Você está na página 1de 64

MILIL /HO/HR & ADMIN/ 033 /2014

July 03, 2014

Electro Mart Limited.


62/3, Purana Paltan (5th Floor)
Dhaka-1000.
Subject: Work Order for Air Conditioner.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotations for Air Conditioner we are very pleased to inform you that the Management has decided to
accept your quotations and give you work order for our Head Office in the manner as follows:
SL.
1

Descriptions of AC
GS-12V Viola-Split type

Capacity
1.0 Ton

Unit Price
47,000/-

Qty.
3pcs

Total Price(BDT)
1,41,000/1,39,380/-

GS-12V Viola-Split type

1.0 Ton

46,460/-

3pcs

3
4
5

GS-18V Viola-Split type


GS-24V Viola-Split type
HS -48 FCM

1.5 Ton
2.0 Ton
4.0 Ton

57,960/70,840/1,20,000/-

3pcs
1pcs
3pcs

1,73,880/70,840/3,60,000/Sub Total = 8,85,100/(VAT & TAX) With Price = 9,42,632/(-)VAT @ 4% = 35,404/Total = 9,07,228/(-)TAX @ 2.5% = 22,128/Total = 8,85,100/-

7
8

Iron Angle
Copper Pipe
Copper Pipe

Copper Pipe

10

GS-12V Viola-Split type, installation charge

7,500/-

11

HS-48 FCM, installation charge

12,000/-

4.0 Ton
2.0 Ton
(1.0+1.5) Ton

1000/450/300/-

7pcs
30ft.
10ft.

7,000/13,500/3,000/-

200/-

60ft.

12,000/-

Sub Total= 55,000/In word tk. (Nine Lac Forty thousand one hundred taka only)

Grand total - (8,85,100+55,000) =

9,40,100/-

So, therefore, request you to please supply & install the product on or before July 30, 2014 at our Head Office. Your kind
cooperation would be highly appreciated. After delivering the air conditioners then necessary step will be taken to payment the
submitted bills.
N.B: Vat & tax will be deducted as per Govt. Rule.
Ma-Assalam
(Nizam Uddin Ahmed)
Deputy Managing Director
& Company Secretary
Cc to:
1. Honble Chairman
2. CEO(Acting)
3. IT Dept. H.O
4. Accounts dept. H.O
5. Audit dept, H.O
6. Office File.

MILIL /HO/HR & ADMIN/ 033 /2014


July 03, 2014
Electro Mart Limited.
62/3, Purana Paltan (5th Floor)
Dhaka-1000.
Subject: Work Order for Air Conditioner.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotations for Air Conditioner we are very pleased to inform you that the Management has
decided to accept your quotations and give you work order for our Head Office in the manner as follows:
SL.

Descriptions of AC

Capacity

Install

Qty.

1.0 Ton

Unit
Price
47,000/-

2,500/-

3pcs

Total
Price(BDT)
1,48,500/-

GS-12V Viola-Split type

GS-12V Viola-Split type

1.0 Ton

46,460/-

Free

3pcs

1,39,380/-

GS-18V Viola-Split type

1.5 Ton

57,960/-

Free

3pcs

1,73,880/-

GS-24V Viola-Split type

2.0 Ton

70,840/-

Free

1pcs

70,840/-

HS -48 FCM

4.0 Ton

1,20,000/-

Iron Angle

7
8
9

Copper Pipe
Copper Pipe
Copper Pipe

4.0 Ton
2.0 Ton
(1.0+1.5) Ton

1000/
450/300/200/-

4,000/-

3pcs
3,72,000/Sub Total = 9,04,600
7pcs
7,000/30ft.
10ft.
60ft.

13500/3000/12,000/-

Sub Total= 35,500/In word tk. (Nine Lac Forty thousand one hundred taka only)
Grand total 9,40,100/So, therefore, request you to please supply & install the product on or before July 30, 2014 at our Head Office. Your
kind cooperation would be highly appreciated. After delivering the air conditioners then necessary step will be
taken to payment the submitted bills.
N.B: Vat & tax will be deducted as per Govt. Rule.
Ma-Assalam
(Nizam Uddin Ahmed)
Deputy Managing Director
& Company Secretary
Cc to:
1. Honble Chairman
2. CEO(Acting)
3. IT Dept. H.O
4. Accounts dept. H.O
5. Underwriting dept, H.O
6. Audit dept, H.O
7. Office File.

MILIL /HO/HR & ADMIN/

/2014

October 13, 2014

Master Simex Paper Ltd


74, Dilkusha C/A(1st Floor)
Dhaka-1000.
Subject: Work Order for Premium Notice.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for computer continuous paper, we are very pleased to inform you that the
Management has decided to accept your quotation and give you work order in the manner as follows:
Sl
01
.

Description
Premium Notice
(Computer Continuous Paper)
Size: 9.5 x 11, Color: 02 Color
2000 sheets/Box
70Gsm printing as per sample

Qty

Unit Price

Total Price

Last Delivery Date

10 Box

1050/-

10500/-

23/10/2014

Total=

10,500/-

Taka In word: Ten thousand five hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.
7.

Honble Chairman
CEO(Acting)
IT Dept. H.O
Accounts dept. H.O
Underwriting dept, H.O
Audit dept, H.O
Office File.

MILIL /HO/HR & ADMIN/

/2014

October 22, 2014

VIP PRINTERS
205/3, Fakirapool, Box Culvert Road
Dhaka-1000.
Subject: Work Order for Proposal Form.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Proposal Form, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Proposal Form
Paper: 80 gsm Offset
Size: 9x2 =18x11.5 (folding)
Print: Both side, Color: 2 color
(as per sample)

Qty

6000 pcs

Unit Price

Total Price

@ 1.70

10,200/-

Total=

10,200/-

Last Delivery Date


26/10/2014

Taka In word: Ten thousand Two hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.
7.

Honble Chairman
CEO(Acting)
IT Dept. H.O
Accounts dept. H.O
Underwriting dept, H.O
Audit dept, H.O
Office File.

MILIL /HO/HR & ADMIN/

/2014

October 26, 2014

VIP PRINTERS
205/3, Fakirapool, Box Culvert Road
Dhaka-1000.
Subject: Work Order for PR Book.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for PR Book, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description
PR Book:
(Carbon sheet Paper)
Size: 8.75 x 5.6,
Paper: 4 color=(white ,pink, yellow, blue)
4 page= 1set, 50 set per Book
printing as per sample

Qty
200
Books

Unit Price
@110

Total=

Total Price

Last Delivery Date

22,000/-

29/10/2014

22,000/-

Taka In word: Twenty Two thousand taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.
7.

Honble Chairman
CEO(Acting)
IT Dept. H.O
Accounts dept. H.O
Underwriting dept, H.O
Audit dept, H.O
Office File

MILIL /HO/HR & ADMIN/

/2014

October 30, 2014

Master Simex Paper Ltd


74, Dilkusha C/A(1st Floor)
Dhaka-1000.
Subject: Work Order for Computer Continuous Paper.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for computer continuous paper, we are very pleased to inform you that the
Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

01
.

COMMISSION Bill Paper


(Computer Continuous Paper)
NCR 3 Ply, Size: 9.5 x 11,
Paper: 3 color=(white ,blue, yellow)
3 page= 1set, 2000 sheets/Box
printing as per sample

Qty

Unit
Price

Total
Price

Last
Date

Delivery

05 Box

2,500/-

12,500/-

03/11/2014

Total=

12,500/-

Taka In word: Twelve thousand five hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.
7.

Honble Chairman
CEO(Acting)
IT Dept. H.O
Accounts dept. H.O
Underwriting dept, H.O
Audit dept, H.O
Office File.

MILIL /HO/HR & ADMIN/

/2014

December 01, 2014

SAIF THAI ALUMINIUM FABRICATORS


H-Kha/2 Tanpara, Khilkhat,
Dhaka-1229..
Subject: Work Order for Thai Work(Intrior desing).
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Thai Work(Interior design)., we are very pleased to inform you that the
Management has decided to accept your quotation and give you work order in the manner as follows:
Description
Thai Work(Interior design).

As per work order copy

Qty

Total Price

170sft

44,000/-

Last Date
05/12/2014

44,000/Taka In word: Forty Four thousand taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e., Thai Glass,
finishing, quality etc. Otherwise the delivery of thai & work item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion work of the said partition.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.

Honble Chairman
CEO
IT Dept. H.O
Audit dept, H.O
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2014

December 03, 2014

Ad Express
288, University Market (1st floor)
Katabon. Dhaka-1000.
Subject: Work Order for Wall Calender.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Wall Calendar, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Wall Calender 2015


Paper: 150 gsm Art Paper
Top sheet: white paper 65 gsm
Basundhara 1 color printing
Size:14.5x19.5 (DC)
Page: 3 page + 1(top sheet)
Print: Both side, Color: 4 color
Binding: Spiral Binding
(as per sample)

Qty

5000 pcs

Unit Price

Total Price

@ 21.70

1,08,500/-

Total=

1,08,500/-

Last Delivery Date


15/12/2014

Taka In word: One Lac Eight thousand Five hundred taka only.
Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.
7.
8.

Honble Chairman
CEO
IT Dept. H.O
Audit Dept.
Dev. Admin Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2014

December 22, 2014

PRIME ALUMINIUM FABRICATORS


9, Atish Dipankar Sarak, Basabo,
Dhaka-1214.
Subject: Work Order for supply fitting & fixing the Aluminium fabrication & false Ceiling.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Work supply fitting & fixing the Aluminum fabrication & false Ceiling, we
are very pleased to inform you that the Management has decided to accept your quotation and give you work order
in the manner as follows:
Description
Fitting & Fixing Thai Aluminium sliding door & Partition
using 3 silver color section Aluminium (KAI),5mm Clear
Glass &

Qty
as per our
requirement

Unit Price
(per sft)

Qty
as per our
requirement

Total Price
(per sft)

210/-

Last Date
10/01/2015

As per your quotation copy & as Management directions.


Description
Fitting & Fixing False Ceiling using 2x2 gypsum boad

As per your quotation copy & as Management directions.

44/-

Last Date
10/01/2015

Terms & Condition:


1. The work must be completed strictly as per above specifications and sample in all respects i.e. Aluminium, Thai
Glass & False ceiling, fixing & fitting, finishing, quality etc. Otherwise the delivery of work item will not be
acceptable to us.
2. Payment shall be made based on submission of bill after completion work of the said partition/chamber, false
ceiling & others.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.
7.

Honble Chairman
CEO
IT Dept. H.O
Audit dept, H.O
Dev-Admin dept. H.O
Accounts dept. H.O
Underwriting Dept. HO

8.

Office File.

MILIL /HO/HR & ADMIN/

/2014

13.01 2015

JJ ENTERPRISE
(Old VIP PRINTERS)
205/3, Fakirapool, Box Culvert Road
Dhaka-1000.
Subject: Work Order for Proposal Form.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Proposal Form, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Proposal Form
Paper: 80 gsm Offset
Size: 9x2 =18x11.5 (folding)
Print: Both side, Color: 2 color
(as per sample)

Qty

7000 pcs

Unit Price

Total Price

@ 1.70

11,900/-

Total=

11,900/-

Last Delivery Date


15/01/2015

Taka In word: Eleven Thousand Nine Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.

Honble Chairman
CEO
IT Dept. H.O
Accounts dept. H.O
Underwriting dept, H.O

6.
7.

Audit dept, H.O


Office File.

MILIL /HO/HR & ADMIN/

/2015

January 24, 2015

TRADE CONCERN
5/6, Sangsad Avenue(2nd floor)
Monipara, Tejgaon
Dhaka-1215.
Subject: Work Order for supply fitting & fixing the Vertical Blinds for Head Office(Ext.).
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Work supply fitting & fixing the Vertical Blinds, we are very pleased to
inform you that the Management has decided to accept your quotation and give you work order in the manner as
follows:
Description
Fitting & Fixing Vertical Blinds

As per your quotation copy & as Management


directions.

Qty
805 sft

Unit Price
(per sft)

Total Price

Last Date

60/-

48,300/-

25/01/2015

Terms & Condition:


1. The work must be completed strictly as per above specifications and sample in all respects i.e. vertical blinds,
quality etc. Otherwise the delivery of work item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion work .
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.

Honble Chairman
MD & CEO
Audit dept, H.O
Dev-Admin dept. H.O
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

February 03, 2015

SONYA STEEL
164/1, DIT Ext. Road
Fakirarpul
Dhaka-1000.
Subject: Work Order for supply Furniture for Head Office(Ext.).
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supplyFurniture for Head Office(Ext.), we are very pleased to inform you that
the Management has decided to accept your quotation and give you work order in the manner as follows:
Description
Supply Furniture (Full Secretariat
Table=02, Side Rack=02, Revolving
Chair=02, Steel File cabinate=02)

Qty
02pcs each
mentioned all
items

Total Price

Delivery Date

43,200/-

03/02/2015

As per your quotation copy & as


Management directions.
Terms & Condition:
1. The Furnitures must be delivered strictly as per above specifications and sample in all respects i.e. board, steel
quality etc. Otherwise the delivery of mentioned item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion delivery .
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.

MD & CEO(Proposed)
Audit dept, H.O
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

February 09, 2015

Ad Express
288, University Market (1st floor)
Katabon. Dhaka-1000.
Subject: Work Order for Printing Items.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Printing items, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

DGH Form
As per sample & management
directions
Development Application Form

As per sample & management


directions

Qty

Unit Price

Total Price

3000 pcs (3o


books)

.90

2,700/-

10000 pcs
(100 books)

.68

6,800/-

2000 pcs

2.87

5,740/-

Total=

15,240/-

Last Delivery Date

16/02/2015

Brochure(Company)

As per sample & management


directions

Taka In word: Fifteen Thousand Two Hundred Forty taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O

5.
6.

HR & Admin Dept.


Office File.

MILIL /HO/HR & ADMIN/

/2015

February 09, 2015

Bismillah Enterprise
89-89/1, BPL Building (4th Floor)
Suite #511, Calvart Road, Arambagh
Motijheel, Dhaka-1000.
Subject: Work Order for Printing Items.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Printing items, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

5000 pcs

1.04

Total Price

Last Delivery Date

FMR Envelop (Glass)

As per sample & management


directions

5,200/16/02/2015

MDPS Brochure

As per sample & management


directions

5000 pcs

1.5288

7,644/-

Total=

12,844/-

Taka In word: Twelve Thousand Eight Hundred Forty Four taka only.
Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

February 09, 2015

United Commercial Enterprise


11/A, K.M. Das Lane, Tikatuly
Dhaka-1203.
Subject: Work Order for Printing Item.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Printing item, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

Total Price

6000 pcs

4.20

25,200/-

Total=

25,200/-

Last Delivery Date

Docket Envelop

As per sample & management


directions

16/02/2015

Taka In word: Twenty Four Thousand Two Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/


/2014
10-12-2014
Merchant Auto.
11, Bijoy Nagar
178, Shahid Syed Nazrul Islam Sarani
Dhaka-1000.
Subject: Work Order for Supply Vehicle .
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotations for Vehicle we are very pleased to inform you that the Management has decided
to accept your quotations and give you work order for our Head Office in the manner as follows:
SL.
1

Descriptions
Brand : Toyota, Model: Assista, Grade: X,
Year: 2006, Chassis No: NZE121-3373639,
Engine No: 1NZ-C168560, CC: 1500cc,
Color: White, Origin: Japan

Qty.
1pcs

Total Price(BDT)
16,50,000/-

Sub total 16,50,000/In word tk. (Sixteen lac Fifty thousand taka only)
Grand total 16,50,000/So, therefore, request you to please supply the Vehicle on or before 30 December 2014 at our Head Office. Your
kind cooperation would be highly appreciated. After delivering the Vehicle then necessary step will be taken to
payment the submitted bills.
Ma-Assalam
(Nizam Uddin Ahmed)
Deputy Managing Director
& Company Secretary
Cc to:
1. Honble Chairman
2. CEO(Applied)
3. Accounts dept. H.O
4. Audit dept, H.O
5. Office File.

MILIL /HO/HR & ADMIN/


/2014
12-10-2014
Merchant Auto.
11, Bijoy Nagar
178, Shahid Syed Nazrul Islam Sarani
Dhaka-1000.
Subject: Work Order for Supply Vehicle Purchase .
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotations for Vehicle we are very pleased to inform you that the Management has decided
to accept your quotations and give you work order for our Head Office in the manner as follows:
SL.
1

Descriptions
Brand : Toyota, Model: Axio, Grade: X, Year:
2008, Chassis No: NZE141-6107634, Engine
No: 1NZ-D302026, CC: 1500cc, Color:
Silver, Origin: Japan

Qty.
1pcs

Total Price(BDT)
17,00,000/-

Sub total 17,00,000/In word tk. (Seventeen lac taka only)


Grand total 17,00,000/So, therefore, request you to please supply the Vehicle on or before 30 October 2014 at our Head Office. Your kind
cooperation would be highly appreciated. After delivering the Vehicle then necessary step will be taken to payment
the submitted bills.
Ma-Assalam
(Nizam Uddin Ahmed)
Deputy Managing Director
& Company Secretary
Cc to:
1. Honble Chairman
2. CEO(Applied)
3. Accounts dept. H.O
4. Audit dept, H.O
5. Office File.

MILIL /HO/HR & ADMIN/

/2015

March 23, 2015

United Commercial Enterprise


11/A, K.M. Das Lane, Tikatuly
Dhaka-1203.
Subject: Work Order for Printing Item.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Printing item, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

15,000 pcs

0.78

Total Price

Last Delivery Date

Letter Envelop

As per sample & management


directions

11,700/29/03/2015

Document Envelop

As per sample & management


directions

10,000 pcs

1.14

11,400/-

Total=

23,100/-

Taka In word: Twenty Three Thousand One Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

March 22, 2015

SONYA STEEL
164/1, DIT Ext. Road
Fakirarpul
Dhaka-1000.
Subject: Work Order for supply Furniture for Head Office(Ext.).
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supplyFurniture for Head Office(Ext.), we are very pleased to inform you that
the Management has decided to accept your quotation and give you work order in the manner as follows:
Description
Supply Furniture (Table=01, Side
Rack=01, Hydraulic Chair=01, File
cabinate=01)

Qty
01pcs each
mentioned all
item

Total Price

Delivery Date

22,900/-

29/03/2015

As per your quotation copy & as


Management directions.
Total=

22,900/-

Taka In word: Twenty Two Thousand Nine Hundred taka only.


Terms & Condition:
1. The Furnitures must be delivered strictly as per above specifications and sample in all respects i.e. board, steel
quality etc. Otherwise the delivery of mentioned item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion delivery .
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

March 23, 2015

Bismillah Enterprise
89-89/1, BPL Building (4th Floor)
Suite #511, Calvart Road, Arambagh
Motijheel, Dhaka-1000.
Subject: Work Order for Printing Item.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Printing item, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Total Price

Last Delivery Date

Policy Schedule

As per sample & management


directions

10 Box

19,500/-

29/03/2015

19,500/Taka In word: Nineteen Thousand Five Hundred Taka Only.


Terms & Condition:
1. The work must be completed strictly as per above specification and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

April 13, 2015

SONYA STEEL
164/1, DIT Ext. Road
Fakirarpul
Dhaka-1000.
Subject: Work Order for supply Furniture for Head Office.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Furniture for Head Office, we are very pleased to inform you that the
Management has decided to accept your quotation and give you work order in the manner as follows:
Description
Supply Furniture (Reception Table=01,
Tea Table=01)

As per your quotation copy & as


Management directions.

Qty
01pcs each
mentioned all
item
Total=

Total Price

Delivery Date

22,200/-

13/04/2015

22,200/-

Taka In word: Twenty Two Thousand Two Hundred taka only.


Terms & Condition:
1. The Furnitures must be delivered strictly as per above specifications and sample in all respects i.e. board, steel,
glass, quality etc. Otherwise the delivery of mentioned item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion delivery.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

April 02, 2015

SUNRISE THAI ALUMINIUM


9, Atish Dipankar Sarak, (Bishwa Road)
Bashaboo, Dhaka-1214.
Subject: Work Order for Thai Work (Decoration).
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Thai Work (Decoration), we are very pleased to inform you that the
Management has decided to accept your quotation and give you work order in the manner as follows:
Description
Thai Work (Decoration). 3 inc Silver
aluminum door & Partition with 5mm
glass (Full & Half Partition)

Qty

Per Sq. ft.

With VAT (psft.)

As per
requirements

210tk
(without
VAT)

218.40

As per management direction

Last Date

20/04/2015

Terms & Condition:


1. The work must be completed strictly as per above specifications and sample in all respects i.e., Thai Glass,
finishing, quality etc. Otherwise the delivery of Thai & work item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion work of the said partition.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

April 22, 2015

SONYA STEEL
164/1, DIT Ext. Road
Fakirarpul
Dhaka-1000.
Subject: Work Order for supply File Cabinet for Head Office.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply File Cabinet for Head Office, we are very pleased to inform you that
the Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description
File Cabinet
(4 Drawer, 20 Geji,
Different Lock)

01
.

Qty

02 Pis

Unit
Price
6,500/Total=

Total Price

Carryin
g

13,000/-

300/-

Total
Price
13,300/-

Last Delivery Date

23/04/2015

13,300/-

Taka In word: Thirteen Thousand Three Hundred taka only.


Terms & Condition:
1. The Furnitures must be delivered strictly as per above specifications and sample in all respects i.e. board, steel,
glass, quality etc. Otherwise the delivery of mentioned item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion delivery.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

April 23, 2015

PATA CREATION
262/1,Fakirapool
Al Rahman Bhaban (2nd Floor)
Dhaka.
Subject: Work Order for supply Digital Festun.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Digital Festun for all over Bangladesh Companies Office, we are very
pleased to inform you that the Management has decided to accept your quotation and give you work order in the
manner as follows:
Sl

Description

Qty

Unit Price

Total Price
(with Vat)

Last Delivery Date

70/-

7,000/-

30/04/2015

1
Digital Festun (Size 2 2

01.

100 Pis

1.50)
As per company direction
Total=

7,000/-

Taka In word: Seven Thousand taka only.


Terms & Condition:
1. The Furnitures must be delivered strictly as per above specifications and sample in all respects i.e. board, steel,
glass, quality etc. Otherwise the delivery of mentioned item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion delivery.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

April 29, 2015

PATA CREATION
262/1,Fakirapool
Al Rahman Bhaban (2nd Floor)
Dhaka.
Subject: Work Order for supply Office File.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Office File for Head Office, we are very pleased to inform you that the
Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit Price

Total Price
(with Vat)

Last Delivery Date

01.

Office File
As per company direction

5000Pi
s

37,500/-

30/04/2015

Total=

37,500/-

Taka In word: Thirty Seven Thousand Five Hundred taka only.


Terms & Condition:
1. The Furnitures must be delivered strictly as per above specifications and sample in all respects i.e. board, steel,
glass, quality etc. Otherwise the delivery of mentioned item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion delivery.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

May 13, 2015

M/S SHEBA ENTERPRISE


64/4, R.K Mission Road
Dhaka-1203.
Subject: Work Order for supply Plastic Cover of Policy.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Plastic Cover of Policy for Head Office, we are very pleased to inform
you that the Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit Price

Total Price
(with Vat)

Last Delivery Date

01.

Plastic Cover of Policy


As per company direction

10000Pc
s

48,000/-

21/05/2015

Total=

48,000/-

Taka In word: Forty Eight Thousand taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

May 13, 2015

DESIGN ONE
Paltan Tower
Suite-708(7th Floor)
87 Purana Paltan Lane
Dhaka-1000.
Subject: Work Order for supply Bima Dolil.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Bima Dolil for Head Office, we are very pleased to inform you that
the Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit Price

Total Price
(with Vat)

Last Delivery Date

01.

Bima Dolil
As per company direction

10000Pc
s

34,040/-

21/5/2015

Total=

34,040/-

Taka In word: Thirty Four Thousand Forty taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

May 06, 2015

United Commercial Enterprise


11/A, K.M. Das Lane, Tikatuly
Dhaka-1203.
Subject: Work Order for Office Pad.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Office Pad for Head Office, we are very pleased to inform you that the
Management has decided to accept your quotation and give you work order in the manner as follows:
Description

Office Pad

As per sample & management


directions

Qty

Unit Price

10,000 pcs
(100 Books)

Total=

Total Price
8,995/-

Last Delivery Date


13/05/2015

8,995/-

Taka In word: Eight Thousand Nine Hundred Ninety Five taka only.
Terms & Condition:
5. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
6. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
7. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
8. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

April 30, 2015

DESIGN ONE
Paltan Tower
Suite-708(7th Floor)
87 Purana Paltan Lane
Dhaka-1000.
Subject: Work Order for supply Proposal form.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Proposal Form for Head Office, we are very pleased to inform you that
the Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit Price

Total Price
(with Vat)

Last Delivery Date

01.

Proposal Form
As per company direction

10000Pi
s

14,835/-

04/05/2015

Total=

14,835/-

Taka In word: Fourteen Thousand Eight Hundred Thirty Five taka only.
Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item to
the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan & proof
copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

April 30, 2015

M/S SHEBA ENTERPRISE


64/4, R.K Mission Road
Dhaka-1203.
Subject: Work Order for supply Product Rate Chart 1 & 2.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Product Rate Chart 1 & 2 for Head Office, we are very pleased to
inform you that the Management has decided to accept your quotation and give you work order in the manner as
follows:
Sl
01.

Description

Qty

Product Chart 1
As per company direction
Product Chart 2
As per company direction

5000Pi
s
5000Pi
s

Unit Price

Total Price
(with Vat)

10,000/-

Last Delivery Date

04/05/2015
9,000/Total=

19,000/-

Taka In word: Nineteen Thousand taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item to
the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan & proof
copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

May 19, 2015

NEW SHEBA ENTERPRISE


125/A, New Kahril Road
Shantinagar Plaza (Ground Floor)
Dhaka-1000.
Subject: Work Order for PABX System supply & Fittings.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation PABX system supply & Fittings for Head Office (Ext.), we are very pleased to
inform you that the Management has decided to accept your quotation and give you work order in the manner as
follows:
Sl

Description

Qty

Unit
Price

Price (without
Vat)

Total Price (with


Vat 4%)

Last Delivery
Date

01.

PABX & Intercom system


As per company direction

01

28,700/-

29,848/-

28/05/2015

Total=

29,848/-

Taka In word: Twenty Nine Thousand Eight Hundred Forty Eight taka only.
Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. PABX, Machine,
Master set, Intercom system etc. Otherwise the delivery & fittings of said item will not be acceptable to us.
2. Delivery & Fitting of PABX system must be made within deadline /days after fitting of the said item to the
Head Office (Ext.), Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply & fitting of the said item along with receiving
copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

May 18, 2015

Touch & Solve


Gause Pak Bhaban(2nd Floor)
28/G/1, Toyenbee Circular Road
Suite#179, Motijheel
Dhaka-1000.
Subject: Work Order for Bulk SMS supply to IT dept.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Bulk SMS supply to Head Office to IT Dept., we are very pleased to inform
you that the Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit
Price

Price (without
VAT)

Total Price (with


VAT 15%)

Last Delivery
Date

01.

Bulk SMS
As per company direction

2500
0

0.80

20,000/-

23,000/-

19/05/2015

Total=

23,000/-

Taka In word: Twenty Three Thousand taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications .
2. Delivery of Bulk SMS must be made within deadline /days after providing of the said item to the Head Office
(IT), Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with receiving copy.
4. VAT & Tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


CEO (Acting)
Cc to:
1.
2.
3.
4.
5.
6.

CEO(Applied)
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

June 14, 2015

NEW SHEBA ENTERPRISE


125/A, New Kahril Road
Shantinagar Plaza (Ground Floor)
Dhaka-1000.
Subject: Work Order for supply Commission Bill Paper.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Commission Bill Paper for Head Office, we are very pleased to inform
you that the Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit Price

Total Price
(with 4% Vat)

Last Delivery Date

01.

Commission Bill Paper


As per company direction

10 Box

17,900/-

18/06/2015

Total=

17,900/-

Taka In word: Seventeen Thousand Nine Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item to
the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan & proof
copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:
1.
2.
3.
4.
5.
6.
7.

CEO)
DMD & CS
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

June 23, 2015

BENGAL PRINTING & PACKAGING


210, Fakirapol Calvart Road
Motijheel C/A
Dhaka-1000.
Subject: Work Order for supply Office File.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Office File for Head Office, we are very pleased to inform you that the
Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit Price

Total Price
(with 15% Vat)

Last Delivery
Date

01.

Office File
As per company direction

5000 pcs

8.00

40,000/-

28/06/2015

Total=

40,000/-

Taka In word: Forty Thousand taka only.


Terms & Condition:
5. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
6. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item to
the Head Office, Dhaka at your own cost and responsibility.
7. Payment shall be made based on submission of bill after supply of the said item along with challan & proof
copy.
8. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:
1.
2.
3.
4.
5.
6.
7.

CEO)
DMD & CS
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

June 23, 2015

Bismillah Enterprise
89-89/1, BPL Building (4th Floor)
Suite #511, Calvart Road, Arambagh
Motijheel, Dhaka-1000.
Subject: Work Order for supply FMR Glass Kham.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply FMR Glass Kham for Head Office, we are very pleased to inform you
that the Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit Price

Total Price
(with 4.5% Vat)

Last Delivery
Date

01.

Office File
As per company direction

5000 pcs

1.04

5,200/-

28/06/2015

Total=

5,200/-

Taka In word: Five Thousand Two Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item to
the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan & proof
copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:
1.
2.
3.
4.
5.
6.
7.

CEO)
DMD & CS
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

June 25, 2015

Ad Express
288, University Market (1st floor)
Katabon. Dhaka-1000.
Subject: Work Order for Printing Items.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Printing items, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

Total Price

5000 pcs

2.75

13,750/-

Total=

13,750/-

Last Delivery Date

Brochure(Company)

As per sample & management


directions

30/06/2015

Taka In word: Thirteen Thousand Seven Hundred Fifty taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.

CEO
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
HR & Admin Dept.
Office File.

MILIL /HO/HR & ADMIN/

/2015

July 07, 2015

BENGAL COMPUTES
G.P.B Computer Market
Suite # 162 (2nd Floor)
28 G-1 Toyenbee Circular Road
Motijheel C/A
Dhaka-1000.
Subject: Work Order for Printing Item.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Printing item, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit
Price

Total Price (With


4% Vat)

Last Delivery Date

10,500/-

09/07/2015

A4 Envelop

As per sample & management


directions

5000 pcs

2.10
Total=

10,500/-

Taka In word: Ten Thousand Five Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:
1.
2.
3.
4.
5.
6.

CEO
DMD & CS
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

July 07, 2015

PATA CREATION
262/1,Fakirapool
Al Rahman Bhaban (2nd Floor)
Dhaka.
Subject: Work Order for supply Banner.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Banner for all over Bangladesh Companies Office, we are very pleased
to inform you that the Management has decided to accept your quotation and give you work order in the manner as
follows:
Description

Qty

Unit
Price

Total Price (With


4.5% Vat)

Last Delivery Date

190/-

19,000/-

09/07/2015

Total=

19,000/-

Banner

As per sample & management


directions

100 pcs

Taka In word: Nineteen Thousand taka only.


Terms & Condition:
1. The Banner must be delivered strictly as per above specifications and sample in all respects i.e. Cloth, type &
art quality etc. Otherwise the delivery of mentioned item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion delivery.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:
1.
2.
3.
4.
5.
6.

CEO
DMD & CS
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

August 19, 2015

N.B THAI ALUMINIUM


Khaja Road, Pakka Dokan
Chandgaon, Chittagong.
Subject: Work Order for Chamber of Chittagong Office.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Chamber, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Thai Aluminium
work with glass
paper

As per management
direction

Qty

Total Sq. ft.

Per Sq. Ft.


(without
VAT)

Total Tk
(without VAT)

Total Tk
(with VAT
4%)

As per
require
ments

288 Sq. Ft.

230 tk

66,240/-

68,890/-

Total =

Last Date

30/08/2015

68,890/-

Taka In word: Sixty Eight Thousand Eight Hundred Ninety taka only.
Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e., Thai Glass,
finishing, quality etc. Otherwise the delivery of Thai & work item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion work of the said partition.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
1.
2.
3.
4.
5.
6.
7.
8.

CEO
Md. Emdat Hossain, AMD(Dev).
Md. Ibrahim Jobayer, AMD (Dev).
Mawlana Abdul Aziz, AMD (Dev).
Audit Dept.
Accounts dept. H.O
Md. Enamul Haque, Officer, Ctg office.
Office File.

MILIL /HO/HR & ADMIN/

/2015

August 20, 2015

NEW SHEBA ENTERPRISE


125/A, New Kahril Road
Shantinagar Plaza (Ground Floor)
Dhaka-1000.
Subject: Work Order for PABX System Power Backup.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation PABX system Power Backup for Head Office, we are very pleased to inform you
that the Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit Price
(with Vat)

Total Price
(with Vat)

Last Delivery
Date

01.

Panasonic PABX System


Power Backup
As per company direction

01

5,500/-

5,500/-

27/08/2015

Total=

5,500/-

Taka In word: Five Thousand Five Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. PABX, Power
Backup system etc. Otherwise the delivery & fittings of said item will not be acceptable to us.
2. Delivery & Fitting of PABX Power backup system must be made within deadline /days after fitting of the said
item to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply & fitting of the said item along with receiving
copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:
Cc to:
1.
2.
3.
4.

CEO.
Audit Dept.
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

September 06, 2015

Ad Express
288, University Market (1st floor)
Katabon. Dhaka-1000.
Subject: Work Order for Printing Items.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for printing items, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

10000 pcs

1.70/-

Total Price

Last Delivery Date

Proposal Form

As per sample & management


directions

Total (Including VAT)=

17,000/-

13/09/2015

17,000/-

Taka In word: Seventeen Thousand taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O
6. Office File.

MILIL /HO/HR & ADMIN/

/2015

September 06, 2015

Kinsman
Huse 54(Ground Floor),
Fakirapool, Motijheel,
Dhaka-1000.
Subject: Work Order for Printing Items.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for printing items, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

50 Books

34/-

Total Price

Last Delivery Date

Payment Voucher

As per sample & management


directions

Total (Including VAT) =

1,700/-

13/09/2015

1,700/-

Taka In word: One Thousand Seven Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O
6. Office File.

MILIL /HO/HR & ADMIN/

/2015

September 06, 2015

United Commercial Enterprise


11/A, K.M. Das Lane, Tikatuly
Dhaka-1203.
Subject: Work Order for Printing Items.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for printing items, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

Total Price

3000 pcs

1.26/-

3,780/-

4000 pcs

1.20/-

4,800/-

4000 pcs

1.20/-

4,800/-

Last Delivery Date

Agent Officer Application Form

As per sample & management


directions
Agent Form (20/2)

As per sample & management


directions

13/09/2015

Agent Form (18/2)

As per sample & management


directions

Total (Including VAT) =

13,380/-

Taka In word: Thirteen Thousand Three Hundred Eighty taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O

6.

Office File.

MILIL /HO/HR & ADMIN/

/2015

September 06, 2015

Interbizz Solution
112, Naya Paton
Dhaka.
Subject: Work Order for Printing Items.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for printing items, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

Total Price

Last Delivery Date

0.64/-

12,800/-

13/09/2015

Total (Including VAT 15%) =

12,800/-

Policy Summary

As per sample & management


directions

20000 pcs

Taka In word: Twelve Thousand Eight Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O
6. Office File.

MILIL /HO/HR & ADMIN/

/2015

September 07, 2015

FURNITURE BAZAR & DARAJA CENTER


Hazi Toyub Market
Bagan Bari
Luxmipur.
Subject: Work Order for supply Furniture for Luxmipur Office.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply Furniture for Luxmipur office, we are very pleased to inform you that
the Management has decided to accept your quotation and give you work order in the manner as follows:
Description
Supply Furniture (Secretary
Table=01, Revolving Chair=01, Visitor
Chair (armless)=04)

Total Qty

Total Price
(without VAT)

Total Price (with


VAT 4%)

Delivery Date

06 pcs

16,800/-

17,472/-

13/09/2015

As per your quotation copy & as


Management directions.
Total=

17,472/-

Taka In word: Seventeen Thousand Four Hundred Seventy Two taka only.
Terms & Condition:
1. The Furnitures must be delivered strictly as per above specifications and sample in all respects i.e. board, steel
quality etc. Otherwise the delivery of mentioned item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion delivery.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O
6. Office File.

MILIL /HO/HR & ADMIN/

/2015

September 07, 2015

GAZI ELECTRIC
Uttar Bazar
Luxmipur.
Subject: Work Order for supply Luxmipur Office.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply for Luxmipur office, we are very pleased to inform you that the
Management has decided to accept your quotation and give you work order in the manner as follows:
Description
Supply Furniture (Ceiling fan (Vision,
RFL)=04, Energy Saving Light=04

As per your quotation copy & as


Management directions.

Total Qty
08 pcs
Total=

Total Price

11,920/-

Delivery Date

13/09/2015

11,920/-

Taka In word: Eleven Thousand Nine Hundred Twenty taka only.


Terms & Condition:
1. The Furnitures must be delivered strictly as per above specifications and sample in all respects i.e. Electric,
Electronics etc. Otherwise the delivery of mentioned item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion delivery.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
7. CEO
8. DMD & CS
9. IT Dept. H.O
10. Audit Dept.
11. Accounts dept. H.O
12. Office File.

MILIL /HO/HR & ADMIN/

/2014

Date: 09-09-2015

Al-Monshur Auto Engineering Works


285, South Shahjahanpur
Dhaka-1217.
Subject: Work Order for Vehicle Servicing.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotations for Vehicle Servicing we are very pleased to inform you that the Management
has decided to accept your quotations and give you work order for our Head Office in the manner as follows:
SL.
1

Descriptions
Vehicle Servicing :

As per your quotation copy &


as Management directions.

Total Price(without VAT)


14,650/-

Total =14,650/So, therefore, request you to please supply & Fittings the Vehicle servicing on or before 13 September 2015 at our
Head Offices car. Your kind cooperation would be highly appreciated. After delivering the Vehicle then necessary
step will be taken to payment the submitted bills.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O
6. Office File.

MILIL /HO/HR & ADMIN/

/2015

October 05, 2015

Ad Express
288, University Market (1st floor)
Katabon. Dhaka-1000.
Subject: Work Order for Printing Items.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for printing items, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

Total Price

5000 pcs

2.75

13,750/-

Total=

13,750/-

Last Delivery Date

Brochure(Company)

As per sample & management


directions

12/10/2015

Taka In word: Thirteen Thousand Seven Hundred Fifty taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O
6. Office File.

MILIL /HO/HR & ADMIN/

/2015

September 20, 2015

Mercantie Systems Limited


Al-Razi Complex(14th Floor)
Shaheed Sayed Nazrul Islam Sharani
Purana Paltan
Dhaka-1000.
Subject: Work Order for Printing Machine.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Dot Printer, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit Price

Total Price
(with VAT)

Last Delivery Date

1 pcs

55,400/-

57,893/-

22/09/2015

Total=

57,893/-

Dot Printer

As per sample & management


directions

Total (Including VAT 4.5%) =

Taka In word: Fifty Seven Thousand Eight Hundred Ninety Three taka only.
Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects. Otherwise the
delivery of printed item will not be acceptable to us.
2. Delivery of Printer must be made within deadline /days after getting final proof copy of the said item to the
Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O
6. Office File.

MILIL /HO/HR & ADMIN/

/2015

October 11, 2015

Merchant Auto.
11, Bijoy Nagar
178, Shahid Syed Nazrul Islam Sarani
Dhaka-1000.
Subject: Work Order for Supply Vehicle .
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotations for Vehicle we are very pleased to inform you that the Management has decided
to accept your quotations and give you work order for our Head Office in the manner as follows:
SL.
1

Descriptions
Brand : Toyota, Model: Axio-Fielder, Grade:
X, Year: 2010, Chassis No: NZE1419155835, Engine No: 1NZ-D696583, CC:
1500cc, Color: Silver, Origin: Japan

In word tk. (Thirteen Lac Eighty Thousand Taka only)

Qty.
1pcs

Total Price(BDT)
13,80,000/Subtotal 13,80,000/Grand total 13,80,000/-

So, therefore, request you to please supply the Vehicle on or before 18 October 2015 at our Head Office. Your kind
cooperation would be highly appreciated. After delivering the Vehicle then necessary step will be taken to payment
the submitted bills.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:
1.
2.
3.
4.
5.
6.
7.

Honble Chairman
CEO
DMD & CS
IT Dept. H.O
Audit Dept.
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

November 01, 2015

CLASSIC AD & MARKETING


66/4 Maniknaga, Mugda
Dhaka-1203.
Subject: Work Order for Supply Bag.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotations for Bag we are very pleased to inform you that the Management has decided to
accept your quotations and give you work order for our Head Office in the manner as follows:
SL.
1
2

Descriptions of Bag
Normal
Medium

Qty.
40 pcs
60 pcs

Unit Price
350/400/-

Total Price(BDT)
14,000/24,000/-

Special

35 pcs

650/Total =

22,750/60,750/-

Last Delivery Date


28/10/2015

Taka In word: Sixty Thousand Seven Hundred Fifty taka only.


So, therefore, request you to please supply the Bag on or before 28 October 2015 at our Head Office. Your kind
cooperation would be highly appreciated. After delivering the Beg then necessary step will be taken to payment the
submitted bills.
Vat & tax will be deducted as per Govt. Rule.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT & Dev. Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O
6. Office File.

MILIL /HO/HR & ADMIN/

/2014

November 22, 2015

SUNRISE THAI ALUMINIUM


9, Atish Dipankar Sarak (Bishwa Road), Bashaboo
Dhaka-1214.
Subject: Work Order for supply fitting & fixing the Aluminium fabrication & false Ceiling.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Work supply fitting & fixing the Aluminum fabrication & false Ceiling, we
are very pleased to inform you that the Management has decided to accept your quotation and give you work order
in the manner as follows:

Description
Fitting & Fixing Thai Aluminium sliding door & Partition

As per your quotation copy & as Management directions.

Description
Fitting & Fixing False Ceiling

As per your quotation copy & as Management directions.

Qty
as per our
requirement

Qty
as per our
requirement

Unit Price
(without
VAT)
(per sft)

210/-

Unit Price
(without
VAT)
(per sft)

44/-

Last Date

24/11/2015

Last Date

24/11/2015

Terms & Condition:


1. The work must be completed strictly as per above specifications and sample in all respects i.e. Aluminium, Thai
Glass & False ceiling, fixing & fitting, finishing, quality etc. Otherwise the delivery of work item will not be
acceptable to us.
2. Payment shall be made based on submission of bill after completion work of the said partition/chamber, false
ceiling & others.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT & Dev. Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O

6.

Office File.

MILIL /HO/HR & ADMIN/

/2015

November 12, 2015

PATA CREATION
262/1,Fakirapool
Al Rahman Bhaban (2nd Floor)
Dhaka.
Subject: Work Order for Wall Calender.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Wall Calendar & Envelop we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:

Description
Wall Calender 2016
Paper: 150 gsm Art Paper
Top sheet: white paper 65 gsm Basundhara 1
color printing
Size:14.5x19.5 (DC)
Page: 3 page + 1(top sheet)
Print: Both side, Color: 4 color
Binding: Spiral Binding
(as per sample)
Wall Calender Envelop 2016
Paper:white paper 65 gsm Basundhara 1 color
printing
Size:14.5x19.5 (DC)
(as per sample)

Qty

Unit Price

7000 pcs

@ 20.32

Total Price

Last Delivery Date

1,42,240/07/12/2015

1000 pcs

@ 3.80
Total=

3,800/1,46,040/-

Taka In word: One Lac Forty Six Thousand Forty taka only.
Terms & Condition:
1.

The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item to the Head
Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan & proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.

Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT & Dev Admin. Dept. H.O

4.
5.
6.

Audit Dept.
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

November 19, 2015

S.S.B ENTERPRISE
69/4, Shamibag,Tikatuli
Dhaka-1203.
Subject: Work Order for Supply Wall Clock.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotations for Wall Clock we are very pleased to inform you that the Management has
decided to accept your quotations and give you work order for our Head Office in the manner as follows:
SL.

Descriptions

Qty.

Unit Price
(with 4%
VAT)

Watch
As per sample & management
directions

100 pcs

210/Total =

Total Price(BDT)

21,000/-

Last Delivery Date

23/11/2015

21,000/-

Taka In word: Twenty One Thousand Taka only.


So, therefore, request you to please supply the Wall Clock on or before 23 November 2015 at our Head Office.
Your kind cooperation would be highly appreciated. After delivering the Beg then necessary step will be taken to
payment the submitted bills.
Vat & tax will be deducted as per Govt. Rule.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:Cc to:
1. CEO
2. DMD & CS
3. IT & Dev. Dept. H.O
4. Audit Dept.
5. Accounts dept. H.O
6. Office File.

MILIL /HO/HR & ADMIN/

/2015

December 08, 2015

BENGAL COMPUTES
G.P.B Computer Market
Suite # 162 (2nd Floor)
28 G-1 Toyenbee Circular Road
Motijheel C/A
Dhaka-1000.
Subject: Work Order for Printing Item.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Karmi Gaide Book, we are very pleased to inform you that the Management
has decided to accept your quotation and give you work order in the manner as follows:
Description

Qty

Unit
Price

Total Price (With


4% Vat)

Last Delivery Date

43/-

86,000/-

09/11/2015

Total=

86,000/-

Karmi Gaide Book

As per sample & management


directions

2000 pcs

Taka In word: Eighty Six Thousand Taka Only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item
to the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan &
proof copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
Cc to:

1.
2.
3.
4.
5.
6.

CEO
DMD & CS
IT & Dev Admin Dept. H.O
Audit Dept.
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

December 10, 2015

Bismillah Enterprise
89-89/1, BPL Building (4th Floor)
Suite #511, Calvart Road, Arambagh
Motijheel, Dhaka-1000.
Subject: Work Order for supply FMR Glass Kham.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for supply FMR Glass Kham for Head Office, we are very pleased to inform you
that the Management has decided to accept your quotation and give you work order in the manner as follows:
Sl

Description

Qty

Unit Price

Total Price
(with 4.5% Vat)

Last Delivery
Date

01.

FMR Glass Kham


As per company direction

5000 pcs

1.16

5,800/-

14/12/2015

Total=

5,800/-

Taka In word: Five Thousand Two Hundred taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e. printing,
packing, finishing, quality of paper etc. Otherwise the delivery of printed item will not be acceptable to us.
2. Delivery of printed item must be made within deadline /days after getting final proof copy of the said item to
the Head Office, Dhaka at your own cost and responsibility.
3. Payment shall be made based on submission of bill after supply of the said item along with challan & proof
copy.
4. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
1.
2.
3.
4.
5.
6.

CEO
DMD & CS
IT & Dev Admin Dept. H.O
Audit Dept.
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

November 24, 2015

SUNRISE THAI ALUMINIUM


9, Atish Dipankar Sarak (Bishwa Road), Bashaboo
Dhaka-1214.
Subject: Work Order for Chamber of Khulna Office.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your quotation for Chamber, we are very pleased to inform you that the Management has
decided to accept your quotation and give you work order in the manner as follows:
Description

Thai Aluminium &


glass

As per management
direction

Qty

As per
require
ments

Total Sq. ft.

As per
requirements

Per Sq. Ft.


(without
VAT)

Total Tk
(without
VAT)

Total Tk
(with VAT
4%)

200 tk

--

--

Total =
Description

Glass Paper

As per management
direction

Qty

As per
require
ments

Total Sq. ft.

As per
requirements

30/11/2015

--

Per Sq. Ft.


(without
VAT)

Total Tk
(without
VAT)

Total Tk
(with VAT
4%)

15 tk

--

--

Total =

Last Date

Last Date

30/11/2015

--

Taka In word: taka only.


Terms & Condition:
1. The work must be completed strictly as per above specifications and sample in all respects i.e., Thai Glass,
finishing, quality etc. Otherwise the delivery of Thai & work item will not be acceptable to us.
2. Payment shall be made based on submission of bill after completion work of the said partition.
3. Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam
(Md. Salahuddin)
Deputy Manager &
Head of HR-Admin & Establishment Dept.
1.

CEO

2.
3.
4.
5.
6.

DMD & CS
IT & Dev Admin Dept. H.O
Audit Dept.
Accounts dept. H.O
Office File.

MILIL /HO/HR & ADMIN/

/2015

December 15, 2015

Mr. ABM Nurul Haq


Member Secretary
Organizing Committee
International Takaful Seminar-2016
Dhaka, Bangladesh.
Subject: Request for publishing of Company Advertisement in the Souvenir for International Takaful
Seminar-2016.
Muhtaram,
Assalamu Alaikum Wa Rahmatullah,
With Reference to your letter dated 27/10/2015 for publishing of Company Add in Souvenir, we are very pleased to
inform you that the Management has decided to accept your proposal and give you work order in the manner as
follows:
Description

Place/aria

Advertisement
Tarff

Full page

10,000/-

Advertisement
(with VAT)

(Company Add)

As per attachment sample

Total=
Taka In word: Eleven Thousand Five Hundred taka only.
So, you are requested to take necessary step as above mentioned.
Payment shall be made based on submission of bill after supply of the souvenir copy.
Vat & tax will be deducted as per Govt. Rule.
Your kind cooperation would be highly appreciated.
Ma-Assalam

(Nizam Uddin Ahmed)


Deputy Managing Director
& Company Secretary
Cc to:Cc to:
1. CEO
2. IT Dept. H.O
3. Audit Dept.
4. Accounts dept. H.O
5. Office File.

11,500/11,500/-

Tarff

Você também pode gostar