Você está na página 1de 2

THE KARACHI ELECTRIC SUPPLY COMPANY LIMITED

CATEGORY-WISE TARIFF RATES EFFECTIVE FROM 01.08.2012


Fixed
charges
Rs./Kw
(1)

CATEGORY TARIFF

Energy
charges
Rs./kWh
(2)

Domestic ( Tax Charged ) A1-R_A


upto 50 kWh

Fuel Adj. Additional


charges surcharge
Rs./kWh Rs./kWh
(3)
(4)

Variable
Charges
Rs./kWh
(5)
(2 to 4)

0.61

0.60

0.79

Rs.
2.00

0.46
0.63
1.56
1.93
1.93
8.22
13.99

3.59
5.01
6.95
8.45
8.45
0.00
0.00

1.74
2.47
3.82
4.69
4.69
0.00
0.00

0.61

0.60

1 to 100 kWh
101 to 300 kWh
301 to 700 kWh
Above 700 kWh
A1-R_B
(Off -PEAK HOURS)
A1-R_B
(PEAK HOURS)

0.46
0.63
1.56
1.93
8.22
13.99

Commercial ( Tax Charged ) A2-C_A


Upto
100 kWh
Above 100 kWh
A2-C_B
A2-C_C
(Off -PEAK HOURS)
A2-C_C
(PEAK HOURS)
Commercial ( Tax Free )
A2-C
1 and Above
A2-C_B
A2-C_C
(Off -PEAK HOURS)
A2-C_C
(PEAK HOURS)

FSA

T51

Electricity Duty
Sindh
Balochistan
% of Variable % of Energy Charges (2)
Charges (5)

%
7.35

5.79
8.11
12.33
15.07
15.07
8.22
13.99

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

0.79

2.00

0.00

0.00

3.59
5.01
6.95
8.45
0.00
0.00

1.74
2.47
3.82
4.69
0.00
0.00

5.79
8.11
12.33
15.07
8.22
13.99

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

7.68
7.32

400
400
400

2.91
3.15
9.72
8.01
13.20

4.18
4.30
0.00
0.00
0.00

14.77
14.77
9.72
8.01
13.20

2.00
2.00
2.00
2.00
2.00

2.78
2.50
2.78
2.78
2.78

2.91
9.72
8.01
13.20

7.68

400
400
400

0.00
0.00

4.18
0.00
0.00
0.00

14.77
9.72
8.01
13.20

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

400
400
400
380
380
380
360
360
360

1.86
1.35
1.25
2.03
1.34
1.20
2.02
1.29
1.16
1.92

5.28
5.29
4.42
7.61
5.53
4.64
8.00
5.21
4.53
7.89

3.37
2.50
2.34
3.13
2.34
1.91
2.66
2.15
1.77
2.56

10.51
9.14
8.01
12.77
9.21
7.75
12.68
8.65
7.46
12.37

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

2.55
4.20
4.20
4.20
4.30
4.30
4.30
4.75
4.75
4.75

340
340

1.16
1.92

4.56
6.23

1.70
2.51

7.42
10.66

1.50
1.50

4.75
4.75

C-1 400 Volts


C-2
11 Kv
Agriculture
D
D-1
D-2_TOD
(Off -PEAK HOURS)
D-2_TOD
(PEAK HOURS)

400
380

1.14
1.11

5.67
5.69

3.54
3.45

10.35
10.25

2.00
2.00

4.00
7.14

200
200
200

0.80
11.22
19.22

6.84
0.00
0.00

2.36
0.00
0.00

10.00
11.22
19.22

1.00
1.00
1.00

4.00
4.00
4.00

Public Lights
G
G 2a for 60 watts
G 2b for 100 watts
Temporary
E
E-1 (i) Domestic
E-1 (ii) Commercial
E-2 (i) Industrial
E-2 (ii) Bulk (a) at 400 Volts

2.20
6.65
495 (per year per lamp)
908 (per year per lamp)

4.88
4.70
4.70

13.73
4.70
4.70

4.00

4.00

FOR CONSUMPTION ABOVE 50 UNITS

1 to 100 kWh
101 to 300 kWh
301 to 700 kWh
Above 700 kWh
Above 1000 kWh
A1-R_B
(Off -PEAK HOURS)
A1-R_B
(PEAK HOURS)
Domestic ( Tax Free )
upto 50 kWh

6.80
5.94
5.00
5.00
3.57
1.50
1.50

A1-R

FOR CONSUMPTION ABOVE 50 UNITS

Industrial
B-1
(upto 50 kW)
B-2
(41-500kW)
B-2 TOD

0.00

0.00
0.00

0.00

(OFF
(PEA

B-3
11KV (501-5000kW)
B-3 TOD 11KV (501-5000kW)

(OFF
(PEAK
B-4
66/132KV (over 5000kW)
B-4 TOD 66/132KV (over 5000kW) (OFF
(PEAK
B-5 220KV and above for all loads
B-5 TOD 220KV & above for all loads (OFF
(PEAK
Bulk Supply
C

(b) at 11 Kv

2.16
3.86
2.41
1.81

12.42
12.22
11.83
12.56

3.88
5.28
3.82
4.09

18.46
21.36
18.06
18.46

1.50
2.00
1.50
2.00

6.00
4.00
4.20
4.00

1.69

12.46

3.91

18.06

2.00

7.14

E-2 (iii) Bulk Supply to other consumers

Minimum charges
A1-R
A2-C
B-1
B-2
B-3
B-4
B-5
E-1(i) & E-1(ii)

Single
Phase
Rs.75/-

Three
Phase
Rs.150/-

Rs.175/Rs.350/Rs. 350 per month


Rs. 2,000 per month
Rs. 50,000 per month
Rs. 500,000 per month
Rs. 1,000,000 per month
Rs.50/- per day subject to minimum of Rs.500/- per day for the entire period of supply.
Remaining tariff as per fixed charges.

Monthly Meter Rent


Single phase
Polyphase upto 20 Amps
Polyphase 20-90 Amp

Rs. 7.50
15.00
20.00

Income Tax

Industrial and commercial consumers are also subject to Income Tax


Taxable Amount = Energy Charges + Fuel Adj. Charges as per notification of CBR.
(i) Does not exceed Rs. 400/- Rs. 0/(vii) Rs.3001 to 4500/Rs. 450/+ Addl. Charges + Fixed Charges + Electricity Duty +
Meter Rent + PF Penalty+Fsa+Gst
(ii) Rs. 401 to 600/Rs. 80/(viii) Rs. 4501 to 6000/Rs. 500/(iii) Rs.601 to 800/Rs. 100/- (ix) Rs. 6001 to 10000
Rs. 650/(iv) Rs.801 to 1000/Rs. 160/- (x) Rs. 10001 to 15000
Rs. 1000/(v) Rs. 1001 to 1500/Rs. 300/- (xi) Rs. 15001 to 20000
Rs. 1500/(vi) Rs. 1501 to 3000/Rs. 350/- (xii) Rs. 20000 and abov @ 5% (Ind Cust), 10% (Conmmercial Cust)

General Sales Tax

General Sales Tax as per notification of CBR

Taxable Amount = Energy Charges + Fuel Adj. Charges


Domestic
+ Addl. Charges + Fixed Charges + Electricity Duty +
Meter Rent + PF Penalty+Fsa
Agricultural
Commercial

16% of Taxable Amount, except consumption under 100 Units


16% of Taxable Amount, except for Tube well consumers
16% of Taxable Amount

Industrial
16% of Taxable Amount
Steel Melters Rs./ 7.00 per Unit (implement 1 August unit)
Industrial Zero Consumer List Provided by CBR
LPS
Others Charges
TV License Fee
Bank Charges

(Energy Charges + Fuel Adj Charges + Surcharge + Additional Surcharge + Fixed Charges + PF Penalty +Fsa) * 0.10
Domestic
@ Rs. 35/= per TV Set, implemented since 01-01-2010
Commercial / In@ Rs. 60/= per TV Set, implemented since 01-01-2010
@ Rs. 8/= per Payment implemented since 01-07-2006.

Você também pode gostar