Item

Description
1 Sceerd Concrete
2 Form work for column base
3 Concreting column base( Manually)
4 Concreting column base (readymix)
5 Formwork & concrete work for column
300*300
225*225
400*400
450*400
450*300
6 Formwork & concrete work for tie beam
(350*150)
7 Formwork & concrete work for lift wall
( 225mm)
8 Formwork & concreting work work for
landing beam (225*300)
9 Formwork & concreting work work for
staircase wall (inside)- 225mm
10 Formwork & concreting work work for
fire staircase wall-225mm

Unit
Sq. ft
Sq. ft
cube
m3
L
L
L
L
L
L

SUB CONTRACTOR BILL NO 01 (S


Quantity
2517 2517.31
1341 1341.67
3.51
3.71
62.44
62.44

ft
ft
ft
ft
ft
ft

20
50
10
20
50
561.66

20
50
10
20
50
571.92

Sq. ft

176.16

171.16

Sq. ft

16

15.58

Sq. ft

16

15.58

L ft

Total
Ddt ( Retention 5%)
To Pay

Item

Description
1 Formwork & concrete work for inside

Unit
L ft

SUB CONTRACTOR BILL NO 02 (G


Quantity
125.3
125.3

staircase (From GF to 1st FL )


2 Formwork & concretework for column
300*300
225*225
400*400
450*400
450*300
3 Formwork & concrete work for
landing beam (225*300)-inside
4 Formwork & concrete work for Fire
stair case-(From GF to 1st FL)
5 Formwork & concrete work for
landing beam (225*300)- fire
6 Formwork & concrete work for sloping
beam at fire staircase (225*450)
7 Formwork for slab & beams at 1st FL
8 Concreting slab & beams at 1st FL
( Readymix)
9 Formwork & concrete work for tiebeams
for lift wall area (225*300)
10 Working days of unskill labour
11 working days of mason
12 Reinforcement work for fire staircase
13 Removing formwork at 1st FL

L
L
L
L
L
L

ft
ft
ft
ft
ft
ft

34
82.5
17
34
86
8

34
100.37
17
34
85
8

L ft

198.44

198.44

L ft

16

20.99

L ft

25.03

25.03

Sq

8900

8722.22

m3
L ft

121
15.3

120.73
14.93

48.5
19
597.83

48.5
19
597.83

Days
Days
kg

Total
Ddt (Retention 5%)
To Pay

Item

Description
1 Formwork & concrete work for staircase
(inside)- From 1st FL to 2nd FL
2 Formwork & concrete work for landing
beam ( 225*300)
3 Formwork & concretework for column
300*300
225*225
400*400
450*400
450*300
4 Formwork & concrete work for Fire
stair case- From 1st FL to 2nd FL

Unit
L ft
L ft

L
L
L
L
L
L

ft
ft
ft
ft
ft
ft

SUB CONTRACTOR BILL NO 03 (


Quantity
125.3
125.3
8

34
82.5
17
34
86
198.44

34
100.37
17
34
85
198.44

5 Formwork & concrete work for


landing beam (225*300)- fire
6 Formwork & concrete work for sloping
beam at fire staircase (225*450)
7 Formwork & concrete work for tiebeams
for lift wall area (225*300)
8 Formwork for slab & beams at 2nd FL
9 Concreting slab & beams at 2nd FL
(Readymix)
10 Removing formwork at 2nd FL

L ft

16

20.99

L ft

25.03

25.03

L ft

15.3

14.93

8900
119.5

8722.22
119.5

Sq ft
m3

Total
Ddt (retention 5%)
To pay

Item

Description
1 Formwork & concrete work for staircase
(inside)- From 2nd FL to 3rd FL
2 Formwork & concrete work for landing
beam ( 225*300)
3 Formwork & concretework for column
300*300
225*225
400*400
450*400
450*300
4 Formwork & concrete work for Fire
stair case- From 2nd FL to 3rd FL
5 Formwork & concrete work for
landing beam (225*300)- fire
6 Formwork & concrete work for sloping
beam at fire staircase (225*450)
7 Formwork & concrete work for tiebeams
for lift wall area (225*300)
8 Formwork for slab & beams at 2nd FL
9 Concreting slab & beams at 2nd FL
(Readymix)
Total
Ddt (retention 5%)
To pay

Unit
L ft
L ft

SUB CONTRACTOR BILL NO 04 (S


Quantity
125.3
127.89
8

ft
ft
ft
ft
ft
ft

34
91
17
36
93
198.44

34
98.98
17
35.36
91.97
198.44

L ft

16

20.99

L ft

25.03

25.03

L ft

30.5

29.86

9049.2
123.5

9049.2
123.5

L
L
L
L
L
L

Sq ft
m3

Item

Description
1 Formwork & concrete work for staircase
(inside)- From 3rd FL to roof top level)
2 Formwork & concrete work for landing
beam ( 225*300)
3 Formwork & concretework for column
300*300
225*225
400*400
300*400
450*300

Unit
L ft
L ft

L
L
L
L
L

ft
ft
ft
ft
ft

SUB CONTRACTOR BILL NO 05 (


Quantity
125.3
127.89
8

17
64
20
17
87

TRACTOR BILL NO 01 (Sub Structure)


Rate
Amount

TRACTOR BILL NO 02 (Ground Floor)


Rate
Amount

NTRACTOR BILL NO 03 (First Floor)


Rate
Amount

TRACTOR BILL NO 04 (Second Floor)


Rate
Amount

NTRACTOR BILL NO 05 (Third Floor)


Rate
Amount