Subcontractor's Name
SURTEQA S.p.c
Topographic Survey
ELV/ICT Works
10
11
BLUE HOUSE
12
13
AL SHAIBETH ESTABLISHMENT
14
15
16
MZ & PARTNERS
17
18
19
TOTAL
Manpower at site:
Type
Sr.Staff
Sup.Level
F/M
Direct Manpower
C/H
4
Clerk
Skilled
Labour
24
14
GRAND TOTAL
Equipment at site:
Pick up / Car & Buses
Wheel Loader
4
1
Telehandler
Water Tanker (3750 USG)
1
1
Half Lorry
Skid Loader
Grader
Jumping Compactor
TOTAL
Min.(C)
Temperature
Max.(C)
We
Humidity
Sunny
Cloudy
Rainy
.
Dusty
.
Weather Condition
Lack of Manpower
Equipment Breakdown
Material Rejected
Unforeseen
Other Events
MTC Representative:
Sankar Mohapatra
windy
RUCTION REPORT
DATE
28-Jun-15
Work Descriptions
No of Staff
gn Consultants
ey
ta acquisition
Laboratory
works
g Works
arking Works
g at TSF
Unskilled
Labour
Drivers/Op Comp.
erators
Operators
25
Remarks
Total
58
0
24
11
61
0
RUCTION REPORT
0
119
5
2
2
2
2
3
16
Weather Conditions
Windy
.
Remarks
Max
Min
Total Pages:
DAIL
Project Name
Location of Work
Person Incharge
S.No.
Activities
CIVIL / ARCHITECTURAL
A
Holding tank at MS 1
Boom Barrier
10
11
12
13
14
Trench Soakaway
15
17
18
19
Detour Road
Prime Coat application
Asphalt laying work
Paving Blocks laying work in Out-bound road
Paving Blocks laying work at In-bound Road
Concreting of RCC slab at utility crossing area ( out-bound )
Concreting of RCC slab at utility crossing area ( In-bound )
Paving blocks laying at Detour Road ( Infront of CCC Gate )
Chainlink Fence
Excavation of fence foundation
Concreteting of fence Post foundations
Backfilling of fence foundation trench
Chainlink fence installation work
Barricading work along the boundary fence and MTC work limit area.
Grading and clearing the top soil along the boundary fence line
Site Cleaning and grubbing and top soil removal between 8-9
Grading and top soil removal between cord no. 9-12
Cleaning, grubbing and levelling for the fill material stock pile area
Temporary Bench mark establishment at Boundary fence perimeter.
Foundation excavation
Boundary Fence post marking between Co-ordinate No. 8-9
Boundary Fence post foundation trench excavation between cord. No 8-9
Fence foundation shuttering preparation work
4
ELECTRICAL
1
IT Cable termination
10
LOSS PREVENTION
1
ctivities
ad
bout
Actual
Start Date
General
Location
Grid
out-bound )
n-bound )
CCC Gate )
work.
warning tap and tiles.
existing line
cabin
Run Date:
28-Jun-15
ELV/IT:
General
Staff Nos.
Actual Completion
Remarks
100% Completed
100% Completed
100% Completed
100% Completed
100% Completed
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
85% Complete
100% Complete
80% Complete
95% Complete
100% Complete
100% Complete
100% Complete
87% Complete
100% Complete
25% Complete
100% Complete
100% Complete
100% Complete
100% Complete
At MPAC NE portion
100% Complete
75% Complete
75% Complete
55% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
2 Nos. completed
100% Complete
100% Complete
100% Complete
100% Complete
NEXT D
Project Name
Location of Work
Person Incharge
S.No.
Activities
CIVIL / ARCHITECTURAL
1
Continue Kerb Stone and paver blocks removal at canopy location at MS02
LOSS PREVENTION
Activities
e GSB footings
Boundary fence
undation excavation
Actual
Start Date
General
Location
Grid
Run Date:
28-Jun-15
ELV/IT:
General
Staff Nos.
Actual Completion
Remarks