Rev.
Fecha
Originador
Verific
C.C
ICAF
Descripcin
10-Sep-15
GSP
ICAF/Construccin
PDDM
CM1-TAG-03
(ST)
PROYECTO
UNIDAD TIPO
GSP
MX036
PL
0806
DES.
N
SERIE
REV
GS
001
Proyecto
No.
Propietario
Contratista
Subcontratista
TAG Pipelines
Sur, S. de R.L.
de C.V.
____________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
REVISION : 3
PROCEDURE
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
PGINA 2 DE 25
NOMBRE
FIRMA
REV. No.
APROBADO
FECHA
10/09/15
MT
10/09/15
FECHA
MT
15/06/15
MT
10/02/15
10/09/15
PP
12/01/15
FECHA
PP
16/10/14
PP
24/09/14
APROBADO POR:
Michele Totaro
NOMBRE
FIRMA
ELABORADO POR:
Carlos Valbuena
____________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 3 DE 25
NDICE
1.0
OBJETO ............................................................................................................................................. 4
2.0
ALCANCE .......................................................................................................................................... 4
3.0
4.0
DEFINICIONES .................................................................................................................................. 4
5.0
6.0
7.0
ANEXOS ............................................................................................................................................ 24
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
1.0
PROPSITO
PGINA 4 DE 25
PURPOSE
ALCANCE
3.0
1.0
FECHA 10-SEP-15
2.0
SCOPE
NORMATIVA DE REFERENCIA
3.0
NORMATIVE REFERENCE
NOM-007-SECRE-2010
NOM-007-SECRE-2010
ASME B31.8
ASME B31.8
4.0 DEFINICIONES
4.0 DEFINITIONS
4.2 Responsabilidades
4.2 Responsibility
Jefe de Fase Es
responsable de dar
instrucciones a todos los operadores y
trabajadores involucrados en las actividades,
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
5.0
PROCEDIMIENTO EJECUCIN
FECHA 10-SEP-15
PGINA 5 DE 25
5.0
5.1
Mtodo
5.1
Method
Calificacin de Procedimientos de Soldadura,
Welding Procedure Qualification And Welders
Calificacin de Soldadores y Operadores de
And Welding Operators Qualification
Soldadura
GSP preparar y entregar a ICAF las GSP will prepare and submit to ICAF preliminary
Especificaciones de los Procedimientos de Welding Procedure Specification (WPS) for
Soldadura (WPS) preliminares para su aprobacin.
approval.
Previo al inicio de la soldadura de produccin, las
WPS preliminares aprobadas por ICAF, sern
calificadas a travs de la realizacin de soldaduras
que sern inspeccionadas visualmente segn la
API 1104 seccin 6.4, una vez aprobando esta
inspeccin, sern inspeccionadas por mtodos
radiogrficos. Posteriormente de las soldaduras se
obtendrn
probetas
para
ser
ensayadas
destructivamente.
Las probetas sern enviadas a un laboratorio en
donde se ensayaran destructivamente de acuerdo
a los requerimientos de API Std 1104.
GSP preparar un Reporte de Calificacin de
Procedimiento (PQR) en el cual se adjuntarn
todos los resultados de todos los ensayos
realizados a las soldaduras de calificacin as como
todos los parmetros obtenidos al momento de su
realizacin.
Al mismo tiempo, se emitir una nueva revisin de
los WPS con los datos obtenidos de la calificacin.
Toda soldadura de produccin debe ser realizada
por soldadores calificados y de acuerdo con las
Especificaciones de Procedimientos de Soldadura
calificados y aprobados por el Cliente.
Antes de comenzar a trabajar, GSP debe presentar
a ICA Fluor la lista de soldadores manuales y
operadores de soldadura automtica calificados
para el proyecto. Las calificaciones se deben hacer
de acuerdo a los requisitos de la Norma API Std
1104.
Los soldadores y operadores sern calificados
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
de Produccin
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 6 DE 25
following steps:
1. GSP will advice the Company about
qualifications to perform. The qualifications of
welders will be carried on only in the presence of a
Representative of the Company.
2. Using Project pipe, welders complete half a weld,
following all the parameters of WPS approved and
issued for construction.
Fecha de la prueba.
Test date.
Nmero del
automtica.
Resultado de la prueba.
Test result.
soldador
manual/
soldador
Production Welding
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 7 DE 25
Documentacin
Documentation
Pipe Identification
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
00
FECHA 10-SEP-15
PGINA 8 DE 25
Soporte De La Tubera
Pipe Support
Alineamiento y Acoplamiento
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 9 DE 25
Condiciones Climatolgicas
Weather Conditions
Golpes de Arco
Arc Burns
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 10 DE 25
Protection Of Coatings
Ejecucin De Soldaduras
Execution Of Welds
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 11 DE 25
La
cuadrilla
de
lnea
regular
consistir
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 12 DE 25
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 13 DE 25
Numeracin de la Soldadura
Welds Number
LNEA / EMPALMES
LINE / TIE-INS
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 14 DE 25
Interrupcin De La Soldadura
Interruptions In Welding
Soldaduras De Transicin
Transition Welds
Para soldadura manual entre diferentes espesores, ser maquinado el espesor mayor como lo indica
ASME B31.8 ltima Rev. Apndice I, I2.2, inciso (2)
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 15 DE 25
Identificacin De Soldadores
Identification Of Welders
General
General
Inspeccin Visual
Una vez completada la soldadura, deber
inspeccionarse visualmente de acuerdo con los
requerimientos de norma API 1104 - 9.7 y cualquier
imperfeccin deber ser evaluada usando el
Estndar de Aceptabilidad de API 1104 aplicable.
La inspeccin visual la deber realizar personal
calificado segn se especifica en la Seccin 8.3 de
API 1104.
Estar permitido reparar los defectos en la pasada
de remate o la pasada de raz detectados en la
inspeccin visual antes de las pruebas no
destructivas, previendo que la reparacin sea
aprobada por el Cliente; cualquier soldadura ser
hecha segn los requisitos del procedimiento de
soldadura aprobado; despus de un trabajo de
reparacin se realizar una nueva inspeccin
visual.
Visual Inspection
Completed welds shall be visually inspected in
accordance with the requirements of API 1104- 9.7
and any imperfection shall be assessed using the
applicable API 1104 acceptance criteria.
For the Main Line Welding and tie ins, in the pipe
will draw a table with the welders number that
make the weld (root, first pass, etc.) and his
position.
On coated pipe, markings shall not be made closer
than 50 mm of the edge of the coating. Wax-based
markers and steel-die stamping shall not be used
for such a purpose.
A record with the qualification of the welders will be
done and it will include the welding procedures in
which the welders are qualified for.
INSPECTION AND TESTING OF PRODUCTION
WELDS
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 16 DE 25
In the same box will certify that the electrode E6010 has been used only in the root pass, with the
signing of the welding inspector.
Ejemplo:
IV
Ok
P. Raz
Fecha de
Inspeccin
Firma
UT
Ok
Fecha de
Inspeccin
Firma
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 17 DE 25
Registros De Inspeccin
Inspection Records
Altura de
Reforzamiento (mm)
Menor de 2,5
Menor de 3,5
Height of
Reinforcement (mm)
Less than 2,5
Less than 3,5
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
SOLDADURA
FECHA 10-SEP-15
PGINA 18 DE 25
General
General
Filler material
Fisuras
Crack
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 19 DE 25
Eliminacin De Defectos
Removal Of Defects
Inspeccin De Reparaciones
Inspection Of Repairs
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 20 DE 25
Welding
Procedure
Qualification
Record
(WPQR) and related list, kept by the Welding
Coordinator who is responsible for its archival
and any revision and/or update;
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 21 DE 25
General
Botas de seguridad
Safety boots
Casco de seguridad;
Safety helmet;
Gafas de seguridad;
Safety Glasses;
- Guantes de seguridad.
Donde proceda:
- Safety Gloves.
Where appropriate:
Ear Protection
Proteccin respiratoria
Respiratory Protection
Petos
Welding vest
Welding mask
Riesgos
Hazards
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
por
ejemplo
FECHA 10-SEP-15
PGINA 22 DE 25
Fuego / explosions;
Fire / explosion;
Quemaduras;
Burns;
Rudos;
Noise;
Entanglement in machine;
Medio Ambiente
Environmental
Environmental Risk
Description
Action/ Mitigation
Protected Species
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Environmental Risk
Description
FECHA 10-SEP-15
PGINA 23 DE 25
Action/ Mitigation
procedure.
Caps will be placed on pipe
ends to ensure that animals
cannot access or become
entrapped within the pipes.
Especies Protegidas
Especies
protegidas
como
tejones, las nutrias o las ranas
se pueden encontrar durante
este proceso.
Noise
Ruido
Refuelling
Reabastecimiento de gasleo
Reabastecimiento
de
la
maquinara que no se realizar
dentro de 30m de cursos de
agua superficiales existentes.
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 24 DE 25
Environmental Risk
Description
Action/ Mitigation
Waste Metal
Residuos Metlicos
Generacin
metlicos
7.0 ANEXOS
- MX036-PL-0806-GS-001_Anexo-A Control
Tubera y Registro de Soldaduras de Lnea
- MX036-PL-0806-GS-001_Anexo-B Planilla
empalmes y cortes
- MX036-PL-0806-GS-001_Anexo-C Informe
Reparacion
- MX036-PL-0806-GS-001_Anexo-D Reporte
Validacin de Integridad del Proceso
Soldadura
- MX036-PL-0806-GS-001_Anexo-E
Acta
Homologacin de Soldador
- MX036-PL-0806-GS-001_Anexo-F Listado
Soldadores Homologados
de
residuos
7.0 APPENDIXES
de
de
de
de
de
de
de
- MX036-PL-0806-GS-001_Attachment-A Control of
Pipe and Record of Mainline Welding
- MX036-PL-0806-GS-001_Attachment-B Tie in
and pup Piece installation
- MX036-PL-0806-GS-001_Attachment- Reparation
Report
- MX036-PL-0806-GS-001_Attachment-D Integrity
Validation of Welding Procedure
- MX036-PL-0806-GS-001_Attachment-E Approval
of Welding Operator
- MX036-PL-0806-GS-001_Attachment-F List of
Approval Welding Operator
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
PROYECTO GASODUCTO LOS RAMONES FASE II
SUR
REVISION : 3
PROCEDURE
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
FECHA 10-SEP-15
PGINA 25 DE 25
- MX036-PL-0806-GS-001_Attachment-G
of Inspections Personnel
- MX036-PL-0806-GS-001_Anexo-H Informe
inspeccin visual soldaduras /soldadores
- MX036-PL-0806-GS-001_Anexo-H
welders inspection report
de
Record
Welds
- MX036-PL-0708-GS-0001_Libro tubos
- MX036-PL-0708-GS-0001_Pipe Book
Plan
and
__________________________________________________________________________________________________________
MX036-PL-0806-GS-001 Procedimiento de Soldadura de Linea y Empalmes Rev3
MX036-PL-0806-GS-001
Anexo-A
Rev.: 1
Fecha: 02/15
N. Informe:
Inspector de soldadura :
Pg.
PK
N TUBO
N Colada
INSPECCIONADO
DN
()
ESP.
(mm)
Revest. LONGITUD
(*)
m
VB GSP
INSPECTOR DE SOLDADURA
RESPONSABLE SOLDADURA
N
SOLDADURA
_____
NOTAS
SOLDADURA
VERIFICADO ICAF
INSPECTOR
de
_____
NOTAS TUBO
(curva, etc.)
VB ICAF
JEFE INSPECTORES
MX036-PL-0806-GS-001
Anexo-B
Rev.1
Fecha: 02/15
N. Informe:
TIE IN BSICO
N EMPALME
N TUBO:
ESPESOR:
COLADA:
N SOLDADURA ANTERIOR
GRADO
CORTE
SI
NO
LONG INICIAL
LONG FINAL
LONG EXCEDENTE
N EXCEDENTE
N SOLDADURA POSTERIOR
N TUBO:
ESPESOR:
COLADA:
GRADO
CORTE
SI
NO
LONG INICIAL
LONG FINAL
LONG EXCEDENTE
N EXCEDENTE
TIE IN NIPLE
N EMPALME
N TUBO:
COLADA:
CORTE
LONG INICIAL
N EMPALME
ESPESOR:
GRADO
SI
NO
LONG FINAL
N SOLDADURA ANTERIOR
N SOLDADURA POSTERIOR
N TUBO:
ESPESOR:
N TUBO:
ESPESOR:
COLADA:
GRADO
COLADA:
GRADO
CORTE
NO
CORTE
LONG INICIAL
SI
LONG FINAL
LONG INICIAL
SI
NO
LONG FINAL
LONG EXCEDENTE
NEXCEDENTE
LONG EXCEDENTE
N EXCEDENTE
Observaciones
INSPECCIONADO
V B GSP
Inspector de Soldadura
Responsable Soldadura
VERIFICADO ICAF
INSPECTOR
V B ICAF
JEFE INSPECTORES
MX036-PL-0806-GS-001
Anexo-C
Rev.: 1
INFORME DE REPARACION
Lnea
.
MATERIAL:
PK
SOLDADURA
N
DN:
ESP.
(mm)
SOLDADOR
N. Informe:
Fecha:
Empalme
WPS:
Fecha: 02/15
Pag de ..
Especificacin de referencia:
CALIFICACIN
A
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
INSPECCION
VISUAL
OBSERVACIONES
INSPECCIONADO
INSPECTOR DE SOLDADURA
VB GSP
RESPONSABLE SOLDADURA
VERIFICADO ICAF
INSPECTOR
VB ICAF
JEFE INSPECTORES
MX036-PL-0806-GS-001
Anexo-D
REPORTE DE SOLDADURA
FECHA
REPORTE
DD
MM
N. Informe
AA
NA
INSPECCIONADO
VB CALIDAD
VERIFICADO ICAF
VB ICAF
INSPECTOR DE SOLDADURA
JEFE DE CALIDAD
INSPECTOR ICAF
MX036-PL-0806-GS-001
GASODUCTO LOS RAMONES FASE II SUR
ANEXO-E
Rev. 1
Fecha: 02/15
ACTA DE HOMOLOGACIN DE
SOLDADOR
Fecha:
TYPE OF QUALIFICATION:
TIPO DE CALIFICACION:
WELDERS NAME:
NOMBRE DEL SOLDADOR:
STAMP No.:
SELLO No.:
ACCETABLE
ACEPTABLE
NOT TESTED
NON PROBADO
TEST PIECE
PIEZA DE PRUEBA
RANGE OF QUALIFICATION
CAMPO DI VALIDACION DE LA CALIFICACION
WELDING PROCESS(ES):
PROCESOS DE SOLDADURA:
TYPE OF WELD:
TIPO DI JUNTA:
BASE MATERIAL (API Group):
MATERIAL BASE (GRUPO API):
WELDING CONSUMABLE (API Group):
METAL DE APORTE:
MATERIAL THICKNESS (mm):
ESPESOR DEL MATERIAL (mm):
OUTSIDE PIPE DIAMETER (mm):
DIAMETRO EXTERNO DEL TUBO (mm):
WELDING POSITIONS:
POSICION DE SOLDADURA:
WELD DIRECTION:
DIRECCION DE SOLDADURA:
PERFORMED
AND ACCEPTABLE
EJECUTADO
Y ACEPTADO
NOT REQUIRED
NO REQUERIDO
VISUALS TESTING:
ENSAYO VISUAL:
RADIOGRAPHY TESTING:
ENSAYO RADIOGRAFICO:
FRACTURE TEST:
ENSAYO DE FRACTURA:
TYPE OF TEST
TIPO DE PRUEBA
REMARKS:
NOTA:
PERFORMED
AND ACCEPTABLE
EJECUTADO
Y ACEPTADO
NOT REQUIRED
NO REQUERIDO
BEND TEST:
ENSAYO DE CURVADO:
MACROSCOPIC TEST:
ENSAYO MACROSCOPICO:
TYPE OF TEST
TIPO DE PRUEBA
CERTIFICAMOS LA VERACIDAD DE LOS DATOS REGISTRADOS EN EL PRESENTE CERTIFICADO Y QUE LOS CUPONES DE
PRUEBA HAN SIDO SOLDADOS DE ACUERDO CON LOS REQUISITOS DEL CDIGO API 1104
EXAMINING BODY:
ORGANISMO DE EXAMEN:
PLACE OF TEST:
LUGAR DE LA PRUEBA:
DATE OF WELDING:
FECHA DE LA SOLDADURA:
TEST RESULT:
RESULTADO DE LA PRUEBA:
THIS TEST QUALIFIES THE REFERENCED WELDER ON THE FOLLOWING WPS
ESTA PRUEBA CALIFICA AL SOLDADOR MENCIONADO EN LOS SIGUIENTES WPS
INSPECCIONADO
V B GSP
VERIFICADO ICAF
V B ICAF
Inspector de Soldadura
Responsable Soldadura
INSPECTOR
JEFE INSPECTORES
Rev.1 def
MX036-PL-0806-GS-001 AnexoF
Rev.1
Fecha: 02/15
SELLO
NOMBRE
DNI
ID
CERTIFICATE
BW 001 ECA
FECHA
ncertificado
BW 002 FECHA BW 003 FECHA BW 004 FECHA BW 005 FECHA FTR 001 FECHA
ncertificado ncertificado ncertificado
ncertificado ncertificado
PPR 001
FECHA
ncertificado
BW 006 ECA
FECHA
ncertificado
BW 007 FECHA
ncertificado
OBSERVACIONES
RANGO ESPESORES
FTR 002
FTR 001/RR
PPR 002 FECHA
FECHA
FECHA
ncertificado
ncertificado
ncertificado
PPR 001/RR
FECHA
ncertificado
BW 008 FECHA
ncertificado
BW 009
FECHA
ncertificado
BW 010
FECHA
ncertificado
MIN.
mm
MX.
mm
POS
RAZ,
RELLENO,
REMATE
VALIDIDACIN
S001
S002
S003
S004
S005
S006
S007
S008
S009
S010
S011
S012
NOTAS:
VBGSP
VERIFICADO ICAF
OTHER
RESPONSABLE SOLDADURA
JEFE INSPECTORES
THIRDY PARTY
1/1
MX036-PL-0806-GS-001 Anexo-G
GASODUCTO LOS RAMONES FASE II SUR
Rev.: 1
Fecha: 02/15
Fecha:
NOMBRE
MTODO DE
INSPECCIN
NIVEL
N INFORME
FECHA
EMITIDO POR
NOTAS:
JEFE DE CALIDAD
VB ICAF
A : Aceptado
LEYENDA:
R: Rechazado
MX036-PL-0806-GS-001
Rev. 1
Anexo-H
Fecha 02/15
N. Informe
Fecha:
FECHA
L
(*)
Raiz
Paso
Caliente
Rellenos
3
Vista
5
n+1
INSP.
VISUAL
(A / R)
OBSERVACIONES
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
D
I
INSPECCIONADO
V B GSP
VERIFICADO ICAF
V B ICAF
Inspector de Soldadura
Responsable Soldadura
INSPECTOR
JEFE INSPECTORES
WPS
MX-036- WPQR-BW-002-14,
MX036-00-0704-SI-004,
MX-036- WPS-BW-006-14
SMAW
GMAW mechanized
MX-036- WPS-BW-001-14,
MX-036- WPS-BW-005-14
Repair
process
Application
Ndt
VT+RT or AUT
Golden welds
VT+RT OR MUT
AFTER 24H
Pipeline
VT+AUT
SMAW
VT+AUT or RT
SMAW
Golden welds
VT+RT+AUT or MUT
AFTER 24H
SMAW
SMAW
MX036-00-0704-SI-003, MX03600-0704-SI-012
Repair WPS
MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036MX-036-
WPS-FTR-001-14,
WPS-FTR-001RR-14,
WPS-CR-001-14,
WPS-IR-001-14,
WPS-FTR-002RR-14,
WPS-CR-002-14,
WPS-IR-002-14,
WPS-PTR-001RR-14,
WPS-PTR-002-14
WPS-FTR-001-14,
WPS-FTR-001RR-14,
WPS-CR-001-14,
WPS-IR-001-14,
WPS-FTR-002RR-14,
WPS-CR-002-14,
WPS-IR-002-14,
WPS-PTR-001RR-14,
WPS-PTR-002-14
WPS-FTR-001-14,
WPS-FTR-001RR-14,
WPS-CR-001-14,
WPS-IR-001-14,
WPS-FTR-002RR-14,
WPS-CR-002-14,
WPS-IR-002-14,
WPS-PTR-001RR-14,
WPS-PTR-002-14
WPS-FTR-001-14,
WPS-FTR-001RR-14,
WPS-CR-001-14,
WPS-IR-001-14,
WPS-FTR-002RR-14,
WPS-CR-002-14,
WPS-IR-002-14,
WPS-PTR-001RR-14,
WPS-PTR-002-14
VT+RT OR AUT
VT+RT OR AUT
VT+AUT
VT+AUT OR RT
VT+RT OR AUT
Notes: MUT will be used after removal of arc burns by grinding to check the area, furthermore to verifie the absence of lamonation in the pipe for not original pipe bevel inspection after thermal cut( GSP
CARRY OUT THE RX OR AUT) AFTER COMPLETE THE WELD.
MPI will be employed for fillet weld inspection in stations and for the detection and evaluation of surface defects in materials.
NOTES:
VT
RT
MPI
MUT
AUT
* AUT
VISUAL CONTROL
RADIOGRAPHY
MAGNETIC PARTICLE INSPECTION
MANUAL ULTRASONIC INSPECTION
AUTOMATIC ULTRASONIC INSPECTION
FOR THE MANUAL WELDING