Chair of Drilling and Completion Engineering

Transient IPR Example


Use the provided data set to construct the IPR curves for
1, 6 and 24 months. S=0

07.08.15

07.08.15

Chair of Drilling and Completion Engineering

Transient IPR Example


6000

5000

psi

4000

1 Month

3000

6 Months
24 Months
2000

1000

0
0

200

400

600

800

1000

1200

1400

STB/day

07.08.15

Chair of Drilling and Completion Engineering

Inuence of the Skin Eect


Using the same data set, construct the IPR curves for
Skin Eects of 0, 5, 10 and 50. Use a drainage radius (r)
of 2980K.

07.08.15

07.08.15

Chair of Drilling and Completion Engineering

Inuence of the Skin Eect


6000

5000

4000

S = 0
S = 5

3000

S = 10
S = 50
2000

1000

0
0

200

400

600

800

1000

1200

07.08.15

Chair of Drilling and Completion Engineering

Inuence of the average reservoir pressure


Considering a Skin eect of 0, construct the IPR curves for
5651, 5500, 5000, 4500, 4000 & 3500 psi (so varying Pis).
Use a drainage radius of 2980K.

07.08.15

07.08.15

Chair of Drilling and Completion Engineering

Inuence of the average reservoir pressure


6000

5000

4000
5651
5500
5000

3000

4500
4000
3500

2000

1000

0
0

200

400

600

800

1000

1200

07.08.15

Chair of Drilling and Completion Engineering

VLP for single phase uid


The tubing installed is 2 3/8in (ID=2in) with a roughness of 0.0006. What
would be the expected producXon rate and corresponding boYomhole
pressure if the wellhead pressure is 0 psi? (assuming a steady state
reservoir).
Depth

8000K

(oil gravity)

0.88

API

28

55lb/K3

gc

32.17 K-lbm/lbf-s2

Step #1: Construct IPR

07.08.15

07.08.15

Chair of Drilling and Completion Engineering

VLP for single phase uid


Step #2: BH Pressure

Pressure [psi] = 0.433*s.g. (oil gravity = 0.88)*Depth

Step #3: Reynolds Number


D ID
Step #4: Fanning fricFon factor via Colebrook-White equaFon

Step #5: Velocity


in Z/s so make sure to convert the STB/day and the ID
07.08.15

Chair of Drilling and Completion Engineering

VLP for single phase uid


Step #6: FricFonal Pressure Drop
L depth

Step #7: Sum up pressure drops and repeat for ow rates 100-1200
Step #8: Finding the intersecFon point via Excels Solver tool
Using Solver:

1. Set ObjecFve to rst trendline equaFon
2. Set "to value of = 0"
3. Set N26 & N27 (x & y) as variables to change
4. Set second tendline equaFon = 0 as constraint
5. Solve & obtain soluFon

07.08.15