Escolar Documentos
Profissional Documentos
Cultura Documentos
SUMMARY
Product Development:
Communication Address
Plot No.3,F1,Ruby Enclave,
Earikarai Street,East
Tambaram,Ch-600059
Personal Details
Date of Birth: 17.12.1989
Fathers Name:
R.Chandrasekaran
Gender: Male
Nationality: Indian
Religion: Hindu
Languages Known: English,
Hindi & Tamil.
Development Activity.
Able to work under pressure and ensure productivity in
challenging projects.
Hobbies: Browsing,
Teaching Design Techniques
& Sports, Etc.
OBJECTIVE
KEY SKILLS
Tear Down analysis of cable and material identification and finding the cost
impact.
WORK EXPERIENCE
Current Company:
FUTURE FOCUS INFOTECH PRIVATE LIMITED.
NO : 27/1, NUNGAMBAKKAM HIGH ROAD, CHENNAI - 600034
(ISO 90012002, Certified Company)
We provide design solutions to TCS.
Designation
: CAD Engineer.
: Team Member
Software
: CATIA V5 R19
Duration
Previous Company:
INFAC INDIA Pvt Ltd , Padappai,Chennai,
(ISO/TS 169492002, ISO14001:2004 & OHSAS18001:1999 Certified Company) is a
Tier-1 Vendor to HYUNDAI MOTOR INDIA Manufacturer of Control cables, Ignition
cables & Battery cables. Our customers are GMI, Mobis India, Mobis Slovakia, TAFE,
Lumax, Volkswagen, Glovis India, Hwashin Automotive India pvt Ltd.
Designation
: Team Member
Software
: CATIA V5 R19
Duration
JOB RESPONSIBILITIES
Study customer requirement. Review the customer drawing and get the key
requirements like functional parameters and material requirement.
Working on 2D to 3D conversion of Machine components.
Working on 2D & 3D modification work orders.
Drafting of the modeling components.
CFT Member for the project (Gally Design ) in product Design team.
B.O.M Preparation and identify the part details and quantity.
Testing requirement according to the customer is identified from the customer
drawing and Testing Preparation.
Preparation of consolidated material list, unique parts required for the Project.
Receiving RFQ and submission to costing department.
Prototype harness build activity co-ordination like Sub Assembly, Circuit
Testing, Visual Inspection and Implementing till mass production.
Ensure APQP activities are adhered, such as milestone quality gate of the
project and align with the customer project time line.
Support PPAP activities, co-ordinate for the Customer Approval.
Fit, Function, Geometry trail at pilot production and ensure the successful
launch at SOP.
Implementing the customer measure of field problem of significant and critical
characteristics.
Preparing and submission of the quotation for the products to the customer.
Carry tear down and Bench marking activity.
Involved in cost reduction activities.
Drawing review, control & Distribution (Assy / Sub part).
1. Project Name
Customer
: BE AEROSPACE
Details
integration in galley
PROJECTS IN DESIGNING & DEVELOPMENT IN INFAC:
1.Project Name
Customer
: Volkswagen.
Model
: VW 250
Details
the end fitment in the cable and is also the mating part in vehicle. The detailing and
drafting of the same part is done and approved by head quarters Korea.
Product Application: These cables are used in car to open the hood and door
respectively in car.
Material
2. Project Name
: PA66,POM.
Customer
Model
: BA
Details
: PA 66.
ACADEMIC QUALIFICATION
NAME OF THE
INSTITUTION
SPECILIZATION
YEAR OF PASSING
PERCENTAGE
K.C.G College of
technology,Chennai
B.E.Mechanical
Engineering
2011
69.37
12th (Biology)
2007
65
ONGC Public
School,Karaikal
10th (CBSE)
2005
52
Central Institution Of
Plastic Engineering &
Technology
2013
SOFTWARE EXPOSURE
: J5787256
Date Of Issue
:13.07.2011
Date Of Expiry
:12.07.2021
File No.
:MAS20008711
Declaration
I hereby declare that the above information given by me are true and correct to the
best of my knowledge.
Date: 27.09.2013
Yours faithfully,