacia el interior o tierra adentro del litoral; esto sera indicativo de
que las temperaturas a nivel del litoral son ms estables en su rgimen que las
temperaturas registradas en el interior de las cuencas, lo cual probablemente se debe a
la influencia del mar que actuara como un termo-regulador.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Esto se debera principalmente a factores de orden atmosfrico, dentro de los cuales


durante los meses invernales es prcticamente ausente permitiendo la incidencia
directa de la insolacin solar, que durante las horas del da llega a calentar
notablemente la superficie terrestre registrando temperaturas muy elevadas; por otra
parte, durante la noche, las temperaturas no llegan a descender a niveles inferiores
extremos dando como resultado promedios diarios que se pueden considerar altos;
estos, a su vez, generalmente los promedios mensuales que son muy poco
diferenciales de los promedios registrados durante los meses ms clidos en los cuales
si hay presencia de estratos nubosos profundos que interfieren la incidencia de la
insolacin solar, evitando el sobre-calentamiento de la superficie terrestre. Es, por las
razones expuestas, que los valores mximo y mnimo extremos para estas estaciones
de Sierra se presentan ligeramente ms oscilantes durante el invierno que durante la
primavera y verano, obtenindose como consecuencia de estas variaciones un rgimen
mensual promedio muy poco oscilante.
Respecto a las temperaturas mnimas extremas, es interesante resaltar, que no
obstante encontrarse las estaciones indicadas a altitudes comprendidas entre 3,200 y
3,900 m.s.n.m., estas no alcanzan niveles extremos de congelacin, sino que se sitan,
en el peor de los casos, a 1.4 C sobre O (Cecchapampa) durante el mes de Julio, que
se registra como uno de los ms fros, esto indicara que, en este sector del rea andina
de las cuencas, la ocurrencia de las heladas perjudiciales a la agricultura es
probablemente eventual aunque sin descartar que su intensidad debe ser fuerte.
5.3

PRESION ATMOSFERICA

La presin atmosfrica en la cuenca Iruro tiene un promedio anual de 1012.7 mb, y el


rgimen mensual varia en forma regular presentando la mnima en Febrero con 1010.3
mb., el cual se incrementa progresivamente hasta Agosto alcanzando 1014.5 mb.; de
este mes haca delante, decrece por un periodo de 5 meses (Septiembre - Enero). La
oscilacin media anual es de 4.2 mb. Y dada la regularidad de esta variacin gradual,
se puede establecer que hay estabilidad climtica dentro de esta rea.
5.4

HUMEDAD RELATIVA

Para el estudio de este elemento meteorolgico, se ha contado con informacin


proveniente de 3 estaciones se encuentra ubicada en Puquio, Palcachacra y
Cecchapampa, en el sector andino de la cuenca.
El rgimen de la humedad relativa se presenta invertido con respecto a la marcha de la
humedad entre Noviembre y Abril, mientras que los ms bajos ocurren entre Mayo y
Octubre. La oscilacin alcanza una mayor variacin, la cual parece incrementarse en
relacin directa con la altitud; en el presente caso, vara entre 50% en la estacin de
Puquio. Con respecto a los valores mximos y mnimos extremos, se observa que esta
rea conforma una oscilacin mucho ms fuerte. Esta oscilacin alcanza un valor de
65% en la estacin de Puquio, ubicndose entre 86% de H.R. mxima y 21% de H.R.
mnima, la misma que se mantiene casi igual para las de mas estaciones que registran
H.R, en la Sierra (Palcachacra y Cecchapampa).

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

5.5

EVAPORACION

Se tienen datos de 2 estaciones meteorolgicas, de las cuales solamente 1 ofrecen


confianza estadstica que es Puquio, la estacin como referencia es la de Palcachacra.
En la sierra la mayor evaporacin se registra durante el invierno. En el sector de Sierra,
se registra un promedio anual de aproximadamente 1,700 mm de evaporacin (para
este clculo se ha tomado en cuenta la estacin referencial adems de la estacin de
Puquio), siendo mayor desde Mayo a Octubre, en que el promedio mensual esta
alrededor de 177 mm, y menor desde Noviembre a Abril, cuando el promedio mensual
solo alcanza 115 mm.
6.0

TRATAMIENTO DE LA INFORMACION METEOROLOGICA E


PLUVIOMETRICA.

Dentro de La Cuenca del Ro Iruro, No existen estaciones Pluviomtricas ni


hidromtricas. Sin embargo, recurriendo a cuencas vecinas podemos citar las
siguientes estaciones:
CUADRO N 15
ESTACIONES METEOROLOGICAS UTILIZADAS EN EL ESTUDIO

ESTACIONES

TIPO PROPIETARIO

COORDENADAS
GEOGRAFICAS
ALTITUD
LATITUD LONGITUD m .s.n.m .
SUR
OESTE

UBICACIN
CUENCA
Departam ento

Provincia

Distrito

PERIODO
RECORD
DE
DE AOS
REGISTRO

EN FUNCIONAMIENTO
1. LUCANAS

CLI

SENAMHI

1437'

7414'

3400.0

ACARI

AYACUCHO

LUCANAS

LUCANAS

1965-2002

37.0

2. PUQUIO

CLI

SENAMHI

1442'

7400'

3213.0

ACARI

AYACUCHO

LUCANAS

PUQUIO

1965-2008

43.0

1. PAUCACORRAL

PLU

SENAMHI

1440'

7405'

3550.0

ACARI

AYACUCHO

LUCANAS

PUQUIO

1965-1996

31.0

2. CCECCAA

PLU

SENAMHI

1436'

7358'

4400.0

ACARI

AYACUCHO

LUCANAS

PUQUIO

1965-1980

15.0

3. ANDAMARCA

PLU

SENAMHI

1423'

7358'

3490.0

ACARI

AYACUCHO

LUCANAS

C. SALCEDO

1965-1980

15.0

4. PAMPAHUASI

PLU

SENAMHI

1430'

7415'

3650.0

ACARI

AYACUCHO

LUCANAS

AUCARA

1965-1980

15.0

5. PAMPAMARCA

PLU
SENAMHI
HIDRO SENAMHI

1414'

7412'

3400.0

ACARI

AYACUCHO

LUCANAS

AUCARA

1966-1996

30.0

1433'

7417'

3200.0

ACARI

AYACUCHO

LUCANAS

LUCANAS

1967-1974

8.0

PARALIZADAS

6. PALCACHACRA

La ubicacin de las estaciones se muestra en la lmina HI-03


6.1

PRECIPITACION

La atmsfera de la tierra contiene vapor de agua. La cantidad de vapor de agua puede


ser convenientemente expresada en trminos de una altura de agua precipitable. Esta
es la altura de agua que sera comprendido si todo el vapor de agua en la columna de
aire sobre un rea dada fuera a condensar y precipitar sobre aquella rea.
La formacin de precipitacin requiere la elevacin de una masa de agua en la
atmsfera de tal manera que se enfre y parte de su humedad se condense. Los tres
tipos principales para la elevacin de masas de aire son la elevacin frontal, donde el
aire caliente es elevado sobre aire fro por un pasaje frontal; la elevacin convectiva,
donde el aire se arrastra hacia arriba por una accin convectiva, como ocurre en el
centro de una tormenta elctrica; y la elevacin orogrfica, mediante la cual una masa
de aire se eleva para pasar por encima de una cadena montaosa. En el rea de
estudio la precipitacin es principalmente de tipo orogrfico, por la presencia de la
cordillera de los andes, sin embargo, en la naturaleza, los efectos de estos varios tipos

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

de enfriamiento a menudo estn interrelacionados, y la precipitacin resultante no


puede identificarse como de un solo tipo.
La precipitacin, incluye todas las formas que el agua cae a la superficie terrestre, ya
sea en forma lquida o slida. La precipitacin ocurre principalmente en la forma de
llovizna, lluvia, nieve, o granizo. En la cuenca de estudio (cuenca Iruro, Callcacc,
Cceroracra, Azuljaja, Jachjalla y Descomulgado) se pudo identificar que la precipitacin
es principalmente en forma de lluvia, ocasionalmente, en la parte alta de la cuenca, es
en forma de granizo, por lo que, en el presente estudio la lluvia es referida como la
precipitacin.
El rgimen hidrolgico es propio de la sierra peruana caracterizado por la ocurrencia de
precipitaciones entre los meses de octubre a abril o mayo siendo, ms abundantes
entre enero y abril. Estas alcanzan los 600 a 900 mm en la parte alta (por encima de los
3900 msnm), 400 a 700 mm en la parte media (3000 a 4000 msnm) y de 180 a 400 mm
en la parte baja de la cuenca (2000 a 3000 msnm).
Luego de realizar una regionalizacin de las precipitaciones en esta parte del Pas, se
ha obtenido los siguientes resultados.
Fig.01

Donde:
P = Precipitacin media anual de un punto dado, en mm y
H = Latitud del punto, en m.s.n.m.
Estos resultados deben considerarse vlidos en el rango de las altitudes de las
estaciones citadas (3,200 a 4,200 msnm), y en el rea del Proyecto (Cuenca del Ro
Iruro).
Por consiguiente, podemos decir que por encima de los 3,200 m.s.n.m., se tiene una
relacin precipitacin altitud, establecida por la siguiente ecuacin:
P = 0.399 H 861.5
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

La precipitacin sigue el rgimen indicado en el prrafo anterior. En el periodo hmedo


se produce el 90% de la precipitacin total anual, alcanzando valores mensuales de
hasta 416 mm. En el estiaje las lluvias son de baja intensidad y muy espordicas,
alcanzando el 10% restante de la lluvia anual.
6.2

REGISTRO HISTRICO

Para el estudio hidrolgico de la cuenca Iruro, se utiliz 7 estaciones pluviomtricas y 1


estacin hidromtrica de las cuales 05 se encuentran dentro de la cuenca Acari y 2 en
cuencas vecinas.
De las 7 estaciones pluviomtricas utilizadas en la cuenca de estudio,
lamentablemente, 5 se encuentran actualmente paralizadas, contndose con
informacin, en el mejor de los casos, hasta el ao 1987; por lo que se dispone
nicamente con 02 estaciones que en la actualidad se encuentran en funcionamiento,
ubicadas en la cuenca de Acari (Lucanas y Puquio), estas 02 estaciones fueron
utilizadas para la completacin y extensin de datos faltantes de las otras 07
estaciones.(los registros se muestran en el cuadro 15 )
LONGITUD DE REGISTRO DE LAS ESTACIONES EN ESTUDIO (1965-2002).

6.3

ANALISIS DE CONSISTENCIA

La no-homogeneidad e inconsistencia en secuencias hidrolgicas representa uno de los


aspectos ms importantes del estudio en la hidrologa, puesto que si stos no son
identificados y eliminados, un error significativo puede introducirse en todos los anlisis
futuros obteniendo resultados altamente sesgados.
Inconsistencia es sinnimo de error sistemtico y se presenta como saltos y tendencias,
y no-homogeneidad es definido como los cambios de los datos vrgenes con el tiempo.
En general, los datos medidos incluyen dos tipos de errores: (a) Errores aleatorios o
accidentales y (b) Errores sistemticos; los errores aleatorios se presentan a causa de
la inexactitud en las mediciones y observaciones. Teniendo entre las ms comunes:
lecturas poco conscientes, aparato ligeramente estropeado y mal colocado, errores de
trascripcin de clculo, copia, impresin e interpretacin. Los errores sistemticos son
los de mayor importancia, ya que los datos pueden ser incrementados reducidos
sistemticamente; los errores sistemticos pueden ser a la vez naturales, artificiales u
ocasionados por la intervencin de la mano del hombre, los mismos que ocurren como
saltos y como tendencias.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Desde un punto de vista prctico son de mayor inters los errores sistemticos
ocasionados por la intervencin de la mano del hombre y en ellos se concentra el
anlisis de consistencia.
Antes de evaluar la consistencia de la informacin pluviomtrica, se realiz la
completacin de los datos mensuales faltantes, utilizando para ello, la informacin de
los aos con registros completos (es decir, aquellas que tengan durante los doce
meses) an stas no sean consecutivas, obtenindose de esta manera la precipitacin
promedio multi-anual a nivel mensual y anual, luego se procedi a hallar el factor
adimensional (k) para cada mes del ao, con la siguiente ecuacin:

Ki

xi
X

Donde:
xi = Precipitacin promedio multi-anual del mes i
X = Precipitacin promedio multi-anual a nivel anual.
Con este factor K se procedi a hallar la precipitacin de los meses faltantes. En los
anexos se presenta la informacin debidamente completada de las 7 estaciones.
Puesto que se dispone de series mltiples de la informacin pluviomtrica en la cuenca
de estudio, se procedi a realizar el anlisis de doble masa para la identificacin de
saltos.
6.3.1 ANALISIS GRAFICO.

Las estaciones pluviomtricas de mayor importancia en la cuenca de estudio son,


Pampahuasi, Pampamarca, Lucanas y Puquio, puesto que se encuentran ubicadas en
la parte alta de la Cuenca, zona de mayor precipitacin, por lo que se analizar en
estas estaciones la variacin temporal de la precipitacin.
Puede notarse que las 04 estaciones tienen similar variacin temporal de la
precipitacin mensual, adems, aos hmedos y aos secos tambin coincidentes,
salvo algunos puntos que presumiblemente podra tratarse de un salto.

6.3.2 ANALISIS DOBLE MASA.

El anlisis de doble masa, es una herramienta muy conocida y utilizada en la deteccin


de inconsistencias en los datos hidrolgicos mltiples (cuando se disponen de dos o
ms series de datos) en lo que respecta a errores que pueden haberse producido
durante la obtencin de los mismos, pero no para realizar una correccin a partir de la
curva de doble masa.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Los posibles errores se pueden detectar por el quiebre o quiebres que presenta la recta
de doble masa; considerndose un registro de datos con menos errores sistemticos,
en la medida que presenta un menor nmero de puntos de quiebre.
Un quiebre de la recta de doble masa o un cambio de pendiente, puede o no ser
significativo, ya que si dicho cambio est dentro de los limites de confianza de la
variacin de la recta para un nivel de probabilidades dado (tal es el caso de las
estaciones en estudio), entonces el salto no es significativo, el mismo que se
comprobar mediante un anlisis estadstico.
Para el anlisis de doble masa de las estaciones, observando los grficos, se
seleccion la estacin Lucanas como estacin base, puesto que presenta mayor
regularidad, vale decir tiene menor nmero de puntos de quiebre, por tanto se
considera como la ms confiable.
Luego, la estacin seleccionada como la ms confiable se plote en el eje de las
abscisas y en las ordenadas cada una de las dems estaciones, obtenindose as
tantas rectas como nmeros de series se tengan menos uno. En estos grficos se
definen el o los quiebres que pueden ser significativos para su posterior anlisis
estadstico.
Una vez identificado el o los periodos con informacin dudosa, se procede a evaluar y
cuantificar el salto, tratndolos a cada uno de los registros como series simples
independientes y de tiempo de cambio conocido. (Grafica 14 del anexo II)
6.3.3

ANALISIS ESTADISTICO DE SALTOS Y TENDENCIAS.

En los cuadros 21 al 30 del anexo II se presenta el anlisis y tratamiento estadstico


completo de las 07 estaciones utilizadas en el estudio de la cuenca Iruro, Callcac y
Cceroracra incluido el anlisis de saltos y tendencias, as como las respectivas
correcciones.
La estacin Pampamarca, observando el grfico de precipitacin anual, no se aprecia
salto en la serie histrica, sin embargo revisando la serie estacional en el anlisis de
salto, se puede observar algunos datos puntuales con posible salto o error sistemtico,
por lo que se procedi a analizar estadsticamente los periodos de 1966 a 1974 como
primer periodo y segundo periodo de 1981 a 1996, asumindose estos como aos
hmedos, encontrndose que presenta inconsistencia en la media y desviacin
estndar, por lo que el primer periodo fue corregido asumiendo la informacin ms
reciente como la ms confiable. La serie corregida por salto no presenta tendencia.
Al realizar el anlisis de salto de la serie histrica en la estacin Pampahuasi, se
observa el histograma anual de la precipitacin en el que no se observa salto alguno,
sin embargo revisando la serie estacional en el anlisis de salto se aprecia un salto el
ao 1967, ya que todas las estaciones cercanas registran valores altos este ao, no se
procedi a corregir este salto por ser solo en la media. La serie histrica, adem,
presenta una tendencia decreciente, esta tendencia es de esperarse ya que se cuenta
con una serie muy corta y esta pasa de aos hmedos a aos secos, por lo tanto se
procedi a corregir por tendencia.
Observando el histograma de precipitacin anual (Fig. 28 de anexo II). Se puede notar
los datos corregidos.
La serie histrica de la estacin Lucanas, de acuerdo al anlisis del histograma
estacional, presenta un posible salto el ao 1985, el cual es descartado con el anlisis
estadstico.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

La serie histrica de la estacin Puquio, de acuerdo al anlisis del histograma


estacional y al anlisis estadstico, se encuentra libre de saltos y tendencias.
La serie histrica de la estacin pluviomtrica Paucacorral, presenta un posible salto el
ao 1967, sin embargo ste no se procedi a corregir, ya que las dems estaciones
vecinas tambin registran valores altos el mismo ao. La serie est libre de tendencia.
6.4

COMPLETACIN Y EXTENSIN
PLUVIOMETRA.

DE

LA

INFORMACIN

Como se indic anteriormente, 05 de las 07 estaciones utilizadas en el estudio


hidrolgico de la cuenca Iruro, se encuentran paralizadas en el mejor de los casos
desde el ao 1987, por lo que se utiliz la informacin histrica de las 02 estaciones,
que actualmente se encuentran en funcionamiento, (Lucanas y Puquio, ubicadas dentro
de la cuenca Acar), para la completacin y extensin de la serie histrica.
Para realizar la completacin y extensin de datos, se utiliz los modelos de regresin
lineal simple y mltiple mediante una correlacin espacial que se muestran en los
anexos (CUADRO N 31).
Inicialmente, se procedi a la completacin de los datos faltantes de la estacin
considerada como completa, Lucanas, utilizando el factor mensual adimensional (k).
Luego, la completacin y extensin de las diferentes estaciones pluviomtricas fue
realizada por regresin lineal mltiple con las estaciones de Lucanas, los datos
corregidos y extendidos se presentan en el los cuadros 32 al 38 del anexo II. Y el
resumen de estas estaciones se visualiza en el grfico 31 del anexo II.

6.5

ANALISIS PLUVIOMETRICO DE LAS CUENCAS.

6.5.1 PRECIPITACIN AREAL MEDIA DE LA CUENCA.


Determinar la precipitacin areal promedio de una cuenca, a partir de los registros
histricos, es de suma importancia para cuantificar la disponibilidad hdrica de la
cuenca. En el presente estudio se determin la precipitacin areal promedio de las
cuencas, tanto anual como mensual, mediante dos mtodos: El mtodo de Thiessen y
el mtodo de las Isoyetas.
Mtodo de Thiessen:
El mtodo de Thiessen establece que en cualquier punto de la cuenca la lluvia es igual
a la que se registra en el pluvimetro ms cercano; por lo que la precipitacin registrada
en un pluvimetro dado se aplica hasta la mitad de la distancia a la siguiente estacin
pluviomtrica en cualquier direccin. Los pesos relativos de cada pluvimetro se
determinan de las correspondientes reas de aplicacin en una red de polgonos de
Thiessen, cuyas fronteras estn formadas por los bisectores perpendiculares a las
lneas que unen pluvimetros adyacentes; luego la precipitacin promedio para la
cuenca sobre el rea es

Pprom

GOBIERNO REGIONAL DE AYACUCHO

Aj Pj
A

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Donde:
J es el nmero de pluvimetros que se utilizan en el anlisis, A es el rea de la cuenca
que se asigna a cada uno de ellos y Pj es la lluvia registrada en el pluvimetro j-simo.
El mtodo de Thiessen generalmente es ms exacto que el mtodo de la media
aritmtica, pero no tiene en cuenta en forma directa las influencias de la orografa en la
lluvia. En planos se muestra los polgonos de Thiessen para el clculo de la
precipitacin promedio y en el cuadro N 41 (anexo II) se muestran los clculos de la
precipitacin areal promedio de las cuencas.
Mtodo de la Isoyetas:
La influencia orogrfica es superada de algn modo mediante la construccin de
Isoyetas, utilizando profundidades que se observan en los pluvimetros e interpolando
entre pluvimetros adyacentes. Una vez construido el mapa de Isoyetas, se mide el
rea Aj entre cada par de Isoyetas en la cuenca y se multiplica por el promedio Pj de las
profundidades de lluvia de las dos Isoyetas adyacentes para calcular la precipitacin
promedio sobre el rea mediante la Ec. Anterior.
En los planos se muestra las Isoyetas a nivel anual y mensual utilizadas en el clculo
de la precipitacin areal promedio de las cuencas y en el cuadro N 42 (anexo II) se
muestra los clculos de la precipitacin areal promedio.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 16
METODO DE LAS ISOYETAS PARA LA CUENCA RIO IRURO
RANGO DE
ISOYETAS

ALTURA MEDIA
(mm)

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

PESOS

P.PARCIAL

510 - 530
530 - 550
550 -570
570 - 590
590 - 610
610- 620

520.0
540.0
560.0
580.0
600.0
615.0

2338.8
3661.4
3448.6
4396.9
4130.4
576.7
18552.9

12161954.8
19771634.6
19312429.8
25502268.2
24782392.4
3546465.9
1.051E+08

0.126
0.197
0.186
0.237
0.223
0.031
1.000

65.55
106.57
104.09
137.46
133.58
19.12
566.4

Sumatoria

Precipitacion areal de la cuenca: 566.4 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO CALLACC


ESTACION

ALTURA MEDIA
(mm)

560 - 570
570 - 590
590 - 610
610 - 630

565.0
580.0
610.0
620.0
Sumatoria

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

PESOS

P.PARCIAL

426.8
811.4
356.9
228.7
1823.8

2411610.7
4706241.3
2176868.4
1418067.8
10712788.1

0.234
0.445
0.196
0.125
1.000

132.23
258.04
119.36
77.75
587.4

Precipitacion areal de la cuenca: 587.4 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO CCERORACCRA


ESTACION

ALTURA MEDIA
(mm)

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

650 - 670
670 - 680

660.0
675.0

774.5
82.1

5111568.6
553983.0

856.6

5665551.6

Sumatoria

PESOS

P.PARCIAL

0.904
0.096
1.000

596.76
64.68
661.4

Precipitacion areal de la cuenca: 661.4 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO AZULJAJA


ESTACION

ALTURA MEDIA
(mm)

560 - 570
570 - 590
590 - 610
610 - 630
630 - 650

565.0
580.0
600.0
620.0
640.0
Sumatoria

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

PESOS

P.PARCIAL

229.8
958.8
567.5
697.5
641.2
3094.8

1298607.5
5560811.8
3404886.9
4324574.1
4103639.1
18692519.4

0.074
0.310
0.183
0.225
0.207
1.000

41.96
179.683
110.020
139.737
132.598
604.0

Precipitacion areal de la cuenca: 604.0 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO JACHJALLA


ESTACION

ALTURA MEDIA
(mm)

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

550 - 570
570 - 580

610.0
575.0

1278.5
85.4

7798641.9
490921.4

1363.8

8289563.3

Sumatoria

PESOS

P.PARCIAL

0.937
0.063
1.000

571.81
36.00
607.8

Precipitacion areal de la cuenca: 607.8 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO DESCOMULGADO


ESTACION

ALTURA MEDIA
(mm)

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

520 - 530
530 - 550
550 - 560

525.0
540.0
555.0

138.3
1513.8
735.3

726187.9
8174616.1
4080649.4

2387.4

12981453.4

Sumatoria

PESOS

P.PARCIAL

0.058
0.634
0.308
1.000

30.42
342.41
170.93
543.8

Precipitacion areal de la cuenca: 543.8 mm

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

7. ANALISIS Y TRATAMIENTO DE LA INFORMACION HIDROMETRICA


Dentro de La Cuenca del Ro Iruro, No existen estaciones hidrometeorolgicas ni
hidromtricas. Sin embargo, recurrimos a cuencas vecinas:
7.1 REGISTRO HISTORICO
La cuenca del Ro Acari, no cuenta con una seccin de control convenientemente
acondicionada para medir el caudal que discurre por su cauce; la estimacin del mismo
se efecta en la hipottica estacin de aforos Palpachacra, aclarndose que en dicha
estacin no se cuenta con el equipo ms elemental de medicin, realizndose sta en
forma rustica y/o simplemente por observacin visual.
La estacin se ubica en las coordenadas geogrficas 7417' de longitud Oeste y 1433'
de latitud Sur y a una elevacin sobre el nivel del mar de 3200 msnm, esta estacin
est ubicada en el rio San Jos teniendo un registro de 8 aos y es la nica estacin
que cuenta con esta informacin, lo que utilizaremos esta informacin para generar
caudales en las subcuencas en estudio (Iruro, Callcac, Cceroracra, Azuljaja, Jachjalla,
Descomulgado y Acari).
8. DETERMINACIN DE LA DISPONIBILIDAD DE AGUA
La estimacin de la disponibilidad de agua en la cuenca, se realiz por medio de
modelos matemticos. El uso de los modelos matemticos en hidrologa es muy amplio,
tanto as que, prcticamente en cada especialidad hidrolgica, se han desarrollado
modelos matemticos para la solucin de problemas generales y especficos. En los
ltimos aos las tcnicas de simulacin hidrolgica han tenido una amplia difusin,
algunos modelos son de aplicacin especfica, mientras que otros son de aplicacin
ms general.
Existen asimismo una amplia variedad de formulaciones matemticas adoptadas por
diferentes modelos para describir los diversos componentes de los procesos de
precipitacin-escorrenta, pudiendo diferir stas, no slo en trminos conceptuales sino
tambin en nivel de complejidad, Planificadores o diseadores, quienes requieren
informacin hidrolgica, tendrn que elegir entre una amplia variedad de modelos
disponibles.
Dado que no existe un modelo universal, apropiado para la solucin de todos los
problemas hidrolgicos, la opcin de realizar uno que satisfaga los problemas de la
hidrologa aplicada en cualquier caso, se hace muy difcil.
La transformacin de la Precipitacin en Escorrenta, se ha realizado aplicando el
mtodo de Generacin de Caudales Mensuales en la Sierra Peruana Lutz Scholz,
desarrollado por el Programa Nacional de Pequeas y Medianas Irrigaciones Plan
Meris II en 1980, cuyo clculo est basado la modelacin matemtica del ciclo hdrico.
En el anexo IV se presenta los clculos de la disponibilidad de agua de la subcuenca
Iruro, Callcac, Cceroracra, Azuljaja, Jachjalla, Descomulgado y Acari respectivamente,
en el cuadro N 75a, 76a, 77a, 78a, 79a, 80a y 81a, se muestra un resumen de los
caudales generados para las cuencas en estudio, desarrollado con el modelo
determinstico-estocstico de Lutz Scholz, explicado en el siguiente acpite.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

La bondad del modelo se puede apreciar al comparar los caudales generados con el
modelo con los caudales registrados en la estacin de control.
8.1 MODELO DETERMINISTICO-ESTOCASTICO DE LUTZ SCHOLZ
Este modelo hidrolgico es combinado por que cuenta con una estructura
determinstico para el clculo de los caudales mensuales para el ao promedio
(Balance Hdrico - Modelo determinstico) y una estructura estocstica para la
generacin de series extendidas de caudal (Proceso markoviano - Modelo Estocstico).
Fue desarrollado por el experto en hidrologa, Lutz Scholz para cuencas de la sierra
peruana, entre los aos 1979-1980, en el marco de Cooperacin Tcnica de la
Repblica de Alemania a travs del Plan Meris II.
Determinado el hecho de la ausencia de registros de caudal en la sierra peruana, el
modelo se desarroll tomando en consideracin parmetros fsicos y meteorolgicos de
las cuencas, que puedan ser obtenidos a travs de mediciones cartogrficas y de
campo. Los parmetros ms importantes del modelo son los coeficientes para la
determinacin de la Precipitacin Efectiva, dficit de escurrimiento, retencin y
agotamiento de las cuencas. Los procedimientos que se han seguido en la
implementacin del modelo son:
1. Clculo de los parmetros necesarios para la descripcin de los fenmenos de
escorrenta promedio.
2. Establecimiento de un conjunto de modelos parciales de los parmetros para el
clculo de caudales en cuencas sin informacin hidromtrica. En base a lo anterior se
realiza el clculo de los caudales necesarios.
3. Calibracin del modelo y generacin de caudales extendidos por un proceso
markoviano combinado de precipitacin efectiva del mes con el caudal del mes anterior.
Este modelo fue implementado con fines de pronosticar caudales a escala mensual,
teniendo una utilizacin inicial en estudios de proyectos de riego y posteriormente
extendindose el uso del mismo, a estudios hidrolgicos con prcticamente cualquier
finalidad (abastecimiento de agua, hidroelectricidad etc). Los resultados de la aplicacin
del modelo a las cuencas de la sierra peruana, han producido una correspondencia
satisfactoria respecto a los valores medidos. Este mtodo se aplicara para las
subcuencas de Iruro, Callcac, Cceroracra, Azuljaja, Jachjalla, Descomulgado y Acari
cuadros 74, 75, 76, 77, 78, 79, 80 y 81 del anexo IV.

8.1.1 ECUACIN DEL BALANCE HIDRICO


La ecuacin fundamental que describe el balance hdrico mensual en mm/mes es la
siguiente: [Fscher]
Qmi = Pi Di + Ci Ai

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Donde:
Qi

: Caudal mensual en mm/mes.

Pi

: Precipitacin total mensual sobre la cuenca en mm/mes

Di

: Dficit de escurrimiento en mm/mes

Ci

: Gasto de la retencin en la cuenca (Aporte)

Ai

: Abastecimiento de la retencin (Retencin).

Asumiendo que para perodos largos (en este caso 1 ao) el Gasto y Abastecimiento de
la retencin tienen el mismo valor, es decir G = A y que para el ao promedio, una parte
de la precipitacin retorna a la atmsfera por evaporacin; luego reemplazando (P-D)
por (C*P), y tomando en cuenta la transformacin de unidades (mm/mes a m3/s) la
ecuacin se convierte en:
Q = c'*C * P * AR
Que es la expresin bsica del mtodo racional, donde:
Q = Caudal (m3/s)
c1

= Coeficiente de conversin del tiempo (mes/s)

C = Coeficiente de escurrimiento
P = Precipitacin total mensual (mm/mes)
AR = rea de la cuenca (m2).

8.1.2 COEFICIENTE DE ESCURRIMIENTO

Se ha considerado el uso de la frmula propuesta por L. Turc:

D
P

donde:
C = Coeficiente de escurrimiento (mm/ao)
P = Precipitacin Total anual (mm/ao)
D = Dficit de escurrimiento (mm/ao)
Para la determinacin de D se utiliza la expresin:

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

D
0.9

P2
L2

1/ 2

Donde:
L = Coeficiente de Temperatura
T = Temperatura media anual (C)
L = 300 + 25(T) + 0.05(T)3
Dado que no se ha podido obtener una ecuacin genera! del coeficiente de escorrenta
para toda la sierra, se ha desarrollado la frmula siguiente, que es vlida para la regin
sur:

C
D

3.16E12( P

0.571

)( EP

3.686

); r

0.96

1380 0.872( P ) 1.032( EP ); r

0.96

Donde;
C =

Coeficiente de escurrimiento

D =

Dficit de escurrimiento (mm/ao)

P =

Precipitacin total anual (mm/ao)

EP=

Evapotranspiracin anual segn Hargreaves (mm/ao)

r =

Coeficiente de correlacin

La evapotranspiracin potencial, se ha determinado por METODO DE THORNTHWAIT

T
ETP 16 * (10 * ) a
I
ETP f * ETP '
ETP :

Evapotranspiracin potencial mensual (mm), por mes


de 30 das y 12 horas de duracin

ETP

Evapotranspiracin potencial mensual corregida (mm)

Temperatura media mensual (C)

ndice trmico anual

ndice trmico mensual

Exponente que varia con el ndice anual de calor de la


localidad

Factor de correccin

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

METODO DE SERRUTO

ETP

ETP

0.003 * ( RS ) 2.5

0.16 * (T ) 0.88

: Evapotranspiracin potencial

RS
:Radiacin solar extraterrestre, expresada en
equivalentes de evaporacin
T

:Temperatura media mensual

Los resultados se muestran en los anexos (cuadro N 70 anexo IV)

8.1.3 PRECIPITACIN EFECTIVA

Para el clculo de la Precipitacin Efectiva, se supone que los caudales promedios


observados en la cuenca pertenecen a un estado de equilibrio entre gasto y
abastecimiento de la retencin. La precipitacin efectiva se calcul para el coeficiente
de escurrimiento promedio, de tal forma que la relacin entre precipitacin efectiva y
precipitacin total resulta igual al coeficiente de escorrenta.
A fin de facilitar el clculo de la precipitacin efectiva se ha determinado el polinomio de
quinto grado:

PE

a0

a1 P

a2 P 2

a3 P 3

a4 P 4

a5 P 5

Donde:
PE = Precipitacin efectiva (mm/mes)
P = Precipitacin total mensual (mm/mes)
ai = Coeficiente del polinomio
Se muestra los valores lmite de la precipitacin efectiva y el cuadro 7.3 muestra los tres
juegos de coeficientes para, ai que permiten alcanzar por interpolacin.
Lmite superior para la Precipitacin Efectiva.
Curva I : PE = P- 120.6 para P > 177.8 mm/mes
Curva II : PE = P-86.4 para P> 152.4 mm/mes
Curva III : PE = P -59.7 para P> 127.0 mm /mes

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Cuadro siguiente: Coeficientes para el Clculo de la Precipitacin Efectiva

Valor del Coeficiente


Descripcin
Curva I

Curva II

Curva III

ao

-0.01800

-0.02130

-0.0280

a1

-0.01850

0.13580

0.2756

a2

0.001105 -0.002296

0.004103

a3

-1.20E05

4.35E-05

5.53E-05

a4

1.44E-07

-8.90E-08

1.24E-07

a5

-2.85E10

-8.79E-11

-1.42E09

De esta forma es posible llegar a la relacin entre la precipitacin efectiva y


precipitacin total:

Q
P

12
i 1

PE i
P

donde:
C = Coeficiente de escurrimiento
Q = Caudal anual
P = Precipitacin Total anual
12
i 1

PE i
= Suma de la precipitacin efectiva mensual
P

8.1.4 RETENCIN DE LA CUENCA


Bajo la suposicin de que para un ao promedio exista un equilibrio entre el gasto y el
abastecimiento de la reserva de la cuenca y adems que el caudal total sea igual a la
precipitacin efectiva anual, la contribucin de la reserva hdrica al caudal se puede
calcular segn las frmulas:

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Ri CM i
CM i

Pi

PE i

Gi

Ai

Donde:
CMi = Caudal mensual

(mm/mes)

PEi = Precipitacin Efectiva Mensual (mm/mes)


Ri = Retencin de la cuenca

(mm/mes)

Gi = Gasto de la retencin

(mm/mes)

A = Abastecimiento de la retencin

(mm/mes)

R = Gi para valores mayores que cero

(mm/mes)

Ri = Ai para valores menores que cero

(mm/mes)

Sumando los valores de G o A respectivamente, se halla la retencin total de la cuenca


para el ao promedio, que para el caso de las cuencas de la sierra vara de 43 a 188
(mm/ao).

8.1.5 RELACIN ENTRE DESCARGAS Y RETENCIN

Durante la estacin seca, el gasto de la retencin alimenta los ros, constituyendo el


caudal o descarga bsica. La reserva o retencin de la cuenca se agota al final de la
estacin seca; durante esta estacin la descarga se puede calcular en base a la
ecuacin:

Qt

Q0 e

at

Donde:

Qt

: Descarga en el tiempo t.

Q0

: Descarga inicial.

: Coeficiente de agotamiento.

: Tiempo.

Al principio de la estacin lluviosa, el proceso de agotamiento de la reserva termina,


comenzando a su vez el abastecimiento de los almacenes hdricos. Este proceso est
descrito por un dficit entre la precipitacin efectiva y el caudal real. En base a los
hidrogramas se ha determinado que el abastecimiento es ms fuerte al principio de la
estacin lluviosa continuando de forma progresiva pero menos pronunciada, hasta el
final de dicha estacin.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

8.1.6 COEFICIENTE DE AGOTAMIENTO


Mediante la frmula anterior se puede calcular el coeficiente de agotamiento "a", en
base a datos hidromtricos. Este coeficiente no es constante durante toda la estacin
seca, ya que va disminuyendo gradualmente.
Con fines prcticos se puede despreciar la variacin del coeficiente "a" durante la
estacin seca empleando un valor promedio.
El coeficiente de agotamiento de la cuenca tiene una dependencia logartmica del rea
de la cuenca.

f ( Ln A)

El anlisis de las observaciones disponibles muestran, adems, cierta influencia del


clima, de la geologa y de la cobertura vegetal. Se ha desarrollado una ecuacin
emprica para la sierra peruana:

3.1249x1067 A

0.144

EP

19.336

3.369

1.429

0.86

Donde:

: Coeficiente de agotamiento por da.

: rea de la cuenca en Km2.

EP

: Evapotranspiracin potencial anual en mm/ao.

: duracin de la temporada seca en das.

: Retencin total de la cuenca en mm/ao.

En principio, es posible determinar el coeficiente de agotamiento real mediante aforos


sucesivos en el ro durante la estacin seca; sin embargo cuando no sea posible ello,
se puede recurrir a las ecuaciones desarrolladas para la determinacin del coeficiente
"a" para cuatro clases de cuencas:

Cuencas con agotamiento muy rpido, debido a temperaturas elevadas (>10C)


y retencin que va de reducida (50mm/ao) a mediana (80 mm/ao).

0.00252 Ln A 0.034

Cuencas con agotamiento rpido, cuya retencin vara entre 50 y 80 mm/ao y


vegetacin poco desarrollada (puna).

0.00252 Ln A 0.030

Cuencas con agotamiento mediano, cuya retencin es alrededor de 80 mm/ao


y vegetacin mezclada (pastos, bosques y terrenos cultivados).

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

0.00252 Ln A 0.026

Cuencas con agotamiento


vegetacin mezclada.

reducido

por alta

retencin (>100mm/ao) y

0.00252 Ln A 0.023

Donde:
a

= coeficiente d agotamiento por da

AR

= rea de la cuenca (km2)

EP

= evapotranspiracin potencia! anual (mm/ao)

= duracin de la temporada seca (das)

= retencin total de la cuenca (mm/ao)

8.1.7 ALMACENAMIENTO HIDRICO

Tres tipos de almacenes hdricos naturales que inciden en la retencin de la cuenca son
considerados:

Acuferos

Lagunas y pantanos

Nevados

La determinacin de la lmina "L" que almacena cada tipo de estos almacenes est
dado por:
Acuferos
Siendo:

LA

750 I

3.15

(mm / ao)

LA = lmina especfica de acuferos


I

= pendiente de desage : / <= 15 %

Lagunas y Pantanos
LL=500 (mm/ao).

Siendo:
LL = Lmina especfica de lagunas y pantanos
Nevados
LN = 500 (mm/ao)
Siendo:
LN = lmina especfica de nevados

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Las respectivas extensiones o reas son determinadas de los mapas o aerofotografas.


Los almacenamientos de corto plazo no son considerados para este caso, estando los
mismos incluidos en las ecuaciones de la precipitacin efectiva.

8.1.8 ABASTECIMIENTO DE LA RETENCIN


El abastecimiento durante la estacin lluviosa es uniforme para cuencas ubicadas en la
misma regin climtica. En la regin del Cuzco el abastecimiento comienza en el mes
de noviembre con 5%, alcanzando hasta enero el valor del 80 % del volumen final. Las
precipitaciones altas del mes de febrero completan el 20% restante, y las
precipitaciones efectivas del mes de marzo escurren directamente sin contribuir a la
retencin. Los coeficientes mensuales expresados en porcentaje del almacenamiento
total anual se muestran en el cuadro siguiente:
Almacenamiento hdrico durante la poca de lluvias - (valores ai %)

Mes

Cuzco Huancavelica

Junn

Cajamarca

Ene

40.0

30.0

30.0

20.0

Feb

20.0

20.0

30.0

25.0

Mar

5.0

5.0

35.0

Oct

10.0

10.0

25.0

Nov

5.0

- 5.0

Dic

35.0

35.0

25.0

Total

100.0

100.0

100.0

100.0

Abr
May
Jun
Jul
Ago
Sep

La lmina de agua Ai que entra en la reserva de la cuenca se muestra en forma de


dficit mensual de la Precipitacin Efectiva PEi. Se calcula mediante la ecuacin:

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Ai

ai

R
100

Siendo:
Ai= abastecimiento mensual dficit de la precipitacin efectiva (mm/mes)
ai= coeficiente de abastecimiento (%)
R = retencin de la cuenca (mm/ao)

8.1.9 DETERMINACIN DEL CAUDAL MENSUAL PARA EL AO PROMEDIO

Est basado en la ecuacin fundamental que describe el balance hdrico mensual a


partir de los componentes descritos anteriormente:

CM i

PE i

Gi

Ai

Donde:
CM

- Caudal del mes i

(mm/mes)

PE

Precipitacin efectiva del mes i (mm/mes)

Gi

Gasto de la retencin del mes i (mm/mes)

Ai

abastecimiento del mes i

(mm/mes)

8.2 INGRESO DE DATOS.

Los datos de ingreso son la Precipitacin Areal, los porcentajes mensuales de


almacenamiento del acufero (retencin), los aportes del acufero (aporte) y los
Caudales de comparacin.
Los caudales aforados de la estacin Palcachacra, las retenciones y aportes sern
obtenidos por calibracin en la cuenca del ro Iruro (ubicacin de la estacin
Palcachacra).
8.3 CALIBRACION DEL MODELO
Consiste en el ajuste de los parmetros del modelo durante un perodo fijado, por
comparacin entre valores simulados y los caudales reales medidos en estaciones de
aforo. Es la comprobacin es la capacidad descriptiva del modelo.
Consideracin la estacin de aforo ms cercana (Estacin Palpachacra), se ha visto
conveniente realizar la calibracin en este punto. Dentro de la cuenca que encierra la
estacin 720 Km2.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Tomando en cuenta la extensin de los registros de las estaciones citadas


(Pampamarca, Pampahuasi, Lucanas), la calibracin del modelo se ha realizado para el
perodo comn, que vienen a ser los aos: 1965 y 2002, aos con informacin completa
de parmetros. Es decir se modelar y balancear las precipitaciones en estas
estaciones.
Luego de realizar los mejores ajustes, dentro de la etapa de calibracin del modelo, se
han obtenido coeficientes de escurrimiento que oscila entre 0.3 y 0.6, as mismo, se ha
obtenido una retencin anual de la cuenca en el orden de 50,500 m3/Km2, los cuales
estn distribuidos en los siguientes porcentajes: 65% en el mes de Enero, 15% en el
mes de Febrero, 5 % en el mes de Marzo, 10% en el mes de Octubre y 5 % en el mes
de Diciembre.
Los resultados de la Calibracin del modelo, se muestra en la figura N 44 (anexo IV).
8.4 SIMULACION
Una vez realizada la calibracin, podemos realizar la simulacin de caudales en el
punto de inters, utilizando los valores de los parmetros ajustados previamente.
La simulacin, para nuestro caso fue en el punto de almacenamiento de las aguas del
Ro Iruro, el cual se ubica a una cota de 4,000 msnm y encierra un rea de 185.53 Km2.
Como resultados de La Simulacin, se obtienen los caudales medios mensuales, para
el perodo 1965 2002, las que se muestran en el cuadro N75b (anexo IV).
8.5 GENERACIN DE CAUDALES MENSUALES PARA PERODOS EXTENDIDOS
A fin de generar una serie sinttica de caudales para perodos extendidos, se ha
implementado un modelo estocstico que consiste en una combinacin de un proceso
markoviano de primer orden, segn la ecuacin siguiente, con una variable de impulso,
que en este caso es la precipitacin efectiva en la ecuacin siguiente.

Qt i
Q

f (Qt 1 )
g ( PE t )

Con la finalidad de aumentar el rango de valores generados y obtener una ptima


aproximacin a la realidad, se utiliza adems una variable aleatoria.

z(S ) (1 r 2 )

La ecuacin integral para la generacin de caudales mensuales es:

Qt

B1 B2(Qt 1 )

GOBIERNO REGIONAL DE AYACUCHO

B3( PEt )

z(S ) 1 r 2

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Donde:
Qt

= Caudal del mes t

Qt-1

= Caudal del mes anterior

PEt

= Precipitacin efectiva del mes

B1

= Factor constante o caudal bsico.

Se calcula los parmetros B1, B2, B3, r y S sobre la base de los resultados del modelo
para el ao promedio por un clculo de regresin lineal con Qt como valor dependiente
y Qt-1 y PEt como valores independientes. Para el clculo se recomienda el uso de
software comercial (hojas electrnicas) o de uso especfico (programas elaborados
tales como el SIH).
El proceso de generacin requiere de un valor inicial, el cual puede ser obtenido en una
de las siguientes formas:
- Empezar el clculo en el mes para el cual se dispone de un aforo.
- Tomar como valor inicial el caudal promedio de cualquier mes.
- Empezar con un caudal cero, calcular un ao y tomar el ltimo valor como valor Qo
sin considerar estos valores en el clculo de los parmetros estadsticos del perodo
generado.
Los valores generados de gasto de las subcuencas en estudio se presentan en los
cuadros 75d, 76d , 77d, 78d, 79d y 80d del anexo IV.
Con los datos generados podemos obtener el caudal de diseo al 75% de las
Quebradas en estudio las cuales se muestran en las Fig. 45, 46, 47, 48 y 49 del anexo
IV.
8.6 RESTRICCIONES DEL MODELO
El modelo presenta ciertas restricciones de uso o aplicacin tales como:

El uso de los modelos parciales, nicamente dentro del rango de calibracin


establecido.

Su uso es nicamente para el clculo de caudales mensuales promedio.

Los registros generados en el perodo de secas presentan una mayor confiabilidad


que los valores generados para !a poca lluviosa.
La aplicacin del modelo se restringe a las cuencas en las que se ha calibrado
parmetros (sierra peruana: Cusco, Huancavelica, Junn, Cajamarca)

sus

Es importante tener en cuenta las mencionadas restricciones a fin de garantizar una


buena performance del modelo.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

8.7 INVENTARIO DE LAS FUENTES DE AGUA EXISTENTES EN LA CUENA ACARI


8.7.1 FUENTES DE AGUA SUPERFICIALES
La identificacin de las distintas fuentes hdricas superficiales en la cuenca del ro Acar,
se ha desarrollado en funcin a las visitas de campo hechas en diferentes
oportunidades, en las cuales se han hecho inventarios y en algunos casos aforos.
Las fuentes de agua identificadas en la cuenca del ro Acar, son:
-

Ros.

Quebradas.

Lagunas.

Bofedales.

Para una mejor identificacin, la cuenca del ro Acar ha sido dividida en 12 subcuencas
(Mapa Hidrogrfico y Subcuencas), las cuales mencionamos a continuacin:
-

Subcuenca 01: Iruro Chacarangra

Subcuenca 02: Iruro

Subcuenca 03: Pallpo

Subcuenca 04: San Jos

Subcuenca 05: Yaurihuiri

Subcuenca 06: Pucaccocha

Subcuenca 07: San Pedro

Subcuenca 08: Geronta

Subcuenca 09

Subcuenca 10: Acar parte alta

Subcuenca 11: Acar (Saisa)

Subcuenca 12: Acar parte baja

A cada una de estas subcuencas le hemos identificado los principales ros, quebradas
y lagunas, los cuales son citados a continuacin:
1. SUBCUENCA 01: IRURO - CHACARANGRA
* Ros y Quebradas:
Ro Iruro
Ro Totorayoc
Ro Intoncca

Quebrada Jasacancha Huaijo

Ro Huancaccocha
Ro Murullama

* Lagunas:
Rangraccocha, Angostura, Taccraccocha,
Tinqueccocha, Chaqueccocha, Huancaccocha.

GOBIERNO REGIONAL DE AYACUCHO

Iscalaccraccocha,

Ccencco,

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

2. SUBCUENCA 02: IRURO


* Ros y Quebradas:
Ro Iruro

Quebrada Croapucro

Ro Yanama/Ccillo

Quebrada ao Huaijo

Quebrada Sora

Quebrada Punojasa

Ro Ccechacancha
Ro Callcacc

Quebrada Cceroracra

Quebrada Chico

Quebrada Azuljaja

* Lagunas:
Intoncca, Tocto, Ccocha, Mapaccocha.

3. SUBCUENCA 03: PALLPO


* Ros y Quebradas:
Ro Pallpo

Quebrada Patacocho

Quebrada Uchcurumi

Quebrada Jalaorjo

Ro Laclaja

Quebrada Jejacha

Quebrada Chilhua
Ro Puchungo
-

Quebrada Nuiscuchayoc

Ro Pallcahuasi/Montejenhua
-

Quebrada Ccaccoscra

Quebrada Chaquihuayjo

Quebrada Pinhuallahuaijo

Quebrada Chiptahuaijo

Quebrada Paljahuasi

Quebrada Chaquilla

Ro Chontay

Quebrada Asubrichayoc

Quebrada Samanachayoc

* Lagunas:
Jochahuasi.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

4. SUBCUENCA 04: SAN JOS


* Ros y Quebradas:
Ro San Jos

Quebrada Jasanga

Quebrada Talcuyoc

Quebrada Queuara

Quebrada Sao

Quebrada Jeausora

Quebrada Hullcapampa

Quebrada Chaquihuayjo

Ro Descomulgado
Ro Jachjalla
Ro Iruro

Quebrada Jontaj

Ro Palljoru

Ro Collopampa
-

Quebrada Tambochayoc

Quebrada Malpaso

Quebrada Quirahuachayoc

Quebrada Pachpucha

Quebrada Paccha

Ro Natimpallja
-

Quebrada Uchpasora

Ro Llancapampa
Ro Piscopampa
Ro Ototo

* Lagunas:
Llamaiso, Antacocha, Padre Pacocha, Yanacocha, Tornacocha, Tinquijocha.

5. SUBCUENCA 05: YAURIHUIRI


* Ros y Quebradas:
Ro Jeuamoyo

Quebrada Yuchuccha

Quebrada Sallayoc

Quebrada Riajaja

Ro Torrumi

Ro Yaurihuiri
-

Quebrada Jejaa

Quebrada Cochalloc

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

* Lagunas:
Yaurihuiri, Orconccocha, Condorcocha.

6. SUBCUENCA 06: PUCACCOCHA


* Ros y Quebradas:
Ro Chilques

Quebrada Quinchipato

Quebrada Quisqui

Quebrada Jotopuquio

Quebrada Malibrayocc

Quebrada Angasilla

Quebrada Puca Pirulo

Ro Ccollpa

* Lagunas:
Pucaccocha, Islaccocha, Apiaccocha, Uchcuccocha, Yanaqsora, Cocullajocha.

7. SUBCUENCA 07: SAN PEDRO


* Ros y Quebradas:
Ro San Pedro

Quebrada Colesnioc

Quebrada Pucaorjo

Quebrada Rupuna Huaycco

Quebrada Amaruyocc Ccata

Quebrada Aasmachay

Ro Jollpamayo

Quebrada Chichina

Ro Jechca

Quebrada Chayacha

Ro Collpamayo

Quebrada Saihua

Ro Yanamayo

Quebrada Capaso

Ro Viscac

* Lagunas:
Asnaccocha.

8. SUBCUENCA 08: GERONTA


* Ros y Quebradas:

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


Ro Chilques

Quebrada Chuua (Chacya)

Quebrada Huachamachay

Quebrada Agrospuquio

Ro Geronta

Quebrada Pumahuasi

Ro Senegayoc

Quebrada Huayhua

Quebrada Antisayoc

Ro Jachangay

Quebrada Sayhuapata

Quebrada Cuchimachay

Quebrada Cachimachay

Quebrada Toromachay

Ro Cojon

Quebrada ahuinpuquio

Quebrada Maraynioj

* Lagunas:
Chaquijocha, Toricocha, Wisacocha, Chaqui, Pia, Artezaccocha.

9. SUBCUENCA 09
Ro Acar

Quebrada Tuncuchi

10. SUBCUENCA 10: ACAR PARTE ALTA


Ro Acar

Quebrada Cuco

Quebrada Yaritayoc

Quebrada Caa Plantada

Quebrada Carrizal

Quebrada Mollejata

Quebrada Curusca

Quebrada Aujasi

Quebrada Uyurumi

Quebrada Jesjehuayo

Quebrada Huajchasulca

Quebrada Salla

Quebrada Huancachata

Quebrada Ayllucucho

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Quebrada Higosnioc

Quebrada Jeljea

Quebrada Chupas

Quebrada Duraznyoc

Quebrada Matevilay

Quebrada Misquiyacuhuayjo

Quebrada Llutupayana

Quebrada Paujalle

Quebrada Maya Maya

Quebrada aupallacta

Quebrada Chacyahuasi

Quebrada Calvario

Quebrada Saucillo

Quebrada Tingo

Quebrada Andasjaja

Quebrada Suyo

Quebrada Jatunjolla

Quebrada Jajahuasi

11. SUBCUENCA 11: ACAR (SAISA)


Ro Acar

Quebrada Huajuma

Quebrada Cuesta Botitano

Quebrada Chaupi Aguada

Quebrada Llamachayoc

Quebrada Andaraylla

Quebrada Mollechayoc

Quebrada Azulorjo

Quebrada Paisae

Quebrada Saya

Quebrada Sarica

Quebrada Chillicayo

Quebrada Jejara

Quebrada Paijoto

Quebrada Colquejanocha

Quebrada Acachina

Quebrada Sulurayoc

Quebrada Jajachaja

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Quebrada Antallja

Quebrada Alljallaque

Quebrada Japasuyoc

Quebrada Luchca Aguada

12. SUBCUENCA 12: ACAR PARTE BAJA


Ro Acar

Quebrada El Toro

Quebrada Pedregosa

Quebrada Los Caracoles

Quebrada El Puente

Quebrada Cuesta del Molino

Quebrada Lucasi

Quebrada Alalo

Quebrada Tres Cruces

Quebrada Pallayhuarmi

Quebrada Colapampa

Quebrada Amato

Quebrada Santa Rosa

Quebrada Brasil

Quebrada Despensa

Quebrada Machaynioc

Quebrada Canchete

Quebrada Bajada de la Cuesta

Quebrada Pampa Redonda

Quebrada Mal Paso

Quebrada Matara

Quebrada Cuchimachay

Quebrada Boyachayoj

Quebrada Callacaso

Quebrada Angano

Quebrada Yanaorjo

Quebrada Yuracyacu

En el listado anterior no se citan las quebradas y lagunas sin nombre, las cuales si
se han tomado en cuenta en la realizacin del cuadro N 01, en el cual se presenta
el consolidado del inventario de fuentes de agua superficial por sub unidades
hidrogrficas, segn nmero total de cada tipo de fuente.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


Cuadro N a
Inventario de Recursos Hdricos Superficiales de la Cuenca del Ro Acar
CUENCA

SUBCUENCA

ROS

QUEBRADAS

LAGUNAS

BOFEDALES

TOTAL

PORCENTAJE

SC-01

17

35

5.1

SC-02

22

13

41

5.9

SC-03

49

59

8.6

SC-04

10

46

12

69

10.0

SC-05

12

20

2.9

SC-06

30

21

53

7.7

SC-07

45

58

8.4

SC-08

20

17

43

6.2

SC-09

0.7

SC-10

87

89

12.9

SC-11

74

75

10.9

SC-12

142

143

20.7

TOTAL

44

538

96

12

690

100.0

PORCENTAJE

6.4

78.0

13.9

1.7

100.0

ACAR

En lo que respecta a la distribucin espacial, segn el inventario realizado, en la


cuenca del ro Acar, existen en total 690 fuentes del recurso hdrico superficial,
distribuidas en ros, quebradas, lagunas y bofedales. La distribucin de las fuentes
hdricas a nivel de sub cuencas es la siguiente:
-

SC-01: Iruro Chacarangra; presenta 35 fuentes de agua y representa el


5.1 % del total de la cuenca del ro Acar.

SC-02: Iruro; presenta 41 fuentes de agua y representa el 5.9 %.

SC-03: Pallpo; presenta 59 fuentes de agua y representa el 8.6 % del total.

SC-04: San Jos; presenta 69 fuentes de agua y representa el 10.0 % del


total.

SC-05: Yaurihuiri; presenta 20 fuentes de agua y representa el 2.9 %.

SC-06: Pucaccocha; presenta 53 fuentes de agua y representa el 7.7 % del


total.

SC-07: San Pedro; presenta 58 fuentes de agua y representa el 8.4 %.

SC-08: Geronta; presenta 43 fuentes de agua y representa el 6.2 % del


total.

SC-09: presenta 5 fuentes de agua y representa el 0.7 % del total.

SC-10: Acar Parte Alta; presenta 89 fuentes de agua y representa el 12.9%


del total de la cuenca.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

SC-11: Acar (Saisa); presenta 75 fuentes de agua y representa el 10.9 %.

SC-12: Acar Parte Baja; presenta 143 fuentes de agua y representa el 20.7
% del total de la cuenca.

En la Figura N a y Figura N b, se aprecia la distribucin del nmero total de


fuentes de agua superficial en la cuenca del ro Acar.
Figura N b

Fuente: Elaboracin propia

Figura N b

Fuente: Elaboracin propia

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

a.

RIOS

El inventario de ros en la cuenca del ro Acar se ha realizado considerando el


concepto de que un ro es un cauce natural con agua durante el ao hidrolgico,
los otros cauces endorreicos tienen la denominacin de quebradas, que son una
parte importante del sistema de drenaje de la cuenca durante la poca de
precipitaciones pluviales.
En la siguiente, se muestra la distribucin de ros por sub cuencas, de la cuenca
del ro Acar.
Figura N c

Fuente: Elaboracin propia

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N 01
Ro Iruro

Foto N 02
Ro Iruro- Cerco Perimtrico ubicado en el rea de embalse

b.

QUEBRADAS

Los cauces de la mayora de quebradas existentes son cauces de drenaje de


carcter endorreico. Segn el inventario realizado existen 538 quebradas en la
cuenca del ro Acar.
En la Figura N d, se muestra la distribucin de quebradas por sub cuencas del la
cuenca del ro Acar.
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N 03
Quebrada Cceroracra

Figura N d

Fuente: Elaboracin propia

c.

LAGUNAS

La cuenca alta del ro Acar presenta, como la mayora de casos, depresiones de


terreno en las que se han formado almacenamientos de agua o lagunas, que se
ubican entre las altitudes 3 500 y 4 600 msnm. Se ha inventariado un total 96
lagunas naturales. La totalidad de estos almacenamientos de agua permanente
en su mayora en estado natural, representando un potencial hdrico para futuras
demandas de la cuenca.
Como se aprecia en el Cuadro N a y Figura N e, las lagunas predominan en la
parte alta de la cuenca.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Figura N e

Fuente: Elaboracin propia

Foto N 04
Laguna Taccracocha

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N 05
Laguna Taccracocha: Estudio de Batimetra

d.

BOFEDALES

Los bofedales o humedales son fuentes hdricas de gran importancia. Se ubican


mayormente en la parte alta de la cuenca. Estos orgenes de agua mayormente
sirven para mantener la humedad de los terrenos aledaos a su ubicacin y
cumplen un vital recurso para actividad pecuaria. Adems estas fuentes son
bolsones de agua que sirven para la alimentacin de la descarga de caudal de la
cuenca en pocas de estiaje, generalmente.
Segn el inventario efectuado en la cuenca del ro Acar, existen 12 bofedales, y
se distribuyen de la siguiente forma:
-

06 Bofedales (50%) en la SC-01 subcuenca Iruro Chacarangra

02 Bofedales (16.7%) en la SC-02 subcuenca Iruro

02 Bofedales (16.7%) en la SC-03 subcuenca Pallpo

01 Bofedal (8.3%) en la SC-04 subcuenca San Jos

01 Bofedal (8.3%) en la SC-08 subcuenca Geronta

Las dems subcuencas no presentan bofedales, en la figura N f, se muestra la


distribucin de bofedales por sub cuencas del ro Acar.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Figura N f

Fuente: Elaboracin propia

Foto N 05
Bofedal

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

8.7.2 INFRAESTRUCTURA EXISTENTE


La identificacin de la Infraestructura Existente en la cuenca del ro Acar, ha sido
realizada en funcin a las visitas de campo hechas en diferentes oportunidades, en las
cuales se han hecho inventarios, y se han tomado coordenadas de las mismas.
Para definir la infraestructura existente y obtener una mejor identificacin, dividimos la
cuenca en la parte alta, correspondiente a Lucanas y San Juan de Lucanas, y parte
baja, correspondiente a Acar y Bella Unin.
1. Parte Alta: Lucanas y San Juan de Lucanas
En la parte alta vamos a encontrar infraestructura existente y adems vamos a tener la
infraestructura a incorporar por el proyecto, ambas sern nombradas a continuacin:
a. Canales
Tenemos 88 canales en la parte alta, de los cuales 87 son existentes y 01, que es el
Canal de Derivacin, es el que se va a incorporar.

Cuadro N b
Canales segn su Tipo
TIPO

Existe

CD

No

L1

33

L2

37

L3

12

L4

Fuente: Elaboracin propia

Cuadro N c
Canales de acuerdo a la Comisin de Regantes a la que Pertenecen
COMISIN

Pampahuasi

38

Ccontacc

14

Santa Cruz

Challhualla

17

Amoca

12

Chacacucho

11

Lucanas

17

San Juan

16

Fuente: Elaboracin propia

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N 07
Trazo de Canal de Derivacin

Foto N 08
Canal Existente

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

b. Bocatomas
El nmero de bocatomas es de, 25 existentes (rsticas) y 6 a incorporar, de estas 6
a incorporar una es la bocatoma principal que se encuentra en Pampahuasi.
Cuadro N d
Bocatomas a Incorporar
COMISIN

Pampahuasi

Ccontacc

Santa Cruz

Lucanas

Fuente: Elaboracin propia

Foto N 09
Bocatoma Principal Iruro (a Incorporar)

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N 10
Bocatoma de Incorporacin Azuljaja

Cuadro N e
Bocatomas Existentes por Comisin de Regantes
COMISIN

Pampahuasi

Ccontacc

Santa Cruz

Challhualla

Amoca

Chacacucho

Lucanas

San Juan

Fuente: Elaboracin propia

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N 11
Bocatoma Rstica Existente

2. Parte Baja: Acar y Bella Unin


En la parte baja, correspondiente a Acar y Bella Unin, tenemos toda la infraestructura
existente, la cual cuenta de canales (188), bocatomas (45), tomas (1095) y pozos (409),
los mismos que son nombrados a continuacin:
a. Canales
Presenta 188 canales, los cuales nombramos a continuacin de acuerdo a su tipo y
a la comisin a la que pertenecen:

Cuadro N f
Canales segn su Tipo
TIPO

CD

45

L1

51

L2

62

L3

11

DR

19

Fuente: Elaboracin propia

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N 12
Canal de Derivacin

Cuadro N g
Canales de acuerdo a la Comisin de Regantes a la que Pertenecen

COMISIN

Acar Bajo

38

Acar Pueblo

14

Chavia

Chocavento

17

El Molino

12

Huanca

11

Huarato Amato Visija

17

Lateral 01

16

Lateral 02

27

Lateral 03

24

Licsahuacchi

Fuente: Elaboracin propia

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N 13
Canal Secundario

b. Bocatomas
Se cuenta con 45 bocatomas, las cuales mencionamos de acuerdo a la comisin a
la que pertenecen en el siguiente cuadro:
Cuadro N h
Bocatomas de acuerdo a la Comisin de Regantes a la que Pertenecen

COMISIN

Acar Bajo

10

Acar Pueblo

Chavia

Chocavento

El Molino

Huanca

Huarato Amato Visija

12

Licsahuacchi

Malco

Fuente: Elaboracin propia

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N 13
Bocatoma Principal La Joya

c. Tomas
Existen 1095 tomas, las cuales mencionamos, en el siguiente cuadro:

Cuadro N i
Tomas Existentes por Comisin de Regantes
COMISIN

Acar Bajo

178

Acar Pueblo

87

Chavia

33

Chocavento

139

El Molino

94

Huarato Amato Visija

102

Lateral 01

100

Lateral 02

163

Lateral 03

170

Malco

29

Fuente: Elaboracin propia

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

d. Pozos
En la parte baja existen 409 pozos, de los cuales 102 son utilizados, 223 son
utilizables y 84 no utilizables.
Cuadro N j
Pozos Existentes por Junta de Usuarios
JUNTA DE USUARIO

Acar

178

Bella Unin

231

Fuente: Elaboracin propia

Cuadro N k
Pozos Existentes de Acuerdo a su Estado
ESTADO

Utilizados

102

Utilizables

223

No Utilizables

84

Fuente: Elaboracin propia

Cuadro N l : CAUDALES MEDIOS MENSUALES GENERADOS DE LA SUB CUENCA Y SUBCUENCA


Cuenca y
Subcuenca

Tributarios
Principales

CAUDALES GENERADOS DE LA CUENCA ACARI Y SUBCUENCAS


Enero
(m 3/s)

Febrero
(m 3/s)

Marzo
(m 3/s)

Abril
(m 3/s)

Mayo
(m 3/s)

Junio
(m 3/s)

Julio
(m 3/s)

Agosto
(m 3/s)

Setiem bre
(m 3/s)

Octubre
(m 3/s)

Noviem bre Diciem bre


(m 3/s)
(m 3/s)

TOTAL
(m3/s)

SC-1

Iruro-Vaso

5.53

6.38

7.10

0.78

0.18

0.11

0.12

0.15

0.32

0.20

0.30

0.94

1.84

SC-1,2

Iruro

15.87

11.19

15.68

1.87

0.63

0.32

0.27

0.31

0.53

0.66

0.78

1.89

4.17

SC-3

Pallpo

9.32

7.55

9.60

1.21

0.34

0.14

0.12

0.12

0.24

0.32

0.41

1.08

2.54

SC-1,2,3,4

San Jose

33.57

29.24

37.63

3.57

1.27

0.76

0.66

0.75

1.17

1.52

1.80

3.97

9.66

SC-5

Yaurihuiri

3.10

3.92

3.27

0.58

0.15

0.07

0.09

0.12

0.21

0.16

0.24

3.69

1.30

SC-6

Pucaccocha

5.13

8.18

7.21

1.11

0.26

0.14

0.16

0.19

0.34

0.27

0.32

0.99

2.03

SC-7

San Pedro

5.83

9.93

10.12

3.86

1.46

0.77

0.56

0.54

0.59

0.71

0.73

1.63

3.06

SC-8

Geronta

8.60

12.61

11.68

0.95

0.25

0.14

0.17

0.22

0.42

0.34

0.43

1.36

3.10

SC-5,6,7,8,9

Chilques

25.77

38.78

35.58

4.75

1.17

0.76

0.78

0.90

1.50

1.28

1.51

4.65

9.78

Acari

SC 1- SC 12

28.96

40.10

38.89

14.42

4.84

2.48

1.66

2.08

2.38

2.85

3.60

5.97

12.35

Fuente: Elaboracin propia

En el cuadro N l se muestra los caudales medios mensuales en m3/s generados para


toda la cuenca y sub cuencas del Rio Acari.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

9.0 ANLISIS DE MXIMAS AVENIDAS


9.1 METODOS ESTADISTICOS EN LA DETERMINACION DEL CAUDAL MAXIMO
Un sistema hidrolgico es afectado eventualmente por eventos extremos, tales como
tormentas severas, crecientes, etc. La magnitud de este evento extremo est
relacionada con su frecuencia de ocurrencia mediante una distribucin de
probabilidades.
Los mtodos estadsticos se apoyan en la existencia de series de datos de caudales en
el lugar de inters, las cuales son sometidas a un anlisis de frecuencias. Esto implica
efectuar el ajuste de varias distribuciones tericas a una determinada muestra, para
comparar y concluir cul de ellas se aproxima mejor a la distribucin emprica.
Las distribuciones tericas ms utilizadas para el anlisis de mximas avenidas son:
Gumbel I, Log Normal y Log Pearson III.
En la recopilacin de informacin de Precipitacin de 24 horas, se ha obtenido los
registros de las estaciones: Puquio, Andamarca, Aucar, Patahuasi y Putaccasa, lasque
se muestran en los Cuadros N 43 al 47. Las series citadas se han ordenado en
funcin al ao, de las cuales se ha seleccionado el valor mximo, para formar una nica
serie para su anlisis. En el Cuadro N 48, se muestra los descrito.
La serie de la columna del valor elegido, fue ajustada a las distribuciones tericas ms
empleadas en el anlisis de eventos extremos, como son: Normal, Log normal, Gumbel,
Gumbel modificado y Log Pearson Tipo III; cuyos clculos se adjuntan en el Anexo.
Como resultado de este clculo se obtienen las precipitaciones mximas probables
para diferentes perodos de retorno, los mismos que se muestran en el Cuadro N 60 y
Figura N 36 (anexo III)
A.

DISTRIBUCION GUMBEL

La funcin de distribucin doble exponencial de los valores mximos, llamada


comnmente la distribucin Gumbel tipo I, en su forma acumulativa es definido como:

F ( x) exp exp(

(x

))

En que F(x) es la distribucin de probabilidad de los valores mximos x, y son


parmetros de escala y de localizacin respectivamente.
Aplicando el mtodo de los momentos en la estimacin de los parmetros, se obtiene

0.45 ,

1.281

Donde es la media y es la desviacin estndar de la muestra.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

B.

DISTRIBUCIN LOG-NORMAL

Cuando los logaritmos, ln(x), de una variable x estn normalmente distribuidos,


entonces se dice que la distribucin de x sigue la distribucin de probabilidad lognormal, en que la funcin de probabilidad log-normal f(x) viene representado como:

f ( x)

1
x

1 ln x
(
2

exp

, Para x 0

Donde y son parmetros de escala y de localizacin respectivamente.


Aplicando el mtodo de los momentos en la estimacin de los parmetros, se obtiene

1
ln
2

ln

2
2

Donde es la media y es la desviacin estndar de la muestra.

C.

DISTRIBUCIN LOG-PEARSON III

La distribucin Log Pearson tipo 3 (LP3) es un modelo muy importante dentro de la


Hidrologa Estadstica, sobre todo, luego de las recomendaciones del Consejo de
Recursos Hidrulicos de los Estados Unidos (Water Resources Council - WRC), para
ajustar la distribucin Pearson tipo 3 (P3) a los logaritmos de las mximas avenidas.
Pues, la distribucin LP3, es una familia flexible de tres parmetros capaz de tomar
muchas formas diferentes, por consiguiente es ampliamente utilizado en el
modelamiento de series anuales de mximas avenidas de los datos no transformados.
Si el logaritmo de una variable x, y = ln(x); tiene la distribucin Pearson P3 (,,),
entonces X tiene la distribucin LP3(,,), con la siguiente funcin densidad

f ( x)

1
ln x
x ( )

exp

ln x

Donde las constantes ,, son parmetros de escala, forma, y posicin en el espacio


log, respectivamente, y (.) denota la funcin gamma. Para >0; x y y tienen la
asimetra positiva y x exp(). Para <0, y tiene la asimetra negativa pero x puede
tener asimetra positiva o negativa y x exp().

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Aplicando el mtodo de los momentos en la estimacin de los parmetros, se obtiene

y
2
y

2
y

1/ 2

Donde y, y, y y es la media, variancia, y coeficiente de asimetra de y = Inx


respectivamente. Cuadro N 53.
Para perodos de retorno menores iguales a 10 aos, las 5 distribuciones dan
resultados similares, mientras que para perodos de retorno mayores, la distribucin
Gumbel da valores mayores y la distribucin Normal valores menores.
Considerando el criterio de bondad de ajuste de Smirnok Kolmogorov, se tiene que la
distribucin Gumbel presenta mejor ajuste a la distribucin emprica (histrica), por lo
que se optar por tomar los estimados con esta distribucin.
Estimando un perodo de retorno de 1000 aos como escala de diseo, y con un criterio
prctico, se elige P24 T=1000 aos = 79.80 mm. Cuadro N 60.

9.2 SELECCIN DEL PERIODO DE RETORNO


En trminos ms generales, el anlisis de frecuencia da respuesta a la siguiente
interrogante: Dado A/aos de registro de datos para un cauce S y n aos de vida til de
una cierta estructura, cual es la probabilidad p de que la descarga Qt excedido por lo
menos una vez durante la vida de diseo. Por tanto es de gran importancia determinar
el periodo de retorno T. Para una presa consideramos T=1000aos y para el caso de
las quebradas un periodo de retorno de T = 50 aos.
Un evento extremo ocurre si una variable aleatoria X es mayor o igual que un cierto
nivel XT. El intervalo de recurrencia t es el tiempo entre ocurrencias
X XT .El periodo de retorno T de un evento X XT es el valor esperado de t,E(t).
La probabilidad de que una observacin X exceda el valor XT, se relaciona con el
periodo de retorno por la expresin.

P( X

X T ) 1 F ( x)

1
T

Los caudales de mximas avenidas para los periodos sealados se muestran en los
cuadros 64a, 65a, 66a, 67a, 68a y 69a del anexo III.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

A.- APROXIMACIN EMPRICA.


La aproximacin emprica, usualmente est relacionado a la experiencia acumulada a lo
largo del tiempo en la construccin de obras hidrulicas en el mundo, produciendo
tablas, mostradas en diferentes publicaciones, que dan un periodo de retorno, T en
aos, de acuerdo al tipo de estructura, sin embargo, estas tablas difieren
considerablemente unas de otras y adems el criterio de diseo mediante una regla
emprica implica un factor de seguridad, o riesgo de falla, totalmente arbitrario.
Una aproximacin emprica, usualmente selecciona el evento ms extremo de las
observaciones pasadas como el valor de diseo. La probabilidad de que un evento ms
extremo de los pasados N aos sea igualado o excedido una vez durante los prximos
n aos puede estimarse como:

P ( N , n)

B.- ANLISIS DE RIESGO.


Una estructura puede fallar si la magnitud del evento correspondiente al periodo de
retorno de diseo T es excedida durante la vida til de la estructura. Este riesgo
hidrolgico de falla puede calcularse utilizando la ecuacin:

R 1

1
T

Donde, R es la probabilidad de que un evento ocurra por lo menos una vez en n aos y
n es la vida til de la estructura.

10.0 ANLISIS DE CAPACIDAD DEL EMBALSE IRURO


La capacidad de almacenamiento del embalse Iruro, se estim a partir de los caudales
mensuales generados, mediante el modelo determinstico-estocstico de Lutz Scholz,
para la subcuenca Iruro y luego se extendi la serie histrica para 100 aos con el
programa SAMS para 50 estaciones.
Una vez determinado la capacidad de almacenamiento (promedio de datos generados),
se estima la capacidad de almacenamiento del embalse Iruro, para una probabilidad de
ser llenado del 75% y 95%. Estos clculos son presentados en el siguiente cuadro
resumen (Fig. 50 anexo IV).

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Fig. 50
CAPACIDAD DE EMBALSE VS PROBABILIDAD
140

VOLUMEN DE EMBALSE( MMC)

120
VOL.75% = 44.1 MMC
VOL.95% = 29.5 MMC
100

80

60

40

20

Series1
0
0.00

20.00

40.00

60.00

80.00

100.00

120.00

PROBABILIDAD

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

11.0 ESQUEMA DE SIMULACION

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

12.0 CONCLUSIONES Y RECOMENDACIONES


12.1 CONCLUSIONES
Los resultados del presente estudio muestran lo siguiente:
1) La oferta de agua de la cuenca colectora Iruro es de 1.84 m3/s, como promedio
anual, y tiene un caudal especfico de 9.92 It/s/km2; dicha cuenca colectora tiene
una capacidad de almacenamiento para una probabilidad de ser llenado del 75% de
44.12MMC y a una probabilidad de 95% es de 29.50MMC.
2) Segn la simulacin realizada, los caudales medios mensuales en el ro Iruro,
Callcac, Cceroracra, Azuljaja, Jachjalla, Descomulgado y Acari son:
CAUDALES GENERADOS (m3/s)
Estacin
Iruro
Callcac
Cceroracra
Azuljaja
Jachjalla
Descomulgado
Acari

Ene
5.53
0.7
0.28
1.19
0.48
1.1
28.99

Feb.
6.38
0.47
0.22
0.76
0.32
0.71
40.18

Mar
7.10
0.68
0.3
1.15
0.47
1.07
39.14

Abr.
0.78
0.07
0.07
0.11
0.06
0.1
14.31

May
0.18
0.02
0.02
0.04
0.02
0.03
4.84

Jun.
0.11
0.01
0.01
0.01
0.01
0.01
2.47

Jul.
0.12
0.01
0.01
0.01
0
0.01
1.91

Ago.
0.15
0.01
0
0.01
0.01
0.01
2.02

Sep.
0.32
0.02
0.01
0.03
0.01
0.03
2.28

Oct.
0.20
0.02
0.01
0.03
0.01
0.03
2.86

Nov.
0.30
0.03
0.01
0.04
0.02
0.04
3.36

Dic.
0.94
0.07
0.03
0.12
0.05
0.11
5.90

Prom
1.84
0.18
0.08
0.29
0.12
0.27
12.35

Todos los caudales de las quebradas son aprovechas hacia el canal de conduccin
principal.
3) Los caudales aprovechables a diferentes probabilidades son:
CAUDALES (Lt/s)
Qda
Q(75%)
Q(90%)
Q(95%)

Ccerora Azuljaja
cra
70
251
50
177
31
108

Callcac Jachjalla Descom


ulgado
151
104
234
106
73
165
65
45
101

Acari
6928
5378
4115

Iruro
1292
994
930

Los volmenes anuales ofertados por sub cuenca son:


Qda.
Q(75%)
Q(90%)
Q(95%)

VOLUMENES DISPONIBLES DE LAS SUB CUENCAS (MMC)


Cceroracra Azuljaja
Callcac
Jachjalla Descom.
IRURO
2.21
7.92
4.75
3.29
7.38
44.12
1.57
5.58
3.35
2.31
5.21
31.34
0.99
3.40
2.05
1.42
3.18
29.33

ACARI
220.41
158.04
144.06

4) Del anlisis de mximas avenidas (por Clark), para un perodo de retorno de hasta
1000 aos, como escala de diseo es:
MAXIMAS AVENIDAS (m3/s)
T (aos)

Cceroracra Azuljaja

50
100
1000

6.7
8.2

24
29.5

Callcac Jachjalla Descomulgado


14.3
17.7

7.7
12.1

18.6
22.8

Iruro
170.8
205.6
339.4

5) El resultado general de la batimetra realizada en la lagunas Taccracocha N1 y


Taccracocha N2; es como sigue:
Laguna Taccracocha N1: Volumen de regulacin de 3805,615 m3, (cotas 4,232.0m
hasta la 4,251.20 m)
Laguna Taccracocha N2: Volumen de regulacin de 337,267 m3 (cotas 4,232.5m
hasta la 4,239.1 m)
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

La profundidad mxima registrada en la zona del volumen muerto es de:


Laguna Taccracocha N1: 19.20m
Laguna Taccracocha N2: 6.60m
12.2

RECOMENDACIONES

1) Se verific que nicamente 02 de las 07 estaciones pluviomtricas ubicadas dentro


de la cuenca del Ro Acar, se encuentran operativas, y el resto se encuentran
paralizadas, se recomienda realizar las gestiones necesarias al
SENAMHI, para
poner en funcionamiento las estaciones inoperativas, as como incorporar algunas
estaciones pluviomtricas, principalmente en la cuenca colectora del embalse
Iruro.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

ANEXO I
- Informacin Meteorolgica Disponible

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 1
REGISTRO PLUVIOMETRICO MENSUAL
ESTACION : LUCANAS
CODIGO : 157206

AO

ENE

1965
65.6
1966
135.8
1967
56.2
1968
S/D
1969
24.0
1970
181.2
1971
80.7
1972
15.9
1973
115.3
1974
309.8
1975
152.4
1976
244.9
1977
21.7
1978
88.4
1979
135.2
1980
135.2
1981
136.9
1982
81.7
1983
49.5
1984
32.9
1985
27.7
1986
134.8
1987
162.4
1988
82.2
1989
198.3
1990
S/D
1991
50.8
1992
S/D
1993
159
1994
101.2
1995
37.1
1996
162.7
1997
111.1
1998
214.2
1999
121.4
2000
223.4
2001
136
2002
191.9
S/D : Sin Dato

DISTRITO
PROVINCIA
DEPARTAMENTO

: LUCANAS
: LUCANAS
: AYACUCHO

ALTITUD : 3400 msnm


LATITUD : 14 37'
LONGITUD : 73 14'

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

212.6
144
95.4
36.1
131
192.2
143.7
54
157.7
177.4
117.6
139.8
278
56.5
49.5
39.3
185.6
160.3
48.8
49.8
221.4
151.7
23.1
231.2
144.1
S/D
58.6
46.2
154.2
178.1
42.4
316.9
158.9
131.9
269.4
150.8
138.4
196.4

247.3
178
118
S/D
259
391.7
149.8
109.1
151.6
174.4
178.1
124.7
181.7
81.4
192.1
119.3
211.3
61.6
14.6
138.9
289.7
118.5
14.3
199
206.4
S/D
215
S/D
151.5
95.6
210.8
128.4
66.6
101.2
118.7
124.5
234
183.5

42.5
85.4
77.2
S/D
144.6
S/D
69.6
0.8
96.7
63.7
9.2
3
3
30.3
4.5
0
50.8
33
4.1
16.8
142.0
21.5
0
36.1
4.6
S/D
16
S/D
52.7
44.4
22.6
181.6
55.7
24.6
64.7
16.3
97.3
34.8

43
6.5
30.4
0
0
0
0
0.5
6.2
0
28.4
2
2
0
1.5
0
0
0
0
4
0
0
0
0
4
S/D
0
0
8.9
0
0
18.7
8.8
0
7.3
8.1
5.6
29

15.2
0
0
0
0
0
0
0
4.3
0
20.1
0
0
0
0
0.1
0
0
0
22.9
0
0
0
0
6
S/D
0
0
0
0
0
0
0
4.7
0.1
0.6
0.3
2.9

13.7
0
0
0
0
0
0
0
0
0
2.1
2.3
2.3
0
3.8
9.3
0
0
0
0
0
0
0
0
2.6
S/D
0
0
0.1
0
0
0
5
0
3.4
0
0.5
S/D

32.0
0
0
0
0
0
0
0
0
S/D
0
0
0
5.2
11.4
3
S/D
0
0
4.4
0
0
0
0
1.2
S/D
0
0
0
0
0
21.4
S/D
0
0.1
14.4
4.1
12.7

14.0
2.1
0
0
20.4
20.4
0
1.0
S/D
0
0.5
S/D
S/D
2.1
0
10.8
0
19.9
0
6.2
0
0
0
0
0
S/D
0
0
0
0
13
20.2
S/D
1.6
9.1
13.8
19
1.6

7.0
S/D
0
12.2
27.5
27.5
S/D
0.9
0
S/D
11.5
11.4
11.4
15.6
28.1
42.6
15.5
43.9
10.2
28.9
0
0
9.5
0
0
S/D
0
18.3
0
0
9.6
5
10.8
11.2
81.8
82.2
12.7
0.2

2.0
9.5
S/D
9.9
17
17
S/D
0.2
31.6
S/D
1.0
27.6
27.6
43.2
2.7
S/D
23.8
28.7
2
58.1
S/D
S/D
4.0
S/D
2.4
S/D
17.2
1.9
15.6
S/D
61
10.3
43.5
35.3
2.6
23.1
2.8
35.3

13.3
28.5
51.3
10.3
33.0
3.0
10.5
3.0
39.5
36.8
57.6
35.0
35.0
17.2
22.0
30.7
128.0
13.1
16.8
67.2
82.3
80.4
2.0
59.8
10.6
S/D
17.0
4.4
18.8
4.1
68.3
57.3
71.9
60.0
83.9
84.1
9.1
51.1

708.2
589.8
428.5
68.5
656.5
833.0
454.3
185.4
602.9
762.1
578.5
590.7
562.7
339.9
450.8
390.3
751.9
442.2
146.0
430.1
763.1
506.9
215.3
608.3
580.2

Promedio :

FUENTE: SENAMHI

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

374.6
70.8
560.8
423.4
464.8
922.5
532.3
584.7
762.5
741.3
659.8
739.4
526.6

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 2
REGISTRO PLUVIOMETRICO MENSUAL
ESTACION : PUQUIO
CODIGO : 157230

AO

ENE

1965
48.8
1966
42.9
1967
204.4
1968
115.6
1969
28.6
1970
189.8
1971
62
1972
156.4
1973
124.4
1974
105
1975
45.8
1976
160.4
1977
1.4
1978
69.4
1979
19.9
1980
45.8
1981
32.5
1982
78.9
1983
34.2
1984
S/D
1985
21.6
1986
133.1
1987
119.4
1988
132.5
1989
394.5
1990
33.8
1991
72.8
1992
5.9
1993
150.2
1994
160.2
1995
111.8
1996
84.6
1997
74.7
1998
191.8
1999
64.4
2000
187.2
2001
107.0
2002
98.3
2003
46.0
2004
57.0
2005
42.0
2006
87.3
S/D : Sin Dato

DISTRITO
PROVINCIA
DEPARTAMENTO

: PUQUIO
: LUCANAS
: AYACUCHO

ALTITUD : 3213 msnm


LATITUD : 14 42'
LONGITUD : 74 74.08'

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

129.2
53.9
374.4
57.1
81.6
69.4
95.4
191.6
104.4
64.8
61.1
152.8
174.9
28
70.7
8.1
106.7
54.4
131.3
S/D
134.7
158.8
82.1
83.1
252.8
15.4
29.8
74.0
135.0
198.0
84.3
176.4
108.6
115.3
229.1
129.2
145.6
142.2
71.5
89.4
74.6
167.4

53.2
47.7
147.1
120.6
146.5
67.6
152.8
167
138.8
31.6
77.9
69.6
68.4
53.2
124.3
82.4
78
32.2
205.6
S/D
318.3
145.4
22.4
51.1
S/D
50.3
107.4
61.2
146.3
104.4
132.0
78.0
94.1
86.6
84.0
140.9
136.1
132.5
80.8
94.9
45.7
122.5

8.5
5.5
59.4
1.8
39.3
7
36.4
7.6
58.2
17.4
2.8
4
0
14.1
0
0
32.5
18.5
29.8
S/D
52.6
22.8
11.4
29.8
7.2
3.8
21.4
12.8
46.7
12.8
12.8
48.0
12.8
1.3
17.5
16.5
43.7
33.4
12.5
58.7
22.0
13.3

0
0
35
0
0
10.8
4.8
0
0
0
7.8
6.1
0
0
0
0
0
0
6.8
S/D
6.8
0
6.1
24.4
4.4
17.2
0
0.6
2.5
11.6
0.6
0.6
0.6
0.0
1.5
7.2
0.0
3.8
12.4
0.0
0.0
0.0

0
0
0
0
0
0
0
3.8
5.8
1.4
0
0
0
0
0
0
0
0
0
S/D
0
0
3
0
0
10.6
0
0.4
0.4
9.3
0.4
0.4
0.4
10.3
0.0
0.0
0.0
5.5
0.0
0.0
0.0
1.3

0
0
5.7
0
0
0
0
3.8
0
0
0
0
0
0
0
7.1
0
0
0
S/D
0
0
2.5
1
0
0
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
13.8
0.0
14.6
0.0
0.0

0
0
0
0
0
0
0
0
1.6
19.4
0
0
0
0
0
0
17.5
0
0
S/D
0
S/D
4
0
0
0
0
0.7
2.4
0.7
0.7
1.5
7.0
0.0
0.0
4.0
0.0
2.8
0.0
6.9
1.4
4.2

4
0
7.6
0
5.2
18.6
0
21.8
35
5.4
2.4
12.1
19.9
0
0
20.5
0
0
7.9
S/D
0
0
0.5
6.1
0
12
0
0.8
0.8
0.8
1.5
2.6
16.1
0.0
0.0
0.0
0.6
5.2
0.0
14.3
13.9
0.0

4.4
26.6
S/D
34.5
S/D
3.8
2.2
24.6
S/D
S/D
3.6
S/D
S/D
S/D
13.4
18.0
0.0
0.0
2.9
S/D
0.4
0
3.3
6.8
9.6
2.4
11.6
2.2
17.4
2.2
2.2
2.2
5.6
0.0
16.8
12.6
5.7
7.6
1.2
0.0
3.6
0.0

S/D
23.2
S/D
44.7
12.8
1.8
1.6
S/D
4.6
4.2
S/D
S/D
3.4
S/D
S/D
S/D
15.6
24.1
4.7
S/D
S/D
2.8
7.4
13.3
S/D
S/D
4.4
2.4
12.8
2.4
40.0
4.8
6.1
33.4
0.6
4.6
5.4
37.5
S/D
5.2
S/D
16.0

S/D
29.5
27.4
50.9
56.4
24.6
44.2
80.8
22.8
3.0
36.9
22.5
15.4
S/D
S/D
3.4
76.1
S/D
65.1
S/D
85.3
43.1
4.7
31.3
S/D
89.7
S/D
16.9
83.4
43.3
58.3
16.9
90.2
79.8
22.2
77.8
5.1
23.1
45.8
70.6
87.7
51.0

248.1
229.3
861.0
425.2
370.4
393.4
399.4
657.4
495.6
252.2
238.3
427.5
283.4
164.7
228.3
185.3
358.9
208.1
488.3
0.0
619.7
506.0
266.8
379.4
668.5
235.2
247.4
178.0
597.8
545.7
444.5
416.0
416.2
518.5
436.1
580.0
449.2
505.7
270.2
411.6
290.9
463.0
389.6

Promedio :

FUENTE: SENAMHI

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 3
REGISTRO PLUVIOMETRICO MENSUAL
Estacin : PAUCACORRAL
Cdigo :157210/DRE-05
Altitud :
4060
AO
ENE
27.50
1965
55.50
1966
353.00
1967
215.90
1968
30.00
1969
465.80
1970
58.60
1971
202.50
1972
105.60
1973
196.10
1974
111.90
1975
133.60
1976
4.60
1977
S/D
1978
S/D
1979
89.70
1980
123.40
1981
135.70
1982
38.90
1983
122.20
1984
S/D
1985
212.10
1986
S/D
1987
137.30
1988
249.70
1989
S/D
1990
127.50
1991
S/D
1992
S/D
1993
201.80
1994
77.10
1995
52.30
1996
S/D : Sin Dato

FEB
144.30
68.40
663.80
78.30
128.80
52.00
145.10
137.10
75.00
140.70
133.60
214.00
174.90
S/D
S/D
38.60
252.70
155.00
70.20
165.50
132.00
324.90
S/D
185.40
224.20
S/D
73.80
S/D
S/D
206.20
23.30
107.60

Latitud
14 40' S
Longitud 74 6' W

MAR
76.20
161.10
230.60
193.90
138.60
115.30
174.40
404.80
73.80
268.30
232.70
172.50
68.30
S/D
S/D
134.00
40.80
106.80
57.50
109.60
422.80
362.20
S/D
S/D
268.80
70.80
203.40
S/D
S/D
264.50
87.60
42.10

ABR
8.40
0.00
140.60
0.00
49.70
6.80
45.60
27.20
36.60
62.30
8.50
7.50
0.00
S/D
S/D
0.00
58.60
27.30
22.70
0.00
54.30
4.80
S/D
42.60
72.20
0.00
23.50
S/D
11.80
25.20
0.00
66.40

Distrito
Provincia
Departamento
MAY
0.00
10.50
0.00
14.40
0.00
5.40
0.00
0.00
0.00
0.00
19.90
12.70
0.00
S/D
S/D
0.00
0.00
0.00
0.00
0.00
23.40
8.60
S/D
0.00
0.00
27.90
0.00
S/D
5.80
14.20
0.00
0.00

JUN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/D
S/D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/D
0.00
0.00
0.00
0.00
S/D
S/D
21.20
0.00
0.00

JUL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.40
0.00
0.00
0.00
0.00
0.00
S/D
S/D
17.20
0.00
0.00
0.00
5.70
0.00
0.00
S/D
0.00
0.00
0.00
0.00
S/D
S/D
0.00
0.00
0.00

PUQUIO
LUCANAS
AYACUCHO
AGO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.90
54.20
0.00
0.00
0.00
S/D
S/D
0.00
17.90
0.00
0.00
5.70
0.00
0.00
S/D
0.00
0.00
19.90
0.00
S/D
0.00
0.00
0.00
3.50

SEP
0.00
3.40
4.00
8.70
5.30
33.40
0.00
12.00
20.80
5.40
0.00
87.30
4.70
S/D
S/D
21.00
0.00
22.70
0.00
9.10
0.00
0.00
S/D
0.00
0.00
0.00
0.00
S/D
11.90
0.00
6.30
5.80

OCT
0.00
26.00
0.00
5.40
0.00
5.80
0.00
30.60
0.00
0.00
4.60
0.00
0.00
S/D
S/D
47.30
0.00
48.90
0.00
27.30
0.00
0.00
S/D
12.90
18.80
0.00
0.00
S/D
5.30
0.00
4.80
0.00

NOV
0.00
37.10
0.00
10.90
17.60
0.00
0.00
16.10
6.40
17.00
0.00
0.00
11.70
S/D
S/D
0.00
21.90
47.10
0.00
25.90
0.00
0.00
S/D
0.00
S/D
57.20
0.00
S/D
0.00
0.00
42.50
2.60

DIC
ANUAL
27.50
283.9
67.60
429.6
5.20
1397.2
30.20
557.7
43.00
413.0
5.80
690.3
69.90
493.6
77.90
911.6
31.90
357.0
14.30
758.3
60.20
571.4
9.40
637.0
11.40
275.6
S/D
0.0
S/D
0.0
22.50
370.3
143.20
658.5
12.90
556.4
42.20
231.5
36.60
507.6
92.30
724.8
139.20
1051.8
S/D
0.0
130.00
508.2
S/D
833.7
115.80
291.6
0.00
428.2
S/D
0.0
27.20
62.0
0.00
733.1
31.60
273.2
32.00
312.3
Promedio : 434.3

FUENTE: SENAMHI

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 4
REGISTRO PLUVIOMETRICO MENSUAL
Latitud
14 36' S
Longitud 74 0' W

Estacin : CCECCAA
Cdigo :157215/DRE-05
Altitud :
4100
AO
ENE
38.40
1965
S/D
1966
118.00
1967
49.40
1968
77.20
1969
275.20
1970
111.20
1971
242.00
1972
225.40
1973
363.00
1974
291.60
1975
533.30
1976
47.00
1977
151.50
1978
76.20
1979
151.20
1980
S/D : Sin Dato

FEB
200.20
110.30
501.10
21.70
166.30
148.60
200.30
232.80
166.90
264.10
361.80
627.40
409.70
56.10
147.20
54.20

MAR
77.80
91.40
543.90
19.20
260.90
106.50
211.40
252.70
159.00
130.80
289.30
770.30
165.80
93.20
196.00
S/D

ABR
7.10
12.20
68.30
9.80
33.30
36.90
94.10
29.10
75.90
191.10
47.40
137.70
7.10
47.20
5.10
6.80

Distrito
Provincia
Departamento
MAY
3.40
55.80
0.00
2.70
0.00
31.50
0.00
0.00
0.00
0.00
107.40
11.40
11.00
0.00
1.50
0.00

JUN
0.00
0.00
0.00
0.00
0.00
7.20
2.10
7.60
1.40
1.00
26.20
0.00
0.00
2.30
2.50
0.00

PUQUIO
LUCANAS
AYACUCHO

JUL
10.90
0.00
0.30
0.00
0.00
0.30
0.00
0.00
0.00
9.10
0.00
77.80
4.90
0.00
2.50
42.90

AGO
13.00
0.00
0.00
2.10
0.00
0.40
1.70
1.70
31.10
78.50
0.00
35.20
0.00
2.30
5.50
44.20

SEP
24.70
43.30
35.00
3.50
10.10
34.90
0.00
32.60
85.50
34.00
19.50
123.50
38.60
18.30
0.00
56.80

OCT
48.60
50.90
0.00
0.30
6.00
13.40
8.00
47.90
17.60
14.20
45.10
4.60
11.70
25.30
65.00
S/D

NOV
7.50
86.00
S/D
55.70
54.90
26.70
7.50
18.00
28.30
77.40
6.10
0.00
58.20
60.50
0.50
7.90

DIC
86.20
11.10
S/D
87.90
116.10
39.80
108.10
101.50
88.00
76.80
173.50
123.50
34.10
30.70
8.90
60.00
Promedio :

FUENTE: SENAMHI

CUADRO N 5
REGISTRO PLUVIOMETRICO MENSUAL
ESTACION : ANDAMARCA
CODIGO : -

AO
ENE
1965
24.40
1966
76.20
1967
211.30
1968
117.70
1969
36.00
1970
116.90
1971
84.10
1972
79.10
1973
72.60
1974
S/D
1975
121.00
1976
139.90
1977
14.50
1978
115.40
1979
26.10
1980
102.60
S/D : Sin Dato

DISTRITO
PROVINCIA
DEPARTAMENTO

: CARMEN SALCEDO
: LUCANAS
: AYACUCHO

ALTITUD : 3490 msnm


LATITUD : 14 23'
LONGITUD : 73 58'

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

165.60

64.60

5.70

S/D

S/D

S/D

10.00

47.50

25.80

3.50
27.70

90.80

177.10

10.20

43.00

S/D

2.40

S/D

4.80

47.00

153.00

168.50

46.00

6.00

S/D

18.50

11.30

22.20

9.90

2.40

64.10

165.30

4.70

19.90

24.20

S/D

13.30

4.30

14.50

50.40

66.00

80.30

4.50

4.00

S/D

S/D

5.00

21.30

S/D

42.90

73.00

81.10

78.80

11.60

S/D

S/D

S/D

31.20

13.50

33.80

115.80

145.40

60.80

1.10

1.00

S/D

S/D

4.50

10.80

1.20

185.10

207.80

16.40

8.40

1.60

S/D

3.00

13.00

34.70

3.80

95.10

S/D

23.50

S/D

S/D

S/D

S/D

S/D

16.80

18.20

S/D

S/D

S/D

S/D

S/D

S/D

12.10

14.70

3.70

29.00

98.80

132.70

3.00

35.20

S/D

S/D

S/D

8.60

13.40

3.90

164.00

102.00

24.20

19.00

S/D

13.00

29.20

80.40

S/D

1.00

203.10

79.60

19.90

1.20

S/D

S/D

S/D

13.40

14.00

47.60

25.30

62.30

16.50

0.00

S/D

S/D

9.20

10.80

11.00

25.70

76.00

141.90

7.10

0.00

1.20

3.00

4.50

5.10

20.80

6.60

35.90

149.90

36.50

0.00

2.90

30.10

2.70

33.40

45.70

1.20

DIC

ANUAL
410.0
40.20
519.4
14.60
663.7
94.90
573.3
85.60
345.6
62.30
502.2
102.60
527.3
33.80
586.7
88.50
314.7
41.10
100.6
109.30
525.9
34.10
606.8
20.90
414.2
31.80
308.0
55.40
347.7
33.50
474.4
Promedio : 451.3
62.90

FUENTE: SENAMHI

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

ANUAL
517.8
461.0
1266.6
252.3
724.8
721.4
744.4
965.9
879.1
1240.0
1367.9
2444.7
788.1
487.4
510.9
424.0
862.3

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 6
REGISTRO PLUVIOMETRICO MENSUAL
Estacin : PAMPAHUAS I
Cdigo :157205/DRE-05
Altitud :
3650
AO
ENE
72.60
1966
243.80
1967
428.70
1968
54.60
1969
197.10
1970
94.80
1971
193.10
1972
201.60
1973
256.00
1974
199.60
1975
256.10
1976
8.30
1977
103.50
1978
S/D
1979
112.00
1980
S/D : Sin Dato

FEB
95.50
438.00
66.90
151.90
87.20
149.10
154.30
156.90
98.00
101.70
179.40
144.00
47.70
59.70
36.00

Latitud
14 29' S
Longitud 74 15' W

MAR
121.90
354.00
185.20
230.80
115.80
120.80
299.30
176.00
71.80
144.50
162.10
294.80
51.50
148.40
140.00

ABR
17.20
63.20
19.80
108.70
36.00
54.90
19.90
102.90
70.00
0.00
0.00
0.00
45.20
2.00
0.00

Distrito
Provincia
Departamento
MAY
31.30
18.20
29.30
0.00
64.70
0.00
0.00
0.00
0.00
63.00
0.00
0.00
18.00
0.00
S/D

JUN
S/D
3.80
3.20
4.00
0.00
0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.20
0.00

JUL
S/D
1.20
0.00
3.60
1.00
0.00
3.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

LUCANAS
LUCANAS
AYACUCHO
AGO
S/D
7.60
3.10
0.00
2.00
1.40
0.00
0.00
0.00
0.00
1.50
0.00
0.00
0.00
0.00

SEP
13.70
S/D
16.20
8.40
30.80
0.00
28.50
25.10
0.00
0.00
7.70
34.00
0.00
0.00
0.00

OCT
67.40
28.80
42.20
2.10
23.30
12.00
37.20
0.00
0.00
27.30
0.00
3.00
21.30
6.50
5.00

NOV
52.40
0.30
53.00
72.10
18.00
1.00
24.20
30.30
26.00
3.20
0.00
30.50
40.80
0.00
0.00

DIC
ANUAL
36.30
508.3
19.50
1178.4
79.50
927.1
60.30
696.5
45.10
621.0
119.00
553.7
141.30
900.9
33.30
726.1
42.80
564.6
86.10
625.4
20.00
626.8
20.00
534.6
19.00
347.0
15.60
234.4
S/D
293.0
Promedio : 622.5

FUENTE: SENAMHI

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 7
REGISTRO PLUVIOMETRICO MENSUAL
Estacin : PAMPAMARCA
Cdigo :157207/DRE-05
Altitud :
3400
AO
ENE
82.20
1966
156.40
1967
147.10
1968
52.40
1969
102.50
1970
66.40
1971
199.10
1972
107.90
1973
434.70
1974
109.40
1975
125.50
1976
27.70
1977
146.60
1978
32.60
1979
62.90
1980
101.80
1981
94.60
1982
24.90
1983
94.60
1984
16.10
1985
151.20
1986
132.10
1987
165.60
1988
105.80
1989
67.40
1990
67.30
1991
66.20
1992
132.00
1993
131.90
1994
70.10
1995
69.80
1996
S/D : Sin Dato

FEB
74.20
159.30
136.70
118.10
92.20
164.70
155.70
100.50
104.10
110.80
137.60
144.20
14.30
20.40
50.50
148.50
64.40
54.10
252.00
165.00
196.80
34.90
71.50
174.00
14.70
63.70
83.00
41.60
153.10
61.00
152.80

Latitud
14 14' S
Longitud 74 12' W

MAR
59.60
135.10
238.70
124.80
90.80
108.30
166.20
116.10
68.00
161.50
62.10
81.30
58.80
82.80
111.00
44.20
25.20
51.90
137.50
34.10
71.60
23.30
28.40
89.70
43.20
98.40
8.50
66.20
85.50
88.90
102.80

ABR
12.50
29.00
18.90
11.20
38.70
14.00
32.80
22.40
44.00
1.60
4.80
19.60
32.70
8.10
9.70
74.00
40.90
23.60
91.10
85.20
37.90
30.60
69.30
52.10
4.20
12.40
2.50
50.50
26.00
32.70
44.60

Distrito
Provincia
Departamento
MAY
49.50
7.30
64.30
0.00
34.20
0.80
2.40
3.50
11.10
15.50
15.10
2.20
0.00
6.40
4.00
1.00
0.00
15.20
1.50
26.90
12.30
8.20
0.00
18.90
15.30
14.70
0.00
13.20
1.30
0.00
0.00

JUN
0.00
4.60
38.30
8.60
2.00
0.00
0.00
18.80
3.50
1.90
0.00
0.00
0.00
0.00
3.90
0.00
9.20
6.60
33.70
28.90
0.00
3.43
0.00
3.90
43.80
20.50
8.30
29.50
9.60
0.00
0.00

AUCARA
LUCANAS
AYACUCHO

JUL
0.00
10.50
2.60
2.80
3.40
0.00
0.70
5.80
5.00
0.00
17.40
21.40
0.00
4.80
20.10
0.00
0.00
0.00
0.70
1.10
17.30
2.90
0.00
1.30
0.00
0.00
0.00
1.20
3.50
0.00
0.00

AGO
0.00
20.40
15.90
3.50
0.00
1.50
1.40
18.30
40.50
0.00
18.40
0.00
6.80
4.70
7.50
55.30
7.30
6.80
31.80
1.60
8.60
13.00
0.00
12.90
8.60
2.30
16.00
16.60
0.00
5.40
15.20

SEP
5.00
33.50
S/D
3.10
20.50
1.30
42.90
69.00
16.40
15.70
70.10
25.50
6.50
4.10
14.00
13.70
22.60
63.50
6.70
25.90
21.00
0.00
13.60
4.00
0.00
12.70
0.00
4.70
15.70
15.30
8.50

OCT
28.80
28.00
102.60
13.60
9.90
11.50
91.00
10.50
0.00
11.60
0.00
9.80
10.50
26.40
58.70
14.00
35.00
34.50
26.20
88.00
0.00
23.10
30.20
17.90
26.60
7.90
23.70
31.60
1.90
11.60
4.10

NOV
50.30
10.60
1.00
24.00
20.20
1.20
21.30
48.40
14.90
2.80
10.70
36.70
29.20
13.20
4.90
31.30
39.60
7.40
63.60
17.70
0.00
17.90
0.60
2.50
62.70
19.70
32.00
36.30
10.10
20.60
22.30

DIC
ANUAL
55.70
417.8
34.40
629.1
38.50
804.6
43.20
405.3
64.60
479.0
108.50
478.2
82.10
795.6
36.00
557.2
57.10
799.3
63.20
494.0
47.10
508.8
28.30
396.7
33.90
339.3
31.80
235.3
34.10
381.3
93.90
577.7
20.40
359.2
47.30
335.8
55.50
794.9
27.50
518.0
46.60
563.3
23.80
313.2
70.60
449.8
2.10
485.1
96.50
383.0
37.00
356.6
24.60
264.8
124.60
548.0
83.50
522.1
54.40
360.0
60.10
480.2
Promedio : 484.9

FUENTE: SENAMHI

CUADRO N 8
REGISTRO DESCARGA MEDIA MENSUAL (M3/S)
Estacin :
Cdigo :
Altitud :

PALCACHACRA
203901/DRE-05
3200

AO
ENE
S/D
1967
8.86
1968
1.76
1969
24.43
1970
2.91
1971
22.01
1972
50.58
1973
S/D
1974
18.42
MEDIA
S/D : Sin Dato

FEB
S/D
3.70
9.97
24.06
S/D
36.26
52.84
43.28
28.35

Latitud
14 33.1' S
Longitud 74 17.1' W

MAR
S/D
19.22
20.57
16.60
S/D
50.17
85.68
40.36
38.77

ABR
S/D
4.57
6.12
4.87
6.91
13.03
32.80
13.89
11.74

Distrito
Provincia
Departamento
MAY
S/D
1.91
1.33
2.83
1.45
2.37
14.64
2.98
3.93

JUN
S/D
1.05
0.69
1.20
0.78
1.41
6.88
1.68
1.95

JUL
S/D
0.77
0.49
1.04
0.54
1.21
4.69
1.09
1.40

LUCANAS
LUCANAS
AYACUCHO
AGO
S/D
0.85
0.47
1.01
0.53
1.11
3.90
1.18
1.29

SEP
0.68
0.82
0.50
0.97
0.49
1.18
3.56
S/D
1.17

OCT
0.95
0.86
0.58
0.79
0.68
1.05
2.90
S/D
1.12

NOV
0.83
1.29
0.84
0.64
0.51
4.12
4.16
S/D
1.77

DIC
0.66
1.61
2.67
1.12
2.12
16.50
5.69
S/D
4.34

FUENTE: SENAMHI

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

ANUAL
3.1
45.5
46.0
79.6
16.9
150.4
268.3
104.4
114.3

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO 9
OBSERVATORIO CLIMATOLOGICO DE PUQUIO
DISTRITO : Puquio
PROVINCIA : Lucanas
DEPARTAM: Ayacucho

Aos
Prom.

LATITUD : 1441'
LONGITUD : 7407'
ALTITUD : 3214

11.2

11.2

11.2

10.8

CUENCA :
RIO :
FUENTE :

Temperatura Media (C)


M
J
J
A
10.9

10.2

10.1

10.6

Acari
Acari
SENAMHI

Prom.

11.3

11.1

10.8

11.2

10.9

OBSERVATORIO CLIMATOLOGICO DE PALCACHACRA


DISTRITO : Puquio
PROVINCIA : Lucanas
DEPARTAM: Ayacucho

Aos
Prom.

LATITUD : 1433'
LONGITUD : 7417'
ALTITUD : 3250

9.9

9.9

10.1

9.5

CUENCA :
RIO :
FUENTE :

Temperatura Media (C)


M
J
J
A
8.8

7.6

8.1

8.7

Acari
Acari
SENAMHI

Prom.

9.8

9.8

9.7

10.0

9.3

OBSERVATORIO CLIMATOLOGICO DE CECHAPAMPA


DISTRITO : San Pedro
PROVINCIA : Lucanas
DEPARTAM: Ayacucho

Aos
Prom.

LATITUD : 1451'
LONGITUD : 7401'
ALTITUD : 3900

7.9

8.1

8.2

7.7

CUENCA :
RIO :
FUENTE :

Temperatura Media (C)


M
J
J
A
7.3

5.8

6.0

6.2

Acari
Acari
SENAMHI

Prom.

7.4

7.4

7.9

8.0

7.3

FUENTE: SENAMHI

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

ANEXO II
- Tratamiento de la Informacin Hidrolgica.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 10
REGISTRO PLUVIOMETRICO CON INFORMACION MENSUAL COMPLETADA
ESTACION : LUCANAS
CODIGO : 157206

DISTRITO
PROVINCIA
DEPARTAMENTO

: LUCANAS
: LUCANAS
: AYACUCHO

ALTITUD : 3400 msnm


LATITUD : 14 37'
LONGITUD : 73 14'

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
MEDIA

65.6
135.8
56.2
119.4
24.0
181.2
80.7
15.9
115.3
309.8
152.4
244.9
21.7
88.4
135.2
135.2
136.9
81.7
49.5
32.9
27.7
134.8
162.4
82.2
198.3
119.4
50.8
119.4
159
101.2
37.1
162.7
111.1
214.2
121.4
223.4
136
191.9

212.6
144
95.4
36.1
131
192.2
143.7
54
157.7
177.4
117.6
139.8
278
56.5
49.5
39.3
185.6
160.3
48.8
49.8
221.4
151.7
23.1
231.2
144.1
137.4
58.6
46.2
154.2
178.1
42.4
316.9
158.9
131.9
269.4
150.8
138.4
196.4

247.3
178
118
158.3
259
391.7
149.8
109.1
151.6
174.4
178.1
124.7
181.7
81.4
192.1
119.3
211.3
61.6
14.6
138.9
289.7
118.5
14.3
199
206.4
158.3
215
158.3
151.5
95.6
210.8
128.4
66.6
101.2
118.7
124.5
234
183.5

42.5
85.4
77.2
45.6
144.6
45.6
69.6
0.8
96.7
63.7
9.2
3
3
30.3
4.5
0
50.8
33
4.1
16.8
142.0
21.5
0
36.1
4.6
45.6
16
45.6
52.7
44.4
22.6
181.6
55.7
24.6
64.7
16.3
97.3
34.8

43
6.5
30.4
0
0
0
0
0.5
6.2
0
28.4
2
2
0
1.5
0
0
0
0
4
0
0
0
0
4
5.8
0
0
8.9
0
0
18.7
8.8
0
7.3
8.1
5.6
29

15.2
0
0
0
0
0
0
0
4.3
0
20.1
0
0
0
0
0.1
0
0
0
22.9
0
0
0
0
6
2.1
0
0
0
0
0
0
0
4.7
0.1
0.6
0.3
2.9

13.7
0
0
0
0
0
0
0
0
0
2.1
2.3
2.3
0
3.8
9.3
0
0
0
0
0
0
0
0
2.6
1.3
0
0
0.1
0
0
0
5
0
3.4
0
0.5
1.3

32.0
0
0
0
0
0
0
0
0
3.2
0
0
0
5.2
11.4
3
3.2
0
0
4.4
0
0
0
0
1.2
3.2
0
0
0
0
0
21.4
3.2
0
0.1
14.4
4.1
12.7

14.0
2.1
0
0
20.4
20.4
0
1.0
5.3
0
0.5
5.3
5.3
2.1
0
10.8
0
19.9
0
6.2
0
0
0
0
0
5.3
0
0
0
0
13
20.2
5.3
1.6
9.1
13.8
19
1.6

7.0
15.8
0
12.2
27.5
27.5
15.8
0.9
0
15.8
11.5
11.4
11.4
15.6
28.1
42.6
15.5
43.9
10.2
28.9
0
0
9.5
0
0
15.8
0
18.3
0
0
9.6
5
10.8
11.2
81.8
82.2
12.7
0.2

2.0
9.5
19.2
9.9
17
17
19.2
0.2
31.6
19.2
1.0
27.6
27.6
43.2
2.7
19.2
23.8
28.7
2
58.1
19.2
19.2
4.0
19.2
2.4
19.2
17.2
1.9
15.6
19.2
61
10.3
43.5
35.3
2.6
23.1
2.8
35.3

13.3
28.5
51.3
10.3
33.0
3.0
10.5
3.0
39.5
36.8
57.6
35.0
35.0
17.2
22.0
30.7
128.0
13.1
16.8
67.2
82.3
80.4
2.0
59.8
10.6
38.3
17.0
4.4
18.8
4.1
68.3
57.3
71.9
60.0
83.9
84.1
9.1
51.1

119.4

137.4

158.3

45.6

5.8

2.1

1.3

3.2

5.3

15.8

19.2

38.3

708.2
605.6
447.7
391.8
656.5
878.6
489.3
185.4
608.2
800.3
578.5
596.0
568.0
339.9
450.8
409.5
755.1
442.2
146.0
430.1
782.3
526.1
215.3
627.5
580.2
551.7
374.6
394.1
560.8
442.6
464.8
922.5
540.8
584.7
762.5
741.3
659.8
740.7
551.6

FIG. 01

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 11
REGISTRO PLUVIOMETRICO CON INFORMACION MENSUAL COMPLETADA
ESTACION : PUQUIO
CODIGO : 157230

AO
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
MEDIA

DISTRITO
PROVINCIA
DEPARTAMENTO

: PUQUIO
: LUCANAS
: AYACUCHO

ALTITUD : 3213 msnm


LATITUD : 14 42'
LONGITUD : 74 74.08'

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

48.8
42.9
204.4
115.6
28.6
189.8
62
156.4
124.4
105
45.8
160.4
1.4
69.4
19.9
45.8
32.5
78.9
34.2
S/D
21.6
133.1
119.4
132.5
394.5
33.8
72.8
5.9
150.2
160.2
111.8
84.6
74.7
191.8
64.4
187.2
107.0
98.3
46.0
57.0
42.0
87.3

129.2
53.9
374.4
57.1
81.6
69.4
95.4
191.6
104.4
64.8
61.1
152.8
174.9
28
70.7
8.1
106.7
54.4
131.3
S/D
134.7
158.8
82.1
83.1
252.8
15.4
29.8
74.0
135.0
198.0
84.3
176.4
108.6
115.3
229.1
129.2
145.6
142.2
71.5
89.4
74.6
167.4

53.2
47.7
147.1
120.6
146.5
67.6
152.8
167
138.8
31.6
77.9
69.6
68.4
53.2
124.3
82.4
78
32.2
205.6
S/D
318.3
145.4
22.4
51.1
102.5
50.3
107.4
61.2
146.3
104.4
132.0
78.0
94.1
86.6
84.0
140.9
136.1
132.5
80.8
94.9
45.7
122.5

8.5
5.5
59.4
1.8
39.3
7
36.4
7.6
58.2
17.4
2.8
4
0
14.1
0
0
32.5
18.5
29.8
S/D
52.6
22.8
11.4
29.8
7.2
3.8
21.4
12.8
46.7
12.8
12.8
48.0
12.8
1.3
17.5
16.5
43.7
33.4
12.5
58.7
22.0
13.3

0
0
35
0
0
10.8
4.8
0
0
0
7.8
6.1
0
0
0
0
0
0
6.8
S/D
6.8
0
6.1
24.4
4.4
17.2
0
0.6
2.5
11.6
0.6
0.6
0.6
0.0
1.5
7.2
0.0
3.8
12.4
0.0
0.0
0.0

0
0
0
0
0
0
0
3.8
5.8
1.4
0
0
0
0
0
0
0
0
0
S/D
0
0
3
0
0
10.6
0
0.4
0.4
9.3
0.4
0.4
0.4
10.3
0.0
0.0
0.0
5.5
0.0
0.0
0.0
1.3

0
0
5.7
0
0
0
0
3.8
0
0
0
0
0
0
0
7.1
0
0
0
S/D
0
0
2.5
1
0
0
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
13.8
0.0
14.6
0.0
0.0

0
0
0
0
0
0
0
0
1.6
19.4
0
0
0
0
0
0
17.5
0
0
S/D
0
1.9
4
0
0
0
0
0.7
2.4
0.7
0.7
1.5
7.0
0.0
0.0
4.0
0.0
2.8
0.0
6.9
1.4
4.2

4
0
7.6
0
5.2
18.6
0
21.8
35
5.4
2.4
12.1
19.9
0
0
20.5
0
0
7.9
S/D
0
0
0.5
6.1
0
12
0
0.8
0.8
0.8
1.5
2.6
16.1
0.0
0.0
0.0
0.6
5.2
0.0
14.3
13.9
0.0

4.4
26.6
7.3
34.5
7.3
3.8
2.2
24.6
7.3
7.3
3.6
7.3
7.3
7.3
13.4
18.0
0.0
0.0
2.9
S/D
0.4
0
3.3
6.8
9.6
2.4
11.6
2.2
17.4
2.2
2.2
2.2
5.6
0.0
16.8
12.6
5.7
7.6
1.2
0.0
3.6
0.0

12.1
23.2
12.1
44.7
12.8
1.8
1.6
12.1
4.6
4.2
12.1
12.1
3.4
12.1
12.1
12.1
15.6
24.1
4.7
S/D
12.1
2.8
7.4
13.3
12.1
12.1
4.4
2.4
12.8
2.4
40.0
4.8
6.1
33.4
0.6
4.6
5.4
37.5
12.1
5.2
12.1
16.0

45.3
29.5
27.4
50.9
56.4
24.6
44.2
80.8
22.8
3.0
36.9
22.5
15.4
45.3
45.3
3.4
76.1
45.3
65.1
S/D
85.3
43.1
4.7
31.3
45.3
89.7
45.3
16.9
83.4
43.3
58.3
16.9
90.2
79.8
22.2
77.8
5.1
23.1
45.8
70.6
87.7
51.0

96.2

114.8

102.5

20.9

4.2

1.3

1.2

1.9

5.7

7.3

12.1

45.3

ANUAL
305.5
229.3
880.4
425.2
377.7
393.4
399.4
669.5
502.9
259.5
250.4
446.9
290.7
229.4
285.7
197.4
358.9
253.4
488.3
631.8
507.9
266.8
379.4
828.4
247.3
292.7
178.0
597.8
545.7
444.5
416.0
416.2
518.5
436.1
580.0
449.2
505.7
282.3
411.6
303.0
463.0
413.3

S/D : Sin Dato

FIG. 02

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 12
REGISTRO PLUVIOMETRICO CON INFORMACION MENSUAL COMPLETADA
Estacin : PAUCACORRAL
Cdigo 157210/DRE-05
:
Altitud :
4060
AO
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996

ENE
27.50
55.50
353.00
215.90
30.00
465.80
58.60
202.50
105.60
196.10
111.90
133.60
4.60
S/D
S/D
89.70
123.40
135.70
38.90
122.20
141.10
212.10
S/D
137.30
249.70
141.10
127.50
S/D
141.10
201.80
77.10
52.30

MEDIA
141.1
S/D Sin Dato

Latitud
14 40' S
Longitud 74 6' W

Distrito
Provincia
Departamento

PUQUIO
LUCANAS
AYACUCHO

FEB
144.30
68.40
663.80
78.30
128.80
52.00
145.10
137.10
75.00
140.70
133.60
214.00
174.90
S/D
S/D
38.60
252.70
155.00
70.20
165.50
132.00
324.90
S/D
185.40
224.20
158.30
73.80
S/D
158.30
206.20
23.30
107.60

MAR
76.20
161.10
230.60
193.90
138.60
115.30
174.40
404.80
73.80
268.30
232.70
172.50
68.30
S/D
S/D
134.00
40.80
106.80
57.50
109.60
422.80
362.20
S/D
172.40
268.80
70.80
203.40
S/D
172.40
264.50
87.60
42.10

ABR
8.40
0.00
140.60
0.00
49.70
6.80
45.60
27.20
36.60
62.30
8.50
7.50
0.00
S/D
S/D
0.00
58.60
27.30
22.70
0.00
54.30
4.80
S/D
28.70
72.20
0.00
23.50
S/D
11.80
25.20
0.00
66.40

MAY
0.00
10.50
0.00
14.40
0.00
5.40
0.00
0.00
0.00
0.00
19.90
12.70
0.00
S/D
S/D
0.00
0.00
0.00
0.00
0.00
23.40
8.60
S/D
0.00
0.00
27.90
0.00
S/D
5.80
14.20
0.00
0.00

JUN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/D
S/D
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/D
0.00
0.00
0.00
0.00
S/D
0.80
21.20
0.00
0.00

JUL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.40
0.00
0.00
0.00
0.00
0.00
S/D
S/D
17.20
0.00
0.00
0.00
5.70
0.00
0.00
S/D
0.00
0.00
0.00
0.00
S/D
1.00
0.00
0.00
0.00

AGO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.90
54.20
0.00
0.00
0.00
S/D
S/D
0.00
17.90
0.00
0.00
5.70
0.00
0.00
S/D
0.00
0.00
19.90
0.00
S/D
0.00
0.00
0.00
3.50

SEP
0.00
3.40
4.00
8.70
5.30
33.40
0.00
12.00
20.80
5.40
0.00
87.30
4.70
S/D
S/D
21.00
0.00
22.70
0.00
9.10
0.00
0.00
S/D
0.00
0.00
0.00
0.00
S/D
11.90
0.00
6.30
5.80

OCT
0.00
26.00
0.00
5.40
0.00
5.80
0.00
30.60
0.00
0.00
4.60
0.00
0.00
S/D
S/D
47.30
0.00
48.90
0.00
27.30
0.00
0.00
S/D
12.90
18.80
0.00
0.00
S/D
5.30
0.00
4.80
0.00

NOV
0.00
37.10
0.00
10.90
17.60
0.00
0.00
16.10
6.40
17.00
0.00
0.00
11.70
S/D
S/D
0.00
21.90
47.10
0.00
25.90
0.00
0.00
S/D
0.00
11.60
57.20
0.00
S/D
0.00
0.00
42.50
2.60

DIC
27.50
67.60
5.20
30.20
43.00
5.80
69.90
77.90
31.90
14.30
60.20
9.40
11.40
S/D
S/D
22.50
143.20
12.90
42.20
36.60
92.30
139.20
S/D
130.00
47.40
115.80
0.00
S/D
27.20
0.00
31.60
32.00

ANUAL
283.9
429.6
1397.2
557.7
413.0
690.3
493.6
911.6
357.0
758.3
571.4
637.0
275.6

158.3

172.4

28.2

5.1

0.8

1.0

3.9

9.4

8.5

11.6

47.4

587.5

370.3
658.5
556.4
231.5
507.6
865.9
1051.8
666.7
892.7
591.0
428.2
535.6
733.1
273.2
312.3

FIG. 03

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 13
REGISTRO PLUVIOMETRICO CON INFORMACION MENSUAL COMPLETADA
Estacin : CCECCAA
Cdigo 157215/DRE-05
:
Altitud :
4100
AO
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
MEDIA

Latitud
14 36' S
Longitud 74 0' W

Distrito
Provincia
Departamento

PUQUIO
LUCANAS
AYACUCHO

ENE
38.40
183.40
118.00
49.40
77.20
275.20
111.20
242.00
225.40
363.00
291.60
533.30
47.00
151.50
76.20
151.20

FEB
200.20
110.30
501.10
21.70
166.30
148.60
200.30
232.80
166.90
264.10
361.80
627.40
409.70
56.10
147.20
54.20

MAR
77.80
91.40
543.90
19.20
260.90
106.50
211.40
252.70
159.00
130.80
289.30
770.30
165.80
93.20
196.00
224.50

ABR
7.10
12.20
68.30
9.80
33.30
36.90
94.10
29.10
75.90
191.10
47.40
137.70
7.10
47.20
5.10
6.80

MAY
3.40
55.80
0.00
2.70
0.00
31.50
0.00
0.00
0.00
0.00
107.40
11.40
11.00
0.00
1.50
0.00

JUN
0.00
0.00
0.00
0.00
0.00
7.20
2.10
7.60
1.40
1.00
26.20
0.00
0.00
2.30
2.50
0.00

JUL
10.90
0.00
0.30
0.00
0.00
0.30
0.00
0.00
0.00
9.10
0.00
77.80
4.90
0.00
2.50
42.90

AGO
13.00
0.00
0.00
2.10
0.00
0.40
1.70
1.70
31.10
78.50
0.00
35.20
0.00
2.30
5.50
44.20

SEP
24.70
43.30
35.00
3.50
10.10
34.90
0.00
32.60
85.50
34.00
19.50
123.50
38.60
18.30
0.00
56.80

OCT
48.60
50.90
0.00
0.30
6.00
13.40
8.00
47.90
17.60
14.20
45.10
4.60
11.70
25.30
65.00
23.90

NOV
7.50
86.00
33.00
55.70
54.90
26.70
7.50
18.00
28.30
77.40
6.10
0.00
58.20
60.50
0.50
7.90

DIC
86.20
11.10
76.40
87.90
116.10
39.80
108.10
101.50
88.00
76.80
173.50
123.50
34.10
30.70
8.90
60.00

183.4

229.3

224.5

50.6

14.0

3.1

9.3

13.5

35.0

23.9

33.0

76.4

ANUAL
517.8
644.4
1376.0
252.3
724.8
721.4
744.4
965.9
879.1
1240.0
1367.9
2444.7
788.1
487.4
510.9
672.4
896.1

FIG. 04

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 14
REGISTRO PLUVIOMETRICO CON INFORMACION MENSUAL COMPLETADA
ESTACION : ANDAMARCA
CODIGO : -

DISTRITO
PROVINCIA
DEPARTAMENTO

: CARMEN SALCEDO
: LUCANAS
: AYACUCHO

ALTITUD : 3490 msnm


LATITUD : 14 23'
LONGITUD : 73 58'

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
MEDIA

24.40

165.60

64.60

5.70

11.50

6.20

13.40

10.00

47.50

25.80

3.50

62.90

76.20

90.80

177.10

10.20

43.00

6.20

2.40

10.00

4.80

47.00

27.70

40.20

211.30

153.00

168.50

46.00

6.00

6.20

18.50

11.30

22.20

9.90

2.40

14.60

117.70

64.10

165.30

4.70

19.90

24.20

13.40

13.30

4.30

14.50

50.40

94.90

36.00

66.00

80.30

4.50

4.00

6.20

13.40

5.00

21.30

21.10

42.90

85.60

116.90

73.00

81.10

78.80

11.60

6.20

13.40

10.00

31.20

13.50

33.80

62.30

84.10

115.80

145.40

60.80

1.10

1.00

13.40

10.00

4.50

10.80

1.20

102.60

79.10

185.10

207.80

16.40

8.40

1.60

13.40

3.00

13.00

34.70

3.80

33.80

72.60

95.10

125.61

23.50

11.50

6.20

13.40

10.00

21.01

16.80

18.20

88.50

89.19

107.44

125.61

23.90

11.50

6.20

13.40

12.10

14.70

3.70

29.00

41.10

121.00

98.80

132.70

3.00

35.20

6.20

13.40

10.00

8.60

13.40

3.90

109.30

139.90

164.00

102.00

24.20

19.00

6.20

13.00

29.20

80.40

21.10

1.00

34.10

14.50

203.10

79.60

19.90

1.20

6.20

13.40

10.00

13.40

14.00

47.60

20.90

115.40

25.30

62.30

16.50

0.00

6.20

13.40

9.20

10.80

11.00

25.70

31.80

26.10

76.00

141.90

7.10

0.00

1.20

3.00

4.50

5.10

20.80

6.60

55.40

102.60

35.90

149.90

36.50

0.00

2.90

30.10

2.70

33.40

45.70

1.20

33.50

89.2

107.4

125.6

23.9

11.5

6.2

13.4

10.0

21.0

20.2

18.7

57.0

441.1
535.6
669.9
586.7
386.3
531.8
550.7
600.1
502.4
477.8
555.5
634.1
443.8
327.6
347.7
474.4
504.1

FIG. 05

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 15
REGISTRO PLUVIOMETRICO CON INFORMACION MENSUAL COMPLETADA
Estacin : PAMPAHUAS I
Cdigo 157205/DRE-05
:
Altitud :
3650
AO
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
MEDIA

Latitud
14 29' S
Longitud 74 15' W

Distrito
Provincia
Departamento

LUCANAS
LUCANAS
AYACUCHO

ENE
72.60
243.80
428.70
54.60
197.10
94.80
193.10
201.60
256.00
199.60
256.10
8.30
103.50
173.00
112.00

FEB
95.50
438.00
66.90
151.90
87.20
149.10
154.30
156.90
98.00
101.70
179.40
144.00
47.70
59.70
36.00

MAR
121.90
354.00
185.20
230.80
115.80
120.80
299.30
176.00
71.80
144.50
162.10
294.80
51.50
148.40
140.00

ABR
17.20
63.20
19.80
108.70
36.00
54.90
19.90
102.90
70.00
0.00
0.00
0.00
45.20
2.00
0.00

MAY
31.30
18.20
29.30
0.00
64.70
0.00
0.00
0.00
0.00
63.00
0.00
0.00
18.00
0.00
16.00

JUN
1.00
3.80
3.20
4.00
0.00
0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.20
0.00

JUL
0.60
1.20
0.00
3.60
1.00
0.00
3.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

AGO
1.10
7.60
3.10
0.00
2.00
1.40
0.00
0.00
0.00
0.00
1.50
0.00
0.00
0.00
0.00

SEP
13.70
11.70
16.20
8.40
30.80
0.00
28.50
25.10
0.00
0.00
7.70
34.00
0.00
0.00
0.00

OCT
67.40
28.80
42.20
2.10
23.30
12.00
37.20
0.00
0.00
27.30
0.00
3.00
21.30
6.50
5.00

NOV
52.40
0.30
53.00
72.10
18.00
1.00
24.20
30.30
26.00
3.20
0.00
30.50
40.80
0.00
0.00

DIC
36.30
19.50
79.50
60.30
45.10
119.00
141.30
33.30
42.80
86.10
20.00
20.00
19.00
15.60
52.70

173.0

131.1

174.5

36.0

16.0

1.0

0.6

1.1

11.7

18.4

23.5

52.7

ANUAL
511.0
1190.1
927.1
696.5
621.0
553.7
900.9
726.1
564.6
625.4
626.8
534.6
347.0
407.4
361.7
639.6

FIG. 05

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 16
REGISTRO PLUVIOMETRICO CON INFORMACION MENSUAL COMPLETADA
Estacin : PAMPAMARCA
Cdigo 157207/DRE-05
:
Altitud :
3400
AO
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
MEDIA

Latitud
14 14' S
Longitud 74 12' W

Distrito
Provincia
Departamento

AUCARA
LUCANAS
AYACUCHO

ENE
82.20
156.40
147.10
52.40
102.50
66.40
199.10
107.90
434.70
109.40
125.50
27.70
146.60
32.60
62.90
101.80
94.60
24.90
94.60
16.10
151.20
132.10
165.60
105.80
67.40
67.30
66.20
132.00
131.90
70.10
69.80

FEB
74.20
159.30
136.70
118.10
92.20
164.70
155.70
100.50
104.10
110.80
137.60
144.20
14.30
20.40
50.50
148.50
64.40
54.10
252.00
165.00
196.80
34.90
71.50
174.00
14.70
63.70
83.00
41.60
153.10
61.00
152.80

MAR
59.60
135.10
238.70
124.80
90.80
108.30
166.20
116.10
68.00
161.50
62.10
81.30
58.80
82.80
111.00
44.20
25.20
51.90
137.50
34.10
71.60
23.30
28.40
89.70
43.20
98.40
8.50
66.20
85.50
88.90
102.80

ABR
12.50
29.00
18.90
11.20
38.70
14.00
32.80
22.40
44.00
1.60
4.80
19.60
32.70
8.10
9.70
74.00
40.90
23.60
91.10
85.20
37.90
30.60
69.30
52.10
4.20
12.40
2.50
50.50
26.00
32.70
44.60

MAY
49.50
7.30
64.30
0.00
34.20
0.80
2.40
3.50
11.10
15.50
15.10
2.20
0.00
6.40
4.00
1.00
0.00
15.20
1.50
26.90
12.30
8.20
0.00
18.90
15.30
14.70
0.00
13.20
1.30
0.00
0.00

JUN
0.00
4.60
38.30
8.60
2.00
0.00
0.00
18.80
3.50
1.90
0.00
0.00
0.00
0.00
3.90
0.00
9.20
6.60
33.70
28.90
0.00
3.43
0.00
3.90
43.80
20.50
8.30
29.50
9.60
0.00
0.00

JUL
0.00
10.50
2.60
2.80
3.40
0.00
0.70
5.80
5.00
0.00
17.40
21.40
0.00
4.80
20.10
0.00
0.00
0.00
0.70
1.10
17.30
2.90
0.00
1.30
0.00
0.00
0.00
1.20
3.50
0.00
0.00

AGO
0.00
20.40
15.90
3.50
0.00
1.50
1.40
18.30
40.50
0.00
18.40
0.00
6.80
4.70
7.50
55.30
7.30
6.80
31.80
1.60
8.60
13.00
0.00
12.90
8.60
2.30
16.00
16.60
0.00
5.40
15.20

SEP
5.00
33.50
S/D
3.10
20.50
1.30
42.90
69.00
16.40
15.70
70.10
25.50
6.50
4.10
14.00
13.70
22.60
63.50
6.70
25.90
21.00
0.00
13.60
4.00
0.00
12.70
0.00
4.70
15.70
15.30
8.50

OCT
28.80
28.00
102.60
13.60
9.90
11.50
91.00
10.50
0.00
11.60
0.00
9.80
10.50
26.40
58.70
14.00
35.00
34.50
26.20
88.00
0.00
23.10
30.20
17.90
26.60
7.90
23.70
31.60
1.90
11.60
4.10

NOV
50.30
10.60
1.00
24.00
20.20
1.20
21.30
48.40
14.90
2.80
10.70
36.70
29.20
13.20
4.90
31.30
39.60
7.40
63.60
17.70
0.00
17.90
0.60
2.50
62.70
19.70
32.00
36.30
10.10
20.60
22.30

DIC
55.70
34.40
38.50
43.20
64.60
108.50
82.10
36.00
57.10
63.20
47.10
28.30
33.90
31.80
34.10
93.90
20.40
47.30
55.50
27.50
46.60
23.80
70.60
2.10
96.50
37.00
24.60
124.60
83.50
54.40
60.10

107.9

106.9

86.0

31.5

11.1

9.0

4.0

11.0

18.5

25.5

21.7

52.5

ANUAL
417.8
629.1
804.6
405.3
479.0
478.2
795.6
557.2
799.3
494.0
508.8
396.7
339.3
235.3
381.3
577.7
359.2
335.8
794.9
518.0
563.3
313.2
449.8
485.1
383.0
356.6
264.8
548.0
522.1
360.0
480.2
485.5

FIG. 06

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

GOBIERNO REGIONAL DE AYACUCHO

1960

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

1965

1970

1975

1980

CONSORCIO IRRIGACIN ACAR


AOS

1985

1990

1995

FIGURA N08
HISTOGRAMA DE PRECIPITACION ANUAL HISTORICA

2000

2005

PAMPAHUASI

PAMPAMARCA

ANDAMARCA

CCECCAA

PUQUIO

LUCANAS

PAUCACORRAL

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

P (mm)

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 17
REGISTRO PLUVIOMETRICO DE LA ESTACION BASE COMPLETADA
ESTACION : LUCANAS
CODIGO : 157206

DISTRITO
PROVINCIA
DEPARTAMENTO

: LUCANAS
: LUCANAS
: AYACUCHO

ALTITUD : 3400 msnm


LATITUD : 14 37'
LONGITUD: 73 14'

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
MEDIA

65.6
135.8
56.2
119.4
24.0
181.2
80.7
15.9
115.3
309.8
152.4
244.9
21.7
88.4
135.2
135.2
136.9
81.7
49.5
32.9
27.7
134.8
162.4
82.2
198.3
119.4
50.8
119.4
159
101.2
37.1
162.7
111.1
214.2
121.4
223.4
136
191.9

212.6
144
95.4
36.1
131
192.2
143.7
54
157.7
177.4
117.6
139.8
278
56.5
49.5
39.3
185.6
160.3
48.8
49.8
221.4
151.7
23.1
231.2
144.1
137.4
58.6
46.2
154.2
178.1
42.4
316.9
158.9
131.9
269.4
150.8
138.4
196.4

247.3
178
118
158.3
259
391.7
149.8
109.1
151.6
174.4
178.1
124.7
181.7
81.4
192.1
119.3
211.3
61.6
14.6
138.9
289.7
118.5
14.3
199
206.4
158.3
215
158.3
151.5
95.6
210.8
128.4
66.6
101.2
118.7
124.5
234
183.5

42.5
85.4
77.2
45.6
144.6
45.6
69.6
0.8
96.7
63.7
9.2
3
3
30.3
4.5
0
50.8
33
4.1
16.8
142.0
21.5
0
36.1
4.6
45.6
16
45.6
52.7
44.4
22.6
181.6
55.7
24.6
64.7
16.3
97.3
34.8

43
6.5
30.4
0
0
0
0
0.5
6.2
0
28.4
2
2
0
1.5
0
0
0
0
4
0
0
0
0
4
5.8
0
0
8.9
0
0
18.7
8.8
0
7.3
8.1
5.6
29

15.2
0
0
0
0
0
0
0
4.3
0
20.1
0
0
0
0
0.1
0
0
0
22.9
0
0
0
0
6
2.1
0
0
0
0
0
0
0
4.7
0.1
0.6
0.3
2.9

13.7
0
0
0
0
0
0
0
0
0
2.1
2.3
2.3
0
3.8
9.3
0
0
0
0
0
0
0
0
2.6
1.3
0
0
0.1
0
0
0
5
0
3.4
0
0.5
1.3

32.0
0
0
0
0
0
0
0
0
3.2
0
0
0
5.2
11.4
3
3.2
0
0
4.4
0
0
0
0
1.2
3.2
0
0
0
0
0
21.4
3.2
0
0.1
14.4
4.1
12.7

14.0
2.1
0
0
20.4
20.4
0
1.0
5.3
0
0.5
5.3
5.3
2.1
0
10.8
0
19.9
0
6.2
0
0
0
0
0
5.3
0
0
0
0
13
20.2
5.3
1.6
9.1
13.8
19
1.6

7.0
15.8
0
12.2
27.5
27.5
15.8
0.9
0
15.8
11.5
11.4
11.4
15.6
28.1
42.6
15.5
43.9
10.2
28.9
0
0
9.5
0
0
15.8
0
18.3
0
0
9.6
5
10.8
11.2
81.8
82.2
12.7
0.2

2.0
9.5
19.2
9.9
17
17
19.2
0.2
31.6
19.2
1.0
27.6
27.6
43.2
2.7
19.2
23.8
28.7
2
58.1
19.2
19.2
4.0
19.2
2.4
19.2
17.2
1.9
15.6
19.2
61
10.3
43.5
35.3
2.6
23.1
2.8
35.3

13.3
28.5
51.3
10.3
33.0
3.0
10.5
3.0
39.5
36.8
57.6
35.0
35.0
17.2
22.0
30.7
128.0
13.1
16.8
67.2
82.3
80.4
2.0
59.8
10.6
38.3
17.0
4.4
18.8
4.1
68.3
57.3
71.9
60.0
83.9
84.1
9.1
51.1

119.4

137.4

158.3

45.6

5.8

2.1

1.3

3.2

5.3

15.8

19.2

38.3

708.2
605.6
447.7
391.8
656.5
878.6
489.3
185.4
608.2
800.3
578.5
596.0
568.0
339.9
450.8
409.5
755.1
442.2
146.0
430.1
782.3
526.1
215.3
627.5
580.2
551.7
374.6
394.1
560.8
442.6
464.8
922.5
540.8
584.7
762.5
741.3
659.8
740.7
551.6

FIG. 09

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 18
REGISTRO PLUVIOMETRICO DE LA ESTACION COMPLETADA
ESTACION
CODIGO

AO
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003

: PUQUIO
: 157230

DISTRITO
PROVINCIA
DEPARTAMENTO

: PUQUIO
: LUCANAS
: AYACUCHO

ALTITUD : 3213 msnm


LATITUD : 14 42'
LONGITUD: 74 74.08'

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

2004
2005
2006

48.8
42.9
204.4
115.6
28.6
189.8
62
156.4
124.4
105
45.8
160.4
1.4
69.4
19.9
45.8
32.5
78.9
34.2
97.7
21.6
133.1
119.4
132.5
394.5
33.8
72.8
5.9
150.2
160.2
111.8
84.6
74.7
191.8
64.4
187.2
107.0
98.3
46.0
57.0
42.0
87.3

129.2
53.9
374.4
57.1
81.6
69.4
95.4
191.6
104.4
64.8
61.1
152.8
174.9
28
70.7
8.1
106.7
54.4
131.3
116.7
134.7
158.8
82.1
83.1
252.8
15.4
29.8
74.0
135.0
198.0
84.3
176.4
108.6
115.3
229.1
129.2
145.6
142.2
71.5
89.4
74.6
167.4

53.2
47.7
147.1
120.6
146.5
67.6
152.8
167
138.8
31.6
77.9
69.6
68.4
53.2
124.3
82.4
78
32.2
205.6
104.1
318.3
145.4
22.4
51.1
102.5
50.3
107.4
61.2
146.3
104.4
132.0
78.0
94.1
86.6
84.0
140.9
136.1
132.5
80.8
94.9
45.7
122.5

8.5
5.5
59.4
1.8
39.3
7
36.4
7.6
58.2
17.4
2.8
4
0
14.1
0
0
32.5
18.5
29.8
21.2
52.6
22.8
11.4
29.8
7.2
3.8
21.4
12.8
46.7
12.8
12.8
48.0
12.8
1.3
17.5
16.5
43.7
33.4
12.5
58.7
22.0
13.3

0
0
35
0
0
10.8
4.8
0
0
0
7.8
6.1
0
0
0
0
0
0
6.8
4.3
6.8
0
6.1
24.4
4.4
17.2
0
0.6
2.5
11.6
0.6
0.6
0.6
0.0
1.5
7.2
0.0
3.8
12.4
0.0
0.0
0.0

0
0
0
0
0
0
0
3.8
5.8
1.4
0
0
0
0
0
0
0
0
0
1.3
0
0
3
0
0
10.6
0
0.4
0.4
9.3
0.4
0.4
0.4
10.3
0.0
0.0
0.0
5.5
0.0
0.0
0.0
1.3

0
0
5.7
0
0
0
0
3.8
0
0
0
0
0
0
0
7.1
0
0
0
1.2
0
0
2.5
1
0
0
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
13.8
0.0
14.6
0.0
0.0

0
0
0
0
0
0
0
0
1.6
19.4
0
0
0
0
0
0
17.5
0
0
1.9
0
1.9
4
0
0
0
0
0.7
2.4
0.7
0.7
1.5
7.0
0.0
0.0
4.0
0.0
2.8
0.0
6.9
1.4
4.2

4
0
7.6
0
5.2
18.6
0
21.8
35
5.4
2.4
12.1
19.9
0
0
20.5
0
0
7.9
5.8
0
0
0.5
6.1
0
12
0
0.8
0.8
0.8
1.5
2.6
16.1
0.0
0.0
0.0
0.6
5.2
0.0
14.3
13.9
0.0

4.4
26.6
7.3
34.5
7.3
3.8
2.2
24.6
7.3
7.3
3.6
7.3
7.3
7.3
13.4
18.0
0.0
0.0
2.9
7.4
0.4
0
3.3
6.8
9.6
2.4
11.6
2.2
17.4
2.2
2.2
2.2
5.6
0.0
16.8
12.6
5.7
7.6
1.2
0.0
3.6
0.0

12.1
23.2
12.1
44.7
12.8
1.8
1.6
12.1
4.6
4.2
12.1
12.1
3.4
12.1
12.1
12.1
15.6
24.1
4.7
12.3
12.1
2.8
7.4
13.3
12.1
12.1
4.4
2.4
12.8
2.4
40.0
4.8
6.1
33.4
0.6
4.6
5.4
37.5
12.1
5.2
12.1
16.0

45.3
29.5
27.4
50.9
56.4
24.6
44.2
80.8
22.8
3.0
36.9
22.5
15.4
45.3
45.3
3.4
76.1
45.3
65.1
46.0
85.3
43.1
4.7
31.3
45.3
89.7
45.3
16.9
83.4
43.3
58.3
16.9
90.2
79.8
22.2
77.8
5.1
23.1
45.8
70.6
87.7
51.0

MEDIA
PORCENTAJE (%)

96.2
23.26

114.8
27.78

102.5
24.80

20.9
5.06

4.2
1.01

1.3
0.31

1.2
0.29

1.9
0.45

5.8
1.39

7.3
1.76

12.1
2.93

45.3
10.96

GOBIERNO REGIONAL DE AYACUCHO

ANUAL
935.0
229.3
880.4
425.2
377.7
393.4
399.4
669.5
502.9
259.5
250.4
446.9
290.7
229.4
285.7
197.4
358.9
253.4
488.3
420.0
631.8
507.9
266.8
379.4
828.4
247.3
292.7
178.0
597.8
545.7
444.5
416.0
416.2
518.5
436.1
580.0
449.2
505.7
282.3
411.6
303.0
463.0
413.5
100.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 19
REGISTRO PLUVIOMETRICO CON INFORMACION MENSUAL EXTENDIDA
Latitud
14 40' S
Longitud 74 6' W

Estacin : PAUCACORRAL
Cdigo 1: 57210/DRE-05
Altitud :
4060

Distrito
Provincia
Departamento

MAY
0.00
10.50
0.00
14.40
0.00
5.40
0.00
0.00
0.00
0.00
19.90
12.70
0.00
5.09
5.15
0.00
0.00
0.00
0.00
0.00
23.40
8.60
5.01
0.00
0.00
27.90
0.00
5.12
5.80
14.20
0.00
0.00
5.21
5.24
5.34
5.33
5.28
5.33

JUN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.79
0.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.77
0.00
0.00
0.00
0.00
0.79
0.80
21.20
0.00
0.00
0.80
0.81
0.83
0.82
0.82
0.82

JUL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.40
0.00
0.00
0.00
0.00
0.00
0.97
0.99
17.20
0.00
0.00
0.00
5.70
0.00
0.00
0.96
0.00
0.00
0.00
0.00
0.98
1.00
0.00
0.00
0.00
1.00
1.00
1.02
1.02
1.01
1.02

PUQUIO
LUCANAS
AYACUCHO

AO
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002

ENE
27.50
55.50
353.00
215.90
30.00
465.80
58.60
202.50
105.60
196.10
111.90
133.60
4.60
140.78
142.64
89.70
123.40
135.70
38.90
122.20
141.10
212.10
138.68
137.30
249.70
141.10
127.50
141.69
141.10
201.80
77.10
52.30
144.16
144.90
147.89
147.53
146.16
147.52

FEB
144.30
68.40
663.80
78.30
128.80
52.00
145.10
137.10
75.00
140.70
133.60
214.00
174.90
157.90
159.99
38.60
252.70
155.00
70.20
165.50
132.00
324.90
155.55
185.40
224.20
158.30
73.80
158.92
158.30
206.20
23.30
107.60
161.69
162.52
165.87
165.47
163.93
165.46

MAR
76.20
161.10
230.60
193.90
138.60
115.30
174.40
404.80
73.80
268.30
232.70
172.50
68.30
171.94
174.22
134.00
40.80
106.80
57.50
109.60
422.80
362.20
169.38
172.40
268.80
70.80
203.40
173.06
172.40
264.50
87.60
42.10
176.07
176.97
180.62
180.19
178.51
180.17

ABR
8.40
0.00
140.60
0.00
49.70
6.80
45.60
27.20
36.60
62.30
8.50
7.50
0.00
28.10
28.47
0.00
58.60
27.30
22.70
0.00
54.30
4.80
27.68
28.70
72.20
0.00
23.50
28.28
11.80
25.20
0.00
66.40
28.77
28.92
29.52
29.44
29.17
29.44

AGO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.90
54.20
0.00
0.00
0.00
3.85
3.90
0.00
17.90
0.00
0.00
5.70
0.00
0.00
3.79
0.00
0.00
19.90
0.00
3.88
0.00
0.00
0.00
3.50
3.94
3.96
4.04
4.04
4.00
4.03

MEDIA

141.9

159.2

173.4

28.3

5.1

0.8

1.0

3.9

PORCENTAJE (%)

24.02

26.94

29.34

4.79

0.87

0.13

0.17

0.66

SEP
0.00
3.40
4.00
8.70
5.30
33.40
0.00
12.00
20.80
5.40
0.00
87.30
4.70
9.32
9.45
21.00
0.00
22.70
0.00
9.10
0.00
0.00
9.19
0.00
0.00
0.00
0.00
9.39
11.90
0.00
6.30
5.80
9.55
9.60
9.80
9.77
9.68
9.77

OCT
0.00
26.00
0.00
5.40
0.00
5.80
0.00
30.60
0.00
0.00
4.60
0.00
0.00
8.47
8.58
47.30
0.00
48.90
0.00
27.30
0.00
0.00
8.34
12.90
18.80
0.00
0.00
8.52
5.30
0.00
4.80
0.00
8.67
8.72
8.90
8.88
8.79
8.87

NOV
0.00
37.10
0.00
10.90
17.60
0.00
0.00
16.10
6.40
17.00
0.00
0.00
11.70
11.60
11.75
0.00
21.90
47.10
0.00
25.90
0.00
0.00
11.43
0.00
11.60
57.20
0.00
11.67
0.00
0.00
42.50
2.60
11.88
11.94
12.18
12.15
12.04
12.15

DIC
27.50
67.60
5.20
30.20
43.00
5.80
69.90
77.90
31.90
14.30
60.20
9.40
11.40
47.29
47.91
22.50
143.20
12.90
42.20
36.60
92.30
139.20
46.58
130.00
47.40
115.80
0.00
47.59
27.20
0.00
31.60
32.00
48.42
48.67
49.67
49.55
49.09
49.55

ANUAL
283.9
429.6
1397.2
557.7
413.0
690.3
493.6
911.6
357.0
758.3
571.4
637.0
275.6
586.1
593.9
370.3
658.5
556.4
231.5
507.6
865.9
1051.8
577.4
666.7
892.7
591.0
428.2
589.9
535.6
733.1
273.2
312.3
600.2
603.2
615.7
614.2
608.5
614.1

9.4

8.5

11.7

47.7

590.9

1.59

1.45

1.98

8.07

100.00

FIG. 10
CORRELACION DE LAS ESTACIONES LUCANAS - PAUCACORRAL
1600

1400

1200

Estacion Paucacorral

y = 0.070x + 562.3
R = 0.002
1000

800

600

400

200

0
0

100

200

300

400

500

600

700

800

900

1000

Estacion Lucanas

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 20
REGISTRO PLUVIOMETRICO CON INFORMACION MENSUAL EXTENDIDA
Latitud
14 14' S
Longitud 74 12' W

Estacin : PAMPAMARCA
Cdigo 1: 57207/DRE-05
Altitud :
3400
AO
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002

ENE
113.22
82.20
156.40
147.10
52.40
102.50
66.40
199.10
107.90
434.70
109.40
125.50
27.70
146.60
32.60
62.90
101.80
94.60
24.90
94.60
16.10
151.20
132.10
165.60
105.80
67.40
67.30
66.20
132.00
131.90
70.10
69.80
108.24
109.54
114.84
114.21
111.78
114.19

FEB
112.19
74.20
159.30
136.70
118.10
92.20
164.70
155.70
100.50
104.10
110.80
137.60
144.20
14.30
20.40
50.50
148.50
64.40
54.10
252.00
165.00
196.80
34.90
71.50
174.00
14.70
63.70
83.00
41.60
153.10
61.00
152.80
107.25
108.55
113.79
113.17
110.76
113.15

MAR
90.19
59.60
135.10
238.70
124.80
90.80
108.30
166.20
116.10
68.00
161.50
62.10
81.30
58.80
82.80
111.00
44.20
25.20
51.90
137.50
34.10
71.60
23.30
28.40
89.70
43.20
98.40
8.50
66.20
85.50
88.90
102.80
86.22
87.26
91.48
90.98
89.04
90.96

ABR
33.09
12.50
29.00
18.90
11.20
38.70
14.00
32.80
22.40
44.00
1.60
4.80
19.60
32.70
8.10
9.70
74.00
40.90
23.60
91.10
85.20
37.90
30.60
69.30
52.10
4.20
12.40
2.50
50.50
26.00
32.70
44.60
31.64
32.02
33.56
33.38
32.67
33.37

MAY
11.67
49.50
7.30
64.30
0.00
34.20
0.80
2.40
3.50
11.10
15.50
15.10
2.20
0.00
6.40
4.00
1.00
0.00
15.20
1.50
26.90
12.30
8.20
0.00
18.90
15.30
14.70
0.00
13.20
1.30
0.00
0.00
11.16
11.29
11.84
11.77
11.52
11.77

MEDIA

108.6

PORCENTAJE (%)

22.22

107.6

86.5

31.7

11.2

22.02

17.70

6.50

2.29

Distrito
Provincia
Departamento
JUN
9.45
0.00
4.60
38.30
8.60
2.00
0.00
0.00
18.80
3.50
1.90
0.00
0.00
0.00
0.00
3.90
0.00
9.20
6.60
33.70
28.90
0.00
3.43
0.00
3.90
43.80
20.50
8.30
29.50
9.60
0.00
0.00
9.03
9.14
9.58
9.53
9.33
9.53

AUCARA
LUCANAS
AYACUCHO

JUL
4.15
0.00
10.50
2.60
2.80
3.40
0.00
0.70
5.80
5.00
0.00
17.40
21.40
0.00
4.80
20.10
0.00
0.00
0.00
0.70
1.10
17.30
2.90
0.00
1.30
0.00
0.00
0.00
1.20
3.50
0.00
0.00
3.96
4.01
4.21
4.18
4.09
4.18

AGO
11.52
0.00
20.40
15.90
3.50
0.00
1.50
1.40
18.30
40.50
0.00
18.40
0.00
6.80
4.70
7.50
55.30
7.30
6.80
31.80
1.60
8.60
13.00
0.00
12.90
8.60
2.30
16.00
16.60
0.00
5.40
15.20
11.01
11.15
11.68
11.62
11.37
11.62

SEP
19.43
5.00
33.50
S/D
3.10
20.50
1.30
42.90
69.00
16.40
15.70
70.10
25.50
6.50
4.10
14.00
13.70
22.60
63.50
6.70
25.90
21.00
0.00
13.60
4.00
0.00
12.70
0.00
4.70
15.70
15.30
8.50
18.58
18.80
19.71
19.60
19.18
19.60

OCT
26.71
28.80
28.00
102.60
13.60
9.90
11.50
91.00
10.50
0.00
11.60
0.00
9.80
10.50
26.40
58.70
14.00
35.00
34.50
26.20
88.00
0.00
23.10
30.20
17.90
26.60
7.90
23.70
31.60
1.90
11.60
4.10
25.54
25.85
27.09
26.95
26.37
26.94

NOV
22.81
50.30
10.60
1.00
24.00
20.20
1.20
21.30
48.40
14.90
2.80
10.70
36.70
29.20
13.20
4.90
31.30
39.60
7.40
63.60
17.70
0.00
17.90
0.60
2.50
62.70
19.70
32.00
36.30
10.10
20.60
22.30
21.80
22.06
23.13
23.00
22.51
23.00

DIC
55.07
55.70
34.40
38.50
43.20
64.60
108.50
82.10
36.00
57.10
63.20
47.10
28.30
33.90
31.80
34.10
93.90
20.40
47.30
55.50
27.50
46.60
23.80
70.60
2.10
96.50
37.00
24.60
124.60
83.50
54.40
60.10
52.65
53.28
55.86
55.55
54.37
55.54

ANUAL
509.5
417.8
629.1
804.6
405.3
479.0
478.2
795.6
557.2
799.3
494.0
508.8
396.7
339.3
235.3
381.3
577.7
359.2
335.8
794.9
518.0
563.3
313.2
449.8
485.1
383.0
356.6
264.8
548.0
522.1
360.0
480.2
487.1
492.9
516.8
513.9
503.0
513.9

9.1

4.0

11.0

18.6

25.6

21.9

52.8

488.6

1.85

0.81

2.26

3.81

5.24

4.48

10.81

100.00

FIG. 11
CORRELACION DE LAS ESTACIONES LUCANAS - PAMPAMARCA
900

800

y = 0.134x + 414.6
R = 0.026

700

Estacion Pampamarca

600

500

400

300

200

100

0
0

100

200

300

400

500

600

700

800

900

1000

Estacion Lucanas

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

GOBIERNO REGIONAL DE AYACUCHO

P (mm)

1960

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1965

1970

1975

1980

1985

1990

1995

FIGURAN 12
HISTOGRAMA DE PRECIPITACION DE LAS ESTACIONES BASE

2000

PUQUIO

LUCANAS

2005

PAMPAMARCA

PAUCACORRAL

AOS
2010

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

GOBIERNO REGIONAL DE AYACUCHO

1960

200

400

600

800

1000

1200

1400

1600

1965

1970

1975

1980

AOS

1985

1990

1995

2000

2005

PAMPAMARCA

PAUCACORRAL

PUQUIO

LUCANAS

FIGURA N 13
HISTOGRAMA DE PRECIPITACIONES DE ESTACIONES COMPLETADAS

2010

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

P (mm)

GOBIERNO REGIONAL DE AYACUCHO

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

22000

24000

0.0

2000.0

4000.0

8000.0

10000.0

12000.0

14000.0

PRECIPITACION ACUMULADO PROMEDIO (mm)

6000.0

16000.0

FIGURA N 14
HISTOGRAMA DE PRECIPITACION ANUAL HISTORICA
CON ESTACIONES PROMEDIO

18000.0

20000.0

PAMPAMARCA

PAUCACORRAL

LUCANAS

PUQUIO

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

PRECIPITACION ACUMULADO (mm)

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIG. 15
DIAGRAMA DE DOBLE MASA DE LA PRECIPITACION ANUAL
18,000

Precipitacion Acumulada de la Estacion Puquio (mm)

16,000
14,000
12,000
10,000
8,000

6,000
4,000
2,000
0
0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

Precipitacion Acumulada de la Estacion Base - Lucanas (mm)

FIG. 16
DIAGRAMA DE DOBLE MASA DE LA PRECIPITACION ANUAL

Precipitacion Acumulada de la Estacion Paucacorral (mm)

25,000

20,000

15,000

10,000

5,000

0
0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

Precipitacion Acumulada de la Estacion Base - Lucanas (mm)

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIG. 17
DIAGRAMA DE DOBLE MASA DE LA PRECIPITACION ANUAL
20,000

Precipitacion Acumulada de la Estacion Pampamarca (mm)

18,000

16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
0
0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

Precipitacion Acumulada de la Estacion Base - Lucanas (mm)

FIG. 18
DIAGRAMA DE DOBLE MASA DE LA PRECIPITACION ANUAL

Precipitacion Acumulada de la Estacion Cceccaa (mm)

16,000
14,000
12,000

10,000
8,000
6,000
4,000
2,000
0

1000

2000
3000
4000
5000
6000
7000
8000
9000
Precipitacion Acumulada de la Estacion Base - Lucanas (mm)

GOBIERNO REGIONAL DE AYACUCHO

10000

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIG. 19

DIAGRAMA DE DOBLE MASA DE LA PRECIPITACION ANUAL

Precipitacion Acumulada de la Estacion Andamarca (mm)

9,000
8,000

7,000
6,000

5,000
4,000
3,000
2,000
1,000
0
0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Precipitacion Acumulada de la Estacion Base - Lucanas (mm)

FIG. 20

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

MESES ACUMULADO

50

100

150

200

250

300

350

400

450

50

100

150

200

250

FIGURAN 21
ANALISIS DE SALTO

300

350

400

450

500

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Precipitacion (mm)
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

MESES ACUMULADO

50

100

150

200

250

300

350

400

450

50

100

150

200

250

ANALISIS DE SALTO

FIGURA N 22

300

350

400

450

500

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Precipitacion (mm)
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

MESES ACUMULADO

100

200

300

400

500

600

700

50

100

150

200

ANALISIS DE SALTO

FIGURA N 23

250

300

350

400

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Precipitacion (mm)
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

MESES ACUMULADO

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

500.00

50

100

150

200

ANALISIS DE SALTO

FIGURA N 24

250

300

350

400

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Precipitacion (mm)
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

MESES ACUMULADO

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

50

100

150

200

ANALISIS DE SALTO CORREGIDA

FIGURA N 25

250

300

350

400

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Precipitacion (mm)

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

MESES ACUMULADO

100

200

300

400

500

600

700

800

900

20

40

60

80

100

ANALISIS DE SALTO

FIGURA N 26

120

140

160

180

200

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Precipitacion (mm)
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

MESES ACUMULADO

50

100

150

200

250

20

40

60

80

100

ANALISIS DE SALTO

FIGURA N 27

120

140

160

180

200

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Precipitacion (mm)
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

MESES ACUMULADO

50

100

150

200

250

300

350

400

450

500

20

40

60

80

100

ANALISIS DE SALTO

FIGURA N 28

120

140

160

180

200

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Precipitacion (mm)
GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 29
De este analisis se concluye que en la media los datos reflejan que son estadisticamente diferentes y en el analisis de la desviacion estandar de
los datos reflejan que son estadisticamente iguales por lo tanto se necesita la correccion mediante la ecuacion:

Y't =Xt - Tm + Tm(prom)


Y't =Xt - (Am+Bm*t) + Tm(prom)
Donde :

Yt :

Valor corregido de la informacion

Xt :

Valor a ser corregido libre de saltos

TENDENCIA EN LA MEDIA
Tm = 53.30
A
= 79.26
B
= -0.29
DATOS CORREGIDOS POR TENDENCIA 1966 - 1980
AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

1966

46.92

70.11

96.80

0.00

6.77

0.00

0.00

0.00

0.00

44.30

29.59

13.78

ANUAL
294.5

1967

221.57

416.05

332.34

41.83

0.00

0.00

0.00

0.00

0.00

9.15

0.00

0.42

1020.93

1968

409.91

48.39

166.98

1.87

11.66

0.00

0.00

0.00

0.00

25.99

37.08

63.86

701.88

1969

39.25

136.84

216.02

94.21

0.00

0.00

0.00

0.00

0.00

0.00

59.62

48.11

545.94

1970

185.19

75.58

104.47

24.95

53.94

0.00

0.00

0.00

21.19

13.98

8.96

36.35

488.26

1971

86.34

140.92

112.91

47.30

0.00

0.00

0.00

0.00

0.00

6.12

0.00

113.69

393.59

1972

188.08

149.57

294.85

15.74

0.00

0.00

0.00

0.00

25.77

34.76

22.05

139.44

730.82

1973

200.02

155.61

175.00

102.18

0.00

0.00

0.14

0.43

25.82

1.00

31.59

34.88

691.80

1974

257.86

100.15

74.24

72.73

3.01

3.30

3.59

3.87

4.16

4.45

30.73

47.82

558.09

1975

204.91

107.29

150.38

6.17

69.46

6.74

7.03

7.32

7.60

35.19

11.38

94.56

613.46

1976

264.85

188.44

171.42

9.61

9.90

10.18

10.47

12.26

18.75

11.33

11.62

31.91

718.83

1977

20.49

156.48

307.57

13.05

13.34

13.63

13.91

14.20

48.49

17.78

45.56

35.35

664.51

1978

119.14

63.62

67.71

61.70

34.78

17.07

17.36

17.64

17.93

39.52

59.31

37.79

515.78

1979

192.08

79.07

168.05

21.94

20.23

22.71

20.80

21.09

21.37

28.16

21.95

37.83

617.45

1980

134.52

58.81

163.10

23.38

39.67

23.96

24.24

24.53

24.82

30.10

25.39

78.38

572.52

MEDIA

171.4

129.8

173.5

35.8

17.5

6.5

6.5

6.8

14.4

20.1

26.3

54.3

662.8

FIGURA N 29

ANALISIS DE TENDENCIA CORREGIDA

450.00

400.00

350.00

Precipitacion (mm)

300.00

250.00

200.00

150.00

100.00

50.00

0.00
0

20

40

60

80

100

120

140

160

180

200

MESES ACUMULADO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 31

CUADRO DE CORRELACIONES ENTRE ESTACIONES BASE Y EN ESTUDIO


Estacion

Paucacorral Pampamarca
Cceccaa Andamarca
Pampahuasi

Puquio

0.09

0.07

0.00

0.22

0.22

Lucanas

0.00

0.02

0.02

0.01

0.17

RESUMEN DE PRECIPITACIONES ANUALES CORREGIDAS POR SALTOS Y TENDENCIAS


N

Ao

Puquio

Lucanas

1965

586.1

708.2

283.9

383.0

517.8

441.1

1966

578.0

605.6

429.6

318.2

644.4

535.6

308.3

1967

669.4

447.7

1397.2

467.4

1376.0

669.9

1021.4

1968

478.5

391.8

557.7

604.4

252.3

586.7

765.7

1969

575.9

656.5

413.0

309.4

724.8

386.3

594.1

1970

393.4

878.6

690.3

361.4

721.4

531.8

524.6

1971

399.4

489.3

493.6

360.9

744.4

550.7

507.3

1972

669.5

185.4

911.6

585.0

965.9

600.1

870.3

1973

502.9

608.2

357.0

416.7

879.1

502.4

726.7

10

1974

259.5

800.3

758.3

587.6

1240.0

477.8

605.9

11

1975

250.4

578.5

571.4

494.0

1367.9

555.5

708.0

12

1976

446.9

596.0

637.0

508.8

2444.7

634.1

750.7

13

1977

290.7

568.0

275.6

396.7

788.1

443.8

699.9

14

1978

229.4

339.9

586.1

339.3

487.4

327.6

553.6

15

1979

285.7

450.8

593.9

235.3

510.9

347.7

655.3

16

1980

197.4

409.5

370.3

381.3

672.4

474.4

650.9

17

1981

358.9

755.1

658.5

577.7

991.7

412.3

644.7

18

1982

253.4

442.2

556.4

359.2

849.3

381.8

610.7

19

1983

488.3

146.0

231.5

335.8

714.5

449.7

686.3

20

1984

420.0

430.1

507.6

794.9

843.8

430.0

664.3

21

1985

631.8

782.3

865.9

518.0

1004.0

491.2

732.5

22

1986

507.9

526.1

1051.8

563.3

887.5

455.4

692.6

23

1987

266.8

215.3

577.4

313.2

746.1

385.7

615.0

24

1988

379.4

627.5

666.7

449.8

933.6

418.2

651.3

25

1989

828.4

580.2

892.7

485.1

912.1

548.0

795.8

26

1990

247.3

551.7

591.0

383.0

899.1

380.1

608.7

27

1991

292.7

374.6

428.2

356.6

818.5

393.2

623.3

28

1992

430.1

394.1

589.9

264.8

827.4

432.9

667.6

29

1993

636.9

560.8

535.6

548.0

903.3

492.7

734.2

30

1994

621.2

442.6

733.1

522.1

849.5

488.1

729.1

31

1995

568.3

464.8

273.2

360.0

859.6

472.8

712.1

32

1996

586.9

922.5

312.3

480.2

1067.8

478.2

718.1

33

1997

674.7

540.8

685.3

482.2

894.2

503.6

746.4

34

1998

746.5

584.7

716.9

495.8

914.1

524.3

769.5

35

1999

674.1

762.5

685.0

482.1

995.0

503.4

746.2

36

2000

697.2

741.3

695.2

486.5

985.4

510.1

753.6

37

2001

661.2

659.8

679.3

479.7

948.3

499.7

742.0

38

2002

713.5

740.7

702.4

489.6

985.1

514.8

758.9

GOBIERNO REGIONAL DE AYACUCHO

Paucacorral
pampamarca
Cceccaa AndamarcaPampahuasi
717.8

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 32
REGISTRO PLUVIOMETRICO 1965 - 2002
ESTACION: PUQUIO

DISTRITO

: PUQUIO

ALTITUD : 3213 msnm

CODIGO : 157230

PROVINCIA

: LUCANAS

LATITUD : 14 42'

DEPARTAMENTO

: AYACUCHO

LONGITUD: 74 74.08'

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

1965

48.8

129.2

53.2

8.5

4.4

12.1

45.3

586.1

1966

42.9

53.9

47.7

5.5

26.6

23.2

29.5

578.0

1967

204.4

374.4

147.1

59.4

35

5.7

7.6

7.3

12.1

27.4

669.4

1968

115.6

57.1

120.6

1.8

34.5

44.7

50.9

478.5

1969

28.6

81.6

146.5

39.3

5.2

7.3

12.8

56.4

575.9

1970

189.8

69.4

67.6

10.8

18.6

3.8

1.8

24.6

393.4

1971

62

95.4

152.8

36.4

4.8

2.2

1.6

44.2

399.4

1972

156.4

191.6

167

7.6

3.8

3.8

21.8

24.6

12.1

80.8

669.5

1973

124.4

104.4

138.8

58.2

5.8

1.6

35

7.3

4.6

22.8

502.9

1974

105

64.8

31.6

17.4

1.4

19.4

5.4

7.3

4.2

3.0

259.5

1975

45.8

61.1

77.9

2.8

7.8

2.4

3.6

12.1

36.9

250.4

1976

160.4

152.8

69.6

6.1

12.1

7.3

12.1

22.5

446.9

1977

1.4

174.9

68.4

19.9

7.3

3.4

15.4

290.7

1978

69.4

28

53.2

14.1

7.3

12.1

45.3

229.4

1979

19.9

70.7

124.3

13.4

12.1

45.3

285.7

1980

45.8

8.1

82.4

7.1

20.5

18.0

12.1

3.4

197.4

1981

32.5

106.7

78

32.5

17.5

0.0

15.6

76.1

358.9

1982

78.9

54.4

32.2

18.5

0.0

24.1

45.3

253.4

1983

34.2

131.3

205.6

29.8

6.8

7.9

2.9

4.7

65.1

488.3

1984

97.7

116.7

104.1

21.2

4.3

1.3

1.2

1.9

5.8

7.4

12.3

46.0

420.0

1985

21.6

134.7

318.3

52.6

6.8

0.4

12.1

85.3

631.8

1986

133.1

158.8

145.4

22.8

1.9

2.8

43.1

507.9

1987

119.4

82.1

22.4

11.4

6.1

2.5

0.5

3.3

7.4

4.7

266.8

1988

132.5

83.1

51.1

29.8

24.4

6.1

6.8

13.3

31.3

379.4

1989

394.5

252.8

102.5

7.2

4.4

9.6

12.1

45.3

828.4

1990

33.8

15.4

50.3

3.8

17.2

10.6

12

2.4

12.1

89.7

247.3

1991

72.8

29.8

107.4

21.4

11.6

4.4

45.3

292.7

1992

5.9

74.0

61.2

12.8

0.6

0.4

0.0

0.7

0.8

2.2

2.4

16.9

430.1

1993

150.2

135.0

146.3

46.7

2.5

0.4

0.0

2.4

0.8

17.4

12.8

83.4

636.9

1994

160.2

198.0

104.4

12.8

11.6

9.3

0.0

0.7

0.8

2.2

2.4

43.3

621.2

1995

111.8

84.3

132.0

12.8

0.6

0.4

0.0

0.7

1.5

2.2

40.0

58.3

568.3

1996

84.6

176.4

78.0

48.0

0.6

0.4

0.0

1.5

2.6

2.2

4.8

16.9

586.9

1997

74.7

108.6

94.1

12.8

0.6

0.4

0.0

7.0

16.1

5.6

6.1

90.2

674.7

1998

191.8

115.3

86.6

1.3

0.0

10.3

0.0

0.0

0.0

0.0

33.4

79.8

746.5

1999

64.4

229.1

84.0

17.5

1.5

0.0

0.0

0.0

0.0

16.8

0.6

22.2

674.1

2000

187.2

129.2

140.9

16.5

7.2

0.0

0.0

4.0

0.0

12.6

4.6

77.8

697.2

2001

107.0

145.6

136.1

43.7

0.0

0.0

0.0

0.0

0.6

5.7

5.4

5.1

661.2

2002

98.3

142.2

132.5

33.4

3.8

5.5

13.8

2.8

5.2

7.6

37.5

23.1

713.5

MEDIA

100.2

116.3

104.3

20.3

4.3

1.4

0.9

1.7

5.6

7.9

12.2

43.4

418.6

NUMERO

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

SUMA

3807.6

4420.8

3962.1

771.3

163.6

53.1

35.1

66.0

213.3

300.9

464.0

1648.0

MAXIMO

394.5

374.4

318.3

59.4

35.0

10.6

13.8

19.4

35.0

34.5

44.7

90.2

M INIMO

1.4

8.1

22.4

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.6

3.0

MEDIANA

91.1

107.7

98.3

15.3

0.6

0.0

0.0

0.0

1.2

7.1

12.1

44.8

DESVIACI.

74.5

71.4

55.9

17.4

7.4

3.0

2.7

4.3

8.3

7.9

10.9

25.8

VARIANZA

5547.9

5099.1

3125.1

302.1

54.8

8.7

7.1

18.3

68.2

61.7

118.0

667.7

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 33
REGISTRO PLUVIOMETRICO 1965 - 2008
ESTACION
CODIGO

: LUCANAS
: 157206

DISTRITO
PROVINCIA
DEPARTAMENTO

: LUCANAS
: LUCANAS
: AYACUCHO

ALTITUD : 3400 msnm


LATITUD : 14 37'
LONGITUD: 73 14'

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002

65.6
135.8
56.2
119.4
24.0
181.2
80.7
15.9
115.3
309.8
152.4
244.9
21.7
88.4
135.2
135.2
136.9
81.7
49.5
32.9
27.7
134.8
162.4
82.2
198.3
119.4
50.8
119.4
159
101.2
37.1
162.7
111.1
214.2
121.4
223.4
136
191.9

212.6
144
95.4
36.1
131
192.2
143.7
54
157.7
177.4
117.6
139.8
278
56.5
49.5
39.3
185.6
160.3
48.8
49.8
221.4
151.7
23.1
231.2
144.1
137.4
58.6
46.2
154.2
178.1
42.4
316.9
158.9
131.9
269.4
150.8
138.4
196.4

247.3
178
118
158.3
259
391.7
149.8
109.1
151.6
174.4
178.1
124.7
181.7
81.4
192.1
119.3
211.3
61.6
14.6
138.9
289.7
118.5
14.3
199
206.4
158.3
215
158.3
151.5
95.6
210.8
128.4
66.6
101.2
118.7
124.5
234
183.5

42.5
85.4
77.2
45.6
144.6
45.6
69.6
0.8
96.7
63.7
9.2
3
3
30.3
4.5
0
50.8
33
4.1
16.8
142.0
21.5
0
36.1
4.6
45.6
16
45.6
52.7
44.4
22.6
181.6
55.7
24.6
64.7
16.3
97.3
34.8

43
6.5
30.4
0
0
0
0
0.5
6.2
0
28.4
2
2
0
1.5
0
0
0
0
4
0
0
0
0
4
5.8
0
0
8.9
0
0
18.7
8.8
0
7.3
8.1
5.6
29

15.2
0
0
0
0
0
0
0
4.3
0
20.1
0
0
0
0
0.1
0
0
0
22.9
0
0
0
0
6
2.1
0
0
0
0
0
0
0
4.7
0.1
0.6
0.3
2.9

13.7
0
0
0
0
0
0
0
0
0
2.1
2.3
2.3
0
3.8
9.3
0
0
0
0
0
0
0
0
2.6
1.3
0
0
0.1
0
0
0
5
0
3.4
0
0.5
1.3

32.0
0
0
0
0
0
0
0
0
3.2
0
0
0
5.2
11.4
3
3.2
0
0
4.4
0
0
0
0
1.2
3.2
0
0
0
0
0
21.4
3.2
0
0.1
14.4
4.1
12.7

14.0
2.1
0
0
20.4
20.4
0
1.0
5.3
0
0.5
5.3
5.3
2.1
0
10.8
0
19.9
0
6.2
0
0
0
0
0
5.3
0
0
0
0
13
20.2
5.3
1.6
9.1
13.8
19
1.6

7.0
15.8
0
12.2
27.5
27.5
15.8
0.9
0
15.8
11.5
11.4
11.4
15.6
28.1
42.6
15.5
43.9
10.2
28.9
0
0
9.5
0
0
15.8
0
18.3
0
0
9.6
5
10.8
11.2
81.8
82.2
12.7
0.2

2.0
9.5
19.2
9.9
17
17
19.2
0.2
31.6
19.2
1.0
27.6
27.6
43.2
2.7
19.2
23.8
28.7
2
58.1
19.2
19.2
4.0
19.2
2.4
19.2
17.2
1.9
15.6
19.2
61
10.3
43.5
35.3
2.6
23.1
2.8
35.3

13.3
28.5
51.3
10.3
33.0
3.0
10.5
3.0
39.5
36.8
57.6
35.0
35.0
17.2
22.0
30.7
128.0
13.1
16.8
67.2
82.3
80.4
2.0
59.8
10.6
38.3
17.0
4.4
18.8
4.1
68.3
57.3
71.9
60.0
83.9
84.1
9.1
51.1

708.2
605.6
447.7
391.8
656.5
878.6
489.3
185.4
608.2
800.3
578.5
596.0
568.0
339.9
450.8
409.5
755.1
442.2
146.0
430.1
782.3
526.1
215.3
627.5
580.2
551.7
374.6
394.1
560.8
442.6
464.8
922.5
540.8
584.7
762.5
741.3
659.8
740.7
551.6

MEDIA

119.4

137.4

158.3

45.6

5.8

2.1

1.3

3.2

5.3

15.8

19.2

38.3

NUMERO
SUMA

39.0
4535.7

39.0
5145.2

39.0
5926.2

39.0
1735.6

39.0
183.5

39.0
66.2

39.0
35.3

39.0
93.9

39.0
193.5

39.0
607.5

39.0
746.9

39.0
1480.2

MAXIMO

309.8

316.9

391.7

181.6

30.4

22.9

9.3

21.4

20.4

82.2

61.0

128.0

M INIMO
MEDIANA

15.9
119.4

23.1
141.8

14.3
154.9

0.0
40.3

0.0
0.3

0.0
0.0

0.0
0.0

0.0
0.0

0.0
1.6

0.0
11.5

0.2
19.2

2.0
35.0

DESVIACI.

67.6

72.6

71.3

42.8

8.3

5.0

1.9

4.8

7.0

19.4

14.9

29.8

VARIANZA

4574.7

5266.4

5086.3

1833.3

68.5

24.5

3.6

23.0

48.5

376.7

223.3

890.1

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 34
REGISTRO PLUVIOMETRICO EXTENDIDO 1987 - 2002
Latitud 14 40' S
Longitud 74 6' W

Estacin : PAUCACORRAL
Cdigo : 157210/DRE-05
Altitud :
4060

Distrito
Provincia
Departamento

PUQUIO
LUCANAS
AYACUCHO

AO
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
MEDIA
PORCENTAJE
NUMERO

ENE
27.5
55.5
353.0
215.9
30.0
465.8
58.6
202.5
105.6
196.1
111.9
133.6
4.6
140.8
142.6
89.7
123.4
135.7
38.9
122.2
141.1
212.1
138.7
137.3
249.7
141.1
127.5
141.7
141.1
201.8
77.1
52.3
161.3
168.8
161.3
163.7
159.9
165.3
144.6
23.5
39.0

FEB
144.3
68.4
663.8
78.3
128.8
52.0
145.1
137.1
75.0
140.7
133.6
214.0
174.9
157.9
160.0
38.6
252.7
155.0
70.2
165.5
132.0
324.9
155.5
185.4
224.2
158.3
73.8
158.9
158.3
206.2
23.3
107.6
187.6
196.2
187.5
190.3
186.0
192.3
163.3
27.4
39.0

MAR
76.2
161.1
230.6
193.9
138.6
115.3
174.4
404.8
73.8
268.3
232.7
172.5
68.3
171.9
174.2
134.0
40.8
106.8
57.5
109.6
422.8
362.2
169.4
172.4
268.8
70.8
203.4
173.1
172.4
264.5
87.6
42.1
202.0
211.3
201.9
204.9
200.2
207.0
177.4
29.5
39.0

ABR
8.4
0.0
140.6
0.0
49.7
6.8
45.6
27.2
36.6
62.3
8.5
7.5
0.0
28.1
28.5
0.0
58.6
27.3
22.7
0.0
54.3
4.8
27.7
28.7
72.2
0.0
23.5
28.3
11.8
25.2
0.0
66.4
32.1
33.5
32.0
32.5
31.8
32.9
28.8
4.7
39.0

MAY
0.0
10.5
0.0
14.4
0.0
5.4
0.0
0.0
0.0
0.0
19.9
12.7
0.0
5.1
5.2
0.0
0.0
0.0
0.0
0.0
23.4
8.6
5.0
0.0
0.0
27.9
0.0
5.1
5.8
14.2
0.0
0.0
5.5
5.7
5.5
5.5
5.4
5.6
5.2
0.8
39.0

JUN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.8
0.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.8
0.0
0.0
0.0
0.0
0.8
0.8
21.2
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.7
0.0
39.0

JUL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.4
0.0
0.0
0.0
0.0
0.0
1.0
1.0
17.2
0.0
0.0
0.0
5.7
0.0
0.0
1.0
0.0
0.0
0.0
0.0
1.0
1.0
0.0
0.0
0.0
1.5
1.5
1.5
1.5
1.5
1.5
1.1
0.2
39.0

AGO
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
6.9
54.2
0.0
0.0
0.0
3.9
3.9
0.0
17.9
0.0
0.0
5.7
0.0
0.0
3.8
0.0
0.0
19.9
0.0
3.9
0.0
0.0
0.0
3.5
4.8
5.0
4.8
4.9
4.8
4.9
4.0
0.7
39.0

SEP
0.0
3.4
4.0
8.7
5.3
33.4
0.0
12.0
20.8
5.4
0.0
87.3
4.7
9.3
9.4
21.0
0.0
22.7
0.0
9.1
0.0
0.0
9.2
0.0
0.0
0.0
0.0
9.4
11.9
0.0
6.3
5.8
13.3
13.9
13.3
13.5
13.2
13.7
10.0
1.9
39.0

OCT
0.0
26.0
0.0
5.4
0.0
5.8
0.0
30.6
0.0
0.0
4.6
0.0
0.0
8.5
8.6
47.3
0.0
48.9
0.0
27.3
0.0
0.0
8.3
12.9
18.8
0.0
0.0
8.5
5.3
0.0
4.8
0.0
11.1
11.6
11.0
11.2
11.0
11.3
8.9
1.6
39.0

NOV
0.0
37.1
0.0
10.9
17.6
0.0
0.0
16.1
6.4
17.0
0.0
0.0
11.7
11.6
11.8
0.0
21.9
47.1
0.0
25.9
0.0
0.0
11.4
0.0
11.6
57.2
0.0
11.7
0.0
0.0
42.5
2.6
12.2
12.8
12.2
12.4
12.1
12.5
11.7
1.8
39.0

DIC
27.5
67.6
5.2
30.2
43.0
5.8
69.9
77.9
31.9
14.3
60.2
9.4
11.4
47.3
47.9
22.5
143.2
12.9
42.2
36.6
92.3
139.2
46.6
130.0
47.4
115.8
0.0
47.6
27.2
0.0
31.6
32.0
53.9
56.4
53.9
54.7
53.4
55.3
48.5
7.9
39.0

SUMA
MAXIMO

5495.7
465.8

6204.2
663.8

6742.2
422.8

1096.0
140.6

196.4
27.9

25.6
21.2

40.1
17.2

152.7
54.2

380.1
87.3

338.8
48.9

446.2
57.2

1844.2
143.2

M INIMO

4.6

23.3

40.8

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

MEDIANA
DESVIACI.

140.9
85.7

158.1
103.2

172.8
90.4

27.9
27.4

5.0
7.0

0.0
3.4

0.0
2.9

0.0
9.5

7.5
15.1

5.4
12.4

11.6
14.1

46.9
36.4

VARIANZA

7350.3

10654.6

8177.9

752.5

49.0

11.8

8.5

90.1

226.7

153.0

198.3

1325.4

GOBIERNO REGIONAL DE AYACUCHO

ANUAL
283.9
429.6
1397.2
557.7
413.0
690.3
493.6
911.6
357.0
758.3
571.4
637.0
275.6
586.1
593.9
370.3
658.5
556.4
231.5
507.6
865.9
1051.8
577.4
666.7
892.7
591.0
428.2
589.9
535.6
733.1
273.2
312.3
685.3
716.9
685.0
695.2
679.3
702.4
604.3
100.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 35
REGISTRO PLUVIOMETRICO EXTENDIDO 1987 - 2002
Latitud 14 14' S
Longitud 74 12' W

Estacin : PAMPAMARCA
Cdigo : 157207/DRE-05
Altitud :
3400
AO
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
MEDIA
PORCENTAJE
NUMERO
SUMA
MAXIMO

Distrito
Provincia
Departamento

AUCARA
LUCANAS
AYACUCHO

ENE
81.88
59.98
112.38
105.81
38.94
74.31
48.82
142.53
78.13
308.90
109.40
125.50
27.70
146.60
32.60
62.90
101.80
94.60
24.90
94.60
16.10
151.20
132.10
165.60
105.80
67.40
67.30
66.20
132.00
131.90
70.10
69.80

FEB
81.16
54.33
114.42
98.46
85.33
67.04
118.24
111.88
72.90
75.44
110.80
137.60
144.20
14.30
20.40
50.50
148.50
64.40
54.10
252.00
165.00
196.80
34.90
71.50
174.00
14.70
63.70
83.00
41.60
153.10
61.00
152.80

MAR
65.62
44.02
97.33
170.49
90.06
66.05
78.41
119.30
83.92
49.95
161.50
62.10
81.30
58.80
82.80
111.00
44.20
25.20
51.90
137.50
34.10
71.60
23.30
28.40
89.70
43.20
98.40
8.50
66.20
85.50
88.90
102.80

ABR
25.30
10.76
22.41
15.28
9.84
29.26
11.82
25.10
17.75
33.00
1.60
4.80
19.60
32.70
8.10
9.70
74.00
40.90
23.60
91.10
85.20
37.90
30.60
69.30
52.10
4.20
12.40
2.50
50.50
26.00
32.70
44.60

MAY
10.18
36.89
7.09
47.34
1.93
26.08
2.50
3.63
4.40
9.77
15.50
15.10
2.20
0.00
6.40
4.00
1.00
0.00
15.20
1.50
26.90
12.30
8.20
0.00
18.90
15.30
14.70
0.00
13.20
1.30
0.00
0.00

JUN
8.60
1.93
5.18
28.98
8.01
3.35
1.93
1.93
15.21
4.40
1.90
0.00
0.00
0.00
0.00
3.90
0.00
9.20
6.60
33.70
28.90
0.00
3.43
0.00
3.90
43.80
20.50
8.30
29.50
9.60
0.00
0.00

JUL
4.86
1.93
9.35
3.77
3.91
4.33
1.93
2.43
6.03
5.46
0.00
17.40
21.40
0.00
4.80
20.10
0.00
0.00
0.00
0.70
1.10
17.30
2.90
0.00
1.30
0.00
0.00
0.00
1.20
3.50
0.00
0.00

AGO
10.07
1.93
16.34
13.16
4.40
1.93
2.99
2.92
14.86
30.53
0.00
18.40
0.00
6.80
4.70
7.50
55.30
7.30
6.80
31.80
1.60
8.60
13.00
0.00
12.90
8.60
2.30
16.00
16.60
0.00
5.40
15.20

SEP
15.66
5.46
25.59
15.00
4.12
16.41
2.85
32.23
50.66
13.51
15.70
70.10
25.50
6.50
4.10
14.00
13.70
22.60
63.50
6.70
25.90
21.00
0.00
13.60
4.00
0.00
12.70
0.00
4.70
15.70
15.30
8.50

OCT
20.80
22.27
21.71
74.38
11.54
8.92
10.05
66.19
9.35
1.93
11.60
0.00
9.80
10.50
26.40
58.70
14.00
35.00
34.50
26.20
88.00
0.00
23.10
30.20
17.90
26.60
7.90
23.70
31.60
1.90
11.60
4.10

NOV
18.04
37.45
9.42
2.64
18.88
16.20
2.78
16.97
36.11
12.46
2.80
10.70
36.70
29.20
13.20
4.90
31.30
39.60
7.40
63.60
17.70
0.00
17.90
0.60
2.50
62.70
19.70
32.00
36.30
10.10
20.60
22.30

DIC
40.82
41.27
26.23
29.12
32.44
47.55
78.55
59.91
27.35
42.25
63.20
47.10
28.30
33.90
31.80
34.10
93.90
20.40
47.30
55.50
27.50
46.60
23.80
70.60
2.10
96.50
37.00
24.60
124.60
83.50
54.40
60.10

104.5
107.5
104.5
105.4
104.0
106.1
96.8
21.7
39.0

105.9
108.9
105.9
106.8
105.3
107.5
98.1
22.0
39.0

83.1
85.4
83.0
83.8
82.6
84.3
77.0
17.2
39.0

32.7
33.7
32.7
33.0
32.6
33.2
30.3
6.8
39.0

11.0
11.3
11.0
11.1
11.0
11.2
10.2
2.3
39.0

9.7
10.0
9.7
9.8
9.6
9.8
9.0
2.0
39.0

4.7
4.8
4.7
4.7
4.6
4.7
4.3
1.0
39.0

11.6
11.9
11.6
11.7
11.5
11.8
10.7
2.4
39.0

18.7
19.2
18.7
18.9
18.6
19.0
17.3
3.9
39.0

25.4
26.1
25.4
25.6
25.3
25.8
23.5
5.3
39.0

22.4
23.0
22.4
22.6
22.3
22.7
20.7
4.6
39.0

52.5
54.0
52.5
53.0
52.3
53.3
48.7
10.9
39.0

3679.8
308.9

3728.5
252.0

2924.3
170.5

1152.6
91.1

388.2
47.3

341.4
43.8

163.9
21.4

408.0
55.3

658.4
70.1

894.0
88.0

788.1
63.6

1850.0
124.6

M INIMO

16.1

14.3

8.5

1.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

2.1

MEDIANA
DESVIACI.

102.9
51.1

101.9
51.4

82.7
34.9

29.9
21.7

10.0
10.4

5.9
10.8

3.2
5.6

9.3
10.5

15.5
15.5

22.7
19.7

19.3
15.1

47.2
23.8

VARIANZA

2615.1

2645.9

1216.9

471.5

109.2

116.2

31.8

110.6

239.2

389.0

227.0

567.5

GOBIERNO REGIONAL DE AYACUCHO

ANUAL
383.0
318.2
467.4
604.4
309.4
361.4
360.9
585.0
416.7
587.6
494.0
508.8
396.7
339.3
235.3
381.3
577.7
359.2
335.8
794.9
518.0
563.3
313.2
449.8
485.1
383.0
356.6
264.8
548.0
522.1
360.0
480.2
482.2
495.8
482.1
486.5
479.7
489.6
446.8
100.00

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 36
REGISTRO PLUVIOMETRICO EXTENDIDO 1981 - 2002
14 36' S

Estacin : CCECCAA

Latitud

Cdigo : 157215/DRE-05

Longitud 74 0' W

Altitud :

4100

Distrito

PUQUIO

Provincia

LUCANAS

Departamento

AYACUCHO

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

1965

38.4

200.2

77.8

7.1

3.4

0.0

10.9

13.0

24.7

48.6

7.5

86.2

517.8

1966

183.4

110.3

91.4

12.2

55.8

0.0

0.0

0.0

43.3

50.9

86.0

11.1

644.4

1967

118.0

501.1

543.9

68.3

0.0

0.0

0.3

0.0

35.0

0.0

33.0

76.4

1376.0

1968

49.4

21.7

19.2

9.8

2.7

0.0

0.0

2.1

3.5

0.3

55.7

87.9

252.3

1969

77.2

166.3

260.9

33.3

0.0

0.0

0.0

0.0

10.1

6.0

54.9

116.1

724.8

1970

275.2

148.6

106.5

36.9

31.5

7.2

0.3

0.4

34.9

13.4

26.7

39.8

721.4

1971

111.2

200.3

211.4

94.1

0.0

2.1

0.0

1.7

0.0

8.0

7.5

108.1

744.4

1972

242.0

232.8

252.7

29.1

0.0

7.6

0.0

1.7

32.6

47.9

18.0

101.5

965.9

1973

225.4

166.9

159.0

75.9

0.0

1.4

0.0

31.1

85.5

17.6

28.3

88.0

879.1

1974

363.0

264.1

130.8

191.1

0.0

1.0

9.1

78.5

34.0

14.2

77.4

76.8

1240.0

1975

291.6

361.8

289.3

47.4

107.4

26.2

0.0

0.0

19.5

45.1

6.1

173.5

1367.9

1976

533.3

627.4

770.3

137.7

11.4

0.0

77.8

35.2

123.5

4.6

0.0

123.5

2444.7

1977

47.0

409.7

165.8

7.1

11.0

0.0

4.9

0.0

38.6

11.7

58.2

34.1

788.1

1978

151.5

56.1

93.2

47.2

0.0

2.3

0.0

2.3

18.3

25.3

60.5

30.7

487.4

1979

76.2

147.2

196.0

5.1

1.5

2.5

2.5

5.5

0.0

65.0

0.5

8.9

510.9

1980

151.2

54.2

224.5

6.8

0.0

0.0

42.9

44.2

56.8

23.9

7.9

60.0

672.4

1981

202.9

253.7

248.5

56.0

15.5

3.5

10.3

14.9

38.8

26.5

36.5

84.6

991.7

1982

173.8

217.3

212.8

47.9

13.3

3.0

8.8

12.8

33.2

22.7

31.3

72.4

849.3

1983

146.2

182.8

179.0

40.3

11.2

2.5

7.4

10.7

27.9

19.1

26.3

60.9

714.5

1984

172.7

215.9

211.4

47.6

13.2

3.0

8.8

12.7

33.0

22.5

31.1

72.0

843.8

1985

205.5

256.9

251.6

56.7

15.7

3.5

10.4

15.1

39.2

26.8

37.0

85.6

1004.0

1986

181.6

227.1

222.4

50.1

13.9

3.1

9.2

13.3

34.7

23.7

32.7

75.7

887.5

1987

152.7

190.9

186.9

42.1

11.7

2.6

7.7

11.2

29.2

19.9

27.5

63.6

746.1

1988

191.1

238.9

233.9

52.7

14.6

3.3

9.7

14.0

36.5

24.9

34.4

79.6

933.6

1989

186.7

233.4

228.6

51.5

14.3

3.2

9.5

13.7

35.6

24.3

33.6

77.8

912.1

1990

184.0

230.1

225.3

50.7

14.1

3.2

9.3

13.5

35.1

24.0

33.1

76.7

899.1

1991

167.5

209.4

205.1

46.2

12.8

2.9

8.5

12.3

32.0

21.8

30.2

69.8

818.5

1992

169.3

211.7

207.3

46.7

13.0

2.9

8.6

12.4

32.3

22.1

30.5

70.6

827.4

1993

184.8

231.1

226.3

51.0

14.2

3.2

9.4

13.6

35.3

24.1

33.3

77.0

903.3

1994

173.8

217.4

212.9

47.9

13.3

3.0

8.8

12.8

33.2

22.7

31.3

72.4

849.5

1995

175.9

220.0

215.4

48.5

13.5

3.0

8.9

12.9

33.6

22.9

31.7

73.3

859.6

1996

218.5

273.2

267.6

60.3

16.7

3.7

11.1

16.1

41.7

28.5

39.3

91.1

1067.8

1997

183.0

228.8

224.1

50.5

14.0

3.1

9.3

13.4

34.9

23.9

32.9

76.2

894.2

1998

187.1

233.9

229.1

51.6

14.3

3.2

9.5

13.7

35.7

24.4

33.7

77.9

914.1

1999

203.6

254.6

249.3

56.1

15.6

3.5

10.3

15.0

38.9

26.5

36.7

84.8

995.0

2000

201.7

252.1

246.9

55.6

15.4

3.5

10.2

14.8

38.5

26.3

36.3

84.0

985.4

2001

194.1

242.7

237.6

53.5

14.9

3.3

9.8

14.3

37.1

25.3

34.9

80.9

948.3

2002

201.6

252.1

246.9

55.6

15.4

3.5

10.2

14.8

38.5

26.3

36.3

84.0

985.1

MEDIA

184.0

230.1

225.3

50.7

14.1

3.2

9.3

13.5

35.1

24.0

33.1

76.7

899.1

PORCENTAJE

20.464

25.588

25.058

5.643

1.567

0.351

1.037

1.504

3.908

2.668

3.684

8.527

100.00

NUMERO

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

SUMA

6992.0

8742.8

8561.7

1928.1

535.4

119.9

354.3

513.9

1335.3

911.6

1258.7

2913.5
173.5

MAXIMO

533.3

627.4

770.3

191.1

107.4

26.2

77.8

78.5

123.5

65.0

86.0

M INIMO

38.4

21.7

19.2

5.1

0.0

0.0

0.0

0.0

0.0

0.0

0.0

8.9

MEDIANA

183.2

227.9

223.2

49.3

13.3

3.0

8.9

13.0

34.9

23.9

33.0

76.9

DESVIACI.

86.7

108.4

121.5

33.9

18.6

4.2

13.5

14.4

20.7

13.4

18.4

28.8

VARIANZA

7524.7

11744.8

14757.3

1150.0

345.8

17.8

182.7

207.1

428.9

179.3

336.8

828.5

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 37
REGISTRO PLUVIOMETRICO EXTENDIDO 1981 - 2002
ESTACION

: ANDAMARCA

DISTRITO

: CARMEN SALCEDO

ALTITUD : 3490 msnm

CODIGO

: -

PROVINCIA

: LUCANAS

LATITUD : 14 23'

DEPARTAMENTO

: AYACUCHO

LONGITUD: 73 58'

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

1965

24.4

165.6

64.6

5.7

11.5

6.2

13.4

10.0

47.5

25.8

3.5

62.9

441.1

1966

76.2

90.8

177.1

10.2

43.0

6.2

2.4

10.0

4.8

47.0

27.7

40.2

535.6

1967

211.3

153.0

168.5

46.0

6.0

6.2

18.5

11.3

22.2

9.9

2.4

14.6

669.9

1968

117.7

64.1

165.3

4.7

19.9

24.2

13.4

13.3

4.3

14.5

50.4

94.9

586.7

1969

36.0

66.0

80.3

4.5

4.0

6.2

13.4

5.0

21.3

21.1

42.9

85.6

386.3

1970

116.9

73.0

81.1

78.8

11.6

6.2

13.4

10.0

31.2

13.5

33.8

62.3

531.8

1971

84.1

115.8

145.4

60.8

1.1

1.0

13.4

10.0

4.5

10.8

1.2

102.6

550.7

1972

79.1

185.1

207.8

16.4

8.4

1.6

13.4

3.0

13.0

34.7

3.8

33.8

600.1

1973

72.6

95.1

125.6

23.5

11.5

6.2

13.4

10.0

21.0

16.8

18.2

88.5

502.4

1974

89.2

107.4

125.6

23.9

11.5

6.2

13.4

12.1

14.7

3.7

29.0

41.1

477.8

1975

121.0

98.8

132.7

3.0

35.2

6.2

13.4

10.0

8.6

13.4

3.9

109.3

555.5

1976

139.9

164.0

102.0

24.2

19.0

6.2

13.0

29.2

80.4

21.1

1.0

34.1

634.1

1977

14.5

203.1

79.6

19.9

1.2

6.2

13.4

10.0

13.4

14.0

47.6

20.9

443.8

1978

115.4

25.3

62.3

16.5

0.0

6.2

13.4

9.2

10.8

11.0

25.7

31.8

327.6

1979

26.1

76.0

141.9

7.1

0.0

1.2

3.0

4.5

5.1

20.8

6.6

55.4

347.7

1980

102.6

35.9

149.9

36.5

0.0

2.9

30.1

2.7

33.4

45.7

1.2

33.5

474.4

1981

84.4

105.5

103.3

23.3

6.5

1.4

4.3

6.2

16.1

11.0

15.2

35.2

412.3

1982

78.1

97.7

95.7

21.5

6.0

1.3

4.0

5.7

14.9

10.2

14.1

32.6

381.8

1983

92.0

115.1

112.7

25.4

7.0

1.6

4.7

6.8

17.6

12.0

16.6

38.3

449.7

1984

88.0

110.0

107.7

24.3

6.7

1.5

4.5

6.5

16.8

11.5

15.8

36.7

430.0

1985

100.5

125.7

123.1

27.7

7.7

1.7

5.1

7.4

19.2

13.1

18.1

41.9

491.2

1986

93.2

116.5

114.1

25.7

7.1

1.6

4.7

6.8

17.8

12.1

16.8

38.8

455.4

1987

78.9

98.7

96.7

21.8

6.0

1.4

4.0

5.8

15.1

10.3

14.2

32.9

385.7

1988

85.6

107.0

104.8

23.6

6.6

1.5

4.3

6.3

16.3

11.2

15.4

35.7

418.2

1989

112.1

140.2

137.3

30.9

8.6

1.9

5.7

8.2

21.4

14.6

20.2

46.7

548.0

1990

77.8

97.3

95.2

21.4

6.0

1.3

3.9

5.7

14.9

10.1

14.0

32.4

380.1

1991

80.5

100.6

98.5

22.2

6.2

1.4

4.1

5.9

15.4

10.5

14.5

33.5

393.2

1992

88.6

110.8

108.5

24.4

6.8

1.5

4.5

6.5

16.9

11.5

15.9

36.9

432.9

1993

100.8

126.1

123.5

27.8

7.7

1.7

5.1

7.4

19.3

13.1

18.1

42.0

492.7

1994

99.9

124.9

122.3

27.5

7.6

1.7

5.1

7.3

19.1

13.0

18.0

41.6

488.1

1995

96.8

121.0

118.5

26.7

7.4

1.7

4.9

7.1

18.5

12.6

17.4

40.3

472.8

1996

97.9

122.4

119.8

27.0

7.5

1.7

5.0

7.2

18.7

12.8

17.6

40.8

478.2

1997

103.1

128.9

126.2

28.4

7.9

1.8

5.2

7.6

19.7

13.4

18.6

42.9

503.6

1998

107.3

134.2

131.4

29.6

8.2

1.8

5.4

7.9

20.5

14.0

19.3

44.7

524.3

1999

103.0

128.8

126.1

28.4

7.9

1.8

5.2

7.6

19.7

13.4

18.5

42.9

503.4

2000

104.4

130.5

127.8

28.8

8.0

1.8

5.3

7.7

19.9

13.6

18.8

43.5

510.1

2001

102.3

127.9

125.2

28.2

7.8

1.8

5.2

7.5

19.5

13.3

18.4

42.6

499.7

2002

105.4

131.7

129.0

29.1

8.1

1.8

5.3

7.7

20.1

13.7

19.0

43.9

514.8

MEDIA

92.3

113.7

119.9

25.1

9.0

3.5

8.4

8.2

19.3

15.7

17.7

46.8

479.8

PORCENTAJE

20.464

25.588

25.058

5.643

1.567

0.351

1.037

1.504

3.908

2.668

3.684

8.527

100.00

NUMERO

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

SUMA

3507.4

4320.4

4557.2

955.4

343.2

134.8

319.8

313.2

733.5

595.0

673.4

1778.4

MAXIMO

211.3

203.1

207.8

78.8

43.0

24.2

30.1

29.2

80.4

47.0

50.4

109.3

M INIMO

14.5

25.3

62.3

3.0

0.0

1.0

2.4

2.7

4.3

3.7

1.0

14.6

MEDIANA

95.0

115.4

122.7

24.3

7.6

1.8

5.2

7.5

18.1

13.2

17.5

40.9

DESVIACI.

33.1

35.5

29.8

14.1

8.3

4.0

5.8

4.2

12.9

8.9

11.6

21.6

VARIANZA

1098.4

1261.7

888.0

198.7

69.4

16.3

33.1

17.4

165.9

79.9

135.1

466.6

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 38
REGISTRO PLUVIOMETRICO EXTENDIDO 1981 - 2002
14 29' S

Estacin : PAMPAHUAS I

Latitud

Cdigo : 157205/DRE-05

Longitud 74 15' W

Altitud :

3650

Distrito

LUCANAS

Provincia

LUCANAS

Departamento

AYACUCHO

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

ANUAL

1965

194.1

147.1

195.8

40.4

18.0

1.1

0.7

1.2

13.2

20.7

26.3

59.1

717.8

1966

46.9

70.1

96.8

0.0

6.8

0.0

0.0

0.0

0.0

44.3

29.6

13.8

308.3

1967

221.6

416.1

332.3

41.8

0.0

0.0

0.0

0.0

0.0

9.1

0.0

0.4

1021.4

1968

409.9

48.4

167.0

1.9

11.7

0.0

0.0

0.0

0.0

26.0

37.1

63.9

765.7

1969

39.3

136.8

216.0

94.2

0.0

0.0

0.0

0.0

0.0

0.0

59.6

48.1

594.1

1970

185.2

75.6

104.5

25.0

53.9

0.0

0.0

0.0

21.2

14.0

9.0

36.3

524.6

1971

86.3

140.9

112.9

47.3

0.0

0.0

0.0

0.0

0.0

6.1

0.0

113.7

507.3

1972

188.1

149.6

294.9

15.7

0.0

0.0

0.0

0.0

25.8

34.8

22.0

139.4

870.3

1973

200.0

155.6

175.0

102.2

0.0

0.0

0.1

0.4

25.8

1.0

31.6

34.9

726.7

1974

257.9

100.2

74.2

72.7

3.0

3.3

3.6

3.9

4.2

4.4

30.7

47.8

605.9

1975

204.9

107.3

150.4

6.2

69.5

6.7

7.0

7.3

7.6

35.2

11.4

94.6

708.0

1976

264.9

188.4

171.4

9.6

9.9

10.2

10.5

12.3

18.7

11.3

11.6

31.9

750.7

1977

20.5

156.5

307.6

13.1

13.3

13.6

13.9

14.2

48.5

17.8

45.6

35.3

699.9

1978

119.1

63.6

67.7

61.7

34.8

17.1

17.4

17.6

17.9

39.5

59.3

37.8

553.6

1979

192.1

79.1

168.1

21.9

20.2

22.7

20.8

21.1

21.4

28.2

21.9

37.8

655.3

1980

134.5

58.8

163.1

23.4

39.7

24.0

24.2

24.5

24.8

30.1

25.4

78.4

650.9

1981

174.4

132.1

175.8

36.3

16.2

1.0

0.6

1.1

11.8

18.6

23.7

53.1

644.7

1982

165.2

125.2

166.6

34.4

15.3

0.9

0.6

1.1

11.2

17.6

22.4

50.3

610.7

1983

185.6

140.7

187.2

38.6

17.2

1.1

0.7

1.2

12.6

19.8

25.2

56.5

686.3

1984

179.7

136.2

181.2

37.4

16.7

1.0

0.7

1.2

12.2

19.1

24.4

54.7

664.3

1985

198.1

150.1

199.8

41.2

18.4

1.1

0.7

1.3

13.4

21.1

26.9

60.4

732.5

1986

187.3

142.0

188.9

39.0

17.4

1.1

0.7

1.2

12.7

19.9

25.4

57.1

692.6

1987

166.3

126.0

167.8

34.6

15.4

1.0

0.6

1.1

11.3

17.7

22.6

50.7

615.0

1988

176.1

133.5

177.6

36.6

16.3

1.0

0.6

1.1

12.0

18.7

23.9

53.7

651.3

1989

215.2

163.1

217.1

44.8

20.0

1.2

0.8

1.4

14.6

22.9

29.2

65.6

795.8

1990

164.6

124.8

166.0

34.2

15.3

0.9

0.6

1.1

11.2

17.5

22.3

50.2

608.7

1991

168.6

127.8

170.0

35.1

15.6

1.0

0.6

1.1

11.4

17.9

22.9

51.4

623.3

1992

180.6

136.8

182.1

37.6

16.7

1.0

0.7

1.2

12.3

19.2

24.5

55.0

667.6

1993

198.6

150.5

200.3

41.3

18.4

1.1

0.7

1.3

13.5

21.1

26.9

60.5

734.2

1994

197.2

149.4

198.9

41.0

18.3

1.1

0.7

1.3

13.4

21.0

26.8

60.1

729.1

1995

192.6

145.9

194.2

40.1

17.9

1.1

0.7

1.2

13.1

20.5

26.1

58.7

712.1

1996

194.2

147.2

195.9

40.4

18.0

1.1

0.7

1.2

13.2

20.7

26.4

59.2

718.1

1997

201.9

153.0

203.6

42.0

18.7

1.2

0.7

1.3

13.7

21.5

27.4

61.5

746.4

1998

208.1

157.7

209.9

43.3

19.3

1.2

0.8

1.3

14.1

22.1

28.2

63.4

769.5

1999

201.8

152.9

203.5

42.0

18.7

1.2

0.7

1.3

13.7

21.5

27.4

61.5

746.2

2000

203.8

154.4

205.6

42.4

18.9

1.2

0.7

1.3

13.8

21.7

27.7

62.1

753.6

2001

200.7

152.1

202.4

41.7

18.6

1.2

0.7

1.3

13.6

21.4

27.2

61.1

742.0

2002

205.2

155.5

207.0

42.7

19.0

1.2

0.8

1.3

13.9

21.8

27.8

62.5

758.9

MEDIA

182.4

138.2

184.2

38.0

17.6

3.2

3.0

3.4

13.5

20.2

26.0

56.4

685.9

PORCENTAJE

27.046

20.495

27.277

5.626

2.507

0.155

0.099

0.174

1.835

2.878

3.67

8.239

100.00

NUMERO

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

39.0

SUMA

6931.2

5250.9

6999.1

1443.6

666.9

122.6

113.5

129.4

511.7

765.8

986.5

2142.4
139.4

MAXIMO

409.9

416.1

332.3

102.2

69.5

24.0

24.2

24.5

48.5

44.3

59.6

M INIMO

20.5

48.4

67.7

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4

MEDIANA

192.3

141.4

184.7

39.5

17.3

1.1

0.7

1.2

13.2

20.6

26.2

56.8

DESVIACI.

64.4

56.6

52.9

20.6

13.6

6.1

6.1

6.1

8.8

9.2

11.6

23.5

VARIANZA

4147.3

3200.3

2803.0

425.3

184.7

36.7

36.7

37.1

78.1

84.1

135.1

550.4

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 39
Precipitacion total mensual - Promedio multimensual (1965-2002)

ESTACION

MESES

ALTITUD
(m snm )

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

TOTAL
ANUAL

PUQUIO

3213.0

100.2

116.3

104.3

20.3

4.3

1.4

0.9

1.7

5.6

7.9

12.2

43.4

418.6

LUCANAS

3400.0

119.4

137.4

158.3

45.6

5.8

2.1

1.3

3.2

5.3

15.8

19.2

38.3

551.6

PAUCACORRAL

4060.0

144.6

163.3

177.4

28.8

5.2

0.7

1.1

4.0

10.0

8.9

11.7

48.5

604.3

PAMPAMARCA

3400.0

96.8

98.1

77.0

30.3

10.2

9.0

4.3

10.7

17.3

23.5

20.7

48.7

446.8

CCECCAA

4100.0

184.0

230.1

225.3

50.7

14.1

3.2

9.3

13.5

35.1

24.0

33.1

76.7

899.1

ANDAMARCA

3490.0

92.3

113.7

119.9

25.1

9.0

3.5

8.4

8.2

19.3

15.7

17.7

46.8

479.8

PAMPAHUASI

3650.0

182.4

138.2

184.2

38.0

17.6

3.2

3.0

3.4

13.5

20.2

26.0

56.4

685.9

Porcentaje de variacion de la precipitacion total mensual (%)

ESTACION

ALTITUD
(m snm )

ENE

FEB

MAR

ABR

MAY

MESES
JUN
JUL

AGO

SEP

OCT

NOV

DIC

TOTAL
ANUAL

PUQUIO

3213.0

23.9

27.8

24.9

4.8

1.0

0.3

0.2

0.4

1.3

1.9

2.9

10.4

100.0

LUCANAS

3400.0

21.6

24.9

28.7

8.3

1.1

0.4

0.2

0.6

1.0

2.9

3.5

6.9

100.0

PAUCACORRAL

4060.0

23.9

27.0

29.4

4.8

0.9

0.1

0.2

0.7

1.7

1.5

1.9

8.0

100.0

PAMPAMARCA

3400.0

21.7

22.0

17.2

6.8

2.3

2.0

1.0

2.4

3.9

5.3

4.6

10.9

100.0

CCECCAA

4100.0

20.5

25.6

25.1

5.6

1.6

0.4

1.0

1.5

3.9

2.7

3.7

8.5

100.0

ANDAMARCA

3490.0

19.2

23.7

25.0

5.2

1.9

0.7

1.8

1.7

4.0

3.3

3.7

9.8

100.0

PAMPAHUASI

3650.0

26.6

20.1

26.9

5.5

2.6

0.5

0.4

0.5

2.0

2.9

3.8

8.2

100.0

FIGURA N 31
Precipitacion Total Anual - Promedio Multianual (1965-2002)
899.1
900
800

685.9

700

551.6

600
500

418.6

604.3
446.8

479.8

400
300
200
100
0

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

GOBIERNO REGIONAL DE AYACUCHO

0.0

50.0

100.0

150.0

200.0

250.0

ENE

FEB

MAR ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

FIGURA N 30
VARIACION DE LA PRECIPITACION - PROMEDIO MULTIMENSUAL
(1965-2002)

Tiempo (meses)

PAMPAHUASI

ANDAMARCA

CCECCAA

PAMPAMARCA

PAUCACORRAL

LUCANAS

PUQUIO

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

Precipitacion (mm)

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 40
METODO DEL POLIGONO DE THIESSEN PARA LA CUENCA DEL RIO IRURO
PRECIPITACION
AREA DEL
VOLUMEN (m3)
(mm)
POLIGONO (Has)

ESTACION
PAMPAMARCA
PAMPAHUASI

446.8
685.9

9601.4
8951.6

Sumatoria

18553.0

Precipitacion areal de la cuenca:

42895773.2
61397274.4
104293047.6

PESOS

P.PARCIAL

0.518
0.482
1.000

231.21
330.93
562.14

562.1 mm

METODO DEL POLIGONO DE THIESSEN PARA LA CUENCA DEL RIO CALLCACC


PRECIPITACION
AREA DEL
VOLUMEN (m3)
(mm)
POLIGONO (Has)

ESTACION
PAMPAHUASI

685.9
Sumatoria

5459.0

37442215.3

5459.0

37442215.3

Precipitacion areal de la cuenca:

PESOS

P.PARCIAL

1.000
1.000

685.88
685.9

685.9 mm

METODO DEL POLIGONO DE THIESSEN PARA LA CUENCA DEL RIO CCERORACRA


PRECIPITACION
AREA DEL
VOLUMEN (m3)
(mm)
POLIGONO (Has)

ESTACION
PAMPAHUASI

685.9
Sumatoria

854.0

5857419.3

854.0

5857419.3

Precipitacion areal de la cuenca:

PESOS

P.PARCIAL

1.000
1.000

685.88
685.9

685.9 mm

METODO DEL POLIGONO DE THIESSEN PARA ESTACION PALPACHACRA


PRECIPITACION
AREA DEL
VOLUMEN (m3)
(mm)
POLIGONO (Has)

ESTACION
PAMPAMARCA
LUCANAS
PAMPAHUASI

446.8
551.6
685.9

9601.4
3509.3
58956.2

Sumatoria

72066.9

Precipitacion areal de la cuenca:

42895773.2
19356670.3
404368792.0
466621235.5

PESOS

P.PARCIAL

0.133
0.049
0.818
1.000

59.52
26.86
561.10
647.48

647.5 mm

METODO DEL POLIGONO DE THIESSEN PARA CUENCA RIO JACHJALLA


ESTACION
LUCANAS
PAMPAHUASI

PRECIPITACION
AREA DEL
VOLUMEN (m3)
(mm)
POLIGONO (Has)
551.6
685.9

3056062.9
10586266.5

16856599519.6
72609135001.2

Sumatoria

13642329.4

89465734520.8

Precipitacion areal de la cuenca:

PESOS

P.PARCIAL

0.224
0.776
1.000

123.56
532.23
655.80

655.8 mm

METODO DEL POLIGONO DE THIESSEN PARA CUENCA RIO ACARI


ESTACION
Huarato
Galeras
Puquio
Cechapampa
Cceccaa
Paucacorral
Lucanas
Pampahuasi
Pampamarca

PRECIPITACION
AREA DEL
VOLUMEN (m3)
(mm)
POLIGONO (Has)

PESOS

P.PARCIAL

9.66
524.49
418.58
685.77
899.14
604.27

77773.34
42081.41
47629.54
58263.18
35074.78
18434.02

7512904.6
220712787.3
199365751.9
399551409.5
315371148.0
111390859.8

0.21

551.58
685.88
446.77

30307.11

167167638.3
390855986.4
42895771.6

0.08
0.15

1854824257.4

1.00

2.00
58.68
53.00
106.22
83.84
29.61
44.44
103.91
11.40
493.11

Sumatoria

56986.0
9601.4
376150.8

Precipitacion areal de la cuenca:

GOBIERNO REGIONAL DE AYACUCHO

0.11
0.13
0.15
0.09
0.05

0.03

493.1 mm

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 41
PRECIPITACION AREAL DE LA CUENCA DEL RIO IRURO (mm)
ESTACION
PAMPAMARCA
PAMPAHUASI

PESOS
0.518
0.482

PRECIPITACION AREAL(SUMA)

ENE
96.8
182.4

FEB
98.1
138.2

MAR
77.0
184.2

ABR
30.3
38.0

MAY
10.2
17.6

JUN
9.0
3.2

JUL
4.3
3.0

AGO
10.7
3.4

SEP
17.3
13.5

OCT
23.5
20.2

NOV
20.7
26.0

DIC
48.7
56.4

TOTAL
446.8
685.9

138.12

117.45

128.69

34.03

13.75

6.21

3.67

7.20

15.46

21.90

23.26

52.40

562.14

PRECIPITACION AREAL DE LA CUENCA DEL RIO CALLCACC , CERORACRA y AZULJAJA (mm)


ESTACION
PAMPAHUASI

PESOS
1.000

PRECIPITACION AREAL(SUMA)

ENE
182.40

FEB
138.18

MAR
184.19

ABR
37.99

MAY
17.55

JUN
3.23

JUL
2.99

AGO
3.41

SEP
13.47

OCT
20.15

NOV
25.96

DIC
56.38

TOTAL
685.9

182.40

138.18

184.19

37.99

17.55

3.23

2.99

3.41

13.47

20.15

25.96

56.38

685.88

PRECIPITACION AREAL DE LA CUENCA DEL RIO DESCOMULGADO (mm)


ESTACION

PESOS

LUCANAS
1.000
PRECIPITACION AREAL(SUMA)

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

TOTAL

119.36
119.36

137.38
137.38

158.29
158.29

45.59
45.59

5.81
5.81

2.09
2.09

1.26
1.26

3.23
3.23

5.32
5.32

15.76
15.76

19.20
19.20

38.29
38.29

551.6
551.58

PRECIPITACION AREAL DE LA ESTACION PALPACHRACRA (mm)


ESTACION
PAMPAMARCA

PESOS
0.133

LUCANAS
0.049
PAMPAHUASI
0.818
PRECIPITACION AREAL(SUMA)

ENE
96.8

FEB
98.1

MAR
77.0

ABR
30.3

MAY
10.2

JUN
9.0

JUL
4.3

AGO
10.7

SEP
17.3

OCT
23.5

NOV
20.7

DIC
48.7

TOTAL
446.8

119.4
182.4
162.12

137.4
138.2
126.11

158.3
184.2
160.93

45.6
38.0
35.12

5.8
17.6
15.72

2.1
3.2
3.84

1.3
3.0
3.02

3.2
3.4
4.22

5.3
13.5
13.32

15.8
20.2
19.62

19.2
26.0
24.00

38.3
56.4
52.61

551.6
685.9
620.62

PRECIPITACION AREAL DE LACUENCA RIO JACHJALLA (mm)


ESTACION

PESOS

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

TOTAL

0.224
0.776

119.4
182.4

137.4
138.2

158.3
184.2

45.6
38.0

5.8
17.6

2.1
3.2

1.3
3.0

3.2
3.4

5.3
13.5

15.8
20.2

19.2
26.0

38.3
56.4

551.6
685.9

168.28

138.00

178.39

39.69

14.92

2.97

2.60

3.37

11.64

19.17

24.45

52.33

655.80

PESOS

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

TOTAL

Huarato
Galeras
Puquio

0.207
0.112
0.127

2.59
126.78
100.20

1.84
135.79
116.34

0.69
118.51
104.27

0.46
33.93
20.30

0.04
8.72
4.30

0.33
3.61
1.40

0.99
2.24
0.92

0.11
3.09
1.74

0.43
6.53
5.61

0.59
14.41
7.92

0.16
19.73
12.21

1.43
51.15
43.37

9.66
524.49
418.58

Cechapampa
Cceccaa

0.155
0.093

139.95
184.00

189.04
230.07

187.77
225.31

46.77
50.74

6.63
14.09

5.19
3.16

2.28
9.32

5.04
13.52

11.19
35.14

15.18
23.99

16.20
33.12

60.53
76.67

685.77
899.14

Paucacorral
Lucanas

0.049
0.081

144.62
119.36

163.27
137.38

177.43
158.29

28.84
45.59

5.17
5.81

0.67
2.09

1.06
1.26

4.02
3.23

10.00
5.32

8.92
15.76

11.74
19.20

48.53
38.29

604.27
551.58

Pampahuasi
Pampamarca

0.151
0.026

182.40
96.84

138.18
98.12

184.19
76.96

37.99
30.33

17.55
10.22

3.23
8.98

2.99
4.31

3.41
10.74

13.47
17.33

20.15
23.53

25.96
20.74

56.38
48.69

685.88
446.77

PESOS

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

TOTAL

0.207
0.112
0.127
0.155
0.093
0.049
0.081
0.151
0.026

0.54
14.18
12.69
21.68
17.16
7.09
9.62
27.63
2.47

0.38
15.19
14.73
29.28
21.45
8.00
11.07
20.93
2.50

0.14
13.26
13.20
29.08
21.01
8.70
12.75
27.90
1.96

0.10
3.80
2.57
7.24
4.73
1.41
3.67
5.76
0.77

0.01
0.98
0.54
1.03
1.31
0.25
0.47
2.66
0.26

0.07
0.40
0.18
0.80
0.29
0.03
0.17
0.49
0.23

0.20
0.25
0.12
0.35
0.87
0.05
0.10
0.45
0.11

0.02
0.35
0.22
0.78
1.26
0.20
0.26
0.52
0.27

0.09
0.73
0.71
1.73
3.28
0.49
0.43
2.04
0.44

0.12
1.61
1.00
2.35
2.24
0.44
1.27
3.05
0.60

0.03
2.21
1.55
2.51
3.09
0.58
1.55
3.93
0.53

0.30
5.72
5.49
9.38
7.15
2.38
3.09
8.54
1.24

2.00
58.68
53.00
106.22
83.84
29.61
44.44
103.91
11.40

113.05

123.55

128.01

30.05

7.51

2.67

2.51

3.88

9.94

12.68

15.97

43.28

493.11

LUCANAS
PAMPAHUASI

PRECIPITACION AREAL(SUMA)

PRECIPITACION AREAL DE LACUENCA RIO ACARI (mm)


ESTACION

PRECIPITACION AREAL MENSUAL DE LACUENCA RIO ACARI (mm)


ESTACION
Huarato
Galeras
Puquio
Cechapampa
Cceccaa
Paucacorral
Lucanas
Pampahuasi
Pampamarca

PRECIPITACION AREAL(SUMA)

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIGURAN 32
Precipitacion Media Areal Total mensual (mm) - Cuenca Rio
Iruro - Metodo Poligonos de Thiessen

138.12
140

128.69
117.45

120
100
80

52.40

60

34.03

40

13.75

20

6.21 3.67 7.20

15.46

21.90 23.26

ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 42
METODO DE LAS ISOYETAS PARA LA CUENCA RIO IRURO
RANGO DE
ISOYETAS

ALTURA MEDIA
(mm)

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

PESOS

P.PARCIAL

510 - 530
530 - 550
550 -570
570 - 590
590 - 610
610- 620

520.0
540.0
560.0
580.0
600.0
615.0

2338.8
3661.4
3448.6
4396.9
4130.4
576.7
18552.9

12161954.8
19771634.6
19312429.8
25502268.2
24782392.4
3546465.9
1.051E+08

0.126
0.197
0.186
0.237
0.223
0.031
1.000

65.55
106.57
104.09
137.46
133.58
19.12
566.4

Sumatoria

Precipitacion areal de la cuenca: 566.4 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO CALLACC


ESTACION

ALTURA MEDIA
(mm)

560 - 570
570 - 590
590 - 610
610 - 630

565.0
580.0
610.0
620.0
Sumatoria

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

PESOS

P.PARCIAL

426.8
811.4
356.9
228.7
1823.8

2411610.7
4706241.3
2176868.4
1418067.8
10712788.1

0.234
0.445
0.196
0.125
1.000

132.23
258.04
119.36
77.75
587.4

Precipitacion areal de la cuenca: 587.4 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO CCERORACCRA


ESTACION

ALTURA MEDIA
(mm)

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

650 - 670
670 - 680

660.0
675.0

774.5
82.1

5111568.6
553983.0

856.6

5665551.6

Sumatoria

PESOS

P.PARCIAL

0.904
0.096
1.000

596.76
64.68
661.4

Precipitacion areal de la cuenca: 661.4 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO AZULJAJA


ESTACION

ALTURA MEDIA
(mm)

560 - 570
570 - 590
590 - 610
610 - 630
630 - 650

565.0
580.0
600.0
620.0
640.0
Sumatoria

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

PESOS

P.PARCIAL

229.8
958.8
567.5
697.5
641.2
3094.8

1298607.5
5560811.8
3404886.9
4324574.1
4103639.1
18692519.4

0.074
0.310
0.183
0.225
0.207
1.000

41.96
179.683
110.020
139.737
132.598
604.0

Precipitacion areal de la cuenca: 604.0 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO JACHJALLA


ESTACION

ALTURA MEDIA
(mm)

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

550 - 570
570 - 580

610.0
575.0

1278.5
85.4

7798641.9
490921.4

1363.8

8289563.3

Sumatoria

PESOS

P.PARCIAL

0.937
0.063
1.000

571.81
36.00
607.8

Precipitacion areal de la cuenca: 607.8 mm

METODO DE ISOYETAS PARA LA CUENCA DEL RIO DESCOMULGADO


ESTACION

ALTURA MEDIA
(mm)

AREA ENTRE
LINEAS (Has)

VOLUMEN
(m3)

520 - 530
530 - 550
550 - 560

525.0
540.0
555.0

138.3
1513.8
735.3

726187.9
8174616.1
4080649.4

2387.4

12981453.4

Sumatoria

PESOS

P.PARCIAL

0.058
0.634
0.308
1.000

30.42
342.41
170.93
543.8

Precipitacion areal de la cuenca: 543.8 mm

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

ANEXO III
- Anlisis de Mximas Avenidas

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 43
REGISTRO DE PRECIPITACION MAXIMA EN 24 HORAS (mm )
ESTACION
: PUQUIO CO - 736

ALTITUD
LATITUD
LONGITUD

: 3213 m.s.n.m.
: 1442' S
: 7408' W

DEPARTAMENTO: AYACUCHO
PROVINCIA
: LUCANAS
DISTRITO
: PUQUIO

1964

3.2

11

13

9.1

6.3

1965

12.20

20.80

12.90

8.50

0.00

0.00

0.00

0.00

1966

8.00

12.10

19.10

2.60

0.00

0.00

0.00

0.00

0.00

6.80

6.70

8.80

1967

22.50

33.50

27.00

19.40

35.00

0.00

4.60

0.00

7.60

0.00

0.00

22.60

1968

23.80

13.10

15.60

1.80

0.00

0.00

0.00

0.00

0.00

20.00

33.00

17.00

1969

12.00

15.40

26.50

14.50

0.00

0.00

0.00

0.00

5.20

0.00

7.60

24.20

1970

22.60

13.80

10.20

2.80

6.80

0.00

0.00

0.00

8.80

2.40

1.80

14.20

1971

12.40

10.00

21.40

11.00

4.80

0.00

0.00

0.00

0.00

2.20

1.60

8.40

1972

18.60

27.00

21.40

3.20

0.00

3.80

3.80

0.00

6.40

10.00

0.00

14.40

1973

22.20

19.20

20.20

11.80

0.00

5.80

0.00

1.60

9.80

0.00

2.40

12.00

1974

25.60

10.20

6.40

2.80

0.00

0.00

5.20

4.00

0.00

2.40

1.80

1975

4.80

12.50

8.40

2.80

4.20

0.00

0.00

0.00

2.40

3.60

8.90

1976

22.40

18.60

9.50

2.30

3.40

0.00

0.00

4.40

0.00

0.00

12.80

1977

1.40

32.90

19.00

0.00

0.00

0.00

0.00

7.10

3.40

1978

17.30

12.90

22.70

14.10

0.00

0.00

0.00

0.00

0.00

23.20

0.00

1979

12.10

15.30

25.40

0.00

0.00

0.00

0.00

0.00

7.60

0.00

0.00

1980

6.00

3.80

13.40

0.00

0.00

5.30

0.00

12.50

3.80

0.00

3.40

1981

20.20

16.50

13.10

12.50

0.00

0.00

0.00

8.70

0.00

0.00

5.60

13.40

1982

24.50

9.80

6.50

0.00

0.00

0.00

0.00

0.00

0.00

7.80

0.00

1983

13.60

10.20

15.00

7.60

6.80

0.00

4.20

2.90

4.70

14.60

1984

15.40

5.80

0.00

10.00

1985

8.50

15.40

32.70

8.90

0.00

0.00

0.40

0.00

17.50

1986

24.10

36.00

12.50

8.10

0.00

0.00

0.00

8.00

0.00

0.00

2.80

16.80

1987

16.00

21.60

15.40

5.70

4.00

3.00

2.50

4.00

0.50

3.30

3.70

4.70

1988

18.90

12.90

9.50

9.10

12.50

0.00

1989

19.20

12.60

11.80

2.80

2.80

0.00

0.00

0.00

8.40

0.00

0.00

1990

8.80

12.60

8.80

3.80

8.40

5.40

0.00

0.00

1.20

2.40

25.20

16.00

1991

12.10

13.80

20.40

13.20

0.00

3.80

3.20

0.00

1993

30.80

16.40

32.90

6.20

8.90

0.00

0.00

8.40

0.00

11.50

4.00

18.50

1994

19.90

22.60

21.30

0.00

3.60

4.00

0.00

0.00

0.00

2.40

0.00

5.80

MAX
22.5
13.0
20.8
19.1
35.0
33.0
26.5
22.6
21.4
27.0
22.2
25.6
12.5
22.4
32.9
23.2
25.4
13.4
20.2
24.5
15.0
15.4
32.7
36.0
21.6
18.9
19.2
25.2
20.4
32.9
22.6

1995

18.80

5.60

0.00

0.00

0.00

0.00

17.00

0.00

12.80

17.00

18.8

A O S

EN E

F EB

M AR

ABR

M AY

1963

SD

22.5

7.6

7.5

J UN

J UL

A GO

SEP

OC T

N OV

D IC

6.9
0

3.3

12.1

11.6

0.00

0.00

0.00

1992

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 44
REGISTRO DE PRECIPITACION MAXIMA EN 24 HORAS (mm )
ESTACION: ANDAMARCA

AO

ENE

FEB

MAR

ALTITUD : 3,490 m.s.n.m.

DEPARTAMENTO

: AYACUCHO

LATITUD : 1423' S

PROVINCIA

: LUCANAS

LONGITUD: 7358' W

DISTRITO

: CARMEN SALCEDO

ABR

MAY

JUN

JUL

AGO

1963

SEP

OCT

NOV

DIC

MAX

11.5

14.2

14.2

1.7

17.8

14.2

17.8

4.7

1964

9.0

10.6

15.2

15.0

1965

8.7

10.6

21.2

5.0

0.0

0.0

1966

19.8

20.1

42.5

7.9

19.9

0.0

1967

30.1

19.2

21.9

6.6

2.8

1968

19.9

13.5

32.1

1.9

1969

9.7

16.0

16.5

1970

19.4

15.8

1971

15.1

1972
1973

7.1

27.8

14.2

3.5

32.8

32.8

2.4

0.0

2.8

18.6

9.8

12.8

42.5

0.0

8.2

3.8

7.6

6.8

1.8

8.8

30.1

7.9

6.3

0.0

5.2

4.3

3.9

16.9

15.0

32.1

3.0

2.4

0.0

0.0

5.0

8.0

11.4

29.2

29.2

10.4

18.4

5.2

0.0

0.0

0.0

13.2

3.8

12.5

15.1

19.4

17.4

22.9

17.3

0.6

1.0

0.0

3.7

7.5

1.2

12.8

22.9

11.4

30.2

39.2

6.0

8.4

1.2

0.0

3.0

10.4

12.5

2.8

10.5

39.2

21.3

18.0

9.4

0.0

0.0

0.0

0.0

0.0

15.6

8.0

18.0

21.3

0.0

12.1

10.5

1.9

20.1

12.9

20.1

1974
1975

19.9

12.1

17.4

3.0

16.8

6.2

0.0

0.0

3.3

2.7

3.9

14.1

19.9

1976

40.0

30.3

13.3

6.4

7.8

0.0

5.3

18.7

12.1

1.0

15.7

40.0

1977

9.8

23.4

12.6

16.5

0.7

0.0

0.0

0.0

5.4

11.1

11.9

6.5

23.4

1978

25.8

5.6

18.5

6.9

0.0

0.0

0.0

9.2

10.8

4.0

5.5

6.9

25.8

1979

18.0

22.3

23.1

3.3

1.2

3.0

1.5

4.0

11.4

6.1

19.0

23.1

1980

27.9

17.5

29.7

17.3

0.0

2.9

19.3

2.7

14.6

9.3

1.2

10.0

29.7

1981

27.2

22.0

5.0

18.7

2.4

0.0

0.0

SD

13.5

27.2

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

10.8

25.7

27.0

10.8

0.0

8.1

10.8

17.6

4.1

23.0

17.6

18.9

1993

24.3

31.1

21.6

16.2

12.2

2.0

8.8

7.4

6.8

16.2

16.2

23.0

1994

16.2

20.3

12.2

27.0

5.4

2.0

0.0

0.0

2.7

2.7

16.2

10.8

1995

23.9

33.8

39.8

9.6

2.0

3.5

2.7

2.7

14.9

3.4

11.5

27.0

1996

35.2

23.0

17.6

18.9

9.5

4.1

1.4

10.1

2.0

11.5

16.2

19.6

1997

28.4

27.7

19.6

12.2

5.4

0.0

0.7

16.9

21.0

16.9

14.9

21.6

1998

27.0

25.7

15.5

20.3

1.4

4.7

0.0

4.1

8.8

8.1

16.2

17.6

1999

16.9

42.6

17.6

18.3

2.7

3.4

3.4

2.7

15.5

16.2

13.5

S/D

2000

23.7

27.7

23.7

10.1

19.6

17.6

4.7

3.4

13.5

17.6

11.5

43.9

2001

27.0

37.9

30.4

11.5

30.4

1.4

2.7

5.4

6.8

5.4

18.9

SD

2002

20.3

18.9

21.6

8.1

6.5

3.4

22.3

9.0

21.9

23.0

8.7

39.3

2003

23.3

15.8

18.6

8.6

4.8

0.0

1.3

10.6

11.4

7.4

11.1

14.8

2004

7.8

30.3

18.8

5.4

2.1

4.6

10.2

3.2

19.7

10.0

12.4

14.7

2005

19.1

20.6

16.9

9.8

0.0

0.0

6.7

10.0

19.9

19.3

12.9

30.6

2006

27.1

36.0

23.1

12.3

4.2

3.6

4.0

22.7

6.5

16.4

15.3

23.4

GOBIERNO REGIONAL DE AYACUCHO

27.0
31.1
27.0
39.8
35.2
28.4
27.0
42.6
43.9
37.9
39.3
23.3
30.3
30.6
36.0

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CUADRO N 45
REGISTRO DE PRECIPITACION MAXIMA EN 24 HORAS (mm )
ESTACION: AUCAR

A O S

EN E

ALTITUD
LATITUD
LONGITUD

F EB

M AR

ABR

: 3220 m.s.n.m.
: 1417' S
: 7358' W
M AY

J UN

1963
1964

16.00

8.60

4.20

8.50

1965

10.00

26.90

13.10

1966

21.00

22.00

8.50

1967

22.90

20.70

1968

25.10

1969
1970

DEPARTAMENTO
PROVINCIA
DISTRITO

: AYACUCHO
: LUCANAS
: CARMEN SALCEDO

J UL

A GO

SEP

OC T

N OV

D IC

MAX

0.00

0.30

7.80

8.70

16.70

22.00

12.00

15.10

22.0
16.0
30.0
22.0
44.2
40.6
20.8
33.8
27.5
30.6
20.3
20.2
28.9
25.8
43.6
16.2
28.5
20.6
20.2
23.4
19.5
36.9
42.3
15.0
39.0
8.2

1.20

0.00

0.00

2.70

1.50

3.30

10.60

0.00

0.00

5.00

3.10

20.00

10.00

0.00

30.00

5.60

12.50

0.00

8.50

0.00

0.00

13.50

11.70

15.00

44.20

22.50

0.00

0.00

14.50

10.50

7.00

12.50

7.00

8.50

40.60

30.50

0.00

0.00

0.00

0.00

10.50

0.00

10.50

10.40

11.50

11.70

20.50

20.80

10.50

0.00

0.00

0.00

9.40

9.50

8.20

10.50

16.00

33.80

20.20

20.80

20.20

15.20

5.60

0.00

0.00

8.10

8.70

11.50

1971

17.30

26.40

27.50

0.00

0.00

0.00

5.10

5.20

3.80

4.10

18.30

1972

30.10

30.60

23.40

14.10

2.10

8.10

0.00

0.00

12.00

12.60

11.30

18.50

1973

15.30

19.10

11.10

10.10

0.00

0.00

0.00

10.10

20.30

15.30

12.50

19.30

1974

20.20

20.10

20.10

20.20

15.10

10.10

9.20

15.60

5.20

8.20

3.30

15.00

1975

28.90

23.90

10.50

14.10

10.10

0.00

4.20

5.20

4.20

10.10

10.10

17.50

1976

22.30

25.80

17.50

9.80

10.40

9.20

15.40

23.70

0.00

12.20

11.20

1977

8.20

43.60

24.70

11.40

8.70

0.00

10.00

10.40

12.10

13.50

15.40

20.10

1978

15.10

14.20

10.10

16.20

0.00

5.10

4.50

2.50

10.00

10.00

1979

9.20

10.20

28.50

10.20

10.10

11.20

12.20

10.10

10.40

10.20

10.10

10.00

1980

10.00

15.00

20.60

8.40

8.20

10.20

10.20

10.50

10.00

10.10

10.50

1981

17.00

20.20

15.20

10.20

10.10

5.10

10.30

15.40

10.20

10.00

10.20

20.10

1982

15.00

23.40

10.20

10.10

10.10

7.00

8.20

10.30

10.10

10.20

15.30

5.10

1983

4.10

8.30

19.50

11.20

10.20

9.30

0.00

0.00

0.00

0.00

8.20

10.30

1984
1985

5.20

36.90

33.50

10.50

4.70

0.00

7.20

7.70

0.00

0.00

14.00

1986

42.30

22.80

23.80

0.00

0.00

0.00

30.20

6.20

3.00

0.00

0.00

15.70

1987

15.00

10.80

6.00

3.00

5.10

0.00

0.00

6.20

0.00

0.00

0.00

10.10

1988

39.00

16.40

30.40

8.00

0.00

0.00

0.00

0.00

18.10

17.80

24.60

37.60

8.20

4.20

0.00

1989

CUADRO N 46
REGISTRO DE PRECIPITACION MAXIMA EN 24 HORAS (mm )
ESTACION
CODIGO
AO
AO
1968
1969
1970
1971
1972
1973

: PATAHUASI
PLU-6208/DRE-5

DISTRITO
: SACSAMARCA
PROVINCIA
: HUANCASANCOS
DEPARTAMENTO : AYACUCHO

ALTITUD
LATITUD
LONGITUD

: 4060.0 msnm
: 1408'00" S
: 7424' 00" W

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

24.6

19.3

24.5

14.4

5.3

5.5

5.6

4.5

6.6

SD

SD

SD

11.3

26.5

25.9

2.2

0.5

0.0

0.0

2.3

0.0

SD

0.0

5.7

26.4
15.2

19.5
19.5

13.6
27.9

5.8
10.7

I
7.1

0.0
0.0

0.0
0.0

0.0
9.9

6.8
19.5

4.5
4.7

4.2
13.9

10.7
15.6

MAX
24.6

26.5
26.4
27.9

CUADRO N 47
REGISTRO DE PRECIPITACION MAXIMA EN 24 HORAS (mm )
ESTACION
CODIGO
AO
AO
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979

: PUTACCASA
PLU-7204/DRE-5

DISTRITO
: SACSAMARCA
PROVINCIA
: HUANCASANCOS
DEPARTAMENTO : AYACUCHO

ALTITUD
LATITUD
LONGITUD

: 4100.0 msnm
: 1407'00" S
: 7412' 00" W

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

13.2

SD

SD

SD

8.3

0.0

7.8

4.0

7.8

5.0

SD

7.6

MAX
13.2

SD

SD

SD

SD

18.8

0.0

0.4

0.0

8.4

8.5

14.7

11.5

13.7

10.2

16.5

5.5

1.2

2.1

0.3

2.4

0.0

3.1

6.1

7.7

2.1

6.2

14.4

5.3

0.0

0.0

0.0

0.0

1.5

3.4

7.5

9.6

18.8
16.5
14.4

2.9
10.1
16.1
10.1
39.3
10.8

9.2
16.4
13.8
6.0
25.5
26.4

11.7
20.6
12.3
8.4
20.5
16.3

6.2
4.4
SD
6.0
22.2
5.8

3.2
5.3
I
6.0
3.5
0.0

0.0
I
0.0
I
0.0
0.0

1.8
0.0
I
I
SD
0.0

0.0
0.0
3.0
0.3
0.0
0.0

2.5
5.0
10.5
0.7
15.0
2.1

7.8
4.5
0.0
SD
22.5
11.2

4.4
10.0
0.0
8.1
20.1
0.0

3.1
10.6
0.7
20.4
10.3
13.2

11.7
20.6
16.1
20.4
39.3
26.4

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 48
RESUMEN DE PRECIPITACION MAXIMA DE 24 HORAS
PARA EL ANALISIS DE LA CUENCA DEL RIO IRURO

AO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006

PUQUIO
MAX
22.5
13.0
20.8
19.1
35.0
33.0
26.5
22.6
21.4
27.0
22.2
25.6
12.5
22.4
32.9
23.2
25.4
13.4
20.2
24.5
15.0
15.4
32.7
36.0
21.6
18.9
19.2
25.2
20.4
32.9
22.6
18.8

MES
FEB
MAR
FEB
MAR
MAY
NOV
MAR
ENE
MAR
FEB
ENE
ENE
FEB
ENE
FEB
NOV
MAR
MAR
ENE
ENE
MAR
ENE
MAR
FEB
FEB
ENE
ENE
NOV
MAR
MAR
FEB
ENE

ANDAMARCA
MAX
14.2
17.8
32.8
42.5
30.1
32.1
29.2
19.4
22.9
39.2
21.3
20.1
19.9
40
23.4
25.8
23.1
29.7
27.2
27
31.1
27
39.8
35.2
28.4
27
42.6
43.9
37.9
39.3
23.3
30.3
30.6
36.0

GOBIERNO REGIONAL DE AYACUCHO

MES
DIC
NOV
DIC
MAR
ENE
MAR
DIC
ENE
MAR
MAR
ENE
NOV
ENE
ENE
FEB
ENE
MAR
MAR
ENE
MAR
FEB
ABR
MAR
ENE
ENE
ENE
FEB
DIC
FEB
DIC
ENE
FEB
DIC
FEB

AUCARA
MAX
22.00
16.00
30.00
22.00
44.20
40.60
20.80
33.80
27.50
30.60
20.30
20.20
28.90
25.80
43.60
16.20
28.50
20.60
20.20
23.40
19.50
36.90
42.30
15.00
39.00
8.20
-

MES
DIC
ENE
DIC
FEB
MAR
FEB
MAR
ENE
ABR
FEB
SEP
ENE
ENE
FEB
FEB
MAY
MAR
MAR
FEB
FEB
MAR
MAR
ENE
ENE
ENE
MAY
-

PATAHUASI

PUTACCASA

MAX
24.6
26.5
26.4
27.9

MAX
13.20
18.80
16.50
14.40
11.70
20.60
16.10
20.40
39.30
26.40
-

MES
ENE
FEB
ENE
MAR
-

MES
ENE
MAY
MAR
MAR
MAR
MAR
ENE
DIC
ENE
FEB
-

VALOR
ELEGIDO
22.5
17.8
32.8
42.5
44.2
40.6
29.2
33.8
27.5
39.2
27.9
25.6
28.9
40.0
43.6
39.3
28.5
29.7
27.2
24.5
19.5
15.4
36.9
42.3
21.6
39.0
19.2
25.2
20.4
27.0
32.9
27.0
39.8
35.2
28.4
27.0
42.6
43.9
37.9
39.3
23.3
30.3
30.6
36.0

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

PRUEBA DE BONDAD DE AJUSTE

Distribucion Normal
CUADRO N 49
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Suma (mm)
Media (mm)
D.Est. (mm)

P
(mm)
15.40
17.80
19.20
19.50
20.40
21.60
22.50
23.30
24.50
25.20
25.60
27.00
27.00
27.00
27.20
27.50
27.90
28.40
28.50
28.90
29.20
29.70
30.30
30.60
32.80
32.90
33.80
35.20
36.00
36.90
37.86
39.00
39.20
39.30
39.34
39.80
40.00
40.60
42.30
42.50
42.60
43.60
43.94
44.20
1386.04
31.50
8.04

GOBIERNO REGIONAL DE AYACUCHO

P(x)

F(Z)

0.0222
0.0444
0.0667
0.0889
0.1111
0.1333
0.1556
0.1778
0.2000
0.2222
0.2444
0.2667
0.2889
0.3111
0.3333
0.3556
0.3778
0.4000
0.4222
0.4444
0.4667
0.4889
0.5111
0.5333
0.5556
0.5778
0.6000
0.6222
0.6444
0.6667
0.6889
0.7111
0.7333
0.7556
0.7778
0.8000
0.8222
0.8444
0.8667
0.8889
0.9111
0.9333
0.9556
0.9778

-2.00
-1.70
-1.53
-1.49
-1.38
-1.23
-1.12
-1.02
-0.87
-0.78
-0.73
-0.56
-0.56
-0.56
-0.54
-0.50
-0.45
-0.39
-0.37
-0.32
-0.29
-0.22
-0.15
-0.11
0.16
0.17
0.29
0.46
0.56
0.67
0.79
0.93
0.96
0.97
0.98
1.03
1.06
1.13
1.34
1.37
1.38
1.51
1.55
1.58

0.02
0.04
0.06
0.07
0.08
0.11
0.13
0.15
0.19
0.22
0.23
0.29
0.29
0.29
0.30
0.31
0.33
0.35
0.35
0.37
0.39
0.41
0.44
0.46
0.56
0.57
0.61
0.68
0.71
0.75
0.79
0.82
0.83
0.83
0.84
0.85
0.85
0.87
0.91
0.91
0.92
0.93
0.94
0.94
Dmax =

Dx
F(Z)-P(x)
0.00
0.00
0.00
0.02
0.03
0.02
0.02
0.02
0.01
0.01
0.01
0.02
0.00
0.02
0.04
0.05
0.05
0.05
0.07
0.07
0.08
0.08
0.07
0.08
0.01
0.01
0.01
0.06
0.07
0.08
0.10
0.11
0.10
0.08
0.06
0.05
0.03
0.03
0.04
0.03
0.01
0.00
0.02
0.03
0.11

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Distribucion Log-Normal
CUADRO N 50
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Suma (mm)
Media (mm)
D.Est. (mm)

P (mm)
X
15.40
17.80
19.20
19.50
20.40
21.60
22.50
23.30
24.50
25.20
25.60
27.00
27.00
27.00
27.20
27.50
27.90
28.40
28.50
28.90
29.20
29.70
30.30
30.60
32.80
32.90
33.80
35.20
36.00
36.90
37.86
39.00
39.20
39.30
39.34
39.80
40.00
40.60
42.30
42.50
42.60
43.60
43.94
44.20
1386.04
31.50
8.04

Ln P
(Y)
2.734
2.879
2.955
2.970
3.016
3.073
3.114
3.148
3.199
3.227
3.243
3.296
3.296
3.296
3.303
3.314
3.329
3.346
3.350
3.364
3.374
3.391
3.411
3.421
3.490
3.493
3.520
3.561
3.584
3.608
3.634
3.664
3.669
3.671
3.672
3.684
3.689
3.704
3.745
3.750
3.752
3.775
3.783
3.789
150.28
3.42
0.27

P(x)

0.022
0.044
0.067
0.089
0.111
0.133
0.156
0.178
0.200
0.222
0.244
0.267
0.289
0.311
0.333
0.356
0.378
0.400
0.422
0.444
0.467
0.489
0.511
0.533
0.556
0.578
0.600
0.622
0.644
0.667
0.689
0.711
0.733
0.756
0.778
0.800
0.822
0.844
0.867
0.889
0.911
0.933
0.956
0.978

-2.504
-1.972
-1.693
-1.636
-1.470
-1.260
-1.110
-0.982
-0.797
-0.694
-0.636
-0.440
-0.440
-0.440
-0.413
-0.373
-0.320
-0.254
-0.241
-0.190
-0.152
-0.090
-0.016
0.020
0.275
0.286
0.386
0.535
0.617
0.708
0.802
0.912
0.930
0.940
0.944
0.986
1.005
1.059
1.210
1.228
1.236
1.322
1.350
1.372

F(Z)
0.01
0.02
0.05
0.05
0.07
0.10
0.13
0.16
0.21
0.24
0.26
0.33
0.33
0.33
0.34
0.35
0.37
0.40
0.40
0.42
0.44
0.46
0.49
0.51
0.61
0.61
0.65
0.70
0.73
0.76
0.79
0.82
0.82
0.83
0.83
0.84
0.84
0.86
0.89
0.89
0.89
0.91
0.91
0.91
Dmax =

Dx
F(Z)-P(x)
0.02
0.02
0.02
0.04
0.04
0.03
0.02
0.01
0.01
0.02
0.02
0.06
0.04
0.02
0.01
0.00
0.00
0.00
0.02
0.02
0.03
0.02
0.02
0.03
0.05
0.03
0.05
0.08
0.09
0.09
0.10
0.11
0.09
0.07
0.05
0.04
0.02
0.01
0.02
0.00
0.02
0.03
0.04
0.06
0.11

Del libro de Mximo Villn, pag. 131


Y=ln(X)
Z=(Y-Y media)/YD.S.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Distribucion Gumbel Modificado


CUADRO N 51
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Suma (mm)
Media (mm)
D.Est. (S)

P (mm)
(X)

P(X)

15.40
0.022
-1.992
17.80
0.044
-1.609
19.20
0.067
-1.386
19.50
0.089
-1.338
20.40
0.111
-1.194
21.60
0.133
-1.003
22.50
0.156
-0.859
23.30
0.178
-0.732
24.50
0.200
-0.540
25.20
0.222
-0.428
25.60
0.244
-0.365
27.00
0.267
-0.141
27.00
0.289
-0.141
27.00
0.311
-0.141
27.20
0.333
-0.109
27.50
0.356
-0.061
27.90
0.378
0.003
28.40
0.400
0.082
28.50
0.422
0.098
28.90
0.444
0.162
29.20
0.467
0.210
29.70
0.489
0.290
30.30
0.511
0.386
30.60
0.533
0.433
32.80
0.556
0.785
32.90
0.578
0.801
33.80
0.600
0.944
35.20
0.622
1.168
36.00
0.644
1.295
36.90
0.667
1.439
37.86
0.689
1.591
39.00
0.711
1.774
39.20
0.733
1.806
39.30
0.756
1.822
39.34
0.778
1.829
39.80
0.800
1.902
40.00
0.822
1.934
40.60
0.844
2.029
42.30
0.867
2.301
42.50
0.889
2.333
42.60
0.911
2.349
43.60
0.933
2.508
43.94
0.956
2.562
44.20
0.978
2.604
1386.04
31.50
8.04
(Para N-1) muestral
6.27
27.88

Del libro de Mximo Villn, pginas: 210-216


6
S
X 0.5772156649
GOBIERNO REGIONAL DE AYACUCHO

G(y)
0.00
0.01
0.02
0.02
0.04
0.07
0.09
0.13
0.18
0.22
0.24
0.32
0.32
0.32
0.33
0.35
0.37
0.40
0.40
0.43
0.44
0.47
0.51
0.52
0.63
0.64
0.68
0.73
0.76
0.79
0.82
0.84
0.85
0.85
0.85
0.86
0.87
0.88
0.90
0.91
0.91
0.92
0.93
0.93
Dmax =

Dx
G(y)-P(x)
0.02
0.04
0.05
0.07
0.07
0.07
0.06
0.05
0.02
0.01
0.01
0.05
0.03
0.01
0.01
0.01
0.01
0.00
0.02
0.02
0.02
0.02
0.00
0.01
0.08
0.06
0.08
0.11
0.12
0.12
0.13
0.13
0.12
0.10
0.07
0.06
0.04
0.03
0.04
0.02
0.00
0.01
0.03
0.05
0.133

G( y )

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Distribucion Gumbel
CUADRO N 52
P (mm)
Dx
N
P(X)
z
F(z)
(X)
F(z)-P(x)
1
15.40
0.022
-1.630
0.006
0.02
2
17.80
0.044
-1.309
0.025
0.02
3
19.20
0.067
-1.122
0.046
0.02
4
19.50
0.089
-1.082
0.052
0.04
5
20.40
0.111
-0.961
0.073
0.04
6
21.60
0.133
-0.801
0.108
0.03
7
22.50
0.156
-0.681
0.139
0.02
8
23.30
0.178
-0.573
0.170
0.01
9
24.50
0.200
-0.413
0.221
0.02
10
25.20
0.222
-0.319
0.253
0.03
11
25.60
0.244
-0.266
0.271
0.03
12
27.00
0.267
-0.079
0.339
0.07
13
27.00
0.289
-0.079
0.339
0.05
14
27.00
0.311
-0.079
0.339
0.03
15
27.20
0.333
-0.052
0.349
0.02
16
27.50
0.356
-0.012
0.364
0.01
17
27.90
0.378
0.042
0.383
0.01
18
28.40
0.400
0.109
0.408
0.01
19
28.50
0.422
0.122
0.413
0.01
20
28.90
0.444
0.176
0.432
0.01
21
29.20
0.467
0.216
0.447
0.02
22
29.70
0.489
0.283
0.471
0.02
23
30.30
0.511
0.363
0.499
0.01
24
30.60
0.533
0.403
0.513
0.02
25
32.80
0.556
0.697
0.608
0.05
26
32.90
0.578
0.711
0.612
0.03
27
33.80
0.600
0.831
0.647
0.05
28
35.20
0.622
1.018
0.697
0.07
29
36.00
0.644
1.125
0.723
0.08
30
36.90
0.667
1.246
0.750
0.08
31
37.86
0.689
1.374
0.776
0.09
32
39.00
0.711
1.527
0.805
0.09
33
39.20
0.733
1.554
0.809
0.08
34
39.30
0.756
1.567
0.812
0.06
35
39.34
0.778
1.573
0.813
0.03
36
39.80
0.800
1.634
0.823
0.02
37
40.00
0.822
1.661
0.827
0.00
38
40.60
0.844
1.741
0.839
0.01
39
42.30
0.867
1.968
0.870
0.00
40
42.50
0.889
1.995
0.873
0.02
41
42.60
0.911
2.008
0.874
0.04
42
43.60
0.933
2.142
0.889
0.04
43
43.94
0.956
2.188
0.894
0.06
44
44.20
0.978
2.222
0.897
0.08
Suma (mm)
1386.04
Dmax =
0.094
Media (mm)
31.50
D.Est. (S)
7.94
(Para N) poblacional
alfa
7.48
35.4900
mu
27.59
183.1897
Del libro de Linsley, Hidrologia para Ingenieros
y del boletin N 34, Analisis de Frecuencias de fenomenos en Hidrologia de Manuel Paulet
(De tabla A-8, Pag. 583 del libro Engineering Hydrology
de Victor Ponce, 1989)

X
n

GOBIERNO REGIONAL DE AYACUCHO

yn

0 . 5236

1 . 0628

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Distribucion Log-Pearson III


CUADRO N 53
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Suma (mm)
Media (mm)
D.Est. (mm)
Coef. Asimetria

P (mm)
X
15.40
17.80
19.20
19.50
20.40
21.62
22.50
23.30
24.50
25.20
25.60
27.00
27.00
27.00
27.20
27.50
27.90
28.40
28.50
28.90
29.20
29.70
30.30
30.60
32.80
32.90
33.80
35.20
36.00
36.90
37.86
38.93
39.20
39.30
39.34
39.80
40.00
40.60
42.30
42.50
42.60
43.60
43.94
44.20
1385.99
31.50
8.03

Log P
(Log X)
1.188
1.250
1.283
1.290
1.310
1.335
1.352
1.367
1.389
1.401
1.408
1.431
1.431
1.431
1.435
1.439
1.446
1.453
1.455
1.461
1.465
1.473
1.481
1.486
1.516
1.517
1.529
1.547
1.556
1.567
1.578
1.590
1.593
1.594
1.595
1.600
1.602
1.609
1.626
1.628
1.629
1.639
1.643
1.645
65.267
1.483
0.118
-0.5124

kT

F(kT)

P(x)

(*)

-2.505
-1.972
-1.694
-1.637
-1.471
-1.257
-1.110
-0.982
-0.797
-0.694
-0.636
-0.440
-0.440
-0.440
-0.413
-0.373
-0.320
-0.254
-0.241
-0.190
-0.152
-0.090
-0.016
0.020
0.275
0.287
0.386
0.535
0.618
0.708
0.802
0.905
0.931
0.940
0.944
0.987
1.005
1.060
1.211
1.228
1.237
1.322
1.350
1.372

0.000
0.016
0.043
0.060
0.090
0.127
0.149
0.177
0.206
0.229
0.241
0.282
0.286
0.283
0.290
0.297
0.304
0.321
0.322
0.338
0.350
0.369
0.388
0.399
0.488
0.496
0.527
0.579
0.611
0.641
0.675
0.709
0.720
0.724
0.729
0.742
0.750
0.771
0.819
0.830
0.831
0.858
0.862
0.867

0.022
0.044
0.067
0.089
0.111
0.133
0.156
0.178
0.200
0.222
0.244
0.267
0.289
0.311
0.333
0.356
0.378
0.400
0.422
0.444
0.467
0.489
0.511
0.533
0.556
0.578
0.600
0.622
0.644
0.667
0.689
0.711
0.733
0.756
0.778
0.800
0.822
0.844
0.867
0.889
0.911
0.933
0.956
0.978
Dmax =

Dx
F(kT)-P(x)
0.02
0.03
0.02
0.03
0.02
0.01
0.01
0.00
0.01
0.01
0.00
0.02
0.00
0.03
0.04
0.06
0.07
0.08
0.10
0.11
0.12
0.12
0.12
0.13
0.07
0.08
0.07
0.04
0.03
0.03
0.01
0.00
0.01
0.03
0.05
0.06
0.07
0.07
0.05
0.06
0.08
0.08
0.09
0.11
0.134

(*): De Tabla 12.3.1 del Libro de Hidrologia Aplicada de Ven Te Chow, Pag. 404; por interpolacion
segn el valor de k T
El valor de k T, se obtiene del libro de Hidrologia Aplicada de Ven Te Chow, pag. 400.

LogYT

LogY k T SLogY

GOBIERNO REGIONAL DE AYACUCHO

kT

LogY T LogY
S LogY
CONSORCIO IRRIGACIN ACAR

GOBIERNO REGIONAL DE AYACUCHO

0.0

0.2

0.4

0.6

0.8

1.0

1.2

10

15

20

25

30

35

PRECIPITACION MAXIMA DE 24 HORAS (mm)

Dist. Log Pearson III

Dist. Gumbel

Dist. Gumbel Modificado

Dist. Log Normal

Dist. Normal

Dist. Emprica

40

45

AJUSTE DE DISTRIBUCIONES DE PROBABILIDAD A LA PRECIPITACION MAXIMA

FIGURA N 35

50

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

PROBABILIDAD ACUMULADA

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


B.

PRECIPITACIONES MAXIMA DE 24 HORAS

B.1

SERIE DE PRECIPITACIONES MAXIMAS DE 24 HORAS


CUADRO N 54
N

AO

P m x (m m )

Log P m x

1963

22.50

1.35

1964

17.80

1.25

1965

32.80

1.52

1966

42.50

1.63

1967

44.20

1.65

1968

40.60

1.61

1969

29.20

1.47

1970

33.80

1.53

1971

27.50

1.44

10

1972

39.20

1.59

11

1973

27.90

1.45

12

1974

25.60

1.41

13

1975

28.90

1.46

14

1976

40.00

1.60

15

1977

43.60

1.64

16

1978

39.30

1.59

17

1979

28.50

1.45

18

1980

29.70

1.47

19

1981

27.20

1.43

20

1982

24.50

1.39

21

1983

19.50

1.29

22

1984

15.40

1.19

23

1985

36.90

1.57

24

1986

42.30

1.63

25

1987

21.60

1.33

26

1988

39.00

1.59

27

1989

19.20

1.28

28

1990

25.20

1.40

29

1991

20.40

1.31

30

1992

27.00

1.43

31

1993

32.90

1.52

32

1994

27.00

1.43

33

1995

39.80

1.60

34

1996

35.20

1.55

35

1997

28.40

1.45

36

1998

27.00

1.43

37

1999

42.60

1.63

38

2000

43.94

1.64

39

2001

37.86

1.58

40

2002

39.34

1.59

41

2003

23.30

1.37

42

2004

30.30

1.48

43

2005

30.60

1.49

44

2006

36.00

1.56

Prom edio

31.5

1.483

Desv. Estndar

8.04

0.118

-0.06

-0.512

Coef. Asim etria

c.a. =

c.a./6

k=

N Datos

n=

GOBIERNO REGIONAL DE AYACUCHO

-0.085
44

44

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

B.2. Distribuciones
B.2.1. Distribucin Norm al
CUADRO N 55
T
(aos)
2
5
10
20
25
50
100
200
500
1000

0.500
0.200
0.100
0.050
0.040
0.020
0.010
0.005
0.002
0.001

1.177
1.794
2.146
2.448
2.537
2.797
3.035
3.255
3.526
3.717

0.00
0.84
1.28
1.65
1.75
2.05
2.33
2.58
2.88
3.09

PT
(m m )
31.50
38.26
41.80
44.72
45.57
48.01
50.20
52.20
54.63
56.34

Usando la metodologia del libro de Hidrologia Aplicada de Ven Te Chow , pag 401
B.2.2. Distribucin Log Norm al
CUADRO N 56
T
(aos)
2

Log Pm

0.500

1.177

0.000

1.483

PT
(m m )
30.43

5
10
20
25
50
100
200
500
1000

0.200
0.100
0.050
0.040
0.020
0.010
0.005
0.002
0.001

1.794
2.146
2.448
2.537
2.797
3.035
3.255
3.526
3.717

0.841
1.282
1.645
1.751
2.054
2.327
2.576
2.879
3.091

1.583
1.635
1.678
1.690
1.726
1.758
1.788
1.823
1.848

38.26
43.13
47.61
49.00
53.22
57.31
61.34
66.59
70.55

Usando la metodologia del libro de Hidrologia Aplicada de Ven Te Chow , pag 401
Se debe tener en cuenta el ultimo parrafo de esta pagina; es decir que el procedimiento es el mismo excepto que este se
aplica a los logaritmos de las variables y su media y desviacion estndar son usadas para la generacion de caudales
B.2.3. Distribucin Log Pearson III
CUADRO N 57
T
P
w
z
KT
Log Pm
(aos)
2
0.500
1.1774
0.000
0.085
1.49
5
0.200
1.7941
0.841
0.855
1.58
10
0.100
2.1460
1.282
1.214
1.63
20
0.050
2.4477
1.645
1.487
1.66
25
0.040
2.5373
1.751
1.564
1.67
50
0.020
2.7971
2.054
1.773
1.69
100
0.010
3.0349
2.327
1.949
1.71
200
0.005
3.2552
2.576
2.103
1.73
500
0.002
3.5255
2.879
2.277
1.75
1000
0.001
3.7169
3.091
2.393
1.77
Usando la metodologia del libro de Hidrologia Aplicada de Ven Te Chow , pag 401-403

GOBIERNO REGIONAL DE AYACUCHO

PT
(m m )
31.14
38.41
42.34
45.61
46.57
49.29
51.72
53.92
56.54
58.35

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

B.2.4.

Distribucin Extrem a Tipo I- Gum bel


CUADRO N 58

T
(aos)
2
5
10
20
25
50
100
200
500
1000
B.2.5.

KT
-0.1478
0.9186
1.6247
2.3020
2.5169
3.1787
3.8357
4.4902
5.3538
6.0065

Para N=20 datos;


PT
(m m )
30.31
38.88
44.56
50.00
51.73
57.05
62.33
67.59
74.53
79.77

(De tabla A-8, Pag. 583 del libro Engineering Hydrology


de Victor Ponce, 1989)

Distribucin Extrem a Tipo I- Gum bel Modificado


CUADRO N 59

T
(aos)
5
10
20
25
50
100
200
500
1000

KT
0.7195
1.3046
1.8659
2.0439
2.5924
3.1368
3.6792
4.3949
4.9357

PT
(m m )
37.28
41.99
46.50
47.93
52.33
56.71
61.07
66.82
71.17

(Pag. 225 del libro Engineering Hydrology


de Victor Ponce, 1989)

PRECIPITACIONES MAXIMA DE 24 HR PARA DIFERENTES PERIODOS DE RETORNO


CUADRO N 60
Distribuci
Log
Perodo de
Distribucin
Gumbel
n Log
Pearson Gumbel
Retorno
Normal
Modificado
P
Normal
III
T
XT
XT
XT
XT
XT
2
0.500
31.5
30.4
31.1
30.3
5
0.200
38.3
38.3
38.4
38.9
37.3
10
0.100
41.8
43.1
42.3
44.6
42.0
20
0.050
44.7
47.6
45.6
50.0
46.5
25
0.040
45.6
49.0
46.6
51.7
47.9
50
0.020
48.0
53.2
49.3
57.0
52.3
100
0.010
50.2
57.3
51.7
62.3
56.7
200
0.005
52.2
61.3
53.9
67.6
61.1
500
0.002
54.6
66.6
56.5
74.5
66.8
1000
0.001
56.3
70.5
58.3
79.8
71.2
Delta c ( c ) =
0.114
0.108
0.13
0.09
0.13
0.21

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

GOBIERNO REGIONAL DE AYACUCHO

10

20

30

40

50

60

70

80

90

10

PERIODO DE RETORNO (Aos)

100

Dist. Gumbel

Dist. Log Normal

Dist. Normal

Dist. Gumbel Modificado

Dist. Log Pearson IIIl

FIGURA N 36
PRECIPITACIONES MAXIMA DE 24 HR. vs PERIODOS DE RETORNO

1000

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

PRECIPITACION MAXIMA (mm)

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 61
DETERMINACION DE MAXIMAS AVENIDAS

Las tablas ESPAO


Inicial (Po), Luego l
calcularse directam

CLCULO DE LA PRECIPITACIN EFECTIVA EN LA CUENCA


DEL RIO IRURO
CN
S(pulg:)
S(mm:)
Pmx 24 horas
Tr
Tr
(horas)
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

NOTA:

:
:
:
:
:
P acum.
%
0.00
2.00
3.50
5.00
7.50
10.00
13.00
16.00
20.00
26.50
52.50
63.00
68.50
73.00
76.50
80.00
83.00
86.00
89.00
91.00
93.00
95.00
96.50
98.00
100.00

80
2.50
Po (mm)
12.70
63.50
62.30 (calculado anteriormente en analisis de frecuencia)
100 aos
P acum.
(mm)
0.00
1.25
2.18
3.12
4.67
6.23
8.10
9.97
12.46
16.51
32.71
39.25
42.68
45.48
47.66
49.84
51.71
53.58
55.45
56.69
57.94
59.19
60.12
61.05
62.30

K
-12.70
-11.45
-10.52
-9.59
-8.03
-6.47
-4.60
-2.73
-0.24
3.81
20.01
26.55
29.98
32.78
34.96
37.14
39.01
40.88
42.75
43.99
45.24
46.49
47.42
48.35
49.60

P neta acum.
(mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.22
4.79
7.83
9.61
11.16
12.41
13.71
14.84
16.01
17.20
18.00
18.82
19.65
20.27
20.90
21.75

P neta hr.
(mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.22
4.58
3.03
1.79
1.55
1.25
1.29
1.14
1.16
1.19
0.81
0.82
0.83
0.63
0.63
0.85

S = 1000/CN-10 (pulg:)
S = 25.4*S (mm.)
K = Pacum - 0.2*S(mm.), K en mm.
Pp efectiva acumulada
a) Si K< = 0, entonces Pneta = Pefectiva = 0
b) Si K> 0, entonces Pneta (acumulada) = K2/(PPacum +0.8*S(mm.))

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

Las Tablas AMERIC


(CN), luego con la e
Mxima S, y por hip
ingual al 20 % de la
Precipitacin Neta A

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 62
DETERMINACION DE MAXIMAS AVENIDAS
HIDROGRAMA UNITARIO DE MXIMAS AVENIDAS (Tr=1000aos)
DEL RIO IRURO
DATOS :
Ac
Duracin
Tc
Tiempo
(horas)
0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9-10
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
19-20
20-21
21-22
22-23
23-24

:
:
:

Pp. Ef. hr.


(mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.16
0.83
8.20
4.77
2.73
2.33
1.87
1.91
1.67
1.70
1.73
1.17
1.18
1.19
0.90
0.90
1.21

185.53 Km
1.00 Hora
4 Horas

Qp
(m 3/s)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.12
11.08
109.16
63.51
36.31
31.03
24.88
25.48
22.28
22.67
23.03
15.54
15.69
15.83
11.96
12.03
16.16

Tp :
Tb :
qp :

2.90 Horas
7.74 Horas
13.31 m^3/s/mm

TIEMPO DEL HIDROGRAMA


to
to + tp
to + tb
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

2.90
3.90
4.90
5.90
6.90
7.90
8.90
9.90
10.90
11.90
12.90
13.90
14.90
15.90
16.90
17.90
18.90
19.90
20.90
21.90
22.90
23.90
24.90
25.90

7.74
8.74
9.74
10.74
11.74
12.74
13.74
14.74
15.74
16.74
17.74
18.74
19.74
20.74
21.74
22.74
23.74
24.74
25.74
26.74
27.74
28.74
29.74
30.74

NOTA :
Tb = 2.67*Tp
Tp = 0.5*D + 0.6*Tc
qp = 0.208*A/Tp
Qp = qp*Pp.efec.

GOBIERNO REGIONAL DE AYACUCHO

donde :
Ac: rea de la cuenca en Km 2
D: Duracin de la lluvia en horas
Tc: Tiempo de concentracin
Tb: Tiempo base del Hidrograma Unitario en horas
Tp: Tiempo pico al Qmx. en horas
qp: Caudal pico al Tp. en m^3/s/mm
Qp: Caudal en m^3/s

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 61a
DETERMINACION DE MAXIMAS AVENIDAS
HIDROGRAMA UNITARIO DE MXIMAS AVENIDAS (Tr=100aos)
DEL RIO CALLCAC
DATOS :
Ac
Duracin
Tc
Tiempo
(horas)
0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9-10
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
19-20
20-21
21-22
22-23
23-24

:
:
:

Pp. Ef. hr.


(mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.16
0.83
8.20
4.77
2.73
2.33
1.87
1.91
1.67
1.70
1.73
1.17
1.18
1.19
0.90
0.90
1.21

18.33 Km
1.00 Hora
1 Horas

Qp
(m 3/s)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.55
2.89
28.43
16.54
9.46
8.08
6.48
6.64
5.80
5.90
6.00
4.05
4.09
4.12
3.12
3.13
4.21

Tp :
Tb :
qp :

1.10 Horas
2.94 Horas
3.47 m^3/s/mm

TIEMPO DEL HIDROGRAMA


to
to + tp
to + tb
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

NOTA :
Tb = 2.67*Tp
Tp = 0.5*D + 0.6*Tc
qp = 0.208*A/Tp
Qp = qp*Pp.efec.

GOBIERNO REGIONAL DE AYACUCHO

donde :
Ac: rea de la cuenca en Km 2
D: Duracin de la lluvia en horas
Tc: Tiempo de concentracin
Tb: Tiempo base del Hidrograma Unitario en horas
Tp: Tiempo pico al Qmx. en horas
qp: Caudal pico al Tp. en m^3/s/mm
Qp: Caudal en m^3/s

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 63
DETERMINACION DE MAXIMAS AVENIDAS
HIDROGRAMA UNITARIO DE MXIMAS AVENIDAS (Tr=100aos)
DEL RIO CCERORACRA
DATOS :
Ac
Duracin
Tc
Tiempo
(horas)
0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9-10
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
19-20
20-21
21-22
22-23
23-24

Pp. Ef. hr.


(mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.16
0.83
8.20
4.77
2.73
2.33
1.87
1.91
1.67
1.70
1.73
1.17
1.18
1.19
0.90
0.90
1.21

:
:
:

8.54 Km
1.00 Hora
1 Horas

Qp
3

(m /s)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.26
1.34
13.25
7.71
4.41
3.77
3.02
3.09
2.70
2.75
2.79
1.89
1.90
1.92
1.45
1.46
1.96

Tp :
Tb :
qp :

1.10 Horas
2.94 Horas
1.61 m^3/s/mm

TIEMPO DEL HIDROGRAMA


to
to + tp
to + tb
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

NOTA :
Tb = 2.67*Tp
Tp = 0.5*D + 0.6*Tc
qp = 0.208*A/Tp
Qp = qp*Pp.efec.

GOBIERNO REGIONAL DE AYACUCHO

donde :
Ac: rea de la cuenca en Km 2
D: Duracin de la lluvia en horas
Tc: Tiempo de concentracin
Tb: Tiempo base del Hidrograma Unitario en horas
Tp: Tiempo pico al Qmx. en horas
qp: Caudal pico al Tp. en m^3/s/mm
Qp: Caudal en m^3/s

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 62a
DETERMINACION DE MAXIMAS AVENIDAS
HIDROGRAMA UNITARIO DE MXIMAS AVENIDAS (Tr=100aos)
DEL RIO AZULJAJA
DATOS :
Ac
Duracin
Tc
Tiempo
(horas)
0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9-10
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
19-20
20-21
21-22
22-23
23-24

Pp. Ef. hr.


(mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.16
0.83
8.20
4.77
2.73
2.33
1.87
1.91
1.67
1.70
1.73
1.17
1.18
1.19
0.90
0.90
1.21

:
:
:

30.66 Km
1.00 Hora
1 Horas

Qp
3

(m /s)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.92
4.83
47.56
27.67
15.82
13.52
10.84
11.10
9.71
9.88
10.03
6.77
6.83
6.90
5.21
5.24
7.04

Tp :
Tb :
qp :

1.10 Horas
2.94 Horas
5.80 m^3/s/mm

TIEMPO DEL HIDROGRAMA


to
to + tp
to + tb
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

NOTA :
Tb = 2.67*Tp
Tp = 0.5*D + 0.6*Tc
qp = 0.208*A/Tp
Qp = qp*Pp.efec.

GOBIERNO REGIONAL DE AYACUCHO

donde :
Ac: rea de la cuenca en Km 2
D: Duracin de la lluvia en horas
Tc: Tiempo de concentracin
Tb: Tiempo base del Hidrograma Unitario en horas
Tp: Tiempo pico al Qmx. en horas
qp: Caudal pico al Tp. en m^3/s/mm
Qp: Caudal en m^3/s

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 63a
DETERMINACION DE MAXIMAS AVENIDAS
HIDROGRAMA UNITARIO DE MXIMAS AVENIDAS (Tr=100aos)
DEL RIO JACHJALLA
DATOS :
Ac
Duracin
Tc
Tiempo
(horas)
0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9-10
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
19-20
20-21
21-22
22-23
23-24

:
:
:

Pp. Ef. hr.


(mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.22
4.58
3.03
1.79
1.55
1.25
1.29
1.14
1.16
1.19
0.81
0.82
0.83
0.63
0.63
0.85

12.61 Km
1.00 Hora
1 Horas

Qp
3

(m /s)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.51
10.92
7.23
4.26
3.69
2.99
3.08
2.71
2.78
2.84
1.92
1.95
1.97
1.49
1.50
2.02

Tp :
Tb :
qp :

1.10 Horas
2.94 Horas
2.38 m^3/s/mm

TIEMPO DEL HIDROGRAMA


to
to + tp
to + tb
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

NOTA :
Tb = 2.67*Tp
Tp = 0.5*D + 0.6*Tc
qp = 0.208*A/Tp
Qp = qp*Pp.efec.

GOBIERNO REGIONAL DE AYACUCHO

donde :
Ac: rea de la cuenca en Km 2
D: Duracin de la lluvia en horas
Tc: Tiempo de concentracin
Tb: Tiempo base del Hidrograma Unitario en horas
Tp: Tiempo pico al Qmx. en horas
qp: Caudal pico al Tp. en m^3/s/mm
Qp: Caudal en m^3/s

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 63b
DETERMINACION DE MAXIMAS AVENIDAS
HIDROGRAMA UNITARIO DE MXIMAS AVENIDAS (Tr=100aos)
DEL RIO DESCOMULGADO
DATOS :
Ac
Duracin
Tc
Tiempo
(horas)
0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9-10
10-11
11-12
12-13
13-14
14-15
15-16
16-17
17-18
18-19
19-20
20-21
21-22
22-23
23-24

Pp. Ef. hr.


(mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.22
4.58
3.03
1.79
1.55
1.25
1.29
1.14
1.16
1.19
0.81
0.82
0.83
0.63
0.63
0.85

:
:
:

23.71 Km
1.00 Hora
1 Horas

Qp
3

(m /s)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.97
20.52
13.60
8.00
6.94
5.62
5.80
5.10
5.22
5.33
3.61
3.66
3.70
2.80
2.83
3.81

Tp :
Tb :
qp :

1.10 Horas
2.94 Horas
4.48 m^3/s/mm

TIEMPO DEL HIDROGRAMA


to
to + tp
to + tb
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

NOTA :
Tb = 2.67*Tp
Tp = 0.5*D + 0.6*Tc
qp = 0.208*A/Tp
Qp = qp*Pp.efec.

GOBIERNO REGIONAL DE AYACUCHO

donde :
Ac: rea de la cuenca en Km 2
D: Duracin de la lluvia en horas
Tc: Tiempo de concentracin
Tb: Tiempo base del Hidrograma Unitario en horas
Tp: Tiempo pico al Qmx. en horas
qp: Caudal pico al Tp. en m^3/s/mm
Qp: Caudal en m^3/s

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 64

HIDROGRAMA UNITARIO DE CLARK


CUENCA RIO IRURO
Tiempo
h
0
0.5
1
1.5
2
2.5
3
3.5
4.0
SUMA

N
1
2
3
4
5
6
7
8

Area
Km 2
0
6.70
15.70
27.87
44.31
31.72
12.19
21.49
25.57
185.55

Porcentaje
del Area
0
3.61
8.46
15.02
23.88
17.10
6.57
11.58
13.78
100.00

q
m3/s/mm
0
3.73
8.73
15.50
24.64
17.64
6.78
11.95
14.22
103.17

Volumen
m3
0
33500
112000
217850
360900
380150
219550
168400
235300
1727650

HIDROGRAMA TIEMPO - AREA


30.00

Area (km2)

25.00

20.00
15.00
10.00
5.00

4.0

3.5

2.5

1.5

0.5

0.00

t (horas)

HISTOGRANA UNITARIO
30
25

serie 1

q (m3/s/mm)

20
15
10
5
0

t (horas)
Pe =

GOBIERNO REGIONAL DE AYACUCHO

9.31 mm

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 64a
DETERMINACION DE MAXIMAS AVENIDAS
CLCULO DE LA PRECIPITACIN EFECTIVA EN LA CUENCA
DEL RIO IRURO
CN
S(pulg:)
S(mm:)
Pmx 24 horas
Tr

Tr
(horas)
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

:
80
:
2.50 Po (mm)
12.70
:
63.50
:
79.80 (calculado anteriormente en analisis de frecuencia)
: 1000 aos

P acum.
%
0.00
2.00
3.50
5.00
7.50
10.00
13.00
16.00
20.00
26.50
52.50
63.00
68.50
73.00
76.50
80.00
83.00
86.00
89.00
91.00
93.00
95.00
96.50
98.00
100.00

P acum.
(mm)
0.00
1.60
2.79
3.99
5.99
7.98
10.37
12.77
15.96
21.15
41.90
50.27
54.66
58.25
61.05
63.84
66.23
68.63
71.02
72.62
74.21
75.81
77.01
78.20
79.80

K
-12.70
-11.10
-9.91
-8.71
-6.72
-4.72
-2.33
0.07
3.26
8.45
29.20
37.57
41.96
45.55
48.35
51.14
53.53
55.93
58.32
59.92
61.51
63.11
64.31
65.50
67.10

P neta acum. P neta hr.


(mm)
(mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.16
0.16
0.99
0.83
9.20
8.20
13.97
4.77
16.70
2.73
19.03
2.33
20.90
1.87
22.81
1.91
24.49
1.67
26.19
1.70
27.92
1.73
29.09
1.17
30.27
1.18
31.46
1.19
32.36
0.90
33.26
0.90
34.47
1.21

Max =

GOBIERNO REGIONAL DE AYACUCHO

Q
(m3/s)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.59
4.49
40.29
106.21
202.26
324.33
339.41
278.80
299.70
329.97
243.67
200.20
181.37
166.30
150.07
135.17
129.25
114.28
95.69
82.92
55.19
31.81
27.36
17.26
339.41

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 64b
DETERMINACION DE CAUDALES MAXIMAS (Tr = 1000 aos)
METODO DE CLARK

q (m3/s/mm) de Clark
U1
3.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.59
3.10
30.56
17.78
10.17
8.69
6.96
7.13
6.24
6.35
6.45
4.35
4.39
4.43
3.35
3.37
4.52

U2
8.73

0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.39
7.27
71.61
41.66
23.82
20.36
16.32
16.71
14.62
14.87
15.11
10.20
10.29
10.38
7.85
7.89
10.60

GOBIERNO REGIONAL DE AYACUCHO

U3
15.50

0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.47
12.90
127.12
73.96
42.28
36.14
28.97
29.67
25.95
26.39
26.82
18.10
18.27
18.43
13.93
14.01
18.81

U4
24.64

0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.92
20.51
202.10
117.59
67.23
57.45
46.06
47.17
41.25
41.96
42.63
28.77
29.04
29.30
22.14
22.28
29.91

U5
17.64

0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.81
14.68
144.68
84.18
48.13
41.13
32.97
33.77
29.53
30.04
30.52
20.60
20.79
20.98
15.85
15.95
21.41

U6
6.78

0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.08
5.64
55.60
32.35
18.49
15.81
12.67
12.98
11.35
11.54
11.73
7.92
7.99
8.06
6.09
6.13
8.23

U7
11.95

0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.90
9.95
98.02
57.03
32.60
27.86
22.34
22.88
20.01
20.35
20.68
13.96
14.09
14.21
10.74
10.80
14.51

U8
14.22

0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.26
11.84
116.63
67.86
38.79
33.15
26.58
27.22
23.81
24.22
24.60
16.60
16.76
16.91
12.78
12.86
17.26

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CUADRO N 64c
CAUDALES MAXIMOS PARA DIFERENTES PERIODOS
DE RETORNO (Tr)
DEL RIO IRURO
(METODO DE HIDROGRAMA UNITARIO - CLARK)

GOBIERNO REGIONAL DE AYACUCHO

Tr

Q mx

(Aos)

(m3/s)

65.6

10

95.3

50

170.8

100

205.9

500

296.2

1000

339.4

10000

490.5

CONSORCIO IRRIGACIN ACAR

0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9 - 10
10 - 11
11 - 12
12 - 13
13 - 14
14 - 15
15 - 16
16 - 17
17 -18
18 - 19
19 - 20
20 - 21
21 - 22
22 - 23
23 - 24

TIEMPO

DATOS

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.75
15.87
10.52
6.19
5.36
4.34
4.48
3.95
4.04
4.12
2.79
2.83
2.86
2.17
2.19
2.94

0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

GOBIERNO REGIONAL DE AYACUCHO

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

TOTAL :

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

Qp
to to + tp to + tb
m^3/s t inicial t mx. t final

:
Ac : 18.33 Km
D :
1.00 Hora
Tc :
1 Horas
8

0.68

0.68

14.81

14.42

0.38

10

5.62

5.36

12

17.65 10.99

9.56

8.09

11

8.03

4.88

3.16

13

6.68

3.95

6.29

4.07

2.22

15

5.87

3.59

2.29

16

5.68

3.67

2.01

17

5.81

3.75

2.06

18

4.64

2.54

2.10

19

CAUDALES DEL HIDROGRAMA

2.74

14

4.00

2.57

1.43

20

4.05

2.60

1.44

21

Tp :
Tb :
qp :

CUADRO N 65
CLCULO DEL HIDROGRAMA TOTAL DE MXIMAS AVENIDAS (Tr= 100 Aos)
DEL RIO CALLCAC

3.43

1.97

1.46

22

3.09

1.99

1.11

23

3.79

2.67

1.12

24

1.50

1.50

25

1.100 Horas
2.937 Horas
3.466 m^3/s/mm

26

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIGURA N 38

HIDROGRAMA DE MXIMAS AVENIDAS DEL RIO CALLCAC (Tr = 100 Aos)


20.0
18.0

16.0

Caudales (m3/s)

14.0
Series1

12.0

10.0
8.0
6.0

4.0
2.0
0.0

10

15

20

25

30

tiempo (hr)

CUADRO N 65a
CAUDALES MAXIMOS PARA DIFERENTES PERIODOS
DE RETORNO (Tr)
DEL RIO CALLCAC
(METODO DE HIDROGRAMA UNITARIO)

GOBIERNO REGIONAL DE AYACUCHO

Tr

Q mx

(Aos)

(m3/s)

4.7

10

7.3

25

11.2

50

14.3

100

17.7

CONSORCIO IRRIGACIN ACAR

0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9 - 10
10 - 11
11 - 12
12 - 13
13 - 14
14 - 15
15 - 16
16 - 17
17 -18
18 - 19
19 - 20
20 - 21
21 - 22
22 - 23
23 - 24

TIEMPO

DATOS

8.54 Km
1.00 Hora
1 Horas

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.35
7.39
4.90
2.88
2.50
2.02
2.09
1.84
1.88
1.92
1.30
1.32
1.33
1.01
1.02
1.37

0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

GOBIERNO REGIONAL DE AYACUCHO

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

TOTAL :

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

Qp
to to + tp to + tb
m^3/s t inicial t mx. t final

:
Ac :
D :
Tc :
8

0.32

0.32

6.90

6.72

0.18

10

8.22

4.45

3.77

11

5.12

2.62

2.50

12

3.74

2.27

1.47

13

3.11

1.84

2.93

1.90

1.03

15

2.74

1.67

1.07

16

2.65

1.71

0.94

17

2.71

1.75

0.96

18

2.16

1.18

0.98

19

CAUDALES DEL HIDROGRAMA

1.27

14

1.86

1.20

0.66

20

1.88

1.21

0.67

21

Tp :
Tb :
qp :

CUADRO N 66
CLCULO DEL HIDROGRAMA TOTAL DE MXIMAS AVENIDAS (Tr= 100 Aos)
DEL RIO CCERORACRA

1.60

0.92

0.68

22

1.44

0.93

0.52

23

1.77

1.25

0.52

24

0.70

0.70

25

1.100 Horas
2.937 Horas
1.615 m^3/s/mm
26

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIGURA N 39

HIDROGRAMA DE MXIMAS AVENIDAS DEL RIO CCERORACRA (Tr = 100 Aos)


9.0
8.0

Caudales (m3/s)

7.0
6.0

Series1

5.0
4.0
3.0
2.0
1.0

0.0
0

10

15

20

25

30

tiempo (hr)

CUADRO N 66a
CAUDALES MAXIMOS PARA DIFERENTES PERIODOS
DE RETORNO (Tr)
DEL RIO CCERORACRA
(METODO DE HIDROGRAMA UNITARIO)

GOBIERNO REGIONAL DE AYACUCHO

Tr

Q mx

(Aos)

(m3/s)

2.2

10

3.4

25

5.2

50

6.7

100

8.2

CONSORCIO IRRIGACIN ACAR

0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9 - 10
10 - 11
11 - 12
12 - 13
13 - 14
14 - 15
15 - 16
16 - 17
17 -18
18 - 19
19 - 20
20 - 21
21 - 22
22 - 23
23 - 24

TIEMPO

DATOS

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.25
26.54
17.59
10.35
8.97
7.26
7.50
6.60
6.75
6.90
4.67
4.73
4.79
3.63
3.66
4.92

0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

GOBIERNO REGIONAL DE AYACUCHO

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

TOTAL :

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

Qp
to to + tp to + tb
m^3/s t inicial t mx. t final

:
Ac : 30.66 Km
D :
1.00 Hora
Tc :
1 Horas

1.14
-

1.14

24.77

24.13

0.64

10

29.53

15.99

13.54

11

8.16

5.28

13

6.60

10.52

6.82

3.71

15

9.82

6.00

3.82

16

9.50

6.14

3.37

17

9.71

6.27

3.44

18

7.77

4.25

3.52

19

CAUDALES DEL HIDROGRAMA

4.58

14

18.38 13.43 11.18

9.41

8.97

12

6.69

4.30

2.38

20

6.77

4.35

2.41

21

Tp :
Tb :
qp :

CUADRO N 67
CLCULO DEL HIDROGRAMA TOTAL DE MXIMAS AVENIDAS (Tr= 100 Aos)
DEL RIO AZULJAJA

5.74

3.30

2.44

22

5.17

3.32

1.85

23

6.34

4.47

1.87

24

2.51

2.51

25

1.100 Horas
2.937 Horas
5.798 m^3/s/mm
26

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIGURA N 40

HIDROGRAMA DE MXIMAS AVENIDAS DEL RIO AZULJAJA (Tr = 100 Aos)


35.0

30.0

Caudales (m3/s)

25.0
Series1

20.0

15.0

10.0

5.0

0.0
0

10

15

20

25

30

tiempo (hr)

CUADRO N 67a
CAUDALES MAXIMOS PARA DIFERENTES PERIODOS
DE RETORNO (Tr)
DEL RIO AZULJAJA
(METODO DE HIDROGRAMA UNITARIO)

GOBIERNO REGIONAL DE AYACUCHO

Tr

Q mx

(Aos)

(m3/s)

7.8

10

12.4

25

18.7

50

24.0

100

29.5

CONSORCIO IRRIGACIN ACAR

0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9 - 10
10 - 11
11 - 12
12 - 13
13 - 14
14 - 15
15 - 16
16 - 17
17 -18
18 - 19
19 - 20
20 - 21
21 - 22
22 - 23
23 - 24

TIEMPO

DATOS

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.51
10.92
7.23
4.26
3.69
2.99
3.08
2.71
2.78
2.84
1.92
1.95
1.97
1.49
1.50
2.02

0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

GOBIERNO REGIONAL DE AYACUCHO

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

TOTAL :

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

Qp
to to + tp to + tb
m^3/s t inicial t mx. t final

:
Ac : 12.61 Km
D :
1.00 Hora
Tc :
1 Horas
8

0.47
-

0.47

10.19

9.92

0.26

10

12.14

6.58

5.57

11

7.56

3.87

3.69

12

5.53

3.35

2.17

13

4.60

2.72

1.88

14

4.33

2.80

1.52

15

4.04

2.47

1.57

16

3.91

2.52

1.38

17

3.99

2.58

1.42

18

3.19

1.75

1.45

19

CAUDALES DEL HIDROGRAMA

2.75

1.77

0.98

20

2.78

1.79

0.99

21

Tp :
Tb :
qp :

CUADRO N 68
CLCULO DEL HIDROGRAMA TOTAL DE MXIMAS AVENIDAS (Tr= 100 Aos)
DEL RIO JACHJALLA

2.36

1.36

1.00

22

2.13

1.37

0.76

23

2.61

1.84

0.77

24

1.03

1.03

25

1.100 Horas
2.937 Horas
2.384 m^3/s/mm
26

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIGURA N 41

HIDROGRAMA DE MXIMAS AVENIDAS DEL RIO CALLCAC (Tr = 100 Aos)


14.0

12.0

Caudales (m3/s)

10.0
Series1

8.0

6.0

4.0

2.0

0.0

10

15

20

25

30

tiempo (hr)

CUADRO N 68a
CAUDALES MAXIMOS PARA DIFERENTES PERIODOS
DE RETORNO (Tr)
DEL RIO JACHJALLA
(METODO DE HIDROGRAMA UNITARIO)

GOBIERNO REGIONAL DE AYACUCHO

Tr

Q mx

(Aos)

(m3/s)

3.2

10

5.0

25

7.7

50

9.9

100

12.1

CONSORCIO IRRIGACIN ACAR

0-1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9 - 10
10 - 11
11 - 12
12 - 13
13 - 14
14 - 15
15 - 16
16 - 17
17 -18
18 - 19
19 - 20
20 - 21
21 - 22
22 - 23
23 - 24

TIEMPO

DATOS

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.97
20.52
13.60
8.00
6.94
5.62
5.80
5.10
5.22
5.33
3.61
3.66
3.70
2.80
2.83
3.81

0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00

GOBIERNO REGIONAL DE AYACUCHO

2.94
3.94
4.94
5.94
6.94
7.94
8.94
9.94
10.94
11.94
12.94
13.94
14.94
15.94
16.94
17.94
18.94
19.94
20.94
21.94
22.94
23.94
24.94
25.94

TOTAL :

1.10
2.10
3.10
4.10
5.10
6.10
7.10
8.10
9.10
10.10
11.10
12.10
13.10
14.10
15.10
16.10
17.10
18.10
19.10
20.10
21.10
22.10
23.10
24.10

Qp
to to + tp to + tb
m^3/s t inicial t mx. t final

:
Ac : 23.71 Km
D :
1.00 Hora
Tc :
1 Horas

0.88
-

0.88

19.15

18.66

0.49

10

22.83

12.37

10.47

11

6.31

4.08

13

14.21 10.39

7.28

6.94

12

8.65

5.11

8.14

5.27

2.87

15

7.60

4.64

2.96

16

7.35

4.75

2.60

17

7.51

4.85

2.66

18

6.01

3.29

2.72

19

CAUDALES DEL HIDROGRAMA

3.54

14

5.17

3.33

1.84

20

5.23

3.37

1.87

21

Tp :
Tb :
qp :

CUADRO N 69
CLCULO DEL HIDROGRAMA TOTAL DE MXIMAS AVENIDAS (Tr= 100 Aos)
DEL RIO DESCOMULGADO

4.44

2.55

1.89

22

4.00

2.57

1.43

23

4.90

3.46

1.44

24

1.94

1.94

25

1.100 Horas
2.937 Horas
4.483 m^3/s/mm
26

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIGURA N 42

HIDROGRAMA DE MXIMAS AVENIDAS DEL RIO CCERORACRA (Tr = 100 Aos)


25.0

Caudales (m3/s)

20.0

Series1

15.0

10.0

5.0

0.0
0

10

15

20

25

30

tiempo (hr)

CUADRO N 69a
CAUDALES MAXIMOS PARA DIFERENTES PERIODOS
DE RETORNO (Tr)
DEL RIO DESCOMULGADO
(METODO DE HIDROGRAMA UNITARIO)

GOBIERNO REGIONAL DE AYACUCHO

Tr

Q mx

(Aos)

(m3/s)

6.1

10

9.5

25

14.5

50

18.6

100

22.8

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

ANEXO IV
- Anlisis de Capacidad de embalse y Aprovechamiento

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


FIGURA N 43

EVAPOTRANSPIRACION

Evapotranspiracion Potencial (mm/mes)

60.00

50.00

40.00

30.00

20.00

Metodo de Thornthwaite
Metodo de Serruto

10.00

0.00
ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

Cuadro N 71
CALCULO DE LA PROPORCION DE LLUVIA QUE PRODUCE ESCORRENTIA
Las cifras romanas se refieren a tres curvas que cubren un rango para el coeficiente de
escurrimiento entre 0.15<C<0.45. Las curvas I y II pertenecen al mtodo del USBR, la
curva III ha sido desarrollada mediante ampliacin simtrica del rango original.
Precipitacin
Total Mensual
(Lmite
Superior)
mm
25.4

PORCION DE LA PRECIPITACION (mm)


Aprovechable por las plantas

Dficit o Escorrenta

I
25.4

II
22.86

III
20.4

I
0.0

II
2.5

III
5.0

50.8

49.5

44.5

39.3

1.3

6.3

11.5

76.2

72.4

63.5

54.6

3.8

12.7

21.6

101.6

92.7

76.2

59.7

8.9

25.4

41.9

127.0

102.9

83.8

59.7

24.1

43.2

67.3

152.4

118.1

86.4

59.7

34.3

66.0

92.7

177.8

120.7

86.4

59.7

57.2

91.4

118.1

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


Cuadro N 72
COEFICIENTES PARA EL CALCULO DE LA PRECIPITACION EFECTIVA
Valor del Coeficiente
Descripcin
Curva I

Curva II

Curva III

ao

-0.018

-0.0213

-0.028

a1

-0.0185

0.1358

0.2756

a2

0.001105

-0.002296

-0.004103

a3

-1.20E-05

4.35E-05

5.53E-05

a4

1.44E-07

-8.90E-08

1.24E-07

a5

-2.85E-10

-8.79E-11

-1.42E-09

Los Coeficientes a0 - a5 , se aplican en el polinomio de quinto grado:


PEi = ao + a1 P + a2 P2 + a3 P3 + a4 P4 + a5 P5.
ao = 0
Los lmites superiores para la precipitacin efectiva son:
Curva I :
Curva II :
Curva III :

PE = P - 120.6 ;
PE = P - 86.4 ;
PE = P - 59.7 ;

para P >= 177.8


para P >= 152.4
para P >= 127.0

mm/mes
mm/mes
mm/mes

CUADRO N 73
COEFICIENTES ANUALES Y MENSUALES PARA EL CALCULO DE LA
CONTRIBUCION DE LA RETENCION
Lmina de agua acumulada en los tres tipos de almacn hdrico, en base a la cuenca de
referencia:
LAMINA ACUMULADA
TIPO

mm/Ao
Pendiente de la Cuenca

Napa Fretica

2%

8%

15%

300

250

200

Lagunas y Pantanos

500

Nevados

500
CUADRO N 73a
ALMACENAMIENTO HIDRICO DURANTE LA EPOCA DE LLUVIAS
VALORES EN PORCENTAJE

REGION

Oct

Nov

Dic

Ene

Feb

Mar

Suma

Cuzco

35

40

20

100

Huancavelica

10

35

30

20

100

Junn

10

25

30

30

100

Cajamarca

25

-5

20

25

35

100

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


DETERMINACION DE CAUDALES MENSUALES
METODO DE LUTZ SCHOLZ
Versin Actualizada, Recomendada y Editada por
EFRAIN NOA YARASCA
Cuenca del Ro Iruro
Area de la Cuenca =

720.67

Km
CUADRO N 74

PRECIPITACIONES (1965 - 2002)


MES

PE1

Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic

162.1
126.1
160.9
35.1
15.7
3.8
3.0
4.2
13.3
19.6
24.0
52.6
620.6

42.3
18.4
41.3
0.4
0.0
0.0
0.0
0.0
0.0
0.0
0.1
1.3
103.7

PE2
mm/mes
75.6
42.5
74.4
3.7
1.7
0.5
0.4
0.5
1.5
2.1
2.5
6.4
211.7

CAUDAL AFORADO

PE3

PE

99.2
66.5
98.6
7.1
3.5
1.0
0.8
1.1
3.1
4.2
5.0
11.6
301.7

125.2
78.3
123.8
8.5
4.3
1.2
0.9
1.3
3.7
5.2
6.1
13.9
372.4

Q
m3/s
18.42
28.35
38.77
11.74
3.93
1.96
1.40
1.29
1.17
1.12
1.77
4.34
9.52

C=

0.60

CM
mm/mes
68.47
95.16
144.07
42.22
14.61
7.03
5.21
4.80
4.22
4.14
6.36
16.13
412.43

Plan Meris II,1980


Descripcin
ao

Valor del Coeficiente


Curva I
Curva II
Curva III
-0.01800

-0.02130

-0.0280

a1

-0.01850

0.13580

0.2756

a2

0.001105

-0.002296

-0.004103

C1 =

-1.49

a3

-1.20E-05

4.35E-05

5.53E-05

C2 =

2.49

a4

1.44E-07

-8.90E-08

1.24E-07

C1 + C2 =

1.00

a5

-2.85E-10

-8.79E-11

-1.42E-09

CALCULO DE LA RETENCION
Pendiente
de la
Cuenca
%
6

Lmina
de Agua

Area

Retencin
Anual

mm/ao
270

Km2
60

m3/ao
1.62E+07

Lagunas

500

1.15

5.75E+05

Nevados

500

0.00E+00

Descripcion

Napa Fretica (Acuiferos)

TOTAL

1.68E+07
Retencin total =

16.775

MMC

23.3

mm/ao

CALCULO DEL COEFICIENTE DE AGOTAMIENTO


CRITERIO N 1
A=
720.67
EP =
532
T=
183
R=
23.3

Area (Km)
Evapotranspiracin (mm/ao)
Das de la estacin seca (das)
Retencin anual (mm/ao)

a = 3.1249 x 1067 A-0.1144 EP -19.336 T-3.369 R-1.429 =

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CRITERIO N 2
Clase de Cuenca :

Coeficiente b :

0.030
a = - 0.00252 Ln A + b =

Coeficiente de Agotamiento :

a =

0.01342
0.01342
bo = e-a.t

RAZON DE AGOTAMIENTO MENSUAL:


Razn Mensual :
b0 =

t=

30

das

0.669
bmes i = b0i e-a.t

GASTO DE RETENCION EN EL PERIODO SECO :


Perodo Seco :
Mes inicial = Abril
Mes final =
Octubre
CUADRO N 74a

enero

Ai Regin
5
65.0

febrero

15.0

3.5

marzo

5.0

1.2

Mes

bmes i

G mes i
mm/mes

A mes i
mm/mes
15.1

abril

0.67

8.2

mayo

0.45

5.5

junio

0.30

3.7

julio

0.20

2.5

agosto

0.13

1.6

septiembre

0.09

1.1

10

octubre

0.06

0.7

10.0

2.3

11

noviembre

12

diciembre

5.0

1.2

100

23.3

TOTAL

1.90

CALCULO DE CAUDALES
N

Mes

23.3

CUADRO N 74b
N Das

PE

Gasto de
Retencin

Abastecimie
nto de la
Retencin

das

mm/mes

Gi (mm/mes)

A i (mm/mes)

mm/mes

m3/s

m3/s

Caudal Generados

Caudales
Aforados

Ene

31

125.2

15.1

110.1

29.6

18.42

Feb

28

78.3

3.5

74.8

22.3

28.35

Mar

31

123.8

1.2

122.6

33.0

38.77

Abr

30

8.5

8.2

16.7

4.7

11.74

May

31

4.3

5.5

9.7

2.6

3.93

Jun

30

1.2

3.7

4.8

1.3

1.96

Jul

31

0.9

2.5

3.4

0.9

1.40

Ago

31

1.3

1.6

2.9

0.8

1.29

Sep

30

3.7

1.1

4.8

1.3

1.17

10

Oct

31

5.2

0.7

2.3

3.6

1.0

1.12

11

Nov

30

6.1

6.1

1.7

1.77

12

Dic

31

13.9

1.2

12.8

3.4

4.34

Ao

365

372.4

23.3

23.3

31.0

8.55

9.52

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

FIGURA N 44

CALIBRACION DE MODELO
45.0
40.0

Caudal Generados

35.0

Caudales Aforados

30.0
25.0
20.0
15.0

10.0
5.0
0.0
Ene

Feb

Mar

Abr

May

Jun

Jul

CALCULO DE REGRESION TRIPLE SIMPLE


CUADRO N 75
CAUDALES GENERADOS
PE II
N
Mes
Qt
Q t-1
Qt
Q t-1
PE t
X1
X2
X3
m3/s
m3/s
mm/mes
mm/mes
mm/mes
1
Ene
29.6
3.4
110.1
12.8
75.6
2
Feb
22.3
29.6
74.8
110.1
42.5
3
Mar
33.0
22.3
122.6
74.8
74.4
4
Abr
4.7
33.0
16.7
122.6
3.7
5
May
2.6
4.7
9.7
16.7
1.7
6
Jun
1.3
2.6
4.8
9.7
0.5
7
Jul
0.9
1.3
3.4
4.8
0.4
8
Ago
0.8
0.9
2.9
3.4
0.5
9
Sep
1.3
0.8
4.8
2.9
1.5
10
Oct
1.0
1.3
3.6
4.8
2.1
11
Nov
1.7
1.0
6.1
3.6
2.5
12
Dic
3.4
1.7
12.8
6.1
6.4
SUMA =
372.4
372.4
211.72823
Xm1 =
Xm2 =
Xm3 =

31.03
31.03
17.64

S11 =
S12 =
S13 =

21857.21
9687.35
14260.61

GOBIERNO REGIONAL DE AYACUCHO

S22 =
S23 =
S33 =

Ago

Sep

Oct

Nov

Dic

CALCULOS
X11

X12

X13

X22

X23

X33

12121.2
5600.7
15036.2
280.4
94.8
23.3
11.4
8.5
22.8
12.7
37.3
163.2
33412.4

1406.4
8239.4
9176.8
2053.2
163.0
47.0
16.3
9.8
13.9
17.0
21.8
78.0
21242.6

8326.8
3180.9
9129.0
61.3
16.6
2.3
1.2
1.5
7.1
7.4
15.2
81.5
20830.8

163.2
12121.2
5600.7
15036.2
280.4
94.8
23.3
11.4
8.5
22.8
12.7
37.3
33412.4

966.2
4679.5
5571.5
448.8
28.6
4.6
1.8
1.7
4.3
9.9
8.9
39.0
11764.7

5720.2
1806.5
5542.5
13.4
2.9
0.2
0.1
0.3
2.2
4.3
6.2
40.7
13139.6

b1 =
b2 =
b3 =

2.246
0.095
1.464

21857.21
5194.50
9403.91

r=
S=

CONSORCIO IRRIGACIN ACAR

1.00
2.56

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

PRECIPITACION EFECTIVA MENSUAL (mm) - PE II - ESTACION PALPACHACRA


Ao
Ene
Feb
Mar
Abr
May
Jun

CUADRO N 75a
Ago
Sep

Oct

Nov

Dic

Suma

89.21

3.83

1.92

0.28

0.32

0.57

1.57

2.08

2.79

24.28

267.12

10.95

18.62

1.06

0.73

0.01

0.01

0.08

0.38

4.57

3.11

6.88

52.70

48.05

113.26

4.14

0.26

0.14

0.26

0.42

0.35

1.02

0.54

9.36

289.74

60.27

1.16

1.49

0.05

0.21

0.24

1.14

2.32

3.61

48.33

209.32

104.06

16.34

0.12

0.05

0.06

0.05

0.31

0.47

6.65

15.35

194.37

29.59

2.69

4.96

0.06

0.01

0.27

2.07

1.64

1.59

13.67

153.82

47.99

25.05

4.63

0.01

0.01

0.03

0.03

0.16

0.74

1.29

55.75

154.79

83.02

55.16

136.34

1.49

0.02

0.02

0.03

0.52

3.08

3.17

2.68

105.30

390.83

1973

92.54

60.07

66.53

18.41

0.28

0.11

0.25

0.84

2.36

0.68

3.20

17.00

262.28

1974

135.28

22.74

12.09

9.05

0.37

0.42

0.83

0.62

0.45

0.73

3.27

37.01

222.87

1975

103.21

34.03

47.32

0.89

7.66

0.78

0.70

0.95

0.92

3.06

1.90

59.79

261.21

1976

136.59

82.76

60.83

1.15

0.96

1.22

1.27

2.05

1.70

1.28

1.84

21.77

313.42

1977

3.89

66.05

131.39

1.26

1.25

1.55

1.30

1.64

4.46

2.11

4.62

15.89

235.43

1978

26.50

8.71

9.00

6.25

2.93

1.54

1.65

1.70

1.75

3.89

6.91

13.26

84.10

1979

79.95

13.73

61.76

2.02

1.80

2.04

1.91

1.96

2.21

2.70

2.33

8.89

181.28

1980

40.31

9.30

54.88

2.08

3.41

2.33

2.23

2.31

2.95

2.82

2.71

34.98

160.29

1981

82.59

40.05

77.51

3.34

1.47

0.09

0.93

0.35

1.31

2.12

3.42

42.84

256.01

1982

61.49

33.02

58.71

3.06

1.52

0.08

0.17

0.47

1.62

2.28

2.34

18.73

183.52

1983

74.94

41.08

70.50

3.51

1.64

0.10

0.17

1.09

1.63

1.89

2.78

19.81

219.14

1984

95.67

47.45

80.65

3.26

1.95

0.25

0.58

0.25

1.52

2.64

3.11

67.36

304.68

1985

98.89

52.76

102.40

4.91

2.01

0.12

0.09

0.55

2.37

2.07

2.74

39.46

308.35

1986

99.52

48.28

78.88

3.60

1.57

0.39

0.20

0.46

1.19

1.77

2.88

42.02

280.75

1987

62.42

28.80

56.20

3.03

1.46

0.13

0.27

0.10

1.38

1.86

2.28

15.81

173.75

1988

71.12

41.02

77.76

3.28

1.49

0.09

0.05

0.33

1.53

1.68

3.08

28.36

229.79

1989

120.10

66.03

107.74

4.20

1.84

0.17

0.30

0.21

1.58

2.03

2.52

36.71

343.41

1990

56.64

33.69

58.17

3.34

1.98

0.10

0.20

0.12

1.44

2.44

3.31

20.89

182.32

1991

62.62

38.05

64.92

3.24

1.69

0.08

0.09

0.31

1.19

1.86

2.53

19.07

195.68

1992

78.06

34.25

70.55

3.41

1.62

0.09

0.33

0.11

1.47

2.19

2.43

14.65

209.16

1993

89.31

53.88

91.53

4.04

2.06

0.12

0.34

0.20

1.66

2.31

4.20

40.23

289.89

1994

100.12

56.51

84.35

3.76

1.76

0.16

0.06

0.38

1.27

1.97

3.52

36.78

290.66

1995

80.97

48.45

87.11

3.52

1.61

0.10

0.15

0.37

1.44

2.11

3.26

23.85

252.93

1996

100.64

63.31

85.98

4.56

1.70

0.10

0.32

0.39

1.38

2.12

3.09

34.07

297.67

1997

98.19

58.01

87.70

4.09

1.83

0.19

0.29

0.45

1.63

2.21

3.25

36.18

294.02

1998

108.29

60.68

94.69

4.04

1.84

0.22

0.27

0.45

1.65

2.27

3.31

38.26

315.98

1999

98.64

63.07

90.23

4.15

1.83

0.19

0.28

0.43

1.65

2.54

3.04

36.59

302.63

2000

105.17

58.86

92.21

3.89

1.85

0.19

0.26

0.52

1.68

2.56

3.17

37.41

307.77

2001

98.36

56.35

94.93

4.34

1.81

0.19

0.26

0.46

1.68

2.21

3.02

33.49

297.10

2002

104.89

61.85

96.29

4.04

1.95

0.21

0.27

0.52

1.63

2.20

3.26

36.77

313.88

1965

86.36

53.92

1966

6.32

1967

111.92

1968

81.43

9.09

1969

4.97

45.95

1970

82.79

14.49

1971

19.09

1972

GOBIERNO REGIONAL DE AYACUCHO

Jul

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Area de Cuenca =
Ene
Ao
31
1965

35.03

720.67
Feb

Km
Mar

Abr

May

CUADRO N 75b
Jun
Jul

Ago

Sep

Oct

Nov

Dic

28

31

30

31

30

31

31

30

31

30

31

Promedio
365

27.92

38.16

5.96

1.90

0.87

0.81

0.87

1.37

1.59

1.87

10.36

10.56

1966

4.02

5.90

8.41

1.88

1.07

0.80

0.72

0.65

0.81

2.45

2.19

3.57

2.71

1967

44.99

26.39

47.50

7.02

1.34

0.85

0.85

0.83

0.84

1.13

0.90

4.37

11.42

1968

33.11

8.10

25.08

3.62

1.50

0.82

0.78

0.72

1.15

1.66

2.31

19.83

8.22

1969

4.41

21.21

43.42

11.58

1.75

0.79

0.69

0.72

0.78

0.84

3.43

7.00

8.05

1970

33.82

10.60

13.15

3.03

2.81

0.88

0.65

0.79

1.57

1.42

1.39

6.13

6.35

1971

8.75

22.59

12.45

3.73

0.96

0.72

0.68

0.72

0.76

1.00

1.31

22.70

6.36

1972

35.50

28.50

56.80

6.89

1.28

0.71

0.66

0.94

1.94

1.98

1.86

42.24

14.94

1973

41.14

31.27

29.56

10.97

1.73

0.78

0.79

1.07

1.75

1.09

2.08

7.44

10.81

1974

54.57

16.33

6.72

4.91

1.15

0.91

1.07

0.95

0.89

1.00

1.99

15.31

8.82

1975

42.65

20.04

20.92

3.09

3.90

1.37

0.96

1.12

1.05

1.89

1.57

24.26

10.24

1976

56.73

42.69

28.22

3.91

1.32

1.25

1.23

1.47

1.47

1.26

1.51

9.35

12.53

1977

3.02

29.74

54.91

6.60

1.73

1.41

1.24

1.39

2.62

1.68

2.69

7.10

9.51

1978

11.71

5.69

4.62

3.58

2.12

1.49

1.39

1.45

1.50

2.23

3.61

6.13

3.79

1979

32.73

10.10

25.79

3.94

1.68

1.59

1.51

1.55

1.66

1.84

1.69

4.24

7.36

1980

16.94

6.46

22.78

3.68

2.25

1.76

1.59

1.61

1.99

1.84

1.89

14.49

6.44

1981

34.53

21.75

32.99

5.26

1.63

0.88

1.07

0.88

1.28

1.51

2.10

17.65

10.13

1982

26.55

17.91

25.30

4.38

1.56

0.76

0.72

0.89

1.40

1.63

1.75

8.13

7.58

1983

30.85

21.90

30.22

5.01

1.76

0.89

0.74

1.16

1.35

1.44

1.91

8.58

8.82

1984

39.13

25.44

34.56

5.42

1.81

0.90

0.87

0.81

1.29

1.80

2.11

27.36

11.79

1985

42.18

28.15

43.36

6.87

1.99

0.85

0.78

0.85

1.68

1.51

1.86

16.32

12.20

1986

41.37

26.14

33.95

5.42

1.78

0.96

0.84

0.81

1.17

1.36

1.90

17.33

11.09

1987

26.84

16.11

24.15

4.26

1.56

0.88

0.76

0.72

1.22

1.39

1.73

7.01

7.22

1988

29.34

21.59

33.05

5.25

1.64

0.85

0.72

0.79

1.26

1.33

2.06

12.00

9.16

1989

49.07

34.58

45.98

6.88

1.96

0.90

0.77

0.71

1.34

1.53

1.85

15.18

13.40

1990

24.34

17.95

25.08

4.50

1.81

0.81

0.80

0.69

1.23

1.68

2.11

8.99

7.50

1991

26.15

20.04

27.91

4.67

1.73

0.80

0.72

0.81

1.24

1.42

1.78

8.28

7.96

1992

32.18

19.03

30.08

4.92

1.66

0.86

0.80

0.77

1.34

1.63

1.83

6.59

8.47

1993

36.41

28.06

39.11

6.08

1.97

0.89

0.84

0.79

1.37

1.65

2.51

16.63

11.36

1994

41.61

29.75

36.35

5.79

1.85

0.84

0.71

0.82

1.22

1.51

2.16

15.23

11.49

1995

33.91

25.40

37.11

5.72

1.83

0.79

0.73

0.80

1.32

1.54

2.15

10.24

10.13

1996

41.28

32.63

37.28

6.16

1.82

0.83

0.81

0.79

1.30

1.56

2.10

14.21

11.73

1997

40.57

30.22

37.69

6.06

1.86

0.86

0.74

0.88

1.34

1.60

2.08

15.02

11.58

1998

44.70

31.80

40.64

6.26

1.88

0.89

0.82

0.84

1.44

1.57

2.10

15.90

12.40

1999

40.91

32.53

38.89

6.15

1.91

0.94

0.80

0.83

1.34

1.72

2.09

15.21

11.94

2000

43.43

30.94

39.61

6.06

1.87

0.82

0.84

0.90

1.33

1.75

2.03

15.48

12.09

2001

40.81

29.48

40.58

6.40

1.92

0.94

0.80

0.88

1.35

1.63

2.00

13.99

11.73

2002

43.20

32.22

41.34

6.34

1.98

0.96

0.78

0.91

1.36

1.58

2.17

15.31

12.34

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


DETERMINACION DE CAUDALES MENSUALES
METODO DE LUTZ SCHOLZ
Versin Actualizada, Recomendada y Editada por
EFRAIN NOA YARASCA
Cuenca del Ro IRURO
Area de la Cuenca =

185.53

Km
CUADRO N 76

PRECIPITACIONES (1965 - 2002)


MES

PE1

Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic

184.0
206.1
223.2
39.4
9.2
1.8
4.3
8.6
24.3
14.1
24.9
63.3
803.1

63.9
91.5
116.5
0.6
0.0
0.0
0.0
0.0
0.1
0.0
0.1
2.2
274.8

PE2
mm/mes
97.6
117.9
129.9
4.2
1.1
0.2
0.5
1.0
2.5
1.6
2.6
8.9
367.9

CAUDAL AFORADO

PE3

PE

99.2
62.8
0.0
8.0
2.2
0.5
1.1
2.1
5.1
3.2
5.2
15.6
204.8

106.8
125.1
133.6
5.2
1.4
0.3
0.7
1.3
3.2
2.0
3.3
10.7
393.5

Q
m3/s
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CM
mm/mes
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C=

0.49

C1 =

-0.28

1.16

Plan Meris II,1980


Descripcin

Valor del Coeficiente


Curva I
Curva II
Curva III

ao

-0.01800

-0.02130

-0.0280

a1

-0.01850

0.13580

0.2756

a2

0.001105

-0.002296

-0.004103

a3

-1.20E-05

4.35E-05

5.53E-05

C2 =

1.28

-0.16

a4

1.44E-07

-8.90E-08

1.24E-07

C1 + C2 =

1.00

1.00

a5

-2.85E-10

-8.79E-11

-1.42E-09

CALCULO DE LA RETENCION
Pendiente
de la
Cuenca
%
3

Lmina
de Agua

Area

Retencin
Anual

mm/ao
292.5

Km2
6

m3/ao
1.76E+06

Lagunas

500

1.15

5.75E+05

Nevados

500

0.00E+00

Descripcion

Napa Fretica (Acuiferos)

TOTAL

2.33E+06
Retencin total =

2.33

MMC

12.6

mm/ao

CALCULO DEL COEFICIENTE DE AGOTAMIENTO


CRITERIO N 1
A=
185.53
EP =
532
T=
183
R=
12.6

Area (Km)
Evapotranspiracin (mm/ao)
Das de la estacin seca (das)
Retencin anual (mm/ao)

a = 3.1249 x 1067 A-0.1144 EP -19.336 T-3.369 R-1.429 =

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CRITERIO N 2
Clase de Cuenca :

Coeficiente b :

0.030
a = - 0.00252 Ln A + b =

Coeficiente de Agotamiento :

a =

0.01684
0.01684
bo = e-a.t

RAZON DE AGOTAMIENTO MENSUAL:


Razn Mensual :
b0 =

t=

30

das

0.603
bmes i = b0i e-a.t

GASTO DE RETENCION EN EL PERIODO SECO :


Perodo Seco :
Mes inicial = Abril
Mes final =
Octubre
CUADRO N 76a

enero

Ai Regin
5
65.0

febrero

15.0

1.9

Mes

bmes i

G mes i
mm/mes

marzo

A mes i
mm/mes
8.2

5.0

0.6

abril

0.60

5.1

mayo

0.36

3.1

junio

0.22

1.9

julio

0.13

1.1

agosto

0.08

0.7

septiembre

0.05

0.4

10

octubre

0.03

0.2

10.0

1.3

11

noviembre

12

diciembre

5.0

0.6

100

12.6

TOTAL

1.48

CALCULO DE CAUDALES
N

Mes

12.6

CUADRO N 76b
N Das

PE

Gasto de
Retencin

Abastecimie
nto de la
Retencin

das

mm/mes

Gi (mm/mes)

A i (mm/mes)

Caudal Generados

Caudales
Aforados

mm/mes

m3/s

m3/s

Ene

31

106.8

8.2

98.7

6.8

0.00

Feb

28

125.1

1.9

123.2

9.5

0.00

Mar

31

133.6

0.6

133.0

9.2

0.00

Abr

30

5.2

5.1

10.3

0.7

0.00

May

31

1.4

3.1

4.5

0.3

0.00

Jun

30

0.3

1.9

2.1

0.2

0.00

Jul

31

0.7

1.1

1.8

0.1

0.00

Ago

31

1.3

0.7

2.0

0.1

0.00

Sep

30

3.2

0.4

3.6

0.3

0.00

10

Oct

31

2.0

0.2

1.3

1.0

0.1

0.00

11

Nov

30

3.3

3.3

0.2

0.00

12

Dic

31

10.7

0.6

10.1

0.7

0.00

Ao

365

393.5

12.6

12.6

32.8

2.35

0.00

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CALCULO DE REGRESION TRIPLE SIMPLE


CUADRO N 76c
CAUDALES GENERADOS
PE II
N
Mes
Qt
Q t-1
Qt
Q t-1
PE t
X1
X2
X3
m3/s
m3/s
mm/mes
mm/mes
mm/mes
1
Ene
6.8
0.7
98.7
10.1
97.6
2
Feb
9.5
6.8
123.2
98.7
117.9
3
Mar
9.2
9.5
133.0
123.2
129.9
4
Abr
0.7
9.2
10.3
133.0
4.2
5
May
0.3
0.7
4.5
10.3
1.1
6
Jun
0.2
0.3
2.1
4.5
0.2
7
Jul
0.1
0.2
1.8
2.1
0.5
8
Ago
0.1
0.1
2.0
1.8
1.0
9
Sep
0.3
0.1
3.6
2.0
2.5
10
Oct
0.1
0.3
1.0
3.6
1.6
11
Nov
0.2
0.1
3.3
1.0
2.6
12
Dic
0.7
0.2
10.1
3.3
8.9
SUMA =
393.5
393.5
367.8776
Xm1 =
Xm2 =
Xm3 =

32.79
32.79
30.66

S11 =
S12 =
S13 =

29964.99
18124.30
29522.33

CALCULOS

S22 =
S23 =
S33 =

X11

X12

X13

X22

X23

X33

9737.9
15188.0
17677.5
106.9
19.8
4.6
3.2
3.8
12.9
1.0
10.6
101.9
42868.1

996.1
12161.3
16385.5
1374.9
46.1
9.5
3.8
3.5
7.0
3.5
3.2
32.9
31027.5

9629.3
14525.3
17270.6
43.5
4.7
0.5
0.9
2.0
9.0
1.5
8.4
89.7
41585.5

101.9
9737.9
15188.0
17677.5
106.9
19.8
4.6
3.2
3.8
12.9
1.0
10.6
42868.1

985.0
11630.8
16008.3
559.2
11.0
1.0
1.1
1.8
4.9
5.6
2.5
28.9
29240.2

9522.0
13891.6
16873.0
17.7
1.1
0.0
0.275413331
1.0
6.3
2.4
6.6
78.9
40401.1

b1 =
b2 =
b3 =

1.187
0.036
0.993

29964.99
17177.07
29123.28

r=
S=

1.00
1.18

Promedio

GENERACION DE CAUDALES MENSUAL (m3/s)

CUADRO N 76d
Area de Cuenca =
Ene
Ao
31

185.53
Feb

Km
Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

28

31

30

31

30

31

31

30

31

30

31

365

6.48

7.21

0.33

0.16

0.10

0.13

0.15

0.25

0.18

0.24

0.53

1.72

1965

4.86

1966

2.39

2.72

3.18

0.31

0.33

0.10

0.10

0.10

0.15

0.19

0.45

0.55

0.88

1967

8.60

10.80

8.04

0.59

0.16

0.10

0.16

0.19

0.36

0.19

0.18

0.33

2.48

1968

7.90

9.42

9.31

0.58

0.42

0.15

0.12

0.17

0.25

0.43

0.13

0.36

2.44

1969

0.93

7.19

9.43

0.54

0.12

0.10

0.12

0.12

0.14

0.14

0.26

0.41

1.62

1970

3.91

4.44

7.43

0.65

0.27

0.10

0.12

0.10

0.26

0.13

0.23

0.67

1.53

1971

1.50

10.54

9.50

0.56

0.12

0.09

0.10

0.11

0.12

0.14

0.12

1.84

2.06

1972

8.75

10.71

9.35

0.67

0.13

0.09

0.11

0.10

0.45

0.39

0.25

1.03

2.67

1973

4.40

5.34

9.64

0.61

0.14

0.12

0.14

0.18

0.88

0.16

0.43

0.35

1.87

1974

6.80

5.83

4.32

0.58

0.17

0.10

0.13

0.26

0.24

0.10

0.21

0.56

1.61

1975

8.30

10.64

9.35

0.45

0.21

0.09

0.08

0.08

0.25

0.15

0.12

1.14

2.57

1976

9.46

8.00

6.78

0.39

0.20

0.09

0.22

0.20

1.74

0.14

0.19

0.66

2.34

1977

0.55

5.11

9.54

0.63

0.12

0.09

0.24

0.09

0.35

0.15

0.44

0.36

1.47

1978

8.08

0.65

5.88

0.63

0.10

0.09

0.09

0.13

0.16

0.14

0.35

0.43

1.39

1979

0.68

0.48

9.46

0.52

0.15

0.09

0.13

0.12

0.14

0.21

0.22

0.40

1.05

1980

2.66

2.33

9.08

0.52

0.13

0.10

0.23

0.14

0.24

0.34

0.15

0.42

1.36

1981

7.43

3.18

3.22

1.78

0.15

0.09

0.08

0.42

0.25

0.16

0.37

2.80

1.66

1982

6.60

4.17

1.03

0.58

0.10

0.11

0.09

0.13

0.32

0.24

0.48

0.29

1.18

1983

0.46

2.62

4.58

0.48

0.20

0.10

0.08

0.13

1.39

0.28

0.17

0.67

0.93

1984

6.52

9.32

9.31

3.02

0.20

0.15

0.09

0.27

0.17

0.21

1.02

0.92

2.60

1985

0.33

9.07

2.00

2.37

0.34

0.15

0.10

0.10

0.36

0.54

0.27

0.35

1.33

1986

7.12

9.34

8.57

0.81

0.19

0.09

0.22

0.15

0.31

0.09

0.09

0.65

2.30

1987

9.47

1.38

0.82

0.42

0.16

0.09

0.11

0.17

0.09

0.19

0.25

0.31

1.12

1988

1.91

5.03

1.31

1.48

0.13

0.09

0.09

0.09

0.23

0.22

0.10

1.45

1.01

1989

7.94

9.37

9.54

1.16

0.25

0.10

0.10

0.16

0.14

0.17

0.12

0.11

2.43

1990

3.12

0.46

2.97

0.24

0.20

0.16

0.09

0.14

0.09

0.21

0.99

3.00

0.97

1991

3.21

3.94

7.47

0.49

0.20

0.13

0.09

0.10

0.22

0.13

0.27

0.47

1.39

1992

3.00

6.89

0.48

0.13

0.09

0.10

0.08

0.18

0.09

0.19

0.38

0.32

1.00

1993

9.46

1.81

7.38

1.04

0.21

0.14

0.10

0.19

0.15

0.22

0.43

5.29

2.20

1994

9.64

9.46

9.78

0.70

0.11

0.11

0.12

0.09

0.25

0.10

0.18

2.12

2.72

1995

3.48

3.58

9.43

0.76

0.11

0.09

0.09

0.12

0.25

0.15

0.27

0.85

1.60

1996

3.40

0.31

5.48

0.83

0.11

0.09

0.08

0.18

0.19

0.11

0.29

1.04

1.01

1997

7.78

10.25

9.78

0.78

0.19

0.11

0.13

0.16

0.28

0.21

0.29

0.80

2.56

1998

8.10

10.50

9.81

0.79

0.19

0.11

0.12

0.16

0.29

0.21

0.30

0.85

2.62

1999

7.77

10.24

9.78

0.78

0.19

0.11

0.12

0.16

0.28

0.21

0.29

0.80

2.56

2000

7.87

10.33

9.80

0.78

0.19

0.11

0.13

0.16

0.28

0.20

0.29

0.81

2.58

2001

7.70

10.19

9.77

0.77

0.19

0.11

0.12

0.16

0.28

0.20

0.29

0.80

2.55

2002
MAX
MIN
PROM
Q(75%)
Q(90%)
Q(95%)

7.95
9.64
0.33
5.53
2.916
0.671
0.458

10.40
10.80
0.31
6.38
3.067
0.633
0.447

9.81
9.81
0.48
7.10
4.516
1.279
0.803

0.79
3.02
0.13
0.78
0.513
0.324
0.238

0.19
0.42
0.09
0.18
0.127
0.106
0.099

0.11
0.16
0.09
0.11
0.089
0.088
0.087

0.12
0.24
0.08
0.12
0.087
0.083
0.081

0.16
0.42
0.08
0.15
0.108
0.090
0.083

0.28
1.74
0.09
0.32
0.163
0.122
0.090

0.21
0.54
0.09
0.20
0.143
0.108
0.097

0.29
1.02
0.09
0.30
0.185
0.117
0.096

0.83
5.29
0.11
0.94
0.391
0.320
0.280

2.59
2.72
0.88
1.84
1.29
0.99
0.93

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


DETERMINACION DE CAUDALES MENSUALES
METODO DE LUTZ SCHOLZ
Versin Actualizada, Recomendada y Editada por
EFRAIN NOA YARASCA
Cuenca del Ro CALLCAC
Area de la Cuenca =

18.33

Km
CUADRO N 77

PRECIPITACIONES (1965 - 2002)


MES

PE1

Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic

182.4
138.2
184.2
38.0
17.6
3.2
3.0
3.4
13.5
20.2
26.0
56.4
685.9

62.2
24.9
64.1
0.5
0.0
0.0
0.0
0.0
0.0
0.0
0.1
1.6
153.4

PE2
mm/mes
96.0
52.8
97.8
4.0
1.9
0.4
0.4
0.4
1.5
2.1
2.7
7.2
267.1

CAUDAL AFORADO

PE3

PE

100.1
79.4
99.0
7.7
3.9
0.8
0.8
0.9
3.1
4.3
5.4
12.8
318.2

110.4
64.6
112.1
5.5
2.7
0.6
0.5
0.6
2.1
3.0
3.8
9.6
315.5

Q
m3/s
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C=

0.46

CM
mm/mes
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Plan Meris II,1980


Descripcin
ao

Valor del Coeficiente


Curva I
Curva II
Curva III
-0.01800

-0.02130

-0.0280

a1

-0.01850

0.13580

0.2756

a2

0.001105

-0.002296

-0.004103

C1 =

-0.43

0.05

a3

-1.20E-05

4.35E-05

5.53E-05

C2 =

1.43

0.95

a4

1.44E-07

-8.90E-08

1.24E-07

C1 + C2 =

1.00

1.00

a5

-2.85E-10

-8.79E-11

-1.42E-09

CALCULO DE LA RETENCION
Pendiente
de la
Cuenca
%
6

Lmina
de Agua

Area

Retencin
Anual

mm/ao
270

Km2
0.5

m3/ao
1.35E+05

Lagunas

500

0.00E+00

Nevados

500

0.00E+00

Descripcion

Napa Fretica (Acuiferos)

TOTAL

1.35E+05
Retencin total =

0.135

MMC

7.4

mm/ao

CALCULO DEL COEFICIENTE DE AGOTAMIENTO


CRITERIO N 1
A=
18.33
EP =
532
T=
183
R=
7.4

Area (Km)
Evapotranspiracin (mm/ao)
Das de la estacin seca (das)
Retencin anual (mm/ao)

a = 3.1249 x 1067 A-0.1144 EP -19.336 T-3.369 R-1.429 =

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


CRITERIO N 2
Clase de Cuenca :

Coeficiente b :

0.030
a = - 0.00252 Ln A + b =

Coeficiente de Agotamiento :

a =

0.02267
0.02267
bo = e-a.t

RAZON DE AGOTAMIENTO MENSUAL:


Razn Mensual :
b0 =

t=

30

das

0.507
bmes i = b0i e-a.t

GASTO DE RETENCION EN EL PERIODO SECO :


Perodo Seco :
Mes inicial = Abril
Mes final =
Octubre
CUADRO N 77a

enero

Ai Regin
5
65.0

febrero

15.0

1.1

Mes

bmes i

G mes i
mm/mes

marzo

A mes i
mm/mes
4.8

5.0

0.4

abril

0.51

3.7

mayo

0.26

1.9

junio

0.13

0.9

julio

0.07

0.5

agosto

0.03

0.2

septiembre

0.02

0.1

10

octubre

0.01

0.1

10.0

0.7

11

noviembre

12

diciembre

5.0

0.4

100

7.4

TOTAL

1.02

CALCULO DE CAUDALES
N

Mes

7.4

CUADRO N 77b
N Das

PE

Gasto de
Retencin

Abastecimie
nto de la
Retencin

das

mm/mes

Gi (mm/mes)

A i (mm/mes)

Caudal Generados

Caudales
Aforados

mm/mes

m3/s

m3/s

Ene

31

110.4

4.8

105.6

0.7

0.00

Feb

28

64.6

1.1

63.5

0.5

0.00

Mar

31

112.1

0.4

111.7

0.8

0.00

Abr

30

5.5

3.7

9.2

0.1

0.00

May

31

2.7

1.9

4.5

0.0

0.00

Jun

30

0.6

0.9

1.5

0.0

0.00

Jul

31

0.5

0.5

1.0

0.0

0.00

Ago

31

0.6

0.2

0.8

0.0

0.00

Sep

30

2.1

0.1

2.3

0.0

0.00

10

Oct

31

3.0

0.1

0.7

2.4

0.0

0.00

11

Nov

30

3.8

3.8

0.0

0.00

12

Dic

31

9.6

0.4

9.2

0.1

0.00

Ao

365

315.5

7.4

7.4

26.3

0.18

0.00

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CALCULO DE REGRESION TRIPLE SIMPLE


CUADRO N 77c
CAUDALES GENERADOS
PE II
N
Mes
Qt
Q t-1
Qt
Q t-1
PE t
X1
X2
X3
m3/s
m3/s
mm/mes
mm/mes
mm/mes
1
Ene
0.7
0.1
105.6
9.2
96.0
2
Feb
0.5
0.7
63.5
105.6
52.8
3
Mar
0.8
0.5
111.7
63.5
97.8
4
Abr
0.1
0.8
9.2
111.7
4.0
5
May
0.0
0.1
4.5
9.2
1.9
6
Jun
0.0
0.0
1.5
4.5
0.4
7
Jul
0.0
0.0
1.0
1.5
0.4
8
Ago
0.0
0.0
0.8
1.0
0.4
9
Sep
0.0
0.0
2.3
0.8
1.5
10
Oct
0.0
0.0
2.4
2.3
2.1
11
Nov
0.0
0.0
3.8
2.4
2.7
12
Dic
0.1
0.0
9.2
3.8
7.2
SUMA =
315.5
315.5
267.12844
Xm1 =
Xm2 =
Xm3 =

26.29
26.29
22.26

S11 =
S12 =
S13 =

19599.66
7610.50
17528.42

S22 =
S23 =
S33 =

CALCULOS
X11

X12

X13

X22

X23

X33

11158.4
4035.3
12483.5
84.3
20.6
2.3
1.0
0.7
5.1
5.5
14.2
84.5
27895.4

971.1
6710.3
7097.5
1025.8
41.7
6.8
1.5
0.8
1.9
5.3
8.9
34.7
15906.3

10142.7
3352.3
10925.8
36.9
8.5
0.6
0.4
0.3
3.4
5.0
10.1
66.0
24552.0

84.5
11158.4
4035.3
12483.5
84.3
20.6
2.3
1.0
0.7
5.1
5.5
14.2
27895.4

882.7
5574.5
6211.9
448.7
17.3
1.8
0.5
0.4
1.2
4.8
6.3
27.1
13177.3

9219.4
2784.9
9562.5
16.1
3.5
0.2
0.1
0.2
2.2
4.5
7.2
51.6
21652.4

b1 =
b2 =
b3 =

0.690
0.043
1.099

19599.66
6153.74
15705.94

r=
S=

1.00
0.76

GENERACION DE CAUDALES MENSUAL (m3/s)


CUADRO N 77d
Area de Cuenca =
Ene
Ao
31

18.33
Feb

Km
Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

28

31

30

31

30

31

31

30

31

30

31

Promedio
365

1965

0.81

0.51

0.82

0.04

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.06

0.20

1966

0.05

0.10

0.18

0.01

0.01

0.01

0.00

0.00

0.00

0.04

0.03

0.02

0.04

1967

0.97

0.49

0.76

0.07

0.01

0.01

0.00

0.00

0.00

0.01

0.01

0.01

0.20

1968

0.73

0.48

0.63

0.03

0.02

0.01

0.00

0.00

0.00

0.03

0.04

0.07

0.17

1969

0.04

0.44

0.96

0.21

0.01

0.01

0.00

0.00

0.00

0.00

0.07

0.05

0.15

1970

0.75

0.15

0.21

0.03

0.06

0.01

0.00

0.00

0.02

0.02

0.01

0.03

0.11

1971

0.14

0.47

0.27

0.06

0.01

0.00

0.00

0.00

0.00

0.01

0.01

0.25

0.10

1972

0.78

0.57

0.68

0.05

0.01

0.00

0.00

0.00

0.03

0.03

0.02

0.41

0.22

1973

0.87

0.62

0.70

0.23

0.01

0.01

0.00

0.01

0.03

0.01

0.03

0.03

0.21

1974

1.02

0.26

0.11

0.10

0.01

0.01

0.01

0.01

0.01

0.01

0.03

0.05

0.13

1975

0.89

0.29

0.50

0.03

0.09

0.02

0.01

0.01

0.01

0.03

0.02

0.17

0.17

1976

0.99

0.90

0.68

0.04

0.02

0.01

0.01

0.02

0.02

0.02

0.02

0.03

0.23

1977

0.02

0.59

0.41

0.03

0.02

0.02

0.02

0.02

0.05

0.02

0.05

0.03

0.11

1978

0.29

0.09

0.08

0.07

0.04

0.02

0.02

0.02

0.02

0.04

0.07

0.04

0.07

1979

0.80

0.16

0.62

0.05

0.02

0.02

0.02

0.02

0.02

0.03

0.02

0.04

0.15

1980

0.38

0.09

0.58

0.05

0.04

0.03

0.02

0.02

0.03

0.03

0.03

0.11

0.12

1981

0.67

0.43

0.69

0.07

0.02

0.01

0.01

0.01

0.02

0.02

0.02

0.05

0.17

1982

0.60

0.38

0.62

0.06

0.02

0.01

0.01

0.01

0.01

0.02

0.02

0.05

0.15

1983

0.75

0.50

0.78

0.07

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.06

0.19

1984

0.71

0.46

0.74

0.07

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.06

0.18

1985

0.84

0.58

0.87

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.07

0.21

1986

0.77

0.51

0.79

0.07

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.06

0.19

1987

0.61

0.39

0.63

0.06

0.02

0.01

0.01

0.01

0.02

0.02

0.02

0.05

0.15

1988

0.68

0.44

0.71

0.07

0.02

0.01

0.01

0.01

0.02

0.02

0.02

0.06

0.17

1989

0.95

0.69

0.98

0.09

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.08

0.24

1990

0.60

0.38

0.62

0.06

0.02

0.01

0.01

0.01

0.02

0.02

0.02

0.05

0.15

1991

0.62

0.40

0.65

0.06

0.02

0.01

0.01

0.01

0.02

0.02

0.02

0.05

0.16

1992

0.71

0.47

0.74

0.07

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.06

0.18

1993

0.84

0.58

0.88

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.07

0.21

1994

0.84

0.57

0.87

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.07

0.21

1995

0.80

0.54

0.83

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.06

0.20

1996

0.81

0.55

0.85

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.06

0.20

1997

0.87

0.60

0.90

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.07

0.22

1998

0.91

0.64

0.94

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.07

0.23

1999

0.87

0.60

0.90

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.07

0.22

2000

0.88

0.61

0.91

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.07

0.22

2001

0.86

0.59

0.89

0.08

0.02

0.01

0.01

0.01

0.02

0.02

0.03

0.07

0.22

2002
MAX
MIN
PROM
Q(75%)
Q(90%)
Q(95%)

0.89
1.02
0.02
0.70
0.620
0.127
0.039

0.62
0.90
0.09
0.47
0.385
0.142
0.039

0.92
0.98
0.08
0.68
0.621
0.210
0.106

0.08
0.23
0.01
0.07
0.050
0.035
0.032

0.02
0.09
0.01
0.02
0.017
0.011
0.007

0.01
0.03
0.00
0.01
0.007
0.005
0.005

0.01
0.02
0.00
0.01
0.005
0.005
0.005

0.01
0.02
0.00
0.01
0.006
0.005
0.005

0.02
0.05
0.00
0.02
0.015
0.005
0.005

0.02
0.04
0.00
0.02
0.020
0.010
0.007

0.03
0.07
0.01
0.03
0.024
0.015
0.005

0.07
0.41
0.01
0.07
0.049
0.033
0.017

0.22
0.24
0.04
0.18
0.151
0.106
0.065

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Fig. 45
CAUDAL VS PROBABILIDAD (Qda. Callcacc)

CAUDAL ( m3/s)

0.30
0.25
Q.(75%) = 151 Lt/S
0.20
0.15
0.10
0.05

Series1

0.00
0

20

40

60

80

100

120

PROBABILIDAD

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


DETERMINACION DE CAUDALES MENSUALES
METODO DE LUTZ SCHOLZ
Versin Actualizada, Recomendada y Editada por
EFRAIN NOA YARASCA
Cuenca del Ro Ceroracra
Area de la Cuenca =

8.54

Km
CUADRO N 78

PRECIPITACIONES (1965 - 2002)


MES

PE1

Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic

182.4
138.2
184.2
38.0
17.6
3.2
3.0
3.4
13.5
20.2
26.0
56.4
685.9

62.2
24.9
64.1
0.5
0.0
0.0
0.0
0.0
0.0
0.0
0.1
1.6
153.4

PE2
mm/mes
96.0
52.8
97.8
4.0
1.9
0.4
0.4
0.4
1.5
2.1
2.7
7.2
267.1

CAUDAL AFORADO

PE3

PE

100.1
79.4
99.0
7.7
3.9
0.8
0.8
0.9
3.1
4.3
5.4
12.8
318.2

110.4
64.6
112.1
5.5
2.7
0.6
0.5
0.6
2.1
3.0
3.8
9.6
315.5

Q
m3/s
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C=

0.46

CM
mm/mes
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Plan Meris II,1980


Valor del Coeficiente
Curva I
Curva II
Curva III

Descripcin

-0.01800

ao

-0.02130

-0.0280

a1

-0.01850

0.13580

0.2756

a2

0.001105

-0.002296

-0.004103

C1 =

-0.43

0.05

a3

-1.20E-05

4.35E-05

5.53E-05

C2 =

1.43

0.95

a4

1.44E-07

-8.90E-08

1.24E-07

C1 + C2 =

1.00

1.00

a5

-2.85E-10

-8.79E-11

-1.42E-09

CALCULO DE LA RETENCION
Pendiente
de la
Cuenca
%
3

Lmina
de Agua

Area

Retencin
Anual

mm/ao
292.5

Km2
1

m3/ao
2.93E+05

Lagunas

500

0.00E+00

Nevados

500

0.00E+00

Descripcion

Napa Fretica (Acuiferos)

TOTAL

2.93E+05
Retencin total =

0.2925

MMC

34.3

mm/ao

CALCULO DEL COEFICIENTE DE AGOTAMIENTO


CRITERIO N 1
A=
EP =
T=
R=

8.54
532
183
34.3

Area (Km)
Evapotranspiracin (mm/ao)
Das de la estacin seca (das)
Retencin anual (mm/ao)

a = 3.1249 x 1067 A-0.1144 EP -19.336 T-3.369 R-1.429 =

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CRITERIO N 2
Clase de Cuenca :

Coeficiente b :

0.030
a = - 0.00252 Ln A + b =

Coeficiente de Agotamiento :

a =

0.02460
0.02460
bo = e-a.t

RAZON DE AGOTAMIENTO MENSUAL:


Razn Mensual :
b0 =

t=

30

das

0.478
bmes i = b0i e-a.t

GASTO DE RETENCION EN EL PERIODO SECO :


Perodo Seco :
Mes inicial = Abril
Mes final =
Octubre
CUADRO N 78a

enero

Ai Regin
5
65.0

febrero

15.0

5.1

marzo

5.0

1.7

Mes

bmes i

G mes i
mm/mes

A mes i
mm/mes
22.3

abril

0.48

18.0

mayo

0.23

8.6

junio

0.11

4.1

julio

0.05

2.0

agosto

0.02

0.9

septiembre

0.01

0.4

10

octubre

0.01

0.2

10.0

3.4

11

noviembre

12

diciembre
TOTAL

0.91

CALCULO DE CAUDALES
N

Mes

34.3

5.0

1.7

100

34.3

CUADRO N 78b
N Das

PE

Gasto de
Retencin

Abastecimie
nto de la
Retencin

das

mm/mes

Gi (mm/mes)

A i (mm/mes)

mm/mes

m3/s

m3/s

110.4

22.3

88.2

0.3

0.00

Caudal Generados

Caudales
Aforados

Ene

31

Feb

28

64.6

5.1

59.5

0.2

0.00

Mar

31

112.1

1.7

110.4

0.4

0.00

Abr

30

5.5

18.0

23.5

0.1

0.00

May

31

2.7

8.6

11.3

0.0

0.00

Jun

30

0.6

4.1

4.7

0.0

0.00

Jul

31

0.5

2.0

2.5

0.0

0.00

Ago

31

0.6

0.9

1.5

0.0

0.00

Sep

30

2.1

0.4

2.6

0.0

0.00

10

Oct

31

3.0

0.2

3.4

-0.2

0.0

0.00

11

Nov

30

3.8

3.8

0.0

0.00

12

Dic

31

9.6

1.7

7.8

0.0

0.00

Ao

365

315.5

34.3

34.3

26.3

0.09

0.00

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CALCULO DE REGRESION TRIPLE SIMPLE


CUADRO N 78c
CAUDALES GENERADOS
PE II
N
Mes
Qt
Q t-1
Qt
Q t-1
PE t
X1
X2
X3
m3/s
m3/s
mm/mes
mm/mes
mm/mes
1
Ene
0.3
0.0
88.2
7.8
96.0
2
Feb
0.2
0.3
59.5
88.2
52.8
3
Mar
0.4
0.2
110.4
59.5
97.8
4
Abr
0.1
0.4
23.5
110.4
4.0
5
May
0.0
0.1
11.3
23.5
1.9
6
Jun
0.0
0.0
4.7
11.3
0.4
7
Jul
0.0
0.0
2.5
4.7
0.4
8
Ago
0.0
0.0
1.5
2.5
0.4
9
Sep
0.0
0.0
2.6
1.5
1.5
10
Oct
0.0
0.0
-0.2
2.6
2.1
11
Nov
0.0
0.0
3.8
-0.2
2.7
12
Dic
0.0
0.0
7.8
3.8
7.2
SUMA =
315.5
315.5
267.12844
Xm1 =
Xm2 =
Xm3 =

26.29
26.29
22.26

S11 =
S12 =
S13 =

15992.10
7166.41
15563.87

S22 =
S23 =
S33 =

CALCULOS
X11

X12

X13

X22

X23

X33

7771.8
3539.2
12184.9
551.9
127.2
21.8
6.2
2.4
6.7
0.0
14.2
61.6
24287.9

692.0
5244.6
6566.9
2593.2
264.9
52.7
11.6
3.8
4.0
-0.5
-0.7
29.6
15462.2

8464.7
3139.5
10794.4
94.4
21.2
1.8
0.9
0.6
3.9
-0.4
10.1
56.4
22587.4

61.6
7771.8
3539.2
12184.9
551.9
127.2
21.8
6.2
2.4
6.7
0.0
14.2
24287.9

753.6
4652.3
5817.5
443.3
44.2
4.5
1.7
1.0
2.3
5.5
-0.5
27.1
11752.6

9219.4
2784.9
9562.5
16.1
3.5
0.2
0.1
0.2
2.2
4.5
7.2
51.6
21652.4

b1 =
b2 =
b3 =

0.898
0.170
0.940

15992.10
4728.99
15705.94

r=
S=

1.00
4.04

Promedio

GENERACION DE CAUDALES MENSUAL (m3/s)


CUADRO N 78d
Area de Cuenca =
Ene
Ao
31

8.54
Feb

Km
Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

28

31

30

31

30

31

31

30

31

30

31

365

1965

0.33

0.21

0.33

0.02

0.01

0.01

0.00

0.00

0.01

0.01

0.01

0.03

0.08

1966

0.02

0.04

0.08

0.02

0.01

0.01

0.01

0.00

0.00

0.02

0.02

0.01

0.02

1967

0.39

0.25

0.34

0.08

0.02

0.00

0.00

0.00

0.01

0.01

0.00

0.00

0.09

1968

0.29

0.08

0.26

0.05

0.02

0.01

0.00

0.01

0.01

0.01

0.02

0.03

0.06

1969

0.02

0.18

0.41

0.14

0.03

0.01

0.00

0.01

0.00

0.00

0.03

0.02

0.07

1970

0.30

0.10

0.10

0.03

0.03

0.01

0.00

0.00

0.01

0.01

0.01

0.01

0.05

1971

0.06

0.20

0.13

0.04

0.01

0.00

0.00

0.00

0.01

0.01

0.00

0.10

0.05

1972

0.33

0.27

0.30

0.06

0.02

0.01

0.00

0.00

0.01

0.02

0.01

0.16

0.10

1973

0.37

0.30

0.31

0.14

0.03

0.01

0.00

0.00

0.01

0.01

0.01

0.02

0.10

1974

0.41

0.16

0.07

0.05

0.01

0.01

0.01

0.01

0.01

0.00

0.01

0.02

0.06

1975

0.36

0.17

0.22

0.04

0.04

0.01

0.01

0.01

0.01

0.01

0.01

0.07

0.08

1976

0.41

0.42

0.32

0.06

0.02

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.11

1977

0.01

0.24

0.19

0.04

0.01

0.01

0.01

0.01

0.02

0.01

0.02

0.02

0.05

1978

0.12

0.06

0.04

0.04

0.02

0.01

0.01

0.01

0.01

0.02

0.03

0.02

0.03

1979

0.32

0.11

0.26

0.06

0.02

0.01

0.01

0.01

0.01

0.01

0.01

0.02

0.07

1980

0.16

0.06

0.24

0.05

0.03

0.02

0.01

0.01

0.01

0.01

0.01

0.05

0.05

1981

0.28

0.21

0.30

0.07

0.02

0.01

0.01

0.00

0.01

0.01

0.01

0.02

0.08

1982

0.24

0.19

0.27

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.01

0.02

0.07

1983

0.30

0.25

0.34

0.08

0.02

0.01

0.00

0.00

0.01

0.01

0.01

0.03

0.09

1984

0.29

0.23

0.32

0.07

0.02

0.01

0.01

0.00

0.01

0.01

0.01

0.02

0.08

1985

0.34

0.28

0.38

0.08

0.02

0.01

0.01

0.01

0.01

0.01

0.02

0.03

0.10

1986

0.31

0.25

0.35

0.08

0.02

0.01

0.01

0.01

0.01

0.01

0.01

0.03

0.09

1987

0.25

0.19

0.28

0.06

0.02

0.01

0.01

0.00

0.01

0.01

0.01

0.02

0.07

1988

0.28

0.22

0.31

0.07

0.02

0.01

0.00

0.00

0.01

0.01

0.01

0.02

0.08

1989

0.38

0.33

0.43

0.09

0.02

0.01

0.01

0.00

0.01

0.01

0.01

0.03

0.11

1990

0.24

0.19

0.27

0.06

0.02

0.01

0.01

0.01

0.01

0.01

0.01

0.02

0.07

1991

0.25

0.19

0.28

0.06

0.02

0.01

0.00

0.01

0.01

0.01

0.01

0.02

0.07

1992

0.29

0.23

0.33

0.07

0.02

0.01

0.00

0.00

0.01

0.01

0.01

0.03

0.08

1993

0.34

0.28

0.38

0.08

0.02

0.01

0.00

0.00

0.01

0.01

0.01

0.03

0.10

1994

0.34

0.28

0.38

0.08

0.02

0.01

0.01

0.01

0.01

0.01

0.01

0.03

0.10

1995

0.33

0.26

0.36

0.08

0.02

0.01

0.00

0.00

0.01

0.01

0.01

0.03

0.09

1996

0.33

0.27

0.37

0.08

0.02

0.01

0.00

0.01

0.01

0.01

0.01

0.03

0.10

1997

0.35

0.29

0.39

0.09

0.02

0.01

0.00

0.00

0.01

0.01

0.01

0.03

0.10

1998

0.36

0.31

0.41

0.09

0.03

0.01

0.00

0.00

0.01

0.01

0.01

0.03

0.11

1999

0.35

0.29

0.40

0.09

0.02

0.01

0.00

0.00

0.01

0.01

0.01

0.03

0.10

2000

0.35

0.30

0.40

0.09

0.02

0.01

0.00

0.00

0.01

0.01

0.01

0.03

0.10

2001

0.35

0.29

0.39

0.09

0.02

0.01

0.01

0.00

0.01

0.01

0.01

0.03

0.10

2002
MAX
MIN
PROM
Q(75%)
Q(90%)
Q(95%)

0.36
0.41
0.01
0.28
0.251
0.052
0.022

0.30
0.42
0.04
0.22
0.185
0.076
0.056

0.40
0.43
0.04
0.30
0.261
0.099
0.062

0.09
0.14
0.02
0.07
0.053
0.037
0.017

0.02
0.04
0.01
0.02
0.016
0.012
0.010

0.01
0.02
0.00
0.01
0.006
0.005
0.004

0.00
0.01
0.00
0.01
0.003
0.002
0.002

0.00
0.01
0.00
0.01
0.002
0.002
0.002

0.01
0.02
0.00
0.01
0.007
0.005
0.003

0.01
0.02
0.00
0.01
0.009
0.007
0.005

0.01
0.03
0.00
0.01
0.012
0.009
0.005

0.03
0.16
0.00
0.03
0.021
0.016
0.011

0.10
0.11
0.02
0.08
0.070
0.050
0.031

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Fig. 46
CAUDAL VS PROBABILIDAD (Qda. Cceroracra)

0.12

0.10

Q.(75%) = 70 Lt/S

CAUDAL ( m3/s)

0.08

0.06

0.04

0.02
Series1

0.00
0.00

20.00

40.00

60.00

80.00

100.00

120.00

PROBABILIDAD

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


DETERMINACION DE CAUDALES MENSUALES
METODO DE LUTZ SCHOLZ
Versin Actualizada, Recomendada y Editada por
EFRAIN NOA YARASCA
Cuenca del Ro AZULJAJA
Area de la Cuenca =

30.66

Km
CUADRO N 79

PRECIPITACIONES (1965 - 2002)


MES

PE1

Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic

182.4
138.2
184.2
38.0
17.6
3.2
3.0
3.4
13.5
20.2
26.0
56.4
685.9

62.2
24.9
64.1
0.5
0.0
0.0
0.0
0.0
0.0
0.0
0.1
1.6
153.4

PE2
mm/mes
96.0
52.8
97.8
4.0
1.9
0.4
0.4
0.4
1.5
2.1
2.7
7.2
267.1

CAUDAL AFORADO

PE3

PE

100.1
79.4
99.0
7.7
3.9
0.8
0.8
0.9
3.1
4.3
5.4
12.8
318.2

110.4
64.6
112.1
5.5
2.7
0.6
0.5
0.6
2.1
3.0
3.8
9.6
315.5

Q
m3/s
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C=

0.46

CM
mm/mes
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Plan Meris II,1980


Descripcin
ao

Valor del Coeficiente


Curva I
Curva II
Curva III
-0.01800

-0.02130

-0.0280

a1

-0.01850

0.13580

0.2756

a2

0.001105

-0.002296

-0.004103

C1 =

-0.43

0.05

a3

-1.20E-05

4.35E-05

5.53E-05

C2 =

1.43

0.95

a4

1.44E-07

-8.90E-08

1.24E-07

C1 + C2 =

1.00

1.00

a5

-2.85E-10

-8.79E-11

-1.42E-09

CALCULO DE LA RETENCION
Pendiente
de la
Cuenca
%
8

Lmina
de Agua

Area

Retencin
Anual

mm/ao
255

Km2
0.5

m3/ao
1.28E+05

Lagunas

500

0.00E+00

Nevados

500

0.00E+00

Descripcion

Napa Fretica (Acuiferos)

TOTAL

1.28E+05
Retencin total =

0.1275

MMC

4.2

mm/ao

CALCULO DEL COEFICIENTE DE AGOTAMIENTO


CRITERIO N 1
A=
30.66
EP =
532
T=
183
R=
4.2

Area (Km)
Evapotranspiracin (mm/ao)
Das de la estacin seca (das)
Retencin anual (mm/ao)

a = 3.1249 x 1067 A-0.1144 EP -19.336 T-3.369 R-1.429 =

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CRITERIO N 2
Clase de Cuenca :

Coeficiente b :

0.030
a = - 0.00252 Ln A + b =

Coeficiente de Agotamiento :

a =

0.02137
0.02137
bo = e-a.t

RAZON DE AGOTAMIENTO MENSUAL:


Razn Mensual :
b0 =

t=

30

das

0.527
bmes i = b0i e-a.t

GASTO DE RETENCION EN EL PERIODO SECO :


Perodo Seco :
Mes inicial = Abril
Mes final =
Octubre
CUADRO N 79a

enero

Ai Regin
5
65.0

febrero

15.0

0.6

marzo

5.0

0.2

Mes

bmes i

G mes i
mm/mes

A mes i
mm/mes
2.7

abril

0.53

2.0

mayo

0.28

1.0

junio

0.15

0.6

julio

0.08

0.3

agosto

0.04

0.2

septiembre

0.02

0.1

10

octubre

0.01

0.0

10.0

0.4

11

noviembre

12

diciembre

5.0

0.2

100

4.2

TOTAL

1.10

CALCULO DE CAUDALES
N

Mes

4.2

CUADRO N 79b
N Das

PE

Gasto de
Retencin

Abastecimie
nto de la
Retencin

das

mm/mes

Gi (mm/mes)

A i (mm/mes)

Caudal Generados

Caudales
Aforados

mm/mes

m3/s

m3/s

Ene

31

110.4

2.7

107.7

1.2

0.00

Feb

28

64.6

0.6

64.0

0.8

0.00

Mar

31

112.1

0.2

111.9

1.3

0.00

Abr

30

5.5

2.0

7.5

0.1

0.00

May

31

2.7

1.0

3.7

0.0

0.00

Jun

30

0.6

0.6

1.1

0.0

0.00

Jul

31

0.5

0.3

0.8

0.0

0.00

Ago

31

0.6

0.2

0.7

0.0

0.00

Sep

30

2.1

0.1

2.2

0.0

0.00

10

Oct

31

3.0

0.0

0.4

2.7

0.0

0.00

11

Nov

30

3.8

3.8

0.0

0.00

12

Dic

31

9.6

0.2

9.4

0.1

0.00

Ao

365

315.5

4.2

4.2

26.3

0.31

0.00

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CALCULO DE REGRESION TRIPLE SIMPLE


CUADRO N 79c
CAUDALES GENERADOS
PE II
N
Mes
Qt
Q t-1
Qt
Q t-1
PE t
X1
X2
X3
m3/s
m3/s
mm/mes
mm/mes
mm/mes
1
Ene
1.2
0.1
107.7
9.4
96.0
2
Feb
0.8
1.2
64.0
107.7
52.8
3
Mar
1.3
0.8
111.9
64.0
97.8
4
Abr
0.1
1.3
7.5
111.9
4.0
5
May
0.0
0.1
3.7
7.5
1.9
6
Jun
0.0
0.0
1.1
3.7
0.4
7
Jul
0.0
0.0
0.8
1.1
0.4
8
Ago
0.0
0.0
0.7
0.8
0.4
9
Sep
0.0
0.0
2.2
0.7
1.5
10
Oct
0.0
0.0
2.7
2.2
2.1
11
Nov
0.0
0.0
3.8
2.7
2.7
12
Dic
0.1
0.0
9.4
3.8
7.2
SUMA =
315.5
315.5
267.12844
Xm1 =
Xm2 =
Xm3 =

26.29
26.29
22.26

S11 =
S12 =
S13 =

20109.69
7694.15
17762.82

S22 =
S23 =
S33 =

CALCULOS
X11

X12

X13

X22

X23

X33

11603.1
4096.6
12519.3
56.3
13.9
1.2
0.7
0.6
4.9
7.0
14.2
87.5
28405.4

1007.6
6894.5
7161.5
839.9
28.0
4.2
0.9
0.6
1.7
5.9
10.0
35.3
15989.9

10342.8
3377.7
10941.5
30.1
7.0
0.4
0.3
0.3
3.3
5.6
10.1
67.2
24786.4

87.5
11603.1
4096.6
12519.3
56.3
13.9
1.2
0.7
0.6
4.9
7.0
14.2
28405.4

898.1
5684.5
6258.9
449.4
14.1
1.5
0.4
0.3
1.1
4.7
7.1
27.1
13347.3

9219.4
2784.9
9562.5
16.1
3.5
0.2
0.1
0.2
2.2
4.5
7.2
51.6
21652.4

b1 =
b2 =
b3 =

0.582
0.031
1.119

20109.69
6323.70
15705.94

r=
S=

1.00
0.65

Promedio

GENERACION DE CAUDALES MENSUAL (m3/s)


CUADRO N 79d
Area de Cuenca =
Ene
Ao
31

30.66
Feb

Km
Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

28

31

30

31

30

31

31

30

31

30

31

365

1965

1.38

0.87

1.40

0.06

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.11

0.33

1966

0.08

0.16

0.30

0.02

0.02

0.01

0.01

0.01

0.01

0.07

0.05

0.03

0.06

1967

1.66

0.81

1.28

0.11

0.01

0.01

0.01

0.01

0.01

0.02

0.01

0.01

0.33

1968

1.24

0.13

1.04

0.04

0.02

0.01

0.01

0.01

0.01

0.04

0.06

0.12

0.23

1969

0.06

0.74

1.63

0.34

0.02

0.01

0.01

0.01

0.01

0.01

0.11

0.08

0.25

1970

1.27

0.23

0.36

0.05

0.09

0.01

0.01

0.01

0.04

0.03

0.02

0.06

0.18

1971

0.23

0.80

0.45

0.09

0.01

0.01

0.01

0.01

0.01

0.02

0.01

0.43

0.17

1972

1.32

0.95

1.14

0.07

0.01

0.01

0.01

0.01

0.04

0.05

0.04

0.70

0.36

1973

1.47

1.04

1.17

0.38

0.02

0.01

0.01

0.01

0.04

0.01

0.05

0.05

0.35

1974

1.73

0.41

0.18

0.17

0.02

0.01

0.01

0.01

0.01

0.01

0.05

0.08

0.22

1975

1.51

0.47

0.84

0.04

0.14

0.02

0.02

0.02

0.02

0.05

0.03

0.28

0.29

1976

1.68

1.51

1.14

0.06

0.02

0.02

0.02

0.02

0.03

0.02

0.02

0.05

0.38

1977

0.04

1.00

0.69

0.05

0.03

0.03

0.03

0.03

0.08

0.03

0.08

0.06

0.18

1978

0.48

0.15

0.14

0.12

0.06

0.03

0.03

0.03

0.03

0.06

0.11

0.06

0.11

1979

1.36

0.25

1.06

0.07

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.06

0.26

1980

0.64

0.14

0.99

0.07

0.06

0.04

0.04

0.04

0.04

0.05

0.04

0.19

0.20

1981

1.14

0.72

1.17

0.09

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.09

0.28

1982

1.02

0.63

1.05

0.09

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.08

0.25

1983

1.28

0.83

1.32

0.10

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.32

1984

1.20

0.77

1.24

0.10

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.30

1985

1.43

0.96

1.47

0.11

0.03

0.01

0.01

0.01

0.03

0.04

0.04

0.11

0.35

1986

1.30

0.85

1.34

0.10

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.32

1987

1.03

0.64

1.07

0.09

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.08

0.26

1988

1.16

0.74

1.20

0.10

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.09

0.29

1989

1.61

1.15

1.65

0.13

0.04

0.01

0.01

0.01

0.03

0.04

0.05

0.13

0.40

1990

1.01

0.63

1.04

0.09

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.08

0.25

1991

1.06

0.66

1.10

0.09

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.09

0.26

1992

1.21

0.78

1.25

0.10

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.30

1993

1.44

0.97

1.48

0.11

0.04

0.01

0.01

0.01

0.03

0.04

0.04

0.11

0.36

1994

1.42

0.95

1.46

0.11

0.04

0.01

0.01

0.01

0.03

0.04

0.04

0.11

0.35

1995

1.37

0.90

1.41

0.11

0.03

0.01

0.01

0.01

0.03

0.04

0.04

0.11

0.34

1996

1.38

0.92

1.43

0.11

0.03

0.01

0.01

0.01

0.03

0.04

0.04

0.11

0.34

1997

1.47

1.00

1.52

0.12

0.04

0.01

0.01

0.01

0.03

0.04

0.05

0.12

0.37

1998

1.54

1.07

1.58

0.12

0.04

0.01

0.01

0.01

0.03

0.04

0.05

0.12

0.38

1999

1.47

1.00

1.52

0.12

0.04

0.01

0.01

0.01

0.03

0.04

0.05

0.12

0.37

2000

1.49

1.02

1.54

0.12

0.04

0.01

0.01

0.01

0.03

0.04

0.05

0.12

0.37

2001

1.46

0.99

1.50

0.11

0.04

0.01

0.01

0.01

0.03

0.04

0.05

0.11

0.36

2002
MAX
MIN
PROM
Q(75%)
Q(90%)
Q(95%)

1.51
1.73
0.04
1.19
1.053
0.214
0.063

1.04
1.51
0.13
0.76
0.632
0.163
0.139

1.55
1.65
0.14
1.15
1.042
0.350
0.174

0.12
0.38
0.02
0.11
0.071
0.048
0.042

0.04
0.14
0.01
0.04
0.027
0.160
0.009

0.01
0.04
0.01
0.01
0.009
0.007
0.007

0.01
0.04
0.01
0.01
0.008
0.007
0.007

0.01
0.04
0.01
0.01
0.008
0.007
0.007

0.03
0.08
0.01
0.03
0.024
0.007
0.007

0.04
0.07
0.01
0.03
0.032
0.016
0.009

0.05
0.11
0.01
0.04
0.039
0.025
0.007

0.12
0.70
0.01
0.12
0.080
0.054
0.027

0.38
0.40
0.06
0.29
0.25
0.18
0.11

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Fig. 47
CAUDAL VS PROBABILIDAD (Qda. Azuljaja)

0.45

CAUDAL ( m3/s)

0.40
0.35

Q.(75%) = 251 Lt/S

0.30

0.25
0.20
0.15
Series1

0.10
0.05
0.00
0

20

GOBIERNO REGIONAL DE AYACUCHO

40

60
80
PROBABILIDAD

100

120

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


DETERMINACION DE CAUDALES MENSUALES
METODO DE LUTZ SCHOLZ
Versin Actualizada, Recomendada y Editada por
EFRAIN NOA YARASCA
Cuenca del Ro JACHJALLA
Area de la Cuenca =
12.61

Km
CUADRO N 80

PRECIPITACIONES (1965 - 2002)


MES

PE1

Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic

168.3
138.0
178.4
39.7
14.9
3.0
2.6
3.4
11.6
19.2
24.4
24.4
627.9

47.8
24.8
57.8
0.6
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
131.1

PE2
mm/mes
81.8
52.6
92.0
4.2
1.6
0.4
0.3
0.4
1.3
2.0
2.5
2.5
241.8

CAUDAL AFORADO

PE3

PE

101.7
79.2
101.8
8.1
3.4
0.8
0.7
0.9
2.7
4.1
5.1
5.1
313.4

96.3
64.4
106.5
5.8
2.3
0.5
0.5
0.6
1.9
2.9
3.6
3.6
288.8

Q
m3/s
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C=

0.46

CM
mm/mes
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Plan Meris II,1980


Descripcin
ao

Valor del Coeficiente


Curva I
Curva II
Curva III
-0.01800

-0.02130

-0.0280

a1

-0.01850

0.13580

0.2756

a2

0.001105

-0.002296

-0.004103

C1 =

-0.42

0.34

a3

-1.20E-05

4.35E-05

5.53E-05

C2 =

1.42

0.66

a4

1.44E-07

-8.90E-08

1.24E-07

C1 + C2 =

1.00

1.00

a5

-2.85E-10

-8.79E-11

-1.42E-09

CALCULO DE LA RETENCION
Pendiente
de la
Cuenca
%
7

Lmina
de Agua

Area

Retencin
Anual

mm/ao
262.5

Km2
0.5

m3/ao
1.31E+05

Lagunas

500

0.00E+00

Nevados

500

0.00E+00

Descripcion

Napa Fretica (Acuiferos)

TOTAL

1.31E+05
Retencin total =

0.13125

MMC

10.4

mm/ao

CALCULO DEL COEFICIENTE DE AGOTAMIENTO


CRITERIO N 1
A=
12.61
EP =
532
T=
183
R=
10.4

Area (Km)
Evapotranspiracin (mm/ao)
Das de la estacin seca (das)
Retencin anual (mm/ao)

a = 3.1249 x 1067 A-0.1144 EP -19.336 T-3.369 R-1.429 =

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CRITERIO N 2
Clase de Cuenca :

Coeficiente b :

0.030
a = - 0.00252 Ln A + b =

Coeficiente de Agotamiento :

a =

0.02361
0.02361
bo = e-a.t

RAZON DE AGOTAMIENTO MENSUAL:


Razn Mensual :
b0 =

t=

30

das

0.492
bmes i = b0i e-a.t

GASTO DE RETENCION EN EL PERIODO SECO :


Perodo Seco :
Mes inicial = Abril
Mes final =
Octubre
CUADRO N 80a

enero

Ai Regin
5
65.0

febrero

15.0

1.6

marzo

5.0

0.5

Mes

bmes i

G mes i
mm/mes

A mes i
mm/mes
6.8

abril

0.49

5.3

mayo

0.24

2.6

junio

0.12

1.3

julio

0.06

0.6

agosto

0.03

0.3

septiembre

0.01

0.2

10

octubre

0.01

0.1

10.0

1.0

11

noviembre

12

diciembre
TOTAL

0.96

CALCULO DE CAUDALES
N

Mes

10.4

5.0

0.5

100

10.4

CUADRO N 80b
N Das

PE

Gasto de
Retencin

Abastecimie
nto de la
Retencin

das

mm/mes

Gi (mm/mes)

A i (mm/mes)

96.3

6.8

Caudal Generados

Caudales
Aforados

mm/mes

m3/s

m3/s

89.5

0.4

0.00

Ene

31

Feb

28

64.4

1.6

62.9

0.3

0.00

Mar

31

106.5

0.5

106.0

0.5

0.00

Abr

30

5.8

5.3

11.1

0.1

0.00

May

31

2.3

2.6

4.9

0.0

0.00

Jun

30

0.5

1.3

1.8

0.0

0.00

Jul

31

0.5

0.6

1.1

0.0

0.00

Ago

31

0.6

0.3

0.9

0.0

0.00

Sep

30

1.9

0.2

2.0

0.0

0.00

10

Oct

31

2.9

0.1

1.0

1.9

0.0

0.00

11

Nov

30

3.6

3.6

0.0

0.00

12

Dic

31

3.6

0.5

3.1

0.0

0.00

Ao

365

288.8

10.4

10.4

24.1

0.12

0.00

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CALCULO DE REGRESION TRIPLE SIMPLE


CUADRO N 80c
CAUDALES GENERADOS
PE II
N
Mes
Qt
Q t-1
Qt
Q t-1
PE t
X1
X2
X3
m3/s
m3/s
mm/mes
mm/mes
mm/mes
1
Ene
0.4
0.0
89.5
3.1
81.8
2
Feb
0.3
0.4
62.9
89.5
52.6
3
Mar
0.5
0.3
106.0
62.9
92.0
4
Abr
0.1
0.5
11.1
106.0
4.2
5
May
0.0
0.1
4.9
11.1
1.6
6
Jun
0.0
0.0
1.8
4.9
0.4
7
Jul
0.0
0.0
1.1
1.8
0.3
8
Ago
0.0
0.0
0.9
1.1
0.4
9
Sep
0.0
0.0
2.0
0.9
1.3
10
Oct
0.0
0.0
1.9
2.0
2.0
11
Nov
0.0
0.0
3.6
1.9
2.5
12
Dic
0.0
0.0
3.1
3.6
2.5
SUMA =
288.8
288.8
241.82332
Xm1 =
Xm2 =
Xm3 =

24.07
24.07
20.15

S11 =
S12 =
S13 =

16433.19
6882.63
14645.23

S22 =
S23 =
S33 =

CALCULOS
X11

X12

X13

X22

X23

X33

8011.8
3952.4
11238.0
123.7
24.5
3.3
1.2
0.8
4.1
3.7
12.8
9.3
23385.6

273.5
5627.2
6664.6
1179.2
55.0
8.9
2.0
1.0
1.8
3.9
6.9
10.9
13835.1

7323.9
3307.7
9754.3
47.2
8.1
0.7
0.3
0.4
2.7
3.9
9.0
7.7
20465.9

9.3
8011.8
3952.4
11238.0
123.7
24.5
3.3
1.2
0.8
4.1
3.7
12.8
23385.6

250.1
4709.4
5784.7
449.7
18.2
1.8
0.6
0.4
1.2
4.1
4.9
9.0
11234.0

6695.1
2768.2
8466.5
18.0
2.7
0.1
0.1
0.2
1.7
4.1
6.4
6.4
17969.5

b1 =
b2 =
b3 =

0.615
0.058
1.094

16433.19
5413.31
13096.29

r=
S=

1.00
0.91

Promedio

GENERACION DE CAUDALES MENSUAL (m3/s)


CUADRO N 80d
Area de Cuenca =
Ene
Ao
31

12.61
Feb

Km
Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

28

31

30

31

30

31

31

30

31

30

31

365

1965

0.56

0.35

0.56

0.03

0.01

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.13

1966

0.03

0.07

0.12

0.01

0.01

0.00

0.00

0.00

0.00

0.03

0.02

0.01

0.03

1967

0.67

0.35

0.52

0.06

0.01

0.00

0.00

0.00

0.00

0.01

0.00

0.00

0.14

1968

0.50

0.07

0.42

0.03

0.01

0.00

0.00

0.00

0.00

0.02

0.02

0.05

0.09

1969

0.03

0.30

0.66

0.16

0.01

0.00

0.00

0.00

0.00

0.00

0.05

0.03

0.10

1970

0.51

0.11

0.15

0.03

0.04

0.01

0.00

0.00

0.02

0.01

0.01

0.02

0.08

1971

0.09

0.32

0.19

0.04

0.01

0.00

0.00

0.00

0.00

0.01

0.00

0.17

0.07

1972

0.54

0.40

0.47

0.04

0.01

0.00

0.00

0.00

0.02

0.02

0.02

0.28

0.15

1973

0.60

0.44

0.48

0.17

0.01

0.00

0.00

0.00

0.02

0.00

0.02

0.02

0.15

1974

0.70

0.19

0.08

0.07

0.01

0.01

0.01

0.01

0.01

0.01

0.02

0.03

0.09

1975

0.61

0.21

0.34

0.03

0.06

0.01

0.01

0.01

0.01

0.02

0.01

0.11

0.12

1976

0.68

0.63

0.47

0.04

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.02

0.16

1977

0.02

0.40

0.29

0.03

0.01

0.01

0.01

0.01

0.03

0.01

0.03

0.02

0.07

1978

0.20

0.07

0.06

0.05

0.02

0.01

0.01

0.01

0.01

0.03

0.05

0.03

0.05

1979

0.55

0.12

0.43

0.04

0.02

0.02

0.01

0.02

0.02

0.02

0.02

0.02

0.11

1980

0.26

0.06

0.40

0.04

0.03

0.02

0.02

0.02

0.02

0.02

0.02

0.08

0.08

1981

0.46

0.30

0.48

0.05

0.01

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.12

1982

0.41

0.27

0.43

0.05

0.01

0.00

0.00

0.00

0.01

0.01

0.02

0.03

0.10

1983

0.52

0.35

0.54

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.13

1984

0.49

0.33

0.51

0.05

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.12

1985

0.58

0.40

0.60

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.05

0.15

1986

0.52

0.36

0.55

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.13

1987

0.42

0.27

0.44

0.05

0.01

0.00

0.00

0.00

0.01

0.01

0.02

0.03

0.11

1988

0.47

0.31

0.49

0.05

0.01

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.12

1989

0.65

0.48

0.68

0.07

0.02

0.00

0.00

0.00

0.01

0.02

0.02

0.05

0.17

1990

0.41

0.27

0.43

0.05

0.01

0.00

0.00

0.00

0.01

0.01

0.02

0.03

0.10

1991

0.43

0.28

0.45

0.05

0.01

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.11

1992

0.49

0.33

0.51

0.05

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.12

1993

0.58

0.41

0.61

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.05

0.15

1994

0.57

0.40

0.60

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.05

0.15

1995

0.55

0.38

0.58

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.14

1996

0.56

0.39

0.58

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.04

0.14

1997

0.59

0.42

0.62

0.06

0.02

0.00

0.00

0.00

0.01

0.02

0.02

0.05

0.15

1998

0.62

0.45

0.65

0.07

0.02

0.00

0.00

0.00

0.01

0.02

0.02

0.05

0.16

1999

0.59

0.42

0.62

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.05

0.15

2000

0.60

0.43

0.63

0.07

0.02

0.00

0.00

0.00

0.01

0.02

0.02

0.05

0.15

2001

0.59

0.42

0.62

0.06

0.02

0.00

0.00

0.00

0.01

0.01

0.02

0.05

0.15

2002
MAX
MIN
PROM
Q(75%)
Q(90%)
Q(95%)

0.61
0.70
0.02
0.48
0.425
0.087
0.027

0.44
0.63
0.06
0.32
0.267
0.068
0.067

0.64
0.68
0.06
0.47
0.425
0.145
0.075

0.07
0.17
0.01
0.06
0.041
0.027
0.025

0.02
0.06
0.01
0.02
0.012
0.007
0.005

0.00
0.02
0.00
0.01
0.004
0.003
0.003

0.00
0.02
0.00
0.00
0.003
0.003
0.003

0.00
0.02
0.00
0.01
0.004
0.003
0.003

0.01
0.03
0.00
0.01
0.010
0.032
0.003

0.02
0.03
0.00
0.01
0.013
0.007
0.005

0.02
0.05
0.00
0.02
0.016
0.011
0.004

0.05
0.28
0.00
0.05
0.034
0.023
0.012

0.16
0.17
0.03
0.12
0.104
0.073
0.045

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Fig. 48
CAUDAL VS PROBABILIDAD (Qda. Jachajalla)
0.18

CAUDAL ( m3/s)

0.16
Q.(75%) =104 Lt/S

0.14
0.12

0.10
0.08
0.06
Series1

0.04
0.02
0.00
0

20

GOBIERNO REGIONAL DE AYACUCHO

40

60
80
PROBABILIDAD

100

120

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


DETERMINACION DE CAUDALES MENSUALES
METODO DE LUTZ SCHOLZ
Versin Actualizada, Recomendada y Editada por
EFRAIN NOA YARASCA
Cuenca del Ro DESCOMULGADO
Area de la Cuenca =
23.71

Km
CUADRO N 81

PRECIPITACIONES (1965 - 2002)


MES

PE1

Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic

119.4
137.4
158.3
45.6
5.8
2.1
1.3
3.2
5.3
15.8
19.2
38.3
551.6

15.4
24.4
39.1
0.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.5
80.2

PE2
mm/mes
37.2
52.1
71.8
5.1
0.7
0.3
0.1
0.4
0.6
1.7
2.0
4.1
176.2

CAUDAL AFORADO

PE3

PE

59.3
78.6
97.0
9.5
1.4
0.5
0.3
0.8
1.3
3.5
4.2
7.8
264.3

54.9
74.4
98.3
8.6
1.3
0.5
0.3
0.7
1.2
3.1
3.7
6.9
253.7

Q
m3/s
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CM
mm/mes
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C=

0.46

C1 =

-0.81

0.12

Plan Meris II,1980


Descripcin

Valor del Coeficiente


Curva I
Curva II
Curva III

ao

-0.01800

-0.02130

-0.0280

a1

-0.01850

0.13580

0.2756

a2

0.001105

-0.002296

-0.004103

a3

-1.20E-05

4.35E-05

5.53E-05

C2 =

1.81

0.88

a4

1.44E-07

-8.90E-08

1.24E-07

C1 + C2 =

1.00

1.00

a5

-2.85E-10

-8.79E-11

-1.42E-09

CALCULO DE LA RETENCION
Pendiente
de la
Cuenca
%
9.6

Lmina
de Agua

Area

Retencin
Anual

mm/ao
243

Km2
0.5

m3/ao
1.22E+05

Lagunas

500

0.00E+00

Nevados

500

0.00E+00

Descripcion

Napa Fretica (Acuiferos)

TOTAL

1.22E+05
Retencin total =

0.1215

MMC

5.1

mm/ao

CALCULO DEL COEFICIENTE DE AGOTAMIENTO


CRITERIO N 1
A=
23.71
EP =
532
T=
183
R=
5.1

Area (Km)
Evapotranspiracin (mm/ao)
Das de la estacin seca (das)
Retencin anual (mm/ao)

a = 3.1249 x 1067 A-0.1144 EP -19.336 T-3.369 R-1.429 =

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CRITERIO N 2
Clase de Cuenca :

Coeficiente b :

0.030
a = - 0.00252 Ln A + b =

Coeficiente de Agotamiento :

a =

0.02202
0.02202
bo = e-a.t

RAZON DE AGOTAMIENTO MENSUAL:


Razn Mensual :
b0 =

t=

30

das

0.517
bmes i = b0i e-a.t

GASTO DE RETENCION EN EL PERIODO SECO :


Perodo Seco :
Mes inicial = Abril
Mes final =
Octubre
CUADRO N 81a

enero

Ai Regin
5
65.0

febrero

15.0

0.8

marzo

5.0

0.3

Mes

bmes i

G mes i
mm/mes

A mes i
mm/mes
3.3

abril

0.52

2.5

mayo

0.27

1.3

junio

0.14

0.7

julio

0.07

0.3

agosto

0.04

0.2

septiembre

0.02

0.1

10

octubre

0.01

0.0

10.0

0.5

11

noviembre

12

diciembre

5.0

0.3

100

5.1

TOTAL

1.06

CALCULO DE CAUDALES
N

Mes

5.1

CUADRO N 81b
N Das

PE

Gasto de
Retencin

Abastecimie
nto de la
Retencin

das

mm/mes

Gi (mm/mes)

A i (mm/mes)

Caudal Generados

Caudales
Aforados

mm/mes

m3/s

m3/s

Ene

31

54.9

3.3

51.6

0.5

0.00

Feb

28

74.4

0.8

73.6

0.7

0.00

Mar

31

98.3

0.3

98.0

0.9

0.00

Abr

30

8.6

2.5

11.1

0.1

0.00

May

31

1.3

1.3

2.6

0.0

0.00

Jun

30

0.5

0.7

1.1

0.0

0.00

Jul

31

0.3

0.3

0.6

0.0

0.00

Ago

31

0.7

0.2

0.9

0.0

0.00

Sep

30

1.2

0.1

1.3

0.0

0.00

10

Oct

31

3.1

0.0

0.5

2.6

0.0

0.00

11

Nov

30

3.7

3.7

0.0

0.00

12

Dic

31

6.9

0.3

6.7

0.1

0.00

Ao

365

253.7

5.1

5.1

21.1

0.19

0.00

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CALCULO DE REGRESION TRIPLE SIMPLE


CUADRO N 81c
CAUDALES GENERADOS
PE II
N
Mes
Qt
Q t-1
Qt
Q t-1
PE t
X1
X2
X3
m3/s
m3/s
mm/mes
mm/mes
mm/mes
1
Ene
0.5
0.1
51.6
6.7
37.2
2
Feb
0.7
0.5
73.6
51.6
52.1
3
Mar
0.9
0.7
98.0
73.6
71.8
4
Abr
0.1
0.9
11.1
98.0
5.1
5
May
0.0
0.1
2.6
11.1
0.7
6
Jun
0.0
0.0
1.1
2.6
0.3
7
Jul
0.0
0.0
0.6
1.1
0.1
8
Ago
0.0
0.0
0.9
0.6
0.4
9
Sep
0.0
0.0
1.3
0.9
0.6
10
Oct
0.0
0.0
2.6
1.3
1.7
11
Nov
0.0
0.0
3.7
2.6
2.0
12
Dic
0.1
0.0
6.7
3.7
4.1
SUMA =
253.7
253.7
176.1807
Xm1 =
Xm2 =
Xm3 =

21.14
21.14
14.68

S11 =
S12 =
S13 =

12526.90
7150.81
9169.75

CALCULOS

S22 =
S23 =
S33 =

X11

X12

X13

X22

X23

X33

2660.9
5420.6
9612.4
122.3
6.5
1.3
0.4
0.8
1.6
6.9
13.5
44.5
17891.7

344.1
3797.9
7218.3
1084.3
28.3
2.9
0.7
0.5
1.1
3.3
9.7
24.5
12515.6

1920.9
3832.8
7042.2
56.6
1.8
0.3
0.1
0.4
0.8
4.5
7.5
27.1
12894.9

44.5
2660.9
5420.6
9612.4
122.3
6.5
1.3
0.4
0.8
1.6
6.9
13.5
17891.7

248.4
2685.4
5288.3
501.7
7.7
0.6
0.2
0.2
0.6
2.1
5.4
14.9
8755.6

1386.7
2710.1
5159.2
26.2
0.5
0.1
0.0
0.2
0.4
2.9
4.1
16.4
9306.9

b1 =
b2 =
b3 =

0.778
0.033
1.340

12526.90
5030.42
6720.31

r=
S=

1.00
0.78

GENERACION DE CAUDALES MENSUAL (m3/s)


CUADRO N 81d
Area de Cuenca =
Ene
Ao
31

23.71
Feb

Km
Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

28

31

30

31

30

31

31

30

31

30

31

Promedio
365

1965

1.28

0.81

1.30

0.06

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.31

1966

0.07

0.15

0.28

0.02

0.02

0.01

0.01

0.01

0.01

0.07

0.05

0.03

0.06

1967

1.54

0.76

1.19

0.10

0.01

0.01

0.01

0.01

0.01

0.02

0.01

0.01

0.30

1968

1.15

0.12

0.97

0.04

0.02

0.01

0.01

0.01

0.01

0.04

0.06

0.12

0.21

1969

0.06

0.69

1.51

0.32

0.02

0.01

0.01

0.01

0.01

0.01

0.10

0.08

0.23

1970

1.18

0.22

0.33

0.05

0.09

0.01

0.01

0.01

0.03

0.03

0.02

0.05

0.17

1971

0.21

0.74

0.41

0.09

0.01

0.01

0.01

0.01

0.01

0.02

0.01

0.40

0.16

1972

1.22

0.88

1.06

0.06

0.01

0.01

0.01

0.01

0.04

0.05

0.04

0.65

0.34

1973

1.36

0.97

1.09

0.36

0.02

0.01

0.01

0.01

0.04

0.01

0.05

0.05

0.33

1974

1.60

0.39

0.16

0.16

0.02

0.01

0.01

0.01

0.01

0.01

0.05

0.07

0.21

1975

1.40

0.44

0.78

0.04

0.13

0.02

0.02

0.02

0.02

0.05

0.02

0.26

0.27

1976

1.56

1.40

1.06

0.06

0.02

0.02

0.02

0.02

0.03

0.02

0.02

0.05

0.36

1977

0.03

0.93

0.64

0.05

0.03

0.03

0.03

0.03

0.08

0.03

0.07

0.05

0.17

1978

0.45

0.14

0.13

0.12

0.05

0.03

0.03

0.03

0.03

0.06

0.11

0.06

0.10

1979

1.26

0.24

0.98

0.07

0.03

0.04

0.03

0.03

0.04

0.04

0.04

0.06

0.24

1980

0.60

0.13

0.92

0.07

0.06

0.04

0.04

0.04

0.04

0.04

0.04

0.17

0.18

1981

1.06

0.67

1.09

0.09

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.09

0.26

1982

0.94

0.59

0.97

0.08

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.08

0.23

1983

1.19

0.77

1.22

0.10

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.09

0.29

1984

1.12

0.72

1.15

0.09

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.09

0.28

1985

1.33

0.89

1.37

0.11

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.33

1986

1.21

0.79

1.24

0.10

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.10

0.30

1987

0.96

0.60

0.99

0.08

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.08

0.24

1988

1.07

0.68

1.11

0.09

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.09

0.27

1989

1.49

1.07

1.53

0.12

0.04

0.01

0.01

0.01

0.03

0.04

0.05

0.12

0.38

1990

0.94

0.59

0.97

0.08

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.08

0.23

1991

0.98

0.62

1.02

0.09

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.08

0.24

1992

1.13

0.73

1.16

0.10

0.03

0.01

0.01

0.01

0.02

0.03

0.04

0.09

0.28

1993

1.33

0.90

1.37

0.11

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.33

1994

1.32

0.88

1.36

0.11

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.33

1995

1.27

0.84

1.31

0.10

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.31

1996

1.28

0.86

1.32

0.11

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.10

0.32

1997

1.37

0.93

1.41

0.11

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.11

0.34

1998

1.43

0.99

1.47

0.12

0.03

0.01

0.01

0.01

0.03

0.04

0.04

0.11

0.36

1999

1.37

0.93

1.41

0.11

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.11

0.34

2000

1.39

0.95

1.43

0.11

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.11

0.35

2001

1.35

0.92

1.39

0.11

0.03

0.01

0.01

0.01

0.03

0.03

0.04

0.11

0.34

2002
MAX
MIN
PROM
Q(75%)
Q(90%)
Q(95%)

1.40
1.60
0.03
1.10
0.977
0.199
0.059

0.97
1.40
0.12
0.71
0.588
0.152
0.131

1.44
1.53
0.13
1.07
0.967
0.328
0.162

0.11
0.36
0.02
0.10
0.068
0.046
0.041

0.03
0.13
0.01
0.03
0.025
0.016
0.009

0.01
0.04
0.01
0.01
0.009
0.007
0.007

0.01
0.04
0.01
0.01
0.008
0.007
0.007

0.01
0.04
0.01
0.01
0.008
0.007
0.007

0.03
0.08
0.01
0.03
0.023
0.007
0.007

0.03
0.07
0.01
0.03
0.030
0.016
0.009

0.04
0.11
0.01
0.04
0.037
0.024
0.008

0.11
0.65
0.01
0.11
0.075
0.051
0.026

0.35
0.38
0.06
0.27
0.234
0.165
0.101

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Fig. 49
CAUDAL VS PROBABILIDAD (Qda. Descomulgado

0.40

CAUDAL ( m3/s)

0.35
0.30

Q.(75%) = 234 Lt/S

0.25
0.20
0.15
0.10

Series1

0.05

0.00
0

20

GOBIERNO REGIONAL DE AYACUCHO

40

60
PROBABILIDAD

80

100

120

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO


DETERMINACION DE CAUDALES MENSUALES
METODO DE LUTZ SCHOLZ
Versin Actualizada, Recomendada y Editada por
EFRAIN NOA YARASCA
Cuenca del Ro ACARI
Area de la Cuenca =

3761.51

Km
CUADRO N 82

PRECIPITACIONES (1965 - 2002)


MES

PE1

Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic

113.1
123.5
128.0
30.1
7.5
2.7
2.5
3.9
9.9
12.7
16.0
43.3
493.1

12.9
17.2
19.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
50.4

PE2
mm/mes
32.7
40.5
44.0
3.1
0.9
0.3
0.3
0.5
1.1
1.4
1.7
4.8
131.3

CAUDAL AFORADO

PE3

PE

52.7
63.8
68.6
6.1
1.8
0.7
0.6
1.0
2.4
2.9
3.6
8.9
213.1

37.9
46.7
50.6
3.9
1.1
0.4
0.4
0.6
1.4
1.8
2.2
5.8
152.9

Q
m3/s
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

C=

0.31

CM
mm/mes
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Plan Meris II,1980


Descripcin

Valor del Coeficiente


Curva I
Curva II
Curva III

ao

-0.01800

-0.02130

-0.0280

a1

-0.01850

0.13580

0.2756

a2

0.001105

-0.002296

-0.004103

C1 =

-0.27

0.74

a3

-1.20E-05

4.35E-05

5.53E-05

C2 =

1.27

0.26

a4

1.44E-07

-8.90E-08

1.24E-07

C1 + C2 =

1.00

1.00

a5

-2.85E-10

-8.79E-11

-1.42E-09

CALCULO DE LA RETENCION
Pendiente
de la
Cuenca
%
4

Lmina
de Agua

Area

Retencin
Anual

mm/ao
285

Km2
300

m3/ao
8.55E+07

Lagunas

500

1.2

6.00E+05

Nevados

500

0.00E+00

Descripcion

Napa Fretica (Acuiferos)

TOTAL

8.61E+07
Retencin total =

86.1

MMC

22.9

mm/ao

CALCULO DEL COEFICIENTE DE AGOTAMIENTO


CRITERIO N 1
A=
3761.51
EP =
532
T=
183
R=
22.9

Area (Km)
Evapotranspiracin (mm/ao)
Das de la estacin seca (das)
Retencin anual (mm/ao)

a = 3.1249 x 1067 A-0.1144 EP -19.336 T-3.369 R-1.429 =

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CRITERIO N 2
Clase de Cuenca :

Coeficiente b :

0.030
a = - 0.00252 Ln A + b =

Coeficiente de Agotamiento :

a =

0.00925
0.00925
bo = e-a.t

RAZON DE AGOTAMIENTO MENSUAL:


Razn Mensual :
b0 =

t=

30

das

0.758
bmes i = b0i e-a.t

GASTO DE RETENCION EN EL PERIODO SECO :


Perodo Seco :
Mes inicial = Abril
Mes final =
Octubre
CUADRO N 82a

enero

Ai Regin
5
65.0

febrero

15.0

3.4

marzo

5.0

1.1

Mes

bmes i

G mes i
mm/mes

A mes i
mm/mes
14.9

abril

0.76

6.5

mayo

0.57

4.9

junio

0.43

3.7

julio

0.33

2.8

agosto

0.25

2.1

septiembre

0.19

1.6

10

octubre

0.14

1.2

10.0

2.3

11

noviembre

12

diciembre
TOTAL

2.68

CALCULO DE CAUDALES
N

Mes

22.9

5.0

1.1

100

22.9

CUADRO N 82b
N Das

PE

Gasto de
Retencin

Abastecimie
nto de la
Retencin

das

mm/mes

Gi (mm/mes)

A i (mm/mes)

mm/mes

m3/s

m3/s

Caudal Generados

Caudales
Aforados

Ene

31

37.9

14.9

23.1

32.4

0.00

Feb

28

46.7

3.4

43.2

67.2

0.00

Mar

31

50.6

1.1

49.5

69.5

0.00

Abr

30

3.9

6.5

10.3

15.0

0.00

May

31

1.1

4.9

6.0

8.5

0.00

Jun

30

0.4

3.7

4.1

6.0

0.00

Jul

31

0.4

2.8

3.2

4.5

0.00

Ago

31

0.6

2.1

2.7

3.8

0.00

Sep

30

1.4

1.6

3.1

4.4

0.00

10

Oct

31

1.8

1.2

2.3

0.7

1.0

0.00

11

Nov

30

2.2

2.2

3.2

0.00

12

Dic

31

5.8

1.1

4.7

6.6

0.00

Ao

365

152.9

22.9

22.9

12.7

18.51

0.00

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CALCULO DE REGRESION TRIPLE SIMPLE


CUADRO N 82c
CAUDALES GENERADOS
PE II
N
Mes
Qt
Q t-1
Qt
Q t-1
PE t
X1
X2
X3
m3/s
m3/s
mm/mes
mm/mes
mm/mes
1
Ene
32.4
6.6
23.1
4.7
32.7
2
Feb
67.2
32.4
43.2
23.1
40.5
3
Mar
69.5
67.2
49.5
43.2
44.0
4
Abr
15.0
69.5
10.3
49.5
3.1
5
May
8.5
15.0
6.0
10.3
0.9
6
Jun
6.0
8.5
4.1
6.0
0.3
7
Jul
4.5
6.0
3.2
4.1
0.3
8
Ago
3.8
4.5
2.7
3.2
0.5
9
Sep
4.4
3.8
3.1
2.7
1.1
10
Oct
1.0
4.4
0.7
3.1
1.4
11
Nov
3.2
1.0
2.2
0.7
1.7
12
Dic
6.6
3.2
4.7
2.2
4.8
SUMA =
152.9
152.9
131.30361
Xm1 =
Xm2 =
Xm3 =

12.74
12.74
10.94

S11 =
S12 =
S13 =

3115.60
1938.98
3080.27

S22 =
S23 =
S33 =

CALCULOS
X11

X12

X13

X22

X23

X33

531.5
1867.8
2448.9
106.8
36.4
17.0
10.3
7.5
9.4
0.5
4.8
21.9
5062.8

107.9
996.4
2138.7
511.5
62.3
24.9
13.2
8.8
8.4
2.2
1.6
10.3
3886.2

753.0
1748.5
2179.8
32.0
5.3
1.3
1.0
1.3
3.5
1.0
3.8
22.3
4752.9

21.9
531.5
1867.8
2448.9
106.8
36.4
17.0
10.3
7.5
9.4
0.5
4.8
5062.8

152.9
932.7
1903.7
153.0
9.2
2.0
1.3
1.5
3.1
4.3
1.3
10.4
3175.5

1066.9
1636.8
1940.3
9.6
0.8
0.1
0.1
0.2
1.3
2.0
3.0
22.6
4683.7

b1 =
b2 =
b3 =

0.731
0.212
0.850

3115.60
1502.84
3246.99

r=
S=

0.99
3.07

Promedio

GENERACION DE CAUDALES MENSUAL (m3/s)


CUADRO N 82d
Area de Cuenca =
Ene
Ao
31
1965

9.10

3761.51
Feb

Km
Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

28

31

30

31

30

31

31

30

31

30

31

365

30.71

11.52

2.67

1.91

2.90

1.81

1.78

2.78

3.46

2.47

3.15

6.19

1966

7.94

12.95

12.29

5.88

3.07

1.21

1.38

1.62

1.90

4.44

5.46

4.75

5.24

1967

38.78

188.77

119.67

34.23

9.54

3.25

3.13

1.26

1.87

1.98

1.15

4.59

34.02

1968

66.75

22.43

64.64

17.46

4.75

3.35

0.69

0.59

1.06

4.26

5.49

5.92

16.45

1969

6.94

20.02

50.86

17.61

4.02

3.14

2.53

0.62

3.57

1.49

4.06

7.46

10.19

1970

59.81

53.84

31.89

9.61

5.21

3.46

1.65

1.42

3.20

3.94

3.14

3.81

15.08

1971

10.78

21.16

33.50

13.13

3.02

1.02

1.38

1.28

0.90

1.68

1.92

9.80

8.30

1972

32.88

52.35

90.99

21.60

4.40

2.37

0.93

0.38

2.90

3.02

3.79

12.34

18.99

1973

43.07

37.48

37.32

15.24

3.49

1.18

1.49

2.10

3.99

2.56

3.14

4.97

13.00

1974

61.84

35.27

17.67

9.48

3.16

2.66

0.71

3.35

3.01

2.86

3.70

2.45

12.18

1975

21.63

23.97

38.36

10.21

4.30

2.06

1.90

1.40

2.53

1.83

1.83

6.12

9.68

1976

44.19

59.56

43.73

13.16

5.03

3.07

1.50

0.68

2.64

1.26

2.90

5.89

15.30

1977

4.73

62.96

44.96

9.95

3.35

2.33

2.45

1.60

3.11

1.48

3.83

4.17

12.08

1978

12.52

6.79

7.69

5.71

1.52

0.94

0.13

1.40

1.15

2.70

4.71

3.18

4.04

1979

4.70

8.70

34.85

9.38

3.61

2.60

2.87

1.14

1.71

2.20

1.76

4.24

6.48

1980

10.68

7.41

16.70

5.73

2.48

2.67

3.10

2.45

1.69

5.21

1.57

2.70

5.20

1981

9.77

27.25

16.99

9.82

3.97

2.98

3.12

4.09

3.81

2.34

3.75

8.37

8.02

1982

15.58

19.31

16.82

9.40

3.13

2.09

3.17

2.31

2.18

3.45

4.89

3.07

7.12

1983

5.23

20.21

36.09

11.51

5.12

2.78

2.79

0.74

2.06

2.64

3.19

6.70

8.26

1984

13.94

23.84

26.50

9.99

3.95

3.58

1.56

1.64

1.97

3.76

7.36

9.34

8.95

1985

6.75

44.72

145.96

109.32

24.35

7.98

3.05

2.06

1.64

2.43

2.87

11.81

30.25

1986

35.43

67.81

54.79

15.39

4.50

1.41

2.69

3.73

2.03

0.94

1.55

8.75

16.58

1987

35.47

17.41

7.88

5.53

2.26

0.87

2.09

1.09

2.18

2.86

2.38

3.42

6.95

1988

29.20

33.64

20.56

10.36

5.46

2.34

1.82

0.94

0.89

2.28

1.57

4.90

9.50

1989

160.05

143.98

86.86

23.26

6.91

3.44

2.80

1.02

2.25

2.75

2.49

2.85

36.55

1990

8.36

10.03

17.54

7.71

4.29

3.95

3.24

3.32

2.33

1.46

10.54

12.96

7.14

1991

11.76

7.86

32.20

11.51

4.26

2.58

2.03

1.47

1.30

1.97

1.44

2.50

6.74

1992

8.42

11.64

7.51

5.10

2.90

2.90

1.75

0.56

1.39

1.96

2.21

3.89

4.19

1993

39.74

28.85

45.21

15.23

6.01

3.70

1.96

2.84

1.52

3.50

2.83

6.45

13.15

1994

35.96

71.36

34.30

9.17

4.36

2.94

2.44

1.57

1.25

1.51

2.12

3.41

14.20

1995

16.26

9.03

31.40

8.41

3.97

1.25

0.56

0.74

2.47

3.06

6.80

7.81

7.65

1996

18.47

71.99

23.05

11.38

3.50

2.97

0.56

1.07

1.05

2.88

2.64

6.13

12.14

1997

16.46

15.32

14.43

4.75

3.35

0.95

2.43

6.03

3.60

2.41

4.85

8.11

6.89

1998

70.09

44.41

30.45

9.41

2.60

3.57

1.03

2.68

2.33

3.08

5.68

13.20

15.71

1999

15.20

62.62

33.58

12.17

4.84

2.41

1.38

2.21

1.87

4.01

3.37

9.65

12.78

2000

66.73

49.71

38.79

12.78

5.21

2.28

1.71

1.04

1.05

5.41

2.40

10.60

16.48

2001

23.82

47.22

52.03

19.47

5.33

2.08

1.24

1.17

1.16

1.18

2.12

3.66

13.37

2002
MAX
MIN
PROM
Q(75%)
Q(90%)
Q(95%)

24.38
160.05
4.70
29.04
9.11
5.66
4.64

54.74
188.77
6.79
40.19
16.97
8.59
7.65

46.99
145.96
7.51
38.86
17.57
12.11
8.39

16.57
109.32
2.67
14.46
8.43
5.83
4.74

5.37
24.35
1.52
4.70
2.87
2.03
1.86

2.99
7.98
0.87
2.64
1.56
1.18
1.14

3.91
3.91
0.13
1.97
1.18
0.75
0.38

1.39
6.03
0.38
1.76
1.37
0.93
0.81

3.04
3.99
0.89
2.14
1.78
0.86
0.68

2.91
5.41
0.94
2.71
2.07
1.29
0.89

4.77
10.54
1.15
3.49
2.53
1.83
1.43

5.19
13.20
2.45
6.27
3.69
2.27
2.19

14.35
36.55
4.04
12.35
6.99
5.01
4.57

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

GOBIERNO REGIONAL DE AYACUCHO

20

40

60

80

100

120

140

0.00

20.00

Series1

40.00

PROBABILIDAD

60.00

80.00

VOL.75% = 44.1 MMC


VOL.95% = 29.5 MMC

Fig. 50
CAPACIDAD DE EMBALSE VS PROBABILIDAD

100.00

120.00

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CONSORCIO IRRIGACIN ACAR

VOLUMEN DE EMBALSE( MMC)

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

ANEXO V
- Lminas

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

*
#
560000

580000

540000

IRURO

TOTO

OC
RAY

CROAP UCRO

A
A S SORA
OJ

AYACUCHO

AREQ UIPA

JOCHAHUASI

TO

TO

A
LL

A
PA L LJ
NAT IM

8280000

8280000

8400000
CONDORCOCHA

CHA
Q UIH

REPRESA PACCHAYA

Paucacorral

Capital de Provincia

PA

SA

SA
N

SAN CRISTOBAL

PUQUIO

JO

SE

S
JA

AN

GA

Estacin Pluviomtrica

*
#

Ros

CUENCA DEL
RO ACARI

CHAQUIJOCHA
H
!
JEUARA

Estacin Hidromtrica

J
"

*
#

TORICOCHA

HU

Capital de Distrito

H
!
TORNACOCHA
TINQUIJOCHA
"SAN JUAN

RA

CUENCA DEL
RO GRANDE

Represa

,
%
"

AP
AM

A
JE

O
US

Bocatoma

1
$

ORCONCCOCHA
YAURIHUIRI

YANACOCHA

LL
C

TAMBOCHAY OC

AL
PA
SO

Y OC
CHA
HU A
UIRA

Simbologa

JO

HA
UC
PA
C

HP

PA

PA CCHA

Ccecaa

*
#

Lucanas

M
PA

8380000

ARTEZA CCOCHA

PADRE PACOCHA

O
LL

Subcuenca
Jachjalla

* "LUCANAS
#

CO

Galeras

*
#

PIA

Subcuenca

PALLJORU

LLAMAISO
S/N

610000

CHAQUI

ANTACOCHADescomulgado

RO

OR

C
PIS

A
MP

U
IR

UC

AS
HP

PA
CA

ERAS
MPA
OPA

PA LM AD

UAY

CUR

JONTAJ

"
J

CUENCA DEL
RO IRURO

540000

Subcuenca
Callcacc

IL
L
H

RJ

Palpachacra

AZULJAJA

PALLPO

UCH

O
LA
JA

L AJ

IC

Subcuenca
Azuljaja

CARAVELI

MAPACCOCHA

AC C

YO
HA

U MI

IS
NU

C
CU

LA C

NGO

LC
CAL

8380000

CCAC

IJ O
UA
EH
AQ
U
CH

PUCHU

*
#

CCOCHA

RA

Pampahuasi

CR

RO
IRU

RA

NA

C OS O

AS E R
U

TOCTO

H
!

CHA

ER
O

PA
LJ
A

8400000

INTONCCA

ILLO
A / CC

CCE
CH A
CAN

ACARI

Subcuenca
Cceroracra

YA NA M

HU

AS
I

Y
CHONTA

A
LL U
JE N

O
UA IJ

Andamarca

ICA

PUQUIO

*
#

CC

N
PU

OC

CHIPTA HUA IJO

$
1

H
!

PARINACOCHAS

Y
ACHA

LA

HU AIJ

Subcuenca
Vaso Iruro

,
%

SUCRE

LUCANAS

IRURO

N
SA M A

AO

CUENCA
PAMPAS - UCAYALI

VICTOR FAJARDO

HUANCA SANCOS

8350000

JO
AI
HU
A
ANGOSTURA CCENCCO
H
NC
RANGRACCOCHA
CA
SA
HUANCACCOCHA
JA
INT
ON
CC
A

Represa Iruro

Q UIL
CHA

TINQUECCOCHA

TACCRACOCHA
ISCALACCRACCOCHA

610000

8420000

*
#

8420000

8420000

Aucara

8350000

8420000

600000

*Puquio
#

Canal Derivacin
Lmite de Subcuencas
Subcuenca Vaso Iruro

COCULLAJOCHA

Cuenca Iruro

TALL CUY OC

"

12

16
Km

560000

GOBIERNO REGIONAL DE
AYACUCHO

"

SUPERVISIN:

SAN PEDRO

580000

600000

PROYECTO:

"FORMULACIN DEL ESTUDIO A NIVEL DE FACTIBILIDAD DEL PROYECTO:

Gobierno Regional de Ayacucho ACAR - BELLA UNIN II ETAPA DE CONSTRUCCIN DE LA REPRESA IRURO"
CONSULTOR

Consorcio Irrigacin Acar

UBICACIN:

Departamento:

Ayacucho
Arequipa

Provincia:

Lucanas
Caravel

Distrito:

Lucanas/San Juan
Bella Unin/Acar

LMINA:

UBICACIN DE
ESTACIONES

ING. SUPERVISOR:

JEFE DE PROYECTO:

DIBUJO:

ESCALA:

Ing. Sergio A. Choccechanca Cuadro


CIP: 53869

J.V.F.R.

Ing. Francisco Coronado del Aguila


CIP: 2375
1/250 000

FECHA:

Abril - 2010

LMINA N:

HI - 05
1 de 1

580000

588000
43

40

50

0
00

50

50
43

50
45 500
4
0

4550

450

4350

00
45
50
45

44

00

5
44

43

JA

HA

43
42

75

INT

HUANCACCOCHA
ONC

43

CA

50

560000

422

Represa Iruro

600000

OC

U
IR

AC
C

422

HA

4250

8360000

C
AN

50

RANGRACCOCHA

C
SA

8360000

CCENCCO

ANGOSTURA

25

IJ O
UA

8416000

4250

43

00

H
!
45

TACCRACOCHA
ISCALACCRACCOCHA

427

PUQUIO

25

CHAQUECCOCHA
4450

TINQUECCOCHA

0
43

LUCANAS

AM
LL

4275

8416000

8400000

4300
00
43

4550

RU

50

8400000

4500

44

MU

00

50
43
0
430

430

50

SUCRE

44

0
44

4400

43

00

43

00

435

00

455
44
50

00

427

00

42

430

VICTOR FAJARDO

HUANCA SANCOS

4500

00

43

44

600000

00

CUENCA
PAMPAS - UCAYALI

43

4450

50

43

4350

440

440

8440000

44

8424000

4500

450

75
42

45

440

50

4500

44

41

50

4200

430

44

4100

560000

4300

8424000

410

4175

44

4200

4450

50

440

50

455

4150

4050

8440000

572000

00

4500

425

50

0
395

Ros

Canal Derivacin

420

385

Capital de Provincia

H
!

4350

44

00

40

00

4200

3700

3650

CONSULTOR

UBICACIN:

588000

"FORMULACIN DEL ESTUDIO A NIVEL DE FACTIBILIDAD DEL PROYECTO:

Gobierno Regional de Ayacucho ACAR - BELLA UNIN II ETAPA DE CONSTRUCCIN DE LA REPRESA IRURO"
Departamento:

Ayacucho
Arequipa

00

00

580000

Provincia:

Lucanas
Caravel

Distrito:

Lucanas/San Juan
Bella Unin/Acar

00

44

44

PROYECTO:

44

YANAMA / CCILLO

435

3850

4200

425 4300
0

SUPERVISIN:

Consorcio Irrigacin Acar

Cuenca Vaso Iruro

4400

4250

4300

4200

4400

GOBIERNO REGIONAL DE
AYACUCHO

RO

572000

445

440

425

IRU

Km

4000

00
38 750
3

00

CUENCA DEL
RO IRURO

437

4350

00
44

435

50

0
390

A
JA S

43

39

4100 SO RA

4375

00

3800

AS
I

Capital de Distrito

HU

Represa

J
AI

00

O
AY

PA
LJ
A

00

4350

8408000

435

43

H
AC

43

O
PUN
430

,
%

4375

AN

00

00

4300

43

4400

Bocatoma

42

50

4200

42

440

50

1
$

"
44

4350

0.5

41

44

440

4350

AN
C

00

M
SA

4450

4350

4400

435

HU

40

395

440

8408000

00
44

$
1
440

4450

440

41

445

Simbologa

,
%

440

CROAP UCRO

4275

4500

4175

44

50

00

4200

00

4225

425

44

4300

405

42

SUBCUENCA
VASO IRURO

4200

4150

50
43

420

AY OC

RO

TOTO R

LMINA:

CUENCA DEL
VASO IRURO

ING. SUPERVISOR:

JEFE DE PROYECTO:

DIBUJO:

ESCALA:

Ing. Sergio A. Choccechanca Cuadro


CIP: 53869

J.V.F.R.

Ing. Francisco Coronado del Aguila


CIP: 2375
1/100 000

FECHA:

Abril - 2010

LMINA N:

HI - 03
1 de 1

560000

580000

ER
O

TO
TO
O

UCH

NAT IM

C
PIS

PA
AM
AP

LUCANAS

SO

RA

SA

8420000
8280000

,
%

Represa

Capital de Distrito

"

Capital de Provincia

H
!

Ros

Canal Derivacin

JEUARA

SAN CRISTOBAL

SA
N

PUQUIO

JO

SE

S
JA

Lmite de Subcuencas

CUENCA DEL
COCULLAJOCHA
ACARI
RO

A
NG

Subcuenca Vaso Iruro


Cuenca Iruro

TALL CUY OC

"

"

SUPERVISIN:

PROYECTO:

CONSULTOR

UBICACIN:

SAN PEDRO

580000

600000

"FORMULACIN DEL ESTUDIO A NIVEL DE FACTIBILIDAD DEL PROYECTO:

Gobierno Regional de Ayacucho ACAR - BELLA UNIN II ETAPA DE CONSTRUCCIN DE LA REPRESA IRURO"
Consorcio Irrigacin Acar

Bocatoma

CHAQUIJOCHA
H
!

HU

GOBIERNO REGIONAL DE
AYACUCHO

1
$

TORICOCHA

PA

AU

REPRESA PACCHAYA

AP
AM

JE

TORNACOCHA
TINQUIJOCHA
" SAN JUAN

16
Km

560000

8420000
8280000

YANACOCHA

LL
C

AL
PA
SO

Y OC
CHA
HU A
UIRA

TAMBOCHAY OC

12

Simbologa

YAURIHUIRI

JO
UAY
CHA
Q UIH

PA
C

HP

PA

UC

HA

PA CCHA

"

M
PA

ARTEZA CCOCHA

PADRE PACOCHA

O
LL

8380000

Subcuenca
Jachjalla

LLAMAISO
S/N

CO

PIA
CHAQUI

Subcuenca
Descomulgado

PALLJORU

CUENCA DEL
RO GRANDE

610000

ANTACOCHA

A
PA L LJ

540000

8380000

OR

Subcuenca
Azuljaja
MAPACCOCHA

RO

AS
HP

ERAS
MPA
P
O A

PA LM AD

U
IR

UC

NC

Subcuenca
Callcacc

CUR

U MI

JONTAJ

A
LL

IC

AZULJAJA

IL
L
H
C

PALLPO

CARAVELI

8400000

RO

JOCHAHUASI

CC
L CA

L AJ

CAL

CC

CCAC

IJ O
UA
R

RA

C OS O

IRU

RA

NA
AS E R
U

CHA

TOCTO

LA C

H
!

PA
LJ
A

CCE
CH A
CAN

ACARI

Subcuenca
Cceroracra

CUENCA DEL
CCOCHA
RO IRURO

EH
AQ
U
CH

O
LA
JA

JO

ICA

PUQUIO

AREQ UIPA

ILLO
A / CC

8400000

,
%
$
1

YA NA M

A IJO
AHU
C
LL U
JE N
YO
HA
C
CU
IS
NU

Subcuenca
Vaso Iruro

H
!

AYACUCHO

INTONCCA

O
CHU NG

LUCANAS

A
A S SORA
OJ

HU

AS
I

Y
CHONTA

PU

CC

CR

N
PU

OC

CHIPTA HUA IJO

ON

CUENCA
PAMPAS - UCAYALI

HUANCACCOCHA

PARINACOCHAS

Y
ACHA

LA

INT

SUCRE

IRURO

N
SA M A

Q UIL
CHA

HA

8350000

OC

CROAP UCRO

HU AIJ

C
AN

IRURO

RAY

JA

C
SA

VICTOR FAJARDO

HUANCA SANCOS

IJ O
UA

610000

8350000

CCENCCO

ANGOSTURA
RANGRACCOCHA

TOTO

AO

TINQUECCOCHA

TACCRACOCHA
ISCALACCRACCOCHA

Represa Iruro

8420000

540000

8420000

600000

Departamento:

Ayacucho
Arequipa

Provincia:

Lucanas
Caravel

Distrito:

Lucanas/San Juan
Bella Unin/Acar

LMINA:

CUENCA RO IRURO
Y SUBCUENCAS

ING. SUPERVISOR:

JEFE DE PROYECTO:

DIBUJO:

ESCALA:

Ing. Sergio A. Choccechanca Cuadro


CIP: 53869

J.V.F.R.

Ing. Francisco Coronado del Aguila


CIP: 2375
1/250 000

FECHA:

Abril - 2010

LMINA N:

HI - 02
1 de 1

630000

660000

CUENCA
PAMPAS - UCAYALI

400000

Represa Iruro

UL
LA
M

A O

C
GA
YO
NE

8380000
8200000

A
JEJ
A

CA

AC

AR

SA

600000

800000

U
CY
AC
RA

8320000

Simbologa

C ES

A LA

Bocatoma
Capital de Distrito

1
$

LO

AR

Capital de Provincia

H
!

Ros

EL

8290000

BELLA UNION

8290000

MOQUEGUA

CUENCA DEL
RO YAUCA

AC

H
!

AREQUIPA

CAMANA

RO

ACARI

CAYLLOMA

O SA

"

CASTILLA

8000000

I
AR

AC

TA
L

AN

CONDESUYOS
CARAVELI

400000

TO

R EG

PUNO

LA UNION
PAUCAR DEL SARA SARA

ACARI

H
!

AY O

YU

JEJARA

R E Q U IP
A
A

8350000

LA

MO
C
C
YO
U

JA
PA
S

AN

ACACHINA HU

HA

JA
I AY
HU
JA
O
ASH
CH
U AR C
LJ
AJ
A
A
A

AQ

UIR

SA

NA

LC

A
PA
L

JA
J
CA
PU
A
M
AJ
U
U
H

A
AT

JE

PARINACOCHAS
YAC
A
UCHO

TACNA

IY

AR

H
!

ISLAY

CH

AC

LUCANAS PUQUIO
ICA

"

PED

APURIMAC

SUCRE

ZN

AJ
UM

IHU

CA

HU

SA

AN

8350000

ARIO
CALV

ASO
C AP

RA

8320000

LA

JO

SILLA

VISCAC

AL
UP

A
LLP

PA

HU

UM

U
S CR

CUSCO

DU

U
JEH
JES

JA
S

AO
SAN PEDRO
A
CT

CC

ANG A

AY

UR
IZA

AU

LE

U
H
C
PE
D R PU
O
C

UI
RI

QU

VIL
H

JA
L

)
YA

RI
H

IS
QU

TE
MA

UY

CALL

O
AC AS

RR

PA
U

"

SAUCILLO

AJA
PU T

CO

CA

SA

TINCO

LA
AL

C
A(

AC

YA
U

H E TE

E
AMATO TR

LU

H
!

AR A

JE
L

CA

CU

E
C
RIO
PAS A
AR
PAY

PA
TE

JA

PAI JOTO

A
YA
SA

M
PA
U EN

PUQUIO

SAO

RA

JEU

8400000

IC
O

CH

O
AY
J

UI
HU

AQ

CH
SO

JEC
H

TO
O
TO

HA

HA

PU C

PAC
H

"

U
A

ATA
AY
AP
H
HU
AC SAY

PA

RIC

LA
O
EL P

MATARA

SI

HUACHARA

SA

HAYO C

AJLAHUITO

OS

AR

CUENCA DEL
RO ACARI

LLAM AC

NT
AR

CO
JO

SAN JUAN

GERONTA

IM

"

"

SAISA

HUANCA SANCOS

LUCANAS

AM
OP

PAC C

PA
PAM

SAN CRISTOBAL TA LLCUYO

"

SA

JA
JA

NCA

HUACHALLA

C AN C

UL

TAJ

JE

CUENCA DEL
RO GRANDE

LA MAR

HUANCAVELICA

IRURO

RUN

ASE

HU

IL
L

CH

Y
HA

LLA

RA

LL
CO

O
AS
HP

LLC

JO N

AC

PO

CA

JO

LIMA

CANGALLO
VILCAS HUAMAN
VICTOR FAJARDO

OR

LL
PA

LA J

AZ

A
JAL

UC

8380000

LA C

CC

RO

HUAMANGA

SUBCUENCA DEL
RO IRURO

YO
HA

800000

HUANTA

TO

S
UI

C
CU

SO RA

SI

CC

600000

JUNIN

,
%

HUAIJ
O

UA

LL
UI

OC

JA
H

AQ

PA
L

CH

RAY

ON

8410000

TO TO

INT

8600000

UR
M

8410000

600000

8600000

570000

8400000

540000

8200000

510000

IRURO

480000

Cuenca Acari
Subcuenca Iruro

480000

10

20

30

8260000

8260000

ACARI

40
Km

510000

GOBIERNO REGIONAL DE
AYACUCHO

540000

570000

SUPERVISIN:

PROYECTO:

CONSULTOR

UBICACIN:

600000

630000

"FORMULACIN DEL ESTUDIO A NIVEL DE FACTIBILIDAD DEL PROYECTO:

Gobierno Regional de Ayacucho ACAR - BELLA UNIN II ETAPA DE CONSTRUCCIN DE LA REPRESA IRURO"
Consorcio Irrigacin Acar

Departamento:

Ayacucho
Arequipa

Provincia:

Lucanas
Caravel

Distrito:

Lucanas/San Juan
Bella Unin/Acar

660000

LMINA:

CUENCA DEL RO ACARI

ING. SUPERVISOR:

JEFE DE PROYECTO:

DIBUJO:

ESCALA:

Ing. Sergio A. Choccechanca Cuadro


CIP: 53869

J.V.F.R.

Ing. Francisco Coronado del Aguila


CIP: 2375
1/750 000

FECHA:

Abril - 2010

LMINA N:

HI - 01
1 de 1

592000

42

560000

50
44

8440000

4400
4450

50

4400

50

00

45

4450

4350

CUENCA
CCERORACRA
4300

8400000

CUENCA
PAMPAS - UCAYALI
8400000

00

4400

44

43

445

LUCANAS

00

42

43

50

00

IC

00

44

41

Cc
er
or

ac
ra

445

SUCRE

8400000

435

4450

4400

50

00

VICTOR FAJARDO

HUANCA SANCOS

8400000

4350
42

43

43

00

39

0
05

4400

600000

8440000

588000

00

584000

4400

PUQUIO

50

420

CUENCA
AZULJAJA

4350

00

CAC C

410

41

44

CAL L

3650

RA

4050

8360000

RO
CE

RA

8360000

3850

H
!

3900

50

385

00

41

00

375

37

38

MAPACCOCHA

385

395

430

AZULJAJA
0

00

43
50

Simbologa
1
$

Bocatoma

,
%

Represa

50

CUENCA
CALLCACC

42

4350

415

CUENCA
IRURO

00

50

42

43

39

600000

8396000

8396000

560000

CALL CACC

Capital de Distrito

"
4200

Capital de Provincia

H
!

Ros

43

4350

375

SC
PI

0.3

0.6

1.2

1.8

AM
OP

Canal Derivacin

0
430

4400

S/N

PA

Cuencas Cceroracra,
Azuljaja y Calccac

8392000

RAS
ADE

CUENCA
ACARI

4100

M
PA L

50

TA J
JON

435

43

8392000

3800

50

4350
4000

2.4
Km

3950

584000

GOBIERNO REGIONAL DE
AYACUCHO

SUPERVISIN:

PROYECTO:

CONSULTOR

UBICACIN:

588000

592000

"FORMULACIN DEL ESTUDIO A NIVEL DE FACTIBILIDAD DEL PROYECTO:

Gobierno Regional de Ayacucho ACAR - BELLA UNIN II ETAPA DE CONSTRUCCIN DE LA REPRESA IRURO"
Consorcio Irrigacin Acar

Departamento:

Ayacucho
Arequipa

Provincia:

Lucanas
Caravel

Distrito:

Lucanas/San Juan
Bella Unin/Acar

LMINA:

CUENCA DEL RO CCERORACRA


CALLCAC Y AZULJAJA

ING. SUPERVISOR:

JEFE DE PROYECTO:

DIBUJO:

ESCALA:

Ing. Sergio A. Choccechanca Cuadro


CIP: 53869

J.V.F.R.

Ing. Francisco Coronado del Aguila


CIP: 2375
1/50 000

FECHA:

Abril - 2010

LMINA N:

HI - 04
1 de 2

588000

8440000
43

SUCRE

4400

8400000

50

8392000

43

MPA

ac
ra

OPA

VICTOR FAJARDO

HUANCA SANCOS

Cc
er
or

C
PIS

LUCANAS

CUENCA
JACHJALLA

PUQUIO

H
!

S/N

4050

410

CH
JA

A
LL
JA

4350

00

560000

39

4200

3850

0
375

GA
UL

CUENCA
DESCOMULGADO

ANTACOCHA

4400

3750

OM

4400

SC
DE

DO

4400

00
3800

38
50
390
0

50

8360000

43

8360000

LLAMAISO

MPA
APA

43

50

43

600000

8388000

00

40

8388000

50

S
ERA

600000

8440000

50
43
50

8392000

42

4350

435

00

M AD
PA L

C
LL A N

560000

4350

41

TA J
JON

39

50

4000

00

43

43

592000

8400000

584000

00

3600

4350

3950

4350

50

Ca
llc
3650

Capital de Distrito

"

Capital de Provincia

H
!

Ros

O
AD

UL
G

Canal Derivacin

4350

"

LUCANAS

JO
AY

YANACOCHA

3500

315

3550

3200

U
IH
QU
HA

8384000

3350

3250

340

Cuenca Vaso Iruro

4200

3450

8384000

DE
SC

CUENCA
IRURO

LA

CUENCA
ACARI

ac
c

430

C
JA

L
JA

Simbologa

43

3700

00

4400

PADRE PACOCHA

43

41

50

0.6

1.2

1.8

50

0.3

30

310

2.4
Km

00

3300

0
30

584000

GOBIERNO REGIONAL DE
AYACUCHO

SUPERVISIN:

PROYECTO:

CONSULTOR

UBICACIN:

588000

592000

"FORMULACIN DEL ESTUDIO A NIVEL DE FACTIBILIDAD DEL PROYECTO:

Gobierno Regional de Ayacucho ACAR - BELLA UNIN II ETAPA DE CONSTRUCCIN DE LA REPRESA IRURO"
Consorcio Irrigacin Acar

Departamento:

Ayacucho
Arequipa

Provincia:

Lucanas
Caravel

Distrito:

Lucanas/San Juan
Bella Unin/Acar

LMINA:

CUENCA DEL RO
JACHJALLA Y DESCOMULGADO

ING. SUPERVISOR:

JEFE DE PROYECTO:

DIBUJO:

ESCALA:

Ing. Sergio A. Choccechanca Cuadro


CIP: 53869

J.V.F.R.

Ing. Francisco Coronado del Aguila


CIP: 2375
1/50 000

FECHA:

Abril - 2010

LMINA N:

HI - 04
2 de 2

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

ANEXO VI
- Batimetra de Lagunas: Taccracocha 1 y Taccracocha 2

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

BATIMETRIA
TACCRACOCHA N1 y TACCRACOCHA N2

INDICE
I.- INTRODUCCION
II.- OBJETIVO
III.- UBICACIN
VI.- ACCESO
V.- METODOLOGIA DEL TRABAJO
VI.- PRODUCTOS
VII.- CONCLUSIONES y RECOMENDACIONES
ANEXOS
A. Panel Fotogrfico
B. Imagen de Ubicacin
C. Cuadro de los resultados de la batimetra
D. Grficos de Curvas Superficie y Volumen
E. Datos de profundidades
F. Planos

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

I.- INTRODUCCION:
En el mes de Enero del 2010, el Consorcio Irrigacin Acar, realiz el
levantamiento batimtrico de las Lagunas Taccracocha N1 y Taccracocha N2;
actividad que se efectu del 04 al 08 de Enero del mismo ao. El levantamiento
batimtrico de las Lagunas TACCRACOCHA N1 y TACCRACOCHA N2,
permitir disponer de toda la informacin necesaria, para planificar los
programas de regulacin, y un mejor manejo y conservacin de la disponibilidad
del recurso hdrico, dentro del Proyecto: ACARI BELLA UNIN II ETAPA DE
CONSTRUCCIN DE REPRESA IRURO
El nivel del espejo de agua hallado en la Laguna Taccracocha N1 es de
(4,250.5 msnm), no corresponde al nivel mximo de embalse (4,251.2 msnm) y
en la Laguna Taccracocha N2 es de (4,238.5 msnm), no corresponde al nivel
mximo de embalse (4,239.1 msnm), por encontrarse ambas lagunas en el
periodo de llenado; siendo necesario por lo tanto, realizar trabajos de topografa
hasta alcanzar el nivel real de embalse, informacin que nos ha permitido
proyectar y calcular los volmenes correspondientes. Los trabajos batimtricos y
topogrficos ejecutados, han sido realizados, con equipos que registran tanto los
niveles como la posicin de modo georeferenciado.
Como resultado del presente trabajo, se ha determinado que la Laguna
Taccracocha N1 posee a la cota 4,243.3 m (Rasante de la seccin inicial del
conducto de descarga sub acutico), un volumen de regulacin de 3805,615.06
m3, (desde la cota 4,232.0 m hasta la 4,251.20 m) y la Laguna Taccracocha N2
posee a la cota 4,236.5 m (Rasante de la seccin inicial del conducto de
descarga sub acutico), un volumen de regulacin de 337,267.65 m3 (desde la
cota 4,232.5 m hasta la 4,239.5 m)
II.- OBJETIVO:
El presente informe, tiene por objetivo, dar a conocer los resultados de los
trabajos batimtricos y topogrficos efectuados en las Lagunas Taccracocha N1
y Taccracocha N2, con la finalidad de que la informacin obtenida, tales como el
volumen, profundidad, superficie y otros parmetros, permitan planificar los
programas de regulacin, y un mejor manejo y conservacin de la disponibilidad
del recurso hdrico.
III.- UBICACIN:
Coordenadas Geogrficas
Zona: 18 Coordenada Este: 577,773 Coordenada Norte: 8417,894
Las Lagunas Taccracocha N1 y Taccracocha N2, se encuentran a una altitud
de 4,269 msnm, se encuentra emplazada en la, Sub Cuenca del Rio Iruro,
Cuenca Rio Acar (el punto de confluencia de ambos ros, se ubica en las
vecindades de la ciudad de Puquio), perteneciente a la Vertiente del Pacifico.
Polticamente est en la jurisdiccin del distrito de Lucanas, provincia de
Lucanas, departamento de Ayacucho (Ver fig. N 1 e imagen de ubicacin).

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

IV.- ACCESO:
Desde Nazca, en direccin Este, hasta el desvo de las Minas Canarias por la
carretera asfaltada. 86.5 km.
Del desvo de Minas Canarias por la misma va, (va afirmada) hasta el kilometro
69.2, en la Localidad de Taccracocha, teniendo un distancia total recorrida.
155.7 km.
Figura. N1: Ubicacin de las Lagunas Taccracocha N1 y Taccracocha N2

Taccracocha N1

Taccracocha N2

Va Minas
Canarias

Ro Iruro

GOBIERNO REGIONAL DE AYACUCHO

Presa
Iruro

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

V.- METODOLOGIA DEL TRABAJO REALIZADO:


5.1- TRABAJO DE CAMPO:
LEVANTAMIENTO TOPOGRFICO:
Abarc la franja del vaso de la laguna comprendido entre el nivel del espejo
de agua (4,250.5 msnm; Bat. Ene. 2007) y el nivel 4269 msnm en la Laguna
Taccracocha N1 y (4,238.5 msnm; Bat. Ene. 2007) y el nivel 4269 msnm en
la Laguna Taccracocha N2, donde adems se encuentran incluida la
carretera de acceso. Las zonas inaccesibles del vaso, fueron medidas con la
ayuda del bote y tambin haciendo uso del lser de la estacin total.
LEVANTAMIENTO BATIMETRICO
EL MTODO EMPLEADO
El mtodo empleado fue el de Sondas Mecnicas, formada por dispositivo
de registro de profundidades. (Regleta calibrada rgida). Est influenciada
por las corrientes, lo que le hace perder la verticalidad pudiendo estar
afectados los resultados de un error de desplazamiento, sin embargo se
considera las correntadas dentro de ambas lagunas como muy leves.
El levantamiento topogrfico de las orillas realizado desde tierra, se
realiza como en cualquier trabajo topogrfico, pero para determinar la
posicin planimtrica de un punto dentro de las lagunas (materializado
por el bote que efecta el sondeo), cuya profundidad queremos medir,
es necesario recurrir a procedimientos especiales.
El problema consiste en guiar el bote por el perfil que pretende
levantarse (replantear el perfil), perfil que se ha diseado en funcin
de la densidad de puntos que requiere el levantamiento; y dentro del perfil
se han de determinar las coordenadas (X, Y) de los puntos en los que se
mide la profundidad.
Para determinar la planimetra de las lagunas se conjugo 2 mtodos para
obtener mayor precisin en la medicin, estos son: Mtodo Radiacin y
Mtodo GPS.

Radiacin.
Se realiza con una estacin total situado en tierra en un
punto de coordenadas conocidas, y que se ha orientado a otro punto
de coordenadas tambin conocidas. La cabeza del perfil se replantea
previamente. El bote va recorriendo el perfil y se van observando
topogrficamente los puntos de la embarcacin desde los que a su
vez se sondea la profundidad. La observacin se realiza con la
estacin total tomando ngulos horizontales, cenitales y distancia
para poder calcular las coordenadas de dichos puntos
posteriormente. El prisma va en la embarcacin o simplemente el laser
es dirigido a un punto rgido y visible del bote.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

El mayor inconveniente es el movimiento del bote y el oleaje del


agua. El prisma, que refleja la onda emitida por el distancimetro,
est en continuo movimiento y esto provocar una prdida de seales.

Metodologa GPS.
Los equipos GPS han hecho posible la aplicacin de las
observaciones a satlites en la determinacin de la posicin de
puntos en la superficie terrestre o en embarcaciones. Los escasos
tiempos de observacin que se requieren permiten alcanzar
elevadas
precisiones,
evitando
la
excesiva influencia del
movimiento del bote.
Se necesita situar una estacin de referencia en tierra y llevar un
receptor en el bote.

PROCESO DE MEDICION:
Se ubicaron secciones transversales, a lo largo de los flancos de la laguna,
representados con hitos rsticos y temporales; posteriormente se hicieron
barridos longitudinales, registrndose un total de 323 puntos batimtricos en
la Laguna Taccracocha N1 y 54 puntos batimtricos en la Laguna
Taccracocha N2 (Ver Anexos)
Se densific los puntos de las mediciones batimtricas, donde se detectaban
variaciones bruscas de profundidad (Ver plano Batimtrico).
5.2- TRABAJOS DE GABINETE:
Los datos obtenidos en campo, fueron procesados en la libreta electrnica
de extensin xls, para su posterior conversin en formato txt, delimitado
convenientemente; hecho esto, se procedi al ploto haciendo uso del
programa Autocad Civil 3D Land 2009.
Las curvas rea-Volumen, fueron elaboradas, a partir de los datos
registrados en la medicin del sondaje mecnico, haciendo uso del
programa Microsoft Excel.
Los cuadros y grficos de volumen y superficie, se elaboraron en el
programa Microsoft Excel.
Se realizaron los respectivos clculos de superficies parciales, en las cotas
indicadas, para el cmputo de los volmenes parciales y totales.
Se elaboracin los planos, a las escalas: 1/5000 y 1/ 2500 en el programa
Autocad Civil 3D Land 2009.
VI.- PRODUCTOS:
Plano Batimtrico y Topogrfico general de las Lagunas Taccracocha N1 y
Taccracocha N2, con las curvas del rea- volumen correspondientes: Escala
1/5,000.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Plano del corte longitudinal y seccin transversal de las lagunas; Escala, H:


1/5,000 y V: 2,500.
VII.- CONCLUSIONES y RECOMENCACIONES:
1. El resultado general, de la batimetra realizada en la lagunas Taccracocha N1
y Taccracocha N2; es como sigue:
Laguna Taccracocha N1
Volumen de regulacin de 3805,615 m3, (cotas 4,232.0 m hasta la
4,251.20 m)
Laguna Taccracocha N2
Volumen de regulacin de 337,267 m3 (cotas 4,232.5 m hasta la
4,239.1 m)
2. La profundidad mxima registrada en la zona del volumen muerto es de:
Laguna Taccracocha N1: 19.20m
Laguna Taccracocha N2: 6.60m
3. En la Laguna Taccracocha N1, la cota 4,251.20m, es considerada
actualmente como la cota mxima en dicha laguna, debido a que existe un dique
rustico que lo regula actualmente.
4. Debe realizarse peridicamente los trabajos batimtricos en ambas lagunas,
para conocer las variaciones del vaso, sobre todo en lo que corresponde a la
profundidad mxima; ya que se ha observado, una importante actividad de
transporte de sedimentos en la zona posterior de la misma.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

ANEXOS

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

A. Panel Fotogrfico

Foto N1 Equipamiento del Personal encargado de realizar el trabajo de Batimetra en las Lagunas

FotoN2 Inicio de los Trabajos de Batimetra en la Laguna Taccracocha N1

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Foto N3: Localizacin Planimetra del bote Laguna Taccracocha N1

Figura N4 Recepcin de la Informacin altitudinal Laguna Taccracocha N1

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Figura N5: Inicio de los Trabajos de Batimetra en la Laguna Taccracocha N2

Figura N6: Localizacin Planimtrica del bote Laguna Taccracocha N2

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Figura N7: Recepcin de la Informacin altitudinal Laguna Taccracocha N2

Figura N8: Vista de la Salida construida en la Laguna Taccracocha N1

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Figura N9: Dique Artesanal construido en la Laguna Taccracocha N1 con fines de regulacin

Figura N10: Toma de medidas en la Laguna Taccracocha N1

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

B. Imagen de Ubicacin
Taccracocha
N2

Taccracocha
N1

Va Minas
Canarias

GOBIERNO REGIONAL DE AYACUCHO

Presa
Iruro

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

C. Cuadro de los resultados de la batimetra


Laguna Taccracocha N1: 19.20m
PUNTO

COTA RELATIVA
(m)

COTA GEOREFERENCIADA PROFUNDIDAD


(m)
(m)

P0

4,251.20

4250.50

P1

4,251.20

4251.00

P2

4,251.20

P3

4,251.20

P4

COORDENADAS
ESTE

NORTE

0.50

577458.03

8417885.8

4250.00

-0.50

577520.92

8417935.72

4250.00

-0.50

577582.81

8417984.84

4,251.20

4250.50

0.00

577641.79

8418031.65

P5

4,251.20

4249.50

-1.00

577661.19

8418047.04

P6

4,251.20

4251.00

0.50

577677.86

8418060.27

P7

4,251.20

4251.00

0.50

577702.82

8418016.25

P8

4,251.20

4249.50

-1.00

577687.68

8418004.23

P9

4,251.20

4248.50

-2.00

577623.46

8417953.27

P10

4,251.20

4248.00

-2.50

577543.87

8417889.99

P11

4,251.20

4249.50

-1.00

577519.4

8417870.68

P12

4,251.20

4251.00

0.50

577497.19

8417852.99

P13

4,251.20

4251.50

1.00

577492.93

8417849.67

P14

4,251.20

4251.00

0.50

577507.71

8417797.56

P15

4,251.20

4249.50

-1.00

577532.16

8417816.97

P16

4,251.20

4248.00

-2.50

577556.77

8417836.51

P17

4,251.20

4246.50

-4.00

577582.16

8417856.65

P18

4,251.20

4245.50

-5.00

577601.98

8417872.38

P19

4,251.20

4246.50

-4.00

577625.23

8417890.84

P20

4,251.20

4247.50

-3.00

577659.61

8417918.12

P21

4,251.20

4249.00

-1.50

577689.14

8417941.56

P22

4,251.20

4250.50

0.00

577714.67

8417961.82

P23

4,251.20

4251.00

0.50

577718.5

8417964.86

P24

4,251.20

4251.00

0.50

577758.4

8417932.7

P25

4,251.20

4249.50

-1.00

577732.99

8417912.52

P26

4,251.20

4248.00

-2.50

577714.35

8417897.73

P27

4,251.20

4246.50

-4.00

577694.18

8417881.72

P28

4,251.20

4245.00

-5.50

577675.81

8417867.15

P29

4,251.20

4243.50

-7.00

577658.56

8417853.46

P30

4,251.20

4244.50

-6.00

577616.06

8417819.72

P31

4,251.20

4246.00

-4.50

577589.63

8417798.75

P32

4,251.20

4247.50

-3.00

577560.67

8417775.76

P33

4,251.20

4249.00

-1.50

577541

8417760.15

P34

4,251.20

4250.50

0.00

577527.89

8417749.75

P35

4,251.20

4251.50

1.00

577520.47

8417743.86

P36

4,251.20

4247.00

-3.50

577543.45

8417698.26

P37

4,251.20

4245.50

-5.00

577552.33

8417705.31

P38

4,251.20

4244.00

-6.50

577593.33

8417737.85

P39

4,251.20

4242.50

-8.00

577617.37

8417756.93

P40

4,251.20

4241.00

-9.50

577631.3

8417767.99

P41

4,251.20

4240.00

-10.50

577657.16

8417788.51

P42

4,251.20

4241.50

-9.00

577687.2

8417812.35

P43

4,251.20

4243.00

-7.50

577739.08

8417853.52

P44

4,251.20

4244.50

-6.00

577755.36

8417866.45

P45

4,251.20

4246.00

-4.50

577770.77

8417878.68

GOBIERNO REGIONAL DE AYACUCHO

OBSERVACION
ESPEJO ACTUAL

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

P46

4,251.20

4247.50

-3.00

577780.19

8417886.15

P47

4,251.20

4249.00

-1.50

577789.99

8417893.93

P48

4,251.20

4250.50

0.00

577796.02

8417898.72

P49

4,251.20

4251.50

1.00

577817.54

8417915.79

P50

4,251.20

4251.00

0.50

577907.74

8417923.54

P51

4,251.20

4249.50

-1.00

577855.73

8417882.27

P52

4,251.20

4248.00

-2.50

577841.12

8417870.68

P53

4,251.20

4246.50

-4.00

577828.16

8417860.39

P54

4,251.20

4245.00

-5.50

577811.43

8417847.11

P55

4,251.20

4243.50

-7.00

577795.96

8417834.84

P56

4,251.20

4242.00

-8.50

577781.05

8417823

P57

4,251.20

4240.50

-10.00

577763.74

8417809.26

P58

4,251.20

4239.00

-11.50

577729.88

8417782.39

P59

4,251.20

4237.50

-13.00

577697.27

8417756.51

P60

4,251.20

4238.50

-12.00

577637.96

8417709.44

P61

4,251.20

4240.00

-10.50

577615.55

8417691.65

P62

4,251.20

4241.50

-9.00

577611.51

8417688.45

P63

4,251.20

4243.00

-7.50

577605.25

8417683.48

P64

4,251.20

4244.50

-6.00

577596.52

8417676.55

P65

4,251.20

4246.00

-4.50

577587.3

8417669.23

P66

4,251.20

4247.50

-3.00

577578.07

8417661.9

P67

4,251.20

4249.00

-1.50

577568.8

8417654.55

P68

4,251.20

4250.50

0.00

577559.62

8417647.26

P69

4,251.20

4251.50

1.00

577551.83

8417641.08

P70

4,251.20

4251.00

0.50

577571.29

8417592.69

P71

4,251.20

4249.50

-1.00

577580.66

8417600.13

P72

4,251.20

4248.00

-2.50

577590.31

8417607.78

P73

4,251.20

4246.50

-4.00

577600.05

8417615.52

P74

4,251.20

4244.50

-6.00

577613.05

8417625.84

P75

4,251.20

4243.00

-7.50

577622.8

8417633.58

P76

4,251.20

4241.50

-9.00

577632.56

8417641.32

P77

4,251.20

4240.00

-10.50

577642.33

8417649.07

P78

4,251.20

4238.50

-12.00

577652.1

8417656.82

P79

4,251.20

4237.00

-13.50

577670.34

8417671.3

P80

4,251.20

4235.50

-15.00

577710.2

8417702.94

P81

4,251.20

4235.50

-15.00

577751.74

8417735.9

P82

4,251.20

4236.50

-14.00

577772.44

8417752.34

P83

4,251.20

4238.00

-12.50

577800.99

8417775

P84

4,251.20

4239.50

-11.00

577835.78

8417802.61

P85

4,251.20

4241.00

-9.50

577868.97

8417828.96

P86

4,251.20

4242.50

-8.00

577891.46

8417846.8

P87

4,251.20

4244.00

-6.50

577925.2

8417873.57

P88

4,251.20

4245.50

-5.00

577946.32

8417890.34

P89

4,251.20

4247.00

-3.50

577967.71

8417907.31

P90

4,251.20

4248.50

-2.00

577989.12

8417924.31

P91

4,251.20

4249.50

-1.00

578018.7

8417947.79

P92

4,251.20

4250.50

0.00

578059.07

8417979.83

P93

4,251.20

4251.50

1.00

578080.63

8417996.93

P94

4,251.20

4251.00

0.50

578135.71

8417976.81

P95

4,251.20

4249.50

-1.00

578118.04

8417962.79

P96

4,251.20

4248.00

-2.50

578102.12

8417950.16

P97

4,251.20

4246.50

-4.00

578086.12

8417937.46

P98

4,251.20

4245.00

-5.50

578070.18

8417924.81

P99

4,251.20

4243.50

-7.00

578052.46

8417910.77

P100

4,251.20

4242.00

-8.50

578019.03

8417884.21

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

P101

4,251.20

4240.50

-10.00

577997.68

8417867.26

P102

4,251.20

4239.50

-11.00

577955.38

8417833.69

P103

4,251.20

4238.50

-12.00

577918.97

8417804.79

P104

4,251.20

4237.00

-13.50

577869.21

8417765.31

P105

4,251.20

4235.50

-15.00

577838.95

8417741.29

P106

4,251.20

4234.00

-16.50

577811.42

8417719.44

P107

4,251.20

4233.00

-17.50

577771.98

8417688.14

P108

4,251.20

4234.50

-16.00

577740.98

8417663.53

P109

4,251.20

4236.00

-14.50

577710.03

8417638.97

P110

4,251.20

4237.50

-13.00

577684.32

8417618.57

P111

4,251.20

4239.00

-11.50

577674.82

8417611.02

P112

4,251.20

4240.50

-10.00

577665.08

8417603.3

P113

4,251.20

4242.00

-8.50

577655.36

8417595.58

P114

4,251.20

4243.50

-7.00

577645.59

8417587.83

P115

4,251.20

4245.00

-5.50

577635.08

8417579.49

P116

4,251.20

4246.50

-4.00

577625.27

8417571.7

P117

4,251.20

4248.00

-2.50

577616.46

8417564.71

P118

4,251.20

4249.50

-1.00

577607.79

8417557.82

P119

4,251.20

4251.00

0.50

577599.05

8417550.89

P120

4,251.20

4251.50

1.00

577593.54

8417546.52

P121

4,251.20

4251.00

0.50

577627.57

8417509.69

P122

4,251.20

4249.50

-1.00

577637.07

8417517.23

P123

4,251.20

4248.00

-2.50

577646.58

8417524.77

P124

4,251.20

4246.50

-4.00

577656.09

8417532.32

P125

4,251.20

4245.00

-5.50

577665.61

8417539.88

P126

4,251.20

4243.50

-7.00

577675.09

8417547.41

P127

4,251.20

4242.00

-8.50

577684.55

8417554.91

P128

4,251.20

4240.50

-10.00

577694.04

8417562.44

P129

4,251.20

4239.00

-11.50

577702.96

8417569.53

P130

4,251.20

4237.50

-13.00

577711.57

8417576.36

P131

4,251.20

4236.00

-14.50

577723.75

8417586.02

P132

4,251.20

4234.50

-16.00

577761.09

8417615.66

P133

4,251.20

4233.00

-17.50

577791.98

8417640.17

P134

4,251.20

4233.00

-17.50

577829.62

8417670.05

P135

4,251.20

4234.50

-16.00

577870.05

8417702.14

P136

4,251.20

4236.00

-14.50

577910.41

8417734.17

P137

4,251.20

4237.50

-13.00

577953.12

8417768.07

P138

4,251.20

4238.50

-12.00

578059.29

8417852.33

P139

4,251.20

4240.00

-10.50

578080.05

8417868.81

P140

4,251.20

4241.50

-9.00

578095.87

8417881.36

P141

4,251.20

4243.00

-7.50

578111.82

8417894.02

P142

4,251.20

4244.50

-6.00

578127.76

8417906.67

P143

4,251.20

4246.00

-4.50

578143.96

8417919.53

P144

4,251.20

4247.50

-3.00

578157.35

8417930.15

P145

4,251.20

4249.00

-1.50

578172.2

8417941.94

P146

4,251.20

4250.50

0.00

578185.54

8417952.53

P147

4,251.20

4251.00

0.50

578192.73

8417958.24

P148

4,251.20

4251.00

0.50

578241.21

8417932.88

P149

4,251.20

4249.50

-1.00

578219.51

8417915.65

P150

4,251.20

4248.00

-2.50

578208.27

8417906.74

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

P151

4,251.20

4246.50

-4.00

578197.01

8417897.8

P152

4,251.20

4245.00

-5.50

578185.75

8417888.86

P153

4,251.20

4243.50

-7.00

578174.48

8417879.92

P154

4,251.20

4242.00

-8.50

578163.25

8417870.98

P155

4,251.20

4240.50

-10.00

578137.86

8417850.86

P156

4,251.20

4239.00

-11.50

578105.97

8417825.54

P157

4,251.20

4237.50

-13.00

578063.82

8417792.09

P158

4,251.20

4236.00

-14.50

577957.2

8417707.47

P159

4,251.20

4234.50

-16.00

577917.97

8417676.33

P160

4,251.20

4233.00

-17.50

577873.93

8417641.38

P161

4,251.20

4232.00

-18.50

577811.56

8417591.88

P162

4,251.20

4233.50

-17.00

577771.77

8417560.3

P163

4,251.20

4235.00

-15.50

577759.33

8417550.48

P164

4,251.20

4236.50

-14.00

577747.14

8417540.75

P165

4,251.20

4238.00

-12.50

577737.69

8417533.25

P166

4,251.20

4239.50

-11.00

577729.04

8417526.39

P167

4,251.20

4241.00

-9.50

577720.46

8417519.58

P168

4,251.20

4242.50

-8.00

577712.15

8417512.98

P169

4,251.20

4244.00

-6.50

577703.99

8417506.51

P170

4,251.20

4245.50

-5.00

577695.89

8417500.08

P171

4,251.20

4247.00

-3.50

577687.81

8417493.67

P172

4,251.20

4248.50

-2.00

577679.76

8417487.28

P173

4,251.20

4250.00

-0.50

577671.73

8417480.91

P174

4,251.20

4251.00

0.50

577666.36

8417476.64

P175

4,251.20

4251.00

0.50

577704.33

8417442.94

P176

4,251.20

4249.50

-1.00

577715.97

8417452.18

P177

4,251.20

4248.00

-2.50

577723.77

8417458.38

P178

4,251.20

4246.50

-4.00

577731.57

8417464.56

P179

4,251.20

4245.00

-5.50

577739.34

8417470.73

P180

4,251.20

4243.50

-7.00

577747.12

8417476.91

P181

4,251.20

4242.00

-8.50

577754.93

8417483.1

P182

4,251.20

4240.50

-10.00

577762.75

8417489.31

P183

4,251.20

4239.00

-11.50

577770.57

8417495.52

P184

4,251.20

4237.50

-13.00

577778.4

8417501.73

P185

4,251.20

4236.00

-14.50

577788.86

8417510.03

P186

4,251.20

4234.50

-16.00

577808.6

8417525.7

P187

4,251.20

4233.00

-17.50

577817.91

8417533.09

P188

4,251.20

4232.00

-18.50

577869.62

8417574.13

P189

4,251.20

4233.50

-17.00

577922.04

8417615.74

P190

4,251.20

4235.00

-15.50

577976.81

8417659.2

P191

4,251.20

4236.50

-14.00

578057.85

8417723.52

P192

4,251.20

4238.00

-12.50

578120.18

8417772.99

P193

4,251.20

4239.50

-11.00

578151.72

8417798.02

P194

4,251.20

4241.00

-9.50

578188.28

8417827.04

P195

4,251.20

4242.50

-8.00

578208.63

8417843.18

P196

4,251.20

4244.00

-6.50

578219.74

8417852

P197

4,251.20

4245.50

-5.00

578230.83

8417860.81

P198

4,251.20

4247.00

-3.50

578243.84

8417871.14

P199

4,251.20

4248.50

-2.00

578265.97

8417888.7

P200

4,251.20

4250.00

-0.50

578283.37

8417902.5

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

P201

4,251.20

4251.00

0.50

578304.64

8417919.39

P202

4,251.20

4251.00

0.50

578355.76

8417896.12

P203

4,251.20

4249.50

-1.00

578335.55

8417880.08

P204

4,251.20

4248.00

-2.50

578318.1

8417866.23

P205

4,251.20

4246.50

-4.00

578300.37

8417852.16

P206

4,251.20

4245.00

-5.50

578282.49

8417837.98

P207

4,251.20

4243.50

-7.00

578262.21

8417821.87

P208

4,251.20

4242.00

-8.50

578246.67

8417809.54

P209

4,251.20

4240.50

-10.00

578218.84

8417787.45

P210

4,251.20

4239.00

-11.50

578179.14

8417755.95

P211

4,251.20

4237.50

-13.00

578143.13

8417727.37

P212

4,251.20

4238.00

-12.50

578054.38

8417656.98

P213

4,251.20

4236.50

-14.00

578007.44

8417619.68

P214

4,251.20

4235.00

-15.50

577985.14

8417601.98

P215

4,251.20

4233.50

-17.00

577961.01

8417582.83

P216

4,251.20

4232.50

-18.00

577907.7

8417540.52

P217

4,251.20

4234.00

-16.50

577884.43

8417522.05

P218

4,251.20

4234.50

-16.00

577839.25

8417486.19

P219

4,251.20

4236.00

-14.50

577832.96

8417481.2

P220

4,251.20

4237.50

-13.00

577826.33

8417475.94

P221

4,251.20

4239.00

-11.50

577816.39

8417468.05

P222

4,251.20

4240.50

-10.00

577806.55

8417460.18

P223

4,251.20

4242.00

-8.50

577799.19

8417454.4

P224

4,251.20

4243.50

-7.00

577792.49

8417449.08

P225

4,251.20

4245.00

-5.50

577785.17

8417443.28

P226

4,251.20

4246.50

-4.00

577777.78

8417437.36

P227

4,251.20

4248.00

-2.50

577770.21

8417431.4

P228

4,251.20

4249.50

-1.00

577762.49

8417425.27

P229

4,251.20

4251.00

0.50

577752.6

8417417.42

P230

4,251.20

4251.00

0.50

577802.08

8417392.86

P231

4,251.20

4249.50

-1.00

577810.47

8417399.49

P232

4,251.20

4248.00

-2.50

577820.68

8417407.62

P233

4,251.20

4246.50

-4.00

577830.45

8417415.38

P234

4,251.20

4245.00

-5.50

577840.04

8417422.98

P235

4,251.20

4243.50

-7.00

577849.47

8417430.47

P236

4,251.20

4242.00

-8.50

577858.65

8417437.75

P237

4,251.20

4240.50

-10.00

577867.56

8417444.83

P238

4,251.20

4239.00

-11.50

577878.4

8417453.43

P239

4,251.20

4237.50

-13.00

577891.53

8417463.85

P240

4,251.20

4236.00

-14.50

577910.06

8417478.54

P241

4,251.20

4234.50

-16.00

577934.97

8417498.33

P242

4,251.20

4235.50

-15.00

577970.02

8417526.14

P243

4,251.20

4237.00

-13.50

577992.96

8417544.35

P244

4,251.20

4238.50

-12.00

578015.48

8417562.23

P245

4,251.20

4239.00

-11.50

578048.81

8417588.67

P246

4,251.20

4239.00

-11.50

578127.56

8417651.18

P247

4,251.20

4240.00

-10.50

578217.49

8417722.55

P248

4,251.20

4241.50

-9.00

578249.45

8417747.91

P249

4,251.20

4243.00

-7.50

578276.38

8417769.29

P250

4,251.20

4244.50

-6.00

578305.27

8417792.27

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

P251

4,251.20

4246.00

-4.50

578326.85

8417809.34

P252

4,251.20

4247.50

-3.00

578345.25

8417823.95

P253

4,251.20

4249.00

-1.50

578363.3

8417838.28

P254

4,251.20

4250.50

0.00

578381.11

8417852.41

P255

4,251.20

4251.00

0.50

578395.25

8417863.63

P256

4,251.20

4250.50

0.00

578444.63

8417838.99

P257

4,251.20

4249.50

-1.00

578388.39

8417794.36

P258

4,251.20

4248.00

-2.50

578359.41

8417771.35

P259

4,251.20

4246.50

-4.00

578330.81

8417748.66

P260

4,251.20

4245.00

-5.50

578302.29

8417726.02

P261

4,251.20

4243.50

-7.00

578273.29

8417703.13

P262

4,251.20

4243.00

-7.50

578172.74

8417623.18

P263

4,251.20

4242.50

-8.00

578045.51

8417522.22

P264

4,251.20

4241.00

-9.50

578023.92

8417505.09

P265

4,251.20

4239.50

-11.00

578003.65

8417489

P266

4,251.20

4238.00

-12.50

577984.49

8417473.8

P267

4,251.20

4238.00

-12.50

577957.85

8417452.65

P268

4,251.20

4239.50

-11.00

577948.61

8417445.32

P269

4,251.20

4241.00

-9.50

577936.41

8417435.63

P270

4,251.20

4242.50

-8.00

577924.49

8417426.17

P271

4,251.20

4244.00

-6.50

577912.62

8417416.76

P272

4,251.20

4245.50

-5.00

577900.07

8417406.8

P273

4,251.20

4247.00

-3.50

577882.05

8417392.5

P274

4,251.20

4248.50

-2.00

577869.33

8417382.4

P275

4,251.20

4250.00

-0.50

577858.22

8417373.58

P276

4,251.20

4251.00

0.50

577848.53

8417365.89

P277

4,251.20

4251.50

1.00

577901.67

8417344.23

P278

4,251.20

4250.00

-0.50

577940.11

8417374.74

P279

4,251.20

4248.50

-2.00

577955.84

8417387.23

P280

4,251.20

4247.00

-3.50

577963.9

8417393.62

P281

4,251.20

4245.50

-5.00

577969.27

8417397.88

P282

4,251.20

4244.00

-6.50

577974.72

8417402.21

P283

4,251.20

4242.50

-8.00

577980.23

8417406.58

P284

4,251.20

4241.00

-9.50

577985.77

8417410.97

P285

4,251.20

4239.50

-11.00

577990.91

8417415.06

P286

4,251.20

4239.50

-11.00

578011.24

8417431.19

P287

4,251.20

4241.00

-9.50

578020.69

8417438.68

P288

4,251.20

4242.50

-8.00

578031.5

8417447.27

P289

4,251.20

4244.00

-6.50

578043.01

8417456.4

P290

4,251.20

4245.50

-5.00

578061.13

8417470.78

P291

4,251.20

4247.00

-3.50

578087.63

8417491.82

P292

4,251.20

4247.50

-3.00

578129.94

8417525.4

P293

4,251.20

4249.00

-1.50

578180.01

8417565.14

P294

4,251.20

4249.00

-1.50

578272.86

8417638.83

P295

4,251.20

4247.50

-3.00

578319.14

8417675.56

P296

4,251.20

4248.50

-2.00

578371.33

8417716.98

P297

4,251.20

4250.00

-0.50

578407.12

8417745.39

P298

4,251.20

4250.50

0.00

578451.68

8417780.75

P299

4,251.20

4251.00

0.50

578372.97

8417654.42

P300

4,251.20

4251.00

0.50

578119.16

8417453.01

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

P301

4,251.20

4249.50

-1.00

578101.61

8417439.08

P302

4,251.20

4248.00

-2.50

578089.78

8417429.69

P303

4,251.20

4246.50

-4.00

578077.63

8417420.05

P304

4,251.20

4245.00

-5.50

578068.01

8417412.42

P305

4,251.20

4243.50

-7.00

578059.21

8417405.43

P306

4,251.20

4242.00

-8.50

578050.57

8417398.57

P307

4,251.20

4241.00

-9.50

578036.42

8417387.34

P308

4,251.20

4242.50

-8.00

578032.36

8417384.12

P309

4,251.20

4244.00

-6.50

578027.93

8417380.61

P310

4,251.20

4245.50

-5.00

578023.49

8417377.08

P311

4,251.20

4247.00

-3.50

578018.77

8417373.34

P312

4,251.20

4248.50

-2.00

578013.85

8417369.43

P313

4,251.20

4250.00

-0.50

578008.93

8417365.52

P314

4,251.20

4251.00

0.50

578005.89

8417363.11

P315

4,251.20

4251.00

0.50

578059.63

8417341.93

P316

4,251.20

4249.50

-1.00

578086.98

8417363.64

P317

4,251.20

4248.00

-2.50

578091

8417366.82

P318

4,251.20

4246.50

-4.00

578096.35

8417371.07

P319

4,251.20

4245.50

-5.00

578104.08

8417377.21

P320

4,251.20

4247.00

-3.50

578109

8417381.11

P321

4,251.20

4248.50

-2.00

578112.64

8417384

P322

4,251.20

4250.00

-0.50

578116.11

8417386.76

P323

4,251.20

4251.00

0.50

578130.71

8417398.34

Laguna Taccracocha N2: 6.60m


PUNTO

COTA RELATIVA COTA GEOREFERENCIADA


(m)
(m)

COORDENADAS

PROFUNDIDAD
(m)

ESTE

NORTE

P0

4,239.10

4238.50

P1

4,239.10

4239.00

0.50

578516.61

8417513.12

P2

4,239.10

4239.00

0.50

578657.89

8417625.24

P3

4,239.10

4239.00

0.50

578727.52

8417616.67

P4

4,239.10

4237.50

-1.00

578672.86

8417573.29

P5

4,239.10

4237.50

-1.00

578575.14

8417495.71

P6

4,239.10

4239.00

0.50

578516.46

8417449.16

P7

4,239.10

4239.50

1.00

578535.69

8417400.59

P8

4,239.10

4238.00

-0.50

578556.7

8417417.26

P9

4,239.10

4236.50

-2.00

578581.66

8417437.08

P10

4,239.10

4236.50

-2.00

578715.88

8417543.6

P11

4,239.10

4238.00

-0.50

578771.54

8417587.78

P12

4,239.10

4238.50

0.00

578847.35

8417647.95

P13

4,239.10

4239.00

0.50

578895.37

8417686.06

P14

4,239.10

4239.00

0.50

578946.11

8417662.5

P15

4,239.10

4237.50

-1.00

578907.73

8417632.09

P16

4,239.10

4236.00

-2.50

578876.49

8417607.24

P17

4,239.10

4236.00

-2.50

578835.84

8417574.97

P18

4,239.10

4235.00

-3.50

578810.35

8417554.74

P19

4,239.10

4233.50

-5.00

578760.8

8417515.42

P20

4,239.10

4234.50

-4.00

578632.94

8417413.94

GOBIERNO REGIONAL DE AYACUCHO

OBSERVACION
ESPEJO ACTUAL

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

P21

4,239.10

4236.00

-2.50

578613.46

8417398.48

P22

4,239.10

4237.50

-1.00

578600.43

8417388.14

P23

4,239.10

4239.00

0.50

578572.18

8417365.71

P24

4,239.10

4238.50

0.00

578615.49

8417336.26

P25

4,239.10

4237.50

-1.00

578638.57

8417354.57

P26

4,239.10

4236.00

-2.50

578655.24

8417367.81

P27

4,239.10

4234.50

-4.00

578672.94

8417381.86

P28

4,239.10

4233.00

-5.50

578702.3

8417405.15

P29

4,239.10

4233.00

-5.50

578833.71

8417509.45

P30

4,239.10

4234.50

-4.00

578889.43

8417553.67

P31

4,239.10

4236.00

-2.50

578914.17

8417573.31

P32

4,239.10

4237.50

-1.00

578941.67

8417595.13

P33

4,239.10

4239.00

0.50

578965.45

8417614.01

P34

4,239.10

4239.50

1.00

578994.06

8417572.88

P35

4,239.10

4238.00

-0.50

578967.57

8417551.85

P36

4,239.10

4236.50

-2.00

578925.57

8417518.53

P37

4,239.10

4235.00

-3.50

578826.26

8417439.7

P38

4,239.10

4234.00

-4.50

578771.7

8417396.4

P39

4,239.10

4235.50

-3.00

578756.81

8417384.59

P40

4,239.10

4237.00

-1.50

578745.41

8417375.54

P41

4,239.10

4238.50

0.00

578708.47

8417346.22

P42

4,239.10

4239.00

0.50

578683.75

8417326.6

P43

4,239.10

4239.50

1.00

578738.97

8417306.59

P44

4,239.10

4238.00

-0.50

578781.42

8417340.29

P45

4,239.10

4236.50

-2.00

578812.15

8417364.67

P46

4,239.10

4236.50

-2.00

578839.46

8417386.35

P47

4,239.10

4238.00

-0.50

578944.3

8417469.55

P48

4,239.10

4239.00

0.50

578997.52

8417511.79

P49

4,239.10

4241.00

2.50

579022.4

8417467.7

P50

4,239.10

4238.50

0.00

578869.01

8417345.96

P51

4,239.10

4238.50

0.00

578839.66

8417322.67

P52

4,239.10

4239.00

0.50

578811.64

8417300.43

P53

4,239.10

4232.50

-6.00

578715.31

8417415.48

P54

4,239.10

4232.50

-6.00

578812.01

8417492.23

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

D. Grficos de Curvas Superficie y Volumen

CALCULO DEL VOLUMEN DE REGULACION


Laguna Taccracocha N1: 19.20m
Cota (m.s.n.m)

diferencia de
cotas (m)

Altura de Dique
(m)

4,232.00

Area (m2)

Vol. Parcial (m3)

Vol. Acumulativo
(m3)

Vol. Acumulativo
(MMC)

0.00

2,894.87

0.00

4,232.50

0.50

0.50

10,874.45

3,442.33

3,442.33

0.00

4,233.00

0.50

1.00

18,278.61

7,288.27

10,730.59

0.01

4,233.50

0.50

1.50

26,005.28

11,070.97

21,801.57

0.02

4,234.00

0.50

2.00

33,847.97

14,963.31

36,764.88

0.04

4,234.50

0.50

2.50

41,832.60

18,920.14

55,685.02

0.06

4,235.00

0.50

3.00

49,937.19

22,942.45

78,627.47

0.08

4,235.50

0.50

3.50

58,095.34

27,008.13

105,635.60

0.11

4,236.00

0.50

4.00

66,501.15

31,149.12

136,784.73

0.14

4,236.50

0.50

4.50

77,683.88

36,046.26

172,830.99

0.17

4,237.00

0.50

5.00

90,054.84

41,934.68

214,765.67

0.21

4,237.50

0.50

5.50

104,156.72

48,552.89

263,318.55

0.26

4,238.00

0.50

6.00

118,640.29

55,699.25

319,017.81

0.32

4,238.50

0.50

6.50

132,280.07

62,730.09

381,747.90

0.38

4,239.00

0.50

7.00

145,515.18

69,448.81

451,196.71

0.45

4,239.50

0.50

7.50

158,215.81

75,932.75

527,129.46

0.53

4,240.00

0.50

8.00

170,460.87

82,169.17

609,298.63

0.61

4,240.50

0.50

8.50

181,688.75

88,037.40

697,336.03

0.70

4,241.00

0.50

9.00

191,904.79

93,398.39

790,734.42

0.79

4,241.50

0.50

9.50

201,793.82

98,424.65

889,159.07

0.89

4,242.00

0.50

10.00

210,214.20

103,002.01

992,161.08

0.99

4,242.50

0.50

10.50

219,041.61

107,313.95

1,099,475.03

1.10

4,243.00

0.50

11.00

228,341.10

111,845.68

1,211,320.70

1.21

4,243.50

0.50

11.50

237,884.44

116,556.39

1,327,877.09

1.33

4,244.00

0.50

12.00

246,847.06

121,182.87

1,449,059.96

1.45

4,244.50

0.50

12.50

256,041.08

125,722.03

1,574,782.00

1.57

4,245.00

0.50

13.00

265,096.53

130,284.40

1,705,066.40

1.71

4,245.50

0.50

13.50

274,617.08

134,928.40

1,839,994.80

1.84

4,246.00

0.50

14.00

284,530.93

139,787.00

1,979,781.80

1.98

4,246.50

0.50

14.50

294,881.01

144,852.99

2,124,634.79

2.12

4,247.00

0.50

15.00

306,097.27

150,244.57

2,274,879.36

2.27

4,247.50

0.50

15.50

317,967.12

156,016.10

2,430,895.45

2.43

4,248.00

0.50

16.00

330,518.15

162,121.32

2,593,016.77

2.59

4,248.50

0.50

16.50

343,759.26

168,569.35

2,761,586.12

2.76

4,249.00

0.50

17.00

358,378.19

175,534.36

2,937,120.49

2.94

4,249.50

0.50

17.50

372,754.07

182,783.06

3,119,903.55

3.12

4,250.00

0.50

18.00

388,255.67

190,252.44

3,310,155.99

3.31

4,250.50

0.50

18.50

406,491.90

198,686.89

3,508,842.88

3.51

4,251.20

0.70

19.20

441,428.62

296,772.18

3,805,615.06

3.81

TOTAL

GOBIERNO REGIONAL DE AYACUCHO

3,805,615.06

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Curva Area Volumen vs Altura

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

CALCULO DEL VOLUMEN DE REGULACION


Laguna Taccracocha N2: 6.60m
Cota (m.s.n.m)

diferencia
de cotas
(m)

4,232.50

Altura de
Dique (m)

Area (m2)

Vol. Parcial
(m3)

Vol.
Acumulativo
(m3)

Vol.
Acumulativo
(MMC)

0.00

5,656.81

0.00

0.00

4,233.00

0.50

0.50

10,135.98

3,948.20

3,948.20

0.00

4,233.50

0.50

1.00

14,604.02

6,185.00

10,133.20

0.01

4,234.00

0.50

1.50

19,659.58

8,565.90

18,699.10

0.02

4,234.50

0.50

2.00

25,237.22

11,224.20

29,923.30

0.03

4,235.00

0.50

2.50

31,328.25

14,141.37

44,064.67

0.04

4,235.50

0.50

3.00

38,087.00

17,353.81

61,418.48

0.06

4,236.00

0.50

3.50

46,346.09

21,108.27

82,526.75

0.08

4,236.50

0.50

4.00

55,708.98

25,513.77

108,040.52

0.11

4,237.00

0.50

4.50

66,537.72

30,561.67

138,602.19

0.14

4,237.50

0.50

5.00

78,641.24

36,294.74

174,896.93

0.17

4,238.00

0.50

5.50

92,112.36

42,688.40

217,585.33

0.22

4,238.50

0.50

6.00

106,412.26

49,631.15

267,216.49

0.27

4,239.10

0.60

6.60

127,091.64

70,051.17

337,267.65

0.34

TOTAL

GOBIERNO REGIONAL DE AYACUCHO

337,267.65

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

Curva Area Volumen vs Altura

E. Planos

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

FACTIBILIDAD PROYECTO ACAR BELLA UNIN: II ETAPA DE LA CONSTRUCCIN DE LA REPRESA IRURO

ANEXO VII
- Modelamiento Hidrulico de la Represa Iruro.

GOBIERNO REGIONAL DE AYACUCHO

CONSORCIO IRRIGACIN ACAR

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO0
AO1
F
M
A
M
J
J
A
S
O
N
D
AO2
F
M
A
M
J
J
A
S
O
N
D
AO3
F
M
A
M
J
J
A
S
O
N
D
AO4
F
M
A
M
J
J
A
S
O
N
D
AO5
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

7.624
2.55
18.33
32.09
45.48
46.99
46.12
40.54
34.18
27.43
21.81
15.43
9.76
6.59
17.66
25.28
45.88
47.97
47.08
41.55
35.40
28.66
22.29
16.71
11.29
9.21
33.60
37.94
42.83
43.06
42.11
36.53
30.36
23.82
18.28
11.93
6.85
8.55
16.64
27.00
45.73
48.07
47.39
41.82
35.40
28.51
22.27
15.81
10.26
8.30
18.90
24.12
45.92
48.79
48.05
42.57
36.05
29.78
25.02
19.24
14.06

NIVEL DE
AGUA
(msnm)
(1)

4,051.80
4,052.24
4,057.88
4,061.49
4,064.32
4,064.61
4,064.45
4,063.34
4,061.97
4,060.36
4,058.88
4,056.99
4,055.07
4,053.89
4,057.68
4,059.81
4,064.40
4,064.80
4,064.63
4,063.54
4,062.24
4,060.67
4,059.01
4,057.39
4,055.62
4,054.88
4,061.84
4,062.79
4,063.80
4,063.85
4,063.66
4,062.49
4,061.08
4,059.43
4,057.86
4,055.84
4,053.99
4,054.64
4,057.37
4,060.25
4,064.37
4,064.82
4,064.69
4,063.60
4,062.24
4,060.63
4,059.01
4,057.11
4,055.25
4,054.54
4,058.05
4,059.51
4,064.41
4,064.95
4,064.81
4,063.75
4,062.38
4,060.94
4,059.75
4,058.15
4,056.55

AREA
ESPEJO
(Km2)
(1)

1.96
3.16
3.93
4.53
4.60
4.56
4.32
4.03
3.69
3.37
2.97
2.56
2.31
3.12
3.57
4.55
4.63
4.60
4.37
4.09
3.75
3.40
3.06
2.68
2.52
4.00
4.21
4.42
4.43
4.39
4.14
3.84
3.49
3.16
2.72
2.33
2.47
3.05
3.67
4.54
4.64
4.61
4.38
4.09
3.75
3.40
3.00
2.60
2.45
3.20
3.51
4.55
4.67
4.64
4.41
4.12
3.81
3.56
3.22
2.88

ENTRADA IRURO
Q ENTRADA
(m3/seg)

5.13
4.95
4.37
0.90
0.16
0.09
0.10
0.15
0.33
0.14
0.26
1.01
3.62
2.77
6.68
1.10
0.16
0.11
0.18
0.16
0.10
0.38
0.36
1.37
7.90
1.62
1.64
0.48
0.13
0.08
0.16
0.22
0.35
0.14
0.45
2.58
2.66
3.75
6.08
1.18
0.24
0.10
0.08
0.10
0.15
0.11
0.30
1.40
3.47
1.92
7.06
1.36
0.21
0.13
0.04
0.29
0.63
0.32
0.44
1.83

SALIDA CANAL IRURO

VOL
ENTRADA
(MMC)

Q SALIDA
(m3/seg)

13.73
11.98
11.70
2.34
0.44
0.24
0.27
0.40
0.87
0.36
0.69
2.71
9.68
6.70
17.88
2.84
0.42
0.29
0.48
0.43
0.25
1.00
0.92
3.66
21.16
3.92
4.41
1.23
0.33
0.20
0.42
0.59
0.89
0.37
1.17
6.90
7.12
9.06
16.27
3.05
0.63
0.25
0.21
0.27
0.39
0.28
0.79
3.75
9.29
4.64
18.90
3.51
0.57
0.34
0.11
0.77
1.62
0.84
1.14
4.91

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

16.28
30.32
43.79
47.04
46.67
41.12
34.80
28.05
22.12
15.77
9.95
6.41
16.28
24.36
43.16
47.95
47.64
42.13
36.03
29.29
22.74
16.89
11.46
8.89
30.37
37.52
42.34
43.28
42.65
37.07
30.94
24.41
18.55
12.24
6.93
7.69
15.67
25.70
43.27
48.00
47.95
42.40
36.03
29.13
22.72
16.15
10.43
7.95
17.58
23.55
43.02
48.65
48.61
43.15
36.68
30.28
25.22
19.46
14.21
12.91

ENTRADA PRECIP
PRECIP
(mm/mes)

23.35
18.15
13.87
2.83
1.43
1.49
6.31
16.70
11.17
21.13
3.41
1.77
1.91
7.80
28.42
5.55
5.36
1.54
1.57
2.78
15.02
12.54
14.71
19.25
3.66
1.69
8.24
15.62
7.88
22.32
4.18
1.09
2.53
1.41
2.20
9.32

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

2.29
2.00
1.95
0.39
0.14
0.11
0.45
1.61
1.12
2.98
0.47
0.17
0.15
0.61
3.53
0.65
0.73
0.21
0.15
0.19
1.15
1.19
1.51
2.71
0.51
0.13
0.62
1.55
0.77
3.15
0.59
0.13
0.27
0.14
0.19
0.82

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.23
0.23
0.26
0.44
0.56
0.57
0.62
0.62
0.45
0.34
0.30
0.27
0.23
0.20
0.26
0.45
0.56
0.58
0.63
0.63
0.45
0.34
0.32
0.29
0.29
0.24
0.25
0.43
0.53
0.55
0.59
0.58
0.42
0.30
0.27
0.28
0.22
0.21
0.25
0.45
0.56
0.58
0.62
0.62
0.45
0.33
0.30
0.28
0.23
0.20
0.25
0.45
0.56
0.58
0.63
0.63
0.47
0.36
0.34
0.32

18.33
32.09
45.48
46.99
46.12
40.54
34.18
27.43
21.81
15.43
9.76
6.59
17.66
25.28
45.88
47.97
47.08
41.55
35.40
28.66
22.29
16.71
11.29
9.21
33.60
37.94
42.83
43.06
42.11
36.53
30.36
23.82
18.28
11.93
6.85
8.55
16.64
27.00
45.73
48.07
47.39
41.82
35.40
28.51
22.27
15.81
10.26
8.30
18.90
24.12
45.92
48.79
48.05
42.57
36.05
29.78
25.02
19.24
14.06
13.41

VOL
REBOSE
(MMC)

NIVEL DE
AGUA
(msnm)
(2)

4,057.88
4,061.49
4,064.32
4,064.61
4,064.45
4,063.34
4,061.97
4,060.36
4,058.88
4,056.99
4,055.07
4,053.89
4,057.68
4,059.81
4,064.40
4,064.80
4,064.63
4,063.54
4,062.24
4,060.67
4,059.01
4,057.39
4,055.62
4,054.88
4,061.84
4,062.79
4,063.80
4,063.85
4,063.66
4,062.49
4,061.08
4,059.43
4,057.86
4,055.84
4,053.99
4,054.64
4,057.37
4,060.25
4,064.37
4,064.82
4,064.69
4,063.60
4,062.24
4,060.63
4,059.01
4,057.11
4,055.25
4,054.54
4,058.05
4,059.51
4,064.41
4,064.95
4,064.81
4,063.75
4,062.38
4,060.94
4,059.75
4,058.15
4,056.55
4,056.33

AREA
ESPEJO
(Km2)
(2)

3.16
3.93
4.53
4.60
4.56
4.32
4.03
3.69
3.37
2.97
2.56
2.31
3.12
3.57
4.55
4.63
4.60
4.37
4.09
3.75
3.40
3.06
2.68
2.52
4.00
4.21
4.42
4.43
4.39
4.14
3.84
3.49
3.16
2.72
2.33
2.47
3.05
3.67
4.54
4.64
4.61
4.38
4.09
3.75
3.40
3.00
2.60
2.45
3.20
3.51
4.55
4.67
4.64
4.41
4.12
3.81
3.56
3.22
2.88
2.83

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

27.67%
48.43%
68.64%
70.92%
69.60%
61.19%
51.60%
41.40%
32.92%
23.29%
14.72%
9.95%
26.66%
38.15%
69.25%
72.41%
71.06%
62.71%
53.43%
43.26%
33.64%
25.22%
17.04%
13.90%
50.72%
57.26%
64.64%
64.99%
63.56%
55.13%
45.82%
35.96%
27.58%
18.01%
10.34%
12.91%
25.11%
40.75%
69.02%
72.55%
71.52%
63.12%
53.43%
43.03%
33.62%
23.87%
15.48%
12.52%
28.53%
36.41%
69.30%
73.64%
72.52%
64.25%
54.41%
44.94%
37.77%
29.04%
21.23%
20.24%

MAXIMA
CAPACIDAD
(MMC)

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

46.99

47.97

43.06

48.07

48.79

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO6
F
M
A
M
J
J
A
S
O
N
D
AO7
F
M
A
M
J
J
A
S
O
N
D
AO8
F
M
A
M
J
J
A
S
O
N
D
AO9
F
M
A
M
J
J
A
S
O
N
D
AO10
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

13.41
17.24
39.55
52.81
54.38
53.27
47.72
41.22
34.35
28.11
21.75
16.45
13.60
30.28
37.73
56.39
57.53
56.66
51.01
44.71
37.81
32.53
26.13
20.52
17.57
27.65
37.70
62.66
61.44
60.43
54.82
48.47
41.43
35.20
29.07
22.66
17.61
41.83
48.96
66.25
66.25
65.21
59.53
53.32
46.38
39.64
33.26
26.98
20.54
43.12
45.42
62.72
61.81
60.83
55.21
48.88
41.93
37.87
31.63
26.24

NIVEL DE
AGUA
(msnm)
(1)

4,056.33
4,057.55
4,063.13
4,065.68
4,065.95
4,065.76
4,064.75
4,063.48
4,062.00
4,060.53
4,058.86
4,057.31
4,056.40
4,061.06
4,062.75
4,066.29
4,066.48
4,066.34
4,065.36
4,064.17
4,062.76
4,061.59
4,060.03
4,058.52
4,057.65
4,060.42
4,062.74
4,067.29
4,067.10
4,066.95
4,066.03
4,064.89
4,063.52
4,062.19
4,060.77
4,059.11
4,057.66
4,063.60
4,064.98
4,068.25
4,067.84
4,067.67
4,066.81
4,065.77
4,064.50
4,063.15
4,061.76
4,060.25
4,058.52
4,063.86
4,064.31
4,067.30
4,067.16
4,067.01
4,066.09
4,064.97
4,063.62
4,062.78
4,061.38
4,060.06

AREA
ESPEJO
(Km2)
(1)

2.83
3.09
4.28
4.82
4.88
4.84
4.62
4.35
4.04
3.73
3.37
3.04
2.84
3.84
4.20
4.95
4.99
4.96
4.75
4.50
4.20
3.95
3.62
3.30
3.11
3.70
4.20
5.17
5.13
5.09
4.90
4.65
4.36
4.08
3.78
3.42
3.11
4.38
4.67
5.37
5.28
5.25
5.06
4.84
4.57
4.28
3.99
3.67
3.30
4.43
4.53
5.17
5.14
5.11
4.91
4.67
4.38
4.20
3.91
3.63

ENTRADA IRURO
Q ENTRADA
(m3/seg)

1.30
7.99
4.33
0.93
0.08
0.12
0.06
0.13
0.16
0.16
0.41
1.13
5.43
2.72
6.06
0.79
0.18
0.08
0.15
0.13
0.47
0.15
0.31
1.11
3.31
3.65
8.08
0.02
0.14
0.10
0.14
0.09
0.18
0.26
0.06
0.43
7.85
2.62
6.67
0.49
0.13
0.09
0.20
0.14
0.00
0.18
0.13
0.00
7.33
0.91
5.63
0.14
0.15
0.10
0.15
0.12
0.89
0.22
0.41
0.90

SALIDA CANAL IRURO

VOL
ENTRADA
(MMC)

Q SALIDA
(m3/seg)

3.48
19.33
11.59
2.42
0.23
0.30
0.17
0.34
0.42
0.42
1.05
3.03
14.53
6.59
16.23
2.05
0.48
0.21
0.39
0.33
1.22
0.41
0.81
2.97
8.87
8.82
21.63
0.05
0.36
0.27
0.36
0.23
0.48
0.70
0.17
1.17
21.03
6.34
17.86
1.27
0.35
0.23
0.54
0.37
0.48
0.34
19.63
2.20
15.07
0.37
0.40
0.27
0.40
0.33
2.29
0.60
1.05
2.42

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

16.88
36.57
51.14
54.44
53.86
48.33
41.88
35.02
28.60
22.12
16.63
13.42
28.13
36.87
53.96
57.66
57.26
51.63
45.39
38.50
32.85
26.53
20.77
17.43
26.44
36.47
59.34
61.93
61.05
55.46
49.17
42.15
35.74
29.49
23.06
17.77
38.64
48.16
66.82
66.75
65.85
60.21
54.06
47.15
40.21
33.71
27.42
20.93
40.17
45.32
60.50
62.31
61.46
55.86
49.60
42.67
38.05
32.07
26.50
22.60

ENTRADA PRECIP
PRECIP
(mm/mes)

6.05
26.89
12.92
2.75
1.92
5.73
20.35
9.34
17.62
2.29
1.71
1.37
5.13
12.89
12.51
22.51
2.01
25.81
8.07
17.88
1.34
23.80
2.88
15.68
3.03
1.61
3.80

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

0.58
3.22
1.93
0.40
0.17
0.51
2.42
1.10
2.71
0.34
0.20
0.14
0.49
1.48
1.47
3.61
0.19
3.50
1.06
2.98
0.21
3.27
0.37
2.51
0.38
0.17
0.40

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.22
0.24
0.27
0.47
0.59
0.61
0.66
0.67
0.49
0.38
0.35
0.32
0.27
0.24
0.28
0.48
0.60
0.63
0.68
0.70
0.52
0.40
0.38
0.36
0.26
0.24
0.29
0.49
0.62
0.64
0.71
0.72
0.54
0.42
0.40
0.36
0.31
0.26
0.30
0.51
0.64
0.67
0.75
0.77
0.58
0.45
0.44
0.39
0.32
0.26
0.29
0.50
0.62
0.65
0.72
0.74
0.56
0.44
0.43
0.40

17.24
39.55
52.81
54.38
53.27
47.72
41.22
34.35
28.11
21.75
16.45
13.60
30.28
37.73
56.39
57.53
56.66
51.01
44.71
37.81
32.53
26.13
20.52
17.57
27.65
37.70
62.66
61.44
60.43
54.82
48.47
41.43
35.20
29.07
22.66
17.61
41.83
48.96
69.50
66.45
65.21
59.53
53.32
46.38
39.64
33.26
26.98
20.54
43.12
45.42
62.72
61.81
60.83
55.21
48.88
41.93
37.87
31.63
26.24
22.61

VOL
REBOSE
(MMC)

3.244
0.193
-

NIVEL DE
AGUA
(msnm)
(2)

4,057.55
4,063.13
4,065.68
4,065.95
4,065.76
4,064.75
4,063.48
4,062.00
4,060.53
4,058.86
4,057.31
4,056.40
4,061.06
4,062.75
4,066.29
4,066.48
4,066.34
4,065.36
4,064.17
4,062.76
4,061.59
4,060.03
4,058.52
4,057.65
4,060.42
4,062.74
4,067.29
4,067.10
4,066.95
4,066.03
4,064.89
4,063.52
4,062.19
4,060.77
4,059.11
4,057.66
4,063.60
4,064.98
4,068.25
4,067.84
4,067.67
4,066.81
4,065.77
4,064.50
4,063.15
4,061.76
4,060.25
4,058.52
4,063.86
4,064.31
4,067.30
4,067.16
4,067.01
4,066.09
4,064.97
4,063.62
4,062.78
4,061.38
4,060.06
4,059.10

AREA
ESPEJO
(Km2)
(2)

3.09
4.28
4.82
4.88
4.84
4.62
4.35
4.04
3.73
3.37
3.04
2.84
3.84
4.20
4.95
4.99
4.96
4.75
4.50
4.20
3.95
3.62
3.30
3.11
3.70
4.20
5.17
5.13
5.09
4.90
4.65
4.36
4.08
3.78
3.42
3.11
4.38
4.67
5.37
5.28
5.25
5.06
4.84
4.57
4.28
3.99
3.67
3.30
4.43
4.53
5.17
5.14
5.11
4.91
4.67
4.38
4.20
3.91
3.63
3.42

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

26.03%
59.70%
79.70%
82.08%
80.40%
72.03%
62.22%
51.85%
42.42%
32.83%
24.82%
20.53%
45.70%
56.94%
85.11%
86.83%
85.52%
76.99%
67.48%
57.06%
49.10%
39.44%
30.97%
26.51%
41.74%
56.91%
94.57%
92.73%
91.22%
82.74%
73.15%
62.53%
53.12%
43.87%
34.21%
26.58%
63.13%
73.89%
104.90%
100.29%
98.43%
89.85%
80.48%
70.01%
59.82%
50.20%
40.73%
31.00%
65.08%
68.56%
94.66%
93.29%
91.82%
83.33%
73.78%
63.29%
57.16%
47.73%
39.61%
34.12%

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

MAXIMA
CAPACIDAD
(MMC)

54.38

57.53

62.66

66.25

62.72

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO11
F
M
A
M
J
J
A
S
O
N
D
AO12
F
M
A
M
J
J
A
S
O
N
D
AO13
F
M
A
M
J
J
A
S
O
N
D
AO14
F
M
A
M
J
J
A
S
O
N
D
AO15
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

22.61
40.85
52.69
66.25
65.56
64.65
59.01
52.68
45.53
39.48
32.92
27.43
23.28
27.91
43.57
66.25
65.60
64.60
58.96
52.55
45.83
39.53
33.08
27.80
24.87
46.45
48.79
62.80
66.10
65.31
59.66
53.23
46.23
40.64
34.51
28.51
25.38
41.82
54.36
66.25
66.25
65.37
59.79
53.33
46.37
41.75
35.64
29.36
22.96
31.29
43.62
64.75
66.25
65.31
59.68
53.22
46.24
40.09
33.65
27.95

NIVEL DE
AGUA
(msnm)
(1)

4,059.10
4,063.40
4,065.66
4,068.37
4,067.72
4,067.59
4,066.72
4,065.65
4,064.33
4,063.12
4,061.68
4,060.36
4,059.28
4,060.48
4,063.95
4,068.10
4,067.72
4,067.58
4,066.71
4,065.63
4,064.39
4,063.13
4,061.72
4,060.46
4,059.71
4,064.51
4,064.95
4,067.31
4,067.79
4,067.68
4,066.83
4,065.75
4,064.47
4,063.36
4,062.04
4,060.63
4,059.84
4,063.60
4,065.95
4,068.32
4,067.82
4,067.69
4,066.85
4,065.77
4,064.49
4,063.58
4,062.29
4,060.84
4,059.19
4,061.30
4,063.96
4,067.60
4,067.85
4,067.68
4,066.83
4,065.75
4,064.47
4,063.24
4,061.85
4,060.49

AREA
ESPEJO
(Km2)
(1)

3.42
4.34
4.82
5.40
5.26
5.23
5.04
4.82
4.54
4.28
3.97
3.69
3.46
3.72
4.45
5.34
5.26
5.23
5.04
4.81
4.55
4.28
3.98
3.71
3.55
4.57
4.67
5.17
5.27
5.25
5.07
4.84
4.56
4.33
4.05
3.75
3.58
4.38
4.88
5.39
5.28
5.25
5.07
4.84
4.57
4.38
4.10
3.79
3.44
3.89
4.46
5.23
5.29
5.25
5.07
4.84
4.56
4.30
4.01
3.72

ENTRADA IRURO
Q ENTRADA
(m3/seg)

5.94
4.29
5.77
0.23
0.18
0.10
0.16
0.05
0.27
0.11
0.37
0.74
1.57
5.64
8.02
0.24
0.15
0.11
0.13
0.21
0.17
0.15
0.44
1.13
7.01
0.92
4.58
1.52
0.22
0.10
0.12
0.12
0.38
0.28
0.24
1.07
5.36
4.54
5.11
0.44
0.19
0.13
0.11
0.13
0.71
0.29
0.13
0.02
2.76
4.46
6.86
1.01
0.17
0.11
0.11
0.12
0.23
0.16
0.31
1.56

SALIDA CANAL IRURO

VOL
ENTRADA
(MMC)

Q SALIDA
(m3/seg)

15.91
10.38
15.45
0.60
0.48
0.27
0.42
0.15
0.70
0.29
0.97
1.99
4.20
13.64
21.47
0.63
0.39
0.27
0.34
0.58
0.45
0.41
1.15
3.03
18.78
2.23
12.26
3.93
0.60
0.27
0.31
0.31
0.99
0.74
0.62
2.87
14.36
10.99
13.67
1.14
0.50
0.34
0.28
0.35
1.83
0.76
0.34
0.06
7.39
10.78
18.37
2.62
0.44
0.29
0.29
0.33
0.60
0.42
0.79
4.16

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

38.52
51.24
68.14
66.07
65.29
59.68
53.42
46.29
40.05
33.37
27.71
23.36
27.48
41.55
65.04
66.11
65.23
59.63
53.30
46.59
40.11
33.53
28.06
24.78
43.65
48.68
61.05
65.95
65.94
60.33
53.97
47.00
41.05
34.97
28.96
25.32
39.74
52.81
68.03
66.62
66.01
60.47
54.07
47.14
42.03
36.11
29.81
23.36
30.34
42.08
61.99
66.59
65.95
60.35
53.97
47.01
40.67
34.10
28.26
26.06

ENTRADA PRECIP
PRECIP
(mm/mes)

19.72
12.83
15.39
1.45
3.09
6.08
18.23
21.63
1.72
4.59
22.08
2.85
12.75
4.14
1.27
4.31
17.63
13.40
13.65
1.20
2.33
10.21
14.41
18.87
2.75
1.18
6.17

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

2.65
1.73
2.57
0.16
0.33
0.70
2.27
3.58
0.19
0.51
3.13
0.37
2.04
0.66
0.17
0.48
2.39
1.83
2.28
0.19
0.31
1.23
1.80
3.06
0.44
0.13
0.69

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.31
0.28
0.30
0.51
0.64
0.67
0.74
0.76
0.58
0.45
0.44
0.41
0.27
0.25
0.30
0.51
0.64
0.67
0.74
0.77
0.58
0.45
0.44
0.42
0.33
0.27
0.29
0.51
0.64
0.67
0.74
0.77
0.58
0.46
0.45
0.42
0.32
0.28
0.30
0.51
0.64
0.67
0.75
0.77
0.59
0.47
0.45
0.40
0.28
0.25
0.30
0.51
0.64
0.67
0.74
0.77
0.58
0.46
0.44
0.43

40.85
52.69
70.41
65.56
64.65
59.01
52.68
45.53
39.48
32.92
27.43
23.28
27.91
43.57
68.32
65.60
64.60
58.96
52.55
45.83
39.53
33.08
27.80
24.87
46.45
48.79
62.80
66.10
65.31
59.66
53.23
46.23
40.64
34.51
28.51
25.38
41.82
54.36
70.01
66.30
65.37
59.79
53.33
46.37
41.75
35.64
29.36
22.96
31.29
43.62
64.75
66.52
65.31
59.68
53.22
46.24
40.09
33.65
27.95
26.33

VOL
REBOSE
(MMC)

4.158
2.068
3.756
0.042
0.262
-

NIVEL DE
AGUA
(msnm)
(2)

4,063.40
4,065.66
4,068.37
4,067.72
4,067.59
4,066.72
4,065.65
4,064.33
4,063.12
4,061.68
4,060.36
4,059.28
4,060.48
4,063.95
4,068.10
4,067.72
4,067.58
4,066.71
4,065.63
4,064.39
4,063.13
4,061.72
4,060.46
4,059.71
4,064.51
4,064.95
4,067.31
4,067.79
4,067.68
4,066.83
4,065.75
4,064.47
4,063.36
4,062.04
4,060.63
4,059.84
4,063.60
4,065.95
4,068.32
4,067.82
4,067.69
4,066.85
4,065.77
4,064.49
4,063.58
4,062.29
4,060.84
4,059.19
4,061.30
4,063.96
4,067.60
4,067.85
4,067.68
4,066.83
4,065.75
4,064.47
4,063.24
4,061.85
4,060.49
4,060.08

AREA
ESPEJO
(Km2)
(2)

4.34
4.82
5.40
5.26
5.23
5.04
4.82
4.54
4.28
3.97
3.69
3.46
3.72
4.45
5.34
5.26
5.23
5.04
4.81
4.55
4.28
3.98
3.71
3.55
4.57
4.67
5.17
5.27
5.25
5.07
4.84
4.56
4.33
4.05
3.75
3.58
4.38
4.88
5.39
5.28
5.25
5.07
4.84
4.57
4.38
4.10
3.79
3.44
3.89
4.46
5.23
5.29
5.25
5.07
4.84
4.56
4.30
4.01
3.72
3.63

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

61.66%
79.53%
106.28%
98.96%
97.58%
89.06%
79.51%
68.72%
59.59%
49.68%
41.40%
35.14%
42.13%
65.76%
103.12%
99.01%
97.50%
88.99%
79.32%
69.17%
59.67%
49.93%
41.96%
37.53%
70.11%
73.63%
94.78%
99.77%
98.57%
90.04%
80.33%
69.78%
61.34%
52.09%
43.03%
38.31%
63.12%
82.05%
105.67%
100.06%
98.66%
90.25%
80.49%
69.99%
63.01%
53.79%
44.31%
34.65%
47.23%
65.83%
97.73%
100.40%
98.57%
90.07%
80.33%
69.80%
60.51%
50.78%
42.19%
39.74%

OK
OK
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK

MAXIMA
CAPACIDAD
(MMC)

66.25

66.25

66.10

66.25

66.25

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO16
F
M
A
M
J
J
A
S
O
N
D
AO17
F
M
A
M
J
J
A
S
O
N
D
AO18
F
M
A
M
J
J
A
S
O
N
D
AO19
F
M
A
M
J
J
A
S
O
N
D
AO20
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

26.33
39.98
59.84
66.25
66.25
65.64
60.03
53.60
46.82
41.44
35.55
29.58
23.12
33.54
47.37
66.25
66.25
65.47
59.84
53.42
46.60
41.32
35.00
28.70
24.31
24.06
36.85
66.25
66.25
65.16
59.41
52.95
45.98
39.84
33.33
27.71
27.52
30.22
40.67
65.39
66.25
65.49
59.89
53.41
46.55
41.25
35.08
29.70
26.00
48.95
59.81
66.25
66.25
65.33
59.68
53.22
46.36
39.96
33.62
27.64

NIVEL DE
AGUA
(msnm)
(1)

4,060.08
4,063.22
4,066.86
4,068.51
4,068.07
4,067.73
4,066.89
4,065.81
4,064.58
4,063.52
4,062.27
4,060.89
4,059.24
4,061.82
4,064.68
4,068.01
4,068.18
4,067.70
4,066.85
4,065.78
4,064.54
4,063.50
4,062.15
4,060.68
4,059.56
4,059.49
4,062.56
4,067.83
4,067.93
4,067.66
4,066.79
4,065.70
4,064.42
4,063.19
4,061.77
4,060.43
4,060.38
4,061.05
4,063.36
4,067.69
4,067.83
4,067.71
4,066.86
4,065.78
4,064.53
4,063.48
4,062.17
4,060.92
4,060.00
4,064.98
4,066.85
4,068.32
4,067.97
4,067.68
4,066.83
4,065.75
4,064.49
4,063.22
4,061.84
4,060.41

AREA
ESPEJO
(Km2)
(1)

3.63
4.30
5.07
5.43
5.33
5.26
5.08
4.85
4.59
4.36
4.10
3.80
3.45
4.00
4.61
5.32
5.36
5.25
5.07
4.85
4.58
4.36
4.07
3.76
3.52
3.50
4.16
5.28
5.30
5.24
5.06
4.83
4.55
4.29
3.99
3.70
3.69
3.84
4.33
5.25
5.28
5.25
5.08
4.84
4.58
4.35
4.07
3.81
3.61
4.67
5.07
5.39
5.31
5.25
5.07
4.84
4.57
4.30
4.00
3.70

ENTRADA IRURO
Q ENTRADA
(m3/seg)

4.47
7.14
3.86
1.04
0.29
0.12
0.12
0.20
0.46
0.32
0.25
0.00
3.43
4.99
6.60
1.32
0.23
0.11
0.13
0.18
0.49
0.21
0.13
0.67
0.00
4.62
9.53
0.69
0.11
0.06
0.11
0.13
0.23
0.13
0.33
2.02
0.95
3.79
8.01
0.74
0.23
0.12
0.10
0.17
0.48
0.26
0.41
0.89
7.45
3.95
3.36
0.81
0.18
0.10
0.11
0.17
0.14
0.19
0.25
1.33

VOL
ENTRADA
(MMC)

11.97
17.27
10.34
2.69
0.78
0.31
0.31
0.53
1.19
0.84
0.65
9.18
12.08
17.68
3.41
0.60
0.29
0.33
0.49
1.27
0.55
0.32
1.78
11.17
25.53
1.79
0.29
0.17
0.28
0.34
0.60
0.35
0.85
5.40
2.56
9.16
21.45
1.92
0.62
0.32
0.27
0.45
1.25
0.70
1.07
2.38
19.96
9.56
9.01
2.10
0.47
0.26
0.29
0.45
0.35
0.52
0.64
3.57

SALIDA CANAL IRURO


Q SALIDA
(m3/seg)

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

38.30
57.26
70.18
68.17
66.28
60.71
54.35
47.59
41.83
35.88
30.03
23.52
32.30
45.62
65.05
68.89
66.11
60.51
54.17
47.37
41.70
35.47
29.15
24.43
24.31
35.23
62.38
67.27
65.80
60.09
53.69
46.75
40.41
33.79
28.01
27.05
30.08
39.39
62.11
66.54
66.13
60.56
54.15
47.32
41.63
35.54
29.97
26.02
45.96
58.50
68.82
67.58
65.97
60.35
53.97
47.13
40.54
34.07
28.08
25.15

ENTRADA PRECIP
PRECIP
(mm/mes)

14.97
20.27
10.24
2.80
1.51
1.11
12.34
15.60
17.87
3.54
1.62
2.72
15.99
25.99
1.88
1.27
7.86
3.59
12.60
21.95
2.02
1.60
1.56
3.55
22.96
11.21
9.00
2.20
5.37

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

2.00
2.88
1.72
0.45
0.20
0.14
1.53
2.01
2.95
0.57
0.21
0.30
1.86
4.26
0.30
0.14
0.90
0.43
1.53
3.57
0.32
0.21
0.18
0.40
3.33
1.59
1.50
0.35
0.59

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.31
0.29
0.31
0.52
0.64
0.68
0.75
0.77
0.59
0.47
0.45
0.41
0.29
0.26
0.30
0.52
0.64
0.68
0.75
0.77
0.59
0.46
0.45
0.41
0.25
0.24
0.30
0.51
0.64
0.67
0.74
0.77
0.58
0.45
0.44
0.43
0.28
0.25
0.30
0.51
0.64
0.67
0.75
0.77
0.58
0.46
0.45
0.42
0.34
0.29
0.30
0.51
0.64
0.67
0.74
0.77
0.58
0.46
0.44
0.42

39.98
59.84
71.60
68.10
65.64
60.03
53.60
46.82
41.44
35.55
29.58
23.12
33.54
47.37
67.70
68.94
65.47
59.84
53.42
46.60
41.32
35.00
28.70
24.31
24.06
36.85
66.34
67.06
65.16
59.41
52.95
45.98
39.84
33.33
27.71
27.52
30.22
40.67
65.39
66.35
65.49
59.89
53.41
46.55
41.25
35.08
29.70
26.00
48.95
59.81
70.02
67.41
65.33
59.68
53.22
46.36
39.96
33.62
27.64
25.32

VOL
REBOSE
(MMC)

5.346
1.844
1.447
2.688
0.087
0.804
0.095
3.762
1.157
-

NIVEL DE
AGUA
(msnm)
(2)

4,063.22
4,066.86
4,068.51
4,068.07
4,067.73
4,066.89
4,065.81
4,064.58
4,063.52
4,062.27
4,060.89
4,059.24
4,061.82
4,064.68
4,068.01
4,068.18
4,067.70
4,066.85
4,065.78
4,064.54
4,063.50
4,062.15
4,060.68
4,059.56
4,059.49
4,062.56
4,067.83
4,067.93
4,067.66
4,066.79
4,065.70
4,064.42
4,063.19
4,061.77
4,060.43
4,060.38
4,061.05
4,063.36
4,067.69
4,067.83
4,067.71
4,066.86
4,065.78
4,064.53
4,063.48
4,062.17
4,060.92
4,060.00
4,064.98
4,066.85
4,068.32
4,067.97
4,067.68
4,066.83
4,065.75
4,064.49
4,063.22
4,061.84
4,060.41
4,059.82

AREA
ESPEJO
(Km2)
(2)

4.30
5.07
5.43
5.33
5.26
5.08
4.85
4.59
4.36
4.10
3.80
3.45
4.00
4.61
5.32
5.36
5.25
5.07
4.85
4.58
4.36
4.07
3.76
3.52
3.50
4.16
5.28
5.30
5.24
5.06
4.83
4.55
4.29
3.99
3.70
3.69
3.84
4.33
5.25
5.28
5.25
5.08
4.84
4.58
4.35
4.07
3.81
3.61
4.67
5.07
5.39
5.31
5.25
5.07
4.84
4.57
4.30
4.00
3.70
3.57

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

60.35%
90.33%
108.07%
102.78%
99.07%
90.61%
80.90%
70.66%
62.55%
53.66%
44.64%
34.89%
50.62%
71.50%
102.18%
104.06%
98.81%
90.31%
80.63%
70.33%
62.37%
52.83%
43.32%
36.69%
36.31%
55.62%
100.13%
101.21%
98.35%
89.68%
79.92%
69.41%
60.13%
50.31%
41.82%
41.53%
45.62%
61.38%
98.70%
100.14%
98.84%
90.39%
80.61%
70.26%
62.26%
52.94%
44.82%
39.24%
73.88%
90.27%
105.68%
101.75%
98.61%
90.07%
80.33%
69.98%
60.32%
50.74%
41.71%
38.22%

OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK

MAXIMA
CAPACIDAD
(MMC)

66.25

66.25

66.25

66.25

66.25

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO21
F
M
A
M
J
J
A
S
O
N
D
AO22
F
M
A
M
J
J
A
S
O
N
D
AO23
F
M
A
M
J
J
A
S
O
N
D
AO24
F
M
A
M
J
J
A
S
O
N
D
AO25
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

25.32
29.01
44.20
66.25
66.25
65.31
59.58
53.07
46.24
40.59
33.87
27.90
25.82
41.96
59.27
65.49
66.25
65.50
59.87
53.52
46.85
40.62
34.11
28.78
22.65
32.15
47.55
66.25
66.25
65.11
59.40
52.92
45.91
40.31
34.22
28.25
22.63
43.77
54.44
66.25
66.25
65.08
59.41
53.01
46.00
39.91
33.23
28.22
21.76
35.85
39.20
62.50
63.31
62.35
56.73
50.36
43.33
38.55
32.41
27.07

NIVEL DE
AGUA
(msnm)
(1)

4,059.82
4,060.75
4,064.07
4,067.89
4,067.89
4,067.68
4,066.81
4,065.72
4,064.47
4,063.35
4,061.90
4,060.48
4,059.95
4,063.63
4,066.76
4,067.71
4,068.14
4,067.71
4,066.86
4,065.80
4,064.59
4,063.35
4,061.95
4,060.70
4,059.11
4,061.50
4,064.72
4,068.09
4,068.18
4,067.65
4,066.78
4,065.70
4,064.41
4,063.29
4,061.97
4,060.57
4,059.11
4,063.99
4,065.96
4,068.16
4,067.95
4,067.65
4,066.79
4,065.71
4,064.42
4,063.21
4,061.75
4,060.56
4,058.87
4,062.34
4,063.06
4,067.27
4,067.39
4,067.24
4,066.35
4,065.24
4,063.90
4,062.92
4,061.56
4,060.27

AREA
ESPEJO
(Km2)
(1)

3.57
3.77
4.48
5.29
5.29
5.25
5.06
4.83
4.56
4.33
4.02
3.71
3.60
4.38
5.05
5.26
5.35
5.26
5.07
4.85
4.59
4.33
4.03
3.76
3.42
3.93
4.62
5.34
5.36
5.24
5.06
4.83
4.55
4.31
4.03
3.73
3.42
4.46
4.88
5.35
5.31
5.24
5.06
4.83
4.56
4.30
3.99
3.73
3.37
4.11
4.26
5.16
5.19
5.16
4.97
4.73
4.44
4.23
3.94
3.67

ENTRADA IRURO
Q ENTRADA
(m3/seg)

1.27
5.47
7.34
0.59
0.17
0.07
0.09
0.18
0.37
0.05
0.25
1.41
5.27
6.24
2.09
1.48
0.24
0.11
0.15
0.24
0.20
0.13
0.43
0.12
3.13
5.55
6.72
1.33
0.09
0.08
0.10
0.11
0.38
0.29
0.25
0.27
6.87
3.88
4.69
0.74
0.08
0.10
0.13
0.11
0.25
0.07
0.53
0.00
4.60
1.27
7.55
0.69
0.16
0.11
0.14
0.09
0.65
0.27
0.42
0.54

VOL
ENTRADA
(MMC)

3.39
13.24
19.65
1.54
0.44
0.19
0.24
0.48
0.95
0.15
0.64
3.78
14.10
15.09
5.58
3.84
0.64
0.29
0.40
0.64
0.52
0.35
1.11
0.33
8.38
13.43
18.00
3.45
0.24
0.21
0.27
0.29
0.98
0.78
0.65
0.72
18.40
9.38
12.57
1.92
0.21
0.25
0.34
0.30
0.66
0.18
1.37
12.33
3.08
20.22
1.79
0.42
0.27
0.37
0.25
1.68
0.71
1.10
1.45

SALIDA CANAL IRURO


Q SALIDA
(m3/seg)

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

28.72
42.25
63.85
67.02
65.95
60.25
53.82
47.01
41.01
34.33
28.34
25.62
39.93
57.05
64.86
68.55
66.14
60.54
54.27
47.62
41.20
34.57
29.05
23.05
31.03
45.57
65.55
68.92
65.75
60.07
53.66
46.68
40.72
34.68
28.69
22.91
41.03
53.16
67.01
67.40
65.72
60.09
53.75
46.77
40.49
33.69
28.43
22.16
34.09
38.93
59.42
63.51
62.98
57.39
51.09
44.08
38.84
32.85
27.33
22.47

ENTRADA PRECIP
PRECIP
(mm/mes)

4.84
17.59
19.95
1.62
1.22
5.64
17.29
17.77
5.71
3.98
1.64
11.46
17.31
18.14
3.58
1.27
1.14
22.17
11.44
12.63
2.02
2.05
16.12
4.31
21.06
1.92
2.20
1.66
2.30

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

0.57
2.21
3.27
0.26
0.16
0.63
2.35
2.51
0.93
0.64
0.18
1.40
2.24
3.00
0.57
0.16
0.12
3.07
1.56
2.09
0.32
0.23
2.05
0.51
3.37
0.30
0.28
0.18
0.24

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.27
0.26
0.30
0.51
0.64
0.67
0.74
0.77
0.58
0.46
0.44
0.42
0.32
0.29
0.30
0.52
0.64
0.68
0.75
0.77
0.58
0.46
0.45
0.40
0.29
0.26
0.30
0.52
0.64
0.67
0.74
0.77
0.58
0.46
0.45
0.40
0.32
0.28
0.30
0.51
0.64
0.67
0.74
0.77
0.58
0.45
0.45
0.40
0.30
0.24
0.29
0.50
0.63
0.66
0.73
0.75
0.57
0.45
0.44
0.40

29.01
44.20
66.82
66.76
65.31
59.58
53.07
46.24
40.59
33.87
27.90
25.82
41.96
59.27
65.49
68.67
65.50
59.87
53.52
46.85
40.62
34.11
28.78
22.65
32.15
47.55
68.24
68.98
65.11
59.40
52.92
45.91
40.31
34.22
28.25
22.63
43.77
54.44
68.80
67.21
65.08
59.41
53.01
46.00
39.91
33.23
28.22
21.76
35.85
39.20
62.50
63.31
62.35
56.73
50.36
43.33
38.55
32.41
27.07
22.31

VOL
REBOSE
(MMC)

0.566
0.509
2.418
1.990
2.726
2.546
0.954
-

NIVEL DE
AGUA
(msnm)
(2)

4,060.75
4,064.07
4,067.89
4,067.89
4,067.68
4,066.81
4,065.72
4,064.47
4,063.35
4,061.90
4,060.48
4,059.95
4,063.63
4,066.76
4,067.71
4,068.14
4,067.71
4,066.86
4,065.80
4,064.59
4,063.35
4,061.95
4,060.70
4,059.11
4,061.50
4,064.72
4,068.09
4,068.18
4,067.65
4,066.78
4,065.70
4,064.41
4,063.29
4,061.97
4,060.57
4,059.11
4,063.99
4,065.96
4,068.16
4,067.95
4,067.65
4,066.79
4,065.71
4,064.42
4,063.21
4,061.75
4,060.56
4,058.87
4,062.34
4,063.06
4,067.27
4,067.39
4,067.24
4,066.35
4,065.24
4,063.90
4,062.92
4,061.56
4,060.27
4,059.02

AREA
ESPEJO
(Km2)
(2)

3.77
4.48
5.29
5.29
5.25
5.06
4.83
4.56
4.33
4.02
3.71
3.60
4.38
5.05
5.26
5.35
5.26
5.07
4.85
4.59
4.33
4.03
3.76
3.42
3.93
4.62
5.34
5.36
5.24
5.06
4.83
4.55
4.31
4.03
3.73
3.42
4.46
4.88
5.35
5.31
5.24
5.06
4.83
4.56
4.30
3.99
3.73
3.37
4.11
4.26
5.16
5.19
5.16
4.97
4.73
4.44
4.23
3.94
3.67
3.40

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

43.78%
66.71%
100.85%
100.77%
98.57%
89.93%
80.10%
69.79%
61.26%
51.13%
42.11%
38.98%
63.33%
89.46%
98.85%
103.65%
98.86%
90.36%
80.78%
70.71%
61.31%
51.49%
43.44%
34.19%
48.52%
71.76%
103.00%
104.11%
98.27%
89.65%
79.88%
69.29%
60.83%
51.65%
42.63%
34.16%
66.07%
82.17%
103.84%
101.44%
98.23%
89.67%
80.00%
69.43%
60.24%
50.16%
42.59%
32.85%
54.11%
59.17%
94.34%
95.56%
94.11%
85.62%
76.02%
65.40%
58.19%
48.91%
40.86%
33.68%

OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

MAXIMA
CAPACIDAD
(MMC)

66.25

66.25

66.25

66.25

63.31

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO26
F
M
A
M
J
J
A
S
O
N
D
AO27
F
M
A
M
J
J
A
S
O
N
D
AO28
F
M
A
M
J
J
A
S
O
N
D
AO29
F
M
A
M
J
J
A
S
O
N
D
AO30
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

22.31
36.10
50.11
63.88
65.14
64.26
58.67
52.27
45.28
39.33
33.00
28.15
26.01
40.83
56.57
66.25
65.94
65.09
59.51
52.98
46.05
39.30
33.01
26.85
22.65
35.60
53.20
66.25
66.25
65.51
59.88
53.55
46.49
39.99
33.76
28.13
21.67
34.11
46.67
66.25
66.25
65.59
59.97
53.55
46.54
40.23
33.64
27.88
22.78
32.05
42.29
60.46
61.81
60.78
55.18
48.70
41.69
35.51
29.68
24.45

NIVEL DE
AGUA
(msnm)
(1)

4,059.02
4,062.39
4,065.19
4,067.47
4,067.66
4,067.53
4,066.67
4,065.58
4,064.28
4,063.08
4,061.70
4,060.54
4,060.00
4,063.40
4,066.32
4,068.65
4,067.77
4,067.65
4,066.80
4,065.71
4,064.43
4,063.08
4,061.70
4,060.22
4,059.11
4,062.28
4,065.75
4,068.31
4,067.88
4,067.71
4,066.86
4,065.81
4,064.52
4,063.22
4,061.87
4,060.54
4,058.84
4,061.95
4,064.55
4,068.02
4,068.10
4,067.72
4,066.87
4,065.81
4,064.53
4,063.27
4,061.84
4,060.48
4,059.15
4,061.48
4,063.69
4,066.95
4,067.16
4,067.00
4,066.09
4,064.93
4,063.57
4,062.26
4,060.92
4,059.60

AREA
ESPEJO
(Km2)
(1)

3.40
4.12
4.72
5.21
5.24
5.22
5.03
4.80
4.53
4.27
3.97
3.73
3.61
4.34
4.96
5.46
5.27
5.24
5.06
4.83
4.56
4.27
3.97
3.66
3.42
4.10
4.84
5.38
5.29
5.26
5.07
4.85
4.57
4.30
4.01
3.73
3.36
4.03
4.58
5.32
5.34
5.26
5.08
4.85
4.58
4.31
4.01
3.71
3.43
3.93
4.40
5.09
5.14
5.11
4.91
4.66
4.37
4.09
3.81
3.53

ENTRADA IRURO
Q ENTRADA
(m3/seg)

4.51
5.06
4.50
0.84
0.19
0.12
0.13
0.12
0.31
0.20
0.59
1.39
4.85
5.68
5.27
0.38
0.20
0.13
0.08
0.14
0.00
0.21
0.17
0.72
4.24
6.34
5.45
0.58
0.24
0.11
0.16
0.09
0.10
0.24
0.33
0.00
4.07
4.54
6.83
1.13
0.27
0.12
0.12
0.11
0.17
0.10
0.29
0.44
3.06
3.72
5.91
0.87
0.13
0.11
0.09
0.10
0.21
0.32
0.45
1.48

VOL
ENTRADA
(MMC)

12.07
12.24
12.06
2.18
0.50
0.32
0.34
0.31
0.80
0.52
1.52
3.72
12.98
13.73
14.11
0.97
0.54
0.33
0.21
0.38
0.57
0.44
1.94
11.35
15.33
14.61
1.52
0.65
0.28
0.42
0.25
0.26
0.63
0.84
10.91
11.00
18.30
2.93
0.72
0.30
0.33
0.30
0.45
0.27
0.74
1.17
8.19
8.99
15.82
2.26
0.34
0.29
0.24
0.27
0.54
0.86
1.17
3.97

SALIDA CANAL IRURO


Q SALIDA
(m3/seg)

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

34.39
48.34
62.17
65.28
64.89
59.33
53.00
46.04
39.90
33.45
28.34
25.81
38.98
54.56
70.68
66.45
65.73
60.18
53.72
46.82
39.88
33.47
27.28
22.73
34.00
50.92
67.81
66.99
66.15
60.55
54.29
47.26
40.57
34.22
28.43
22.07
32.58
45.10
64.97
68.41
66.23
60.64
54.29
47.31
40.81
34.09
28.20
22.99
30.97
41.04
58.11
61.94
61.41
55.83
49.41
42.43
36.06
29.97
24.68
22.37

ENTRADA PRECIP
PRECIP
(mm/mes)

15.75
15.43
12.46
2.31
2.26
5.53
16.09
16.48
13.90
3.05
14.89
18.86
14.59
1.59
1.26
14.56
14.28
18.49
3.05
1.11
1.83
11.21
12.16
16.70
2.44
1.22
1.84
6.24

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

2.01
2.04
2.01
0.36
0.25
0.62
2.16
2.29
2.35
0.32
1.89
2.55
2.44
0.25
0.14
1.82
1.83
3.05
0.49
0.12
0.19
1.36
1.50
2.64
0.38
0.14
0.19
0.66

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.30
0.27
0.29
0.51
0.63
0.67
0.74
0.76
0.57
0.45
0.44
0.42
0.31
0.28
0.31
0.51
0.64
0.67
0.74
0.77
0.57
0.45
0.44
0.40
0.30
0.28
0.30
0.51
0.64
0.68
0.75
0.77
0.58
0.46
0.45
0.40
0.29
0.26
0.30
0.52
0.64
0.68
0.75
0.77
0.58
0.46
0.44
0.40
0.28
0.25
0.29
0.50
0.62
0.65
0.72
0.73
0.55
0.43
0.42
0.40

36.10
50.11
63.88
65.14
64.26
58.67
52.27
45.28
39.33
33.00
28.15
26.01
40.83
56.57
72.72
65.94
65.09
59.51
52.98
46.05
39.30
33.01
26.85
22.65
35.60
53.20
69.94
66.73
65.51
59.88
53.55
46.49
39.99
33.76
28.13
21.67
34.11
46.67
67.72
68.38
65.59
59.97
53.55
46.54
40.23
33.64
27.88
22.78
32.05
42.29
60.46
61.81
60.78
55.18
48.70
41.69
35.51
29.68
24.45
22.63

VOL
REBOSE
(MMC)

6.467
3.687
0.479
1.468
2.122
-

NIVEL DE
AGUA
(msnm)
(2)

4,062.39
4,065.19
4,067.47
4,067.66
4,067.53
4,066.67
4,065.58
4,064.28
4,063.08
4,061.70
4,060.54
4,060.00
4,063.40
4,066.32
4,068.65
4,067.77
4,067.65
4,066.80
4,065.71
4,064.43
4,063.08
4,061.70
4,060.22
4,059.11
4,062.28
4,065.75
4,068.31
4,067.88
4,067.71
4,066.86
4,065.81
4,064.52
4,063.22
4,061.87
4,060.54
4,058.84
4,061.95
4,064.55
4,068.02
4,068.10
4,067.72
4,066.87
4,065.81
4,064.53
4,063.27
4,061.84
4,060.48
4,059.15
4,061.48
4,063.69
4,066.95
4,067.16
4,067.00
4,066.09
4,064.93
4,063.57
4,062.26
4,060.92
4,059.60
4,059.10

AREA
ESPEJO
(Km2)
(2)

4.12
4.72
5.21
5.24
5.22
5.03
4.80
4.53
4.27
3.97
3.73
3.61
4.34
4.96
5.46
5.27
5.24
5.06
4.83
4.56
4.27
3.97
3.66
3.42
4.10
4.84
5.38
5.29
5.26
5.07
4.85
4.57
4.30
4.01
3.73
3.36
4.03
4.58
5.32
5.34
5.26
5.08
4.85
4.58
4.31
4.01
3.71
3.43
3.93
4.40
5.09
5.14
5.11
4.91
4.66
4.37
4.09
3.81
3.53
3.42

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

54.49%
75.63%
96.42%
98.32%
96.98%
88.55%
78.89%
68.34%
59.36%
49.80%
42.49%
39.25%
61.63%
85.38%
109.76%
99.52%
98.24%
89.82%
79.96%
69.51%
59.32%
49.83%
40.52%
34.19%
53.73%
80.30%
105.56%
100.72%
98.88%
90.37%
80.82%
70.16%
60.36%
50.96%
42.45%
32.71%
51.48%
70.44%
102.21%
103.20%
98.99%
90.51%
80.82%
70.24%
60.72%
50.77%
42.08%
34.39%
48.38%
63.82%
91.25%
93.30%
91.74%
83.28%
73.50%
62.93%
53.60%
44.80%
36.91%
34.15%

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

MAXIMA
CAPACIDAD
(MMC)

65.14

66.25

66.25

66.25

61.81

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO31
F
M
A
M
J
J
A
S
O
N
D
AO32
F
M
A
M
J
J
A
S
O
N
D
AO33
F
M
A
M
J
J
A
S
O
N
D
AO34
F
M
A
M
J
J
A
S
O
N
D
AO35
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

22.63
38.41
54.43
64.84
66.25
65.27
59.61
53.25
46.35
40.38
33.92
28.25
26.94
34.20
44.02
59.88
62.43
61.70
56.11
49.78
42.88
37.36
30.70
25.37
23.83
36.40
44.60
66.25
66.25
65.28
59.69
53.29
46.37
39.95
33.82
28.31
24.37
39.20
46.63
61.19
63.05
62.15
56.52
50.06
43.14
37.52
31.25
26.22
24.56
30.98
45.06
66.25
65.45
64.44
58.79
52.56
45.65
39.46
32.95
26.98

NIVEL DE
AGUA
(msnm)
(1)

4,059.10
4,062.89
4,065.96
4,067.61
4,067.83
4,067.68
4,066.82
4,065.75
4,064.49
4,063.30
4,061.91
4,060.57
4,060.24
4,061.97
4,064.04
4,066.86
4,067.26
4,067.15
4,066.25
4,065.13
4,063.81
4,062.67
4,061.16
4,059.84
4,059.43
4,062.46
4,064.15
4,068.05
4,067.99
4,067.68
4,066.83
4,065.76
4,064.49
4,063.21
4,061.88
4,060.58
4,059.57
4,063.06
4,064.54
4,067.07
4,067.35
4,067.21
4,066.31
4,065.18
4,063.86
4,062.70
4,061.29
4,060.06
4,059.62
4,061.23
4,064.24
4,067.93
4,067.70
4,067.56
4,066.69
4,065.63
4,064.36
4,063.11
4,061.69
4,060.25

AREA
ESPEJO
(Km2)
(1)

3.42
4.23
4.88
5.24
5.28
5.25
5.07
4.84
4.57
4.32
4.02
3.73
3.66
4.03
4.47
5.07
5.16
5.14
4.94
4.71
4.42
4.18
3.86
3.58
3.49
4.14
4.50
5.33
5.32
5.25
5.07
4.84
4.57
4.30
4.01
3.74
3.52
4.26
4.58
5.12
5.18
5.15
4.96
4.72
4.44
4.19
3.89
3.62
3.53
3.87
4.52
5.30
5.25
5.22
5.04
4.81
4.54
4.28
3.97
3.66

ENTRADA IRURO
Q ENTRADA
(m3/seg)

5.15
5.78
3.42
0.93
0.15
0.10
0.14
0.15
0.30
0.15
0.31
1.66
2.42
3.57
5.17
1.27
0.24
0.12
0.15
0.14
0.40
0.06
0.42
1.58
4.12
3.00
7.58
0.86
0.16
0.13
0.13
0.14
0.13
0.28
0.37
0.81
4.84
2.73
4.75
1.04
0.18
0.11
0.10
0.14
0.37
0.21
0.52
1.54
2.14
5.08
7.14
0.19
0.14
0.10
0.19
0.15
0.21
0.13
0.25
1.73

VOL
ENTRADA
(MMC)

13.79
13.98
9.17
2.42
0.41
0.25
0.38
0.41
0.78
0.40
0.81
4.43
6.48
8.64
13.83
3.29
0.64
0.30
0.40
0.37
1.04
0.17
1.09
4.23
11.02
7.25
20.29
2.22
0.42
0.32
0.35
0.38
0.33
0.74
0.95
2.17
12.97
6.60
12.73
2.69
0.48
0.27
0.27
0.36
0.96
0.57
1.35
4.12
5.75
12.29
19.11
0.49
0.37
0.26
0.52
0.40
0.56
0.34
0.64
4.63

SALIDA CANAL IRURO


Q SALIDA
(m3/seg)

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

36.41
52.38
63.61
66.48
65.91
60.29
53.99
47.12
40.96
34.38
28.56
26.63
33.41
42.84
57.86
62.38
62.33
56.77
50.50
43.62
37.75
31.13
25.61
23.54
34.86
43.65
64.89
67.69
65.92
60.36
54.04
47.14
40.53
34.28
28.60
24.42
37.34
45.79
59.36
63.11
62.78
57.18
50.79
43.89
37.93
31.69
26.43
24.28
30.30
43.27
64.17
65.96
65.08
59.46
53.30
46.42
40.04
33.40
27.41
25.55

ENTRADA PRECIP
PRECIP
(mm/mes)

17.53
17.04
9.42
2.54
1.21
6.51
8.63
11.49
14.66
3.54
1.39
1.69
6.51
14.33
9.60
20.47
2.32
1.42
3.31
16.36
8.57
13.37
2.88
1.27
2.08
6.27
7.97
16.20
19.38
6.90

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

2.30
2.33
1.53
0.40
0.14
0.74
1.08
1.44
2.31
0.55
0.17
0.18
0.70
1.84
1.21
3.38
0.37
0.16
0.36
2.16
1.10
2.12
0.45
0.16
0.23
0.69
0.96
2.05
3.19
0.77

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.31
0.28
0.29
0.51
0.64
0.67
0.74
0.77
0.58
0.46
0.44
0.43
0.29
0.25
0.29
0.50
0.62
0.65
0.72
0.74
0.56
0.44
0.42
0.41
0.30
0.26
0.30
0.51
0.64
0.67
0.75
0.77
0.58
0.46
0.45
0.41
0.31
0.26
0.29
0.50
0.63
0.66
0.72
0.74
0.56
0.44
0.43
0.41
0.28
0.26
0.30
0.51
0.64
0.67
0.74
0.76
0.58
0.45
0.44
0.42

38.41
54.43
64.84
66.37
65.27
59.61
53.25
46.35
40.38
33.92
28.25
26.94
34.20
44.02
59.88
62.43
61.70
56.11
49.78
42.88
37.36
30.70
25.37
23.83
36.40
44.60
67.97
67.55
65.28
59.69
53.29
46.37
39.95
33.82
28.31
24.37
39.20
46.63
61.19
63.05
62.15
56.52
50.06
43.14
37.52
31.25
26.22
24.56
30.98
45.06
67.06
65.45
64.44
58.79
52.56
45.65
39.46
32.95
26.98
25.89

VOL
REBOSE
(MMC)

0.119
1.716
1.293
0.802
-

NIVEL DE
AGUA
(msnm)
(2)

4,062.89
4,065.96
4,067.61
4,067.83
4,067.68
4,066.82
4,065.75
4,064.49
4,063.30
4,061.91
4,060.57
4,060.24
4,061.97
4,064.04
4,066.86
4,067.26
4,067.15
4,066.25
4,065.13
4,063.81
4,062.67
4,061.16
4,059.84
4,059.43
4,062.46
4,064.15
4,068.05
4,067.99
4,067.68
4,066.83
4,065.76
4,064.49
4,063.21
4,061.88
4,060.58
4,059.57
4,063.06
4,064.54
4,067.07
4,067.35
4,067.21
4,066.31
4,065.18
4,063.86
4,062.70
4,061.29
4,060.06
4,059.62
4,061.23
4,064.24
4,067.93
4,067.70
4,067.56
4,066.69
4,065.63
4,064.36
4,063.11
4,061.69
4,060.25
4,059.97

AREA
ESPEJO
(Km2)
(2)

4.23
4.88
5.24
5.28
5.25
5.07
4.84
4.57
4.32
4.02
3.73
3.66
4.03
4.47
5.07
5.16
5.14
4.94
4.71
4.42
4.18
3.86
3.58
3.49
4.14
4.50
5.33
5.32
5.25
5.07
4.84
4.57
4.30
4.01
3.74
3.52
4.26
4.58
5.12
5.18
5.15
4.96
4.72
4.44
4.19
3.89
3.62
3.53
3.87
4.52
5.30
5.25
5.22
5.04
4.81
4.54
4.28
3.97
3.66
3.61

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

57.97%
82.16%
97.87%
100.18%
98.52%
89.98%
80.37%
69.96%
60.95%
51.20%
42.64%
40.66%
51.62%
66.44%
90.37%
94.23%
93.13%
84.69%
75.14%
64.72%
56.39%
46.33%
38.29%
35.97%
54.93%
67.32%
102.59%
101.95%
98.53%
90.09%
80.44%
69.98%
60.29%
51.05%
42.73%
36.79%
59.16%
70.38%
92.36%
95.17%
93.81%
85.31%
75.56%
65.11%
56.64%
47.16%
39.58%
37.06%
46.76%
68.01%
101.21%
98.79%
97.26%
88.73%
79.33%
68.91%
59.56%
49.73%
40.72%
39.08%

OK
OK
OK
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK

MAXIMA
CAPACIDAD
(MMC)

66.25

62.43

66.25

63.05

66.25

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO36
F
M
A
M
J
J
A
S
O
N
D
AO37
F
M
A
M
J
J
A
S
O
N
D
AO38
F
M
A
M
J
J
A
S
O
N
D
AO39
F
M
A
M
J
J
A
S
O
N
D
AO40
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

25.89
40.44
57.56
66.25
66.25
65.19
59.52
53.13
46.49
41.84
35.64
29.65
24.39
28.38
47.53
64.35
65.43
64.34
58.65
52.41
45.41
39.88
33.43
28.88
24.78
42.19
50.98
66.25
66.25
65.19
59.47
52.93
45.96
39.91
33.61
27.40
23.24
36.93
45.51
62.98
63.72
62.64
56.99
50.55
43.63
37.16
31.28
25.84
24.30
29.29
45.77
66.25
66.25
65.42
59.80
53.22
46.57
40.18
33.97
28.45

NIVEL DE
AGUA
(msnm)
(1)

4,059.97
4,063.32
4,066.49
4,068.58
4,067.94
4,067.66
4,066.80
4,065.73
4,064.52
4,063.60
4,062.29
4,060.91
4,059.58
4,060.60
4,064.71
4,067.54
4,067.70
4,067.54
4,066.66
4,065.61
4,064.31
4,063.20
4,061.80
4,060.72
4,059.68
4,063.67
4,065.35
4,068.20
4,068.08
4,067.66
4,066.80
4,065.70
4,064.42
4,063.21
4,061.84
4,060.36
4,059.27
4,062.57
4,064.33
4,067.34
4,067.45
4,067.29
4,066.39
4,065.27
4,063.96
4,062.62
4,061.30
4,059.96
4,059.55
4,060.82
4,064.38
4,068.00
4,068.11
4,067.70
4,066.85
4,065.75
4,064.53
4,063.26
4,061.92
4,060.62

AREA
ESPEJO
(Km2)
(1)

3.61
4.32
4.99
5.44
5.30
5.25
5.06
4.83
4.58
4.38
4.10
3.81
3.52
3.74
4.62
5.22
5.25
5.22
5.03
4.81
4.53
4.29
4.00
3.77
3.54
4.40
4.75
5.36
5.33
5.25
5.06
4.83
4.55
4.30
4.00
3.69
3.46
4.16
4.53
5.18
5.20
5.17
4.97
4.74
4.46
4.17
3.89
3.60
3.52
3.79
4.55
5.32
5.34
5.25
5.07
4.84
4.58
4.31
4.02
3.74

ENTRADA IRURO
Q ENTRADA
(m3/seg)

4.76
6.17
4.76
0.72
0.12
0.09
0.13
0.25
0.70
0.25
0.25
0.39
1.37
6.88
5.48
0.78
0.11
0.08
0.19
0.12
0.40
0.15
0.69
0.76
5.68
3.21
5.91
1.07
0.12
0.07
0.08
0.13
0.27
0.21
0.15
0.74
4.48
3.13
5.68
0.67
0.11
0.10
0.11
0.14
0.10
0.31
0.38
1.58
1.69
5.93
7.08
1.15
0.21
0.11
0.06
0.25
0.14
0.25
0.36
0.31

VOL
ENTRADA
(MMC)

12.74
14.92
12.74
1.87
0.33
0.24
0.35
0.68
1.81
0.68
0.64
1.04
3.66
16.64
14.67
2.02
0.30
0.21
0.50
0.31
1.04
0.41
1.78
2.03
15.20
7.77
15.83
2.78
0.33
0.19
0.21
0.33
0.70
0.56
0.40
1.98
11.99
7.58
15.22
1.73
0.30
0.25
0.29
0.37
0.26
0.83
0.99
4.23
4.51
14.35
18.95
2.99
0.56
0.29
0.17
0.66
0.36
0.66
0.94
0.84

SALIDA CANAL IRURO


Q SALIDA
(m3/seg)

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

38.63
55.36
70.30
67.34
65.83
60.19
53.87
47.26
42.13
36.11
30.10
24.63
28.05
45.02
62.20
65.60
64.98
59.32
53.15
46.17
40.28
33.88
29.03
24.85
39.98
49.96
66.81
68.26
65.83
60.15
53.68
46.73
40.49
34.07
27.84
23.32
35.23
44.51
60.73
63.93
63.27
57.65
51.28
44.38
37.72
31.59
26.10
24.00
28.81
43.64
64.72
68.46
66.06
60.47
53.97
47.34
40.76
34.43
28.74
23.23

ENTRADA PRECIP
PRECIP
(mm/mes)

15.85
17.78
12.59
1.95
2.29
1.58
5.26
21.45
15.11
2.14
1.35
2.62
3.08
18.59
9.73
15.87
2.89
3.07
15.50
9.95
15.81
1.85
1.15
1.53
6.46
6.41
18.79
19.16
3.11
1.39
1.32

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

2.12
2.49
2.12
0.31
0.30
0.17
0.61
2.77
2.45
0.34
0.17
0.30
0.34
2.53
1.29
2.64
0.46
0.33
2.00
1.26
2.54
0.29
0.14
0.17
0.70
0.75
2.39
3.16
0.50
0.16
0.14

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.31
0.29
0.31
0.51
0.64
0.67
0.74
0.77
0.59
0.47
0.46
0.41
0.27
0.26
0.29
0.51
0.64
0.67
0.74
0.76
0.58
0.45
0.45
0.41
0.32
0.27
0.30
0.52
0.64
0.67
0.74
0.77
0.58
0.46
0.44
0.41
0.30
0.26
0.29
0.50
0.63
0.66
0.73
0.75
0.56
0.44
0.43
0.41
0.27
0.26
0.30
0.52
0.64
0.67
0.74
0.77
0.58
0.46
0.45
0.40

40.44
57.56
72.12
67.14
65.19
59.52
53.13
46.49
41.84
35.64
29.65
24.39
28.38
47.53
64.35
65.43
64.34
58.65
52.41
45.41
39.88
33.43
28.88
24.78
42.19
50.98
69.15
68.20
65.19
59.47
52.93
45.96
39.91
33.61
27.40
23.24
36.93
45.51
62.98
63.72
62.64
56.99
50.55
43.63
37.16
31.28
25.84
24.30
29.29
45.77
67.58
68.44
65.42
59.80
53.22
46.57
40.18
33.97
28.45
22.97

VOL
REBOSE
(MMC)

5.865
0.886
2.891
1.949
1.328
2.190
-

NIVEL DE
AGUA
(msnm)
(2)

4,063.32
4,066.49
4,068.58
4,067.94
4,067.66
4,066.80
4,065.73
4,064.52
4,063.60
4,062.29
4,060.91
4,059.58
4,060.60
4,064.71
4,067.54
4,067.70
4,067.54
4,066.66
4,065.61
4,064.31
4,063.20
4,061.80
4,060.72
4,059.68
4,063.67
4,065.35
4,068.20
4,068.08
4,067.66
4,066.80
4,065.70
4,064.42
4,063.21
4,061.84
4,060.36
4,059.27
4,062.57
4,064.33
4,067.34
4,067.45
4,067.29
4,066.39
4,065.27
4,063.96
4,062.62
4,061.30
4,059.96
4,059.55
4,060.82
4,064.38
4,068.00
4,068.11
4,067.70
4,066.85
4,065.75
4,064.53
4,063.26
4,061.92
4,060.62
4,059.20

AREA
ESPEJO
(Km2)
(2)

4.32
4.99
5.44
5.30
5.25
5.06
4.83
4.58
4.38
4.10
3.81
3.52
3.74
4.62
5.22
5.25
5.22
5.03
4.81
4.53
4.29
4.00
3.77
3.54
4.40
4.75
5.36
5.33
5.25
5.06
4.83
4.55
4.30
4.00
3.69
3.46
4.16
4.53
5.18
5.20
5.17
4.97
4.74
4.46
4.17
3.89
3.60
3.52
3.79
4.55
5.32
5.34
5.25
5.07
4.84
4.58
4.31
4.02
3.74
3.44

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

61.04%
86.88%
108.85%
101.34%
98.40%
89.83%
80.18%
70.17%
63.15%
53.80%
44.75%
36.81%
42.84%
71.74%
97.13%
98.75%
97.11%
88.52%
79.10%
68.54%
60.19%
50.46%
43.59%
37.40%
63.68%
76.95%
104.36%
102.94%
98.40%
89.77%
79.89%
69.37%
60.24%
50.73%
41.36%
35.08%
55.74%
68.69%
95.05%
96.17%
94.54%
86.02%
76.30%
65.86%
56.09%
47.22%
39.00%
36.67%
44.21%
69.09%
102.00%
103.31%
98.74%
90.25%
80.33%
70.29%
60.64%
51.27%
42.94%
34.67%

OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK

MAXIMA
CAPACIDAD
(MMC)

66.25

65.43

66.25

63.72

66.25

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO41
F
M
A
M
J
J
A
S
O
N
D
AO42
F
M
A
M
J
J
A
S
O
N
D
AO43
F
M
A
M
J
J
A
S
O
N
D
AO44
F
M
A
M
J
J
A
S
O
N
D
AO45
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

22.97
37.13
47.58
65.29
64.01
62.98
57.35
50.97
44.11
38.65
32.33
26.66
24.67
39.50
50.59
66.25
65.39
64.28
58.63
52.28
45.17
39.57
33.04
27.13
21.90
42.32
47.70
60.78
60.45
59.54
53.93
47.52
40.81
35.22
28.81
22.78
21.59
38.30
41.44
58.77
60.34
59.45
53.87
47.44
40.67
36.61
30.44
25.05
24.23
33.31
45.65
65.54
65.19
64.18
58.55
52.22
45.30
38.76
32.59
26.49

NIVEL DE
AGUA
(msnm)
(1)

4,059.20
4,062.62
4,064.72
4,067.68
4,067.49
4,067.34
4,066.45
4,065.35
4,064.05
4,062.94
4,061.54
4,060.17
4,059.65
4,063.12
4,065.28
4,068.51
4,067.69
4,067.53
4,066.66
4,065.58
4,064.26
4,063.13
4,061.71
4,060.29
4,058.90
4,063.70
4,064.75
4,067.00
4,066.95
4,066.81
4,065.87
4,064.71
4,063.39
4,062.20
4,060.71
4,059.15
4,058.82
4,062.87
4,063.52
4,066.68
4,066.93
4,066.79
4,065.86
4,064.70
4,063.36
4,062.50
4,061.10
4,059.75
4,059.54
4,061.77
4,064.36
4,067.71
4,067.66
4,067.52
4,066.65
4,065.57
4,064.29
4,062.97
4,061.60
4,060.13

AREA
ESPEJO
(Km2)
(1)

3.44
4.17
4.62
5.25
5.21
5.18
4.99
4.75
4.48
4.24
3.94
3.65
3.54
4.28
4.74
5.43
5.25
5.22
5.03
4.80
4.52
4.28
3.98
3.67
3.38
4.40
4.62
5.10
5.09
5.06
4.86
4.62
4.34
4.08
3.76
3.43
3.36
4.22
4.36
5.04
5.09
5.06
4.86
4.61
4.33
4.15
3.85
3.56
3.51
3.99
4.54
5.26
5.25
5.21
5.03
4.80
4.53
4.24
3.95
3.64

ENTRADA IRURO
Q ENTRADA
(m3/seg)

4.63
3.80
5.76
0.00
0.13
0.10
0.13
0.16
0.42
0.20
0.31
1.44
4.84
4.02
6.81
0.16
0.11
0.10
0.15
0.07
0.38
0.12
0.27
0.39
6.64
2.00
4.28
0.36
0.17
0.11
0.11
0.21
0.37
0.16
0.21
1.68
5.45
1.20
5.64
0.94
0.18
0.12
0.10
0.19
0.88
0.25
0.40
1.81
3.00
4.47
6.46
0.36
0.14
0.11
0.15
0.14
0.08
0.25
0.20
0.72

VOL
ENTRADA
(MMC)

12.39
9.19
15.43
0.35
0.27
0.35
0.43
1.10
0.54
0.80
3.84
12.97
9.74
18.23
0.42
0.28
0.26
0.39
0.19
0.98
0.33
0.71
1.04
17.78
4.84
11.45
0.94
0.46
0.28
0.30
0.56
0.97
0.43
0.55
4.51
14.58
2.90
15.10
2.44
0.48
0.30
0.27
0.50
2.29
0.67
1.03
4.84
8.03
10.80
17.30
0.93
0.37
0.29
0.41
0.37
0.21
0.68
0.51
1.93

SALIDA CANAL IRURO


Q SALIDA
(m3/seg)

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

35.36
46.31
63.02
64.51
63.62
58.01
51.70
44.86
39.03
32.78
26.96
24.45
37.65
49.23
68.82
65.90
64.92
59.30
53.02
45.93
39.98
33.49
27.57
22.12
39.67
47.16
59.16
60.94
60.16
54.58
48.23
41.54
35.60
29.24
23.19
21.23
36.17
41.20
56.54
60.43
60.07
54.52
48.14
41.39
36.78
30.87
25.30
23.83
32.26
44.11
62.95
65.70
64.81
59.22
52.96
46.05
39.33
33.04
26.92
22.36

ENTRADA PRECIP
PRECIP
(mm/mes)

15.98
11.84
15.81
1.44
1.22
5.84
16.30
12.23
18.07
1.28
1.07
1.66
21.72
6.24
12.06
1.31
7.21
18.57
3.96
16.12
2.66
3.07
1.61
7.41
10.82
14.16
17.70
3.05

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

2.07
1.53
2.57
0.18
0.13
0.64
2.16
1.62
3.04
0.16
0.17
2.96
0.81
1.91
0.16
0.75
2.43
0.48
2.52
0.41
0.38
0.17
0.81
1.34
1.80
2.88
0.32

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.30
0.26
0.30
0.50
0.63
0.66
0.73
0.75
0.57
0.45
0.43
0.41
0.31
0.27
0.31
0.51
0.64
0.67
0.74
0.76
0.58
0.45
0.44
0.40
0.32
0.26
0.29
0.49
0.62
0.65
0.71
0.73
0.55
0.43
0.41
0.39
0.31
0.25
0.28
0.49
0.62
0.64
0.71
0.72
0.55
0.43
0.42
0.41
0.29
0.26
0.30
0.51
0.63
0.67
0.73
0.76
0.57
0.45
0.43
0.39

37.13
47.58
65.29
64.01
62.98
57.35
50.97
44.11
38.65
32.33
26.66
24.67
39.50
50.59
71.55
65.39
64.28
58.63
52.28
45.17
39.57
33.04
27.13
21.90
42.32
47.70
60.78
60.45
59.54
53.93
47.52
40.81
35.22
28.81
22.78
21.59
38.30
41.44
58.77
60.34
59.45
53.87
47.44
40.67
36.61
30.44
25.05
24.23
33.31
45.65
65.54
65.19
64.18
58.55
52.22
45.30
38.76
32.59
26.49
22.29

VOL
REBOSE
(MMC)

5.299
-

NIVEL DE
AGUA
(msnm)
(2)

4,062.62
4,064.72
4,067.68
4,067.49
4,067.34
4,066.45
4,065.35
4,064.05
4,062.94
4,061.54
4,060.17
4,059.65
4,063.12
4,065.28
4,068.51
4,067.69
4,067.53
4,066.66
4,065.58
4,064.26
4,063.13
4,061.71
4,060.29
4,058.90
4,063.70
4,064.75
4,067.00
4,066.95
4,066.81
4,065.87
4,064.71
4,063.39
4,062.20
4,060.71
4,059.15
4,058.82
4,062.87
4,063.52
4,066.68
4,066.93
4,066.79
4,065.86
4,064.70
4,063.36
4,062.50
4,061.10
4,059.75
4,059.54
4,061.77
4,064.36
4,067.71
4,067.66
4,067.52
4,066.65
4,065.57
4,064.29
4,062.97
4,061.60
4,060.13
4,059.01

AREA
ESPEJO
(Km2)
(2)

4.17
4.62
5.25
5.21
5.18
4.99
4.75
4.48
4.24
3.94
3.65
3.54
4.28
4.74
5.43
5.25
5.22
5.03
4.80
4.52
4.28
3.98
3.67
3.38
4.40
4.62
5.10
5.09
5.06
4.86
4.62
4.34
4.08
3.76
3.43
3.36
4.22
4.36
5.04
5.09
5.06
4.86
4.61
4.33
4.15
3.85
3.56
3.51
3.99
4.54
5.26
5.25
5.21
5.03
4.80
4.53
4.24
3.95
3.64
3.40

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

56.04%
71.82%
98.55%
96.61%
95.06%
86.56%
76.93%
66.57%
58.33%
48.80%
40.24%
37.24%
59.61%
76.35%
108.00%
98.69%
97.03%
88.50%
78.91%
68.17%
59.72%
49.86%
40.95%
33.05%
63.87%
72.00%
91.73%
91.23%
89.87%
81.40%
71.73%
61.60%
53.15%
43.49%
34.39%
32.59%
57.81%
62.54%
88.70%
91.08%
89.74%
81.31%
71.60%
61.38%
55.26%
45.94%
37.80%
36.57%
50.27%
68.90%
98.92%
98.39%
96.86%
88.38%
78.82%
68.37%
58.51%
49.19%
39.98%
33.64%

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
REBOSE
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

MAXIMA
CAPACIDAD
(MMC)

65.29

66.25

60.78

60.34

65.54

SIMULACIN DE EMBALSE Y DESEMBALSE DE LA PRESA IRURO - 50 AOS

8.8

CAPACIDAD MAXIMA DEL EMBALSE (MMC)


66.255
AO

DIAS

AO46
F
M
A
M
J
J
A
S
O
N
D
AO47
F
M
A
M
J
J
A
S
O
N
D
AO48
F
M
A
M
J
J
A
S
O
N
D
AO49
F
M
A
M
J
J
A
S
O
N
D
AO50
F
M
A
M
J
J
A
S
O
N
D

31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31
31
28
31
30
31
30
31
31
30
31
30
31

VOLUMEN
DE AGUA
(MMC)

22.29
39.11
47.70
62.32
65.27
64.45
58.81
52.35
45.69
41.02
34.53
28.52
22.45
31.39
45.39
61.54
61.96
61.21
55.63
49.17
42.38
37.11
30.77
25.37
20.93
25.51
44.64
62.66
61.87
60.76
55.08
48.79
41.95
36.28
30.03
24.65
21.33
28.80
36.93
58.75
59.63
58.74
53.18
46.86
40.06
34.96
29.10
23.41
19.15
39.62
55.25
61.38
61.48
60.42
54.76
48.47
41.68
35.62
29.28
23.70

NIVEL DE
AGUA
(msnm)
(1)

4,059.01
4,063.04
4,064.75
4,067.24
4,067.67
4,067.56
4,066.69
4,065.60
4,064.36
4,063.43
4,062.05
4,060.63
4,059.06
4,061.32
4,064.31
4,067.12
4,067.18
4,067.07
4,066.16
4,065.02
4,063.71
4,062.61
4,061.18
4,059.84
4,058.63
4,059.87
4,064.16
4,067.29
4,067.17
4,067.00
4,066.07
4,064.95
4,063.62
4,062.43
4,061.00
4,059.65
4,058.75
4,060.70
4,062.57
4,066.68
4,066.82
4,066.68
4,065.74
4,064.59
4,063.24
4,062.14
4,060.78
4,059.32
4,058.12
4,063.15
4,066.10
4,067.10
4,067.11
4,066.95
4,066.01
4,064.89
4,063.57
4,062.29
4,060.82
4,059.39

AREA
ESPEJO
(Km2)
(1)

3.40
4.26
4.62
5.16
5.25
5.22
5.04
4.81
4.54
4.34
4.05
3.75
3.41
3.89
4.53
5.13
5.14
5.12
4.93
4.68
4.40
4.17
3.86
3.58
3.32
3.58
4.50
5.17
5.14
5.10
4.91
4.67
4.38
4.13
3.83
3.54
3.34
3.76
4.16
5.04
5.07
5.04
4.84
4.59
4.30
4.07
3.78
3.47
3.21
4.28
4.91
5.12
5.13
5.09
4.89
4.65
4.37
4.10
3.79
3.48

ENTRADA IRURO
Q ENTRADA
(m3/seg)

5.48
3.13
4.77
1.40
0.21
0.10
0.11
0.24
0.69
0.14
0.23
0.14
2.95
5.05
5.26
0.56
0.23
0.12
0.10
0.18
0.48
0.19
0.39
0.64
1.55
6.87
5.86
0.19
0.09
0.08
0.16
0.16
0.35
0.22
0.40
1.00
2.48
2.97
7.07
0.71
0.18
0.12
0.14
0.17
0.53
0.31
0.29
0.69
6.65
5.63
2.06
0.45
0.12
0.08
0.16
0.18
0.25
0.18
0.33
0.88

VOL
ENTRADA
(MMC)

14.68
7.58
12.78
3.62
0.57
0.27
0.28
0.64
1.78
0.37
0.60
0.38
7.90
12.22
14.08
1.45
0.62
0.31
0.26
0.48
1.24
0.50
1.02
1.71
4.14
16.62
15.69
0.49
0.25
0.21
0.43
0.43
0.90
0.58
1.03
2.68
6.63
7.17
18.94
1.83
0.47
0.32
0.38
0.46
1.38
0.83
0.76
1.85
17.81
13.63
5.50
1.17
0.31
0.22
0.42
0.48
0.65
0.49
0.85
2.36

SALIDA CANAL IRURO


Q SALIDA
(m3/seg)

0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00
0.30
0.28
0.76
0.98
1.18
1.12
1.13
1.12
1.00

VOL
SALIDA
(MMC)

0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68
0.78
0.75
1.97
2.62
3.16
2.90
3.03
2.90
2.68

SALIDA RIO IRURO


Q SALIDA
(m3/seg)

1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

VOL
SALIDA
(MMC)

3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38
3.27
3.38
3.38
3.27
3.38
3.27
3.38

VOLUMEN
MMC
PARCIAL

36.97
46.70
60.48
65.17
65.09
59.48
53.09
46.45
41.30
34.99
28.96
22.85
30.35
43.61
59.48
62.21
61.83
56.28
49.89
43.12
37.45
31.20
25.62
21.02
25.07
42.13
60.33
62.37
61.38
55.73
49.50
42.68
36.68
30.46
24.89
21.27
27.96
35.97
55.87
59.81
59.35
53.81
47.56
40.77
35.27
29.39
23.69
19.21
36.96
53.25
60.75
61.77
61.03
55.40
49.17
42.41
36.17
29.71
23.96
20.00

ENTRADA PRECIP
PRECIP
(mm/mes)

18.53
9.76
13.33
3.83
2.28
10.91
16.06
14.76
1.57
1.66
1.59
2.78
6.22
21.99
16.33
1.21
1.62
4.31
9.47
10.26
20.22
2.01
1.88
1.18
1.22
3.11
22.36
16.52
5.77
1.26
1.35
3.89

SALIDA EVAPORACION

PRECIP
(MMC)

EVAPO
(mm/mes)

2.45
1.26
2.13
0.60
0.30
1.32
2.04
2.35
0.24
0.21
0.17
0.29
0.69
2.77
2.61
0.15
0.17
0.45
1.10
1.20
3.16
0.31
0.23
0.14
0.13
0.31
2.97
2.27
0.92
0.19
0.14
0.39

72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88
72.70
57.29
56.46
96.84
122.06
133.11
154.08
168.47
134.73
114.05
119.85
117.88

VOLUMEN
VOL EVAPO RESULTANTE
(MMC)
(MMC)

0.31
0.26
0.29
0.51
0.63
0.67
0.73
0.76
0.58
0.46
0.44
0.39
0.28
0.26
0.29
0.49
0.62
0.65
0.71
0.73
0.55
0.43
0.42
0.38
0.26
0.25
0.29
0.49
0.62
0.65
0.71
0.73
0.55
0.43
0.41
0.38
0.27
0.23
0.28
0.49
0.61
0.64
0.70
0.71
0.54
0.42
0.40
0.37
0.31
0.28
0.29
0.49
0.61
0.64
0.71
0.72
0.54
0.42
0.41
0.37

39.11
47.70
62.32
65.27
64.45
58.81
52.35
45.69
41.02
34.53
28.52
22.45
31.39
45.39
61.54
61.96
61.21
55.63
49.17
42.38
37.11
30.77
25.37
20.93
25.51
44.64
62.66
61.87
60.76
55.08
48.79
41.95
36.28
30.03
24.65
21.33
28.80
36.93
58.75
59.63
58.74
53.18
46.86
40.06
34.96
29.10
23.41
19.15
39.62
55.25
61.38
61.48
60.42
54.76
48.47
41.68
35.62
29.28
23.70
20.02

VOL
REBOSE
(MMC)

NIVEL DE
AGUA
(msnm)
(2)

4,063.04
4,064.75
4,067.24
4,067.67
4,067.56
4,066.69
4,065.60
4,064.36
4,063.43
4,062.05
4,060.63
4,059.06
4,061.32
4,064.31
4,067.12
4,067.18
4,067.07
4,066.16
4,065.02
4,063.71
4,062.61
4,061.18
4,059.84
4,058.63
4,059.87
4,064.16
4,067.29
4,067.17
4,067.00
4,066.07
4,064.95
4,063.62
4,062.43
4,061.00
4,059.65
4,058.75
4,060.70
4,062.57
4,066.68
4,066.82
4,066.68
4,065.74
4,064.59
4,063.24
4,062.14
4,060.78
4,059.32
4,058.12
4,063.15
4,066.10
4,067.10
4,067.11
4,066.95
4,066.01
4,064.89
4,063.57
4,062.29
4,060.82
4,059.39
4,058.37

AREA
ESPEJO
(Km2)
(2)

4.26
4.62
5.16
5.25
5.22
5.04
4.81
4.54
4.34
4.05
3.75
3.41
3.89
4.53
5.13
5.14
5.12
4.93
4.68
4.40
4.17
3.86
3.58
3.32
3.58
4.50
5.17
5.14
5.10
4.91
4.67
4.38
4.13
3.83
3.54
3.34
3.76
4.16
5.04
5.07
5.04
4.84
4.59
4.30
4.07
3.78
3.47
3.21
4.28
4.91
5.12
5.13
5.09
4.89
4.65
4.37
4.10
3.79
3.48
3.27

LLENADO
EMBALSE
(%)

ESTADO
DEL
EMBALSE

59.04%
71.99%
94.07%
98.51%
97.28%
88.77%
79.02%
68.97%
61.91%
52.12%
43.05%
33.89%
47.38%
68.51%
92.88%
93.51%
92.39%
83.97%
74.22%
63.97%
56.01%
46.43%
38.29%
31.59%
38.50%
67.38%
94.57%
93.38%
91.70%
83.13%
73.65%
63.32%
54.77%
45.33%
37.20%
32.20%
43.47%
55.74%
88.67%
90.00%
88.65%
80.26%
70.73%
60.47%
52.77%
43.92%
35.33%
28.90%
59.80%
83.39%
92.65%
92.79%
91.19%
82.64%
73.15%
62.91%
53.77%
44.20%
35.77%
30.22%

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

MAXIMA
CAPACIDAD
(MMC)

65.27

61.96

62.66

59.63

61.48

Você também pode gostar