Você está na página 1de 3

ASIF JALAL

REGISTERED ENGINEER
PEC #:
Email:
Cell#:
Address:

25733
asifjalal.60@hotmail.com
+92 331 4471512 / 0324-9898620
House# E37/5B-1, Al-Noor Town Walton Road Lahore Cantt.

PERSONAL INFORMATION
Fathers name:
Date of Birth:
CNIC No. :
Domicile:
Marital Status:
Languages:

JALAL-UD-DIN AKBAR
7th March, 1991
35201-5109596-3
Punjab (Lahore)
Single
English, Urdu & Punjabi

OBJECTIVE
My main objective is to work as a member of a team in a well-reputed and dynamic organization,
where I can broaden my horizon by complementing my theoretical knowledge by practical
experience which has the potential to expose individual excellence. An organization, that provides
me with the opportunity to apply my practical, management, decision-making and communication
skills, to produce satisfying, innovative and successful solutions to problems.

ACADEMIC BACKGROUND
Master of Science in Mechanical Design Engineering (2012 Session)

University of Engineering and Technology, Lahore

CGPA:

3.483/4.00

Bachelor of Science in Mechanical Engineering

The University of Lahore, Lahore

CGPA:

3.09/4.00

(2008-12)

Higher school Certificate (F.Sc Pre-Engineering)

Punjab college of Science, Ferozpur road Lahore

Percentage: 79.4%

Secondary School Certificate (Science Group)

Sir Syed Boys High School, Walton Road Lahore Cantt

Percentage: 84%

TRAINING & CERTIFICATION:


PROGRAMMEABLE-ENGINEER (PRO-E)

(JANUARY TO FEBURARY, 2013)

(JIBS INSTITUTE OF PROFESSIONAL DESIGNERS LAHORE)


o
o

Worked on Simulations & Animations.


Die & Mould Design etc.

AUTOCAD (2D & 3D )

(NOVEMBER TO DECEMBER, 2012)

(JIBS INSTITUTE OF PROFESSIONAL DESIGNERS LAHORE)


o
o

Working at AutoCAD 2009.


2D & 3D modelling and Designing.

PROCESS DESIGN & ANALYSIS

(3 DAYS)

(NATIONAL INSTITUTE OF DESIGN & ANALYSIS, LAHORE -NIDA)


o
o

How to make PFD & BFD of different processes.


Study of Heat Exchanger Design, Compressor pump curves, Refrigerated Gas plant etc.

POWER GENERATION USING STIRLING ENGINE

( JANUARY TO JUNE 2012)


(THE INSTITUTION OF ENGINEERS PAKISTAN, LAHORE)
o
o

Power generation from Sun without using PV technology (Solar cells).


Look out the Manufacturing of different parts at Workshop IFC at Chung, Multan road
Lahore.

CPD COURSES AS PER PEC REQUIREMENT


(THE INSTITUTION OF ENGINEERS PAKISTAN, LAHORE)
EM 117 ENVIRONMENTAL MANAGEMENT SYSTEM TO ISO-14001 on February 18,
2012.
IT 118 INFORMATION TECHNOLOGY FOR ENGINEERS on February 25, 2012.
RENEWABLE ENERGY TECHNOLOGY on February 29, 2012.
EC 119 EFFECTIVE COMMUNICATION on March 03, 2012.
PRODUCTIVITY ENHANCMENT on April 07, 2012.

o
o
o
o
o

OTHERS:
o
o
o
o
o

ENGINEERING DRAUGHTING on December 01, 2010, at PITAC.


Information and Communication Technology & E-Learning
On July 15th -18th 2013 at UOL, LAHORE
INTRODUCTION TO CAD on April 10, 2014 at UOL, LAHORE
INTRODUCTION TO CAE on April 28, 2014 at UOL, LAHORE
COMPUTER AIDED GRAPHICS TOOLS on June 10, 2014 at UOL, LAHORE

EXPERIENCE:
THE UNIVERSITY OF LAHORE, LAHORE
(LECTURER AT MECHANICAL DEPARTMENT)
o
o
o
o
o

To contribute to the development, planning and implementation of a high


quality curriculum
Supply Chain Management (Procurement)
To teach an undergraduate level in areas allocated by HOD.
Lab In charge of Thermodynamics Lab.
Patron of MES Society.

PAK ELEKTRON LIMITED (PEL LAHORE)


(INTERNSHIP)
o
o
o

(OCTOBER 2012 TO TILL DATED)

(JULY TO AUGUST, 2012)

Research & Development


Plastic Injection Molding & Thermoforming,
Quality Control & Assembly Lines

CENTURY PAPER & BOARD MILLS LIMITED - IN POWER PLANT & UTILITY
(INTERNSHIP)

(JULY TO AUGUST, 2011)

GAS TURBINE POWER PLANT

Understanding of Different Processes and Cycles at Plant.

DIESEL-GAS ENGINE POWER PLANT

o
o

Understanding of Different Processes and Cycles at Plant.


Look out the Complete 30,000 Hours Engine maintenance by Wartsila.

ENGINE, TURBINE CONTROLL ROOM

Know How of the complete handling of operations on the PLCs.

PAK HERO INDUSTRIES (PVT) LTD.


(INTERNSHIP)
o
o
o
o

Assembly Line;
Engine Assembly Shop;
Paint Shop;
Pre-delivery Inspection (PDI).

(JUNE TO JULY, 2011)

PROJECTS

M.SC THESIS WORK:

Wind speed and Power density analysis based on Weibull and Rayleigh
distribution functions

FINAL YEAR PROJECT: (B.SC MECHANICAL ENGINEERING)


Autonomous Quality Control System, Focus on Metrology

Consisting of
o Two Robotic Arms, One Conveyor Belt, Dimension checking system using IR sensors

SEMESTER PROJECTS:
o
o
o
o
o
o
o

3-D modeling of different hardware components by using AutoCAD and Solid Edge.
Mat Lab Programmes for different vibration problems.
Making of Weight Measuring Instrument.
Making of wax Mold for alphabet A.
Making of Mold for Mobile Phone Casing (Modified Nokia N73 after removing defaults)
Making of Mechanism for Car Wiper.
Study of Cam & Follower mechanism after cutting the Engine Head of Honda CD-70.

MANAGERIAL SKILL
o
o
o
o

Having Good communication, interpersonal and management skills.


Proficient in professional work.
Having Good systematic and analytical problem solving approach.
Competent as an individual and in a Group.

COMPUTER SKILLS AND EXPERTISE


DESIGNING SOFTWARE:
OTHER SOFTWARE:

Auto CAD 2D/3D, Solid edge, Ansys, Aspen Hysis


Microsoft Office, Mat lab

INDUSTRIAL VISITS:
o
o
o
o

Heavy Mechanical Complex (HMC), Taxila


Pak Elektron Limited (PEL), Lahore
Millat Tractors (Private) Limited, Lahore
PIA training centre Lahore

EXTRA-CIRECULAR ACTIVITIES:
o

Patron of UOL Mechanical Engineering Society (MES).

INTERESTS & HOBBIES


o
o

Playing Cricket, Football, Computer Games


Technology Exposure and Internet Surfing.

REFERENCE
o

References will be furnished on demand.

Você também pode gostar