Notes:
1. CBS to be used for Project Estimation, Planning and Monitoring.
2. Elements of the CBS and detail level to be modified for each project as per the respective scop
3.
to be
updated
of the
for respective
project.
4. Coding
Coding of
canElements
be changed
for
aligningafter
withmodification
the WBS Coding
of CBS
the Schedule
and/or
Company Cha
However, it is recommended to develop standardized coding system which is aligned with the W
with the Company Chart of Accounts).
5. CBS may or may not be at the same level as that of WBS; depending upon the level of detail re
estimate, available information / time etc.
6. Detailed cost estimation of each element along with basis / references to be carried out on se
L0
L1
PROJECT SCOPE
L4
FACILITIES COST
ENGINEERING + HSE CASE
A
A.1
A.1.1
Basic Engineering
A.1.1.1
A.1.2
Detailed Engineering
A.1.2.1
A.1.3
HSSE Studies
A.1.3.1
A.1.3.2
A.1.3.3
A.1.3.4
A.1.3.5
A.1.3.6
A.1.3.7
A.1.3.8
A.1.3.9
A.1.3.10
A.1.3.11
A.1.4
PROCUREMENT
A.2
A.2.1
Major Packages
A.2.1.1
A.2.1.2
A.2.2
A.2.3
A.2.3.9
A.2.3.10
A.2.3.11
A.2.3.12
A.2.3.13
A.2.4
A.2.5
A.2.6
A.2.7
A.2.8
A.2.8.1
A.2.8.1.1
A.2.8.1.2
A.2.8.1.3
A.2.8.1.4
A.2.8.1.5
A.2.8.1.6
A.2.8.1.7
A.2.8.1.8
A.2.8.2
Manual Valves
A.2.8.2.1
A.2.8.2.2
A.2.8.2.3
A.2.8.2.4
A.2.8.2.5
A.2.8.2.6
A.2.8.2.7
A.2.8.3
A.2.9
A.2.9.1
A.2.9.1.1
A.2.9.1.2
A.2.9.1.3
A.2.9.1.4
A.2.9.1.5
A.2.9.1.6
A.2.9.1.7
A.2.9.1.8
A.2.9.2
Instrumentation
A.2.9.2.1
A.2.9.2.2
A.2.9.2.3
A.2.9.2.4
A.2.9.2.5
A.2.9.2.6
A.2.9.2.7
A.2.9.2.8
A.2.9.2.9
A.2.9.2.10
A.2.9.2.11
A.2.9.2.12
A.2.9.2.13
A.2.9.2.14
A.2.9.2.15
A.2.9.2.16
A.2.9.2.17
A.2.9.2.18
A.2.9.2.19
A.2.9.2.20
A.2.9.2.21
A.2.9.2.22
LOGISTICS
A.3
A.3.1
A.3.2
CONSTRUCTION
A.4
A.4.1
Plant Construction
A.4.1.1
A.4.1.2
A.4.1.3
A.4.1.4
A.4.1.5
A.4.1.6
A.4.2
A.4.3
Erection of Tanks
A.4.3.1
A.4.3.2
A.4.3.3
A.4.3.4
A.4.3.5
A.4.3.6
A.4.3.7
A.4.3.8
A.4.3.9
A.4.4
Project Yard
A.4.4.1
COMMISSIONING
A.5
A.5.1
First Fills
A.5.1.1
A.5.1.2
A.5.2
Commissioning Spares
A.5.2.1
A.5.3
Commissioning Consumables
A.5.3.1
A.5.3.2
OWNERS COSTS
Project Management Team (PMT)
PMT (Salaries) & Construction Site Deployment
Security
Insurance Costs
Community Relations
Approvals
C
CONTIGENCIES / INFLATION
S; General)
s that of WBS; depending upon the level of detail required for the
G + HSE CASE
Estimated Cost
0.0
0.0
IEE
EIA
HAZOP
HAZID
SIL Verification & Validation
F&G Mapping
Quantitative Risk Analysis
RAM study
EERA
ESSA
Human Factor Analysis
on + Survey
Land Demarcation & Measurement
Geotechnical Investigation
Line Pipe Route Survey
Topographic Survey
0.0
0
Produced Water Treatment Package (Capacity???)
Produced Water Injection Package (Capacity???)
pment / Systems
UPS & Batteries
MCC/Switchgear
Control System (DCS/SIS)
F&G System
Wellhead Control Panel
RTU Panel
Solar Panel
Hydraulic Cabinet
Nitrogen Bottles
PABX
PAGA
CCTV
Radio/VSAT
0
Line Pipes (transfer)
Line Pipes (injection)
Line Pipes (additional)
0
Heat shrink sleeves & accessories
Coating Material
Adhesive
Epoxy
tion Services
Coating Application Services
ection Systems
Cathodic Protection System
Corrosion Monitoring System
CS Pipe
SS Pipe
Fittings (CS) Flanges, Elbows, Tees, Olet, Reducers,
Couplings etc.
Fittings (SS) Flanges, Elbows, Tees, Olet, Reducers,
Couplings etc.
Gaskets
Bolts
Y-Strainers
Piping Special Items
0
0
Civil Works
Equipment Erection
Piping
Painting
Instrumentation works
Electrical works
uction Cost
Pipeline Construction
Layiung of FOC
Crossings
Condensate Storage Tanks
Condensate Storage Tanks
Raw Water Storage Tank
Potable Water Storage Tank
Fire Water Storage Tanks
Diesel Day Tank
Diesel Storage Tank
Cathodic Protection for Tanks
Other (Contingency)
Construction (L.S.)
0
Chemicals
Nitrogen Cylinders
Commissioning Spares
Consumables
Misc. Items (Water, Lube Oil, Coolant, etc)
Diesel
0.0
0
Temporary Camp
Vehicles on rent
Portacabins
Rental Generators
Inspection
Lab Test of Samples
g for pre-comm/Comm
ES / INFLATION
0.0