CONTENTS
AT-SKTSZZ-QA-PRO-0008-000
Page
1.0 Purpose.............................................................................................................. 3
2.0 Scope................................................................................................................. 3
3.0 Definitions .......................................................................................................... 3
4.0 Responsibilities................................................................................................... 3
4.1
4.2
4.3
4.4
4.5
Supervision .............................................................................................................................. 6
4.6
Operators ................................................................................................................................. 6
Page 2 of 14
1.0
AT-SKTSZZ-QA-PRO-0008-000
Purpose
This procedure defines the inspection activities that are performed to ensure that specification and
procedural quality requirements are met.
2.0
Scope
The procedure is applicable to fabrication and construction of the Production Risers (PR) and
Quarters Utilities (QU) platforms with Interconnecting Bridge for the Shah Deniz Stage 2
development. The inspection requirements are described in greater depth in the relevant
procedures referenced in this procedure.
3.0
Definitions
VE:
NDE:
PWHT:
ITM:
FWR:
WPS:
NCR:
EDR:
RIR:
UID:
PMI:
GOC:
EIR:
IRN:
CCN:
SEQ:
SIN:
QCS:
NDT:
ID:
QAF:
MPI:
DPI:
Visual Examination
Non-Destructive Examination
Post Weld Heat Treatment
Inspection and Test Methods
Field Work Reports
Welding Procedure Specification
Non-Conformance Report
Equipment Damage Report
Receipt Inspection Report
Unique Identification Numbers
Positive Material Identification
Guidance on Certification
Equipment Inspection Report
Inspection Release Note
Construction Change Notice
Site Engineering Query
Site Instruction Notice
Quality Control System (Oracle database)
Non-Destructive Testing
Identification (Welder ID Welder Identification number)
Quality Assurance Form
Magnetic Particle Inspection
Dye Penetration Inspection
4.0
Responsibilities
4.1 QA/QC Manager
The QA/QC Manager, and in his absence the Deputy QA/QC Manager, is responsible to the
Project Manager for the following:
a) Supervising QA Engineers, Welding Engineer, Senior Discipline Inspectors, NDE
Coordinator and Senior Certification Engineers.
b) Ensuring that members of the QA/QC team have the requisite levels of qualifications,
certification and experience for their role.
Page 3 of 14
AT-SKTSZZ-QA-PRO-0008-000
c) Ensuring the quality of all work carried out by means of quality control / inspection is in
accordance with relevant codes, procedures and specifications.
d) Administering and approving project inspection and test plans.
e) Supervision, co-ordination and control of the Quality Control / Inspection department
activities.
f) Co-ordination of all project quality management activities in accordance with the
associated specifications and procedures.
g) Reporting quality problem areas to the Project Manager and verifying the closeout of
non-conformances.
h) Implementing an independent and documented surveillance inspection system for
work performed both on site and at subcontractors / suppliers works.
Welding
The Inspectors are responsible to the Senior Welding Inspector. Their duties shall include,
but not be limited to the following:
b) Perform inspections and examinations in accordance with the project ITP, confirm work
carried out within his discipline has been performed in accordance with the latest
approved drawings, codes and specifications and that all out of specification work is
identified, recorded, and corrected.
c) Request any NDE and PWHT for visually accepted welds in accordance with
specification requirements.
d) The reporting of any non-conformances.
e) Performance of hold / witness / review points as identified in relevant Inspection and Test
Plans.
4.3.2 Coatings
The Inspectors are responsible to the Senior Coating Inspector. Their duties shall include, but
not be limited to the following:
Ensure testing and inspections are performed during all blasting, painting, coating, PFP
and insulation activities.
4.3.3 Piping
The Inspectors are responsible to the Senior Piping Inspector. Their duties shall include, but
not be limited to the following:
Page 4 of 14
AT-SKTSZZ-QA-PRO-0008-000
a)
b)
c)
d)
e)
4.4
NDT Personnel
NDT Personnel are responsible to the NDE Coordinator/Supervisor for the following:
a) Performing NDE in accordance with project requirements.
b) Reporting NDE results to the Certification group.
c) Requesting the necessary resources to fulfil NDE requirements.
Page 5 of 14
4.5
AT-SKTSZZ-QA-PRO-0008-000
Supervision
It is the responsibility of the discipline supervisors to ensure the work is carried out to the required
standard. They are ultimately responsible for the quality of work produced by their operatives.
They report to the Construction Manager and shall liaise with the QC Inspectors for all QC duties
carried out, including, but not limited to the following listed:
4.5.1
a) Inspection and acceptance of weld fit up prior to welding. Joints inspected and accepted
are to be marked accordingly by the Supervisor.
b) Ensuring that the joint number, WPS, fit-up & visual acceptance, welders numbers for
portion welded, and weld completion date & time are marked in a painted matrix adjacent
to all primary structural joints.
c) Advising welders of the specific WPS(s) applicable to the joints they are required to
complete.
d) Ensuring the welders in their charge complete all welds to the required standard.
e) Using the Visual & NDE Request Report Form QAF-155 to report all completed welds.
f) The Supervisor shall endorse the records for all completed welds to illustrate visual
acceptance by signing the relevant record.
g) Facilitate NDE and subsequent activities.
h) Ensure that all operations are carried out in a safe manner
4.5.2
a)
b)
c)
d)
4.5.3
a)
b)
c)
d)
4.6
Mechanical
4.5.4
a)
b)
c)
d)
Operators
4.6.1
Welders
They are responsible to their foreman to perform all welding to the required quality standard
and in accordance with the appropriate WPS / Welders Instruction Sheet.
Operator shall mark their Welder No. on the work piece identifying the portion of the weld for
which they are responsible.
4.6.2
Page 6 of 14
AT-SKTSZZ-QA-PRO-0008-000
Ensure blasting and coating is in accordance with the criteria specified for the applicable
paint system applied.
4.6.3
Mechanical Operators
Mechanical operators are responsible to carry out mechanical operations in a safe manner
and in accordance with the criteria specified in the specifications.
4.6.4
Electrical and Instrumentation Operators are responsible to carry out electrical and
instrumentation operations in a safe manner and in accordance with the criteria specified in
the specifications.
5.0
6.0
Documentation Requirements
The purpose of preparing documentation is to provide objective evidence that items have
been properly constructed, installed and tested and in compliance with project codes,
specifications, and statutory legislation.
6.2
Reporting
ATA standard reporting formats shall be used for recording all inspections and tests.
All structural and pipe work inspection reports, check lists and inspection certificates shall be
collated by the certification department in accordance with Final Certification Procedure ATSKTSZZ-QA-PRO-0024-000.
The certification department shall produce a weld history sheet summarising all welds,
fabrication and inspection data / cross-references. QCS is utilised to record these details.
Structural, Piping, painting/Coating, Insulation, Telecom, HVAC Mechanical, Electrical and
Instrumentation inspection reports shall be collated by the completions department for input
to GOC.
6.3
6.4
Non Conformances
If production departments are found to be working out-with approved procedures /
specification requirements, the Quality Control department, where necessary shall raise a
Non Conformance Report (NCR) in accordance with Non-conformance Control Procedure
AT-SKTSZZ-QA-PRO-0033-000. Non-conforming situations can be identified by any member
of the project and raised by their department head via the QA department.
Page 7 of 14
6.5
AT-SKTSZZ-QA-PRO-0008-000
7.0
7.1
7.2
Page 8 of 14
AT-SKTSZZ-QA-PRO-0008-000
on the Delivery Note and the material register. For non-ferrous materials the UID is to be
marked using a certified low halide marker.
Positive Material Identification (PMI) on Duplex and stainless materials shall be performed
where required, reference Positive Material Identification procedure AT-SKTSZZ-QA-PRO0076-000.
8.0
Structural Inspection
Stages of inspection per activity shall be as per the approved Inspection and Test Plan for
Steelwork AT-SKTSZZ-QA-PLN-0002-000.
8.1
8.2
Welding
As a minimum, the Supervisor and Welding Inspector shall inspect all the relevant activities
as detailed on the Inspection and Test Plan for Steelwork AT-SKTSZZ-QA-PLN-0002-000,
Welding Control AT-SKTSZZ-QA-PRO-0023-000, and Structural Steel Fabrication ATSKTSZZ-QA-PRO-0088-000.
The Welding Inspectors shall carry out surveillance on a patrol basis checking that welding is
performed by a qualified welder in accordance with the approved procedure and to an
acceptable visual standard of finish.
Deviations from the approved welding procedures shall be reported to supervision, and
processed as per Section 6.0 of this procedure.
The details of WPS used, welder identity, weld completion and NDE are entered into the
QCS system and form part of the certification package.
8.3
Page 9 of 14
AT-SKTSZZ-QA-PRO-0008-000
When the welding inspector has accepted the weld he shall endorse the visual and NDE
request report. A copy of this sheet is passed to the Certification department and NDE
department thus releasing the weld for NDE
8.4
NDE
The NDE Supervisor shall ensure that the welds are tested and reported in accordance with
the Project approved NDT Procedures AT-SKTSZZ-QA-PRO-0095-000, AT-SKTSZZ-QAPRO-0097-000, AT-SKTSZZ-QA-PRO-0099-000.
The NDE Supervisor shall report any rectification work required to the Production Supervisor
and Senior Inspector by returning the report form detailing the rejection via Certification
Department.
Welding repair rates are produced by the Certification Engineer from the QCS database and
reported weekly to the QA/QC Manager, Welding Engineer and Company.
The Supervisor and Inspector shall ensure that rectification work is carried out in accordance
with approved repair procedures and the weld shall then be subjected to, as a minimum,
NDE as originally specified.
8.5
8.6
Dimensional Control
Dimensional control shall be carried out in accordance with the Dimensional Control
Procedure AT-SKTSZZ-QA-PRO-0012-000.
8.7
9.0
Spool Fabrication
Pipe work fabrication shall be controlled in accordance with the following project approved
procedures:
Inspection and Test Plan for Pipework
Pipework Fabrication
AT-SKTSZZ-QA-PLN-0008-000
AT-SKTSZZ-QA-PRO-0093-000.
Fabrication and erection of Riser pipe work shall be in accordance with Riser Fabrication
procedure AT-SKTSZZ-QA-PRO-0048-000.
9.1.1 NDE
When the Supervisor has visually accepted the weld, he shall complete a Visual & NDE
Request Report QAF-155 detailing the weld number, welder ID, WPS and date welded. This
report is then passed to the Welding Inspector who performs his visual inspection.
Page 10 of 14
AT-SKTSZZ-QA-PRO-0008-000
The Welding Inspector endorses the report entering his acceptance and any NDT / PWHT
requirements.
A copy of the report is passed to the certification department for input into the QCS database
and if applicable a copy to the PWHT supervisor and NDT supervisor for action.
NDT shall be performed in accordance with the following procedures:
AT-SKTSZZ-QA-PRO-0074-000
AT-SKTSZZ-QA-PRO-0075-000
AT-SKTSZZ-QA-PRO-0095-000
AT-SKTSZZ-QA-PRO-0096-000
AT-SKTSZZ-QA-PRO-0097-000
AT-SKTSZZ-QA-PRO-0098-000
UT Duplex Steels
UT Risers
MPI
DPI
Pipework & Riser Radiography
UT Pipework
9.1.2 Repairs
Weld repair rates shall be monitored by the Welding Engineer who shall take appropriate
action if necessary to ensure any adverse trends are controlled.
9.1.3 Welder Audits
The Welding Inspector shall perform welder audits daily using QAF-021 Structural &
Pipework Welding Audit Report. The intention is to audit every welder and every process in
order to obtain a high level of confidence that the working practice is in accordance with the
procedure parameters. The requirement for welding audits shall be reviewed on an on-going
basis. It may be necessary to increase their frequency depending upon welding processes in
use and operator utilisation. This shall generally be agreed between the QA/QC Manager and
Welding Engineer.
The Welding Inspector shall perform the welder audits using calibrated equipment.
Results of audits shall be recorded using a Welding Audit report sheet, reports shall be
reviewed, summarised and filed by the Welding Engineer. Any anomalies shall be
investigated and appropriate measures taken in the form of written instructions or Toolbox
Talks to prevent recurrence.
9.1.4 Release of Pipe Spools
To authorise the release of piping items to go offsite or offshore, or for special applications,
Inspection Release Certificate QAF-240 will be issued to certify that the fabricated pipe
spools are in accordance with the referenced drawings and specifications and are approved
for release.
9.1.5 Subcontracted Work
If there is a need to have any major work fabricated offsite, an Inspector shall be assigned to
attend the works (e.g. Primary Steelwork, Pipe-work Pre-fab, FRP spools, and Blasting and
Coating) to perform inspections as required by the relevant ITPs and as directed by the
QA/QC Manger.
The responsibilities of the Quality Control Department are detailed in the Subcontract Control
Procedure AT-SKTSZZ-QA-PRO-0010-000 and AT-SKTSZZ-QA-PRO-0006-000 Quality
Surveillance of Subcontractors.
9.1.6 Spool Release from ATA Offsite Fabricator
On completion of spool fabrication, the Weld History summary sheet shall be completed and
a certification documentation package prepared by the ATA offsite fabricator. On satisfactory
review and approval by the ATA / Company Inspector, the pipe-work package certificate shall
be endorsed accordingly. Certification documentation shall be made available for review as
indicated on the ITP.
On receipt of the ATA / Company approval signature on the Inspection Release Note, the
ATA offsite fabricator can release the items for despatch to site ensuring that two copies of
the release note for each spool are despatched with the consignment.
Page 11 of 14
AT-SKTSZZ-QA-PRO-0008-000
On completion of the final spool of an isometric, the isometric drawing signed by Piping
supervisor, as being Checked shall accompany the original final documentation and show
the placement of materials.
Any outstanding work shall be clearly identified on a punch list, which shall be referenced on
the pipe-work package certificate. The punch list shall be included within the documentation
package.
9.2
Pipework Installation
9.2.1 Erection, Welding and Inspection
During installation of the pipe spools all activities shall be monitored with all inspections
recorded in accordance with the Inspection and Test Plan for Pipework AT-SKTSZZ-QAPLN-0008-000 and AT-SKTSZZ-QA-PRO-0093-000 Pipework fabrication.
9.2.2 Welding Inspection
On completion of spool fabrication, the Weld History summary sheet shall be completed and
a certification documentation package prepared. Certification documentation shall be made
available for review as indicated on the Inspection and Test Plan for Pipe work AT-SKTSZZQA-PLN-0008-000.
9.2.3 Heat Treatment
Prior to any PWHT taking place, reference PWHT procedure AT-SKTSZZ-QA-PRO-0019000, visual inspection and in-house NDE will be carried out.
On completion of heat treatment, the Senior Welding Inspector or nominated representative
shall review and endorse the heat treatment chart so that visual and non-destructive testing
can be repeated.
9.2.4 Pipe Supports
Pipe supports and hangers shall be checked against the detail drawing and arrangement
drawing for location. These inspections shall be ongoing during erection and during line
walks.
9.2.5 Installation Checks
The Inspector shall monitor pipe-work installation ensuring that open ends are covered, pipe
internals are clear of debris, and machined / threaded connections are protected.
All the flanges will be controlled as per Flange Management Procedure AT-SKTSZZ-QAPRO-0175-000 for ensuring that pipe spools has been installed clean and tight.
9.2.6 NDE and PWHT
The same procedures are followed as that for the spool fabrication.
Page 12 of 14
AT-SKTSZZ-QA-PRO-0008-000
Blasting and painting shall be controlled in accordance with Inspection and Test Plan for
Coatings, AT-SKTSZZ-QA-PLN-0005-000 and Surface Preparation and Coatings procedure
AT-SKTSZZ-QA-PRO-0094-000.
Pipe insulation works will be controlled in accordance with Piping / Equipment Insulation ITP
AT-SKTSZZ-QA-PLN-0019-000 and Piping / Equipment Insulation Guidelines AT-SKTSZZQA-PRO-0179-000.
List of Forms
QAF-021
QAF-065
QAF-092
QAF-155
QAF-240
Associated Procedures
Material Control
Quality Surveillance of Subcontractors
Sub Contract Control
Dimensional Control
Heat Treatment
Pressure Testing
Welding Control
Final Certification
Non Conformance
Visual Inspection of Structural Steel
Riser Fabrication
AT-SKTSZZ-QA-PRO-0005-000
AT-SKTSZZ-QA-PRO-0006-000
AT-SKTSZZ-QA-PRO-0010-000
AT-SKTSZZ-QA-PRO-0012-000
AT-SKTSZZ-QA-PRO-0019-000
AT-SKTSZZ-QA-PRO-0021-000
AT-SKTSZZ-QA-PRO-0023-000
AT-SKTSZZ-QA-PRO-0024-000
AT-SKTSZZ-QA-PRO-0033-000
AT-SKTSZZ-QA-PRO-0044-000
AT-SKTSZZ-QA-PRO-0048-000
Page 13 of 14
AT-SKTSZZ-QA-PRO-0008-000
AT-SKTSZZ-QA-PRO-0074-000
AT-SKTSZZ-QA-PRO-0075-000
AT-SKTSZZ-QA-PRO-0076-000
AT-SKTSZZ-QA-PRO-0088-000
AT-SKTSZZ-QA-PRO-0093-000
AT-SKTSZZ-QA-PRO-0094-000
AT-SKTSZZ-QA-PRO-0095-000
AT-SKTSZZ-QA-PRO-0096-000
AT-SKTSZZ-QA-PRO-0097-000
AT-SKTSZZ-QA-PRO-0098-000
AT-SKTSZZ-QA-PRO-0099-000
AT-SKTSZZ-QA-PRO-0102-000
AT-SKTSZZ-QA-PRO-0120-000
AT-SKTSZZ-QA-PRO-0133-000
AT-SKTSZZ-QA-PRO-0152-000
AT-SKTSZZ-QA-PRO-0175-000
AT-SKTSZZ-QA-PRO-0179-000
AT-SKTSZZ-QA-PLN-0002-000
AT-SKTSZZ-QA-PLN-0005-000
AT-SKTSZZ-QA-PLN-0008-000
AT-SKTSZZ-QA-PLN-0010-000
AT-SKTSZZ-QA-PLN-0019-000
Page 14 of 14