AP-T44/06
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Project Manager
Gary Liddle, VicRoads
Prepared by
John Oliver, ARRB Group
Ron Gordon, Consultant
John Rebbechi, RoadCor
Austroads believes this publication to be correct at the time of printing and does not accept
responsibility for any consequences arising from the use of information herein. Readers should
rely on their own skill and judgement to apply information to particular issues.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Sydney 2006
Austroads profile
Austroads is the association of Australian and New Zealand road transport and traffic authorities
whose purpose is to contribute to the achievement of improved Australian and New Zealand road
transport outcomes by:
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Austroads membership
Austroads membership comprises the six state and two territory road transport and traffic
authorities and the Australian Department of Transport and Regional Services in Australia, the
Australian Local Government Association and Transit New Zealand. It is governed by a council
consisting of the chief executive officer (or an alternative senior executive officer) of each of its
eleven member organisations:
The success of Austroads is derived from the collaboration of member organisations and others in
the road industry. It aims to be the Australasian leader in providing high quality information, advice
and fostering research in the road sector.
EXECUTIVE SUMMARY
To assist with the development of a practically focussed Austroads research program in the
sprayed sealing area, a workshop was held at ARRB on 8 and 9 February 2005. Attendance at the
Workshop was by invitation to ensure a broad representation of interests from SRAs and industry.
Seventy-one delegates attended, coming from all regions of Australia and New Zealand, and
covering interest groups including CEOs, regional and network managers, operational staff and
technical experts. The Workshop was judged a success by delegates, and key elements in
achieving this were the extensive pre-planning by a Steering Committee and the appointment of a
facilitator, Dr Ron Gordon, to mediate the Workshop sessions.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
During the Workshop, topics were first introduced by way of a prepared presentation whereby a
selected speaker summarised basic information and highlighted issues. Each topic was then
followed by a general discussion. One of the most successful sessions was a series of seven,
short presentations by practitioners from State Road Authorities (SRAs) and industry on what they
considered to be the top five issues. Presenters in this segment were drawn from all over Australia
and New Zealand and from different areas of sprayed sealing technology.
At the end of each day, delegates were split into six breakout groups, each of which was given two
themes to consider. These themes had been developed from the days discussions. The breakout
groups were asked to consider what issues each theme raised, and then to select the most
important issues. These issues were presented to a plenary session, and delegates then
discussed and prioritised them.
The Steering Committee considered it was important that momentum generated at the Workshop
should not be lost, and that ways of assisting the implementation process should be identified.
Subsequent to the Workshop, actions to address each of the high priority issues were therefore
developed. A high proportion of the technical issues were already addressed in the Austroads /
ARRB research program. Some other issues could be easily fitted into existing three year
research projects. Most of the remaining issues will be considered by the Steering Committee and,
in consultation with Bitumen Surfacings Research Reference Group (BSRRG), recommendations
prepared for the Pavement Technology Review Panel.
The key issues are summarised below under twelve theme headings.
Austroads 2006
i
National Uniformity
The need to enhance uniform practices across jurisdictions was strongly supported. While
Austroads and AAPA have made substantial commitments in the past, considerable scope remains
to encourage utilisation of consistent design methods, specifications and testing methods, and to
ensure that learnings are shared broadly across Australia and New Zealand.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Austroads 2006
ii
Bituminous Materials
The recent past has seen a decline in the resources made available for the evaluation and study of
bituminous binders, the critical component of sprayed seal surfacings. However, changing sources
of crude oil, developments in proprietary products, increasing demands on seals due to heavier
traffic and emerging environmental constraints are but some of the factors which necessitate
ongoing monitoring of binder behaviour and performance. Primes, emulsions and polymer
modified binders were particular materials attracting great interest.
Quarry Products
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
High quality aggregate is the other key component of sprayed seal surfacings. Road authorities
have generally had reasonably ready access to good surfacing aggregates capable of adhering to
bituminous binders, resisting the effects of heavy load and environment, and providing adequate
skid resistance. However, appropriate materials are becoming less accessible and more costly.
Consideration needs to be given by all sectors on ways to extend the availability of aggregates for
future use. While the primary motivation to do this clearly rests with quarry suppliers, users of
these materials may assist by adopting approaches which permit the optimum use of quarried
material (the use of a range of alternative aggregate sizes was suggested as one such possibility).
Similarly, creation of strategic reserves of quarry products is another option. Further work is also
required to better understand the performance and behaviour of pre-coatings for aggregate.
Skid Resistance
In recent years, several road agencies have increased standards to improve the skid resistance of
surfacings. This has had impacts in additional costs for more polish-resistant (and more scarce
and costly) aggregates, an increase in the frequency of resurfacing, and utilisation of specialised
maintenance treatment to remove flushed bitumen. There are questions as to whether such
additional expenditure is justified or if some more cost effective options are available. At the same
time, a need exists to provide better evidence of the reliability of forecasts of field skid resistance
based on laboratory testing protocols (PSV) for Australian and New Zealand circumstances.
Design of Treatments
Some concerns have been raised about the applicability of the Austroads sprayed seal design
method, particularly in cases with very heavy (or very light) traffic loadings. There is a need to reexamine and update the method to ensure its applicability across this broader range of
circumstances. It is also apparent that there is a need to promulgate further the rationale of the
design approach to make it available to the occasional designer or new designers.
Austroads 2006
iii
CONTENTS
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Page
BACKGROUND .................................................................................................................... 1
OBJECTIVES ........................................................................................................................ 2
ATTENDANCE ...................................................................................................................... 4
Opening ........................................................................................................................ 6
Sprayed Sealing from the SRA and Industry Viewpoint................................................ 6
Selection of Treatments ................................................................................................ 8
Delivery Systems .......................................................................................................... 8
Operational Viewpoint................................................................................................... 9
Austroads Strategic Research Program and Importance of Spray Seal Expertise
and Knowledge ........................................................................................................... 13
6.7 Occupational Health & Safety and Environmental Issues........................................... 14
6.8 Factors Affecting Seal Life .......................................................................................... 15
6.9 Are We Getting Value from Seals? ............................................................................. 16
6.10 Bitumen....................................................................................................................... 17
6.11 Modified Binders and Emulsion .................................................................................. 18
6.12 Sealing Aggregates..................................................................................................... 19
Introduction ................................................................................................................. 22
Overview of Issues Identified at the Workshop........................................................... 22
Development of an Austroads / ARRB Research Program......................................... 24
IMPLEMENTATION ............................................................................................................ 25
9.1
9.2
Overview ..................................................................................................................... 25
Action Statements....................................................................................................... 25
Austroads 2006
iv
1. BACKGROUND
The Austroads Technology Program promotes best practice in technology through the
development and maintenance of the Austroads publications series. The surfacings research
program into bitumen, asphalt and sprayed seals underpins the development of the Pavement
Technology publications and is overseen by the Austroads Pavement Technology Review Panel,
which provides advice to the Program Manager.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
As part of the process of developing a well focused and relevant research program in this area,
ARRB was directed to organise and hold a national workshop on sprayed sealing. Sprayed seals
are recognised as a key component of the Australian and New Zealand road network. They are a
low cost surfacing solution and their continued use depends on developing materials and
procedures to meet new challenges, and on maintaining and improving the skills and expertise of
technical and construction personnel.
The Workshop was held at ARRB on 8 and 9 February 2005. It was considered by participants to
be very successful, and this has raised the possibility of further workshops being arranged in other
areas such as asphalt and binders. This report, therefore, summarises the processes involved in
planning and running the Workshop, as well as detailing the outcomes.
Austroads 2006
1
2. OBJECTIVES
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
develop a set of key issues to assist Austroads in formulating a sprayed seal research
program
canvas new technologies and examine how they may be utilised in the sealing area.
Austroads 2006
2
3. WORKSHOP PLANNING
A crucial aspect in the planning of the Workshop was the establishment of a Steering Committee
which consisted of key practitioners in the area. A list of Steering Committee members is given in
Appendix 1. A second important decision was to use a facilitator to mediate the Workshop
sessions. Dr Ron Gordon was appointed and proved to be most successful in the role. He also
participated in the planning process.
It was decided that two sorts of information would be presented to delegates during the Workshop:
basic facts about the technologies, materials and processes involved in spray sealing
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
The Workshop was modelled on the successful PMB Workshop held at ARRB in 1990. Based on
experience from that event, it was decided that two days was the minimum time necessary to
present information to delegates and to go through the process of identifying and prioritising key
issues.
One of the first tasks of the Steering Committee was to build up a topic list and then identify
individuals who might be suitable as presenters. To assist presenters, the Committee prepared a
list of key points to be covered for each topic, in addition to any the presenter might wish to add.
The Steering Committee held four formal meetings to address matters which included:
ensuring that different types of issues raised at the Workshop were subsequently actioned.
Austroads 2006
3
4. ATTENDANCE
It was decided that attendance would be by invitation only. It was expected, as turned out to be
the case, that more people would wish to attend than could be accommodated in a Workshop
setting. A list of possible delegates was therefore prepared to ensure a good geographical spread
and that an appropriate range of expertise and representation across interest areas would be
obtained.
This objective was achieved and every State and New Zealand was represented at the Workshop.
Altogether 71 delegates attended, although a small number were only part time. The attendance
list is shown in Appendix 2 together with the affiliation of each delegate. In the interests of privacy,
no further information has been provided but delegates can be contacted through ARRB.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
A notable comment by delegates was that the Workshop brought together people from different
interest areas who would not normally have the opportunity to interact. Among the groupings
present were:
sealing contractors
materials suppliers
researchers.
Austroads 2006
4
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
One of the most successful sessions was a series of seven, short presentations by practitioners
from State Road Authorities (SRAs) and industry on what they considered to be the top five issues.
Presenters in this segment were drawn from all over Australia and New Zealand and from different
areas of sprayed sealing technology.
Towards the end of each day delegates were split into six (breakout) discussion groups which met
in separate rooms. The topics introduced during the day were split into a number of themes by the
facilitator, and each discussion group was given two themes to consider. Normally each theme
would be looked at by two groups and each group was permitted to introduce other material. The
discussion groups were asked to consider what issues each theme raised, and then to select the
most important issues. A leader from each group presented the findings to a plenary session and
described why each issue had been selected. There then followed a process by which all
delegates identified the most important issues from those raised by the discussion groups.
All presentations were made in PowerPoint and copies of the speaker slides were included in the
workshop handout notes. A summary of key points from each of the 21 presentations, as well as
the ensuing discussion is provided in Section 6 while Section 7 lists the outputs produced as a
result of the prioritisation process.
Austroads 2006
5
Gerard Waldron welcomed participants to the workshop and gave a brief background to some
forthcoming organisational changes at ARRB. He described how ARRB had evolved from its
origins as the research grant driven Australian Road Research Board into the predominantly
commercially focussed ARRB Transport Research Limited.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
With a new level of research funding from Austroads, a new business model has been adopted
that will separate ARRB into two groups ARRB Research and a commercial arm including ARRB
Consulting, ARRB Technology and Financial and Corporate Services. Subject to completion of
registration formalities, the new name of the organisation will be the ARRB Group.
Gerard also referred to the importance of sprayed seals to the road systems in Australia and New
Zealand and the objective of ARRB to be a sustainable centre of expertise in sprayed sealing
technology.
Bob then went on to discuss some of the challenges arising from limitations on funding, increased
traffic loadings, aging pavements and increased health, safety and environment requirements and
higher customer expectations.
Sprayed seals comprise some 68% of the network managed by the RTA and consume around
13% of the maintenance budget. They represent low cost per square metre and good value for
money. Qualities provided by sprayed seals include waterproofing, skid resistance, texture, crack
resistance and tolerance to pavement deflection.
Austroads 2006
6
Sprayed seal failures, if they occur, represent a safety hazard to road users, safety hazard to
crews undertaking repair work, high cost of repair and a potential for further pavement damage and
ongoing maintenance. They also reflect poorly on the image of the road authority and the
contractor, as well as leading to a potential for claims against the authority.
Avoiding failure, and obtaining quality from sprayed seals, involves optimal project selection,
treatment selection, timely intervention and good service delivery. It is important to get the basics
correct through training, accreditation and maintenance of expertise. Achieving quality in the
medium to long term also involves continued performance monitoring, research and development,
process development and a continued supply of quality materials
The presentation prepared by Malcolm Frost was delivered on his behalf by John Bethune,
Director Austroads Projects, Australian Asphalt Pavement Association.
The theme of Malcolm Frosts presentation was that of keeping sprayed seals affordable.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Malcolm emphasised the importance of adequate returns from sprayed sealing to justify private
sector investment in equipment, expertise and technology. Factors impacting on the ability to
achieve adequate returns include:
the ability to standardise assets to meet multiple customer needs over the long term
a level playing field for all participants, and how price based tendering favoured short-term
low cost operators who do not bear the costs of investment in the future of the industry
Particular reference was made to the cost impact of waste generated through inappropriate choice
of materials and treatments, and the cost of compliance with different standards of accreditation,
equipment requirements, work procedures, materials specifications, etc. in different jurisdictions.
Discussion
Ray Gaughan (formerly RTA NSW and Convenor of the Austroads Bituminous Surfacing
Research Reference Group) spoke of the substantial achievements that had already been made in
preparation of national guidelines in areas such as sprayed seal design, sprayer calibration /
accreditation, safety, materials, work practices, etc.
In subsequent discussion there was some criticism of the extent of soft options in national guides.
Further discussion focussed on the need to communicate, to all levels of specifying and contracting
organisations, and the existence and application of relevant guides to good practice.
Austroads 2006
7
Walter Holtrop provided a general introduction to the factors influencing choice of sprayed seal
treatments and then went on to discuss particular issues relating to priming and primer-sealing
practices, seal selection, maintenance practices, and treatment of flushed seals, including high
pressure water blasting.
Walter expressed concern at the reduction in the use of priming on new granular (and concrete)
bases. This is often driven by expediency or cost saving. All new work should be primed where
possible.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Discussion
Some lively discussion took place on the merits of priming and the factors that inhibit its use. It is
not a suitable treatment on works constructed under traffic. Walter repeated his concern that
priming was being omitted on works constructed away from traffic where priming was a feasible
treatment.
Mention was made of a practice, sometimes used in NSW, of mixing bitumen emulsion into the
surface of the granular base during final preparation thereby providing a partially bitumen bound
surface layer for the subsequent seal.
Further discussion took place on the common problem of sealing over soft base materials. Walter
again repeated his suggestion for greater use of the ball embedment test in determining fitness for
sealing.
John Esnouf provided an overview of the process of selection and design of treatments, selection
of materials, and the technology of equipment used in sprayed sealing works.
Of particular interest, was a description of a range of equipment developments seen on recent
overseas study tours. Although a relatively minor proportion of overall road networks, a surprising
amount of sprayed seal work is undertaken in places such as the USA and Europe leading to
significant investment in the equipment development.
Austroads 2006
8
large (10 000 L plus) sophisticated bitumen sprayers with variable spray width and variable
binder application
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Transporting and storage of materials (especially binders) and ensuring the properties
remain as expected. Do we really know what we are using?
Field blending vs plant blending / processing (aggregates and binders). Are the materials
appropriately treated for the actual site conditions?
Sprayers. Are we getting the application rates we want everywhere including across the
road (wheel paths and edges) and along the road?
After care. Is this happening at all? (Early intervention and remedial work can be very cost
effective and ensure a quality seal).
Discussion
Speakers emphasised the importance of aggregate spreading; including an appreciation of the
influence of aggregate spread rate on seal performance and the need for greater accuracy in
measuring and recording. Timing, particularly when using PMBs is also important. It was noted
that the RTA requires field verification of aggregate spread rate using a test tray on all projects, as
well as providing photographs to assist in visual assessment of correct spread rate.
Other observations made during discussion included:
synchronised spraying / spreading machines involve some very high axle loadings that are
permitted in Europe but not allowed in Australia.
increased outputs should not overlook the need for adequate rolling of completed work.
taper bars may not answer all problems and can lead to poor edge finish and uncertainty of
application rate.
Austroads 2006
9
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
skills drain
contractors
poor working conditions, seasonal work, make it difficult to attract and retain skilled workers,
particularly key personnel such as sprayer drivers
lack of practical knowledge leads to poor contract administration, on-site conflict, etc.
seasonal constraints
customer imposed contract timing increases the impact of seasonal work. Could improved
technology assist in extending season?
pre-treatments
poor surface preparation for reseals and initial treatments has an impact on contractor
performance and reputation
ball embedment specifications for basecourse preparation
timing of seals and primer seals
poor material and treatment selection.
bitumen supply
customer supply (in some states) increases handling and administration cost.
specification appropriate? Could higher viscosity grades be used?
Is
inconsistent approach
use of outdated specifications, national inconsistencies in specification requirements
(work procedures) and sprayer certification.
Austroads 2006
10
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
client expectations
poor understanding of the capabilities of sprayed seal surfacings and treatment
selection.
use of cutter
inappropriate cutting practice can lead to bleeding in hot weather. Example shown
where use of an alternative cutter provided a good outcome.
rolling
selection of equipment, timing and extent of rolling are important.
binders
binders need to be matched to pavement, traffic and climate. Suggest the use of
modified binders, e.g. S35E, to provide increased softening point and improved early
cohesion at high summer pavement temperatures on high traffic roads.
increase in traffic
increased bleeding of seals.
materials
too many binder grades, rationalisation required. Aggregate quality and pre-coating
practices are variable.
safety
manual aggregate spreading, overhead and width clearances are issues. Lack of road
user compliance with traffic control is also an issue.
skid resistance
more understanding is required on the interaction between all factors including
relationship between PSV and on-road performance, environmental factors and seal
type. Intervention levels must be appropriate and alternative corrective measures
considered.
expertise
issues of career development and future technical experts and skilled practitioners
requires consideration of industry profile, meaningful career paths, use of current
expertise and the use of contract structures that will develop and encourage the use of
combined industry expertise.
Austroads 2006
11
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
John Cornall put forward the five top issues for independent and smaller industry members as:
education
loss of skills and knowledge in SRAs and Local Government requires additional
education in areas such as surface treatment selection, seal design, pavement
preparation, understanding of environmental issues. Education of the public on the
need for seals and their importance to the road network is also desirable.
design issues
more attention needs to be paid to assessment of traffic including seasonal effects, high
stress areas, and the influence of climate. Aggregate application rates may also require
variation for different binders and seal types.
David Atkinson spoke about surfacing strategy in North Queensland with particular reference to
addressing outcomes not products. Products are selected to achieve a specific outcome and
quality assessed through rigorous testing and performance monitoring. Specific outcomes from
surfacing include:
road safety
intervention levels are applied to rut depth (risk of aquaplaning), skid resistance,
cracking and crack sealing.
environmental sustainability
low impact products are desirable in terms of reduced kerosene levels, high binder
content emulsions, conservation of aggregate by use of surface enrichment and hot inplace recycling.
Austroads 2006
12
Discussion
Only a brief period of general discussion took place prior to the breakout discussion groups. Points
raised included issues of communication, attracting school leavers to the industry, time period
allowed before sealing over slurry surfacing (12 months suggested), design rates for aggregate
spreading, and an observation that some sprayed sealing programs include an element of
selection based on age rather than being totally needs driven.
David spoke about the strategic review undertaken by Austroads Council members in 2003 that
resulted in a new program structure that reflected the priorities in the Strategic Plan 20042007.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Assets
Freight
Network
Safety
Technology.
yearly usage by road authorities exceeds seven million tonnes of asphalt and 750,000
tonnes of bitumen
Strategic research projects have been established in each program area. Delivery of research
programs is to be provided through a restructured ARRB. Austroads has agreed to support the
following areas:
Pavement Technology
Bituminous Surfacing
Asset Management
Austroads 2006
13
Austroads members recognise the importance of sprayed sealing expertise and knowledge in
maintaining a low cost network. This requires expertise to be maintained in both the road
authorities and the industry.
Walter spoke to the presentation jointly prepared with Ray Farrelly, Chief Executive Officer, AAPA.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Health, Safety and Environment is a key planning area of AAPA. The objectives of the HS&E
program are to:
identify and, where appropriate, assist the industry on issues related to health, safety and the
environment.
be proactive in assisting industry to deal with third party related HS&E issues.
Outputs from the program include HS&E Advisory Notes, Guides, safety videos, training courses,
and annual HS&E Conference, annual Health and Safety Awards and collation of safety statistics.
Walter then went on to outline AAPA concerns in areas of:
Continuous concerns:
clothing
manual handling
Future concerns:
Discussion
Issues raised during discussion, but without a consensus view, included choice of colour for safety
jackets and the relative merits of elastic sided versus lace-up boots. Lack of a national approach
to traffic control at work sites, including erection / compliance with speed restriction signs, is a
major industry concern.
Austroads 2006
14
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
If a seal does not fail prematurely due to design, construction or pavement problem then maximum
seal life is determined by binder hardening rate. Hardening to a high viscosity level results in
cracking from volume changes due to daily temperature cycle, or stone loss from the surface.
John outlined extensive ARRB research involving bitumen hardening road trials followed for up to
15 years, the development of the ARRB Durability Test, the development of a bitumen hardening
model and development of a distress viscosity model. A combination of these two models permits
prediction of seal life for a given combination of climate, bitumen durability and seal size.
The main issues involved in premature retirement were:
early resealing to correct skid resistance which can make the problem worse and should be
taken into account in determining treatment needs.
The model can be used to quantify the effect of the main variables involved in retirement due to
age. These are:
bitumen durability (average of 33% life increase by using a normal durability bitumen
compared to a poor durability one)
seal size (15% increase in seal life by using a 14 mm seal instead of 10 mm)
acceptance of risk (minor roads have different requirements to main arterial roads).
Discussion
The ensuing discussion mainly focussed on those issues related to retirement due to age, and
clarification of issues raised during the presentation.
Austroads 2006
15
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
This was followed by a discussion of the general requirements of specifications, assessment and
feedback of contractor performance and assessment of tenders, particularly the use of non-price
factors based on past history and performance.
The presentation concluded with some discussion of alternative contractual systems, the sharing of
risk between Principal and Contractor and the means of encouraging good work.
Greg Arnold opened his presentation with some statistics on the New Zealand road system, traffic
volumes and life of sprayed seals. The charts based on age of seal when resealed showed a
surprisingly large proportion of seals being retreated when less than two years old while a
significant number extended some 80% past the nominal design lives of 7 to 9 years. The average
life, however, has not changed over the last decade.
Changes in sealing practice include:
The use of performance models where the contractor provides a 12 month warranty has increased.
The primary performance measure is surface texture. Performance models are expected to
provide advantages in:
surety of performance
encourage innovation.
Austroads 2006
16
Discussion
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
John Oliver observed that the average life of seals quoted for NZ was shorter than expected from
models (and experience in areas of Australia with climate similar to NZ) although the NZ data could
be distorted by premature failures. He mentioned that an Australian / NZ survey had indicated that
the life of two coat seals was not necessarily any greater than single coat seals.
Ian Cossens sought additional input into determining the criteria for resealing, with an observation
that current assessment criteria were leading to intervention earlier than necessary.
Greg Arnold replied that NZ criteria were based only on need, although texture loss (50%) and
skid resistance (10%) were major factors. The remaining factors were cracking, binder hardening,
and scabbing.
Kym Neaylon observed that the resealing program was dictated by funding but that budget
limitations resulted in a significant backlog and a necessity for long seal life.
6.10 Bitumen
Speakers: Steve Brown, VicRoads
Geoff Hose, Mobil
Steve Brown spoke about the need for SRAs to be informed purchasers of bitumen.
Geoff Hose acknowledged the assistance of Mike Bresnahan, Shell Bitumen, in preparing the
paper on the current position and future plans for bitumen supply in Australia and New Zealand.
Refineries are provided primarily to manufacture fuels or lubricants but where heavy ends are
created these are normally sold as bitumen. Australian refineries are small by world standards and
low returns on investment have seen a number of refineries close in recent years. Bitumen
suppliers in Australia remain committed to supplying customers although the use of imported
bitumen is likely to increase.
Austroads 2006
17
All product is made to meet AS 2008 (or relevant TNZ specification) regardless of the location of
refining. If refined overseas then a special batch is made for shipment to the Australian market.
This may be finished hot bitumen or partly processed residue or re-blended feedstock for stripping
locations / refineries.
Storage of the number of required grades and distribution of bitumen across state boundaries is an
important issue. Development of specifications should be done on an industry-wide basis and not
just an individual specifier / purchaser.
The presentation concluded with some comments on R&D and the adoption of innovative products.
Discussion
A comment was made that funding for properly controlled field trials was an inhibiting factor in
assessing innovative products.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
A suggestion was made that we need more R&D in the area of bitumen. Geoff Hose replied that
current products were largely meeting needs and that performance problems tended to be in
attention to detail in the execution of work.
A question on the future supply of bitumen into South Australia was answered with advice that
Shell have announced a plan to import finished bitumen (C170 and C320) into Adelaide this year.
A question on low temperature performance of bitumen was answered by John Oliver to the effect
that some additional work is being done at ARRB but that penetration will likely remain in
specifications for the time being as the appropriate control.
John Vercoe opened his presentation by drawing the distinction between emulsions as a short
term delivery system and modified binders, including multigrade bitumen as long term modifiers of
bitumen.
It is the interface between each component of a sprayed seal which is critical to performance the
bond between the road surface and the binder, the bond between binder and aggregate and the
cohesive strength of binder. Potential areas of research include aggregate / binder adhesion and
the cohesive strength of binders.
John put forward an outline of the benefits of bitumen emulsions as a binder delivery system and
referred to the successful use of bitumen emulsion sealing in urban areas of Auckland.
Principal benefits to the Contractor are in areas of safety, ability to spray pump and circulate, ability
to wet the aggregate and energy and solvent savings. Benefit to the road owner is reduced risk of
failure. Emulsions also reduce risk of heat degradation of binders, particularly PMBs.
Key issues relating to PMBs include adhesion between binder and aggregate, cohesive strength,
simulated aging and effect of aging on ductility / elongation properties. These issues all represent
potential areas of research.
Austroads 2006
18
Discussion
A number of practitioners spoke of practical problems that inhibited the use of emulsions,
particularly low productivity due to extended set-up times and consequent risk of stripping, as well
as safety concerns when changing product.
John Vercoe stated that many of the perceived problems could be overcome, partly through
improved emulsion technology / ormulation and partly through use of crews dedicated to use of
emulsion. He conceded that emulsions may not be suited to large volume rural works but more
suited to urban work where a small increase in material cost was a minor factor in the overall cost
of the work.
Ray Gaughan reminded the gathering that an Austroads group had undertaken a study of
emulsions, including environmental effects and the production of an emulsions guide.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Speaker:
Craig provided an outline of the requirements for sealing aggregates including fundamental
aggregate properties, testing properties and supplier process.
Particular issues of importance to the quarrying industry include:
resource sustainability
utilisation of a range of aggregate sizes
identifying and securing aggregate reserves
extractive industries development approvals.
specifications
stacksites
safety and environment, availability and access.
pre-coating
absence of specified types and grades
quarry versus roadside application
effectiveness (laboratory tests and field performance)
potential use of bitumen emulsion pre-coats.
Austroads 2006
19
skid resistance
relationship between laboratory PSV test and field performance
liability / risk management.
Discussion
A question was raised on the effect of blending aggregates of different PSV. Ray Gaughan
referred to an RTA laboratory study which showed that introduction of highly polishing material (a
glassy slag) dominated the PSV result. Other speakers suggested that laboratory studies and field
trials had shown that the general outcome was an arithmetic mean of the PSV of the components.
High PSV materials could therefore be used to upgrade lesser polish resistant materials.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
An industry speaker suggested that the demand for quarry pre-coating was largely market driven.
Some contractors use field pre-coating as they consider they have more control over the outcomes
while some purchasers believed that quarry pre-coating was more reliable. A better understanding
of the effectiveness of different pre-coating processes is desirable.
Austroads 2006
20
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
For purposes of convenience in generating discussion, ten themes were proposed as the
framework for discussion groups to identify and explore issues. These themes were distributed to
the breakout (discussion) groups and are listed below.
Bituminous materials
Aggregates
Surfacing design
Appendix 4lists the issues which the groups felt were important. These issues have been further
categorised into two priority groupings (A and B) based on the level of support for issues
expressed in the plenary discussions.
Austroads 2006
21
8. SUMMARY OF OUTCOMES
8.1 Introduction
Section 8.2 gives a general overview of the issues which emerged from the Workshop process.
One of the aims of the Workshop was to identify those issues which should be addressed in a
research program and this is discussed in Section 8.3.
The Steering Committee considered it important that momentum generated at the Workshop
should not be lost, and that ways of assisting the implementation process should be identified.
This has been addressed in Section 9 which indicates proposed implementation actions for key
issues.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
National Uniformity
The need to enhance uniform practices across jurisdictions was strongly supported. While
Austroads and AAPA have made substantial commitments in the past, considerable scope remains
to encourage utilisation of consistent design methods, specifications and testing methods and to
ensure that learnings are shared broadly across Australia and New Zealand.
Austroads 2006
22
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Each of the sectors owner / supplier / research contribute to the delivery of well performing
surfacings. Each is dependent on the others in fulfilling their roles. It was indicated at the
workshop that considerable gains could be made if relationships could be strengthened and the
sectors worked together better.
Access to a broader range of expertise, facilitation of business activities through access to relevant
information, more planned use of resources, and easier introduction of innovations were just some
of the areas where benefits could be achieved through cooperation and increasingly working in
partnerships.
Bituminous Materials
The recent past has seen a decline in the resources made available for the evaluation and study of
bituminous binders, the critical component of sprayed seal surfacings. However, changing sources
of crude oil, developments in proprietary products, increasing demands on seals due to heavier
traffic and emerging environmental constraints are but some of the factors which necessitate
ongoing monitoring of binder behaviour and performance. Primes, emulsions and polymer
modified binders were particular materials attracting great interest.
Quarry Products
High quality aggregate is the other key component of sprayed seal surfacings. Road authorities
have generally had reasonably ready access to good surfacing aggregates capable of adhering to
bituminous binders, resisting the effects of heavy load and environment, and providing adequate
skid resistance. However, appropriate materials are becoming less accessible and more costly.
Consideration needs to be given by all sectors on ways to extend the availability of aggregates for
future use. While the primary responsibility to do this clearly rests with quarry suppliers, users of
these materials may assist by adopting approaches which permit the optimum use of quarried
material (the use of a range of alternative aggregate sizes was suggested as one such possibility).
Similarly creation of strategic reserves of quarry products is another option. Further work is also
required to better understand the performance and behaviour of pre-coatings for aggregate.
Austroads 2006
23
Skid Resistance
In recent years, several road agencies have increased standards to improve the skid resistance of
surfacings. This has had impacts in additional costs for more polish- resistant (and more scarce
and costly) aggregates, an increase in the frequency of resurfacing and utilisation of specialised
maintenance treatment to remove flushed bitumen. There are questions as to whether such
additional expenditure is justified or if some more cost effective options are available. At the same
time, a need exists to provide better evidence of the reliability of forecasts of field skid resistance
based on laboratory testing protocols (PSV) for Australian and New Zealand circumstances.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Design of Treatments
Some concerns have been raised about the applicability of the Austroads sprayed seal design
method, particularly in cases with very heavy (or very light) traffic loadings. There is a need to reexamine and update the method to ensure its applicability across this broader range of
circumstances. It is also apparent that there is a need to promulgate further the rationale of the
design approach to make it available to the occasional designer or new designers.
Austroads 2006
24
9. IMPLEMENTATION
9.1 Overview
The Workshop was judged a success by delegates, and a summary of responses given in the
feedback forms is included as Appendix 5. Arrangements were made for the PowerPoint
presentations to be placed on the Austroads Web Site (www.austroads.com.au) so that they are
easily accessible to a wide audience.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
In order to ensure that the issues identified at the Workshop were actioned, the Steering
Committee considered the priority A issues (those considered by the delegates to be most
important) and prepared action statements as shown below.
Austroads 2006
25
Bituminous Materials
Priority A Issues
Proposed Action
Binder characterisation was one of the top three issues. It is being
addressed in Austroads / ARRB projects TT1133 and TT1134 (PMBs
and overseas bitumens).
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
effects of transport
adhesion of aggregate
relative costs
environmental benefits
Need for advice on the availability and suitability of C170 bitumen for
future highway applications, especially under heavy traffic.
Austroads 2006
26
Aggregates
Priority A Issues
Proposed Action
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Austroads 2006
27
Surfacing Design
Priority A Issues
Proposed Action
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Austroads 2006
28
Proposed Action
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Austroads 2006
29
Proposed Action
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
future programs of work (e.g. what is planned for next two to three
years) which are developed and communicated to stakeholders
(such as surfacings contractors)
Need to develop more data for sprayed seals and minor works
before this can issue can be addressed. Previous tasks should
assist.
Austroads 2006
30
Proposed Action
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Austroads 2006
31
Proposed Action
This task has been covered under the second proposed action in
the Strategic Management of Sprayed Seal Surfacings table
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Utilise contractor expertise by involving contractors in the preconstruction processes (e.g. evaluation of options, materials
selection, scheduling) for mutual benefit
Austroads 2006
32
Proposed Action
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
This was one of the top three issues. Recommend that the
Convenor of PTRP pursue proposed VicRoads actions in this area
and advise of outcome.
This issue has been high priority for AAPA and there have been a
number of initiatives. BSRRG has also addressed some
elements, such as handling of hot bituminous materials.
clearance of powerlines.
Austroads 2006
33
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Membership of the Steering Committee varied from time to time depending on the availability of
staff to attend meetings. The list below includes those who attended a number of meetings.
John Oliver
ARRB (Convenor)
Allan Alderson
ARRB
John Bethune
AAPA
Steve Brown
GeoPave
John Esnouf
VicRoads
Ron Gordon
Consultant
Walter Holtrop
AAPA
Kym Neaylon
Transport SA
John Vercoe
Fulton Hogan
Austroads 2006
34
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
MR WA
MR WA
MR WA
DIER Tas
DIER Tas
DIER Tas
RTA NSW
RTA NSW
RTA NSW
RTA NSW
RTA NSW
RTA NSW
DMR Qld
DMR Qld
DMR Qld
DMR Qld
DMR Qld
DMR Qld
DTEI SA
DTEI SA
DTEI SA
DTEI SA
DIPE NT
VicRoads
VicRoads
VicRoads
VicRoads
VicRoads
VicRoads
VicRoads
VicRoads
Past Convenor, Austroads Sealing Project
ARRB
ARRB
ARRB
ARRB
ARRB
ARRB
Facilitator
Austroads 2006
35
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Austroads 2006
36
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Time
Session
Presenter
9.00 9.10
9.10 9.15
9.15 9.55
9.55 10.15
10.15 10.30
Morning Tea
10.30 11.00
11.00 11.15
11.15 11.35
11.35 11.50
11.50 12.30
12.30 1.30
Lunch
1.30 2.00
2.00 2.20
2.20 3.00
3.00 3.30
Afternoon Tea
3.30 4.30
In auditorium
4.30 4.40
Ron Gordon
4.40 5.00
5.00 5.15
Discussion 15 min
5.15
Session Close
6.30
Austroads 2006
37
In breakout rooms
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Time
Session
Presenter
8.30 8.35
Ron Gordon
8.35 8.55
8.55 9.15
Discussion 20 min
9.15 9.40
9.40 10.00
Discussion 20 min
10.00 10.20
10.20 10.55
10.55 11.15
Discussion 20 min
11.15 11.40
11.40 12.00
12.00 12.30
12.30 12.50
Discussion 20 min
12.50 1.30
1.30 1.50
1.50 2.05
Discussion 15 min
2.05 2.35
In breakout rooms
2.35 3.20
In auditorium
3.20 3.50
3.50 4.30
In auditorium
4.30 4.50
4.50 5.00
Austroads 2006
38
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
future programs of work (e.g. what is planned for next five or ten years) which are developed and communicated to
stakeholders (such as surfacings contractors)
basis for including whole of life costs and considerations in making decisions about surfacing options.
PRIORITY B ISSUES
(nominated as important by some, but less than ten workshop attendees)
Need to manage the surfacings network to address stakeholder interests especially with regard to:
minimising noise
minimising delays
Austroads 2006
39
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Need to ensure that the industry is supported through a training program which:
incorporates gaining experience in various sectors (e.g. specialist, purchaser and contracting areas)
PRIORITY B ISSUES
Need to enhance the roads industry as an attractive career option especially in regard to:
raising the profile of the industry and its importance and relevance to the good of the community
Need to recognise, utilise and acknowledge the value of the different roles vital to the success of the industry (e.g.
specialists and generalists, purchasers, contractors and suppliers).
Austroads 2006
40
making annual work programs available to interested stakeholders (e.g. materials suppliers and surfacing contractors) in a
timely manner, allowing better forward planning by all ( e.g. three months in advance of tendering process).
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
provide a means for assessment and performance monitoring of contractors and including findings of this in the contractor
pre-qualification accreditation process
clearly define and balance the risk / returns between contractor and client ( including performance measures)
Utilising contractor expertise by involving contractors in the pre-construction processes(e.g. evaluation of options,
materials selection, scheduling) for mutual benefit.
Need for close cooperation between road authorities, contracting industries and ARRB in articulating cases for new
technologies and equipment. Such cases to include future potential works programs, potential opportunities and work
guarantees for proposed innovations.
While much has been achieved, there remains considerable potential for future industry improvement through enhancing
uniformity in the industry in many areas but particularly through:
uniform specifications in different jurisdictions (e.g. across different-and particularly adjoining-states, local governments and
organisational regions).
Need for Austroads to proceed with greater commitment to and emphasis on introducing nationally consistent
specifications and testing procedures.
PRIORITY B ISSUES
Recognition of the importance of a sustainable surfacings industry to the economic prosperity and social good of
Australia.
Developing and implementing appropriate KPIs for assessing performance and benefits of long term networks
maintenance contracts.
Develop a national approach to adopting and adapting significant new technology.
Need to apply findings of studies and investigations at local level to national codes of practice.
Austroads 2006
41
PRIORITY B ISSUES
Need to improve practices in priming (selection of prime type, design and placement).
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Develop processes and materials which will lead to improved surfacing performance, reduced incidence of failures and
efficiencies in placement including:
Need to establish a simple national system for evaluation of innovative materials as a means to permit their inclusion in
specifications. (e.g. a modified version of TIPES such as that developed in QLD).
PRIORITY B ISSUES
Guidelines for selection of surfacings for difficult locations (sharp turns, roundabouts, very heavy traffic etc.),
incorporating risk factors to assist decision making for specific applications.
Need for adopting fitness for purpose considerations (e.g. with regard to material property requirements) in specifications
in order to avoid over- specification of needs, leading to additional costs and avoidable depletion of valuable resources.
Need for more effective means to test and evaluate final seal quality after placement, including investigation of a field test
for binder viscosity (much greater end product testing effort is directed to asphalt than seals).
Important for SRAs to retain in house testing capability and be able to ensure quality of testing undertaken by agents.
Austroads 2006
42
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Traffic management to ensure the safety of road workers and public was identified as a major issue. Key points included:
need for strengthening commitment to traffic management and control through roadworks
greater importance placed on traffic management in contracts (e.g. inclusion of traffic management costs in contracts as a
below the line item, paid by the principal).
avoidance of powerlines.
PRIORITY B ISSUES
Need for ongoing management commitment to induction and safety training of all staff.
Specific areas of workplace safety requiring current attention include:
development of a nationally accepted approach to standardising colour and design of Personal Protection Equipment (currently
considerable variation in PPEs).
Austroads 2006
43
Bituminous Materials
PRIORITY A ISSUES
Need for ongoing evaluation and understanding of the performance and properties of binders currently being used in
surfacings.
Need for guidelines on selection of binder types to ensure best use of resources, achieve required performance and extend
spraying seasons.
Need for advice on the availability and suitability of C170 bitumen for future highway applications, especially under heavy
traffic.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Need to evaluate new binders from non-traditional sources, especially in regard to:
Need for guidelines on the selection and use and performance of polymer modified binders, especially giving regard to:
specification requirements
effects of transport
adhesion of aggregate
Need for guidelines on the selection, performance and use of emulsion binders, especially in regard to:
relative costs
environmental benefits
PRIORITY B ISSUES
Need for ongoing evaluation and understanding of the performance and properties of binders currently being used in
surfacings.
Need for advice on the selection, use, behaviour and properties of the range of additives in use to alter the properties of
binders (e.g. cutters, fluxes , rejuvenators, enrichments etc.).
Austroads 2006
44
Aggregates
PRIORITY A ISSUES
Guidelines on the selection, use, performance and properties of alternative aggregate pre-coating materials currently on
the market, especially with regard to their use with current and emerging binders.
Need for clients (e.g. SRAs to give consideration to impacts of their decisions and emerging operational constraints on the
viability of the quarry industry which produces surfacing aggregates. Particular issues raised were:
need to include long term quarry product resources in regional strategic planning
selection of surfacing aggregate sizes to include consideration of quarry viability ( ie attempt to utilise range of product sizes to
minimise waste).
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Need increased understanding in road authorities about skid resistance especially in regard to;
relation of PSV to skid resistance (e.g. sideways force coefficient as measured by SCRIM) in the field for different applications
potential for enhancing surfacing skid resistance by using blended aggregates with differing Polished Stone Values (PSVs).
PRIORITY B ISSUES
No Priority B issues
Austroads 2006
45
Surfacing Design
PRIORITY A ISSUES
Need to assess the performance of seals to determine currently achieved surfacing lives and prevalent deficiencies and
distress mechanisms.
Modification of sprayed seal design method to better accommodate:
cases with predominantly very heavy vehicles(e.g. emerging range of innovative vehicles)
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Practitioners require information on sensitivity of seal performance to variation in application rate and construction
procedures.
PRIORITY B ISSUES
Design procedure for double bar sprayers.
Need for guidelines on the selection, use and performance of primer seals and primes, especially giving consideration to
impacts of base conditions and period of elapsed time occurring between priming and sealing.
Need exists to communicate rationale and background of the sprayed seal design method.
Austroads 2006
46
Need for timely scheduling of pavement construction or patching prior to applying the surfacing.
Attention to ensure quality of pre-treatment maintenance patching.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Need to consider impacts of pavement strength and material quality (e.g. use of low strength base materials) in seal
design.
Better control of binder and aggregate application processes required, particularly to address variable transverse surface
texture.
PRIORITY B ISSUES
Importance of ensuring good construction practices in seal construction (achievement of design aggregate spread rates).
Austroads 2006
47
Workshop useful in information transfer and being updated on technology matters as well as
directly addressing Austroads primary needs from workshop
Appreciated receiving both contractor and client views on key issues in presentations.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Facilitation
Keeping on time
More quantified date relating to performance etc (help to focus more on facts than opinions)
Later start to Day One (to assist Victorian country delegates who have to travel to the
workshop in the morning)
Avoid motherhood presentations and include those which are concise and well focussed
Need for more administrative advice on access to ARRB, accommodation, transport options
for regional Victorian delegates.
Austroads 2006
48
INFORMATION RETRIEVAL
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
Abstract:
An Austroads national workshop on sprayed sealing was held to assist
development of a research program and identify challenges to the future use of
seals. Delegates identified key issues under the themes of: safety and traffic
management; national uniformity; expertise and capability; seal / pavement
interaction; seal performance data; improving business and communication;
gains from technology; bituminous materials; quarry products; skid resistance;
construction and maintenance practices; design of treatments. The key issues
were prioritised and action statements subsequently developed for each.
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
NOTES
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
NOTES
Licensed to Mr Anastasios Karahalios on 10 Jun 2010. Personal use licence only. Storage, distribution or use on network prohibited.
NOTES