CONTRACT ID:

15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
101(3) Removal of Existing PCCP
Quantity
539.00 sq.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
4.00
b. Laborers
6
4.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Backhoe with Breaker
Dumptruck
Payloader

D.
E.
F.
G.
H.
I.

500.00
280.00

Php
No. of
Equipment

No. of Days

1
2
1

4.00
1.00
1.00

Sub-Total for B
Name and Specification
C. Materials

Daily Rate

Daily Rate
16,599.60
10,816.00
13,864.00

Php
Quantity

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit

Unit Cost

Amount
2,000.00
6,720.00

8,720.00
Amount
66,398.40
21,632.00
13,864.00

101,894.40
Amount

Php

say

110,614.40
7,743.01
8,849.15
15,264.79
142,471.35
264.33
264.33

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
102(2) Common Surplus Excavation
Quantity
21,915.00 cu.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
80.00
b. Laborers
5
80.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Backhoe
Bulldozer
Dumptruck
Payloader

D.
E.
F.
G.
H.
I.

500.00
280.00

Php
No. of
Equipment
2
2
4
1

No. of Days
80.00
80.00
50.00
50.00

Sub-Total for B
Name and Specification
C. Materials

Daily Rate

Daily Rate
12,296.00
18,392.00
10,816.00
13,864.00

Php
Quantity

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit

Unit Cost

Amount
40,000.00
112,000.00

152,000.00
Amount
1,967,360.00
2,942,720.00
2,163,200.00
693,200.00

7,766,480.00
Amount

Php

7,918,480.00
554,293.60
633,478.40
1,092,750.24
10,199,002.24
465.39
say
465.39

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
Quantity
Description
A. Labor
a. Foreman
b. Laborers

103
Structure Excavation
535.50 cu.m.
No. of Person

No. of Days

1
6

6.00
6.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Backhoe
Dumptruck

D.
E.
F.
G.
H.
I.

500.00
280.00

Php
No. of
Equipment
1
1

No. of Days
6.00
3.00

Sub-Total for B
Name and Specification
C. Materials

Daily Rate

Daily Rate
12,296.00
10,816.00

Php
Quantity

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit

Unit Cost

Amount
3,000.00
10,080.00

13,080.00
Amount
73,776.00
32,448.00

106,224.00
Amount

Php

say

119,304.00
8,351.28
9,544.32
16,463.95
153,663.55
286.95
286.95

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
103(3) Foundation Fill
Quantity
2.00 cu.m.
Description
No. of Person
A. Labor
a. Foreman
1
b. Laborers
2

No. of Days
1.00
1.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Plate Compactor

D.
E.
F.
G.
H.
I.

500.00
280.00

Php
No. of
Equipment
1

No. of Days
0.50

Sub-Total for B
Name and Specification
C. Materials
Selected Materials + 15%
shrinkage factor

Daily Rate

Daily Rate
984.00

Php
Quantity

2.300

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit

cu.m.

Unit Cost

Amount
500.00
560.00

1,060.00
Amount
492.00

492.00
Amount

600.00

Php

say

1,380.00

1,380.00
2,932.00
205.24
234.56
404.62
3,776.42
1,888.21
1,888.21

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
103(6) Pipe Culvert and Drain Excavation
Quantity
5.50 cu.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
1.00
b. Laborers
4
1.00

Sub-Total for A
Name and Capacity
B. Equipment Rental

Daily Rate
500.00
280.00

Php
No. of
Equipment

No. of Days

Daily Rate

Amount
500.00
1,120.00

1,620.00
Amount
-

Sub-Total for B
Name and Specification
C. Materials

D.
E.
F.
G.
H.
I.

Php
Quantity

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit

Unit Cost

Amount

Php

say

1,620.00
113.40
129.60
223.56
2,086.56
379.37
379.37

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
104(1) Embankment, from Excavation
Quantity
8,425.00 cu.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
20.00
b. Laborers
6
20.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Road Grader
Road Roller
Water Truck
Payloader

D.
E.
F.
G.
H.
I.

500.00
280.00

Php
No. of
Equipment
1
1
1
1

No. of Days
20.00
20.00
4.00
20.00

Sub-Total for B
Name and Specification
C. Materials

Daily Rate

Daily Rate
17,384.00
12,056.00
8,520.00
13,864.00

Php
Quantity

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit

Unit Cost

Amount
10,000.00
33,600.00

43,600.00
Amount
347,680.00
241,120.00
34,080.00
277,280.00

900,160.00
Amount

Php

say

943,760.00
66,063.20
75,500.80
130,238.88
1,215,562.88
144.28
144.28

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
104(2) Embankment ( Common Borrow )
Quantity
780.50 cu.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
3.00
b. Laborers
6
3.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Road Grader
Road Roller
Water Truck

D.
E.
F.
G.
H.
I.

500.00
280.00

Php
No. of
Equipment
1
1
1

No. of Days
3.00
3.00
1.00

Sub-Total for B
Name and Specification
C. Materials
Selected Borrow + 25%
shrinkage factor

Daily Rate

Daily Rate
17,384.00
12,056.00
8,520.00

Php
Quantity

975.62

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit

cu.m.

Unit Cost

Amount
1,500.00
5,040.00

6,540.00
Amount
52,152.00
36,168.00
8,520.00

96,840.00
Amount

300.00

Php

say

292,686.00

292,686.00
396,066.00
27,724.62
31,685.28
54,657.11
510,133.01
653.60
653.60

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
Quantity
Description
A. Labor
a. Foreman
b. Laborers

105
29,010.00

Subgrade Preparation
sq.m.
No. of Person No. of Days
1
4

15.00
15.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Road Grader
Road Roller
Water Truck

D.
E.
F.
G.
H.
I.

500.00
280.00

Php
No. of
Equipment
1
1
1

No. of Days
15.00
15.00
3.00

Sub-Total for B
Name and Specification
C. Materials

Daily Rate

Daily Rate
17,384.00
12,056.00
8,520.00

Php
Quantity

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit

Unit Cost

Amount
7,500.00
16,800.00

24,300.00
Amount
260,760.00
180,840.00
25,560.00

467,160.00
Amount

Php

say

491,460.00
34,402.20
39,316.80
67,821.48
633,000.48
21.82
21.82

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
Quantity
Description
A. Labor
a. Foreman
b. Laborers

200
13,210.50

Aggregate Sub-base Course


cu.m.
No. of Person No. of Days
1
6

25.00
25.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Road Grader
Road Roller
Water Truck

D.
E.
F.
G.
H.
I.

500.00
280.00

Php
No. of
Equipment
2
2
1

No. of Days
25.00
25.00
6.00

Sub-Total for B
Name and Specification
C. Materials
Aggregate Subbase Course+15%
shrinkage factor

Daily Rate

Daily Rate
17,384.00
12,056.00
8,520.00

Php
Quantity

15,192.07

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit

cu.m.

Unit Cost

700.00

Amount
12,500.00
42,000.00

54,500.00
Amount
869,200.00
602,800.00
51,120.00

1,523,120.00
Amount

10,634,449.00

Php 10,634,449.00
12,212,069.00
854,844.83
976,965.52
1,685,265.52
15,729,144.87
1,190.65
say
1,190.65

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
311a
PCCP - Conventional Method
Quantity
23,479.50 sq.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
145.00
b. Skilled Laborers
12
145.00
c. Unskilled Laborers
20
145.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Transit Mixer
Payloader
Concrete Vibrator
Concrete Screeder
Concrete Cutter
Water Truck
Batching Plant

D.
E.
F.
G.
H.
I.

500.00
300.00
280.00

Php
No. of
Equipment
2
1
1
1
1
1
1

No. of Days
145.00
145.00
145.00
145.00
145.00
145.00
145.00

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Gravel
Reinf Steel Bar
Round Bar for Dowel
Curing Compound
Asphalt Sealant
Forms

Daily Rate

Quantity

Unit

62,456.00 bags
3,682.00 cu.m.
5,785.00 cu.m.
5,685.00 kgs
1,326.00 kgs
800.00 liters
7.00 drums
800.00 l.m.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Daily Rate

Amount
72,500.00
522,000.00
812,000.00

1,406,500.00
Amount

10,232.00
13,864.00
1,191.00
4,360.00
1,339.00
8,520.00
9,664.00

2,967,280.00
2,010,280.00
172,695.00
632,200.00
194,155.00
1,235,400.00
1,401,280.00

Php

8,613,290.00

Unit Cost
280.00
800.00
1,000.00
45.00
50.00
40.00
12,000.00
100.00

Amount
17,487,680.00
2,945,600.00
5,785,000.00
255,825.00
66,300.00
32,000.00
84,000.00
80,000.00

Php 26,736,405.00
36,756,195.00
2,572,933.65
2,940,495.60
5,072,354.91
47,341,979.16
2,016.31
say
2,016.31

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
311b
Portland Cement Concrete Pavement 0.15m thick
Quantity
9,792.50 sq.m.
Description
No. of Person No. of Days
Daily Rate
A. Labor
a. Foreman
1
33.00
500.00
b. Laborers(Skilled)
12
33.00
300.00
c. Laborers(Unskilled)
20
33.00
280.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Transit Mixer
Payloader
Concrete Vibrator
Concrete Screeder
Concrete Cutter
Water Truck
Batching Plant

Php
No. of
Equipment
2
1
1
1
1
1
1

No. of Days
33.00
33.00
33.00
33.00
33.00
33.00
33.00

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Gravel
Reinf Steel Bar
Round Bar for Dowel
Curing Compound
Asphalt Sealant
Forms

D.
E.
F.
G.
H.
I.

Quantity

Unit

13,955.00 bags
823.00 cu.m.
1,293.00 cu.m.
2,606.00 kgs
266.00 kgs
200.00 liters
3.00 drums
200.00 l.m.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Daily Rate

Amount
16,500.00
118,800.00
184,800.00

320,100.00
Amount

10,232.00
13,864.00
1,191.00
4,360.00
1,339.00
8,520.00
9,664.00

675,312.00
457,512.00
39,303.00
143,880.00
44,187.00
281,160.00
318,912.00

Php

1,960,266.00

Unit Cost

Amount

280.00
800.00
1,000.00
45.00
50.00
40.00
12,000.00
100.00

Php

3,907,400.00
658,400.00
1,293,000.00
117,270.00
13,300.00
8,000.00
36,000.00
20,000.00

6,053,370.00
8,333,736.00
583,361.52
666,698.88
1,150,055.57
10,733,851.97
1,096.13
say
1,096.13

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
Quantity
Description
A. Labor
a. Foreman
b. Skilled Laborers
c. Unskilled Laborers

404
10,988.50

Reinforcing Steel ( Grade 40 )


kg
No. of Person No. of Days
1
4
8

30.00
30.00
30.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Bar Cutter
Bar Bender

D.
E.
F.
G.
H.
I.

500.00
300.00
280.00

Php
No. of
Equipment
1
1

No. of Days
30.00
30.00

Sub-Total for B
Name and Specification
C. Materials
Reinf Steel Bar
Tie Wire #16
Hacksaw Blade

Daily Rate

Quantity
10,988.50
1,100.00
30.00

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit
kgs
kgs
pcs

Daily Rate

Amount
15,000.00
36,000.00
67,200.00

118,200.00
Amount

1,758.00
2,812.00

52,740.00
84,360.00

Php

137,100.00

Unit Cost

Amount

45.00
45.00
60.00

Php

say

494,482.50
49,500.00
1,800.00

545,782.50
801,082.50
56,075.78
64,086.60
110,549.39
1,031,794.26
93.90
93.90

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
405
Structural Concrete Class "A"
Quantity
271.50 cu.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
30.00
b. Laborers(Skilled) Carpenters
10
30.00
c. Laborers(Skilled) Mason
4
7.00
d. Laborers(Unskilled)
20
7.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Transit Mixer
Payloader
Concrete Vibrator
Water Truck
Batching Plant

D.
E.
F.
G.
H.
I.

500.00
300.00
300.00
280.00

Php
No. of
Equipment
2
1
1
1
1

No. of Days
7.00
7.00
7.00
7.00
7.00

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Gravel
1/2" Ord plywood
Form Lumber
CWN Assorted Size

Daily Rate

Quantity
2,987.00
152.00
239.00
120.00
10,000.00
10.00

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit
bags
cu.m.
cu.m.
pcs
bd ft
keg

Daily Rate

Amount
15,000.00
90,000.00
8,400.00
39,200.00

152,600.00
Amount

10,232.00
13,864.00
1,191.00
8,520.00
9,664.00

143,248.00
97,048.00
8,337.00
59,640.00
67,648.00

Php

375,921.00

Unit Cost

Amount

280.00
800.00
1,000.00
680.00
17.00
1,800.00

Php

say

836,360.00
121,600.00
239,000.00
81,600.00
170,000.00
18,000.00

1,466,560.00
1,995,081.00
139,655.67
159,606.48
275,321.18
2,569,664.33
9,464.69
9,464.69

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
500(1a) RC Culvert Pipe, 910mm ( 36" dia )
Quantity
14.00 l.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
1.00
b. Skilled Laborers
2
1.00
c. Unskilled Laborers
4
1.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Backhoe

D.
E.
F.
G.
H.
I.

500.00
300.00
280.00

Php
No. of
Equipment
1

No. of Days
0.50

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Pipe Culvert, 36" dia
Form Lumber
Cwn

Daily Rate

Quantity
6.00
0.50
14.00
60.00
1.00

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit
bags
cu.m.
pcs
bd.ft.
kl

Daily Rate

Amount
500.00
600.00
1,120.00

2,220.00
Amount

12,296.00

6,148.00

Php

6,148.00

Unit Cost

Amount

280.00
800.00
3,600.00
17.00
65.00

Php

say

1,680.00
400.00
50,400.00
1,020.00
65.00

53,565.00
61,933.00
4,335.31
4,954.64
8,546.75
79,769.70
5,697.84
5,697.84

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
505(5) Grouted Riprap, Class "A"
Quantity
3.50 cu.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
1.00
b. Skilled Laborers
2
1.00
c. Unskilled Laborers
10
1.00

Sub-Total for A
Name and Capacity
B. Equipment Rental

D.
E.
F.
G.
H.
I.

500.00
300.00
280.00

Php
No. of
Equipment

No. of Days

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Boulder
Form Lumber
Cwn

Daily Rate

Daily Rate

Amount
500.00
600.00
2,800.00

3,900.00
Amount

Php
Quantity
10.00
1.00
3.50
60.00
1.00

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit
bags
cu.m.
cu.m.
bd.ft.
kl

Unit Cost

Amount

280.00
800.00
800.00
17.00
65.00

Php

say

2,800.00
800.00
2,800.00
1,020.00
65.00

7,485.00
11,385.00
796.95
910.80
1,571.13
14,663.88
4,189.68
4,189.68

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
Quantity
Description
A. Labor
a. Foreman
b. Skilled Laborers
c. Unskilled Laborers

506
8.00

Stone Masonry
cu.m.
No. of Person

No. of Days

1
4
12

2.00
2.00
2.00

Sub-Total for A
Name and Capacity
B. Equipment Rental

D.
E.
F.
G.
H.
I.

500.00
300.00
280.00

Php
No. of
Equipment

No. of Days

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Boulder
Form Lumber
Cwn

Daily Rate

Daily Rate

Amount
1,000.00
2,400.00
6,720.00

10,120.00
Amount

Php
Quantity
25.00
2.00
8.00
80.00
1.00

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit
bags
cu.m.
cu.m.
bd.ft.
kl

Unit Cost

Amount

280.00
800.00
800.00
17.00
65.00

Php

say

7,000.00
1,600.00
6,400.00
1,360.00
65.00

16,425.00
26,545.00
1,858.15
2,123.60
3,663.21
34,189.96
4,273.75
4,273.75

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
611(1) Trees ( Furnishing & Transplanting )
Quantity
328.00 each
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
40.00
b. Skilled Laborers
c. Unskilled Laborers
20
40.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Water Truck

D.
E.
F.
G.
H.
I.

500.00
280.00

Php
No. of
Equipment
1

No. of Days
30.00

Sub-Total for B
Name and Specification
C. Materials
Trees Seadling

Daily Rate

Daily Rate
8,520.00

Php
Quantity
328.00

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Unit
each

Unit Cost
1,500.00

Php

Amount
20,000.00
224,000.00

244,000.00
Amount
255,600.00

255,600.00
Amount
492,000.00

492,000.00
991,600.00
69,412.00
79,328.00
136,840.80
1,277,180.80
3,893.84

say

3,893.84

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
612(1) Reflecorized Thermoplastic pavement markings ( White )
Quantity
794.50 sq.m.
Description
No. of Person No. of Days
Daily Rate
A. Labor
a. Foreman
1
4.00
500.00
b. Skilled Laborers
2
4.00
300.00
c. Unskilled Laborers
6
4.00
280.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Stake truck
Applicator Machine
Kneading Mabhine
Traffic Safety Devices

Php
No. of
Equipment
1
1
1
1

No. of Days
4.00
4.00
4.00
4.00

Sub-Total for B
Name and Specification
C. Materials
Thermoplastic Paint White

D.
E.
F.
G.
H.

Quantity

Unit

794.50 sq.m.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost

Daily Rate

Amount
2,000.00
2,400.00
6,720.00

11,120.00
Amount

6,808.00
750.00
1,500.00
500.00

27,232.00
3,000.00
6,000.00
2,000.00

Php

38,232.00

Unit Cost

Amount

800.00

635,600.00

Php

635,600.00
684,952.00
47,946.64
54,796.16
94,523.38
882,218.18

I. Total unit Cost


say

1,110.41
1,110.41

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
612(2) Reflecorized Thermoplastic pavement markings ( Yellow )
Quantity
140.00 sq.m.
Description
No. of Person No. of Days
Daily Rate
Amount
A. Labor
a. Foreman
1
1.00
500.00
500.00
b. Skilled Laborers
2
1.00
300.00
600.00
c. Unskilled Laborers
6
1.00
280.00
1,680.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Stake truck
Applicator Machine
Kneading Mabhine
Traffic Safety Devices

Php
No. of
Equipment
1
1
1
1

No. of Days
1.00
1.00
1.00
1.00

Sub-Total for B
Name and Specification
C. Materials
Thermoplastic Paint Yellow

D.
E.
F.
G.

Quantity

Unit

140.00 sq.m.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )

Daily Rate

2,780.00
Amount

6,808.00
750.00
1,500.00
500.00

6,808.00
750.00
1,500.00
500.00

Php

9,558.00

Unit Cost

Amount

850.00

119,000.00

Php

119,000.00
131,338.00
9,193.66
10,507.04
18,124.64

H. Total Cost
I. Total unit Cost
say

169,163.34
1,208.31
1,208.31

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
Quantity
Description
A. Labor
a. Foreman
b. Skilled Laborers
c. Unskilled Laborers

500
18.00

RC Culvert Pipe, 610mm


l.m.
No. of Person No. of Days
1
2
4

1.00
1.00
1.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Backhoe

500.00
300.00
280.00

Php
No. of
Equipment
1

No. of Days
0.50

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Pipe Culvert, 610mm
Form Lumber
Cwn

Daily Rate

Quantity
6.00
0.50
18.00
60.00
1.00

Sub-Total for C
D. Total Direct Cost
E. Overhead, Contingencies and Miscellaneous ( 7% of D )

Unit
bags
cu.m.
pcs
bd.ft.
kl

Daily Rate

Amount
500.00
600.00
1,120.00

2,220.00
Amount

12,296.00

6,148.00

Php

6,148.00

Unit Cost
280.00
800.00
2,400.00
17.00
65.00

Php

Amount
1,680.00
400.00
43,200.00
1,020.00
65.00

46,365.00
54,733.00
3,831.31

F.
G.
H.
I.

Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost
say

4,378.64
7,553.15
70,496.10
3,916.45
3,916.45

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
502(3) Catch Basin
Quantity
6.00 each
Description
No. of Person
A. Labor
a. Foreman
1
b. Skilled Laborers
4
c. Unskilled Laborers
10

No. of Days
3.00
3.00
3.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
One Bagger Mixer

Sub-Total for C

500.00
300.00
280.00

Php
No. of
Equipment
1

No. of Days
2.00

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Gravel
Reinf Steel Bar
Form Lumber
Plywood
Cwn

Daily Rate

Quantity
144.00
5.00
6.00
529.00
300.00
4.00
6.00

Unit
bags
cu.m.
cu.m.
kls
bd.ft.
pcs
kls

Daily Rate

Amount
1,500.00
3,600.00
8,400.00

13,500.00
Amount

1,376.00

2,752.00

Php

2,752.00

Unit Cost
280.00
2,500.00
2,000.00
45.00
17.00
680.00
65.00

Php

Amount
40,320.00
12,500.00
12,000.00
23,805.00
5,100.00
2,720.00
390.00

96,835.00

D.
E.
F.
G.
H.
I.

Total Direct Cost


Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost
say

113,087.00
7,916.09
9,046.96
15,606.01
145,656.06
24,276.01
24,276.01

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
502(4) Concrete Cover
Quantity
6.00 each
Description
No. of Person
A. Labor
a. Foreman
1
b. Skilled Laborers
4
c. Unskilled Laborers
10

No. of Days
0.50
1.00
0.50

Sub-Total for A
Name and Capacity
B. Equipment Rental

Sub-Total for C

500.00
300.00
280.00

Php
No. of
Equipment

No. of Days

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Gravel
Reinf Steel Bar
Form Lumber
Plywood
Cwn

Daily Rate

Daily Rate

Amount
250.00
1,200.00
1,400.00

2,850.00
Amount

Php
Quantity
25.00
1.50
2.00
98.00
64.00
1.00
1.00

Unit
bags
cu.m.
cu.m.
kls
bd.ft.
pc
kls

Unit Cost
280.00
2,500.00
2,000.00
45.00
17.00
680.00
65.00

Php

Amount
7,000.00
3,750.00
4,000.00
4,410.00
1,088.00
680.00
65.00

20,993.00

D.
E.
F.
G.
H.
I.

Total Direct Cost


Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost
say

23,843.00
1,669.01
1,907.44
3,290.33
30,709.78
5,118.30
5,118.30

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
Quantity
Description
A. Labor
a. Foreman
b. Skilled Laborers
c. Unskilled Laborers

503
6.00

Metal Frame & Grating


set
No. of Person No. of Days
1
1
1

1.00
1.00
1.00

Sub-Total for A
Name and Capacity
B. Equipment Rental

500.00
300.00
280.00

Php
No. of
Equipment

No. of Days

Sub-Total for B
Name and Specification
C. Materials
Metal Frame & Gratings

Daily Rate

Daily Rate

Amount
500.00
300.00
280.00

1,080.00
Amount

Php
Quantity
6.00

Unit
sets

Unit Cost
500.00

Amount
3,000.00

D.
E.
F.
G.
H.
I.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

3,000.00
4,080.00
285.60
326.40
563.04
5,255.04
875.84
875.84

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
600(3) Concrete Curb & Gutter
Quantity
122.00 l.m.
Description
No. of Person No. of Days
A. Labor
a. Foreman
1
3.00
b. Skilled Laborers
6
3.00
c. Unskilled Laborers
20
3.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
One Bagger Mixer
Water Truck

500.00
300.00
280.00

Php
No. of
Equipment
1
1

No. of Days
2.00
2.00

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Gravel
Form Lumber

Daily Rate

Quantity
140.00
9.00
13.00
160.00

Unit
bags
cu.m.
cu.m.
bd.ft.

Daily Rate

Amount
1,500.00
5,400.00
16,800.00

23,700.00
Amount

1,376.00
8,520.00

2,752.00
17,040.00

Php

19,792.00

Unit Cost
280.00
2,500.00
2,000.00
17.00

Amount
39,200.00
22,500.00
26,000.00
2,720.00

D.
E.
F.
G.
H.
I.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

90,420.00
133,912.00
9,373.84
10,712.96
18,479.86
172,478.66
1,413.76
1,413.76

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
Quantity
Description
A. Labor
a. Foreman
b. Skilled Laborers
c. Unskilled Laborers

601
244.00

Sidewalk
sq.m.
No. of Person

No. of Days

1
6
20

3.00
3.00
3.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
One Bagger Mixer
Water Truck

500.00
300.00
280.00

Php
No. of
Equipment
1
1

No. of Days
2.00
2.00

Sub-Total for B
Name and Specification
C. Materials
Portland Cement
Sand
Gravel
Form Lumber

Daily Rate

Quantity
220.00
14.00
21.00
240.00

Unit
bags
cu.m.
cu.m.
bd.ft.

Daily Rate

Amount
1,500.00
5,400.00
16,800.00

23,700.00
Amount

1,376.00
8,520.00

2,752.00
17,040.00

Php

19,792.00

Unit Cost
280.00
2,500.00
2,000.00
17.00

Amount
61,600.00
35,000.00
42,000.00
4,080.00

D.
E.
F.
G.
H.
I.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

142,680.00
186,172.00
13,032.04
14,893.76
25,691.74
239,789.54
982.74
982.74

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
605(3) Informatory Signs
Quantity
2.00 units
Description
No. of Person
A. Labor
a. Foreman
1
b. Laborers
2

No. of Days
1.00
1.00

Sub-Total for A
Name and Capacity
B. Equipment Rental

500.00
280.00

Php
No. of
Equipment

No. of Days

Sub-Total for B
Name and Specification
C. Materials
Informatory Signs

Daily Rate

Daily Rate

Amount
500.00
560.00

1,060.00
Amount

Php
Quantity
2.00

Unit
each

Unit Cost
6,000.00

Amount
12,000.00

D.
E.
F.
G.
H.
I.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

12,000.00
13,060.00
914.20
1,044.80
1,802.28
16,821.28
8,410.64
8,410.64

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
FEA1.1a Bunkhouse, ( 7.00m X 9.00m )
Quantity
1.00 l.s.
Description
Quantity
Unit
A. Labor

Sub-Total for A
Name and Capacity
B. Equipment Rental

Amount

Php
No. of
Equipment

No. of Days

Sub-Total for B
Name and Specification
C. Materials
7.00m x 9.00m - Bunkhouse
including Labor & Materials

Unit Cost

Daily Rate

Amount

Php
Quantity

1.00

Unit

l.s.

Unit Cost

380,000.00

Amount

380,000.00

D.
E.
F.
G.
H.
I.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

380,000.00
380,000.00
26,600.00
30,400.00
52,440.00
489,440.00
489,440.00
489,440.00

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
FEA1.1b Facilities for the Engineers
Quantity
1.00 l.s.
Description
Quantity
Unit
A. Labor

Sub-Total for A
Name and Capacity
B. Equipment Rental

Amount

Php
No. of
Equipment

No. of Days

Sub-Total for B
Name and Specification
C. Materials
Faciliteis fro the Engineer

Unit Cost

Daily Rate

Amount

Php
Quantity
1.00

Unit
l.s.

Unit Cost
540,000.00

Amount
540,000.00

D.
E.
F.
G.
H.
I.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

540,000.00
540,000.00
37,800.00
43,200.00
74,520.00
695,520.00
695,520.00
695,520.00

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
FEA1.2 Project Billboard
Quantity
2.00 units
Description
No. of Person
A. Labor
a. Foreman
1
b. Laborers
2

No. of Days
2.00
2.00

Sub-Total for A
Name and Capacity
B. Equipment Rental

500.00
280.00

Php
No. of
Equipment

No. of Days

Sub-Total for B
Name and Specification
C. Materials
Tarpaulin
1/4" Marine Plywood

Daily Rate

Daily Rate

Amount
1,000.00
1,120.00

2,120.00
Amount

Php
Quantity
2.00
2.00

Unit
pcs
pcs

Unit Cost
1,200.00
480.00

Amount
2,400.00
960.00

Coco Lumber
Cwn

D.
E.
F.
G.
H.
I.

240.00
4.00

bd ft
kls

17.00
65.00

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

4,080.00
260.00

7,700.00
9,820.00
687.40
785.60
1,355.16
12,648.16
6,324.08
6,324.08

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
FEA1.3 Construction Safety and Health Program
Quantity
1.00 l.s.
Description
No. of Person No. of Days
Daily Rate
A. Labor
a. Safety Officer
1
160.00
400.00
b. Flagman
2
160.00
280.00

Sub-Total for A
Name and Capacity
B. Equipment Rental

Php
No. of
Equipment

No. of Days

Sub-Total for B
Name and Specification
C. Materials
First Aide Kit with Medicines

Daily Rate

Amount
64,000.00
89,600.00

153,600.00
Amount

Php
Quantity
1.00

Unit
l.s.

Unit Cost
10,000.00

Amount
10,000.00

Hard Hut, Rubber Boots & Others


Warning Signs & Others

D.
E.
F.
G.
H.
I.

1.00
1.00

l.s.
l.s.

25,000.00
5,000.00

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

25,000.00
5,000.00

40,000.00
193,600.00
13,552.00
15,488.00
26,716.80
249,356.80
249,356.80
249,356.80

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
FEA1.4 Provision of a Service Vehicle for the Engineers
Quantity
1.00 l.s.
Description
No. of Person No. of Mos.
Daily Rate
A. Labor
a. Foreman
b. Laborers

Sub-Total for A
Name and Capacity
B. Equipment Rental
One(1) Brand New Double Cab
Pick up, Diesel Engine

Php
No. of
Equipment
1

No. of Days

l.s.

Daily Rate

1,200,000.00

Sub-Total for B
Name and Specification
C. Materials

Amount

Php
Quantity

Unit

Unit Cost

Amount

1,200,000.00

1,200,000.00
Amount

Diesel

D.
E.
F.
G.
H.
I.

2,070.00

liters

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

42.00

Php

say

86,940.00

86,940.00
1,286,940.00

154,432.80
1,441,372.80
1,441,372.80
1,441,372.80

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
SPL-1 Mobilization/Demobilization
Quantity
1.00 l.s.
Description
No. of Person No. of Days
A. Labor
a. Foreman
b. Laborers

Sub-Total for A
Name and Capacity
B. Equipment Rental
Mobilization of Equipment & Materials
@ jobsite

Amount

Php
No. of
Equipment
1.00

No. of Days

l.s.

Daily Rate

800,000.00

Sub-Total for B
Name and Specification

Daily Rate

Php
Quantity

Unit

Unit Cost

Amount

800,000.00

800,000.00
Amount

C. Materials

D.
E.
F.
G.
H.
I.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

800,000.00

96,000.00
896,000.00
896,000.00
896,000.00

CONTRACT ID:
15JO0010
CONTRACT NAME: Road Upgrading ( Gravel to Paved ) of Crossing Sta. Clara- Sabdayong,
Zamboanga Sibugay, K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )
LOCATION OF THE CONTRACT: Crossing Sta. Clara-Sandayong, Zamboanga Sibugay,
K1789+117.19 - K1789+237.00, K1789+237.00 - K1810+517.00
( Intermittent Sections )

DETAILED ESTIMATES
Item No./Description
SPL -2 Construction Survey and Staking
Quantity
3.26 kms
Description
No. of Person No. of Days
A. Labor
a. Surveyor
1
30.00
b. Utility Man/Survey Aide
8
30.00

Sub-Total for A
Name and Capacity
B. Equipment Rental
Survey Equipment

400.00
280.00

Php
No. of
Equipment
1.00

No. of Days
30.00

Sub-Total for B
Name and Specification

Daily Rate

Daily Rate
500.00

Php
Quantity

Unit

Unit Cost

Amount
12,000.00
67,200.00

79,200.00
Amount
15,000.00

15,000.00
Amount

C. Materials

D.
E.
F.
G.
H.
I.

Sub-Total for C
Total Direct Cost
Overhead, Contingencies and Miscellaneous ( 7% of D )
Contractor's Profit ( 8% of D )
VAT ( 12% of D+E+F )
Total Cost
Total unit Cost

Php

say

94,200.00
6,594.00
7,536.00
12,999.60
121,329.60
37,217.67
37,217.67

SUMMARY OF COST FOR CONTRACT ID NO. 15JO0010


.
ITEM NO.

DESCRIPTION

101(3)

Removal of Existing RCCP

102(2)

Surplus Common Excavation

103

Structure Excavation

QUNTITY

UNIT

UNIT COST

AMOUNT

539.00 ln.m.

264.33

142,473.87

21,915.00 cu.m.

465.39

10,199,021.85

535.50 cu.m.

286.95

153,661.73
3,776.42

103(3)

Foundation Fill

2.00 cu.m.

1,888.21

103(6)

Pipe Culvert and Drain Excavation

5.50 cu.m.

379.37

2,086.54

104(1)

Embankment, from Excavation

8,425.00 cu.m.

144.28

1,215,559.00

104(2)

Embankment ( Common Borrow )

780.50 cu.m.

653.60

510,134.80

105

Subgrade Preparation

29,010.00 sq.m.

21.82

632,998.20

200

Aggregate Sub-base Course

13,210.50 cu.m.

1,190.65

15,729,081.83

311a

PCCP - Conventional Method

23,479.50 sq.m.

2,016.31

47,341,950.65

311b

PCCP, 0.15m thick

9,792.50 sq.m.

1,096.13

10,733,853.03

404a

Reinforcing Stee ( Grade 40 )

93.90

1,031,820.15

405

Structural Concrete Class "A"

271.50 cu.m.

9,464.69

2,569,663.34

10,988.50 kg

500(1a)

RC Culvert Pipe, 910mm dia ( 36" dia )

14.00 ln.m.

5,697.84

79,769.76

505(5)

Grouted Riprap Class "A"

3.50 cu.m.

4,189.68

14,663.88

Stone Masonry

8.00 cu.m.

4,273.75

34,190.00

506
611(1)

Trees ( Furnishing & Transplanting )

328.00 each

3,893.84

1,277,179.52

612(1)

Reflectorized Thermoplastic Pavement


Markings(white)

794.50 sq.m.

1,110.41

882,220.75

612(2)

Reflectorized Thermoplastic Pavement


Markings(yellow)

140.00 sq.m.

1,208.31

169,163.40

18.00 ln.m.

3,916.45

70,496.10

500

RC Culvert Pipe, 610mm dia

502(3)

Catch Basin

6.00 each

24,276.01

145,656.06

502(4)

Concrete Cover

6.00 each

5,118.30

30,709.80

503

Metal Frame & Gratings

6.00 set

600 (3)

Concrete Curb & Gutter

122.00 ln.m.

Sidewalk

244.00 sq.m.

601
605(3)

875.84

5,255.04

1,413.76

172,478.72

982.74

239,788.56

8,410.64

16,821.28

Informatory Signs

2.00 unit

FEA 1.1a Bunkhouse ( 7.00m x 9.00m )

1.00 l.s.

489,440.00

489,440.00

FEA 1.1b Facilities for the Engineer

1.00 l.s.

695,520.00

695,520.00

FEA 1.2 Project Billboard

2.00 units

6,324.08

12,648.16

FEA 1.3 Construction Safety and Health Program

1.00 l.s.

Provision of a Service vehicle for the


FEA 1.4 Engineers
SPL-1 Mobilization & Demobilization
SPL-2 Construction Survey and Staking

1.00 l.s.
1.00 l.s.
3.26 kms

TOTAL AMOUNT

Submitted by:

RANDOLF IVAN A. RUSTE


President
Rcdg Construction Corporation

249,356.80

249,356.80

1,441,372.80
896,000.00
37,217.67

1,441,372.80
896,000.00
121,329.60

Php

97,310,141.64

4,746,022.40
10,199,002.24
(5,452,979.84)

13,772,406.26
15,729,144.87
(1,956,738.61)

53,420,177.39
47,341,979.16
6,078,198.23

12,226,714.20

6,773,823.91

78,119,136.94

83,590,040.28

2,593,569.71

1,650,013.40

2,720,707.36

97,310,141.61

97,310,141.64

97,328,154.66