SUMMARY:
A competent Electrical Commissioning Technician with overseas experience in
the Oil & Gas industries, Refineries, LPG & LNG, Drilling Rigs, FPSO and Power
Plant. A vast knowledge of both onshore and offshore construction and
commissioning.
WORK EXPERIENCE:

SPIE OIL AND GAS
Location
:
Madinat Zayed, Abu Dhabi, UAE
Designation :
E&I Commissioning Technician
Duration
:
July 12, 2012 to May 31, 2013
Client
:
Shams Power Company
Project
:
SHAMS ONE (SOLAR POWER PLANT)
Duties and Responsibilities:

Inspection and testing of Lightning Protection, Plant Earthing
System and its respective electrodes. Using Advanced Earth/Ground Tester and
Earth/Ground Clamp.

Make detailed reports and submit directly to Commissioning
Lead.

Conduct verification regarding the voltage drop for 24VDC
supply of transmitters.

Loop verification of all instrumentation, incorporating
sequence checks of motors and pumps with Electrical Department Commissioning
and other associated control instrumentation.

Conduct point-to-point wire checking between field control
instrument and field junction boxes and between field junction boxes and
marshalling cabinets prior to loop energization.

Perform loop checking and loop simulation on various process
control instrument to ensure the correct tagging, ranges, and alarm trip
setting.

Prepared list of instrument and points to be Loop Check and
confirm all instrument check sheets are completed with no outstanding punch
list items.

Diagnose malfunctioning system, equipments and components
using test equipment and hand tools to locate the cause of the breakdown and
suggest the necessary corrective action.

Simulation of motor control panels and ensure that the control
circuit is properly working as per client requirement.

Conduct no-load and load run test of HV and LV motors and
monitor motor integrity.

EW TEAM SERVICES PTE. LTD.
Location
:
Keppel Shipyard Singapore
Designation
:
Electrical Commissioning Technician
Duration
:
January 2012 to June 2012
Client
:
Single Buoy Mooring (SBM)
Project



Responsible for the testing and commissioning of all the
motors in the rig. Making sure that the control circuit is properly working as
per the client requirement.

Conduct no-load and load run test of HV and LV motors and
monitor motor integrity.

Oversee and coordinate with vendor representative for the
testing and commissioning of major electrical equipment

Responsible for MCC modification such as changing and swapping
of MCC buckets and internal wiring modification.

Ensure that the commissioning ITRs was properly filled-in and
signed.

Ensure timely completion of job activities whenever there is
scheduled shutdown

Isolate, De-isolate and energize LV and HV motors.

Conduct visual inspection, gather technical data and identify
any developing problem in the assigned area and report immediately to area
engineer.

Verify/Double check completed activities and ensure that the
job is performed as per requirement.

ADDITIONAL SKILLS:




Computer Literate
Driving with Philippines License.
Can operate various types of electrical testing equipments.
Can operate manlift (VELOSI TRAINED)
Responsibilities: Desalination Plant Project, New Water Plant, Ras Abu Fontas, Doha, Qatar
Subcontractor : Target Engineering (arabic company) ; Client : QEWC Qatar Electricity and Water
Company
Electrical Commissioning Engineer, responsible for check-out and Pre-commissioning of Electrical
Systems
Training for Commisioning activities : Testing and Data Sheets on Omega 100 Testing Meter.
Coordinating a team (2-4 people) for :
- Meggering and HIPOT Test for cables up to Un=11Kv, meggering at 5000V and HI-POT test at 30Kv,
- Meggering for LV motors,
- Meggering for transformers windings, test windings for proper voltage ratio, check oil DC HI-POT test,
- Checking and inspecting for LV Contactors and Breakers ; Checking general conditions, meggering for
control wiring and main poles ;
- Checking and inspections for grounding, lighting, lightning, cathodic protection.
- All tests have been done according to Company Drawings and Technical Requirements and Vendor
Specifications ;
- Data sheets have been recorded and submitted to superiors and Client