Description
1 Sceerd Concrete
2 Form work for column base
3 Concreting column base( Manually)
4 Concreting column base (readymix)
5 Formwork & concrete work for column
300*300
225*225
400*400
450*400
450*300
6 Formwork & concrete work for tie beam
(350*150)
7 Formwork & concrete work for lift wall
( 225mm)
8 Formwork & concreting work work for
landing beam (225*300)
9 Formwork & concreting work work for
staircase wall (inside)- 225mm
10 Formwork & concreting work work for
fire staircase wall-225mm
Unit
Sq. ft
Sq. ft
cube
m3
L
L
L
L
L
L
ft
ft
ft
ft
ft
ft
20
50
10
20
50
561.66
20
50
10
20
50
571.92
Sq. ft
176.16
171.16
Sq. ft
16
15.58
Sq. ft
16
15.58
L ft
Total
Ddt ( Retention 5%)
To Pay
Item
Description
1 Formwork & concrete work for inside
Unit
L ft
L
L
L
L
L
L
ft
ft
ft
ft
ft
ft
34
82.5
17
34
86
8
34
100.37
17
34
85
8
L ft
198.44
198.44
L ft
16
20.99
L ft
25.03
25.03
Sq
8900
8722.22
m3
L ft
121
15.3
120.73
14.93
48.5
19
597.83
48.5
19
597.83
Days
Days
kg
Total
Ddt (Retention 5%)
To Pay
Item
Description
1 Formwork & concrete work for staircase
(inside)- From 1st FL to 2nd FL
2 Formwork & concrete work for landing
beam ( 225*300)
3 Formwork & concretework for column
300*300
225*225
400*400
450*400
450*300
4 Formwork & concrete work for Fire
stair case- From 1st FL to 2nd FL
Unit
L ft
L ft
L
L
L
L
L
L
ft
ft
ft
ft
ft
ft
34
82.5
17
34
86
198.44
34
100.37
17
34
85
198.44
L ft
16
20.99
L ft
25.03
25.03
L ft
15.3
14.93
8900
119.5
8722.22
119.5
Sq ft
m3
Total
Ddt (retention 5%)
To pay
Item
Description
1 Formwork & concrete work for staircase
(inside)- From 2nd FL to 3rd FL
2 Formwork & concrete work for landing
beam ( 225*300)
3 Formwork & concretework for column
300*300
225*225
400*400
450*400
450*300
4 Formwork & concrete work for Fire
stair case- From 2nd FL to 3rd FL
5 Formwork & concrete work for
landing beam (225*300)- fire
6 Formwork & concrete work for sloping
beam at fire staircase (225*450)
7 Formwork & concrete work for tiebeams
for lift wall area (225*300)
8 Formwork for slab & beams at 2nd FL
9 Concreting slab & beams at 2nd FL
(Readymix)
Total
Ddt (retention 5%)
To pay
Unit
L ft
L ft
ft
ft
ft
ft
ft
ft
34
91
17
36
93
198.44
34
98.98
17
35.36
91.97
198.44
L ft
16
20.99
L ft
25.03
25.03
L ft
30.5
29.86
9049.2
123.5
9049.2
123.5
L
L
L
L
L
L
Sq ft
m3
Item
Description
1 Formwork & concrete work for staircase
(inside)- From 3rd FL to roof top level)
2 Formwork & concrete work for landing
beam ( 225*300)
3 Formwork & concretework for column
300*300
225*225
400*400
300*400
450*300
Unit
L ft
L ft
L
L
L
L
L
ft
ft
ft
ft
ft
17
64
20
17
87