Project
Owner
Conntractor

C
D
E
F
M/S Indcon Projects & Equipment Ltd.

Job Procedure No. IPEL-PJPL-ST-CIVIL-02


:PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
:I.O.C.L.
: M/s Indcon Projects & Equipment Ltd.

Job Procedure For :


Earthwork in Excavation.
NO: IPEL-PJPL-ST-CIVIL-02

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
0
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88

Rev. No.

Date

For
review &
Approval
Descriptio Prepared Checked Approved
n
by IPEL
by IPEL
by IPEL

Reviewed &
approved by IOCL

Index
Sl. No.
1
2
3
4
5
6
7

Description Page No.


Purpose
3
Scope
3
Reference
3
Method
4-Mar
Documenta
4
ITP
IPEL-PJPL-ST-CIVIL-ITP-02 ( Enclosed )
Formats IPEL-PJPL-ST-CIVIL-FM-01 ( Enclosed )

89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113

1.Purpose:
The purpose of this procedure is for supervision of all excavation works & to ensure that
the proper quality control is exercised at site.
2. Scope:
This Procedure covers the work method, supervision & method of record keeping for all
excavation works in foundations & trenches in stations.
2. Reference:
Tender specification no. PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 Volume II of IV.
AFC Drawings.
3.Equipment :
Excavator, JCB, Manual excavations tools, Dewatering Pump - as per site requirement.
4. Method
4.1 Prepatory works:4.1.1
Before taking up any work,spot levels with pre determined grids are to be jointl

115

4.1.2 Traverse survey pillars and intermediate grid pillars will be errected with
reference to co-ordinates from the existing reference pillars checked by IOCL.
In case under ground live cables/ pipes/ drains are crossing the excavation
4.1.3
area, the necessary permission to start work has to be taken from IOCL.
4.2 Clearing:-

116

4.2.1

4.1.2
114

117
118

Area of construction shall be cleared of all materials including


bushes,trees,vegetation,obstruction and rubbish disposed off to a suitable
place as per the provision of contract & instructions of IOCL.
4.3 Excavation(soft/loose/hard/dense soil & mud):Excavation for foundations and other sub structures shall be done as per
4.3.1 drawing with sufficient working space working space all around as per site
requirement.

119
120
4.3.2

Suitable shoring & strutting shall be adopted where ever required to withhold
the face of earth or cutting shall be done in slope as per site requirements and
instruction of IOCL.

123
124

4.3.3

Excavation shall be carried out upto the required formation level as specified
in the " IFC " drawing maintaining line and dimension.

125

4.3.4

126
127

4.3.5

128

4.3.6

122

129

If the excavation has gone deeper than the required level, it shall be brought
back to the required level by sand filling or PCC as per the instructions of
IOCL.
If earth work involves mass excavation,the same will be carried out in a well p
Surplus earth and soil from excavation shall be removed from construction
site to a suitable area as per the provision of contract and instruction of IOCL.

130
131
132
133
134
135
137
138
139
140
141
142
143
144
145
146
147
148
149

4.4.1
4.4.2
4.4.3

4.4 Excavation (soft/disintegrated/weathered rock):If loose rock is met with in excavation, it shall be removed with rock breaker/other suitable tools.
Excavation for foundations and other sub-structures shall be done as per
drawing with sufficient working space as per site requirement.
The sides of excavation may be cut in suitable slope to hold the face of earth.

4.4.4

Excavation shall be carried out upto the required formation level as specified
in IFC drawing maintaining the line & dimension.

4.4.5

If the excavation has gone deeper than the required level, it shall be brought
to the level in the manner described in Cl. 3.3.4 of this procedure.
If earth work involves mass excavation,the same will be carried out in a well p

4.4.6
4.4.7

Surplus earth and soil from excavation shall be removed from construction
site to suitable area as per the provision of contract & instruction of IOCL.
4.5 Excavation(hard rock):4.4.1
If hard rock is met with in excavation, it shall be removed with rock breaker/other suitable tools.
4.5.2
If the excavation is in the hard rock which requires blasting operations
approval of the Engineer-in-charge shall be obtained.

150

4.5.3
.

Licence shall be obtained from the Competent Authorities for storing the
explosive & blasting operations as per explosives latest prevailing Acts/Rules.

151

4.5.4

All blasting materials such as explosive, fuses, detonators etc. shall be


procured from a licensed dealer. All items shall be kept separately in safe
custody. EIC can check the store of explosives and its account any time he
desires.

153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169

4.5.5
4.5.6

All required safety measures shall be taken to avoid any accident to workmen,
public or property damage due to blasting operations.

4.5.7

If the excavation has gone deeper than the required level, it shall be brought
to the level in the manner described in Cl. 3.3.4 of this procedure.

4.5.8

Excavated rock shall be removed from construction site to suitable area as


per the provision of contract & instruction of IOCL.
Documentation:Inspection & Test Plan IPEL-PJPL-ST-CIVIL-ITP-02
Inspection Report
IPEL-PJPL-ST-CIVIL-FM-01

Note:The above procedure is only a brief guideline for working at site. For detail
description The contract specification shall be refered. In case of any dispute
between this procedure and contract specification, the later shall prevail.

Blasting operations sha


authorised person durin
charge per blast shall be

ITP2
A
1
2
3
4
5
6

B
C
D
E
F
G
INDCON PROJECTS & EQUIPMENTS LIMITED
Inspection & Test Plan for Excavation works
Project:PANIPAT-JALLANDHAR PIPELINE PROJECT.
Client:I.O.C.L.
Conntractor
INDCON PROJECTS & EQUIPMENT LTD.

7
S.No

Layout of pits with reference to


grid pillars and keeping
alowance from face of
substructure.

IPELPJPL-STCIVIL-FM01

Excavation in slopes or steps as


specified and required and
stacking soil at a distance at
least half the depth of
excavation.

RM

do

RM

do

RM

do

do

do

10
3
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

Activity Description

Records
Verificati
to be
Inspectio
on by
Submitte
n by IPEL
IOCL
d by IPEL

4
5
6

Check for subsoil water and


providing shoring & strutting
wherever required and
barricading the pits.
De-watering and dressing the
botttom level of pits.
Identification of stratum (soil /
rock).
Check for obstacles,
encountered (cables, pipes).
W - Witness
RM - Random
R - Review Documents

29
30
31
32
33
34
35
36
37
For
review &
Approval

38
0
39
Rev. No.

Date

Reviewed
&
Descriptio Prepared Checked Approved approved
n
by IPEL
by IPEL
by IPEL by IOCL

40
41

No. IPEL-PJPL-ST-CIVIL-ITP-02

FM1
A

1
2
3
4
5
6
7
8

10

11
12

B
C
D
E
F
G
H
I
INDCON PROJECTS & EQUIPMENTS LIMITED
Report for Excavation works
Project:PANIPAT-JALLANDHAR PIPELINE PROJECT.
Client:I.O.C.L.
REPORT NO:
Conntractor
INDCON PROJECTS & EQUIPMENT LTD.
DATE:
Drawing No.Location:Sl. No.
Description
Checked Yes/No .( If not applicable say NA )
Layout of pits with reference to grid pillars
and keeping allowance from face of
1 substructure.
Excavation in slopes or steps as specified
and required and stacking soil at a distance
2 at least half the depth of excavation.
Check for subsoil water and providing
shoring & strutting wherever required and
barricading the pits.Lowering of water table
3 (if any).
De-watering and dressing the bottom level
4 of pits.
Check for obstacles, encountered (cables,
5 pipes).

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

6 Identification of stratum (soil / rock).

Length = L Width = B Depth = D Volume = V

a
b
c
d
e
f
g
h
I
j
k
l

IPEL

Search
Check Mai Mail:
Address Book Shortcuts
Add Contact
Add Category
View Contacts
View Lists
QuickBuilder
Import Contacts
Synchronize
Addresses Options
Addresses Help
Calendar Shortcuts
Add Event
Add Task
Add Birthday
Day
Week
Month
Year
Event List
Reminders
Tasks

IOCL
No. IPEL-PJPL-ST-CIVIL-FM-01

Search MailSearch the Web

Sharing
Synchronize
Calendar Options
Calendar Help
Notepad Shortcuts
Add Note
Add Folder
View Notes
Notepad Options
Notepad Help
Advanced Search
Advanced Search

o! Inc. All rights reserved. Terms of Service - Copyright/IP Policy - Guidelines

OTICE: We collect personal information on this site.

ut how we use your information, see our Privacy Policy

her suitable tools.

Blasting operations shall be carried out under the supervision of a responsible


authorised person during the specified hours as approved by E.I.C..The
charge per blast shall be as approved by the Engineer-in-Charge.

REPORT NO:

Remarks

PJPL-ST-CIVIL-FM-01