Escolar Documentos
Profissional Documentos
Cultura Documentos
B
B
M
P
K
E
Y
M
A
P
Yelahanka
Byatrayanpura
K.R. Puram
Dasarahalli
Core Area
Kengeri
Mahadevapura
R.R. Nagar
Bommanahalli
Valley
Existing
Under
construction
Total
1) Vrishbhavathi
276
105
190
60
631
2) Koramangala
and Challaghatta
305
150
205
90
750
3) Hebbal
140
81
120
39
380
721
336
515
189
1761
100%
Commissioned
utilization by K&C Valley by
end of 2016 March 2017 & V
Valley by end of
2018
Expected
to
be
completed
by 2019
Expected
to
be
completed
by 2020
Total
Location
Capacity in
MLD
Treatment Facility
1.
Vrishabhavathi Valley
180
2.
K & C Valley I
248
3.
Hebbal Valley
60
4.
Madivala
04
5.
Kempambudhi
01
6.
Yelahanka
10
Location
Capacity in
MLD
Treatment Facility
7.
Mylasandra
75
8.
Nagasandra
20
9.
Jakkur
10
10.
K. R. Puram
20
11.
Kadabeesanahalli
50
Secondary-Extended aeration
12.
Rajacanal
40
13.
Cubbon Park
1.5
Membrane
14.
Lalbagh
1.5
Grand Total
721
Jakkur 10 MLD
Hebbal 60 MLD
K R Purum 20 MLD
10
Raja Canal
40
Horamavu Agara
20
Nagasandra
20
SBR
Chikkabanavara
SBR
Kadugodi
SBR
Kengeri
60
K & C Valley
60
ASP
Bellandur Amanikere
90
ASP
Doddabele
20
SBR
15
SBR
Total
336
Chikkabanavara 5 MLD
Nagasandra 20 MLD
Raja Canal 40 MLD
Horamavu Agara 20 MLD
Kodugodi 6 MLD
Yelemallappa
chettykere 15 MLD
Doddabele 20 MLD
12
Hebbal
100 MLD STP
K.R.PURAM
20 MLD STP
Bangalore University
60 MLD STP
K& C Valley
150 MLD STP
Doddabele
40 MLD STP
V Valley
150 MLD STP
14
Location
Sarakki
Hulimavu
ChikkaBegur
Agaram
K R Purum
Capacity in MLD
5
10
5
35
20
TOTAL
Cost in Rs.
Crore
15.00
30.00
15.00
105.00
33.00
188.00
Chikkabanavara 5 MLD
Nagasandra 20 MLD
Quantity of wastewater
generation 528 MLD
Nagasandra 20 MLD
Treatment Plants
Existing
276 MLD
Under Construction- 105MLD
Proposed 250 MLD
Total Treatment Plants 631 MLD
B University 60 MLD
Kempambudhi 1 MLD
V Valley 150 MLD
Kengari 60 MLD
Doddabele 20 MLD
Doddabele 40 MLD
305 MLD
Under Construction
150 MLD
Proposed
205 MLD
In Pipe line
90 MLD
Madivala 4 MLD
Begur 5 MLD
Hulimavu 10 MLD
Agara 35 MLD
Yelahanka 10 MLD
Jakkur 10 MLD
Rajacanal 40 MLD
Rajacanal 40 MLD
Hebbal 60 MLD
Hebbal 100 MLD
140 MLD
Under Construction
81 MLD
Proposed
120 MLD
In Pipe line
39 MLD
Yelemallappa Chetty
Kere 15 MLD
Abatement of pollution in
Bellandur and Varthur Lakes
9
10
11
12
13
17
16
15
14
Location
Flow in
MLD
3.00
1.00
10.00
Challaghatta
20.00
10
Nagasandra Slum
1.00
11
Nagasandra Colony
1.00
12
30.00
13
190.00
14
Ibalur
3.00
15
Agaram
1.00
16
120.00
17
S T Bed
100.00
Total
480.00
Flow from inlet 1,2,10,11,14 &15 KMRP works completed by end of 2016
Flow from inlet 8 & 9 work is in progress completed by end of 2016
Flow from inlet 16 KMRP works completed by March 2017
Flow from inlet 17 Approved under AMRUT Cost Rs.95 Cr expected to be completed by 2018
Medium Term
Providing diversion channel for diverting dry weather
flow
Long Term