Escolar Documentos
Profissional Documentos
Cultura Documentos
OFICINA DE PROYECTOS
MES
ENE-10
FEB-10
MAR-10
ABR-10
MAY-10
JUN-10
JUL-10
AGO-10
Promedio
ltimos 12
meses
Energa Total
(kWh - 10 kV)
Var %
Consumo
Energa
879,756.24
796,663.67
740,524.18
740,912.59
657,793.95
669,098.10
759,102.63
10.5%
-9.4%
-7.0%
0.1%
-11.2%
1.7%
13.5%
740,386.02
DM Punta
Compensaciones SST
(kW - 10 kV)
(Soles)
1,412.40
1,425.80
1,245.64
1,312.96
1,266.76
1,191.08
1,320.00
21,637.55
20,418.05
19,710.13
19,821.20
18,695.20
18,856.82
20,126.56
1,304.09
21,778.59
Var %
Compens
5.1%
-5.6%
-3.5%
0.6%
-5.7%
0.9%
6.7%
Neto
(Soles)
169,963.90
157,495.92
148,689.71
150,344.33
134,709.78
134,260.11
146,685.35
149,158.80
Electr. Rural
(Soles)
6,334.24
5,735.98
5,331.77
5,334.57
4,736.12
4,817.51
5,465.54
5,295.17
Comercializacin/Co
mpensacin por
Sobrecostos (Soles)
Nota de
Dbito/
Crdito
Total
Facturado
(Soles)
Var %
Facturacin
-1,400.01
209,022.28
200,348.67
189,571.40
184,734.47
165,708.22
165,104.39
180,624.51
10.8%
-4.1%
-5.4%
-2.6%
-10.3%
-0.4%
9.4%
186,261.41
NOTAS:
a) Con el anterior contrato de suministro firmado con SEAL y que termin en Diciembre 2007, no se aplicaron los cargos por Compensaciones a los Sistemas de Transmisin
y Distribucin, a pesar de que se establecieron desde el ao 2001. (Resolucin N 1089-2001)
b) En la vigencia del ltimo contrato con SEAL (3 meses), se aplicaba un Cargo por Comercializacin equivalente a 2.10 S/. x kW contratado, adems de la aplicacin de los cargos
por Compensaciones a los Sistemas de Transmisin y Distribucin
c) En el nuevo contrato firmado con San Gabn, no se aplica ningn cargo de Comercializacin y las Compensaciones al SST son calculadas con los factores de prdidas medias, lo que
da como resultado un menor pago en este rubro.
Costo Neto
(S/. x
kWh)
0.1988
0.2049
0.2080
0.2101
0.2120
0.2079
0.2004
0.2112
Var %
Costo Neto
Proveedor
0.4%
3.1%
1.5%
1.0%
0.9%
-1.9%
-3.6%
SAN GABAN
SAN GABAN
SAN GABAN
SAN GABAN
SAN GABAN
SAN GABAN
SAN GABAN
Tipo de
Cambio
2.857
2.850
2.842
2.849
2.845
2.827
2.824
2.896
Parmetro
PCSPT
CPSEE-02
Unidad
S/. / kWh
S/. / kWh
S/. / kW-mes
S/. / kW-mes
S/. / kW-mes
S/. / kWh
S/. / kWh
S/. / kWh
S/. / kW
S/. / Kw
S/. / kW
Jan-08
0.1267
0.1095
19.4600
11.8300
8.9300
0.0011
0.0219
0.0214
0.7100
6.6700
-
Feb-08
0.1260
0.1087
19.4600
11.8300
8.9300
0.0011
0.0219
0.0214
0.7100
6.7000
-
SEAL
SEAL
[1] Este cargo slo se aplica en caso de Exceso de Potencia en Horas de Punta. Hasta la fecha no se ha aplicado en nue
Soles x kWh
0.1300
0.1200
0.1100
0.1000
0.0900
0.0800
Nov-08 Dec-08 Ene-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09
Energa Hora Punta
Energa Fuera Punta
Soles x kWh
0.0140
0.0130
0.0120
0.0110
0.0100
Nov-08 Dec-08 Ene-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09
Energa Hora Punta
Energa Fuera Punta
Apr-08
0.1249
0.0996
15.1388
22.7225
8.2700
0.0011
0.0126
0.0126
0.1711
8.0180
9.5080
May-08
0.1247
0.0993
15.4199
23.1298
4.7500
0.0011
0.0131
0.0128
0.1423
8.1936
9.7015
Jun-08
0.1300
0.1036
16.1108
24.1811
4.8400
0.0011
0.0130
0.0127
0.1484
8.1889
9.7021
Jul-08
0.1247
0.0991
15.8500
23.7900
5.0200
0.0011
0.0135
0.0132
0.1408
8.3635
9.9123
Aug-08
0.1308
0.1039
16.0939
24.1555
4.0161
0.0011
0.0133
0.0130
0.1477
8.4161
9.9811
SEAL
2.851
SAN GABAN
2.845
SAN GABAN
2.967
SAN GABAN
2.816
SAN GABAN
2.953
SAN GABAN
Soles x kW
24.0000
22.0000
20.0000
18.0000
16.0000
14.0000
12.0000
10.0000
Mar09
/2009
Apr09
May09
/2009
Soles x kW
9.5000
9.0000
8.5000
8.0000
7.5000
7.0000
6.5000
6.0000
Nov08
Sep09
9/2010
Set-08
0.1318
0.1048
16.7605
25.1557
5.0200
0.0011
0.0137
0.0134
0.1489
8.5738
10.1516
Oct-08
0.1369
0.1087
17.4894
26.2341
5.5300
0.0012
0.0136
0.0136
0.1545
8.6829
10.2897
Nov-08
0.1371
0.1089
17.5200
26.2850
5.6200
0.0012
0.0137
0.0135
0.1547
8.7600
10.4000
Dec-08
0.1392
0.1106
18.4435
27.6810
5.8441
0.0012
0.0138
0.0139
0.1571
8.7976
10.4314
Ene-09
0.1406
0.1117
18.6949
28.0600
5.8700
0.0012
0.0140
0.0136
0.1587
8.7920
10.4107
Feb-09
0.1440
0.1144
19.1484
28.7388
5.8800
0.0012
0.0140
0.0137
0.1626
8.6477
10.2732
2.977
SAN GABAN
3.090
SAN GABAN
3.096
SAN GABAN
3.142
SAN GABAN
3.197
SAN GABAN
3.251
SAN GABAN
- 2008/2009
16.0000
Soles x kW
caso de
otencia en
12.0000
8.0000
4.0000
tribucin - 2008/2009
Oct09
0.0000
tribucin - 2008/2009
Sep- Oct-09
09
Mar-09
0.1400
0.1113
19.1241
28.7019
6.1383
0.0012
0.0139
0.0136
0.1581
8.5663
10.1468
Apr-09
0.1327
0.1054
18.1796
27.2844
6.1697
0.0012
0.0138
0.0138
0.1797
8.3860
9.9434
May-09
0.1327
0.1054
19.7071
29.5607
16.3527
0.1149
0.0132
0.0132
0.2396
8.3561
9.9135
Jun-09
0.1334
0.1060
19.8124
29.7186
16.2895
0.1145
0.0132
0.0132
0.2409
8.2501
9.7858
Jul-09
0.1323
0.1051
19.5649
29.3622
16.3090
0.1145
0.0131
0.0131
0.2390
8.2441
9.7974
Aug-09
0.1306
0.1038
19.2504
28.8904
12.9712
0.1137
0.0133
0.0130
0.2358
8.1070
9.6105
Sep-09
0.1278
0.1016
18.8391
28.2730
12.4921
0.1136
0.0133
0.0130
0.2308
8.1069
9.6071
3.161
2.995
2.995
3.011
2.987
2.948
2.885
SAN GABAN SAN GABAN SAN GABAN SAN GABAN SAN GABAN SAN GABAN SAN GABAN
Jul-09
Oct-09
0.1287
0.1023
18.9762
28.4788
12.4958
0.1136
0.0131
0.0131
0.2325
8.1077
9.6189
Nov-09
0.1276
0.1014
18.8129
28.2338
15.5574
Dec-09
0.1281
0.1018
18.3868
27.5801
15.3801
Jan-10
0.1326
0.1054
18.1134
27.1701
15.3707
Feb-10
0.1322
0.1051
18.0627
27.0940
15.3561
Mar-10
0.1319
0.1049
18.0183
27.0274
15.2615
Apr-10
0.1322
0.1051
18.0627
27.0940
15.2422
0.0124
0.0006
0.0123
0.0006
0.0123
0.0006
0.0123
0.0006
0.0123
0.0006
0.0123
0.0006
7.1449
7.8651
7.0830
7.7768
7.0568
7.7996
7.1225
7.8632
7.1334
7.8723
7.2080
7.9202
2.906
2.881
2.891
2.857
2.849
2.842
2.849
SAN GABAN SAN GABAN SAN GABAN SAN GABAN SAN GABAN SAN GABAN SAN GABAN
May-10
0.1320
0.1050
17.8097
26.7146
11.9206
Jun-10
0.1311
0.1043
17.6970
26.5455
11.9299
Jul-10
0.1310
0.1042
17.6782
26.5174
11.9200
0.0123
0.0006
0.0123
0.0006
0.0123
0.0006
7.1694
7.9091
7.1806
7.9156
7.2577
7.9919
2.845
2.827
2.824
SAN GABAN SAN GABAN SAN GABAN
Mes
ENE-10
FEB-10
MAR-10
ABR-10
MAY-10
JUN-10
JUL-10
AGO-10
SET-10
OCT-10
NOV-10
DIC-10
ENE-11
FEB-11
MAR-11
ABR-11
MAY-11
JUN-11
JUL-11
AGO-11
SET-11
OCT-11
NOV-11
DIC-11
ENE-12
FEB-12
MAR-12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Energa
Punta
163,342.06
150,949.69
148,617.26
137,902.02
124,020.86
121,108.56
134,765.35
140,021.79
136,058.93
138,242.26
138,889.05
137,999.29
139,414.35
139,292.86
139,555.51
140,202.30
140,272.88
140,727.60
141,086.28
141,348.93
141,755.63
142,066.30
142,400.98
142,759.66
143,082.33
143,429.01
143,769.69
Tarifa
US$/kWh
4.64
4.64
4.64
4.64
4.64
4.64
4.64
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
4.72
E. Fuera
Punta
753,058.94
678,897.67
622,752.21
633,872.03
561,172.36
575,859.69
655,956.43
666,343.73
666,559.09
673,555.74
676,031.53
681,521.23
685,001.66
689,821.60
693,748.53
698,270.80
702,396.18
706,786.15
710,999.73
715,330.90
719,583.68
723,888.72
728,158.92
732,452.35
736,730.29
741,018.55
745,299.94
Tarifa
US$/kWh
3.69
3.69
3.69
3.69
3.69
3.69
3.69
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
3.74
TC
2.857
2.849
2.842
2.849
2.845
2.827
2.824
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
2.798
Total Soles:
101,043.37
91,325.81
84,905.88
84,867.53
75,283.90
75,957.70
86,013.12
88,221.73
87,720.91
88,741.42
89,085.92
89,542.88
90,093.98
90,582.31
91,027.94
91,586.59
92,027.61
92,547.05
93,035.35
93,523.28
94,022.02
94,513.55
95,004.61
95,501.26
95,991.54
96,486.07
96,979.09
0.00
-500.82
519.69
864.19
1,321.15
1,872.24
2,360.58
2,806.20
3,364.85
3,805.88
4,325.32
4,813.62
5,301.54
5,800.29
6,291.82
6,782.87
7,279.53
7,769.81
8,264.34
8,757.36
Potencia
kW
1,412.40
1,425.80
1,245.64
1,312.96
1,266.76
1,191.08
1,320.00
1,285.68
1,274.90
1,322.20
1,299.65
1,317.91
1,330.29
1,328.14
1,343.46
1,348.57
1,355.16
1,365.38
1,371.23
1,379.63
1,387.66
1,394.79
1,403.00
1,410.58
1,418.25
1,426.15
1,433.78
Tarifa
US$/kW
18.1134
18.0627
18.0183
18.0627
17.8097
17.6970
17.6782
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
17.4875
1,586.73
1,340.25
4,583.13
3,378.45
4,153.93
5,466.96
3,182.08
3,747.92
3,936.44
3,109.28
3,503.62
3,184.30
2,967.89
3,005.40
2,737.54
2,648.09
2,532.91
2,354.25
2,251.94
2,105.03
1,964.54
1,839.93
1,696.22
1,563.67
1,429.52
1,291.39
1,158.04
88,221.73
Compensacin
81,800.44
DIFERENCIA A FAVOR:
AHORROS
49,027.92
-32,772.52
COMPOSICION DE LA FACTURACI
Cargo
Energa Hora Punta
Energa Fuera Punta
D. Mxima Punta
D. Mxima Fuera Punta
Peaje Conexin Sist. Principal
Peaje Secundario Equiv. Energ
Comp. Sist. Sec. Trans - Energ HP
Comp. Sist. Sec. Trans - Energ HFP
Comp. Sist. Sec. Trans - Pot HP
Comp. Sist. Sec. Distr - Pot HP
Comp. Sist. Sec. Distr - Pot HFP
Parmetro
Jan-08
24,078.12
96,940.33
30,696.20
1,670.40
14,086.18
1,182.87
4,161.88
18,945.42
1,119.95
10,521.26
-
Feb-08
21,705.31
84,283.94
29,497.47
889.62
13,536.09
1,042.41
3,772.59
16,593.16
1,076.22
10,155.86
-
Total Neto:
Electrificacin Rural
203,402.61
7,527.38
182,552.67
6,633.52
Compensaciones SST-SSD
34,748.51
31,597.83
SEAL
SEAL
PCSPT
CPSEE-01
Unidad
S/. / kWh
S/. / kWh
S/. / kW-mes
S/. / kW-mes
S/. / kW-mes
S/. / kWh
S/. / kWh
S/. / kWh
S/. / kW
S/. / Kw
S/. / kW
Apr-08
22,233.47
80,349.62
22,708.22
10,953.66
May-08
Jun-08
195,154.02
7,149.02
136,244.96
0.00
0.00
33,693.32
0.00
0.00
0.00
SEAL
2.851
SAN GABAN
2.845
SAN GABAN
2.967
SAN GABAN
Jul-08
Aug-08
Set-08
2.816
SAN GABAN
2.953
SAN GABAN
2.977
SAN GABAN
Oct-08
Nov-08
Dec-08