Escolar Documentos
Profissional Documentos
Cultura Documentos
000/HARI
UKURAN : (L)125 X (P)250 X (T)100
I
BIAYA INVESTASI
1 Automatic Hydrolic interlock brick (7,5 kw)
2 Pan Mixer ( 5.5 kw )
3 Conveyor belt-1/6 m ( 2 kw )
4 Conveyor belt-2/4 m ( 2 kw )
5 Roller Crusher (15 kw )
6 Vibrator/rotary screen ( 1.5 Kw )
7 Extra interlocking block mold
8. Semi Automatic Hydrolic Interlock (5.5kw)
(5.5
KW)
9 Brick
Separator (2 KW)
set
set
set
set
set
set
set
set
set
1
2
2
2
1
1
2
2
1
8.000
800
850
700
850
900
250
3.700
400
subtotal :
Bea Masuk+PPN+Clearance+Tax+dll : 25%
10 Freight (Shipping+Handling to Location)
ls
7.500
8.000
1.600
1.700
1.400
850
900
500
7.400
400
22.750
5.688
7.500
8.000
16.000
orang
Kurs :
PRASARANA ( Lahan disediakan )
1 Lahan 1 HA disediakan pengembang
2 Pembersihan lahan dan leveling dg sirtu
3 Pembuatan workshop dan kantor
4 Pembuatan sumur + Pompa
5 Biaya erection/comisioning dan pondasi
6 Alat kerja dan lab
7 Pasang instalasi listrik 50 KW
8 Biaya Mobilisasi Peralatan
9 Tempat produk jadi (lantai & atap)
10 Alat Bantu / Palet dll
subtotal :
USD
m2
m2
ls
ls
ls
ls
ls
m2
ls
R
p
5.000
250
1
1,5
1
1
1
4.000
1
1
2
3
5
6
7
8
SUMARY :
BIAYA INVESTASI PERALATAN & LAHAN
BIAYA MODAL KERJA PER BULAN
BIAYA CADANGAN DLL
DANA YANG HARUS DISEDIAKAN
GROSS PROFIT PER BULAN
GROSS PROFIT PER TAHUN
BEP 24 BULAN
b.
14.100
732.318.750
50.000
500.000
25.000.000
20.000.000
30.000.000
50.000.000
########
#####
50.000
250.000.000
125.000.000
25.000.000
30.000.000
30.000.000
50.000.000
100.000.000
200.000.000
25.000.000
835.000.000
25.000.000
thn
bh
bh
bh
20.000
500.000
6.000.000
5%
bh
bln
thn
2.042,65
87,07
106,49
2.236,21
3.000
764
381.895.286
4.582.743.438
1.567.318.750
1.021.325.000
25.000.000
2.613.643.750
381.895.286
4.582.743.438
kw
h
lt
ls
ls
Solar
Pelumas
Sp.Part
2.120
100
1
1
0,003125
20.000
62,50
Upah
Leader/QC
Operator
Mechanic
Pekerja/Handling Produksi
Pembantu
d.
sub total :
Total a+b+c =
Biaya Kantor Jakarta
bln
Direksi/Komisaris/Owner
Proy Direktur
bln
Manager Pabrik
Staff Kantor
Rata2 Biaya Ops per hari
e.
2 shift
hr
hr
hr
hr
hr
bln
bln
Office Expenditure
Kend Operasional
bln
ATK/Copy dll
bln
PLN/Tlp/Air dll
bln
Rata2 Biaya Ops per hari
Total a+b+c+d+e =
3
100
70
70
1.200
19.000
10.000
37.500
Total
1.974.000
1.974.000
4.320.000
11.400.000
6.000.000
225.000
25.893.000
10.000
20.000
1.500
6.360.000
10.000
250.000
300.000
2.000.000
500.000
600.000
9.460.000
sub total :
c.
522.439.583
87,07
47,0%
47,0%
6,0%
1,0%
1,0%
0,01%
2 shift
Peralatan
Listrik
1.567.318.750
51.938
subtotal :
II
10.000
2
8
2
250.000
120.000
120.000
100.000
80.000
20.000
500.000
960.000
240.000
800.000
320.000
2.820.000
38.173.000
1 25.000.000
1 20.000.000
25.000.000
20.000.000
1 10.000.000
1 3.500.000
10.000.000
3.500.000
2.340.000
1
1
1
5.000.000
1.000.000
2.500.000
5.000.000
1.000.000
2.500.000
340.000
40.853.000
Harga satuan/Bt.Bata :
2.042,65
CATATAN :
1 Kebutuhan bata Interlock rumah Type 36
1
100
4.300
430.000