Escolar Documentos
Profissional Documentos
Cultura Documentos
VERTICAL ANALYSIS
P vs yt and Mmax
P
3.75
7.5
15
22.5
30
37.5
45
yt
0.07
0.16
0.37
0.6
0.85
1.11
1.4
Mmax
29.08
62.67
135
208.33
284.17
363.33
446.67
INSTRUCTION:
1. Run Lateral Analysis in Allpile, then click [To MS-Excel] button to begin
the data transfer.
2. Check [Enable Macros] if you are asked while Excel is being opened.
3. After opening this Excel file, press [Update Lateral Data] button to
upload the transferred data onto the spreadsheet.
4. Turn to [Lateral-y] sheet or [Lateral-M] sheet for graphical output.
Qdw
852.68
1596.53
2178.39
2719.97
3252.33
3729.56
4354.4
5841.5
7330.99
8833.66
Qup
61.36
251.26
334.62
448.52
587.16
740.7
1104.17
2615.43
4129.36
5657.67
INSTRUCTION:
1. Run Lateral Analysis in Allpile, then click [To MS-Excel] button to begin
the data transfer.
2. Check [Enable Macros] if you are asked while Excel is being opened.
3. After opening this Excel file, press [Update Lateral Data] button to
upload the transferred data onto the spreadsheet.
4. Turn to [Lateral-y] sheet or [Lateral-M] sheet for graphical output.
Notes:
1. You can save the file under different file name. But do NOT delete this file: allpile.xls
2. You can customize the format of the graphs if you are familiar with Excel. Make sure each graph is linked to appropriate source
on the [Data] sheet.
3. Do not change the contents on the [Data] sheet.
4 If you want to run a new analysis in Allpile again, you MUST close the Excel program first. Only one Excel program can be opened at any time.
5 Unit=
0
Input "0" in If the value in the yellow cell above is 0, all data are in English units.
Input "1" in the above yellow cell for Metric (SI) units.
35
30
25
20
15
10
5
0
0
0.2
0.4
0.6
0.8
1.2
1.4
1.6
Sheet No.
Printing Notes:
If you click on the chart area, you will print the chart only.
If you click on any cell outside the chart, you will print the entire sheet with chart.
Please go to Print Preview before you print to make sure you have the right selection.
35
30
25
20
15
10
5
0
0
50
100
150
200
250
300
350
400
450
Project Name
Graphical Result of AllPile Analysis
CivilTech Software
Sheet No.
500
Printing Notes:
If you click on the chart area, you will print the chart only.
If you click on any cell outside the chart, you will print the entire sheet with chart.
Please go to Print Preview before you print to make sure you have the right selection.
8000
7000
6000
5000
4000
3000
2000
1000
0
0
10
12
14
CivilTech Software
Sheet No.
16
Printing Notes:
12
If you click on the chart area, you will print the chart only.
If you click on any cell outside the chart, you will print the entire sheet with chart.
Please go to Print Preview before you print to make sure you have the right selection.
14
Sheet No.
16
5000
4000
3000
2000
1000
0
0
10
12
14
CivilTech Softwarwe
Sheet No.
16
Printing Notes:
If you click on the chart area, you will print the chart only.
If you click on any cell outside the chart, you will print the entire sheet with chart.
Please go to Print Preview before you print to make sure you have the right selection.
Compression
Uplift
8834
8000
7331
7000
6000
5842
5658
5000
4354
4000
4129
3730
3252
3000
2720
2615
2178
2000
1597
1000
1104
853
61
0
0
251
335
449
6
587
741
10
12
14
CivilTech Softwarwe
Project Title
Project Location
Date:
Sheet No.
16