Escolar Documentos
Profissional Documentos
Cultura Documentos
E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
APPENDIX 1 TO PART 3
QUALITY AUDIT FORMS
DESCRIPTION
MOQA- 01
MOQA- 02
MOQA- 03
MOQA- 04
MOQA- 05
MOQA- 06
MOQA- 07
MOQA- 08
COMPONENT SUPPLIERS
MOQA- 09
MOQA-10
MOQA-11
LINE STATION
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
MOQA- 01
FORM MOQA-01
Page 1 of 3
Issue: 01/ 06 Nov 2012
Rev.:00
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Page 2 of 3
AUDIT PERFORMED:
Audit Subject
Annotation
NCR
No
FACILITY REQUIREMENTS
FACILITIES ARE APPROPRIATE FOR ALL PLANNED WORK
145.A.25
(a)
145.A.25
(b)
145.A.25
(c)
145.A.25
(d)
PERSONNEL REQUIREMENTS
145.A.30
(a)
145.A.30
(b)
Page 3 of 3
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
145.
A.30 (c)
145.A.30
(d)
145.A.30
(e)
PERSON
WITH
145.A.30
(f)
145.A.30
(g)
145.A.30
(h)
Remarks: ( Please explain the reasons for N/A, N/P annotations above)
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
FORM MOQA-02
Page 1 of 3
Issue: 01/06 Nov 2012
Rev.:00
M. O. E
PART- 3
QUALITY
SYSTEM
QUALITY AUDIT
FORM
No:
Doc No: HA-MOE-001
AUDIT PERFORMED:
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
Manual
Ref
Audit Subject
CERTIFYING STAFF
Annotatio
n
NCR
No
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
AMC
145.A.35 (a)
AMC
145.A.35 (b)
AMC
145.A.35 (c)
AMC
145.A.35 (d)
AMC
145.A.35 (e)
AMC
145.A.35 (f)
AMC
145.A.35 (g)
AMC
145.A.35 (h)
AMC
145.A.35 (I)
AMC
145.A.35 (j)
AMC
145.A.35 (k)
AMC
145.A.35 (l)
AMC 145.A.35
(m)
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
AMC
145.A.40 (b)
Remarks: ( Please explain the reasons for N/A, N/P annotations above)
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
Page 3 of 3
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
MOQA- 03
FORM MOQA-03
Page 1 of 3
Issue: 01/06 Nov 2012
Rev.:00
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
Page 2 of 3
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
AUDIT PERFORMED:
Audit Subject
Annotation
ACCEPTANCE OF COMPONENTS
ALL COMPONENTS ARE CLASSIFIED AND APPROPRIATELY SEGREGATED
AMC
145.A.42 (a)
AMC
145.A.42 (b)
OF
MAINTENANCE DATA
AMC
145.A.45 (a)
AMC
145.A.45 (b)
CHECK AVAILABILITY OF MM, IPC, WD, C.M.M., SRM, ETC. (HARD COPIES OR
MICROFILMS)
A) REVISION STATUS
- M.M.s ...........................................
B) SUBSCRIPTIONS UPDATE
- I.P.C.s .........................................
C) REVISIONS DELIVERY TIME
- W.D.s .........................................
TEMPORARY REVISION STATUS
- C.M.M.s .......................................
- S.R.M.s .......................................
- Other ...........................................
CONDITION OF MANUALS
AMC
145.A.45 (c)
AMC
145.A.45 (d)
N/A
AMC
145.A.45 (e)
AMC
145.A.45 (f)
ALL APPLICABLE
BY MAINTENANCE
AMC
145.A.45 (g)
NCR
No
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Page 3 of 3
Remarks: ( Please explain the reasons for N/A, N/P annotations above)
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
MOQA- 04
FORM MOQA-04
Page 1 of 3
Issue: 01/06 Nov 2012
Rev.:00
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
Page 2 of 3
AUDIT PERFORMED:
Audit Subject
Annotation
NCR
No
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
PRODUCTION PLANNING
AMC
145.A.47 (a)
AMC
145.A.47 (b)
AMC
145.A.47 (c)
CERTIFICATION OF MAINTENANCE
AMC
145.A.50 (a)
AMC
145.A.50 (b)
AMC
145.A.50 (c)
AMC
145.A.50 (d)
N/A
AMC
145.A.50 (e)
AMC
145.A.50 (f)
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Auditor:
Signature:
Page 3 of 3
AcM Notified
Signature:
MOQA- 05
FORM MOQA-05
Page 1 of 3
Issue: 01/06 Nov 2012
Rev.:00
Attached Pages:
(For additional remarks may use the back side of this page)
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Auditee:
Auditor:
Quality Manager:
Page 2 of 3
AUDIT PERFORMED:
Audit Subject
MAINTENANCE RECORDS
THE ORGANISATION RECORDS ALL DETAILS OF MAINTENANCE WORK
CARRIED OUT
AMC
145.A.55 (a)
AMC
145.A.55 (b)
AMC
145.A.55
RECORDS ARE STORED IN A SAFE WAY WITH REGARD TO FIRE, FLOOD AND
THEFT
IF APPLICABLE, COMPUTER BACKUP DISKS, TAPES ETC. ARE STORED IN
DIFFERENT LOCATION FROM THAT CONTAINING THE WORKING DISKS, TAPES
ETC.
OCCURRENCE REPORTING
AMC
145.A.60 (a)
AMC
145.A.60 (b)
AMC
145.A.60 (c)
AMC
145.A.60 (d)
AMC
145.A.60 (e)
Annotation
NCR
No
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
Page 3 of 3
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
FORM MOQA-06
Page 1 of 4
Issue: 01/06 Nov 2012
Rev.:00
MOQA- 06
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
Page 2 of 4
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
AUDIT PERFORMED:
Audit Subject
AMC
145.A.70 (a)
AMC
145.A.70 (b)
AMC
145.A.80 (a)
AMC
145.A.85 (a)
The organisation shall notify HCAA of any proposal to carry out any
changes before such change take place to enable HCAA to determine
continuing compliance with Part 145 and to amend, if necessary, the
approval certificate, except that in the case of proposed changes in
personnel not known to the management beforehand, these changes must
be notified at the earliest opportunity
Annotation
NCR
No
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
AMC
145.A.85 (a)
Page 3 of 4
The organisation shall notify HCAA of any proposal to carry out any
changes before such change take place to enable HCAA to determine
continuing compliance with Part 145 and to amend, if necessary, the
approval certificate, except that in the case of proposed changes in
personnel not known to the management beforehand, these changes must
be notified at the earliest opportunity
COMPLIANCE IN ACCORDANCE WITH THE M.O.E.
2.1
2.2
2.3
SUPPLIER/S EVALUATION
ACCEPTANCE / INSPECTION OF COMPONENTS & MATERIALS FROM OUTSIDE
CONTRACTORS
STORAGE, TAGGING & RELEASE OF COMPONENTS & MATERIAL TO AIRCRAFT
MAINTENANCE
2.4
2.5
2.6
2.7
2.8
MAINTENANCE
COMPONENTS
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
INSTRUCTIONS
&
RELATIONSHIP
TO
AIRCRAFT
&
(AS IN
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
2.24
2.25
2.26
2.27
2.28
PRODUCTION PLANNING
L2.1
L2.2
L2.3
L2.4
L2.5
L2.6
L2.7
3.9
3.10
CONCESSION CONTROL
PROCEDURES
3.11
3.12
3.13
3.14
FOR
DEVIATION
FROM
THE
ORGANISATION
Remarks: ( Please explain the reasons for N/A, N/P annotations above)
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
Page 4 of 4
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
MOQA- 07
FORM MOQA-07
Page 1of 3
Issue: 01/06 Nov 2012
Rev.:00
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
Page 2 of 3
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
AUDIT PERFORMED:
LINE MAINTENANCE
Manual
Ref
Audit Subject
WORK IN PROGRESS
1. Work pack properly presented and used
2. Availability of tooling / equipment necessary for the inspection / task
3. Tools calibration timex
4. Availability of steps / ladders / fire extinguishers
5. Vehicles clear of obstructions
6. Removed panels / cowlings properly secured
7. Cockpit controls secured, tagged
8. Circuit Breakers for systems under work pulled & tagged
9. Personnel safety (gloves, goggles, safety shoes)
M.M
Annotation
NCR
No
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
Page 3 of 3
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
MOQA- 08
FORM MOQA-08
Page 1 of 3
Issue: 01/06 Nov 2012
Rev.:00
COMPONENT SUPPLIERS
Requirement Ref.: EASA PART 145, EASA PART M, EU-OPS 1, MOE
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
Page 2 of 3
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
AUDIT PERFORMED:
ORGANIZATION:
LOCATION:
Manual
Ref
Audit Subject
COMPANY :
COMPANY EXPOSITION/ MANUAL
145.A. 70
Names of Key Post Holders. Are they listed in Company Exposition? Check
capability list and validity.
..............
..............
..............
.............
STORAGE FACILITIES & OFFICE ACCOMODATION
AMC
145.A.25 (b)
(d)
145.A. 25
(d)
Annotation
NCR
No
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Page 3 of 3
BOGUS PARTS
Is there an effective system in place to address the problem of bogus parts?
How are suspected bogus parts processed? (Quarantine procedures)
How are staff informed about the problem of Bogus Parts?
TECHNICAL PUBLICATIONS
Validity, storage, cleanliness of area.
Control of Revisions, amendment procedure. Are revised publications
being received from the AEA?
Check sample of manuals for correct revision status, and procedure for
checking revision
TRAINING
Check training programme including continuation training and human
factors for content, validity and records for all personnel.
Training on Companys Procedures and Publications
Remarks: ( Please explain the reasons for N/A, N/P annotations above)
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
MOQA- 09
FORM MOQA-09
Page 1 of 4
Issue: 01/06 Nov 2012
Rev.:00
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
Page 2 of 4
AUDIT PERFORMED:
ORGANIZATION:
LOCATION:
Manual
Ref
Audit Subject
Annotation
NCR
No
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Page 3 of 4
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
Page 4 of 4
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
FORM MOQA-10
Page 1 of 2
Issue: 01/06 Nov 2012
Rev.:00
MOQA- 10
Requirement Ref.:
Part -145.A.65
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Page 2 of 2
Audit Subject
Annotation
NCR
No
AMC
145.A.65 (b)
CRITICAL TASKS :
THE ORGANISATION HAS ESTABLISHED PROCEDURES TO MINIMISE THE RISK
OF MULTIPLE ERRORS AND CAPTURE ERRORS ON CRITICAL SYSTEMS,
ENSURING THAT NO PERSON IS REQUIRED TO CARRY OUT AND INSPECT IN
RELATION TO A MAINTENANCE TASK INVOLVING SOME ELEMENT OF
DISASSEMBLY/REASSEMBLY OF SEVERAL COMPONENTS OF THE SAME TYPE
FITTED TO MORE THAN ONE SYSTEM ON THE SAME AIRCRAFT DURING A
PARTICULAR MAINTENANCE CHECK
WHEN ONLY ONE PERSON IS AVAILABLE TO CARRY OUT CRITICAL TASKS THEN
THE WORK CARD OR WORKSHEET MUST INCLUDE AN ADDITIONAL STAGE FOR
RE-INSPECTION OF THE WORK BY THIS PERSON AFTER COMPLETION OF THE
SAME TASKS
THE ORGANISATION HAS ESTABLISHED MAINTENANCE PROCEDURES TO
ENSURE THAT DAMAGES ARE ASSESSED AND MODIFICATIONS AND REPAIRS
ARE CARRIED OUT USING DATA APPROVED BY THE HCAA OR BY AN
APPROVED PART-21 DESIGN ORGANISATION, AS APPROPRIATE
Page 2 of 2
Remarks: ( Please explain the reasons for N/A, N/P annotations above)
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
FORM MOQA-11
Page 1 of 3
Issue: 01
Rev.:04 / 10 Aug 2014
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
MOQA- 11
LINE STATION
Requirement Ref.:
Attached Pages:
(For additional remarks may use the back side of this page)
Auditee:
Auditor:
Quality Manager:
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Page 2 of 3
AUDIT PERFORMED:
LINE STATION:
Manual
Ref
145.A.10
Scope
Audit Subject
NCR
No
1. Review Contracts.
2. Confirm Access on Server.
145.A.25
Facility
Requirem
ents
1. Quarantine Records
2. Approval Certificates
3. Health and Safety Notices
4. Humidity and Temp
5. Tech Library suitable
6. Wheel Change Equipment
7. Noise protection
8. Stores Housekeeping
9. Goods in sample
10. Goods out sample
11. Bonded Store Item check
12. Bonded store security
13. Oil- Hyd- Grease Store Housekeeping
14. Oil- Hyd- Grease Batch Check
15. Rack markings
16. Stores Documentation
17. Form 1 sample
145. A.30
Personnel
Requirem
ents.
145.A.35
Certifying
Staff
1. Man-hour plan
2. Mechanic Assessments
3. P-147 Training certificates
4. Part- 66 Licence
5. Part -145 Approval
6. Sufficient Staff
7. P-145 Training Certificates
145.A.40
Equipmen
t, Tools &
Materials
1. Tool housekeeping,
2. Calibration Records,
3. Asset Number Check,
4. Tooling inventory,
5. Calibration sample,
6. Jack load tests
145.A.42
Acceptan
ce of
Compone
nts
Annotation
1. Release certificate
2. Staff awareness
3. Form 1 Format
4. Material sample
5. 8130 Dual release check
Page 3 of 3
M. O. E
PART- 3
QUALITY SYSTEM
Doc No: HA-MOE-001
Manual
Ref
145.A.45
Maintena
nce Data
145.A.47
Productio
n
Planning
145.A.50
Certificati
on of
Maintena
nce
145.A.55
Maintena
nce
Records
145.A.60
Occurren
ce
Reporting
145.A.65
Safety &
Q. Policy
145.A.70
MOE
Audit Subject
Annotation
1. Staff awareness
2. Confirm Aircraft maintained i.a.w. MOE
Remarks: ( Please explain the reasons for N/A, N/P annotations above)
Auditor:
Auditee:
Signature:
Signature:
Station/ Contact
AcM Notified
Signature:
NCR
No