1 Warranty Clause
2 Mention DGCA CAR - All related
3 Power Connectivities
4 Pond Lininng requirent and Pump requirement
5 NAV Aids Coordination
6 ASMGCS
7 Apron Design
8 Scope of Cordination with LCE/LCA
9 Shall we put LED light fixture in Provisional Quantity?
12 Establish the PCN Value with Required Test and submitt the
14 Cross duct for Utility Crossing- Every 500 Mtr. 400 mm Con
requirement
ovisional Quantity?
that All Airside Buildings to be designed by LCA/LCE upto DD level, further detailing shall be done by EPC contr
uired Test and submitt the report during testing and commissionning
ery 500 Mtr. 400 mm Concrete Pipe along the RWY and TWY and all other Link TWY