Description
Get Permits
Plot Plan & Stake-Out
Order Temporary Power
Order Trusses, metal, wood beams
Order windows
Order Exterior Doors
Excavation
Footings
Inspection: Footings / Steel
Foundation
Inspection: Foundation / Steel
Waterproof Foundation
Flatwork: Basement & Garage
Flatwork: Outside
Backfill & Rough Grade
Lumber
Framing
Plumbing Rough
HVAC Rough
Electric Rough
Order Interior & Exterior Handrails
Fireplace box Installation
Tub & Shower Installation
Truss Delivery
Roof Load Materials
Masonry/Dry-in Installation
Window Installation
Siding Installation
Gutter & Soffit Installation
Insulation
Drywall Stock
Inspect: Framing/Plumbing Rough/Elec Rough
Garage Door Installation
Drywall Hanging
Inspect: Drywall
Drywall Taping
Order Showerdoors and Mirrors
Order Countertops
Order Cabinets
Interior Paint
HVAC Final
Hang Interior Doors
Shelving Installation
Tile Installation
Countertop Installation
Plumbing Final/Install fixtures

Called
6/1
6/4
6/1
6/1
6/1
6/2
6/1
6/7
6/15
6/7
6/15
6/20
6/17
6/17
6/20
6/20
6/20
7/2
7/2
7/2
7/2/
7/2
6/20
7/2
7/2
7/5
7/20
7/20
7/30
7/25
7/30
7/30
8/1
7/25
8/13
8/13
8/13
8/13
8/13
8/13
9/10
9/10
9/16
9/17
9/24
9/30

Scheduled
6/3
6/5
6/7
6/15
6/20
6/22
6/7
6/15
6/17
6/20
6/21
6/25
6/28
6/30
7/1
7/2
7/2
7/20
7/21
7/23
7/23
7/23
7/15
7/15
7/15
7/25
7/30
7/30
8/5
8/3
8/7
8/2
8/8
8/9
8/15
8/16
9/10
9/10
9/10
9/1
9/15
9/16
9/18
9/25
9/30
10/2

47
48
49
50
51
52
53
54
55
56

Electric Final / Install fixtures


Install Electric Meter and perm power
Interior & Exterior hand rails
Interior trim and Rehang doors
Shower and Mirror Installation
Carpet Installation
Paint Touch Up
Trim Carpenter
Construction clean
Occupancy Inspection

10/2
10/5
10/5
10/10
10/15
10/12
10/15
10/20
10/25
10/28

10/5
10/10
10/12
10/15
10/17
10/20
10/22
10/25
10/28
11/1

Projected
Days

Actual
Days

Days Needed to Complete


According to Bid
2

Release for Start Permits

Connect Temporary Power

Stake Out

Excavation

Footings

Foundation

Waterproofing

Backfill
Lumber Delivery

Start Framing

10

Finish Framing

3
6

Roofing
Rough Plumbing, Electric,
HVAC

Insulation

Drywall Hang

Drywall Tape/Sand

Paint

Hang Doors

Tile

Carpet

15

Cabinets/ Final Trim

Final Plumbing/Electrical

Carpenter Final

Carpenter Final

Drywall Touchup

Paint Touchup

Windows

Final Inspection

Walk Through