PROJECT NAME
Purpose
DOCUMENT NO.
: KP-00+++-TZ782-V0015
For Information
TITLE
OWNER
29.04.2015
Rev.
No.
DATE
First Issue
DESCRIPTION
For Review
For Approval
For Construction
As-Built
DE
AY
PREPARED
CHECKED
REVIEWED
APPROVED
Owner
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
Page: 1/11
Date:29.04.2015
HSE Manager
QA/QC Manager
Site Manager
Name
Date
Sign
Remarks:
Any such review or consent by GAMA, shall not relieve the Subcontractor, in any case or for any reason whatsoever,
from any obligation, liability or responsibility arising out of or in connection with the Contract, including without being
limited thereto, to the responsibility for errors, omissions, discrepancies and non-compliances. Within this context, this
document shall not prevail over or amend the Contract, or relieve the Subcontractor from any of its duties, obligations,
responsibilities or liabilities under the Contract.
Anything presented herein by the Subcontractor shall in no event
i) excuse the Subcontractors non-performance under the Contract, or
ii) entitle him to a variation under the Contract or an adjustment to the Contract Price.
SUBCONTRACTOR
Rev.
No.
Date
Description*
29.04.2015
132kV Switchyard
Steel Erection
Works
Prepared
by
HSE
Manager
QA/QC
Manager
Site
Manager
Project
Manager
Deniz
EREN
Eyyp
ZBAY
DOCUMENT HISTORY:
Page: 2/11
Date:29.04.2015
Remarks
Rev.
No.
Date
(Reason for Revision)
29.04.2015
First Issue
* Description:
Document issue purpose
-
First Issue
For Information
For Review
Page: 3/11
Date:29.04.2015
CONTENT
1.0
OBJECTIVE ........................................................................................................................ 4
2.0
3.0
4.0
5.0
PREREQUISITES............................................................................................................... 6
6.0
7.0
8.0
RESTORATION ................................................................................................................. 6
9.0
REFERENCES ................................................................................................................... 6
10.0
APPENDIX ......................................................................................................................... 7
Page: 4/11
Date:29.04.2015
1.0 OBJECTIVE
To provide instructions for electrical testing of Protection Equipments before putting
into service. It included visual inspection of the Protection Cubicles for proper
installation and cleanness, to verify the correct operation and to verify equipments meet
the acceptable requirements.
3.0 PROCEDURE
Page: 5/11
Date:29.04.2015
Page: 6/11
Date:29.04.2015
5.0 PREREQUISITIES
1) Protection Panel should be installed.
2) External cable connections should be completed.
3) AC and DC power should be prepared.
4) Panel Grounding should be completed.
9.0 REFERENCE
Page: 7/11
Date:29.04.2015
10.0 APPENDIX
APPENDIX A PROTECTION PANEL CHECKLIST
EQUIPMENT IDENTIFICATION
FACILITY
UNIT NO.
JOB NO.
SHEET
____ OF ____
SYSTEM
EQUIPMENT NAME/NUMBER
Rated Voltage:
Feeder Name:
Frequency:
TEST EQUIPMENT
NAME OF MANUFACTURER
SERIAL NUMBER:
PANEL TYPE:
Control&Tests
1
Terminals labelled?
Measurement Devices
Interlocking Conditions
Local&Remote control
10
11
12
Status
Notes
TEST RESULTS
Test results are attached.
REMARKS
DATE
APPROVED
DATE
Page: 8/11
Date:29.04.2015
UNIT NO.
JOB NO.
SHEET
____ OF ____
SYSTEM
VT Ratio:
EQUIPMENT NAME/NUMBER
Frequency:
Line Length(km):
CT Ratio:
TEST EQUIPMENT
NAME OF MANUFACTURER
SERIAL Number:
Protective Relay:
RELAY SETTINGS
Relay settings and selectivity study can be added to this section
Function tests
1
Fault Locator
Status
Notes
TEST RESULTS
Test results are attached.
REMARKS
DATE
APPROVED
DATE
Page: 9/11
Date:29.04.2015
UNIT NO.
JOB NO.
SHEET
____ OF ____
SYSTEM
EQUIPMENT NAME/NUMBER
VT Ratio:
Frequency:
Line Length(km):
CT Ratio:
TEST EQUIPMENT
NAME OF MANUFACTURER
SERIAL Number:
Protective Relay:
RELAY SETTINGS
Relay settings and selectivity study can be added to this section
No
Control &Tests
Output Check
Input Check
CFC
10
11
Status
Explanation
TEST RESULTS
Test results are attached.
REMARKS
DATE
APPROVED
DATE
Page: 10/11
Date:29.04.2015
UNIT NO.
JOB NO.
SHEET
____ OF ____
SYSTEM
EQUIPMENT NAME/NUMBER
VT Ratio:
Frequency:
Line Length(km):
CT Ratio:
TEST EQUIPMENT
NAME OF MANUFACTURER
SERIAL Number:
Protective Relay:
RELAY SETTINGS
Relay settings and selectivity study can be added to this section
Test Settings
Busbar Protection
Current
Time
Operational Settings
Current
Time
Time
Operational Settings
Current
Time
Idiff>
Idiff>>
Test Settings
Current
Iq>
Iq>>
Feeder
No
Test
I (A)
1
2
3
4
5
6
7
8
9
10
11
12
Page: 11/11
Feede
r No
1
Test
I (A)
Date:29.04.2015
2
3
4
5
6
7
8
9
10
11
12
TEST RESULTS
Test results are attached.
REMARKS
DATE
APPROVED
DATE