CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS

No

KOTA BANJAR

Diameter

Berat Besi

mm

Kg / m1

4.0

0.13

5.0

0.12

5.5

0.19

5.7

No

BESI BETON SPIRAL

Diameter

Berat Besi

mm

Kg / m1

No.

Diameter

Berat Besi

mm

Kg / m1

11

12

0.89

10.00

0.62

12

13

1.04

13.00

1.04

13

14

1.21

16.00

1.58

0.20

14

16

1.58

19.00

2.23

6.0

0.22

15

19

2.23

22.00

2.98

6.5

0.31

16

22

2.98

25.00

3.85

8.0

0.40

17

23

3.26

29.00

5.19

9.0

0.53

18

25

3.85

32.00

6.31

10.0

0.62

19

28

4.83

36.00

7.99

10

11.0

0.75

20

31

5.93

21

32

6.31

Halaman : 1+114

Lampiran 1

DAFTAR BERAT BESI KANAL " C "

NO.

UKURAN BESI KANAL " C "

BERAT 6 M1

BERAT PER 1 M1
6.00

60

30

10

1.6

mm

9.80

kg

1.63

kg

60

30

10

2.3

mm

13.90

kg

2.32

kg

75

35

15

1.6

mm

12.50

kg

2.08

kg

75

35

15

2.3

mm

17.40

kg

2.90

kg

75

45

15

1.6

mm

14.00

kg

2.33

kg

75

45

15

2.3

mm

19.00

kg

3.17

kg

100

50

20

mm

21.40

kg

3.57

kg

100

50

20

2.3

mm

24.40

kg

4.07

kg

100

50

20

3.2

mm

33.00

kg

5.50

kg

10

125

50

20

mm

23.70

kg

3.95

kg

11

125

50

20

2.3

mm

27.10

kg

4.52

kg

12

125

50

20

3.2

mm

37.00

kg

6.17

kg

13

150

50

20

mm

26.10

kg

4.35

kg

14

150

50

20

2.3

mm

29.76

kg

4.96

kg

15

150

50

20

3.2

mm

40.56

kg

6.76

kg

16

150

65

20

mm

28.92

kg

4.82

kg

17

150

65

20

2.3

mm

33.00

kg

5.50

kg

18

150

65

20

3.2

mm

45.10

kg

7.52

kg

19

200

75

20

mm

35.52

kg

5.92

kg

20

200

75

20

2.3

mm

40.62

kg

6.77

kg

21

200

75

20

3.2

mm

55.62

kg

9.27

kg

KOTA BANJAR

Halaman :2+115

Lampiran 2

DAFTAR BERAT BESI IWF


NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

UKURAN IWF
100
125
148
150
175
198
200
248
250
298
300
346
350
396
400
446
450
500
588
600
700
800
900

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

50
60
100
75
90
99
100
124
125
149
150
174
175
199
200
199
200
200
300
200
300
300
300

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

5
6
6
5
5
4.5
5.5
5
6
6
6.5
6
7
7
8
8
9
10
12
11
13
14
16

BERAT 12 M1
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

7
8
9
7
8
7
8
8
9
8
9
9
11
11
13
12
14
16
20
17
24
26
28

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

112.00
158.40
253.20
168.00
217.40
218.40
256.00
308.40
355.20
384.00
440.40
497.00
595.20
679.20
792.00
794.40
912.00
1,075.00
1,812.00
1,272.00
2,220.00
2,520.00
2,916.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

BERAT PER 1 M1
9.33
13.20
21.10
14.00
18.12
18.20
21.33
25.70
29.60
32.00
36.70
41.42
49.60
56.60
66.00
66.20
76.00
89.58
151.00
106.00
185.00
210.00
243.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

DAFTAR BERAT BESI SIKU " L "


NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

KOTA BANJAR

UKURAN BESI KANAL " L "


25
30
40
40
50
50
60
60
65
70
75
75
80
90
100
100
120
120
125
130
130

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

25
30
40
40
50
50
60
60
65
70
75
75
80
90
100
100
120
120
125
130
130

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

3
3
3
4
4
5
5
6
6
7
6
8
8
9
8
10
10
12
12
9
12

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

BERAT / BATANG
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
12
12
12
12
12

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

6.72
8.16
11.00
14.50
18.50
22.60
27.30
32.52
35.46
44.28
41.22
54.18
57.96
73.20
73.20
90.60
218.40
260.00
280.00
214.20
280.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

BERAT PER 1 M1
1.12
1.36
1.83
2.42
3.08
3.77
4.55
5.42
5.91
7.38
6.87
9.03
9.66
12.20
12.20
15.10
36.40
43.33
46.67
35.70
46.67

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

Halaman : 3+116

DAFTAR SATUAN UPAH PEKERJA

NO

JENIS PEKERJA BANGUNAN

HARGA UPAH
( Rp. )

SATUAN WAKTU

PEKERJA

60,000

1 ORANG/ HR/ 8 JAM

TUKANG GALI

72,500

1 ORANG/ HR/ 8 JAM

TUKANG BATU TERAMPIL

72,500

1 ORANG/ HR/ 8 JAM

KEPALA TUKANG BATU

80,000

1 ORANG/ HR/ 8 JAM

TUKANG KAYU TERAMPIL

72,500

1 ORANG/ HR/ 8 JAM

KEPALA TUKANG KAYU

80,000

1 ORANG/ HR/ 8 JAM

TUKANG CAT / PELITUR TERAMPIL

72,500

1 ORANG/ HR/ 8 JAM

KEPALA TUKANG CAT / PELITUR

80,000

1 ORANG/ HR/ 8 JAM

TUKANG BESI BETON TERAMPIL

72,500

1 ORANG/ HR/ 8 JAM

10

KEPALA TUKANG BESI BETON

80,000

1 ORANG/ HR/ 8 JAM

11

TUKANG BESI PROFIL TERAMPIL

72,500

1 ORANG/ HR/ 8 JAM

12

KEPALA TUKANG BESI PROFIL

80,000

1 ORANG/ HR/ 8 JAM

13

MANDOR

80,000

1 ORANG/ HR/ 8 JAM

14

PEMBANTU OPERATOR / MEKANIK

60,000

1 ORANG/ HR/ 8 JAM

15

OPERATOR ALAT BERAT TERLATIH

80,000

1 ORANG/ HR/ 8 JAM

16

TUKANG ASPAL

72,500

1 ORANG/ HR/ 8 JAM

17

TUKANG LAS

72,500

1 ORANG/ HR/ 8 JAM

4 dari 124

DAFTAR SATUAN HARGA BAHAN


DINAS CIPTA KARYA KEBERSIHAN TATA RUANG DAN LINGKUNGAN HIDUP

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug

107,000.00

2 Sirtu

120,000.00

3 Pasir Pasang Kali

142,000.00

4 Pasir Beton

168,400.00

5 Abu Batu

188,500.00

6 Batu Gosok ( Apung )

kg

17,000.00

7 Screen

207,200.00

8 Batu belah 15-20

152,500.00

9 Kerikil Sungai Ayak Tanpa Pasir

135,000.00

10 Batu Pecah Mesin 1/2

242,900.00

11 Batu Pecah Mesin 2/3

222,700.00

12 Batu Pecah Mesin 3/5

213,700.00

13 Batu Pecah Mesin 5/7

174,000.00

14 Batu Belah 10 - 15 cm

125,100.00

15 Batu Belah 7 - 10 cm

145,100.00

16 Batu Bronjol ( Untuk Bronjong )

140,000.00

17 Batu Tempel Hitam

200,000.00

18 Batu Pinggir Beton 10 x 20 x 35

bh

20,000.00

19 Batu Pinggir Beton 15 x 35 x 50 ( K -225 )

bh

50,000.00

20 Batu Telor

165,000.00

21 Batako kecil 8 x 10 x 20

bh

4,000.00

22 Batako Besar 8 x 20 x 30

bh

6,000.00

23 Con Blok 8 x 20 x 40 (Holowblock)

bh

5,000.00

24 Bata Merah Bakar Kelas I

bh

1,200.00

25 Bata Merah Bakar Kelas II

bh

650.00

26 Bata Merah Oven

bh

4,000.00

27 Roster Beton 20 x 20

bh

28 Roster Beton 30 x 30

bh

9,000.00

29 Grass Blok 20 x 20

bh

25,000.00

30 Grass Blok 30 x 30

bh

31,000.00

31 Paving Blok Natural 6 cm

50,000.00

32 Paving Blok Warna 6 cm

55,000.00

33 Paving Blok Natural 8 cm

55,000.00

34 Paving Blok Warna 8 cm

60,000.00

35 a. Bentuk Hexagonal (1m 2 = 27 bh)

bh

2,500.00

36 b. Bentuk Tiga Berlian (1m2 = 50 bh)

bh

2,500.00

37 c. Bentuk Segi Panjang (1m2 = 50 bh)

bh

38 Paving Blok Biasa

bh

2,500.00

39 Kanstin Paving Blok

bh

57,000.00

40 Semen PC / 50 kg *M080

zak

75,000.00

41 Semen PC

Kg

1,500.00

42 Semen Putih

zak

120,000.00

43 Kanstin Jalan ukuran Besar ( bina Marga ) 1 bh = 50 cm

bh

45,000.00

44 Kanstin Jalan ukuran 1 bh = 50 cm, tinggi 20 cm

bh

27,000.00

45 Kanstin Jalan ukuran Besar ( bina Marga K - 300 ) 1 bh = 50 cm

bh

65,000.00

46 Readymix Beton K 350, tanpa pompa ( selang ) * lokasi batching plant

1,150,000.00

47 Readymix Beton K 300, tanpa pompa ( selang ) * lokasi batching plant

1,110,000.00

48 Readymix Beton K 225, tanpa pompa ( selang ) * lokasi batching plant

1,040,000.00

49 Readymix Beton K 175, tanpa pompa ( selang ) * lokasi batching plant

970,000.00

50 Kapur Pasang/ kapur tembok

78,000.00

51 Kapur Sirih

kg

6,000.00

2,500.00

2,500.00

52 Semen Warna

kg

8,500.00

53 Tanah Liat

45,000.00

54 Tanah Urug (dilokasi)

35,000.00

55 Rumput

57,000.00

56 Hollow Block 20

bh

4,500.00

57 Hollow Block 15

bh

58 Hollow Block 10

bh

3,500.00

59 Roster Terawang Keramik

bh

35,000.00

60 Batu Candi

m2

110,000.00

61 Batu Sikat 0,5 / 2 cm

m2

115,000.00

62 Semen Mortar MU 380

zak

140,000.00

63 Semen Mortar MU 301

zak

95,000.00

64 Semen Mortar MU 200

zak

130,000.00

65 Pasir beton ayakan

m3

300,000.00

66 Bata ringan Celcon block t=100 mm

bh

11,000.00

67 Pipa beton precast 400mm

bh

235,000.00

68 Pipa beton precast 600mm

bh

550,000.00

69 Base plate t=18mm ASTM A572 Grade 60

kg

30,000.00

4,000.00

70 Kolom H BEAM
a H.260

batang

300,000.00

b H.300

batang

345,000.00

c H.340

batang

365,000.00

d H.360

batang

490,000.00

e H.380

batang

520,000.00

f H.420

batang

585,000.00

71 Dinding Superpanel ex. Hebel

m3

72 dinding beton pre cast sekwalitas Jaya beton

m2

445,000.00

73 Pompa JET pump ex. SANYO PDH.400

bh

8,045,000.00

74 Tangki air FRP 5 m3

bh

30,475,000.00

75 Tangki air FRP 15 m3

bh

91,425,000.00

76 Septic tank FRP 4m3

bh

36,570,000.00

77 U ditch type 400x600mm

bh

434,000.00

5 dari 124

1,855,000.00

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA

1 Plamir Tembok

kg

19,000.00

2 Cat Tembok ICI Eksterior ( BETON )

kg

50,000.00

3 Cat Tembok Kelas II

kg

15,000.00

4 Cat Tembok ICI Interior ( PLAFOND DAN DINDING )

lt

40,000.00

5 Cat Tembok Vinilex

kg

21,000.00

6 Cat Dasar ICI untuk Interior ( 2 Pelapis )

lt

130,000.00

7 Cat Tembok Sanlex

kg

18,000.00

8 Cat Genteng

kg

37,000.00

9 Cat Tahan Asam

kg

65,000.00

10 Cat Berkilat/Cat kayu

kg

65,000.00

11 Plamir Kayu

kg

12 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )

lt

65,000.00

13 Water Profing Emulsion

kg

115,000.00

23,000.00

14 Water Profing Membrance

ml

105,000.00

15 Rool Cat Tembok

bh

30,000.00

16 Kape Tembok

bh

17 Kape Kayu

bh

11,000.00

18 Soligneum 1 blek

5 lt

75,000.00

19 Plincote

kg

41,000.00

20 Pengawetan Kayu

59,000.00

21 Pengopenan Kayu

900,000.00

22 Kwas 3"

bh

14,000.00

23 Kwas 2'

bh

12,000.00

24 Oker

kg

47,000.00

25 Oyan

bks

26 Oten (Pewarna Plitur )

11,000.00

6,500.00

bks

6,500.00

27 Spirtus

lt

14,000.00

28 Bahan Plitur Kripik ( Sirlak India )

kg

90,000.00

29 Dempul Lilin

kg

37,000.00

30 Dempul Plitur

kg

6,500.00

31 Dempul Halus / Imfra ( Wood Filler )

kg

63,000.00

32 Terpentin

lt

14,000.00

33 Tiner A

lt

21,000.00

34 Tiner B

lt

28,000.00

35 Kumpon

kg

28,000.00

36 Melamik

kg

60,000.00

37 Impra

kg

47,000.00

38 Dempul Plastik

kg

45,000.00

39 Dempul Duco

kg

47,000.00

40 Ampelas

lbr

4,000.00

41 Dempul Kayu Cap Kucing

kg

37,000.00

42 Meni Kayu / Besi

kg

31,000.00

43 Meni Sincromat

kg

37,000.00

44 Cat Kayu Sieve

kg

80,000.00

45 Cat Besi Sieve

kg

80,000.00

46 Cat Besi Duco Danaglos/ICI

kg

95,000.00

47 Cat Bron

kg

80,000.00

48 Sirlak

kg

90,000.00

49 Lem Fox

bh

21,000.00

50 Anti Rayap cypermetrin 10 Ec

ltr

18,000.00

51 Compound UB-10/20/888/CCL 20 kg/bag

bks

90,000.00

52 Floor Hardener ex. Ika chapdur

kg

5,000.00

53 Waterproofing ex. Sika top 107 seal

kg

23,000.00

54 Pre Treatment/cleaning

m2

3,500.00

55 Curbing sudut

m'

3,500.00

56 Water proofing coating ex. Sika rain tile

m2

48,000.00

BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu Biasa

bt

9,500.00

2 Bambu 5 s.d 7

bt

13,000.00

3 Bambu 7 s.d 10

bt

14,000.00

4 Bambu Gombong

bt

42,000.00

5 Rucuk Bambu

bt

5,500.00

6 Kayu untuk Perancah

2,500,000.00

7 Kayu untuk Kontruksi Jembatan

2,330,000.00

8 Kayu untuk Mebeulair ( kayu lokal )

2,500,000.00

9 Kayu Balok Lokal Kelas II

3,200,000.00

10 Kayu Papan Lokal Kelas II

3,500,000.00

11 Kayu Balok Kamper

9,500,000.00

12 Kayu Papan Kamper

9,750,000.00

13 Kayu Balok Borneo Super

5,800,000.00

14 Kayu Papan Borneo Super

7,000,000.00

15 Kayu Balok Kruing

4,700,000.00

16 Kayu Papan Kruing

4,450,000.00

17 Kayu Balok jati

12,000,000.00

18 Kayu Papan Jati

13,500,000.00

19 Kayu Balok Albasiah

2,200,000.00

20 Kayu Papan Albasiah

2,300,000.00

21 Dolken 8 s/d 10 uk.4m'

bt

93,000.00

22 Dolken 7 s/d 10

bt

93,000.00

23 List profil kamper 1 cm

m1

4,000.00

24 List profil kamper 2 cm

m1

5,000.00

25 List profil kamper 4 cm

m1

6,000.00

26 List profil kamper 5 cm

m1

7,500.00

27 List profil kamper 10 cm

m1

46,000.00

28 Pegangan Tangga profil Jati

m1

370,000.00

29 Pegangan Tangga profil Kamper

m1

160,000.00

30 Kayu Reng 2/3 Borneo

m1

3,000.00

31 Kayu Reng 2/3 Kamper Banjar

m1

4,000.00

32 Kayu Reng 3/4 Kamper Banjar

m1

6,000.00

6 dari 124

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

3
m1

2,500.00

34 List profil Kayu Lokal KLs II 4 cm

m1

4,000.00

BAHAN PENUTUP RANGKA PLAFOND


1 Bahan plafond Enternit 4 mm

12,000.00

2 Bahan plafond hardpleks 5 mm 120 x 240

lbr

150,000.00

3 Bahan plafond Asbes Semen 5 mm

14,000.00

4 Gypsum 120 x 240 t = 9 mm ex DN

lbr

80,000.00

5 Gypsum 120 x 240 t = 9 mm ex Luar

lbr

105,000.00

6 Acustik Amstrong 60 x 120

lbr

155,000.00

7 GRC 120 x 240

lbr

70,000.00

8 Panel GRC

m2

530,000.00

9 Silicate uk. 120 x 240 t=4mm ex. GRC

lbr

55,000.00

10 Silicate uk. 120 x 240 t=6mm ex. GRC

lbr

95,000.00

11 List Gypsum T. 8 - 10 cm

m1

15,000.00

12 List Plafond Gypsum T, 5 - 7 cm

m1

10,500.00

13 Tepung Gypsum @ 20 kg

zak

80,000.00

14 Plafond Akustik

lbr

69,000.00

15 Ceiling Panel 12mm (600mmx1200mm)

lbr

47,000.00

16 Textile tape

bh

22,000.00

17 Kohler top Cros

batang

37,000.00

18 Kohler ceiling Batten

batang

28,000.00

19 Kohler furring chanel U Clamp Channel

batang

40,000.00

20 Kohler Batten to top cross rail

pcs

21 Kohlerfurring channel to top cross rail

pcs

22 Kohler wall angle panjang 3m, tebal 0.43 mm

33 Reng Kayu Kls II

800.00
900.00

batang

17,000.00

23 Kohler top cross rail spring adjuster rod

pcs

2,500.00

24 U-champ

pcs

1,500.00

25 5mm Soft Suspension rod

pcs

4,000.00

26 Angle clips

pcs

650.00

27 Bracket PN-220 / PN-221

pc(s)

1,100.00

28 Suspension Rod 2400mm PN-409

pc(s)

5,000.00

29 Suspension Clip Adjuster PN-410

pc(s)

3,500.00

30 Wall Angel 3000mm PN-408

pc(s)

23,000.00

31 Main Tee 3600mm PN-400

pc(s)

40,000.00

32 Cross Tee 600mm PN-401

pc(s)

55,000.00

33 Cross Tee 1200mm PN-401

pc(s)

12,000.00

1 Triplek 3 mm 120 x 240

lbr

60,000.00

2 Triplek 4 mm 120 x 240

lbr

70,000.00

3 Triplek 4 mm Ukuran Pintu

lbr

55,000.00

4 Triplek 6 mm 120 x 240

lbr

100,000.00

5 Jabar Wood 4 mm

lbr

100,000.00

6 Plywood 18 mm 120 x 240

lbr

385,000.00

7 Plywood 4 mm 120 x 240

lbr

135,000.00

8 Plywood 3 mm 120 x 240

lbr

90,000.00

9 Plywood 3 mm ukuran Pintu

lbr

145,000.00

10 Plywood 4 mm ukuran Pintu

lbr

155,000.00

BAHAN KAYU LAPIS

11 Bilik Bambu ( tanpa kulit )

8,500.00

12 Bilik Bambu ( dengan kulit )

20,000.00

13 Bilik Bambu Hitam Variasi

24,000.00

14 Wall Paper ( kls menengah )

68,000.00

15 Multiplek 9 mm 120 x 240

lbr

160,000.00

16 Multiplek 12 mm 120 x 240

lbr

210,000.00

17 Multiplek 18 mm 120 x 240

lbr

310,000.00

18 Teak Wood 3 mm 120 x 240

lbr

135,000.00

19 Teak Wood 4 mm 120 x 240

lbr

160,000.00

20 Teak Wood 3 mm 120 x 240 Ukuran Pintu

lbr

95,000.00

21 Teak Wood ukuran Pintu 4 mm

lbr

140,000.00

22 Tacon ( tahan bakar )

160,000.00

23 Supercon

85,000.00

24 Melamin 4 mm 120 x 240

lbr

180,000.00

25 Melamin TIK 4 mm

lbr

300,000.00

26 Formika 120 x 240

lbr

275,000.00

27 Formika Ukuran Pintu

lbr

190,000.00

1 Plin Tegel PC 15 x 30

bh

4,000.00

2 Tegel Warna 20 x 20

bh

6,000.00

3 Plin Tegel Warna 10 x 20

bh

4,000.00

4 Tegel Warna 30 x 30

bh

6,000.00

5 Plin Tegel Warna 15 x 30

bh

6 Tegel Badak PC 30 x 30

bh

7,000.00

7 Tegel Badak Warna PC 30 x 30

bh

7,500.00

8 Poslin 11 x 11 Warna Standar DN

65,000.00

9 Poslin 11 x 11 Warna Khusus DN

BAHAN LANTAI DAN PELAPIS DINDING

4,000.00

75,000.00

10 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos

60,000.00

11 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip

65,000.00

12 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip

65,000.00

13 Keramik 20 x 20 (KM) KWI DN Putih Polos

60,000.00

14 Keramik 20 x 25 Dinding KM KWI DN Corak

65,000.00

15 Keramik 30 x 30 KW I DN putih polos

55,000.00

16 Keramik 30 x 30 KW I DN Warna/Corak / Anti Slip

65,000.00

17 Keramik Mozaik 30 x 30 cm

dus

105,000.00

18 Keramik Lantai Antislip sekualitas Romance KW I Warna 33x33 cm

m2

100,000.00

19 Keramik Lantai sekualitas Romance KW I Warna 33x33 cm

m2

95,000.00

20 Keramik 40 x 40 cm

dus

21 Keramik 60 x 60 cm

dus

90,000.00

22 Granito Tile Esenssza 40 x 40 polis

505,000.00

23 Granito Tile Esenssza 40 x 40 un polis

370,000.00

24 Granito Tile Esenssza 60 x 60 polis

585,000.00

25 Granito Tile Esenssza 60 x 60 un polis

435,000.00

7 dari 124

85,000.00

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

3
m

2,860,000.00

27 Granit Alam LN Ukuran Kecil

3,280,000.00

28 Granit Alam DN Ukuran Besar

1,855,000.00

29 Granit Alam DN Ukuran Kecil

1,750,000.00

30 Marmer Alam Lampung Ukuran Besar

515,000.00

31 Marmer Alam Lampung Ukuran Kecil

410,000.00

32 Marmer Alam Citatah Ukuran Besar

850,000.00

33 Marmer Alam Citatah Ukuran Kecil

650,000.00

34 Marmer Sintetis

515,000.00

35 Bata Karawang

bh

8,500.00

36 Campuran untuk Kedap Air (AM)

ltr

47,000.00

37 Vinyl Lantai standar

37,000.00

38 Stairnosing keramik 10/20

bh

16,000.00

39 Stairnosing fiber

m'

28,000.00

40 Taraso Kerang 30 x 30

45,000.00

41 Plin Taraso 10 x 30

bh

8,500.00

42 Lantai Parket

580,000.00

43 Stepnozing

26 Granit Alam LN Ukuran Besar

m'

23,000.00

44 Plint Keramik 5/20

bh

9,500.00

45 Gym Floor (lantai kayu)

m2

415,000.00

46 Homogenous uk. 60x60cm

m2

215,000.00

1 Grafel 1/2 d.20 cm

m1

31,000.00

2 Grafel 1/2 d.30 cm

m1

37,000.00

3 Grafel 1/2 d.40 cm

m1

60,000.00

4 Buis Beton 20 cm ( 1 m' )

m1

55,000.00

5 Buis Beton 30 cm ( 1 m' )

bh

6 Buis Beton 40 cm ( 1 m' )

bh

95,000.00

7 Buis Beton 50 cm ( 1 m' )

bh

125,000.00

8 Buis Beton 60 cm ( 1 m' ) *M031

bh

180,000.00

9 Buis Beton 100 cm ( 0.50 m ) *M035

BAHAN SALURAN AIR KOTOR / BERSIH

70,000.00

bh

275,000.00

10 Buis Beton 80 cm ( 0.50 m ) *M033

bh

180,000.00

11 Buis Tanah 10 cm ( 0.50 m )

bh

16,000.00

12 Buis Tanah 15 cm ( 0.50 m )

bh

21,000.00

13 Buis Tanah 20 cm ( 0.50 m )

bh

26,000.00

14 Buis Tanah 25 cm ( 0.50 m )

bh

31,000.00

15 Injuk

kg

26,000.00

1 Besi Beton U-24 Rata - Rata *M167' < 22 mm

kg

11,000.00

2 Besi Beton U-24 Rata - Rata *M167' > 22 mm

kg

11,000.00

3 Besi Beton U-39 / U-32 Rata - Rata *M167

kg

12,000.00

BAHAN LOGAM DAN BAHAN JADINYA

4 Pagar BRC (60 x 240 cm)

bh

140,000.00

5 Pagar BRC (90 x 240 cm)

bh

180,000.00

6 Bondek

195,000.00

7 Ongkos Galfanis Besi

kg

8,500.00

8 Kawat Duri

m1

3,500.00
25,000.00

9 Kawat Pengikat

m1

10 Kawat Tembaga

kg

7,500.00

11 Baja Siku / Profil DN

kg

16,000.00

12 Baja IWF DN SII

kg

17,000.00

13 Baja IWF Jepang

kg

20,000.00

14 Kawat Beton *M168

kg

19,000.00

15 Kawat Bronjong 4 mm *M162

kg

17,000.00

16 Besi Galvanisir * M164

kg

60,000.00

17 Baja Tralis *M161

kg

25,000.00

18 Ram Nyamuk Hijau

16,000.00

19 Ram Kawat 1 x 1 cm

19,000.00

20 Ram Ayam

18,000.00

21 Kawat Kasa 1 x 1 cm ( Putih )

18,000.00

22 Kawat Harmonika 4 cm

35,000.00

23 Kawat Harmonika 2 cm

45,000.00

24 Kawat Las Listrik

kg

36,000.00

25 Wiremesh M8

60,000.00

26 Wiremesh M6

50,000.00

27 Plat Srip 2 x 30 mm ( 6 m1)

bt

50,000.00

28 Plat Srip 3 x 30 mm ( 6 m1)

bt

100,000.00

29 Plat Alumunium 0.1 mm

30 Plat Alumunium 0.2 mm

115,000.00

31 Plat Alumunium 0.3 mm

150,000.00

32 Plat Alumunium 0.4 mm

175,000.00

33 Plat Alumunium 0.5 mm

215,000.00

34 Plat Alumunium 0.6 mm

235,000.00

35 Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " )

m1

215,000.00

36 Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " )

m1

240,000.00

37 Kusen Alumunium 4" CA

m1

110,000.00

38 Handle Alumunium ( Tarikan Pintu Alumunium )

bh

130,000.00

39 Kait Angin alumunium

ps

135,000.00

40 Karet Asisoris Kusen / Pintu Alumunium

m1

5,500.00

41 Seng Plat BJLS dia. 60 cm ( 100 m1 )

m1

37,000.00

42 Seng Plat BJLS dia. 90 cm ( 100 m1 )

m1

47,000.00

43 Plat Besi Tipis 1 mm

kg

16,000.00

44 Plat Besi Tipis 0.5 mm

kg

16,000.00

45 Plat Besi 2 mm s/d 5 mm

kg

16,000.00

46 Plat Besi 6 mm s/d 10 mm

kg

16,000.00

47 Plat Besi 10 mm Ke atas

kg

16,000.00

48 Lem Kuning (aibond)

kg

63,000.00

65,000.00

49 Lem Fox

kg

23,000.00

50 Rolling door Besi

m2

670,000.00

51 Pintu Aluminium

m2

255,000.00

52 Pintu Swing 5 mm

unt

1,490,000.00

53 Pintu Swing 8 mm

unt

2,350,000.00

8 dari 124

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

54 Teralis Besi strip

m2

160,000.00

55 Besi Teralis

m2

700,000.00

56 Epoxy primer EP 118, Dongyang Finish ET 5635-Selflevelling type

m2

230,000.00

57 Rangka Alumunium hollow 33x38x1mm, MF termasuk:

m2

480,000.00

- bracket besi hollow 40x40x4 zincromate


- Silicone sealant dan accessories
58 Alumunium Composite Panel 4mm poliester

m2

265,000.00

59 Partisi Cubical toilet lengkap berikut:

unit

6,900,000.00

60 non woven geotextile 150 gr/m2

m2

13,000.00

61 Pipa Hollow galvanis 4x4cm

m'

26,000.00

62 Pipa Hollow galvanis 2x4cm

m'

17,000.00

1 Kaca Polos 2 mm

60,000.00

2 Kaca Polos 3 mm

70,000.00

3 Kaca Polos 5 mm

80,000.00

4 Kaca Polos Tebal 8 mm

230,000.00

5 Kaca Polos Tebal 12 mm

320,000.00

6 Kaca Rayband 5 mm ( ASAHI )

7 Kaca Rayband 8 mm ( ASAHI )

800,000.00

8 Kaca Rayband 12 mm ( ASAHI )

1,350,000.00

- partisi phenolic resin board 12mm waterproof


- pintu phenolic resin board 800x1800x12mm waterproof
- doorhardware stainless steel acc
- frame allumunium
- kaki pedestal dan screw connection stainless steel

BAHAN KACA

90,000.00

9 Kaca Patri Lokal Terpasang ( ASAHI )

5,300,000.00

10 Kaca Patri EX Luar negeri terpasang

2,100,000.00

11 Glass Block DN 20 x 20

bh

12 Glass Block 20 x 20 Ex LN

bh

13 Sealent kaca

kg

31,000.00
125,000.00
-

BAHAN PAKU DAN MUR BAUT


1 Paku 3 cm

kg

20,000.00

2 Paku 5 cm s/d 7 cm / Paku Reng - Usuk

kg

18,000.00

3 Paku 8 cm s/d 12 cm

kg

18,000.00

4 Paku 2 cm s/d 4 cm /Paku Tripleks - Bilik

kg

20,000.00

5 Paku 1/2 cm s/d 1 cm /Paku seng-Plat Poil

kg

20,000.00

6 Paku Beton 2 cm s/d 5 cm

kg

7 Paku Kait Lengkap

bh

1,500.00

8 Paku Cacing

kg

20,000.00

3,000.00

9 Paku Seng Glb. / Paku Asbes Glb.

kg

25,000.00

10 Paku Skrup

kg

10,000.00

11 Besi Beugel kuda - kuda

kg

20,000.00

12 Duk Angker

kg

19,000.00

13 Angker Mur Baut dia.19 / panjang 60 cm

bh

23,000.00

14 Mur Baut HTB dia. 19 s/d 16 (5 cm)

bh

7,500.00

15 Mur Baut Biasa dia.19 s/d 16 (5 cm)

bh

5,500.00

16 Piser dia. 12 s/d 20 cm

bh

4,500.00

1 Besi Pipa untuk Hydrant BSP 1"

bt

145,000.00

2 Besi Pipa untuk Hydrant BSP 1,25"

bt

160,000.00

3 Besi Pipa untuk Hydrant BSP 1,5"

bt

165,000.00

4 Besi Pipa untuk Hydrant BSP 2"

bt

200,000.00

5 Besi Pipa untuk Hydrant BSP 2,5"

bt

635,000.00

6 Besi Pipa untuk Hydrant BSP 3"

bt

890,000.00

7 Besi Pipa untuk Hydrant BSP 4"

bt

1,200,000.00

8 Besi Pipa untuk Hydrant BSP 6"

BAHAN PERPIPAAN

bt

2,150,000.00

9 Pipa GIP Medium A 1/2" ( 6 m1 )

bt

255,000.00

10 Pipa GIP Medium A 3/4" ( 6 m1 )

bt

285,000.00

11 Pipa GIP Medium A 1" ( 6 m1 )

bt

320,000.00

12 Pipa GIP Medium A 1.5" ( 6 m1 )

bt

400,000.00

13 Pipa GIP Medium A 2" ( 6 m1 )

bt

14 Pipa GIP Medium A 2.5" ( 6 m1 )

bt

740,000.00

15 Pipa GIP Medium A 3" ( 6 m1 )

bt

1,100,000.00

16 Pipa GIP Medium A 4" ( 6 m1 )

bt

1,500,000.00

17 Pipa GIP Medium A 6" ( 6 m1 )

bt

1,750,000.00

18 Pipa GIP Medium A 8" ( 6 m1 )

bt

2,400,000.00

19 Pipa GIP Medium B 1/2" ( 6 m1 )

bt

170,000.00

20 Pipa GIP Medium B 3/4" ( 6 m1 )

bt

190,000.00

21 Pipa GIP Medium B 1" ( 6 m1 )

bt

215,000.00

22 Pipa GIP Medium B 1.5" ( 6 m1 )

bt

265,000.00

23 Pipa GIP Medium B 2" ( 6 m1 )

bt

325,000.00

24 Pipa GIP Medium B 2.5" ( 6 m1 )

bt

500,000.00

25 Pipa GIP Medium B 3" ( 6 m1 )

bt

750,000.00

26 Pipa GIP Medium B 4" ( 6 m1 )

bt

1,000,000.00

27 Pipa GIP Medium B 6" ( 6 m1 )

bt

1,200,000.00

28 Pipa GIP Medium B 8" ( 6 m1 )

bt

1,600,000.00

29 Besi Pipa Hitam 1" t=2 mm

bt

120,000.00

30 Besi Pipa Hitam 2" t=2 mm

bt

225,000.00

31 Besi Pipa Hitam 3" t=2 mm

bt

400,000.00

32 Besi Pipa Hitam 4" t=2 mm

bt

500,000.00

33 Besi Pipa Hitam 6" t=2 mm

bt

700,000.00

34 Tee All Socket 20 (3/4") X 20 (3/4")

bh

23,000.00

35 Tee All Flange 50 (1.5") X 50 (1.5")

bh

190,000.00

36 Tee All Flange 63 (2") X 63 (2")

bh

275,000.00

37 Tee All Flange 90 (3") X 63 (2")

bh

400,000.00

38 Tee All Flange 90 (3") X 90 (3")

bh

550,000.00

39 Tee All Flange110 (4") X 63 (2")

bh

675,000.00

40 Tee All Flange 110 (4") X 100 (4")

bh

600,000.00

41 Tee All Flange 160 (6") X 90 (3")

bh

800,000.00

42 Tee All Flange 160 200 (8") X 90 (3")

bh

1,700,000.00

9 dari 124

485,000.00

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

43 Tee Y Flange 160 (6") X 110 (4")

bh

1,550,000.00

44 Tee Y Flange 160 (6") X 160 (6")

bh

1,165,000.00

45 Tee Y Flange 200 (8") X 200 (8")

bh

1,750,000.00

46 Bend All Flange 22.5 160 (6")

bh

650,000.00

47 Bend All Flange 45 90 (3")

bh

320,000.00

48 Bend All Flange 45 110 (4")

bh

400,000.00

49 Bend All Flange 45 160 (6")

bh

680,000.00

50 Bend All Flange 90 63 (2")

bh

260,000.00

51 Bend All Flange 90 90 (3")

bh

400,000.00

52 Bend All Flange 45 110 (4")

bh

415,000.00

53 Bend All Flange 90 160 (6")

bh

900,000.00

54 Loose Flange 63 (2")

bh

140,000.00

55 Loose Flange 90 (3")

bh

215,000.00

56 Loose Flange 110 (4")

bh

57 Loose Flange 160 (6")

bh

380,000.00

58 Gate Valve PN.10 Ci 63 (2")

bh

3,400,000.00

59 Gate Valve PN.10 Ci 90 (3")

bh

4,000,000.00

60 Gate Valve PN.10 Ci 110 (4")

bh

61 Gate Valve PN.10 Ci 160 (6")

bh

9,000,000.00

62 Gate Valve PN.10 Ci 200 (8")

bh

12,200,000.00

63 Fietkrant 32 (1/2")

bh

115,000.00

64 Fietkrant 32 (1")

bh

150,000.00

65 Fietkrant 50 (1,5")

bh

160,000.00

66 Reducer All Flange 32 (1") X 20 (3/4")

bh

67 Reducer All Flange 50 (1.5") X 32 (1")

bh

115,000.00

68 Reducer All Flange 63 (2") X 32 (1")

bh

130,000.00

69 Reducer All Flange 90 (3") X 63 (2")

bh

140,000.00

70 Reducer All Socket 160 (6") X 110 (4")

bh

570,000.00

71 Reducer All Socket 160 (6") X 110 (4")

bh

700,000.00

72 Tapping Sleep CI 63 X 32

bh

320,000.00

73 Tapping Sleep CI 90 X 32

bh

345,000.00

74 Tapping Sleep CI 110 X 32

bh

380,000.00

75 Tapping Sleep CI 160 X 32

bh

400,000.00

76 Automatic Double Relief Valve Flange Ci 32 (1")

bh

2,450,000.00

77 Automatic Single Relief Valve Flange Ci 90 (3")

bh

5,200,000.00

78 Clamp Sadle GI 2" X 3/4"

bh

25,000.00

79 Clamp Sadle GI 2" X 1"

bh

27,000.00

80 Clamp Sadle GI 3" X 3/4"

bh

81 Clamp Sadle GI 3" X 1"

bh

37,000.00

82 Clamp Sadle GI 4" X 3/4"

bh

425,000.00

83 Clamp Sadle GI 4" X 1"

bh

445,000.00

84 Double Neple GI 3/4"

bh

10,000.00

85 Double Neple GI 32 Mm (1")

bh

14,000.00

86 Check Valve Nd 75 MM PN 10 60 (2")

bh

1,500,000.00

87 Check Valve Nd 50 MM PN 10 90 (3")

bh

2,000,000.00

88 Knie GI 3/4"

bh

13,000.00

89 Knie G 32 MM (1")

bh

17,000.00

90 Knie Gi 50 MM (1.5")

bh

45,000.00

91 Knie Gi 63 MM (2")

bh

55,000.00

92 Elbow Gi 20 (3/4")

bh

11,000.00

93 Elbow Gi 32 MM (1")

bh

13,000.00

94 Macam2 Sambungan GIP 1/2"

bh

5,500.00

95 Macam2 Sambungan GIP 3/4"

bh

8,500.00

96 Macam2 Sambungan GIP 1"

bh

12,000.00

97 Macam2 Sambungan GIP 1.5"

bh

17,000.00

98 Macam2 Sambungan GIP 2"

bh

40,000.00

99 Macam2 Sambungan GIP 2.5"

bh

60,000.00

100 Macam2 Sambungan GIP 3"

bh

75,000.00

101 Macam2 Sambungan GIP 4"

bh

80,000.00

102 Macam2 Sambungan GIP 6"

bh

80,000.00

103 Macam2 Sambungan GIP 8"

bh

80,000.00

104 PIPA PVC S-12.5 MOF 32 (1")

m'

10,000.00

105 PIPA PVC S-12.5 MOF 50 (1,5")

m'

22,000.00

106 PIPA PVC S-12.5 RR 63 (2")

m'

107 PIPA PVC S-12.5 RR 90 (3")

m'

80,000.00

108 PIPA PVC S-12.5 RR 110 (4")

m'

110,000.00

109 PIPA PVC S-12.5 RR 160 (6")

m'

240,000.00

110 Pipa PVC Rucika type AW 1/2"

bt

35,000.00

230,000.00

5,200,000.00

95,000.00

35,000.00

35,000.00

111 Pipa PVC Rucika type AW

3/4"

bt

50,000.00

112 Pipa PVC Rucika type AW

1"

bt

65,000.00

113 Pipa PVC Rucika type AW

1 1/4"

bt

90,000.00

114 Pipa PVC Rucika type AW

1 1/2"

bt

115,000.00

115 Pipa PVC Rucika type AW

2"

bt

165,000.00

116 Pipa PVC Rucika type AW

2 1/2"

bt

210,000.00

117 Pipa PVC Rucika type AW

3"

bt

310,000.00

118 Pipa PVC Rucika type AW

4"

bt

480,000.00

119 Pipa PVC Rucika type AW

6"

bt

930,000.00

120 Pipa PVC Rucika type AW

8"

bt

1,350,000.00

121 Pipa PVC Maspion Abu 1/2" (Aw)

bt

21,000.00

122 Pipa PVC Maspion Abu 3/4" (Aw)

bt

26,000.00

123 Pipa PVC Maspion Abu 1" (Aw)

bt

37,000.00

124 Pipa PVC Maspion Abu 1 1/4" (Aw)

bt

47,000.00

125 Pipa PVC Maspion Abu 1 1/2" (Aw)

bt

65,000.00

126 Pipa PVC Maspion Abu 2" (Aw)

bt

100,000.00

127 Pipa PVC Maspion Abu 2 1/2" (Aw)

bt

135,000.00

128 Pipa PVC Maspion Abu 3" (Aw)

bt

185,000.00

129 Pipa PVC Maspion Abu 4" (Aw)

bt

265,000.00

130 Pipa PVC Maspion Abu 6" (Aw)

bt

835,000.00

131 Pipa PVC Maspion Abu 1/2"

bt

14,000.00

132 Pipa PVC Maspion Abu 3/4"

bt

16,000.00

133 Pipa PVC Maspion Abu 1"

bt

21,000.00

134 Pipa PVC Maspion Abu 1 1/4"

bt

25,000.00

135 Pipa PVC Maspion Abu 1 1/2"

bt

26,000.00

10 dari 124

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

136 Pipa PVC Maspion Abu 2"

bt

31,000.00

137 Pipa PVC Maspion Abu 2 1/2"

bt

37,000.00

138 Pipa PVC Maspion Abu 3"

bt

55,000.00

139 Pipa PVC Maspion Abu 4"

bt

70,000.00

140 Pipa PVC Maspion Abu 6"

bt

85,000.00

141 Bend All Socket PVC 22.5 50 (1,5")

bh

95,000.00

142 Bend All Socket RR PVC 22.5 63 (2")

bh

120,000.00

143 Bend All Socket RR PVC 22.5 90 (3")

bh

1,800,000.00

144 Bend All Socket RR PVC 22.5 110 (4")

bh

255,000.00

145 Bend All Socket RR PVC 22.5 160 (6")

bh

480,000.00

146 Bend All Socket PVC 45 32 (1")

bh

60,000.00

147 Bend All Socket PVC 45 50 (1,5")

bh

115,000.00

148 Bend All Socket RR PVC 45 63 (2")

bh

125,000.00

149 Bend All Socket RR PVC 45 90 (3")

bh

190,000.00

150 Bend All Socket RR PVC 45 110 (4")

bh

275,000.00

151 Bend All Socket RR PVC 45 160 (6")

bh

670,000.00

152 Bend All Socket PVC 90 32 (1")

bh

45,000.00

153 Bend All Socket PVC 90 50 (1.5")

bh

65,000.00

154 Bend All Socket RR PVC 90 63 (2")

bh

145,000.00

155 Bend All Socket RR PVC 90 90 (3")

bh

220,000.00

156 Bend All Socket RR PVC 90 110 (4")

bh

340,000.00

157 Bend All Socket RR PVC 90 160 (6")

bh

765,000.00

158 Knee PVC 32 (1")

bh

7,500.00

159 Knee PVC 50 (1,5")

bh

18,000.00

160 Valve Socket 32 (1")

bh

5,500.00

161 Valve Socket 50 (1,5")

bh

12,000.00

162 Valve Socket 63 (2")

bh

50,000.00

163 Tee All Socket PVC 32 X 32

bh

164 Tee All Socket PVC 50 X 50

bh

18,000.00

165 Tee All Socket RR Joint PVC 63 X 63

bh

175,000.00

166 Tee All Socket RR Joint PVC 90 X 63

bh

425,000.00

167 Tee All Socket RR Joint PVC 90 X 90

bh

425,000.00

168 Tee All Socket RR Joint PVC 110 X 63

bh

680,000.00

169 Tee All Socket RR Joint PVC 110 X 90

bh

170 Tee All Socket RR Joint PVC 110 X 110

bh

680,000.00

171 Tee All Socket RR Joint PVC 160 X 63

bh

1,350,000.00

172 Tee All Socket RR Joint PVC 160 X 90

bh

1,500,000.00

173 Tee All Socket RR Joint PVC 160 X 110

bh

3,200,000.00

174 Tee All Socket RR Joint PVC 160 X 160

bh

4,450,000.00

175 Reducer All Socket PVC 50 X 32

bh

50,000.00

176 Reducer All Socket PVC 63 X 32

bh

80,000.00

177 Reducer All Socket PVC 63 X 50

bh

100,000.00

178 Reducer All Socket RR Joint Pvc 90 X 63

bh

1,400,000.00

179 Reducer All Socket RR Joint Pvc 110 X 63

bh

2,150,000.00

180 Reducer All Socket RR Joint Pvc 110 X 90

bh

230,000.00

181 Reducer All Socket RR Joint Pvc 160 X 110

bh

400,000.00

182 Repair Socket RR Joint Pvc 63

bh

85,000.00

183 Repair Socket RR Joint Pvc 90

bh

135,000.00

184 Repair Socket RR Joint Pvc 110

bh

220,000.00

185 Repair Socket RR Joint Pvc 160

bh

350,000.00

186 Repair Socket RR Joint Pvc 200

bh

700,000.00

187 Flange Socket PVC 32 (1")

bh

75,000.00

188 Flange Socket PVC 50 (1.5")

bh

115,000.00

189 Flange Socket RR PVC 63 (2")

bh

410,000.00

190 Flange Socket RR PVC 90 (3")

bh

650,000.00

191 Flange Socket RR PVC 110 (4")

bh

800,000.00

192 Flange Socket RR PVC 160 (6")

bh

1,500,000.00

193 Flange Socket RR PVC 200 (8")

bh

2,200,000.00

194 Socket Drat Luar RR PVCc 50 (1,5")

bh

24,000.00

195 Socket Drat Luar RR PVC 63 (2")

bh

31,000.00

196 Socket Drat Luar RR PVC 90 (3")

bh

37,000.00

197 Dop 20 (3/4")

bh

8,500.00

198 Dop 110 (4")

bh

85,000.00

199 Dop 160 (6")

bh

120,000.00

200 Dop Socket 32 (1")

bh

2,000.00

201 Dop Socket 50 (1,5")

bh

20,000.00

202 Dop Socket 63 (2")

bh

55,000.00

203 Dop Socket 90 (3")

bh

85,000.00

204 Dop Socket 110 (4")

bh

140,000.00

205 Dop Socket 160 (6")

bh

250,000.00

206 Giboult Joint 63 (2")

bh

160,000.00

207 Giboult Joint 90 (3")

bh

200,000.00

208 Giboult Joint 110 (4")

bh

265,000.00

209 Giboult Joint 160 (6")

bh

415,000.00

210 Giboult Joint 200 (8")

bh

450,000.00

211 Knie PVC Diameter 0,5"

bh

3,500.00

212 Knie PVC Diameter 0,75"

bh

3,500.00

213 Knie PVC Diameter 1"

bh

5,500.00

214 Knie PVC Diameter 2"

bh

21,000.00

215 Knie PVC Diameter 3"

bh

30,000.00

216 Knie PVC Diameter 4"

bh

80,000.00

217 Tee PVC Diameter 0,5"

bh

3,500.00

218 Tee PVC Diameter 0,75"

bh

3,500.00

219 Tee PVC Diameter 1"

bh

5,500.00

220 Tee PVC Diameter 2"

bh

7,500.00

221 Tee PVC Diameter 3"

bh

9,500.00

222 Tee PVC Diameter 4"

bh

18,000.00

223 Kran Diameter 0,5"

bh

224 Fiet Kran Diameter 0,5"

bh

55,000.00

225 Fiet Kran Diameter 0,75"

bh

100,000.00

226 Fiet Kran Diameter 1"

bh

160,000.00

227 Fiet Kran Diameter 2"

bh

600,000.00

228 Fiet Kran Diameter 3"

bh

1,200,000.00

11 dari 124

12,000.00

680,000.00

37,000.00

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

3
bh

2,500,000.00

230 Macam2 Sambungan Paralon 1/2"

bh

6,500.00

231 Macam2 Sambungan Paralon 3/4"

bh

6,500.00

232 Macam2 Sambungan Paralon 1"

bh

20,000.00

233 Macam2 Sambungan Paralon 1 1/4"

bh

23,000.00

234 Macam2 Sambungan Paralon 1 1/2"

bh

23,000.00

235 Macam2 Sambungan Paralon 1 3/4"

bh

30,000.00

236 Macam2 Sambungan Paralon 2"

bh

30,000.00

237 Macam2 Samb. Paralon 2 1/2"

bh

30,000.00

238 Macam2 Samb. Paralon 3"

bh

70,000.00

239 Macam2 Samb. Paralon 4"

bh

80,000.00

240 Sambungan Pipa PVC Jenis AW 4 " TY

bh

50,000.00

241 Lem Paralon

bh

242 Solatip Leideng

229 Fiet Kran Diameter 4"

8,500.00

gl

4,500.00

243 Pipa PVC 4" berlobang jenis AW

m1

65,000.00

244 UB tape 75 m/roll

roll

23,000.00

BAHAN SANITAIR
1 Air Kerja

ltr

50.00

2 Stop Kran 1/2 " KIT

bh

45,000.00

3 Stop Kran 3/4 " KIT

bh

55,000.00

4 Stop Kran 1 " KIT

bh

300,000.00

5 Stop Kran 1 1/2 " KIT

bh

400,000.00

6 Stop Kran 2 " KIT

bh

1,000,000.00

7 Stop Kran 2 1/2" KIT

bh

1,200,000.00

8 Stop Kran 3 " KIT

bh

1,550,000.00

9 Fiet kran 3/4"

bh

95,000.00

10 Fiet kran 1"

bh

125,000.00

11 Fiet kran 2"

bh

12 Fiet kran 3"

bh

745,000.00

13 Fiet kran 4"

bh

1,250,000.00

220,000.00

14 Saringan Air Lt KM Stainless Steel

bh

60,000.00

15 Apooer Bath Tube

bh

350,000.00

16 Kran stain less Lokal Kait

bh

75,000.00

17 Shower Dengan Tiang

bh

375,000.00

18 Shower Tanpa Tiang

bh

180,000.00

19 Kran Tembok Sun Eui dia. 1/2 "

bh

135,000.00

20 Kran Tembok ITAP dia. 1/2 "

bh

550,000.00

21 Kran Bebek Sun Eui 1/2 "

bh

225,000.00

22 Kran Bebek ITAP 1/2 "

bh

80,000.00

23 Kran Panas Dingin San Eui Standard

bh

290,000.00

24 Bath Cape Washteren

unit

2,900,000.00

25 Tempat Sabun Poslin

bh

70,000.00

26 Wastafel Lengkap TOTO LW 230

unit

1,750,000.00

27 Wastafel Lengkap INA

unit

900,000.00

28 Wastafel Bulat Warna Standard Lengkap

unit

2,250,000.00

29 Closet Duduk Poslin (INA) Lengkap

set

2,250,000.00

30 Closet Jongkok Poslin (INA)

bh

200,000.00

31 Closet Jongkok Teraso

bh

120,000.00

32 Closet Jongkok Poslin warna TOTO

unit

200,000.00

33 Closet Jongkok Standard Putih Poslin TOTO

unit

120,000.00

34 Closet Jongkok Lengkap Sistem Jet TOTO

unit

585,000.00

35 Closet Duduk Warna Standard TOTO C 240 Lengkap

unit

2,800,000.00

36 Closet Duduk Warna Standard lengkap INA

bh

2,100,000.00

37 Urinoar Lengkap TOTO Warna Standard lengkap

unit

2,350,000.00

38 Penyekat Poslin Urinoar TOTO

lbr

600,000.00

39 Kitchen Zink Stainless Standard Lokal ( 1 Lobang )

bh

265,000.00

40 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang )

bh

210,000.00

41 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )

bh

415,000.00

42 Bak Mandi Teraso

bh

375,000.00

43 Bak Mandi Fiber Glass 60 x 60 cm

bh

260,000.00

44 Floordrain stainless

bh

42,000.00

1 Atap Plastik Gelombang 80 x 180

lbr

32,000.00

2 Atap Fiber Glass Tipis 80 x 180 (gelombang)

lbr

60,000.00

3 Atap Fiber Glass Tebal 80 x 180 (gelombang)

lbr

110,000.00

4 Atap Aluminium Natural USR 26 ( JAINDO )

220,000.00

5 Atap Aluminium Warna USR 26 ( JAINDO )

265,000.00

6 Atap Seng Gelombang BJLS 80 x 180

lbr

42,000.00

7 Atap Asbes Gel. Kecil 4 mm 80 x 180

lbr

50,000.00

8 Bubung Asbes

lbr

40,000.00

9 Atap Asbes Gel. 4 mm 90 x 180

lbr

70,000.00

10 Atap Asbes Gel. 5 mm 90 x 180

lbr

11 Atap Asbes Gel. Besar 4 mm 90 x 240

lbr

85,000.00

12 Atap Asbes Gel. Besar 5 mm 90 x 240

lbr

100,000.00

13 Atap Genteng Plentong pres Bakar KW 1

bh

2,500.00

14 Atap Genteng Plentong pres Molen Oven KW1

bh

3,500.00

15 Atap Genteng Flam pres Molen Oven Jatiwangi

bh

2,500.00

16 Genteng Bubungan Ex Jatiwangi Segi Tiga

bh

5,500.00

17 Genteng Bubungan Beton

bh

6,500.00

18 Genteng Beton Warna 14,5/m2

bh

11,000.00

19 Genteng Beton Warna 14,5/m2

115,000.00

20 Genteng Beton Natural

21 Sirap Kelas I ( 80 / m2 )

bh

27,000.00

22 Sirap

130,000.00

BAHAN PENUTUP ATAP

80,000.00

80,000.00

23 Genteng Keramik

bh

12,000.00

24 Genteng Keramik Natural Intan 14,5 / m2

110,000.00

25 Genteng Keramik Glasur Standard 14,5 / m2

160,000.00

26 Genteng Keramik Glasur Special 14,5 / m2

180,000.00

27 Genteng Keramik Glasur Premium 14,5 / m2

185,000.00

28 Genteng Murando Natural 1m2

bh

4,500.00

29 Genteng Murando Glasur 1m2

bh

7,500.00

12 dari 124

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

30 Genting Magas

bh

3,500.00

31 Genteng Beton Natural

bh

8,500.00

32 Bubung Genteng pres Bulat Ex Jatiwangi

bh

33 Bubung Murando Natural

bh

6,500.00

34 Bubung Murando Glasur

bh

10,500.00

35 Bubungan Genteng Keramik

bh

10,500.00

36 Bubungan Genteng Palentong

bh

3,500.00

37 Bubungan Genting Flam

bh

4,500.00

38 Bubungan Genting Magas eks banjar

bh

5,500.00

BAHAN ELEKTRIKAL
1 Kabel Twist (2x16 mm)

m'

20,000.00

2 Kabel Twist (4x16 mm)

m'

24,000.00

3 Kabel Twist (2x10 mm)

m'

17,000.00

4 Kabel NYA (1.5 mm)

m'

5,500.00

5 Kabel NYA (2.5 mm)

m'

6 Kabel NYM (2x1.5 mm)

m'

11,000.00

7 Kabel NYM (2x2.5 mm)

m'

14,000.00

8 Kabel NYM (3x1.5 mm)

m'

18,000.00

9 Kabel NYM (3x2.5 mm)

m'

16,000.00

7,500.00

7,500.00

10 Kabel NYM (3x4 mm)

m'

22,000.00

11 Kabel NYY (1x35 mm)

m'

135,000.00

12 Kabel NYY (2x16 mm)

m'

85,000.00

13 Kabel NYY (2x10 mm)

m'

75,000.00

14 Kabel NYFGBY (4x6 mm)

m'

125,000.00

15 Kabel NYFGBY (4x16 mm)

m'

230,000.00

16 Kabel NYFGBY (4x25 mm)

m'

250,000.00

17 NYY 4 x 95 mm2

m'

665,000.00

18 NYY 4 x 70 mm2

m'

650,000.00

19 NYY 4 x 50 mm2

m'

355,000.00

20 NYY 4 x 2,5 mm2

m'

45,000.00

21 NYY 4 x 35 mm2

m'

240,000.00

22 NYY 4 x 25 mm2

m'

261,000.00

23 NYFGBY 4X4mm2

m'

110,000.00

24 NYFGBY 4X70 Sqmm

m'

1,000,000.00

25 NYFGBY 4X35mm2

m'

750,000.00

26 NYY 4x4 mm

m'

60,000.00

27 NYA 1 x 35 mm2

m'

100,000.00

28 NYY 4 x 2,5 mm2

m'

45,000.00

29 NYA 1 x 25 mm2

m'

95,000.00

30 NYA 1 x 16 mm2

m'

85,000.00

31 NYA 4 mm2

m'

32 Kabel TIC 3x70 +N

m'

90,000.00

33 Tiang PJU 9m

unit

7,100,000.00

34 Grounding Panel

set

7,300,000.00

35 Kabel Tembaga

Kg

17,000.00

50,000.00

36 Kabel Tik 2 10 mm

m'

5,500.00

37 NSFB FUJI EA - 100 A

bh

760,000.00

38 NSFB FUJI EA - 150 A

bh

2,000,000.00

39 Rumah Panel 30 x 60 cm (kosong)

unt

105,000.00

40 Skring Kas 2 grop Biasa

unt

155,000.00

41 Skring Kas 3 grop Biasa

unt

195,000.00

42 Skring Kas 5 grop Biasa

unt

415,000.00

43 MCB Mercury

bh

80,000.00

44 MCB 1 PAS

bh

50,000.00

45 MCB 3 PAS

bh

46 MCB (15 Ampere)

bh

70,000.00

47 MCB (25 Ampere)

bh

195,000.00

48 MCB (2 Ampere)

bh

75,000.00

49 MCB (6 Ampere)

bh

215,000.00

50 Tahanan 50 A Merk Fuji

bh

450,000.00

51 Saklar Tunggal Biasa

bh

52 Saklar Ganda Biasa

bh

8,000.00

53 Saklar Magnet 25 PK

bh

1,100,000.00

54 Saklar Broko Tunggal Standard ( 1 Phase )

bh

14,000.00

55 Saklar Broko Seri Standard ( 1 Phase )

bh

20,000.00

56 Saklar Engkel Outbow

bh

21,000.00

57 Saklar Engkel Outbow (Persegi Cream)

bh

45,000.00

58 Saklar Engkel Outbow (Persegi mahagony)

bh

45,000.00

59 Saklar Engkel 1 B

bh

55,000.00

60 Saklar Engkel Hotel New Gee Urea

bh

50,000.00

61 Saklar Engkel 1 B (Radium)

bh

55,000.00

62 Saklar Engkel New Gee (Urea)

bh

45,000.00

63 Saklar Engkel New Gee (Urea Mahagony)

bh

50,000.00

64 Saklar Engkel New Gee (Urea Brasil)

bh

50,000.00

65 Saklar Engkel New Gee (Urea Grey)

bh

50,000.00

66 Saklar Seri 1 B

bh

45,000.00

67 Saklar Seri 1 B (Radium)

bh

60,000.00

68 Saklar Seri New Gee Urea

bh

60,000.00

69 Saklar Seri New Gee Urea (Urea Mahagony)

bh

65,000.00

70 Saklar Seri New Gee Urea (Urea Brasil)

bh

65,000.00

71 Saklar Seri New Gee Urea (Urea Grey)

bh

65,000.00

72 Saklar Seri Outbow

bh

27,000.00

73 Saklar Seri Outbow (Persegi Cream)

bh

60,000.00

74 Saklar Seri Outbow (Persegi Mahagony)

bh

65,000.00

75 Saklar Triple 1 B

bh

75,000.00

76 Saklar Triple 1 B (Radium)

bh

100,000.00

77 Steker Arde Baru

bh

45,000.00

78 Steker Arde New Gee (Cream)

bh

45,000.00

79 Steker Biasa

bh

7,500.00

80 Steker T (Arde Persegi)

bh

90,000.00

81 Steker T (Putih)

bh

8,500.00

82 Steker T (Hitam)

bh

8,500.00

13 dari 124

80,000.00

5,000.00

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

3
bh

84 Stop Kontak Biasa

bh

8,000.00

85 Stop Kontak Putar

bh

26,000.00

86 Stop Kontak Broko Standard ( 1 Phase )

bh

87 Stop Kontak Broko 3 Phase ( Out Bow )

bh

76,000.00

88 Stop Kontak Broko 3 Phase ( In Bow )

bh

130,000.00

89 Stop Kontak Handle 3 Phase

bh

80,000.00

90 Stop Kontak AC Arde 1B

bh

225,000.00

91 Stop Kontak Arde 1B

bh

40,000.00

92 Stop Kontak Arde 1B Tutup

bh

115,000.00

93 Stop Kontak Arde 1B New Gee (Urea)

bh

45,000.00

94 Stop Kontak Arde 1B New Gee (Urea Mahagony)

bh

50,000.00

95 Stop Kontak Arde 1B New Gee (Urea Brasil)

bh

50,000.00

96 Stop Kontak Arde 1B New Gee (Urea Grey)

bh

50,000.00

97 Stop Kontak Arde Outbow (Putih)

bh

22,000.00

98 Stop Kontak Arde Outbow (Hitam)

bh

19,000.00

99 Stop Kontak Arde Outbow (Persegi Cream)

bh

45,000.00

100 Stop Kontak Arde Outbow (Persegi Mahagony)

bh

50,000.00

101 Stop Kontak Arde Putar (NG Cream)

bh

75,000.00

102 Stop Kontak Arde Putar (NG Cream Mahagony)

bh

90,000.00

103 Stop Kontak Arde Putar (NG Grey)

bh

90,000.00

104 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat )

ttk

105,000.00

105 Lampu pijar 25 Watt s/d 100 Watt

bh

7,500.00

106 Lampu Neon TL Philip 20 W

bh

17,000.00

107 Lampu Neon TL Philip 40 W

bh

22,000.00

108 Trapo TL 20 W ( Philip )

bh

30,000.00

109 Trapo TL 40 W ( Philip )

bh

35,000.00

110 Trapo TL 20 W ( Sinar )

bh

60,000.00

20,000.00

31,000.00

111 Trapo TL 40 W ( Sinar )

bh

30,000.00

112 Trapo Ballas

bh

665,000.00

113 Stater Neon Philip

bh

5,500.00

114 Stater Neon Biasa

bh

3,500.00

115 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan )

bh

105,000.00

116 Down Light + SL 25 W

bh

270,000.00

117 Lampu SL Philip 25 W

bh

95,000.00

118 Lampu Sirkel TL 20 W Lengkap

bh

63,000.00

119 Lampu Mercuri 80 W

bh

230,000.00

120 Lampu Mercuri 250 W

bh

240,000.00

121 Lampu Son 150 W

bh

235,000.00

122 Lampu Taman + Tiang + Lampu 1 Buah

bh

700,000.00

123 Lampu Baret 30 cm + Neon

bh

95,000.00

124 Lampu Neon Arcrilik 2 x 40 W lengkap

bh

21,000.00

125 Pentanahan Penangkal Petir

ttk

385,000.00

ttk

170,000.00

126 Pentanahan Panel

83 Steker T (Arde)

127 Pipa Penangkal Petir

bh

31,000.00

128 Box Sekering

set

170,000.00

129 Box Lampu Mercury

bh

1,135,000.00

130 Terminal Kabel

bh

26,000.00

131 Box Panel KWH (1 Phase)

bh

415,000.00

132 Box Panel KWH (3 Phase)

bh

890,000.00

133 Box Sikring (lengkap)

set

160,000.00

134 Rak kabel 30 cm

m'

275,000.00

135 Rak kabel 20 cm

m'

260,000.00

136 Rak kabel 10 cm

m'

137 Kabel Lader di shaft

m'

275,000.00

138 Lampu Sorot HPIT 250 W

bh

3,500,000.00

139 Lampu sorot Lapangan 2000 w

bh

35,500,000.00

140 Lampu TL 1 x 28 W (TKO)

bh

850,000.00

141 Lampu TL 1 x 14 W (TKO)

bh

142 Baret TLC 20 W

bh

550,000.00

143 Lampu TL 2x28 w (RM-5)

bh

1,700,000.00

144 Lampu PJU (1xHPIT125W)

bh

13,300,000.00

145 Industrial Lamp MH-250W +cover anti silau)

bh

3,350,000.00

146 Grid Switch 6 modul

bh

785,000.00

147 Saklar hotel

bh

55,000.00

148 Stopkontak 10 A

bh

55,000.00

1 Kunci Silinder ALFA untuk Pintu Alumunium

bh

265,000.00

2 Tarikan Pintu

bh

37,000.00

3 Kunci 2 Slaag ROYAL

bh

90,000.00

4 Rel Henderson Lengkap

bh

1,075,000.00

5 Rel Maraton I Pintu

unt

150,000.00

6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226

bh

295,000.00

7 Kunci 2 Slaag Ancor Asli

bh

145,000.00

8 Kunci 2 Slaag ISO

bh

160,000.00

9 Kunci KM Bulat Kualitas Biasa

bh

65,000.00

10 Kunci KM Bulat Sekwalitas ALFA

bh

170,000.00
150,000.00

180,000.00

650,000.00

BAHAN ALAT PENGANTUNG DAN KUNCI

11 Kunci 2 Slaag Silinder Utama Standard

bh

12 Kunci Gembok

bh

30,000.00

13 Kunci tanam Slaag Royal

bh

148,000.00

14 Kunci tanam Slaag Ancor

bh

120,000.00

15 Kunci 2 Slaag Kuda Terbang

bh

105,000.00

16 Kunci Jendela

bh

13,000.00

17 Espangolet

ps

90,000.00

18 Grendel Hitam Biasa 15 cm

bh

14,000.00

19 Grendel 15 cm

bh

18,000.00

20 Grendel 5 cm biasa

bh

4,500.00

21 Hak Angin Kait Jendela Biasa

ps

13,000.00

22 Hak Angin Jendela Antik

ps

25,000.00

23 Hak Angin Sendok Stainless / Kuningan

bh

30,000.00

24 Sloot Pintu berikut Rantai

bh

42,000.00

25 Sloot Jendela Tunggal

bh

15,000.00

14 dari 124

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

26 Engsel Pintu Biasa

bh

20,000.00

27 Engsel Pintu Unilon Standard

ps

40,000.00

28 Engsel Jendela Biasa

bh

13,000.00

29 Engsel Jendela Unilon

ps

21,000.00

30 Engsel Patrun

ps

10,000.00

31 Engsel Harmonika

m1

17,000.00

32 Engsel Floring

unit

800,000.00

33 Door Closer Kelas Standard ( Kelas Sedang )

unt

230,000.00

34 Door Closer Kelas Standard ( Kelas Baik )

unt

670,000.00

35 Door Closer Kelas Rendah

unt

190,000.00

36 Tarikan Almari Rata - rata

bh

15,000.00

37 Reiling Tangga Stainlessteel

m'

32,000.00

38 Kunci 2 Slaag Tanpa Handle

bh

125,000.00

39 Tarikan Pintu ( satu set 2 ps )

ps

85,000.00

40 Tarikan Almari

bh

12,500.00

41 Kunci Almari

bh

15,000.00

42 Slot Almari

bh

4,500.00

43 Engsel Almari

bh

44 Engsel kupu-kupu

bh

4,500.00

45 Jok

bh

80,000.00

46 Plat gantungan Papan tulis

bh

3,500.00

47 Paku uril 1"

bh

300.00

9,500.00

BAHAN PENGIKAT UNTUK KONTRUKSI JALAN


1 Laston (AC) * lokasi AMP

Tonne

2 Laston(ATB) * lokasi AMP

Tonne

3 Laston (HRS) * lokasi AMP

Tonne

4 Laston (AC\WC) * lokasi AMP

Tonne

5 Laston (AC\DC) * lokasi AMP

Tonne

6 Laston (AC\BASE) * lokasi AMP

Tonne

7 Aspal Bitumen * M061

kg

8 Minyak Fluk *M063

lt

9 Minyak Aspal *M064

lt

9,500.00

BAHAN PENAMPUNG AIR


1 Tangki Air Fiber Glass 0.5 m3 ( Excel )

bh

910,000.00

2 Tangki Air Fiber Glass 1 m3 ( Excel )

bh

1,550,000.00

3 Tangki Air Fiber Glass 2 m3 ( Excel )

bh

2,800,000.00

BIAYA QUALITY CONTROL , IZIN - IZIN, PENGUKURAN


DAN BIAYA PENYAMBUNGAN
1 Penyambungan Listrik PLN

1w

2 IMB Bertingkat Rata - rata (Rumah )

3 IMB Bertingkat Rata - rata (Kantor)

4 IMB tidak bertingkat Rata - rata (Rumah / Kantor)

5 IMB Bertingkat Rata - rata (untuk Usaha)

6 IMB tidak bertingkat Rata - rata (untuk Usaha)

7 Sondir Rata - rata

1 ttk

8 Pengukuran Site + Patok

9 Biaya Tes Jalan ( quality control )

ttk

10 Biaya Tes 1 Macam Beton

1 spl

11 Biaya Pengujian Bahan Agregat

1 spl

12 Biaya Pengujian Listrik + gambar + trafo & Adm

1 watt

13 Izin Sumur Artesis Lengkap

unit

14 Penyambungan PDAM untuk rumah

unit

15 Geolistrik

1 ttk

16 Geolistrik

1 ttk

STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA

1 Stamper 8 Jam

hari

237,512.00

2 Molen

hari

205,400.00

BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah

lt

2 Kapur Bakar *M081

145,000.00

3 Kayu Bakar *M070


4 Bahan Residu

m
lt

80,000.00
3,500.00

5 Minyak Solar
6 Bensin Premium

lt
lt

12,000.00
12,000.00

7 Minyak Pelumas

lt

21,000.00

8 Minyak Pelumas Bekisting ( Oli Bekas )

lt

3,500.00

TELEPON
1 PABX/3PTT/30 extention

bh

67,450,000.00

2 Multi Core (OTC) 20 pair (4x0,6mm2)


3 MDF (main distribution frame) 40 Pair

bh
bh

130,000.00
3,000,000.00

Interface modul untuk:


4 Interface modul PABX

bh

3,600,000.00

5 Sound system

bh

3,600,000.00

6 Terminal Box telepon 20 pair


7 kabel multi core (OTC) 20 pair x (4x0,6mm2)

bh
m'

6,000,000.00
130,000.00

8 kabel multi core (ITC) 10 pair x (4x0,6mm2)


9 kabel multi core (ITC) 40 pair x (4x0,6mm2)

m'
m'

13,000.00
150,000.00

10 Socket Telepon RJ-11

bh

150,000.00

11 Pesawat Telepon Standard

bh

480,000.00

SOUND SISTEM
1 CTB

bh

3,625,000.00

2 Amplifier (AMP120W)

bh

3,375,000.00

3 Interface Unit
4 Network Controller Mixer

bh
bh

3,190,000.00
25,970,000.00

5 HUB
6 Call Station Interface

bh
bh

1,290,000.00
1,750,000.00

15 dari 124

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

7 UPS Rechargable backup 2 jam

bh

16,000,000.00

8 Information & Car Call Area

bh

9 Call station remote c/w keypad

bh

3,850,000.00

bh

2,100,000.00

10 Terminal box sound system

11 NYMHY 3 x 2,5 mm2

m'

45,000.00

12 ceilling speaker (CS 3 W)

bh

265,000.00

13 Horn speaker 15 W

bh

755,000.00

14 Kabel UTP cat-6


15 Kabel Canary LT2S

m'
m'

70,000.00
45,000.00

FIRE ALARM
1 FACP Semi Adressible 1 Loop

bh

50,900,000.00

2 Terminal box fire alarm

bh

810,000.00

3 Grounding Panel

set

9,500,000.00

4 FRC 3x2,5 mm2

m'

160,000.00

5 smoke detector

bh

1,300,000.00

6 ROR / Heat detector

bh

410,000.00

7 Alarm bell

bh

695,000.00

8 Break glass

bh

650,000.00

9 Fire extinguisher 3,5kg

bh

1,850,000.00

10 Audible Alarm

bh

700,000.00

11 Visual Alarm

bh

700,000.00

12 Telephone emergency

bh

13 EOL Zone Detector

bh

885,000.00

14 EOL Zone bell

bh

1,325,000.00

15 Kabel AWG 18 (TBFT-TBFST)


16 Kabel AWG 18 (TBFST-TBFMF)

m'
m'

65,000.00
65,000.00

17 Kabel ITC 2x2x0,6mm (TBFT-TBST)

m'

30,000.00

16 dari 124

360,000.00

ANALISA SATUAN PEKERJAAN


DINAS CIPTA KARYA, KEBERSIHAN, TATA RUANG DAN LINGKUNGAN HIDUP
KOTA BANJAR

NO.

URAIAN

KOEF

SAT.

HARGA SAT.

JUMLAH

6=(3x5)

A.01.04

PENGUKURAN DAN PEMASANGAN 1 M1 BOUWPLANK


BAHAN :
Kayu 5/7 Albasiah

0.0120

m3

2,200,000.00

Paku Biasa 2" - 3"

0.0200

kg

18,000.00

360.00

Kayu Papan 3/20 Kayu Albasiah

0.0070

m3

2,300,000.00

16,100.00

Jumlah Bahan

26,400.00

42,860.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0050

Oh

80,000.00

14,450.00

Jumlah Bahan + Pekerja

57,310.00

Keuntungan Max. 10 %

A.01.10

400.00

Jumlah Pekerja

5,731.00

Jumlah Total

63,041.00

Dibulatkan

63,000.00

PEMBUATAN 1 M2 STEIGER/PERANCAH DARI BAMBU


BAHAN :
Bambu 6-8/600 cm

1.2500

Batang

14,000.00

Tali ijuk

0.1860

kg

26,000.00

Jumlah Bahan

17,500.00
4,836.00
22,336.00

UPAH :
Pekerja

1.0000

Oh

60,000.00

60,000.00

Tukang Kayu

2.0000

Oh

72,500.00

145,000.00

Kepala Tukang

0.2000

Oh

80,000.00

16,000.00

Mandor

0.0500

Oh

80,000.00

225,000.00

Jumlah Bahan + Pekerja

247,336.00

Keuntungan Max. 10 %

A.02.01

4,000.00

Jumlah Pekerja

24,733.60

Jumlah Total

272,069.60

Dibulatkan

272,000.00

PENGGALIAN 1 M3 TANAH BIASA SEDALAM 1 METER


BAHAN :

Jumlah Bahan

UPAH :
Pekerja

0.7500

Oh

60,000.00

Mandor

0.0250

Oh

80,000.00

2,000.00

Jumlah Pekerja

47,000.00

Jumlah Bahan + Pekerja

47,000.00

Keuntungan Max. 10 %

A.02.02

45,000.00

4,700.00

Jumlah Total

51,700.00

Dibulatkan

51,700.00

PENGGALIAN 1 M3 TANAH BIASA SEDALAM 2 METER


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.9000

Oh

60,000.00

Mandor

0.0450

Oh

80,000.00

Jumlah Pekerja

54,000.00
3,600.00
57,600.00

17 dari 124

6=(3x5)

Jumlah Bahan + Pekerja

57,600.00

Keuntungan Max. 10 %

A.02.09

5,760.00

Jumlah Total

63,360.00

Dibulatkan

63,300.00

PENGURUGAN 1 M3 KEMBALI GALIAN TANAH


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.5000

Oh

60,000.00

Mandor

0.0500

Oh

80,000.00

4,000.00

Jumlah Pekerja

34,000.00

Jumlah Bahan + Pekerja

34,000.00

Keuntungan Max. 10 %

A.02.11

30,000.00

3,400.00

Jumlah Total

37,400.00

Dibulatkan

37,400.00

PENGURUGAN 1 M3 PASIR URUG


BAHAN :
Pasir Urug

1.2000

m3

107,000.00

Jumlah Bahan

128,400.00

128,400.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

Mandor

0.0100

Oh

80,000.00

Jumlah Pekerja

800.00
18,800.00

Jumlah Bahan + Pekerja

147,200.00

Keuntungan Max. 10 %

A.02.14

18,000.00

14,720.00

Jumlah Total

161,920.00

Dibulatkan

161,900.00

PENGURUGAN 1 M3 SIRTU PADAT


BAHAN :
Sirtu

1.2000

m3

120,000.00

Jumlah Bahan

144,000.00

144,000.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

Mandor

0.0250

Oh

80,000.00

Jumlah Pekerja

2,000.00
17,000.00

Jumlah Bahan + Pekerja

161,000.00

Keuntungan Max. 10 %

A.03.03

15,000.00

16,100.00

Jumlah Total

177,100.00

Dibulatkan

177,100.00

PEMASANGAN 1 M3 BATU BELAH MORTAR TIPE N (UNTUK MUTU PP TERTENTU SETARA DENGAN CAMPURAN 1 PC:4 PP)
BAHAN :
Batu Belah 15/20
Semen Portland
Pasir Pasang

1.200

m3

152,500.00

183,000.00

163.000

kg

1,500.00

244,500.00

0.520

m3

142,000.00

Jumlah Bahan

73,840.00
501,340.00

UPAH :
Pekerja

2.700

Oh

60,000.00

162,000.00

Tukang Batu

0.900

Oh

72,500.00

65,250.00

Kepala Tukang

0.090

Oh

80,000.00

7,200.00

0.270

Oh

80,000.00

21,600.00

Mandor
Jumlah Pekerja

256,050.00

PERALATAN :
Molen

0.167

Jumlah Pekerja

unit/hari

205,400.00

34,301.80
34,301.80

Jumlah Bahan + Pekerja

791,691.80

Keuntungan Max. 10 %

79,169.18
18 dari 124

A.03.04

6=(3x5)

Jumlah Total

870,860.98

Dibulatkan

870,800.00

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 5 PP


BAHAN :
Batu Belah 15/20
Semen Portland
Pasir Pasang

1.2000

m3

152,500.00

183,000.00

136.0000

kg

1,500.00

204,000.00

0.5440

m3

142,000.00

Jumlah Bahan

77,248.00
464,248.00

UPAH :
Pekerja

1.5000

Oh

60,000.00

90,000.00

Tukang Batu

0.7500

Oh

72,500.00

54,375.00

Kepala Tukang

0.0750

Oh

80,000.00

6,000.00

Mandor

0.0750

Oh

80,000.00

156,375.00

Jumlah Bahan + Pekerja

620,623.00

Keuntungan Max. 10 %

A.03.10

6,000.00

Jumlah Pekerja

62,062.30

Jumlah Total

682,685.30

Dibulatkan

682,600.00

PEMASANGAN 1 M3 AANSTAMPING BATU KOSONG


BAHAN :
Batu Belah 15/20

1.2000

m3

152,500.00

Pasir Urug

0.4320

m3

107,000.00

Jumlah Bahan

183,000.00
46,224.00
229,224.00

UPAH :
Pekerja

0.7800

Oh

60,000.00

46,800.00

Tukang Batu

0.3900

Oh

72,500.00

28,275.00

Kepala Tukang

0.0390

Oh

80,000.00

3,120.00

Mandor

0.0390

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

310,539.00

Keuntungan Max. 10 %

A.03.11

3,120.00
81,315.00

31,053.90

Jumlah Total

341,592.90

Dibulatkan

341,500.00

PEMASANGAN 1 M3 PONDASI SIKLOP 60% BETON CAMPURAN 1 SP : 2 PB : 3 KR


DAN 40 % BATU BELAH
BAHAN :
Batu Belah 15/20

0.4800

m3

152,500.00

73,200.00

194.0000

kg

1,500.00

291,000.00

Pasir Beton

0.3120

m3

168,400.00

52,540.80

Batu Pecah 2/3

0.4680

m3

222,700.00

104,223.60

126.0000

kg

11,000.00

1,386,000.00

1.8000

kg

19,000.00

Semen Portland

Besi Beton
Kawat Beton
Jumlah Bahan

34,200.00
1,941,164.40

UPAH :
Pekerja

3.4000

Oh

60,000.00

204,000.00

Tukang Batu

0.8500

Oh

72,500.00

61,625.00

Kepala Tukang

0.0850

Oh

80,000.00

6,800.00

MAndor

0.1700

Oh

80,000.00

13,600.00

Jumlah Pekerja

286,025.00

Jumlah Bahan + Pekerja

2,227,189.40

Keuntungan Max. 10 %

A.03.12

222,718.94

Jumlah Total

2,449,908.34

Dibulatkan

2,449,900.00

PEMASANGAN 1 M3 PONDASI SUMURAN DIAMETER 100 CM


BAHAN :
Batu Belah 15/20

0.4500

m3

152,500.00

68,625.00

194.0000

kg

1,500.00

291,000.00

Pasir Beton

0.3120

m3

168,400.00

52,540.80

Batu Pecah 2/3

0.4680

m3

222,700.00

104,223.60

Semen Portland

Jumlah Bahan

516,389.40
19 dari 124

6=(3x5)

UPAH :
Pekerja

2.4000

Oh

60,000.00

144,000.00

Tukang Batu

0.8000

Oh

72,500.00

58,000.00

Kepala Tukang

0.0800

Oh

80,000.00

6,400.00

Mandor

0.1190

Oh

80,000.00

217,920.00

Jumlah Bahan + Pekerja

734,309.40

Keuntungan Max. 10 %

A.03.13

9,520.00

Jumlah Pekerja

73,430.94

Jumlah Total

807,740.34

Dibulatkan

807,700.00

PEMASANGAN 1 M3 BATU BRONJONG TIPE D BENTUK I L = 2 M, B = 1 M, T = 0.5 M LUBANG HEXAGONAL 100 X 120 MM

BAHAN :
Batu/batu belah
Kawat Bronjong 3 mm

1.4000

m3

140,000.00

196,000.00

15.5510

kg

17,000.00

264,367.00

Jumlah Bahan

460,367.00

UPAH :
Pekerja

3.0400

Oh

60,000.00

182,400.00

Tukang Besi

0.7800

Oh

72,500.00

56,550.00

Mandor

0.2340

Oh

80,000.00

257,670.00

Jumlah Bahan + Pekerja

718,037.00

Keuntungan Max. 10 %

A.04.01

18,720.00

Jumlah Pekerja

71,803.70

Jumlah Total

789,840.70

Dibulatkan

789,800.00

MEMBUAT 1 M3 BETON MUTU f'c = 7,4 Mpa (K 100), SLUMP (12 2) CM, W/C = 0.87
BAHAN :
Semen Portland

247.000

kg

1,500.00

370,500.00

Pasir Beton

0.6207

168,400.00

104,528.29

Kerikil (Maks 30mm)

0.7400

222,700.00

164,798.00

Air

215.00

ltr

50.00

Jumlah Bahan

10,750.00
650,576.29

UPAH :
Pekerja

1.6500

Oh

60,000.00

99,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Kepala Tukang

0.0280

Oh

80,000.00

2,240.00

Mandor

0.0830

Oh

80,000.00

127,817.50

Jumlah Bahan + Pekerja

778,393.79

Keuntungan Max. 10 %

A.04.02

6,640.00

Jumlah Pekerja

77,839.38

Jumlah Total

856,233.16

Dibulatkan

856,200.00

MEMBUAT 1 M3 BETON MUTU f'c = 9,8 Mpa (K 125), SLUMP (12 2) CM, W/C = 0.78
BAHAN :
Semen Portland

276.000

kg

1,500.00

Pasir Beton

0.5914

168,400.00

99,596.57

Kerikil (Maks 30mm)

0.7496

222,700.00

166,942.52

Air

215.00

ltr

50.00

Jumlah Bahan

414,000.00

10,750.00
691,289.09

UPAH :
Pekerja

1.6500

Oh

60,000.00

99,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Kepala Tukang

0.0280

Oh

80,000.00

2,240.00

Mandor

0.0830

Oh

80,000.00

127,817.50

Jumlah Bahan + Pekerja

819,106.59

Keuntungan Max. 10 %

A.04.03

6,640.00

Jumlah Pekerja

81,910.66

Jumlah Total

901,017.25

Dibulatkan

901,000.00

MEMBUAT 1 M3 BETON MUTU f'c = 12,2 Mpa (K 150), SLUMP (12 2) CM, W/C = 0.72
20 dari 124

6=(3x5)

BAHAN :
Semen Portland

299.000

kg

1,500.00

Pasir Beton

0.5707

168,400.00

96,108.29

Kerikil (Maks 30mm)

0.7533

222,700.00

167,767.33

Air

215.00

ltr

50.00

Jumlah Bahan

448,500.00

10,750.00
723,125.62

UPAH :
Pekerja

1.6500

Oh

60,000.00

99,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Kepala Tukang

0.0280

Oh

80,000.00

2,240.00

Mandor

0.0830

Oh

80,000.00

127,817.50

Jumlah Bahan + Pekerja

850,943.12

Keuntungan Max. 10 %

A.04.04

6,640.00

Jumlah Pekerja

85,094.31

Jumlah Total

936,037.43

Dibulatkan

936,000.00

MEMBUAT 1 M3 LANTAI KERJA BETON MUTU f'c = 7,2 Mpa (K 100), SLUMP (3-6) CM, W/C = 0.87
BAHAN :
Semen Portland

230.000

kg

1,500.00

345,000.00

Pasir Beton

0.6379

168,400.00

107,415.14

Kerikil (Maks 30mm)

0.7607

222,700.00

169,416.96

Air

200.00

ltr

50.00

Jumlah Bahan

10,000.00
631,832.11

UPAH :
Pekerja

1.2000

Oh

60,000.00

72,000.00

Tukang Batu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0600

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

724,732.11

Keuntungan Max. 10 %

A.04.05

4,800.00
92,900.00

72,473.21

Jumlah Total

797,205.32

Dibulatkan

797,200.00

MEMBUAT 1 M3 BETON MUTU f'c = 14,5 Mpa (K 175), SLUMP (12 2) CM, W/C = 0.66
BAHAN :
Semen Portland

326.000

kg

1,500.00

Pasir Beton

0.5429

168,400.00

91,417.14

Kerikil (Maks 30mm)

0.7622

222,700.00

169,746.89

Air

215.00

ltr

50.00

Jumlah Bahan

489,000.00

10,750.00
760,914.03

UPAH :
Pekerja

1.6500

Oh

60,000.00

99,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Kepala Tukang

0.0280

Oh

80,000.00

2,240.00

Mandor

0.0830

Oh

80,000.00

127,817.50

Jumlah Bahan + Pekerja

888,731.53

Keuntungan Max. 10 %

A.04.14

6,640.00

Jumlah Pekerja

88,873.15

Jumlah Total

977,604.68

Dibulatkan

977,600.00

PEMBESIAN 1 Kg DENGAN BESI POLOS ATAU BESI ULIR


BAHAN :
Besi Beton (Polos / ulir)

1.0500

kg

11,000.00

Kawat Beton

0.0150

kg

19,000.00

Jumlah Bahan

11,550.00
285.00
11,835.00

UPAH :
Pekerja

0.0070

Oh

60,000.00

420.00

Tukang Besi

0.0070

Oh

72,500.00

507.50

Kepala Tukang

0.0007

Oh

80,000.00

56.00

Mandor

0.0004

Oh

80,000.00

32.00

21 dari 124

6=(3x5)

Jumlah Pekerja

1,015.50

Jumlah Bahan + Pekerja

12,850.50

Keuntungan Max. 10 %

A.04.22

1,285.05

Jumlah Total

14,135.55

Dibulatkan

14,100.00

PEMASANGAN 1 M2 JEMBATAN/TANGGA PENGECORAN


BAHAN :
Kayu Terentang Albasiah, Papan

0.0264

2,300,000.00

60,720.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

0.6000

kg

18,000.00

10,800.00

Dolken Kayu Galam - 8 - 10 / 4 m

0.5000

btg

93,000.00

Jumlah Bahan

46,500.00
118,020.00

UPAH :
Pekerja

1.6500

Oh

60,000.00

99,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Kepala Tukang

0.0280

Oh

80,000.00

2,240.00

Mandor

0.0830

Oh

80,000.00

127,817.50

Jumlah Bahan + Pekerja

245,837.50

Keuntungan Max. 10 %

A.05.01

6,640.00

Jumlah Pekerja

24,583.75

Jumlah Total

270,421.25

Dibulatkan

270,400.00

MEMBUAT 1 M3 PONDASI BETON BERTULANG (157.5000 kg BESI + BEKISTNG)


BAHAN :
Kayu Terentang Albasiah, Papan

0.2000

2,300,000.00

460,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

1.5000

kg

18,000.00

27,000.00

Minyak Bekisting

0.4000

ltr

21,000.00

8,400.00

Besi Beton Polos

157.5000

kg

11,000.00

1,732,500.00

Kawat Beton

2.2500

kg

19,000.00

42,750.00

336.0000

kg

1,500.00

504,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah Mesin 2/3

0.8100

222,700.00

180,387.00

Semen Portland

Jumlah Bahan

3,045,973.00

UPAH :
Pekerja

5.3000

Oh

60,000.00

318,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.3000

Oh

72,500.00

94,250.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.2620

Oh

80,000.00

20,960.00

Mandor

0.2650

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

3,596,445.50

Keuntungan Max. 10 %

A.P1

21,200.00
550,472.50

359,644.55

Jumlah Total

3,956,090.05

Dibulatkan

3,956,000.00

MEMBUAT 1 M3 PONDASI BETON BERTULANG (157.5000 kg BESI + BEKISTNG)


BAHAN :
Kayu Terentang Albasiah, Papan

0.2000

2,300,000.00

460,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

1.5000

kg

18,000.00

27,000.00

Minyak Bekisting

0.4000

ltr

3,500.00

1,400.00

Besi Beton Polos

157.5000

kg

11,000.00

1,732,500.00

Kawat Beton

2.2500

kg

19,000.00

42,750.00

326.0000

kg

1,500.00

489,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah Mesin 2/3

0.8100

222,700.00

180,387.00

Semen Portland

Jumlah Bahan

3,023,973.00

UPAH :
Pekerja

5.3000

Oh

60,000.00

318,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.3000

Oh

72,500.00

94,250.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

22 dari 124

6=(3x5)

Kepala Tukang

0.2620

Oh

80,000.00

Mandor

0.2650

Oh

80,000.00

Jumlah Pekerja

21,200.00
550,472.50

Jumlah Bahan + Pekerja

3,574,445.50

Keuntungan Max. 10 %

A.P2

20,960.00

357,444.55

Jumlah Total

3,931,890.05

Dibulatkan

3,931,800.00

MEMBUAT 1 M3 PONDASI BETON BERTULANG (157.5000 kg BESI + BEKISTNG)


BAHAN :
Kayu Terentang Albasiah, Papan

0.2000

2,300,000.00

460,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

1.5000

kg

18,000.00

27,000.00

Minyak Bekisting

0.4000

ltr

3,500.00

1,400.00

Besi Beton Polos

157.5000

kg

11,000.00

1,732,500.00

Kawat Beton

2.2500

kg

19,000.00

42,750.00

Semen Portland

1.6500

kg

1,500.00

2,475.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah Mesin 2/3

0.8100

222,700.00

Jumlah Bahan

180,387.00
2,537,448.00

UPAH :
Pekerja

5.3000

Oh

60,000.00

318,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.3000

Oh

72,500.00

94,250.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.2620

Oh

80,000.00

20,960.00

Mandor

0.2650

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

3,087,920.50

Keuntungan Max. 10 %

A.05.02

21,200.00
550,472.50

308,792.05

Jumlah Total

3,396,712.55

Dibulatkan

3,396,700.00

MEMBUAT 1 M3 SLOOF BETON BERTULANG (200 kg BESI + BEKISTNG)


BAHAN :
Kayu Terentang Albasiah, Papan

0.2700

2,300,000.00

621,000.00

Paku 5 cm 12 cm

2.0000

kg

18,000.00

36,000.00

Minyak Bekisting

0.6000

ltr

21,000.00

12,600.00

Besi Beton Polos

210.0000

kg

11,000.00

2,310,000.00

Kawat Beton

3.0000

kg

25,000.00

75,000.00

336.0000

kg

1,500.00

504,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah Mesin 2/3

0.8100

222,700.00

180,387.00

Semen Portland

Jumlah Bahan

3,829,923.00

UPAH :
Pekerja

5.6500

Oh

60,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.5600

Oh

72,500.00

113,100.00

Tukang Besi

1.4000

Oh

72,500.00

101,500.00

Kepala Tukang

0.3230

Oh

80,000.00

25,840.00

Mandor

0.2830

Oh

80,000.00

Jumlah Pekerja

22,640.00
622,017.50

Jumlah Bahan + Pekerja

4,451,940.50

Keuntungan Max. 10 %

A.05.02.a

339,000.00

445,194.05

Jumlah Total

4,897,134.55

Dibulatkan

4,897,100.00

1 M3 MEMBUAT SLOOF 15/20 (117.6000 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Kayu Terentang Albasiah, Papan ( 2 x Pakai

0.2700

2,300,000.00

621,000.00

Paku 5 cm 12 cm

4.0000

kg

18,000.00

72,000.00

Minyak Bekisting

1.3300

ltr

3,500.00

4,655.00

117.6000

kg

11,000.00

1,293,600.00

Besi Beton Polos U 24

23 dari 124

2
Kawat Beton

6=(3x5)

1.7600

kg

19,000.00

33,440.00

336.0000

kg

1,500.00

504,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah 2/3

0.7400

222,700.00

164,798.00

Semen Portland

Jumlah Bahan

2,784,429.00

UPAH :
Pekerja

5.6500

Oh

60,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.5600

Oh

72,500.00

113,100.00

Tukang Besi

1.4000

Oh

72,500.00

101,500.00

Kepala Tukang

0.3230

Oh

80,000.00

25,840.00

Mandor

0.2830

Oh

80,000.00

Jumlah Pekerja

22,640.00
622,017.50

Jumlah Bahan + Pekerja

3,406,446.50

Keuntungan Max. 10 %

A.05.03

339,000.00

340,644.65

Jumlah

3,747,091.15

Dibulatkan

3,747,000.00

MEMBUAT 1 M3 KOLOM BETON BERTULANG (300 kg BESI + BEKISTNG)


BAHAN :
Kayu Kelas III

0.4000

2,300,000.00

920,000.00

Paku 5 cm 12 cm

4.0000

kg

18,000.00

72,000.00

Minyak Bekisting

2.0000

ltr

21,000.00

42,000.00

Besi Beton Polos

315.0000

kg

11,000.00

3,465,000.00

Kawat Beton

4.5000

kg

25,000.00

112,500.00

336.0000

kg

1,500.00

504,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah Mesin 2/3

0.8100

222,700.00

180,387.00

Kayu Kelas II Balok

0.1500

m3

3,200,000.00

480,000.00

plywood 9mm

3.5000

lbr

160,000.00

560,000.00

20.0000

batang

93,000.00

1,860,000.00

Semen Portland

Dolken kayu (8-10) cm panjang 4m


Jumlah Bahan

8,286,823.00

UPAH :
Pekerja

7.0500

Oh

60,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.6500

Oh

72,500.00

119,625.00

Tukang Besi

2.1000

Oh

72,500.00

152,250.00

Kepala Tukang

0.4030

Oh

80,000.00

32,240.00

Mandor

0.3530

Oh

80,000.00

Jumlah Pekerja

28,240.00
775,292.50

Jumlah Bahan + Pekerja

9,062,115.50

Keuntungan Max. 10 %

A.05.04

423,000.00

906,211.55

Jumlah Total

9,968,327.05

Dibulatkan

9,968,300.00

MEMBUAT 1 M3 BALOK BETON BERTULANG (200 kg BESI + BEKISTNG)


BAHAN :
Kayu Kelas III

0.3200

2,300,000.00

736,000.00

Paku 5 cm 12 cm

3.2000

kg

18,000.00

57,600.00

Minyak Bekisting

1.6000

ltr

21,000.00

33,600.00

Besi Beton Polos

210.0000

kg

11,000.00

2,310,000.00

Kawat Beton

3.0000

kg

25,000.00

75,000.00

336.0000

kg

1,500.00

504,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah Mesin 2/3

0.8100

222,700.00

180,387.00

Kayu Kelas II Balok

0.1400

m3

3,200,000.00

448,000.00

plywood 9mm

2.8000

lbr

160,000.00

448,000.00

16.0000

batang

93,000.00

1,488,000.00

Semen Portland

Dolken kayu (8-10) cm panjang 4m


Jumlah Bahan

6,371,523.00

UPAH :
Pekerja

6.3500

Oh

60,000.00

381,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

24 dari 124

6=(3x5)

Tukang Kayu

1.6500

Oh

72,500.00

119,625.00

Tukang Besi

1.4000

Oh

72,500.00

101,500.00

Kepala Tukang

0.3330

Oh

80,000.00

26,640.00

Mandor

0.3180

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

7,045,665.50

Keuntungan Max. 10 %

A.05.04.a

25,440.00
674,142.50

704,566.55

Jumlah Total

7,750,232.05

Dibulatkan

7,750,200.00

1 M3 MEMBUAT RING BALK 12/20 (125,23 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekisting Kayu Albasiah ( 2 x Pakai )

0.4000

2,300,000.00

920,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

1.9037

kg

18,000.00

34,266.60

Minyak Bekisting

3.3200

ltr

3,500.00

11,620.00

211.2900

kg

11,000.00

2,324,190.00

Besi Beton Polos U 24


Kawat Beton

3.1700

kg

19,000.00

60,230.00

326.0000

kg

1,500.00

489,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah 2/3

0.7400

222,700.00

164,798.00

Kayu Balok Albasiah

0.1400

m3

2,200,000.00

Semen Portland

Jumlah Bahan

308,000.00
4,403,040.60

UPAH :
Pekerja

3.0000

Oh

60,000.00

180,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Tukang Kayu

1.0400

Oh

72,500.00

75,400.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.2450

Oh

80,000.00

19,600.00

Mandor

0.1225

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

4,789,340.60

Keuntungan Max. 10 %

A.05.04.b

9,800.00
386,300.00

478,934.06

Jumlah

5,268,274.66

Dibulatkan

5,268,200.00

1 M3 MEMBUAT RING BALK 15/20 (180,6000 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekisting Kayu Albasiah ( 2 x Pakai )

0.3350

2,300,000.00

770,500.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

3.2000

kg

18,000.00

57,600.00

Minyak Bekisting

1.6000

ltr

3,500.00

5,600.00

180.6000

kg

11,000.00

1,986,600.00

Besi Beton Polos U 24


Kawat Beton

3.0000

kg

19,000.00

57,000.00

336.0000

kg

1,500.00

504,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah 2/3

0.8100

222,700.00

180,387.00

Kayu Balok Albasiah

0.1400

m3

2,200,000.00

Semen Portland

Jumlah Bahan

308,000.00
3,960,623.00

UPAH :
Pekerja

6.3500

Oh

60,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.6500

Oh

72,500.00

119,625.00

Tukang Besi

1.4000

Oh

72,500.00

101,500.00

Kepala Tukang

0.3330

Oh

80,000.00

26,640.00

Mandor

0.3180

Oh

80,000.00

Jumlah Pekerja

25,440.00
674,142.50

Jumlah Bahan + Pekerja

4,634,765.50

Keuntungan Max. 10 %

A.05.05

381,000.00

463,476.55

Jumlah

5,098,242.05

Dibulatkan

5,098,200.00

MEMBUAT 1 M3 KOLOM BETON BERTULANG (150 kg BESI + BEKISTNG)


25 dari 124

6=(3x5)

BAHAN :
Kayu Kelas III

0.3200

2,300,000.00

736,000.00

Paku 5 cm 12 cm

3.2000

kg

18,000.00

57,600.00

Minyak Bekisting

1.6000

ltr

21,000.00

33,600.00

Besi Beton Polos

157.0000

kg

11,000.00

1,727,000.00

Kawat Beton

2.2500

kg

25,000.00

56,250.00

336.0000

kg

1,500.00

504,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah Mesin 2/3

0.8100

222,700.00

180,387.00

Kayu Kelas II Balok

0.1200

m3

3,200,000.00

384,000.00

plywood 9mm

2.8000

lbr

160,000.00

448,000.00

32.0000

batang

93,000.00

2,976,000.00

Semen Portland

Dolken kayu (8-10) cm panjang 4m


Jumlah Bahan

7,193,773.00

UPAH :
Pekerja

5.3000

Oh

60,000.00

318,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.3000

Oh

72,500.00

94,250.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.2650

Oh

80,000.00

21,200.00

Mandor

0.2650

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

7,744,485.50

Keuntungan Max. 10 %

A.05.05.a

21,200.00
550,712.50

774,448.55

Jumlah Total

8,518,934.05

Dibulatkan

8,518,900.00

1 M3 MEMBUAT KOLOM 12/12 (211.2900 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekisting Kayu Albasiah ( 2 x Pakai )

0.3750

2,300,000.00

862,500.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

3.2000

kg

18,000.00

57,600.00

Minyak Bekisting

1.6000

ltr

3,500.00

5,600.00

211.2900

kg

11,000.00

2,324,190.00

Besi Beton Polos U 24


Kawat Beton

2.2500

kg

19,000.00

42,750.00

326.0000

kg

1,500.00

489,000.00

Pasir Beton

0.5429

168,400.00

91,417.14

Batu Pecah 2/3

0.7622

222,700.00

169,746.89

Semen Portland

Jumlah Bahan

4,042,804.03

UPAH :
Pekerja

5.3000

Oh

60,000.00

318,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.3000

Oh

72,500.00

94,250.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.2650

Oh

80,000.00

21,200.00

Mandor

0.2650

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

4,593,516.53

Keuntungan Max. 10 %

A.05.05.b

21,200.00
550,712.50

459,351.65

Jumlah

5,052,868.18

Dibulatkan

5,052,800.00

1 M3 MEMBUAT KOLOM 15/20 (211.2900 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekisting Kayu Albasiah

0.4100

2,300,000.00

943,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

9.3300

kg

18,000.00

167,940.00

Minyak Bekisting

4.6600

ltr

3,500.00

16,310.00

180.5700

kg

11,000.00

1,986,270.00

Besi Beton Polos U 24


Kawat Beton

2.7000

kg

19,000.00

51,300.00

326.0000

kg

1,500.00

489,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah 2/3

0.7400

222,700.00

164,798.00

Semen Portland

26 dari 124

2
Kayu Balok Albasiah

4
0.1200

m3

6=(3x5)

2,200,000.00

Jumlah Bahan

264,000.00
4,173,554.00

UPAH :
Pekerja

3.0000

Oh

60,000.00

180,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Tukang Kayu

1.0400

Oh

72,500.00

75,400.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.2450

Oh

80,000.00

19,600.00

Mandor

0.1225

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

4,559,854.00

Keuntungan Max. 10 %

A.05.05.c

9,800.00
386,300.00

455,985.40

Jumlah

5,015,839.40

Dibulatkan

5,015,800.00

1 M3 MEMBUAT KOLOM 15/25 (122.7567 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekisting Kayu Albasiah ( 2 x Pakai )

0.3680

2,300,000.00

846,400.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

3.2000

kg

18,000.00

57,600.00

Minyak Bekisting

1.6000

ltr

3,500.00

5,600.00

122.7567

kg

11,000.00

1,350,323.70

Besi Beton Polos U 24


Kawat Beton

2.7000

kg

19,000.00

51,300.00

326.0000

kg

1,500.00

489,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah 2/3

0.7400

222,700.00

164,798.00

Kayu Balok Albasiah

0.1200

m3

2,200,000.00

Semen Portland

Jumlah Bahan

264,000.00
3,319,957.70

UPAH :
Pekerja

5.3000

Oh

60,000.00

318,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.3000

Oh

72,500.00

94,250.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.2650

Oh

80,000.00

21,200.00

Mandor

0.2650

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

3,870,670.20

Keuntungan Max. 10 %

A.05.06

21,200.00
550,712.50

387,067.02

Jumlah

4,257,737.22

Dibulatkan

4,257,700.00

MEMBUAT 1 M3 DINDING BETON BERTULANG (150 kg BESI + BEKISTNG)


BAHAN :
Kayu Kelas III

0.2400

2,300,000.00

552,000.00

Paku 5 cm 12 cm

3.2000

kg

18,000.00

57,600.00

Minyak Bekisting

1.6000

ltr

21,000.00

33,600.00

Besi Beton Polos

157.0000

kg

11,000.00

1,727,000.00

Kawat Beton

2.2500

kg

25,000.00

56,250.00

336.0000

kg

1,500.00

504,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah Mesin 2/3

0.8100

222,700.00

180,387.00

Kayu Kelas II Balok

0.1600

m3

3,200,000.00

512,000.00

plywood 9mm

2.8000

lbr

160,000.00

448,000.00

24.0000

batang

93,000.00

2,232,000.00

Semen Portland

Dolken kayu (8-10) cm panjang 4m


Jumlah Bahan

6,393,773.00

UPAH :
Pekerja

5.3000

Oh

60,000.00

318,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.3000

Oh

72,500.00

94,250.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.2620

Oh

80,000.00

20,960.00

Mandor

0.2620

Oh

80,000.00

20,960.00

27 dari 124

6=(3x5)

Jumlah Pekerja

550,232.50

Jumlah Bahan + Pekerja

6,944,005.50

Keuntungan Max. 10 %

A.05.07

694,400.55

Jumlah Total

7,638,406.05

Dibulatkan

7,638,400.00

MEMBUAT 1 M3 DINDING BETON BERTULANG (2000 kg BESI + BEKISTNG)


BAHAN :
Kayu Kelas III

0.2500

2,300,000.00

575,000.00

Paku 5 cm 12 cm

3.0000

kg

18,000.00

54,000.00

Minyak Bekisting

1.2000

ltr

21,000.00

25,200.00

Besi Beton Polos

210.0000

kg

11,000.00

2,310,000.00

Kawat Beton

3.0000

kg

25,000.00

75,000.00

336.0000

kg

1,500.00

504,000.00

Pasir Beton

0.5400

168,400.00

90,936.00

Batu Pecah Mesin 2/3

0.8100

222,700.00

180,387.00

Kayu Kelas II Balok

0.1050

m3

3,200,000.00

336,000.00

plywood 9mm

2.5000

lbr

160,000.00

400,000.00

14.0000

batang

93,000.00

1,302,000.00

Semen Portland

Dolken kayu (8-10) cm panjang 4m


Jumlah Bahan

5,852,523.00

UPAH :
Pekerja

5.3000

Oh

60,000.00

318,000.00

Tukang Batu

0.2750

Oh

72,500.00

19,937.50

Tukang Kayu

1.3000

Oh

72,500.00

94,250.00

Tukang Besi

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.2620

Oh

80,000.00

20,960.00

Mandor

0.2620

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

6,402,755.50

Keuntungan Max. 10 %

A.05.08

20,960.00
550,232.50

640,275.55

Jumlah Total

7,043,031.05

Dibulatkan

7,043,000.00

MEMBUAT 1 M1 KOLOM PRAKTIS BETON BERTULANG (11 X 11) CM


BAHAN :
Kayu Kelas III

0.0020

2,300,000.00

Paku 5 cm s/d 12 cm

0.0100

kg

18,000.00

180.00

Besi Beton Polos U 24

3.0000

kg

11,000.00

33,000.00

Kawat Beton

0.4500

kg

25,000.00

11,250.00

Semen Portland

4.0000

kg

1,500.00

6,000.00

Pasir Beton

0.0060

168,400.00

1,010.40

Batu Pecah 2/3

0.0090

222,700.00

Jumlah Bahan

4,600.00

2,004.30
58,044.70

UPAH :
Pekerja

0.1800

Oh

60,000.00

10,800.00

Tukang Batu

0.0200

Oh

72,500.00

1,450.00

Tukang Kayu

0.0200

Oh

72,500.00

1,450.00

Tukang Besi

0.0200

Oh

72,500.00

1,450.00

Kepala Tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0090

Oh

80,000.00

16,350.00

Jumlah Bahan + Pekerja

74,394.70

Keuntungan Max. 10 %

A.05.09

720.00

Jumlah Pekerja

7,439.47

Jumlah

81,834.17

Dibulatkan

81,800.00

MEMBUAT 1 M1 RING BALOK BETON BERTULANG (11 X 11) CM


BAHAN :
Kayu Kelas III

0.0030

2,300,000.00

Paku 5 cm s/d 12 cm

0.0200

kg

18,000.00

360.00

Besi Beton Polos U 24

3.6000

kg

11,000.00

39,600.00

Kawat Beton

0.0500

kg

25,000.00

1,250.00

Semen Portland

5.5000

kg

1,500.00

8,250.00

28 dari 124

6,900.00

6=(3x5)

Pasir Beton

0.0090

168,400.00

Batu Pecah 2/3

0.0150

222,700.00

Jumlah Bahan

1,515.60
3,340.50
61,216.10

UPAH :
Pekerja

0.2970

Oh

60,000.00

17,820.00

Tukang Batu

0.0330

Oh

72,500.00

2,392.50

Tukang Kayu

0.0330

Oh

72,500.00

2,392.50

Tukang Besi

0.0330

Oh

72,500.00

2,392.50

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

26,997.50

Jumlah Bahan + Pekerja

88,213.60

Keuntungan Max. 10 %

A.05.10

8,821.36

Jumlah

97,034.96

Dibulatkan

97,000.00

MEMBUAT 1 M1 RING BALOK BETON BERTULANG (10 X 15) CM


BAHAN :
Kayu Kelas III

0.0030

2,300,000.00

Paku 5 cm s/d 12 cm

0.0200

kg

18,000.00

360.00

Besi Beton Polos U 24

3.6000

kg

11,000.00

39,600.00

Kawat Beton

0.0500

kg

25,000.00

1,250.00

Semen Portland

5.5000

kg

1,500.00

8,250.00

Pasir Beton

0.0090

168,400.00

1,515.60

Batu Pecah 2/3

0.0150

222,700.00

Jumlah Bahan

6,900.00

3,340.50
61,216.10

UPAH :
Pekerja

0.2970

Oh

60,000.00

17,820.00

Tukang Batu

0.0330

Oh

72,500.00

2,392.50

Tukang Kayu

0.0330

Oh

72,500.00

2,392.50

Tukang Besi

0.0330

Oh

72,500.00

2,392.50

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

26,997.50

Jumlah Bahan + Pekerja

88,213.60

Keuntungan Max. 10 %

A.06.01

8,821.36

Jumlah

97,034.96

Dibulatkan

97,000.00

PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 8 CM BETON f'c 14.5 Mpa (K 175) SLUMP (12 2)CM
BAHAN :
Semen Portland

26.0800

kg

1,500.00

Pasir Beton

0.0434

168,400.00

7,313.37

Batu Pecah 2/3

0.0610

222,700.00

13,579.75

17.20

ltr

50.00

Air
Jumlah Bahan

39,120.00

860.00
60,873.12

UPAH :
Pekerja

0.1320

Oh

60,000.00

7,920.00

Tukang Batu

0.0220

Oh

72,500.00

1,595.00

Kepala Tukang

0.0020

Oh

80,000.00

160.00

Mandor

0.0070

Oh

80,000.00

10,235.00

Jumlah Bahan + Pekerja

71,108.12

Keuntungan Max. 10 %

A.06.02

560.00

Jumlah Pekerja

7,110.81

Jumlah

78,218.93

Dibulatkan

78,200.00

PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 10 CM BETON f'c 14.5 Mpa (K 175) SLUMP (12 2)CM
BAHAN :
Semen Portland

32.6000

kg

1,500.00

Pasir Beton

0.0543

kg

168,400.00

9,141.71

Kerikil (maks 30 mm)

0.0762

kg

222,700.00

16,974.69

21.50

ltr

50.00

1,075.00

Air

29 dari 124

48,900.00

6=(3x5)

Jumlah Bahan

76,091.40

UPAH :
Pekerja

0.1320

Oh

60,000.00

7,920.00

Tukang Batu

0.0220

Oh

72,500.00

1,595.00

Kepala Tukang

0.0020

Oh

80,000.00

160.00

Mandor

0.0070

Oh

80,000.00

10,235.00

Jumlah Bahan + Pekerja

86,326.40

Keuntungan Max. 10 %

A.06.03

560.00

Jumlah Pekerja

8,632.64

Jumlah

94,959.04

Dibulatkan

94,900.00

PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 12 CM BETON f'c 14.5 Mpa (K 175) SLUMP (12 2)CM
BAHAN :
Semen Portland

32.1200

kg

1,500.00

48,180.00

Pasir Beton

0.0651

kg

168,400.00

10,970.06

Kerikil (maks 30 mm)

0.0915

kg

222,700.00

20,369.63

25.80

ltr

50.00

Air
Jumlah Bahan

1,290.00
80,809.68

UPAH :
Pekerja

0.1980

Oh

60,000.00

11,880.00

Tukang Batu

0.0330

Oh

72,500.00

2,392.50

Kepala Tukang

0.0030

Oh

80,000.00

240.00

Mandor

0.0100

Oh

80,000.00

15,312.50

Jumlah Bahan + Pekerja

96,122.18

Keuntungan Max. 10 %

A.06.04

800.00

Jumlah Pekerja

9,612.22

Jumlah

105,734.40

Dibulatkan

105,700.00

PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 15 CM BETON f'c 14.5 Mpa (K 175) SLUMP (12 2)CM
BAHAN :
Semen Portland

48.9000

kg

1,500.00

73,350.00

Pasir Beton

0.0814

kg

168,400.00

13,712.57

Kerikil (maks 30 mm)

0.1143

kg

222,700.00

25,462.03

32.25

ltr

50.00

Air
Jumlah Bahan

1,612.50
114,137.10

UPAH :
Pekerja

0.2480

Oh

60,000.00

14,880.00

Tukang Batu

0.0410

Oh

72,500.00

2,972.50

Kepala Tukang

0.0040

Oh

80,000.00

320.00

Mandor

0.0130

Oh

80,000.00

1,040.00

Jumlah Pekerja

19,212.50

Jumlah Bahan + Pekerja

133,349.60

Keuntungan Max. 10 %

A.07.01

13,334.96

Jumlah

146,684.57

Dibulatkan

146,600.00

1 KG PEK. KONSTRUKSI BESI PROFIL


Besi profil

1.1500

kg

16,000.00

Jumlah Bahan

18,400.00

18,400.00

UPAH :
Pekerja

0.0600

Oh

60,000.00

3,600.00

Tukang Las

0.0600

Oh

72,500.00

4,350.00

Kepala tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

27,070.00

Keuntungan Max. 10 %

A.07.02

240.00
8,670.00

2,707.00

Jumlah Total

29,777.00

Dibulatkan

29,700.00

1 KG PEKERJAAN RANGKA KUDA-KUDA BAJA IWF


30 dari 124

Besi Baja IWF

4
1.1500

kg

6=(3x5)
17,000.00

Jumlah Bahan

19,550.00

19,550.00

UPAH :
Pekerja

0.0600

Oh

60,000.00

3,600.00

Tukang Las

0.0600

Oh

72,500.00

4,350.00

Kepala tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

28,220.00

Keuntungan Max. 10 %

A.07.03

240.00
8,670.00

2,822.00

Jumlah Total

31,042.00

Dibulatkan

31,000.00

PENGERJAAN 100 KG PEKERJAAN PERAKITAN


Solar

1.0000

liter

12,000.00

Minyak Pelumas

0.1000

liter

21,000.00

Jumlah Bahan

12,000.00
2,100.00
14,100.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Besi Kontruksi

0.1000

Oh

72,500.00

7,250.00

Kepala tukang

0.0010

Oh

80,000.00

80.00

Mandor

0.0050

Oh

80,000.00

400.00

Jumlah Pekerja

13,730.00

PERALATAN :
Sewa Alat

0.8000

Jam

14,100.00

11,280.00

Jumlah Bahan + Pekerja

39,110.00

Keuntungan Max. 10 %

A.07.04

11,280.00

Jumlah Harga Alat

3,911.00

Jumlah Total

43,021.00

Dibulatkan

43,000.00

PEMBUATAN 1 M2 PINTU BESI PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU
BAHAN :
Besi siku L 30.30.3

15.0000

kg

16,000.00

240,000.00

Besi plat baja

32.8000

kg

16,000.00

524,800.00

0.0500

kg

36,000.00

Kawat Las
Jumlah Bahan

1,800.00
766,600.00

UPAH :
Pekerja

1.0500

Oh

60,000.00

63,000.00

Tukang Las

1.0500

Oh

72,500.00

76,125.00

Kepala Tukang

0.1050

Oh

80,000.00

8,400.00

Mandor

0.0520

Oh

80,000.00

151,685.00

Jumlah Bahan + Pekerja

918,285.00

Keuntungan Max. 10 %

A.07.05

4,160.00

Jumlah Pekerja

91,828.50

Jumlah Total

1,010,113.50

Dibulatkan

1,010,100.00

PENGERJAAN 10 CM PENGELASAN DENGAN LAS LISTRIK


Kawat las listrik

0.4000

kg

36,000.00

14,400.00

Bahan bakar solar

0.3000

lt

12,000.00

3,600.00

Pelumas

0.0400

lt

21,000.00

Jumlah Bahan

840.00
18,840.00

UPAH :
Pekerja

0.0400

Oh

60,000.00

2,400.00

Tukang Las

0.0200

Oh

72,500.00

1,450.00

Kepala tukang

0.0020

Oh

80,000.00

160.00

Mandor

0.0020

Oh

80,000.00

160.00

Alat bantu ( Mesin Las Listrik)

0.1700

lot

23,010.00

3,911.70

Jumlah Pekerja

8,081.70

Jumlah Bahan + Pekerja

26,921.70

Keuntungan Max. 10 %

2,692.17
31 dari 124

A.07.06

6=(3x5)

Jumlah Total

29,613.87

Dibulatkan

29,600.00

1 M2 PEMASANGAN ROLLING DOOR BESI


BAHAN :
Rolling Door besi

1.0000

670,000.00

Jumlah Bahan

670,000.00
670,000.00

UPAH :
Pekerja

1.2000

Oh

60,000.00

72,000.00

Tukang besi profil

1.2000

Oh

72,500.00

87,000.00

Kepala Tukang

0.1200

Oh

80,000.00

9,600.00

Mandor

0.0060

Oh

80,000.00

169,080.00

Jumlah Bahan + Pekerja

839,080.00

Keuntungan Max. 10 %

A.07.07

480.00

Jumlah Pekerja

83,908.00

Jumlah Total

922,988.00

Dibulatkan

922,900.00

1 M2 PEMASANGAN ROLLING DOOR ALUMINIUM


BAHAN :
Rolling door alumunium

1.0000

255,000.00

Jumlah Bahan

255,000.00
255,000.00

UPAH :
Pekerja

1.0000

Oh

60,000.00

60,000.00

Tukang besi profil

1.0000

Oh

72,500.00

72,500.00

Kepala Tukang

0.1000

Oh

80,000.00

8,000.00

Mandor

0.0500

Oh

80,000.00

144,500.00

Jumlah Bahan + Pekerja

399,500.00

Keuntungan Max. 10 %

A.07.08

4,000.00

Jumlah Pekerja

39,950.00

Jumlah Total

439,450.00

Dibulatkan

439,400.00

PEMASANGAN 1 M2 RANGKA BESI HOLLOW 1 X 40.40.2MM, MODUL 60 X 120CM, PLAFON


BAHAN :
Rangka metal hollow 40.40.2 mm
Asesoris (perkuatan, las dll)

4.0000
100% x rangka

m1

26,000.00

ls

26,000.00

Jumlah Bahan

104,000.00
26,000.00
130,000.00

UPAH :
Pekerja

0.3500

Oh

60,000.00

21,000.00

Tukang Besi

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0160

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

180,455.00

Keuntungan Max. 10 %

A.08.01

1,280.00
50,455.00

18,045.50

Jumlah Total

198,500.50

Dibulatkan

198,500.00

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 2PP
BAHAN :
Bata Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang

140.0000

m2

650.00

91,000.00

43.5000

kg

1,500.00

65,250.00

0.0800

142,000.00

Jumlah Bahan

11,360.00
167,610.00

UPAH :
Pekerja

0.6000

Oh

60,000.00

36,000.00

Tukang Batu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0300

Oh

80,000.00

Jumlah Pekerja

2,400.00
54,500.00

Jumlah Bahan + Pekerja

222,110.00

Keuntungan Max. 10 %

22,211.00

Jumlah Total

244,321.00
32 dari 124

6=(3x5)

Dibulatkan
A.08.02

244,300.00

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 3PP
BAHAN :
Bata Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang

140.0000

m2

650.00

91,000.00

32.9500

kg

1,500.00

49,425.00

0.0910

142,000.00

Jumlah Bahan

12,922.00
153,347.00

UPAH :
Pekerja

0.6000

Oh

60,000.00

36,000.00

Tukang Batu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0300

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

207,847.00

Keuntungan Max. 10 %

A.08.03

2,400.00
54,500.00

20,784.70

Jumlah Total

228,631.70

Dibulatkan

228,600.00

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 4PP
BAHAN :
Bata Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang

140.0000

m2

650.00

91,000.00

26.5500

kg

1,500.00

39,825.00

0.0930

142,000.00

Jumlah Bahan

13,206.00
144,031.00

UPAH :
Pekerja

0.6000

Oh

60,000.00

36,000.00

Tukang Batu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0300

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

198,531.00

Keuntungan Max. 10 %

A.08.04

2,400.00
54,500.00

19,853.10

Jumlah Total

218,384.10

Dibulatkan

218,300.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang

140.0000

m2

650.00

91,000.00

22.2000

kg

1,500.00

33,300.00

0.1020

142,000.00

Jumlah Bahan

14,484.00
138,784.00

UPAH :
Pekerja

0.6000

Oh

60,000.00

36,000.00

Tukang Batu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0300

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

193,284.00

Keuntungan Max. 10 %

A.08.05

2,400.00
54,500.00

19,328.40

Jumlah Total

212,612.40

Dibulatkan

212,600.00

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 6PP
BAHAN :
Bata Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang

140.0000

m2

650.00

91,000.00

26.5000

kg

1,500.00

39,750.00

0.1220

142,000.00

Jumlah Bahan

17,324.00
148,074.00

UPAH :
Pekerja

0.6000

Oh

60,000.00

36,000.00

Tukang Batu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0300

Oh

80,000.00

2,400.00

33 dari 124

6=(3x5)

Jumlah Pekerja

54,500.00

Jumlah Bahan + Pekerja

202,574.00

Keuntungan Max. 10 %

A.08.06

20,257.40

Jumlah Total

222,831.40

Dibulatkan

222,800.00

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 3KP : 10 PP
BAHAN :
Bata Merah 5 x 11 x 22 cm

140.0000

m2

650.00

91,000.00

10.0800

kg

1,500.00

15,120.00

Kapur Padam

0.0275

78,000.00

2,145.00

Pasir Pasang

0.0925

142,000.00

13,135.00

Semen Portland

Jumlah Bahan

121,400.00

UPAH :
Pekerja

0.6000

Oh

60,000.00

36,000.00

Tukang Batu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0300

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

175,900.00

Keuntungan Max. 10 %

A.08.07

2,400.00
54,500.00

17,590.00

Jumlah Total

193,490.00

Dibulatkan

193,400.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

650.00

45,500.00

Semen Portland

18.9500

kg

1,500.00

28,425.00

0.0380

142,000.00

Pasir Pasang
Jumlah Bahan

5,396.00
79,321.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

106,571.00

Keuntungan Max. 10 %

A.08.08

10,657.10

Jumlah Total

117,228.10

Dibulatkan

117,200.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

650.00

45,500.00

Semen Portland

14.3700

kg

1,500.00

21,555.00

0.0400

142,000.00

Pasir Pasang
Jumlah Bahan

5,680.00
72,735.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

99,985.00

Keuntungan Max. 10 %

A.08.09

9,998.50

Jumlah Total

109,983.50

Dibulatkan

109,900.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

650.00

45,500.00

Semen Portland

11.5000

kg

1,500.00

17,250.00

0.0430

142,000.00

Pasir Pasang
Jumlah Bahan

6,106.00
68,856.00

34 dari 124

6=(3x5)

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

96,106.00

Keuntungan Max. 10 %

A.08.10

9,610.60

Jumlah Total

105,716.60

Dibulatkan

105,700.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

650.00

45,500.00

Semen Portland

9.6800

kg

1,500.00

14,520.00

Pasir Pasang

0.0450

142,000.00

Jumlah Bahan

6,390.00
66,410.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

93,660.00

Keuntungan Max. 10 %

A.08.11

9,366.00

Jumlah Total

103,026.00

Dibulatkan

103,000.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 6 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

650.00

45,500.00

Semen Portland

8.3200

kg

1,500.00

12,480.00

Pasir Pasang

0.0490

142,000.00

Jumlah Bahan

6,958.00
64,938.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

92,188.00

Keuntungan Max. 10 %

A.08.12

9,218.80

Jumlah Total

101,406.80

Dibulatkan

101,400.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 8 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

650.00

45,500.00

Semen Portland

6.5000

kg

1,500.00

9,750.00

Pasir Pasang

0.0500

142,000.00

Jumlah Bahan

7,100.00
62,350.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

89,600.00

Keuntungan Max. 10 %

A.08.13

8,960.00

Jumlah Total

98,560.00

Dibulatkan

98,500.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 SP : 3 KP : 10 PP


BAHAN :
35 dari 124

70.0000

bh

650.00

45,500.00

Semen Portland

4.5000

kg

1,500.00

6,750.00

Kapur Padam

0.0150

78,000.00

1,170.00

Pasir Pasang

0.0500

142,000.00

Bata Merah 5 x 11 x 22 cm

6=(3x5)

Jumlah Bahan

7,100.00
60,520.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

87,770.00

Keuntungan Max. 10 %

A.08.14

8,777.00

Jumlah Total

96,547.00

Dibulatkan

96,500.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 SP : 1 KP : 1 PP


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

650.00

Semen Portland

0.0180

kg

1,500.00

27.00

Kapur Padam

0.0180

78,000.00

1,404.00

Pasir Pasang

0.0180

142,000.00

Jumlah Bahan

45,500.00

2,556.00
49,487.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

76,737.00

Keuntungan Max. 10 %

A.08.15

7,673.70

Jumlah Total

84,410.70

Dibulatkan

84,400.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 SP : 1 KP : 2 PP


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

650.00

Semen Portland

0.0140

kg

1,500.00

21.00

Kapur Padam

0.0140

78,000.00

1,092.00

Pasir Pasang

0.0280

142,000.00

Jumlah Bahan

45,500.00

3,976.00
50,589.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

77,839.00

Keuntungan Max. 10 %

A.08.16

7,783.90

Jumlah Total

85,622.90

Dibulatkan

85,600.00

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.20) CAMP 1 PC : 3 PS


BAHAN :
Hollow Block/Cone Block (HB/CB.20)

12.5000

bh

4,500.00

Semen Portland

30.3200

kg

1,500.00

45,480.00

Pasir Pasang

0.7280

142,000.00

103,376.00

Besi Beton Polos

0.2800

kg

11,000.00

Jumlah Bahan

56,250.00

3,080.00
208,186.00

UPAH :
Pekerja

0.3500

Oh

60,000.00

21,000.00

Tukang Batu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

36 dari 124

2
Mandor

4
0.0180

Oh

6=(3x5)
80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

242,701.00

Keuntungan Max. 10 %

A.08.17

1,440.00
34,515.00

24,270.10

Jumlah Total

266,971.10

Dibulatkan

266,900.00

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.20) CAMP 1 PC : 4 PS


BAHAN :
Hollow Block/Cone Block (HB/CB.20)

12.5000

bh

4,500.00

Semen Portland

24.2600

kg

1,500.00

36,390.00

Pasir Pasang

0.7720

142,000.00

109,624.00

Besi Beton Polos

0.2800

kg

11,000.00

Jumlah Bahan

56,250.00

3,080.00
205,344.00

UPAH :
Pekerja

0.3500

Oh

60,000.00

21,000.00

Tukang Batu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0180

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

239,859.00

Keuntungan Max. 10 %

A.08.18

1,440.00
34,515.00

23,985.90

Jumlah Total

263,844.90

Dibulatkan

263,800.00

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.15) CAMP 1 PC : 3 PS


BAHAN :
Hollow Block/Cone Block (HB/CB.15)

12.5000

bh

4,000.00

Semen Portland

22.7400

kg

1,500.00

34,110.00

Pasir Pasang

0.5500

142,000.00

78,100.00

Besi Beton Polos

0.2800

kg

11,000.00

Jumlah Bahan

50,000.00

3,080.00
165,290.00

UPAH :
Pekerja

0.3200

Oh

60,000.00

19,200.00

Tukang Batu

0.1200

Oh

72,500.00

8,700.00

Kepala Tukang

0.0120

Oh

80,000.00

960.00

Mandor

0.0160

Oh

80,000.00

1,280.00

Jumlah Pekerja

30,140.00

Jumlah Bahan + Pekerja

195,430.00

Keuntungan Max. 10 %

A.08.19

19,543.00

Jumlah Total

214,973.00

Dibulatkan

214,900.00

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.15) CAMP 1 PC : 4 PS


BAHAN :
Hollow Block/Cone Block (HB/CB.15)

12.5000

bh

4,000.00

50,000.00

Semen Portland

18.2000

kg

1,500.00

27,300.00

Pasir Pasang

0.5820

142,000.00

82,644.00

Besi Beton Polos

0.2800

kg

11,000.00

Jumlah Bahan

3,080.00
163,024.00

UPAH :
Pekerja

0.3200

Oh

60,000.00

19,200.00

Tukang Batu

0.1200

Oh

72,500.00

8,700.00

Kepala Tukang

0.0120

Oh

80,000.00

960.00

Mandor

0.0160

Oh

80,000.00

1,280.00

Jumlah Pekerja

30,140.00

Jumlah Bahan + Pekerja

193,164.00

Keuntungan Max. 10 %

A.08.20

19,316.40

Jumlah Total

212,480.40

Dibulatkan

212,400.00

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.10) CAMP 1 PC : 3 PS


BAHAN :
Hollow Block/Cone Block (HB/CB.10)

12.5000
37 dari 124

bh

3,500.00

43,750.00

15.1600

kg

1,500.00

22,740.00

Pasir Pasang

0.3640

142,000.00

51,688.00

Besi Beton Polos

0.2800

kg

11,000.00

Semen Portland

6=(3x5)

Jumlah Bahan

3,080.00
121,258.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

148,508.00

Keuntungan Max. 10 %

A.08.21

14,850.80

Jumlah Total

163,358.80

Dibulatkan

163,300.00

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.10) CAMP 1 PC : 4 PS


BAHAN :
Hollow Block/Cone Block (HB/CB.10)

12.5000

bh

3,500.00

43,750.00

Semen Portland

12.1300

kg

1,500.00

18,195.00

Pasir Pasang

0.3880

142,000.00

55,096.00

Besi Beton Polos

0.2800

kg

11,000.00

Jumlah Bahan

3,080.00
120,121.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

147,371.00

Keuntungan Max. 10 %

A.08.22

14,737.10

Jumlah Total

162,108.10

Dibulatkan

162,100.00

1 M2 PASANGAN DINDING ROSTER/TERAWANG (12X11X24) KERAMIK CAMP 1 PC : 3 PS


BAHAN :
Bahan Roster/Terawang

30.0000

bh

35,000.00

1,050,000.00

Semen Portland

11.0000

kg

1,500.00

16,500.00

0.0350

142,000.00

Pasir Pasang
Jumlah Bahan

4,970.00
1,071,470.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

1,098,720.00

Keuntungan Max. 10 %

A.08.23

109,872.00

Jumlah Total

1,208,592.00

Dibulatkan

1,208,500.00

1 M2 PASANGAN DINDING ROSTER/TERAWANG (12X11X24) KERAMIK CAMP 1 PC : 4 PS


BAHAN :
Bahan Roster/Terawang

30.0000

bh

35,000.00

1,050,000.00

Semen Portland

11.0000

kg

1,500.00

16,500.00

0.0350

142,000.00

Pasir Pasang
Jumlah Bahan

4,970.00
1,071,470.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

1,098,720.00
38 dari 124

6=(3x5)

Keuntungan Max. 10 %

A.08.24

109,872.00

Jumlah Total

1,208,592.00

Dibulatkan

1,208,500.00

1 M2 PASANGAN DINDING BATA BERONGGA EKSPOSE (12X11X24) CAMP 1 PC : 3 PS


BAHAN :
Bata Berongga

30.0000

bh

35,000.00

1,050,000.00

Semen Portland

11.0000

kg

1,500.00

16,500.00

0.0350

142,000.00

Pasir Pasang
Jumlah Bahan

4,970.00
1,071,470.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0150

Oh

80,000.00

1,200.00

Jumlah Pekerja

27,250.00

Jumlah Bahan + Pekerja

1,098,720.00

Keuntungan Max. 10 %

A.09.01

109,872.00

Jumlah Total

1,208,592.00

Dibulatkan

1,208,500.00

1 M2 PASANGAN PLESTERAN 1 Pc : 1 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland
Pasir Pasang

15.5040

kg

1,500.00

0.0160

142,000.00

Jumlah Bahan

23,256.00
2,272.00
25,528.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0150

Oh

80,000.00

31,275.00

Jumlah Bahan + Pekerja

56,803.00

Keuntungan Max. 10 %

A.09.02

1,200.00

Jumlah Pekerja

5,680.30

Jumlah Total

62,483.30

Dibulatkan

62,400.00

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland
Pasir Pasang

10.2240

kg

1,500.00

0.0200

142,000.00

Jumlah Bahan

15,336.00
2,840.00
18,176.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0150

Oh

80,000.00

31,275.00

Jumlah Bahan + Pekerja

49,451.00

Keuntungan Max. 10 %

A.09.03

1,200.00

Jumlah Pekerja

4,945.10

Jumlah Total

54,396.10

Dibulatkan

54,300.00

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland

7.7760

kg

1,500.00

Pasir Pasang

0.0230

142,000.00

Jumlah Bahan

11,664.00
3,266.00
14,930.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0150

Oh

80,000.00

Jumlah Pekerja

1,200.00
31,275.00

39 dari 124

6=(3x5)

Jumlah Bahan + Pekerja

46,205.00

Keuntungan Max. 10 %

A.09.04

4,620.50

Jumlah Total

50,825.50

Dibulatkan

50,800.00

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland

6.2400

kg

1,500.00

Pasir Pasang

0.0240

142,000.00

Jumlah Bahan

9,360.00
3,408.00
12,768.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0150

Oh

80,000.00

31,275.00

Jumlah Bahan + Pekerja

44,043.00

Keuntungan Max. 10 %

A.09.05

1,200.00

Jumlah Pekerja

4,404.30

Jumlah Total

48,447.30

Dibulatkan

48,400.00

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland

5.1840

kg

1,500.00

Pasir Pasang

0.0260

142,000.00

Jumlah Bahan

7,776.00
3,692.00
11,468.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0150

Oh

80,000.00

31,275.00

Jumlah Bahan + Pekerja

42,743.00

Keuntungan Max. 10 %

A.09.24

1,200.00

Jumlah Pekerja

4,274.30

Jumlah Total

47,017.30

Dibulatkan

47,000.00

1 M2 PASANGAN PLESTERAN SIAR PASANGAN BATU KALI CAMPURAN 1 Pc : 2 PP


BAHAN :
Semen Portland

6.3400

kg

1,500.00

Pasir Pasang

0.0120

kg

142,000.00

Jumlah Bahan

9,510.00
1,704.00
11,214.00

UPAH :
Pekerja

0.3000

Oh

60,000.00

18,000.00

Tukang Batu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0150

Oh

80,000.00

31,275.00

Jumlah Bahan + Pekerja

42,489.00

Keuntungan Max. 10 %

A.09.25

1,200.00

Jumlah Pekerja

4,248.90

Jumlah Total

46,737.90

Dibulatkan

46,700.00

1 M2 ACIAN PC
BAHAN :
Semen Portland

3.2500

kg

1,500.00

Jumlah Bahan

4,875.00
4,875.00

UPAH :
Pekerja

0.2000

Oh

60,000.00

12,000.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0100

Oh

80,000.00

800.00

Jumlah Pekerja

20,850.00

Jumlah Bahan + Pekerja

25,725.00
40 dari 124

6=(3x5)

Keuntungan Max. 10 %

A.10.01

2,572.50

Jumlah

28,297.50

Dibulatkan

28,200.00

PASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN 40CM X 40CM


BAHAN :
Ubin Abu-abu

1.1000

m2

Smen Portlan

9.8000

kg

1,500.00

Pasir Pasang

0.0450

M3

142,000.00

Jumlah Bahan

14,700.00
6,390.00
21,090.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

15,000.00

Tukang Batu

0.1250

Oh

72,500.00

9,062.50

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

26,142.50

Jumlah Bahan + Pekerja

47,232.50

Keuntungan Max. 10 %

A.10.02

1,040.00

Jumlah Pekerja

4,723.25

Jumlah Total

51,955.75

Dibulatkan

51,900.00

PASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN 30CM X 30CM


BAHAN :
Tegel Badak Abu-abu 30x30 cm
Semen Portland
Pasir Pasang

1.1000

m2

7,000.00

7,700.00

10.0000

kg

1,500.00

15,000.00

0.0450

m3

142,000.00

Jumlah Bahan

6,390.00
29,090.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

15,000.00

Tukang Batu

0.1250

Oh

72,500.00

9,062.50

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

26,142.50

Jumlah Bahan + Pekerja

55,232.50

Keuntungan Max. 10 %

A.10.03

1,040.00

Jumlah Pekerja

5,523.25

Jumlah Total

60,755.75

Dibulatkan

60,700.00

PASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN 20CM X 20CM


BAHAN :
Ubin Abu-abu

1.1000

m2

Smen Portlan

10.4000

kg

1,500.00

Pasir Pasang

0.0450

M3

142,000.00

Jumlah Bahan

15,600.00
6,390.00
21,990.00

UPAH :
Pekerja

0.2700

Oh

60,000.00

16,200.00

Tukang Batu

0.1350

Oh

72,500.00

9,787.50

Kepala Tukang

0.0140

Oh

80,000.00

1,120.00

Mandor

0.0140

Oh

80,000.00

28,227.50

Jumlah Bahan + Pekerja

50,217.50

Keuntungan Max. 10 %

A.10.04

1,120.00

Jumlah Pekerja

5,021.75

Jumlah Total

55,239.25

Dibulatkan

55,200.00

PEMASANGAN 1 M2 LANTAI UBIN WARNA UKURAN 40 X 40 CM


BAHAN :
Ubin Warna

1.1000

m2

Semen Portland

9.8000

kg

Semen Warna

1.3000

Pasir Pasang

0.0450

1,500.00

14,700.00

kg

8,500.00

11,050.00

m3

142,000.00

Jumlah Bahan

6,390.00
32,140.00

UPAH :
Pekerja

0.2500
41 dari 124

Oh

60,000.00

15,000.00

6=(3x5)

Tukang Batu

0.1250

Oh

72,500.00

9,062.50

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

26,142.50

Jumlah Bahan + Pekerja

58,282.50

Keuntungan Max. 10 %

A.10.05

1,040.00

Jumlah Pekerja

5,828.25

Jumlah Total

64,110.75

Dibulatkan

64,100.00

PEMASANGAN 1 M2 LANTAI UBIN WARNA UKURAN 30 X 30 CM


BAHAN :
Ubin Warna
Semen Portland

1.1000

m2

10.0000

kg

1,500.00

15,000.00
12,750.00

Semen Warna

1.5000

kg

8,500.00

Pasir Pasang

0.0450

m3

142,000.00

Jumlah Bahan

6,390.00
34,140.00

UPAH :
Pekerja

0.2600

Oh

60,000.00

15,600.00

Tukang Batu

0.1300

Oh

72,500.00

9,425.00

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

27,105.00

Jumlah Bahan + Pekerja

61,245.00

Keuntungan Max. 10 %

A.10.06

1,040.00

Jumlah Pekerja

6,124.50

Jumlah Total

67,369.50

Dibulatkan

67,300.00

PEMASANGAN 1 M2 LANTAI UBIN WARNA UKURAN 20 X 20 CM


BAHAN :
Ubin Warna

1.1000

m2

10.4000

kg

Semen Warna

1.6200

Pasir Pasang

0.0450

Semen Portland

1,500.00

15,600.00

kg

8,500.00

13,770.00

142,000.00

Jumlah Bahan

6,390.00
35,760.00

UPAH :
Pekerja

0.2700

Oh

60,000.00

16,200.00

Tukang Batu

0.1350

Oh

72,500.00

9,787.50

Kepala Tukang

0.0140

Oh

80,000.00

1,120.00

Mandor

0.0140

Oh

80,000.00

28,227.50

Jumlah Bahan + Pekerja

63,987.50

Keuntungan Max. 10 %

A.10.07

1,120.00

Jumlah Pekerja

6,398.75

Jumlah Total

70,386.25

Dibulatkan

70,300.00

PEMASANGAN 1 M2 LANTAI UBIN TERASO UKURAN 40 X 40 CM


BAHAN :
Ubin Teraso

1.1000

m2

Semen Portland

9.8000

kg

Semen Warna

1.3000

Pasir Pasang

0.0450

1,500.00

14,700.00

kg

8,500.00

11,050.00

142,000.00

Jumlah Bahan

6,390.00
32,140.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

15,000.00

Tukang Batu

0.1250

Oh

72,500.00

9,062.50

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

26,142.50

Jumlah Bahan + Pekerja

58,282.50

Keuntungan Max. 10 %

A.10.08

1,040.00

Jumlah Pekerja

5,828.25

Jumlah Total

64,110.75

Dibulatkan

64,100.00

PEMASANGAN 1 M2 LANTAI UBIN TERASO UKURAN 30 X 30 CM


42 dari 124

6=(3x5)

BAHAN :
Ubin Teraso
Semen Portland

1.1000

m2

10.0000

kg

1,500.00

15,000.00
12,750.00

Semen Warna

1.5000

kg

8,500.00

Pasir Pasang

0.0450

142,000.00

Jumlah Bahan

6,390.00
34,140.00

UPAH :
Pekerja

0.2600

43 dari 124

Oh

60,000.00

15,600.00

6=(3x5)

Tukang Batu

0.1300

Oh

72,500.00

9,425.00

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

27,105.00

Jumlah Bahan + Pekerja

61,245.00

Keuntungan Max. 10 %

A.10.09

1,040.00

Jumlah Pekerja

6,124.50

Jumlah Total

67,369.50

Dibulatkan

67,300.00

PEMASANGAN 1 M2 LANTAI UBIN GRANIT UKURAN 40X40 CM


BAHAN :
Ubin Granit

1.1000

m2

505,000.00

555,500.00

Semen Portland

9.8000

kg

1,500.00

14,700.00

Semen Warna

1.3000

kg

8,500.00

11,050.00

Pasir Pasang

0.0450

142,000.00

Jumlah Bahan

6,390.00
587,640.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

15,000.00

Tukang Batu

0.1250

Oh

72,500.00

9,062.50

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

613,782.50

Keuntungan Max. 10 %

A.10.10

1,040.00
26,142.50

61,378.25

Jumlah Total

675,160.75

Dibulatkan

675,100.00

PEMASANGAN 1 M2 LANTAI UBIN GRANIT UKURAN 30X30 CM


BAHAN :
Ubin Granit
Semen Portland

1.1000

m2

10.0000

kg

1,500.00

15,000.00
12,750.00

Semen Warna

1.5000

kg

8,500.00

Pasir Pasang

0.0450

142,000.00

Jumlah Bahan

6,390.00
34,140.00

UPAH :
Pekerja

0.2600

Oh

60,000.00

15,600.00

Tukang Batu

0.1300

Oh

72,500.00

9,425.00

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

27,105.00

Jumlah Bahan + Pekerja

61,245.00

Keuntungan Max. 10 %

A.10.11

1,040.00

Jumlah Pekerja

6,124.50

Jumlah Total

67,369.50

Dibulatkan

67,300.00

PEMASANGAN 1 M2 LANTAI UBIN TERALUK MARMER UKURAN 60X60 CM


BAHAN :
Ubin Traluk Marmer

1.1000

m2

65,000.00

71,500.00

Semen Portland

9.6000

kg

1,500.00

14,400.00

Semen Warna

1.5000

kg

8,500.00

12,750.00

Pasir Pasang

0.0450

142,000.00

Jumlah Bahan

6,390.00
105,040.00

UPAH :
Pekerja

0.2400

Oh

60,000.00

14,400.00

Tukang Batu

0.1200

Oh

72,500.00

8,700.00

Kepala Tukang

0.0120

Oh

80,000.00

960.00

Mandor

0.0120

Oh

80,000.00

Jumlah Pekerja

960.00
25,020.00

Jumlah Bahan + Pekerja

130,060.00

Keuntungan Max. 10 %

13,006.00

Jumlah Total

143,066.00

Dibulatkan

143,000.00

44 dari 124

1
A.10.11 Rob

6=(3x5)

PEMASANGAN 1 M2 LANTAI UBIN GRANITO UKURAN 60X60 CM


BAHAN :
Granito Tile Esenssza 60 x 60 polis

1.1000

m2

585,000.00

643,500.00

Semen Portland

9.6000

kg

1,500.00

14,400.00

Semen Warna

1.5000

kg

8,500.00

12,750.00

Pasir Pasang

0.0450

142,000.00

Jumlah Bahan

6,390.00
677,040.00

UPAH :
Pekerja

0.2400

Oh

60,000.00

14,400.00

Tukang Batu

0.1200

Oh

72,500.00

8,700.00

Kepala Tukang

0.0120

Oh

80,000.00

960.00

Mandor

0.0120

Oh

80,000.00

Jumlah Pekerja

960.00
25,020.00

Jumlah Bahan + Pekerja

702,060.00

Keuntungan Max. 10 %

70,206.00

Jumlah Total

772,266.00

Dibulatkan

772,200.00

A.10.11 Rob a PEMASANGAN 1 M2 LANTAI UBIN MARMER UKURAN 60X60 CM


BAHAN :
Marmer Alam Citatah Ukuran Besar

1.1000

m2

850,000.00

935,000.00

Semen Portland

9.6000

kg

1,500.00

14,400.00

Semen Warna

1.5000

kg

8,500.00

12,750.00

Pasir Pasang

0.0450

142,000.00

Jumlah Bahan

6,390.00
968,540.00

UPAH :
Pekerja

0.2400

Oh

60,000.00

14,400.00

Tukang Batu

0.1200

Oh

72,500.00

8,700.00

Kepala Tukang

0.0120

Oh

80,000.00

960.00

Mandor

0.0120

Oh

80,000.00

Jumlah Pekerja

960.00
25,020.00

Jumlah Bahan + Pekerja

993,560.00

Keuntungan Max. 10 %

99,356.00

Jumlah Total

1,092,916.00

Dibulatkan

1,092,900.00

45 dari 124

1
A.10.12

6=(3x5)

PEMASANGAN 1 M2 LANTAI UBIN TERALUK MARMER UKURAN 40X40 CM


BAHAN :
Ubin Traluk Marmer

1.1000

m2

65,000.00

71,500.00

Semen Portland

9.8000

kg

1,500.00

14,700.00

Semen Warna

1.3000

kg

8,500.00

11,050.00

Pasir Pasang

0.0450

142,000.00

Jumlah Bahan

6,390.00
103,640.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

15,000.00

Tukang Batu

0.1250

Oh

72,500.00

9,062.50

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

129,782.50

Keuntungan Max. 10 %

A.10.13

1,040.00
26,142.50

12,978.25

Jumlah Total

142,760.75

Dibulatkan

142,700.00

PEMASANGAN 1 M2 LANTAI UBIN TERALUK MARMER 30X30 CM


BAHAN :
Ubin Traluk Marmer

1.1000

m2

65,000.00

71,500.00

10.0000

kg

1,500.00

15,000.00

Semen Warna

1.5000

kg

8,500.00

12,750.00

Pasir Pasang

0.0450

142,000.00

Semen Portland

Jumlah Bahan

6,390.00
105,640.00

UPAH :
Pekerja

0.2600

Oh

60,000.00

15,600.00

Tukang Batu

0.1300

Oh

72,500.00

9,425.00

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

132,745.00

Keuntungan Max. 10 %

A.10.14

1,040.00
27,105.00

13,274.50

Jumlah Total

146,019.50

Dibulatkan

146,000.00

PEMASANGAN 1 M' PLINT UBIN PC ABU-ABU UKURAN 15 CM X 20 CM


BAHAN :
Plint Ubin PC

5.3000

bh

4,000.00

21,200.00

Semen Portland

1.6500

kg

1,500.00

2,475.00

Pasir Pasang

0.0040

142,000.00

Jumlah Bahan

568.00
24,243.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

37,288.00

Keuntungan Max. 10 %

A.10.15

400.00

Jumlah Pekerja

3,728.80

Jumlah Total

41,016.80

Dibulatkan

41,000.00

PEMASANGAN 1 M' PLINT UBIN PC ABU-ABU UKURAN 10 CM X 30 CM


BAHAN :
Plint Ubin PC

3.5300

bh

4,000.00

14,120.00

Semen Portland

1.2400

kg

1,500.00

1,860.00

Pasir Pasang

0.0030

142,000.00

Jumlah Bahan

426.00
16,406.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

46 dari 124

2
Mandor

4
0.0030

Oh

6=(3x5)
80,000.00

12,885.00

Jumlah Bahan + Pekerja

29,291.00

Keuntungan Max. 10 %

A.10.16

240.00

Jumlah Pekerja

2,929.10

Jumlah Total

32,220.10

Dibulatkan

32,200.00

PEMASANGAN 1 M' PLINT UBIN WARNA UKURAN 10 CM X 20 CM


BAHAN :
Plint Ubin Warna

2.6500

bh

4,000.00

Semen Portland

1.1400

kg

1,500.00

1,710.00

Pasir Pasang

0.1000

142,000.00

14,200.00

Semen Warna

0.0030

8,500.00

Jumlah Bahan

10,600.00

25.50
26,535.50

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

39,580.50

Keuntungan Max. 10 %

A.10.17

400.00

Jumlah Pekerja

3,958.05

Jumlah Total

43,538.55

Dibulatkan

43,500.00

PEMASANGAN 1 M' PLINT UBIN WARNA UKURAN 10 CM X 30 CM


BAHAN :
Plint Ubin Warna

3.5300

bh

4,000.00

Semen Portland

1.1400

kg

1,500.00

1,710.00

Pasir Pasang

0.1000

kg

142,000.00

14,200.00

Semen Warna

0.0030

m3

8,500.00

Jumlah Bahan

14,120.00

25.50
15,935.50

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

28,980.50

Keuntungan Max. 10 %

A.10.18

400.00

Jumlah Pekerja

2,898.05

Jumlah Total

31,878.55

Dibulatkan

31,800.00

PEMASANGAN 1 M' PLINT UBIN WARNA UKURAN 10 CM X 40 CM


BAHAN :
Plint Ubin Warna

2.6500

bh

8,500.00

Semen Portland

1.1400

kg

1,500.00

1,710.00

Pasir Pasang

0.1000

kg

142,000.00

14,200.00

Semen Warna

0.0030

m3

8,500.00

Jumlah Bahan

22,525.00

25.50
15,935.50

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

28,980.50

Keuntungan Max. 10 %

A.10.19

400.00

Jumlah Pekerja

2,898.05

Jumlah Total

31,878.55

Dibulatkan

31,800.00

PEMASANGAN 1 M' PLINT UBIN TERASO UKURAN 10 X 30 CM


BAHAN :
Plint Ubin Teraso

3.5300
47 dari 124

bh

8,500.00

30,005.00

6=(3x5)

Semen Portland

1.1400

kg

1,500.00

1,710.00

Semen Warna

0.1000

kg

8,500.00

850.00

Pasir Pasang

0.0030

m3

142,000.00

Jumlah Bahan

426.00
2,986.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

16,031.00

Keuntungan Max. 10 %

A.10.20

400.00

Jumlah Pekerja

1,603.10

Jumlah Total

17,634.10

Dibulatkan

17,600.00

PEMASANGAN 1 M' PLINT UBIN TERASO UKURAN 10 X 40 CM


BAHAN :
Plint Ubin Teraso

2.6500

bh

8,500.00

22,525.00

Semen Portland

1.1400

kg

1,500.00

1,710.00

Semen Warna

0.1000

kg

8,500.00

850.00

Pasir Pasang

0.0030

m3

142,000.00

Jumlah Bahan

426.00
2,986.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

16,031.00

Keuntungan Max. 10 %

A.10.21

400.00

Jumlah Pekerja

1,603.10

Jumlah Total

17,634.10

Dibulatkan

17,600.00

PEMASANGAN 1 M' PLINT UBIN GRANIT UKURAN 10 X 40 CM


BAHAN :
Plint Ubin Granit

2.6500

bh

9,500.00

25,175.00

Semen Portland

1.1400

kg

1,500.00

1,710.00

Semen Warna

0.1000

kg

8,500.00

850.00

Pasir Pasang

0.0030

m3

142,000.00

Jumlah Bahan

426.00
2,986.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

16,031.00

Keuntungan Max. 10 %

A.10.22

400.00

Jumlah Pekerja

1,603.10

Jumlah Total

17,634.10

Dibulatkan

17,600.00

PEMASANGAN 1 M' PLINT UBIN GRANIT UKURAN 10 X 30 CM


BAHAN :
Plint Ubin Granit

3.5300

bh

9,500.00

33,535.00

Semen Portland

1.1400

kg

1,500.00

1,710.00

Semen Warna

0.1000

kg

8,500.00

850.00

Pasir Pasang

0.0030

m3

142,000.00

Jumlah Bahan

426.00
2,986.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

400.00

48 dari 124

6=(3x5)

Jumlah Pekerja

13,045.00

Jumlah Bahan + Pekerja

16,031.00

Keuntungan Max. 10 %

A.10.23

1,603.10

Jumlah Total

17,634.10

Dibulatkan

17,600.00

PEMASANGAN 1 M' PLINT UBIN TERALUX KERANG UKURAN 10 X 40 CM


BAHAN :
Plint Tralux Kerang

2.6500

bh

8,500.00

22,525.00

Semen Portland

1.1400

kg

1,500.00

1,710.00

Semen Warna

0.1000

kg

8,500.00

850.00

Pasir Pasang

0.0030

m3

142,000.00

Jumlah Bahan

426.00
2,986.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

16,031.00

Keuntungan Max. 10 %

A.10.24

400.00

Jumlah Pekerja

1,603.10

Jumlah Total

17,634.10

Dibulatkan

17,600.00

PEMASANGAN 1 M' PLINT UBIN TERALUX KERANG UKURAN 10 X 30 CM


BAHAN :
Plint Tralux Kerang

3.5300

bh

8,500.00

30,005.00

Semen Portland

1.1400

kg

1,500.00

1,710.00

Semen Warna

0.1000

kg

8,500.00

850.00

Pasir Pasang

0.0030

m3

142,000.00

Jumlah Bahan

426.00
2,986.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

16,031.00

Keuntungan Max. 10 %

A.10.25

400.00

Jumlah Pekerja

1,603.10

Jumlah Total

17,634.10

Dibulatkan

17,600.00

PEMASANGAN 1 M' PLINT UBIN TERALUX MARMER UKURAN 10 X 60 CM


BAHAN :
Plint Tralux Marmer

1.7000

bh

8,500.00

14,450.00

Semen Portland

1.1400

kg

1,500.00

1,710.00

Semen Warna

0.1000

kg

8,500.00

850.00

Pasir Pasang

0.0030

m3

142,000.00

Jumlah Bahan

426.00
2,986.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

16,031.00

Keuntungan Max. 10 %

A.10.26

400.00

Jumlah Pekerja

1,603.10

Jumlah Total

17,634.10

Dibulatkan

17,600.00

PEMASANGAN 1 M' PLINT UBIN TERALUX MARMER UKURAN 10 X 40 CM


BAHAN :
Plint Ubin PC

2.6500

bh

8,500.00

22,525.00

Semen Portland

1.2400

kg

1,500.00

1,860.00

49 dari 124

2
Pasir Pasang

4
0.0030

m3

6=(3x5)
142,000.00

Jumlah Bahan

426.00
2,286.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0050

Oh

80,000.00

13,045.00

Jumlah Bahan + Pekerja

15,331.00

Keuntungan Max. 10 %

A.10.27

400.00

Jumlah Pekerja

1,533.10

Jumlah Total

16,864.10

Dibulatkan

16,800.00

PEMASANGAN 1 M2 LANTAI TERASO COR DITEMPAT, TEBAL 3CM


BAHAN :
Teraso Cor

1.1000

m2

Semen Warna

0.1000

kg

8,500.00

850.00

Jumlah Bahan

850.00

UPAH :
Pekerja

0.2600

Oh

60,000.00

15,600.00

Tukang Batu

0.1300

Oh

72,500.00

9,425.00

Kepala Tukang

0.0130

Oh

80,000.00

1,040.00

Mandor

0.0130

Oh

80,000.00

27,105.00

Jumlah Bahan + Pekerja

27,955.00

Keuntungan Max. 10 %

A.10.28

1,040.00

Jumlah Pekerja

2,795.50

Jumlah Total

30,750.50

Dibulatkan

30,700.00

PEMASANGAN 1 M2 LANTAI KERAMIK ARTISTIK 10CM X 20CM


BAHAN :
Ubin Keramik

1.1000

m2

65,000.00

71,500.00

Semen Portland

8.1900

kg

1,500.00

12,285.00

Pasir Pasang

0.0450

m3

142,000.00

6,390.00

Semen Warna

0.0350

kg

8,500.00

Jumlah Bahan

297.50
90,472.50

UPAH :
Pekerja

0.7000

Oh

60,000.00

42,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

163,447.50

Keuntungan Max. 10 %

A.10.29

2,800.00
72,975.00

16,344.75

Jumlah Total

179,792.25

Dibulatkan

179,700.00

PEMASANGAN 1 M2 LANTAI KERAMIK ARTISTIK 10CM X 10CM ATAU 5CM X 20 CM


BAHAN :
Ubin Keramik

1.1000

m2

Semen Portland

8.1900

kg

1,500.00

12,285.00

Pasir Pasang

0.0450

m3

142,000.00

6,390.00

Semen Warna

3.2000

kg

8,500.00

27,200.00

Jumlah Bahan

45,875.00

UPAH :
Pekerja

0.7000

Oh

60,000.00

42,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja

2,800.00
72,975.00

Jumlah Bahan + Pekerja

118,850.00

Keuntungan Max. 10 %

11,885.00

Jumlah Total

130,735.00
50 dari 124

6=(3x5)

Dibulatkan
A.10.30

130,700.00

1 M2 PASANG LANTAI KERAMIK 33 X 33 CM


BAHAN :
Ubin Keramik 33 x 33 cm

1.10

m2

95,000.00

104,500.00

Semen Portland

8.1900

kg

1,500.00

12,285.00

Pasir Pasang

0.0450

m3

142,000.00

6,390.00

Semen Warna

1.6200

kg

8,500.00

13,770.00

Jumlah Bahan

136,945.00

UPAH :
Pekerja

0.7000

Oh

60,000.00

42,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

209,920.00

Keuntungan Max. 10 %

A.10.31

2,800.00
72,975.00

20,992.00

Jumlah Total

230,912.00

Dibulatkan

230,900.00

PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 30 X 30 CM


BAHAN :
Ubin Keramik

1.1000

m2

55,000.00

60,500.00

14.1500

kg

1,500.00

21,225.00

Pasir Pasang

0.0390

m3

142,000.00

5,538.00

Semen Warna

2.0000

kg

8,500.00

17,000.00

Semen Portland

Jumlah Bahan

104,263.00

UPAH :
Pekerja

0.7000

Oh

60,000.00

42,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

177,238.00

Keuntungan Max. 10 %

A.10.31.a

2,800.00
72,975.00

17,723.80

Jumlah Total

194,961.80

Dibulatkan

194,900.00

PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 30 X 30 CM, ANTI SLIP


BAHAN :
Ubin Keramik Anti Slip

1.1000

m2

65,000.00

71,500.00

14.1500

kg

1,500.00

21,225.00

Pasir Pasang

0.0390

m3

142,000.00

5,538.00

Semen Warna

2.0000

kg

8,500.00

17,000.00

Semen Portland

Jumlah Bahan

115,263.00

UPAH :
Pekerja

0.7000

Oh

60,000.00

42,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

188,238.00

Keuntungan Max. 10 %

A.10.32.a

2,800.00
72,975.00

18,823.80

Jumlah Total

207,061.80

Dibulatkan

207,000.00

PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 20 X 20 CM, ANTI SLIP


BAHAN :
Ubin Keramik

1.1000

m2

65,000.00

71,500.00

10.4000

kg

1,500.00

15,600.00

Pasir Pasang

0.0450

m3

142,000.00

6,390.00

Semen Warna

1.6200

kg

8,500.00

13,770.00

Semen Portland

Jumlah Bahan

107,260.00

UPAH :
51 dari 124

6=(3x5)

Pekerja

0.7000

Oh

60,000.00

42,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

180,235.00

Keuntungan Max. 10 %

A.10.33

2,800.00
72,975.00

18,023.50

Jumlah Total

198,258.50

Dibulatkan

198,200.00

PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 10 X 33 CM UNTUK VARIASI/BORDER


BAHAN :
Ubin Keramik

1.1000

m2

Semen Portland

9.8000

kg

1,500.00

Pasir Pasang

0.0450

m3

142,000.00

6,390.00

Semen Warna

4.3700

kg

8,500.00

37,145.00

Jumlah Bahan

14,700.00

58,235.00

UPAH :
Pekerja

1.0500

Oh

60,000.00

63,000.00

Tukang Batu

0.5250

Oh

72,500.00

38,062.50

Kepala Tukang

0.0530

Oh

80,000.00

4,240.00

Mandor

0.0530

Oh

80,000.00

109,542.50

Jumlah Bahan + Pekerja

167,777.50

Keuntungan Max. 10 %

A.10.34

4,240.00

Jumlah Pekerja

16,777.75

Jumlah Total

184,555.25

Dibulatkan

184,500.00

PEMASANGAN 1 M' PLINT KERAMIK UKURAN 10 X 20 CM


BAHAN :
Plint Keramik

5.3000

bh

4,000.00

21,200.00

Semen Portland

1.4000

kg

1,500.00

2,100.00

Pasir Pasang

0.0030

m3

142,000.00

426.00

Semen Warna

0.0250

kg

8,500.00

Jumlah Bahan

212.50
2,738.50

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0050

Oh

80,000.00

15,125.00

Jumlah Bahan + Pekerja

17,863.50

Keuntungan Max. 10 %

A.10.35

400.00

Jumlah Pekerja

1,786.35

Jumlah Total

19,649.85

Dibulatkan

19,600.00

PEMASANGAN 1 M' PLINT KERAMIK UKURAN 10 X 10 CM


BAHAN :
Plint Keramik

10.6000

bh

Semen Portland

1.1400

kg

1,500.00

1,710.00

Pasir Pasang

0.0030

m3

142,000.00

426.00

Semen Warna

0.0500

kg

8,500.00

Jumlah Bahan

425.00
2,561.00

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0050

Oh

80,000.00

400.00

Jumlah Pekerja

15,125.00

Jumlah Bahan + Pekerja

17,686.00

Keuntungan Max. 10 %

1,768.60

Jumlah Total

19,454.60

Dibulatkan

19,400.00
52 dari 124

1
A.10.36

6=(3x5)

PEMASANGAN 1 M' PLINT KERAMIK UKURAN 5 X 20 CM


BAHAN :
Plint Keramik

5.3000

bh

9,500.00

50,350.00

Semen Portland

0.5700

kg

1,500.00

855.00

Pasir Pasang

0.0015

m3

142,000.00

213.00

Semen Warna

0.0130

kg

8,500.00

Jumlah Bahan

110.50
1,178.50

UPAH :
Pekerja

0.0900

Oh

60,000.00

5,400.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0050

Oh

80,000.00

15,125.00

Jumlah Bahan + Pekerja

16,303.50

Keuntungan Max. 10 %

A.10.37

400.00

Jumlah Pekerja

1,630.35

Jumlah Total

17,933.85

Dibulatkan

17,900.00

PEMASANGAN 1 M' PLINT INTERNAL COVE ARTISTIK 5 X 5 X 20 CM


BAHAN :
Internal cove

5.3000

bh

Semen Portland

1.1400

kg

Pasir Pasang

0.0030

m3

8,500.00

25.50

Semen Warna

0.1000

kg

142,000.00

14,200.00

1,500.00

Jumlah Bahan

1,710.00

15,935.50

UPAH :
Pekerja

0.7500

Oh

60,000.00

45,000.00

Tukang Batu

0.7500

Oh

80,000.00

60,000.00

Kepala Tukang

0.0750

Oh

80,000.00

6,000.00

Mandor

0.0380

Oh

80,000.00

114,040.00

Jumlah Bahan + Pekerja

129,975.50

Keuntungan Max. 10 %

A.10.38

3,040.00

Jumlah Pekerja

12,997.55

Jumlah Total

142,973.05

Dibulatkan

142,900.00

PEMASANGAN 1 M2 LANTAI MARMER UKURAN 100X100 CM


BAHAN :
Marmer

1.1000

m2

515,000.00

566,500.00

Semen Portland

8.1900

kg

1,500.00

12,285.00

Pasir Pasang

0.0450

kg

142,000.00

6,390.00

Semen Warna

0.6500

m3

8,500.00

Jumlah Bahan

5,525.00
590,700.00

UPAH :
Pekerja

0.7000

Oh

60,000.00

42,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

663,675.00

Keuntungan Max. 10 %

A.11.01

2,800.00
72,975.00

66,367.50

Jumlah Total

730,042.50

Dibulatkan

730,000.00

PEMASANGAN 1 M2 LANTAI KARPET


BAHAN :
Karpet

1.0500

m2

Lem

0.3500

kg

28,000.00

Jumlah Bahan

9,800.00
9,800.00

UPAH :
Pekerja

0.1700

Oh

60,000.00

10,200.00

Tukang Kayu

0.1700

Oh

72,500.00

12,325.00

Kepala Tukang

0.0170

Oh

80,000.00

1,360.00

53 dari 124

2
Mandor

4
0.0090

Oh

6=(3x5)
80,000.00

24,605.00

Jumlah Bahan + Pekerja

34,405.00

Keuntungan Max. 10 %

A.11.02

720.00

Jumlah Pekerja

3,440.50

Jumlah Total

37,845.50

Dibulatkan

37,800.00

PEMASANGAN 1 M2 UNDERLAYER (PELAPIS BAWAH KARPET)


BAHAN :
Underlayer

1.0500

m2

Lem

0.3500

kg

21,000.00

Jumlah Bahan

7,350.00
7,350.00

UPAH :
Pekerja

0.1200

Oh

60,000.00

7,200.00

Tukang Kayu

0.1200

Oh

72,500.00

8,700.00

Kepala Tukang

0.0120

Oh

80,000.00

960.00

Mandor

0.0060

Oh

80,000.00

17,340.00

Jumlah Bahan + Pekerja

24,690.00

Keuntungan Max. 10 %

A.11.03

480.00

Jumlah Pekerja

2,469.00

Jumlah Total

27,159.00

Dibulatkan

27,100.00

1 M2 PASANG LANTAI PARQUET KAYU


BAHAN :
Parquet

1.0500

m2

580,000.00

Lem Vinyl

0.6000

kg

21,000.00

Jumlah Bahan

609,000.00
12,600.00
621,600.00

UPAH :
Pekerja

0.7000

Oh

60,000.00

42,000.00

Tukang Kayu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

694,575.00

Keuntungan Max. 10 %

A.11.04

2,800.00
72,975.00

69,457.50

Jumlah Total

764,032.50

Dibulatkan

764,000.00

1 M2 PASANG LANTAI KAYU GYMFLOOR


BAHAN :
Parquet

1.0500

m2

Lem Vinyl

0.6000

kg

5,800,000.00

Jumlah Bahan

3,480,000.00
3,480,000.00

UPAH :
Pekerja

0.7000

Oh

72,500.00

50,750.00

Tukang Kayu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

3,561,725.00

Keuntungan Max. 10 %

A.11.05

2,800.00
81,725.00

356,172.50

Jumlah Total

3,917,897.50

Dibulatkan

3,917,800.00

1 M2 PASANG DINDING PORSLEN 11 X 11 CM


BAHAN :
Porselen 11 x 11 cm

86.0000

bh

Semen Abu-abu

9.3000

kg

1,500.00

Pasir Pasang

0.0180

m3

142,000.00

2,556.00

Semen Warna

1.5000

kg

8,500.00

12,750.00

Jumlah Bahan

13,950.00

29,256.00

UPAH :
Pekerja

1.0000
54 dari 124

Oh

60,000.00

60,000.00

6=(3x5)

Tukang Batu

0.5000

Oh

72,500.00

36,250.00

Kepala Tukang

0.0500

Oh

80,000.00

4,000.00

Mandor

0.0500

Oh

80,000.00

104,250.00

Jumlah Bahan + Pekerja

133,506.00

Keuntungan Max. 10 %

A.11.06

4,000.00

Jumlah Pekerja

13,350.60

Jumlah Total

146,856.60

Dibulatkan

146,800.00

1 M2 PASANG DINDING PORSLEN 10 X 20 CM


BAHAN :
Porselen 10 x 20 cm

53.0000

bh

Semen Abu-abu

9.3000

kg

3,500.00

Pasir Pasang

0.0180

m3

165,000.00

2,970.00

Semen Warna

2.7500

kg

21,000.00

57,750.00

Jumlah Bahan

32,550.00

93,270.00

UPAH :
Pekerja

0.9000

Oh

60,000.00

54,000.00

Tukang Batu

0.4500

Oh

72,500.00

32,625.00

Kepala Tukang

0.0450

Oh

80,000.00

3,600.00

Mandor

0.0450

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

187,095.00

Keuntungan Max. 10 %

A.11.07

3,600.00
93,825.00

18,709.50

Jumlah Total

205,804.50

Dibulatkan

205,800.00

1 M2 PASANG DINDING PORSLEN 20 X 20 CM


BAHAN :
Porselen 20 x 20 cm

26.0000

bh

Semen Abu-abu

9.3000

kg

1,500.00

Pasir Pasang

0.0180

m3

142,000.00

2,556.00

Semen Warna

1.9400

kg

8,500.00

16,490.00

Jumlah Bahan

13,950.00

32,996.00

UPAH :
Pekerja

0.9000

Oh

60,000.00

54,000.00

Tukang Batu

0.4500

Oh

72,500.00

32,625.00

Kepala Tukang

0.0450

Oh

80,000.00

3,600.00

Mandor

0.0450

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

126,821.00

Keuntungan Max. 10 %

A.11.08

3,600.00
93,825.00

12,682.10

Jumlah Total

139,503.10

Dibulatkan

139,500.00

PEMASANGAN 1 M2 DINDING KERAMIK ARTISTIK 10 X 20 CM


BAHAN :
Keramik 10 x 20 cm

53.0000

bh

Semen Abu-abu

9.3000

kg

1,500.00

Pasir Pasang

0.0180

m3

142,000.00

2,556.00

Semen Warna

2.7500

kg

8,500.00

23,375.00

Jumlah Bahan

13,950.00

39,881.00

UPAH :
Pekerja

0.9000

Oh

60,000.00

54,000.00

Tukang Batu

0.4500

Oh

72,500.00

32,625.00

Kepala Tukang

0.0450

Oh

80,000.00

3,600.00

Mandor

0.0450

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

133,706.00

Keuntungan Max. 10 %

A.11.09

3,600.00
93,825.00

13,370.60

Jumlah Total

147,076.60

Dibulatkan

147,000.00

PEMASANGAN 1 M2 DINDING KERAMIK ARTISTIK 5 X 20 CM


55 dari 124

6=(3x5)

BAHAN :
Keramik 5 x 20 cm

106.0000

bh

Semen Abu-abu

9.3000

kg

1,500.00

Pasir Pasang

0.0180

m3

142,000.00

2,556.00

Semen Warna

2.9000

kg

8,500.00

24,650.00

Jumlah Bahan

13,950.00

41,156.00

UPAH :
Pekerja

0.9000

Oh

60,000.00

54,000.00

Tukang Batu

0.4500

Oh

72,500.00

32,625.00

Kepala Tukang

0.0450

Oh

80,000.00

3,600.00

Mandor

0.0450

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

134,981.00

Keuntungan Max. 10 %

A.11.10

3,600.00
93,825.00

13,498.10

Jumlah Total

148,479.10

Dibulatkan

148,400.00

PEMASANGAN 1 M2 DINDING KERAMIK 10 X 20 CM


BAHAN :
Keramik 10 x 20 cm

53.0000

bh

Semen Abu-abu

9.3000

kg

1,500.00

Pasir Pasang

0.0180

m3

142,000.00

2,556.00

Semen Warna

2.7500

kg

8,500.00

23,375.00

Jumlah Bahan

13,950.00

39,881.00

UPAH :
Pekerja

0.9000

Oh

60,000.00

54,000.00

Tukang Batu

0.4500

Oh

72,500.00

32,625.00

Kepala Tukang

0.0450

Oh

80,000.00

3,600.00

Mandor

0.0450

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

133,706.00

Keuntungan Max. 10 %

A.11.11

3,600.00
93,825.00

13,370.60

Jumlah Total

147,076.60

Dibulatkan

147,000.00

PEMASANGAN 1 M2 DINDING KERAMIK 20 X 20 CM


BAHAN :
Keramik artistik 20 x 20 cm

1.1000

m2

60,000.00

66,000.00

Semen Abu-abu

9.3000

kg

1,500.00

13,950.00

Pasir Pasang

0.0180

m3

142,000.00

2,556.00

Semen Warna

1.9400

kg

8,500.00

16,490.00

Jumlah Bahan

98,996.00

UPAH :
Pekerja

0.9000

Oh

60,000.00

54,000.00

Tukang Batu

0.4500

Oh

72,500.00

32,625.00

Kepala Tukang

0.0450

Oh

80,000.00

3,600.00

Mandor

0.0450

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

192,821.00

Keuntungan Max. 10 %

A.11.11.a

3,600.00
93,825.00

19,282.10

Jumlah Total

212,103.10

Dibulatkan

212,100.00

PEMASANGAN 1 M2 DINDING KERAMIK 20 X 25 CM


BAHAN :
Keramik artistik 20 x 25 cm

1.1000

m2

65,000.00

71,500.00

Semen Abu-abu

9.3000

kg

1,500.00

13,950.00

Pasir Pasang

0.0180

m3

142,000.00

2,556.00

Semen Warna

1.9400

kg

8,500.00

16,490.00

Jumlah Bahan

104,496.00

UPAH :
Pekerja

0.9000

Oh

60,000.00

54,000.00

Tukang Batu

0.4500

Oh

72,500.00

32,625.00

56 dari 124

6=(3x5)

Kepala Tukang

0.0450

Oh

80,000.00

Mandor

0.0450

Oh

80,000.00

Jumlah Pekerja

3,600.00
93,825.00

Jumlah Bahan + Pekerja

198,321.00

Keuntungan Max. 10 %

A.11.12

3,600.00

19,832.10

Jumlah Total

218,153.10

Dibulatkan

218,100.00

PEMASANGAN 1 M2 DINDING MARMER 100 X 100 CM


BAHAN :
Marmer

1.0600

m2

515,000.00

Paku 12 cm

0.1515

kg

18,000.00

2,727.00

12.4400

kg

1,500.00

18,660.00

Pasir Pasang

0.0250

m3

142,000.00

3,550.00

Semen Warna

0.6500

kg

8,500.00

Semen Abu-abu

Jumlah Bahan

545,900.00

5,525.00
576,362.00

UPAH :
Pekerja

1.3000

Oh

60,000.00

78,000.00

Tukang Batu

0.6500

Oh

72,500.00

47,125.00

Kepala Tukang

0.0650

Oh

80,000.00

5,200.00

Mandor

0.0650

Oh

80,000.00

135,525.00

Jumlah Bahan + Pekerja

711,887.00

Keuntungan Max. 10 %

A.11.13

5,200.00

Jumlah Pekerja

71,188.70

Jumlah Total

783,075.70

Dibulatkan

783,000.00

1 M2 PASANGAN DINDING BATU TEMPEL HITAM


BAHAN :
Bata Tempel Hitam
Semen Portland
Pasir Pasang

1.1000

m2

200,000.00

220,000.00

11.7500

kg

1,500.00

17,625.00

0.0350

142,000.00

Jumlah Bahan

4,970.00
242,595.00

UPAH :
Pekerja

0.7000

Oh

60,000.00

42,000.00

Tukang Batu

0.3500

Oh

72,500.00

25,375.00

Kepala Tukang

0.0350

Oh

80,000.00

2,800.00

Mandor

0.0350

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

315,570.00

Keuntungan Max. 10 %

A.11.14

2,800.00
72,975.00

31,557.00

Jumlah Total

347,127.00

Dibulatkan

347,100.00

PEMASANGAN 1 M2 LANTAI VYNIL UKURAN 30 CM X 30 CM


BAHAN :
Vynil

11.8700

bh

Lem

0.3500

kg

65,000.00

Jumlah Bahan

22,750.00
22,750.00

UPAH :
Pekerja

0.1500

Oh

60,000.00

9,000.00

Tukang Batu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0080

Oh

80,000.00

21,715.00

Jumlah Bahan + Pekerja

44,465.00

Keuntungan Max. 10 %

A.11.15

640.00

Jumlah Pekerja

4,446.50

Jumlah Total

48,911.50

Dibulatkan

48,900.00

PEMASANGAN 1 M2 WALLPAPER LEBAR 50 CM


BAHAN :
Wallpaper

2.2000

Lem

0.2500

kg

57 dari 124

65,000.00

16,250.00

6=(3x5)

Jumlah Bahan

16,250.00

UPAH :
Pekerja

0.3500

Oh

60,000.00

21,000.00

Tukang Batu

0.1750

Oh

72,500.00

12,687.50

Kepala Tukang

0.0170

Oh

80,000.00

1,360.00

Mandor

0.0020

Oh

80,000.00

35,207.50

Jumlah Bahan + Pekerja

51,457.50

Keuntungan Max. 10 %

A.11.16

160.00

Jumlah Pekerja

5,145.75

Jumlah Total

56,603.25

Dibulatkan

56,600.00

1 M1 PASANG PLINT VYNIL 15 CM X 30 CM


BAHAN :
Vynil

1.7600

bh

lem

0.0800

kg

Jumlah Bahan

UPAH :
Pekerja

0.0800

Oh

60,000.00

4,800.00

Tukang Kayu

0.0800

Oh

72,500.00

5,800.00

Kepala Tukang

0.0080

Oh

80,000.00

640.00

Mandor

0.0040

Oh

80,000.00

11,560.00

Jumlah Bahan + Pekerja

11,560.00

Keuntungan Max. 10 %

A.11.17

320.00

Jumlah Pekerja

1,156.00

Jumlah Total

12,716.00

Dibulatkan

12,700.00

PEMASANGAN 1 M1 PLINT KAYU 2 X 10 CM


BAHAN :
Papan kayu kelas 1

0.0030

m3

13,500,000.00

Paku/skrup 5cm

0.0500

kg

10,000.00

Jumlah Bahan

40,500.00
500.00
41,000.00

UPAH :
Pekerja

0.1200

Oh

60,000.00

7,200.00

Tukang Kayu

0.1200

Oh

72,500.00

8,700.00

Kepala Tukang

0.0120

Oh

80,000.00

960.00

Mandor

0.0060

Oh

80,000.00

17,340.00

Jumlah Bahan + Pekerja

58,340.00

Keuntungan Max. 10 %

A.12.01

480.00

Jumlah Pekerja

5,834.00

Jumlah Total

64,174.00

Dibulatkan

64,100.00

PEMASANGAN 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM, DAN 6 MM


BAHAN :
Asbes semen

1.1000

m2

14,000.00

Paku tripleks

0.0100

kg

20,000.00

Jumlah Bahan

15,400.00
200.00
15,600.00

UPAH :
Pekerja

0.0300

Oh

60,000.00

1,800.00

Tukang Kayu

0.0700

Oh

72,500.00

5,075.00

Kepala Tukang

0.0070

Oh

80,000.00

560.00

Mandor

0.0040

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

23,355.00

Keuntungan Max. 10 %

A.12.02

320.00
7,755.00

2,335.50

Jumlah Total

25,690.50

Dibulatkan

25,600.00

PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (30 X30) CM


BAHAN :
Akustik
Paku tripleks

12.0000

lbr

0.0500

kg

58 dari 124

20,000.00

1,000.00

6=(3x5)

Jumlah Bahan

1,000.00

UPAH :
Pekerja

0.1200

Oh

60,000.00

7,200.00

Tukang Kayu

0.1200

Oh

72,500.00

8,700.00

Kepala Tukang

0.0120

Oh

80,000.00

960.00

Mandor

0.0060

Oh

80,000.00

17,340.00

Jumlah Bahan + Pekerja

18,340.00

Keuntungan Max. 10 %

A.12.03

480.00

Jumlah Pekerja

1,834.00

Jumlah Total

20,174.00

Dibulatkan

20,100.00

PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (30 X60) CM


BAHAN :
Akustik

5.8000

lbr

Paku tripleks

0.0500

kg

20,000.00

Jumlah Bahan

1,000.00
1,000.00

UPAH :
Pekerja

0.1200

Oh

60,000.00

7,200.00

Tukang Kayu

0.1200

Oh

72,500.00

8,700.00

Kepala Tukang

0.0120

Oh

80,000.00

960.00

Mandor

0.0060

Oh

80,000.00

17,340.00

Jumlah Bahan + Pekerja

18,340.00

Keuntungan Max. 10 %

A.12.04

480.00

Jumlah Pekerja

1,834.00

Jumlah Total

20,174.00

Dibulatkan

20,100.00

PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (60 X120) CM


BAHAN :
Akustik

1.5000

lbr

155,000.00

Paku tripleks

0.0500

kg

20,000.00

Jumlah Bahan

232,500.00
1,000.00
233,500.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0050

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

247,950.00

Keuntungan Max. 10 %

A.12.05

400.00
14,450.00

24,795.00

Jumlah Total

272,745.00

Dibulatkan

272,700.00

PEMASANGAN 1 M2 LANGIT-LANGIT TRIPLEKS UKURAN (120 X 240) CM, TEBAL 3 MM, 4MM & 6 MM
BAHAN :
Tripleks

0.3750

lbr

70,000.00

Paku tripleks

0.0300

kg

20,000.00

Jumlah Bahan

26,250.00
600.00
26,850.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0050

Oh

80,000.00

14,450.00

Jumlah Bahan + Pekerja

41,300.00

Keuntungan Max. 10 %

A.12.06

400.00

Jumlah Pekerja

4,130.00

Jumlah Total

45,430.00

Dibulatkan

45,400.00

PEMASANGAN 1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm


BAHAN :
Gypsum Board (120 x 240 x9) mm

0.3640

lbr

80,000.00

29,120.00

Paku Sekrup

0.1100

kg

10,000.00

1,100.00

59 dari 124

6=(3x5)

Jumlah Bahan

30,220.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.0500

Oh

72,500.00

3,625.00

Kepala Tukang

0.0050

Oh

80,000.00

400.00

Mandor

0.0050

Oh

80,000.00

10,425.00

Jumlah Bahan + Pekerja

40,645.00

Keuntungan Max. 10 %

A.12.07

400.00

Jumlah Pekerja

4,064.50

Jumlah Total

44,709.50

Dibulatkan

44,700.00

PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (60 X120) CM BERIKUT RANGKA ALUMUNIUM


BAHAN :
Frofil Alumunium "T"

3.6000

Kawat dia 4 mm

0.1500

kg

Ramset

1.0500

bh

Akustik 60 X 120

1.5000

lbr

Jumlah Bahan

0
-

UPAH :
Pekerja

0.5000

Oh

60,000.00

30,000.00

Tukang Kayu

0.5000

Oh

72,500.00

36,250.00

Kepala Tukang

0.0500

Oh

80,000.00

4,000.00

Mandor

0.0250

Oh

80,000.00

72,250.00

Jumlah Bahan + Pekerja

72,250.00

Keuntungan Max. 10 %

A.12.08

2,000.00

Jumlah Pekerja

7,225.00

Jumlah Total

79,475.00

Dibulatkan

79,400.00

PEMASANGAN 1 M' LIST LANGIT LANGIT KAYU PROFIL


BAHAN :
List Kayu Profil

1.0500

m1

4,000.00

Paku

0.0100

kg

18,000.00

Jumlah Bahan

4,200.00
180.00
4,380.00

UPAH :
Pekerja

0.0500

Oh

60,000.00

3,000.00

Tukang Kayu

0.0500

Oh

72,500.00

3,625.00

Kepala Tukang

0.0050

Oh

80,000.00

400.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

11,645.00

Keuntungan Max. 10 %

A.13.01

240.00
7,265.00

1,164.50

Jumlah Total

12,809.50

Dibulatkan

12,800.00

PEMASANGAN 1 M2 ATAP GENTENG PALENTONG KECIL


BAHAN :
Genteng Palentong

25.0000

buah

2,500.00

Jumlah Bahan

62,500.00
62,500.00

UPAH :
Pekerja

0.1500

Oh

60,000.00

9,000.00

Tukang Kayu

0.0750

Oh

72,500.00

5,437.50

Kepala Tukang

0.0075

Oh

80,000.00

600.00

Mandor

0.0080

Oh

15,037.50

Jumlah Bahan + Pekerja

77,537.50

Keuntungan Max. 10 %

A.13.04

Jumlah Pekerja

7,753.75

Jumlah Total

85,291.25

Dibulatkan

85,200.00

1 M1 PASANG BUBUNG GENTENG PALENTONG


BAHAN :
Genteng Bubung Palentong

5.0000
60 dari 124

buah

3,500.00

17,500.00

6=(3x5)

Semen Portland

8.0000

kg

1,500.00

Pasir Pasang

0.0320

m3

142,000.00

Jumlah Bahan

12,000.00
4,544.00
34,044.00

UPAH :
Pekerja

0.4000

Oh

60,000.00

24,000.00

Tukang Kayu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0020

Oh

80,000.00

40,260.00

Jumlah Bahan + Pekerja

74,304.00

Keuntungan Max. 10 %

A.14.02.a

160.00

Jumlah Pekerja

7,430.40

Jumlah Total

81,734.40

Dibulatkan

81,700.00

PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II
BAHAN :
Balok Kayu (kayu kelas II)

1.2000

3,200,000.00

3,840,000.00

Paku 10 CM

1.2500

kg

18,000.00

22,500.00

Lem Kayu

1.0000

kg

21,000.00

Jumlah Bahan

21,000.00
3,883,500.00

UPAH :
Pekerja

6.0000

Oh

60,000.00

360,000.00

18.0000

Oh

72,500.00

1,305,000.00

Kepala Tukang

1.8000

Oh

80,000.00

144,000.00

Mandor

0.3000

Oh

80,000.00

Tukang Kayu

1,833,000.00

Jumlah Bahan + Pekerja

5,716,500.00

Keuntungan Max. 10 %

A.14.06,a

24,000.00

Jumlah Pekerja

571,650.00

Jumlah Total

6,288,150.00

Dibulatkan

6,288,100.00

PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL, KAYU KELAS II


BAHAN :
Kayu Kls II

0.0400

3,500,000.00

Lem Kayu

0.5000

kg

21,000.00

Jumlah Bahan

140,000.00
10,500.00
150,500.00

UPAH :
Pekerja

1.0000

Oh

60,000.00

60,000.00

Tukang Kayu

3.0000

Oh

72,500.00

217,500.00

Kepala Tukang

0.3000

Oh

80,000.00

24,000.00

Mandor

0.0500

Oh

80,000.00

305,500.00

Jumlah Bahan + Pekerja

456,000.00

Keuntungan Max. 10 %

A.14.07

4,000.00

Jumlah Pekerja

45,600.00

Jumlah Total

501,600.00

Dibulatkan

501,600.00

PEMBUATAN DAN PEMASANGAN 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS 1 DAN 2
BAHAN :
Kayu Jati, Papan

0.0240

13,500,000.00

Lem Kayu

0.3000

kg

21,000.00

Jumlah Bahan

324,000.00
6,300.00
330,300.00

UPAH :
Pekerja

0.8000

Oh

60,000.00

48,000.00

Tukang Kayu

2.4000

Oh

72,500.00

174,000.00

Kepala Tukang

0.2400

Oh

80,000.00

19,200.00

Mandor

0.0400

Oh

80,000.00

244,400.00

Jumlah Bahan + Pekerja

574,700.00

Keuntungan Max. 10 %

A.14.07,a

3,200.00

Jumlah Pekerja

57,470.00

Jumlah Total

632,170.00

Dibulatkan

632,100.00

1 M2 PASANGAN JENDELA TANPA KACA KAYU KAYU LOKAL KLS II


61 dari 124

6=(3x5)

BAHAN :
Kayu KAYU LOKAL KLS II , Papan

0.0106

3,500,000.00

Lem Kayu

0.3000

kg

21,000.00

Jumlah Bahan

36,960.00
6,300.00
43,260.00

UPAH :
Pekerja

0.8000

Oh

60,000.00

48,000.00

Tukang Kayu

2.4000

Oh

72,500.00

174,000.00

Kepala Tukang

0.2400

Oh

80,000.00

19,200.00

Mandor

0.0400

Oh

80,000.00

244,400.00

Jumlah Bahan + Pekerja

287,660.00

Keuntungan Max. 10 %

A.14.11,a

3,200.00

Jumlah Pekerja

28,766.00

Jumlah Total

316,426.00

Dibulatkan

316,400.00

PEMASANGAN 1 M2 JALUSI KUSEN, KAYU KELAS II


BAHAN :
Papan Kayu Kls II

0.0315

3,500,000.00

Paku 1 cm - 2.5 cm

0.1500

kg

20,000.00

Jumlah Bahan

110,250.00
3,000.00
113,250.00

UPAH :
Pekerja

0.6700

Oh

60,000.00

40,200.00

Tukang Kayu

2.0000

Oh

72,500.00

145,000.00

Kepala Tukang

0.2000

Oh

80,000.00

16,000.00

Mandor

0.3350

Oh

80,000.00

228,000.00

Jumlah Bahan + Pekerja

341,250.00

Keuntungan Max. 10 %

A.14.12

26,800.00

Jumlah Pekerja

34,125.00

Jumlah Total

375,375.00

Dibulatkan

375,300.00

PEMASANGAN 1 M2 TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I


BAHAN :
Papan Kayu (kayu jati)

0.0250

13,500,000.00

Paku 1 cm - 2.5 cm

0.0300

kg

20,000.00

600.00

Lem Kayu

0.3000

kg

21,000.00

6,300.00

Teakwood 4mm 90 x 220 mm

1.0000

lbr

140,000.00

140,000.00

Jumlah Bahan

337,500.00

484,400.00

UPAH :
Pekerja

0.8000

Oh

60,000.00

48,000.00

Tukang Kayu

2.4000

Oh

72,500.00

174,000.00

Kepala Tukang

0.2400

Oh

80,000.00

19,200.00

Mandor

0.0400

Oh

80,000.00

244,400.00

Jumlah Bahan + Pekerja

728,800.00

Keuntungan Max. 10 %

A.14.13

3,200.00

Jumlah Pekerja

72,880.00

Jumlah Total

801,680.00

Dibulatkan

801,600.00

PEMASANGAN 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU KELAS II


BAHAN :
Papan Kayu (kayu kelas II)

0.0250

3,500,000.00

Paku 1 cm - 2.5 cm

0.0300

kg

3,000.00

90.00

Lem Kayu

0.8000

lt

23,000.00

18,400.00

Teakwood 4mm 90 x 220 mm

1.0000

lbr

160,000.00

160,000.00

Formica

0.5000

lbr

190,000.00

Jumlah Bahan

87,500.00

95,000.00
360,990.00

UPAH :
Pekerja

0.8500

Oh

60,000.00

51,000.00

Tukang Kayu

2.5500

Oh

72,500.00

184,875.00

Kepala Tukang

0.2550

Oh

80,000.00

20,400.00

Mandor

0.0430

Oh

80,000.00

Jumlah Pekerja

3,440.00
259,715.00

62 dari 124

6=(3x5)

Jumlah Bahan + Pekerja

620,705.00

Keuntungan Max. 10 %

A.14.14

62,070.50

Jumlah Total

682,775.50

Dibulatkan

682,700.00

1 M3 PASANG KONSTRUKSI KUDA - KUDA KONVENSIONAL KAYU KELAS I, II, DAN III BENTANG 6 M
BAHAN :
Balok Kayu (kayu jati)

1.1000

12,000,000.00

13,200,000.00

Besi strip tebal 5 mm

15.0000

kg

20,000.00

300,000.00

Paku 8 cm s/d 12 cm

5.6000

kg

18,000.00

Jumlah Bahan

100,800.00
13,600,800.00

UPAH :
Pekerja

4.0000

Oh

60,000.00

240,000.00

12.0000

Oh

72,500.00

870,000.00

Kepala Tukang

1.2000

Oh

80,000.00

96,000.00

Mandor

0.2000

Oh

80,000.00

Tukang Kayu

Jumlah Pekerja
Jumlah Bahan + Pekerja

14,822,800.00

Keuntungan Max. 10 %

A.14.15

16,000.00
1,222,000.00

1,482,280.00

Jumlah Total

16,305,080.00

Dibulatkan

16,305,000.00

PEMASANGAN 1 M3 KONSTRUKSI KUDA - KUDA EXPOSE, KAYU LOKAL KLS I


BAHAN :
Balok Kayu (kayu jati)

1.2000

12,000,000.00

14,400,000.00

Besi strip tebal 5 mm

15.0000

kg

20,000.00

300,000.00

5.6000

kg

18,000.00

Paku 12 cm
Jumlah Bahan

100,800.00
14,800,800.00

UPAH :
Pekerja

6.7000

Oh

60,000.00

402,000.00

20.1000

Oh

72,500.00

1,457,250.00

Kepala Tukang

2.0100

Oh

80,000.00

160,800.00

Mandor

0.3350

Oh

80,000.00

Tukang Kayu

Jumlah Pekerja
Jumlah Bahan + Pekerja

16,847,650.00

Keuntungan Max. 10 %

A.14.16

26,800.00
2,046,850.00

1,684,765.00

Jumlah Total

18,532,415.00

Dibulatkan

18,532,400.00

1 M3 PASANG KONSTRUKSI GORDENG KAYU KELAS II


BAHAN :
Balok Kayu

1.1000

2,500,000.00

2,750,000.00

Besi strip tebal 5 mm

15.0000

kg

20,000.00

300,000.00

Paku 8 cm s/d 12 cm

3.0000

kg

18,000.00

Jumlah Bahan

54,000.00
3,104,000.00

UPAH :
Pekerja

6.7000

Oh

60,000.00

402,000.00

20.1000

Oh

72,500.00

1,457,250.00

Kepala Tukang

2.0100

Oh

80,000.00

160,800.00

Mandor

0.3350

Oh

Tukang Kayu

Jumlah Pekerja

2,020,050.00

Jumlah Bahan + Pekerja

5,124,050.00

Keuntungan Max. 10 %

A.14.16,a

512,405.00

Jumlah Total

5,636,455.00

Dibulatkan

5,636,400.00

1 M3 PASANGAN KONSTRUKSI KUDA - KUDA KAYU KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II, Balok

1.1000

2,500,000.00

Paku 8 cm s/d 12 cm

5.6000

kg

18,000.00

Jumlah Bahan

2,750,000.00
100,800.00
2,850,800.00

UPAH :
Pekerja
Tukang Kayu

4.0000

Oh

60,000.00

240,000.00

12.0000

Oh

72,500.00

870,000.00

63 dari 124

6=(3x5)

Kepala Tukang

1.2000

Oh

80,000.00

Mandor

0.3350

Oh

Jumlah Pekerja

1,206,000.00

Jumlah Bahan + Pekerja

4,056,800.00

Keuntungan Max. 10 %

A.14.17

96,000.00

405,680.00

Jumlah Total

4,462,480.00

Dibulatkan

4,462,400.00

PEMASANGAN 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU LOKAL KLS II


BAHAN :
Kaso-kaso (5x7) cm Kayu Lokal Kls II

0.0140

2,500,000.00

35,000.00

Reng (2 x 3) cm

0.3600

m1

6,000.00

2,160.00

Paku 5 cm s/d 10 CM

0.2500

kg

18,000.00

Jumlah Bahan

4,500.00
41,660.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0050

Oh

14,050.00

Jumlah Bahan + Pekerja

55,710.00

Keuntungan Max. 10 %

A.14.18

Jumlah Pekerja

5,571.00

Jumlah Total

61,281.00

Dibulatkan

61,200.00

PEMASANGAN 1 M2 RANGKA ATAP GENTENG BETON, KAYU LOKAL KLS II


BAHAN :
Kaso-kaso (5x7) cm Kayu Lokal Kls II

0.0140

2,500,000.00

Reng (3 x 4) cm

0.0570

m1

6,000.00

342.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

0.2500

kg

18,000.00

4,500.00

Jumlah Bahan

35,000.00

39,842.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0050

Oh

Jumlah Pekerja

14,050.00

Jumlah Bahan + Pekerja

53,892.00

Keuntungan Max. 10 %

A.14.18,a

5,389.20

Jumlah Total

59,281.20

Dibulatkan

59,200.00

1 M2 PASANG RANGKA ATAP GENTENG PALENTONG KAYU LOKAL KLS II


BAHAN :
Kaso-kaso (5x7) cm Kayu Lokal Kls II

0.0140

3,200,000.00

44,800.00

Reng (2 x 3) cm

6.0000

m1

2,500.00

15,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

0.2500

kg

18,000.00

Jumlah Bahan

4,500.00
64,300.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0050

Oh

14,050.00

Jumlah Bahan + Pekerja

78,350.00

Keuntungan Max. 10 %

A.14.22

Jumlah Pekerja

7,835.00

Jumlah Total

86,185.00

Dibulatkan

86,100.00

1 M2 PASANG RANGKA LANGIT - LANGIT (60 x 60) cm, KAYU LOKAL KLS II atau III
BAHAN :
Kaso-kaso 5X7cm (kayu albasiah)

0.0163

2,500,000.00

Paku 7 cm - 10 cm

0.2500

kg

18,000.00

Jumlah Bahan

40,750.00
4,500.00
45,250.00

64 dari 124

6=(3x5)

UPAH :
Pekerja

0.2000

Oh

60,000.00

12,000.00

Tukang Kayu

0.3000

Oh

72,500.00

21,750.00

Kepala Tukang

0.0300

Oh

80,000.00

2,400.00

Mandor

0.0100

Oh

Jumlah Pekerja

36,150.00

Jumlah Bahan + Pekerja

81,400.00

Keuntungan Max. 10 %

A.14.22

8,140.00

Jumlah Total

89,540.00

Dibulatkan

89,500.00

1 M2 PASANG RANGKA LANGIT - LANGIT (60 x 60) cm, KAYU LOKAL KLS II
BAHAN :
Kaso-kaso 5X7cm (kayu Kls II)

0.0163

3,200,000.00

Paku 7 cm - 10 cm

0.2500

kg

18,000.00

Jumlah Bahan

52,160.00
4,500.00
56,660.00

UPAH :
Pekerja

0.2000

Oh

60,000.00

12,000.00

Tukang Kayu

0.3000

Oh

72,500.00

21,750.00

Kepala Tukang

0.0300

Oh

80,000.00

2,400.00

Mandor

0.0100

Oh

36,150.00

Jumlah Bahan + Pekerja

92,810.00

Keuntungan Max. 10 %

A.09.07.a

Jumlah Pekerja

9,281.00

Jumlah Total

102,091.00

Dibulatkan

102,000.00

1 M2 LANGIT - LANGIT GRC (1,20 x 2,40) m


BAHAN :
GRC ( 1,20 X 2, 40 )

0.3640

m2

70,000.00

Paku 3 cm

0.1100

kg

18,000.00

Jumlah Bahan

25,480.00
1,980.00
27,460.00

UPAH :
Pekerja

0.0300

Oh

60,000.00

1,800.00

Tukang Kayu

0.0700

Oh

72,500.00

5,075.00

Kepala Tukang

0.0070

Oh

80,000.00

560.00

Mandor

0.0040

Oh

Jumlah Pekerja

7,435.00

Jumlah Bahan + Pekerja

34,895.00

Keuntungan Max. 10 %

A.14.23

3,489.50

Jumlah Total

38,384.50

Dibulatkan

38,300.00

1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, Kayu Kelas I atau Kelas II


BAHAN :
Papan Kayu (kayu jati)

0.0108

13,500,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

0.1000

kg

18,000.00

Jumlah Bahan

145,800.00
1,800.00
147,600.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0050

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

170,100.00

Keuntungan Max. 10 %

A.14.23,a

400.00
22,500.00

17,010.00

Jumlah Total

187,110.00

Dibulatkan

187,100.00

1 M1 PASANG LISPLANK UKURAN 3 x 10 + 3 x 25 cm, KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II, Papan

0.0116

3,500,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

0.0600

kg

18,000.00

Jumlah Bahan

40,600.00
1,080.00
41,680.00

65 dari 124

6=(3x5)

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0500

Oh

80,000.00

4,000.00

Jumlah Pekerja

18,050.00

Jumlah Bahan + Pekerja

59,730.00

Keuntungan Max. 10 %

A.14.24

5,973.00

Jumlah Total

65,703.00

Dibulatkan

65,700.00

1 M1 PASANG LISPLANK UKURAN (3 x 30) cm Kelas I atau Kelas II


BAHAN :
Papan Kayu (kayu jati)

0.0110

13,500,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

0.0500

kg

18,000.00

Jumlah Bahan

148,500.00
900.00
149,400.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0050

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

171,900.00

Keuntungan Max. 10 %

A.14.25

400.00
22,500.00

17,190.00

Jumlah Total

189,090.00

Dibulatkan

189,000.00

1 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER


BAHAN :
Balok Kayu 6 X 12

0.0280

9,500,000.00

Paku 5 Dan 10

0.1500

kg

18,000.00

2,700.00

Teakwood 4mm 120 x 240 mm

0.8600

lbr

160,000.00

137,600.00

Lem Kayu

0.5600

kg

21,000.00

Jumlah Bahan

266,000.00

11,760.00
418,060.00

UPAH :
Pekerja

0.1500

Oh

60,000.00

9,000.00

Tukang Kayu

0.4500

Oh

72,500.00

32,625.00

Kepala Tukang

0.0450

Oh

80,000.00

3,600.00

Mandor

0.0080

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

463,925.00

Keuntungan Max. 10 %

A.14.26

640.00
45,865.00

46,392.50

Jumlah Total

510,317.50

Dibulatkan

510,300.00

1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER


BAHAN :
Kayu Kamper, Balok

0.0280

9,500,000.00

Paku 8 cm s/d 12 cm

0.1500

kg

18,000.00

2,700.00

Lem Kayu

0.5600

21,000.00

11,760.00

Plywood 4 mm 120 x 240

0.8600

lbr

135,000.00

Jumlah Bahan

266,000.00

116,100.00
396,560.00

UPAH :
Pekerja

0.2000

Oh

60,000.00

12,000.00

Tukang Kayu

0.6000

Oh

72,500.00

43,500.00

Kepala Tukang

0.0600

Oh

80,000.00

4,800.00

Mandor

0.0100

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

457,660.00

Keuntungan Max. 10 %

A.14.27

800.00
61,100.00

45,766.00

Jumlah Total

503,426.00

Dibulatkan

503,400.00

PEMASANGAN 1 M2 DINDING LAMBRISERING DARI PAPAN KAYU KELAS I


66 dari 124

6=(3x5)

BAHAN :
Papan Kayu (kayu jati)

0.0070

13,500,000.00

94,500.00

Paku 5 cm s/d 10 cm

0.1000

kg

18,000.00

1,000.00

Paku Skrup 10 cm

0.1500

kg

10,000.00

Jumlah Bahan

1,500.00
97,000.00

UPAH :
Pekerja

0.6000

Oh

60,000.00

36,000.00

Tukang Kayu

1.8000

Oh

72,500.00

130,500.00

Kepala Tukang

0.1800

Oh

80,000.00

14,400.00

Mandor

0.0300

Oh

80,000.00

183,300.00

Jumlah Bahan + Pekerja

280,300.00

Keuntungan Max. 10 %

A.14.28

2,400.00

Jumlah Pekerja

28,030.00

Jumlah Total

308,330.00

Dibulatkan

308,300.00

PEMASANGAN 1 M2 DINDING LAMBRISERING DARI PLYWOOD UKURAN (120X240) CM


BAHAN :
Plywood 4 mm

0.4000

135,000.00

Paku 1 cm dan 2.5 cm

0.0500

kg

20,000.00

Jumlah Bahan

54,000.00
1,000.00
55,000.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

15,000.00

Tukang Kayu

0.0750

Oh

72,500.00

5,437.50

Kepala Tukang

0.0080

Oh

80,000.00

640.00

Mandor

0.0010

Oh

80,000.00

21,157.50

Jumlah Bahan + Pekerja

76,157.50

Keuntungan Max. 10 %

A.14.29

80.00

Jumlah Pekerja

7,615.75

Jumlah Total

83,773.25

Dibulatkan

83,700.00

PEMASANGAN 1 M2 DINDING BILIK, RANGKA KAYU RANGKA KAYU KELAS III ATAU IV
BAHAN :
Bilik Bambu

1.5000

m2

8,500.00

12,750.00

Kayu 5/7 Albasiah

0.0140

2,200,000.00

30,800.00

Paku 8 cm s/d 12 cm

0.0120

kg

18,000.00

216.00

List Kayu 2/4

0.0030

5,000.00

Jumlah Bahan

15.00
43,781.00

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.0500

Oh

72,500.00

3,625.00

Kepala Tukang

0.0050

Oh

80,000.00

400.00

Mandor

0.0050

Oh

80,000.00

10,425.00

Jumlah Bahan + Pekerja

54,206.00

Keuntungan Max. 10 %

A.14.30

400.00

Jumlah Pekerja

5,420.60

Jumlah Total

59,626.60

Dibulatkan

59,600.00

PEMASANGAN 1 M2 RANGKA DINDING PEMISAH (60 X 120 CM ) KAYU KAYU LOKAL KLS II
BAHAN :
Kayu KAYU LOKAL KLS II , Balok

0.0280

3,200,000.00

Paku 8 cm s/d 12 cm

0.1500

kg

18,000.00

Jumlah Bahan

89,600.00
2,700.00
92,300.00

UPAH :
Pekerja

0.1500

Oh

60,000.00

9,000.00

Tukang Kayu

0.4500

Oh

72,500.00

32,625.00

Kepala Tukang

0.0450

Oh

80,000.00

3,600.00

Mandor

0.0080

Oh

80,000.00

Jumlah Pekerja

640.00
45,865.00

Jumlah Bahan + Pekerja

138,165.00

Keuntungan Max. 10 %

13,816.50
67 dari 124

A.14.31

6=(3x5)

Jumlah Total

151,981.50

Dibulatkan

151,900.00

PEMASANGAN 1 M2 RANGKA BESI HOLLOW 1 X 40.40.2MM, MODUL 60 X 120CM, DINDING PARTISI


BAHAN :
Rangka metal hollow 40.40.2 mm
Asesoris (perkuatan, las dll)

3.5000
100% x rangka

m1

26,000.00

ls

26,000.00

Jumlah Bahan

91,000.00
26,000.00
117,000.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

15,000.00

Tukang Besi

0.2500

Oh

72,500.00

18,125.00

Kepala Tukang

0.0250

Oh

80,000.00

2,000.00

Mandor

0.0130

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

153,165.00

Keuntungan Max. 10 %

A.14.32

1,040.00
36,165.00

15,316.50

Jumlah Total

168,481.50

Dibulatkan

168,400.00

1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGAN


Galian Tanah

0.1500

47,000.00

7,050.00

Grefel Beton 20 Cm X 1/2

1.0000

bh

31,000.00

31,000.00

Pas . Bata + Plesteran 1 : 3

1.0000

m'

87,665.00

Jumlah Bahan

87,665.00
125,715.00

UPAH :
Upah kerja

0.1500

ls

125,715.00

Jumlah Pekerja

18,857.25

Jumlah Bahan + Pekerja

144,572.25

Keuntungan Max. 10 %

A.14.33

18,857.25

14,457.23

Jumlah Total

159,029.48

Dibulatkan

159,000.00

1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN


Galian Tanah

0.2000

47,000.00

9,400.00

Grefel Beton 30 Cm X 1/2

1.0000

bh

37,000.00

37,000.00

Pas . Bata + Plesteran 1 : 3

1.0000

m1

87,665.00

Jumlah Bahan

87,665.00
134,065.00

UPAH :
Upah Kerja

0.1500

Jumlah Pekerja

ls

134,065.00

20,109.75
20,109.75

Jumlah Bahan + Pekerja

154,174.75

Keuntungan Max. 10 %

15,417.48

Jumlah Total

169,592.23

Dibulatkan

169,500.00

68 dari 124

1
A.15.01

6=(3x5)

PEMASANGAN 1 BUAH KUNCI TANAM ANTIK


BAHAN :
Kunci Tanam antik

1.0000

bh

Jumlah Bahan

0
-

UPAH :
Pekerja

0.0600

Oh

60,000.00

3,600.00

Tukang Kayu

0.6000

Oh

72,500.00

43,500.00

Kepala Tukang

0.0600

Oh

80,000.00

4,800.00

Mandor

0.0030

Oh

80,000.00

52,140.00

Jumlah Bahan + Pekerja

52,140.00

Keuntungan Max. 10 %

A.15.02

240.00

Jumlah Pekerja

5,214.00

Jumlah Total

57,354.00

Dibulatkan

57,300.00

PEMASANGAN 1 BUAH KUNCI TANAM BIASA


BAHAN :
Kunci Tanam biasa

1.0000

bh

120,000.00

Jumlah Bahan

120,000.00
120,000.00

UPAH :
Pekerja

0.0100

Oh

60,000.00

600.00

Tukang Kayu

0.5000

Oh

72,500.00

36,250.00

Kepala Tukang

0.0500

Oh

80,000.00

4,000.00

Mandor

0.0050

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

161,250.00

Keuntungan Max. 10 %

A.15.02,a

400.00
41,250.00

16,125.00

Jumlah Total

177,375.00

Dibulatkan

177,300.00

1 BUAH PASANG KUNCI TANAM TANPA HANDLE


BAHAN :
Kunci Tanam tanpa handle

1.0000

bh

125,000.00

Jumlah Bahan

125,000.00
125,000.00

UPAH :
Pekerja

0.0100

Oh

60,000.00

600.00

Tukang Kayu

0.5000

Oh

72,500.00

36,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0050

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

163,050.00

Keuntungan Max. 10 %

A.15.03

400.00
38,050.00

16,305.00

Jumlah Total

179,355.00

Dibulatkan

179,300.00

PEMASANGAN 1 BUAH KUNCI TANAM KAMAR MANDI


BAHAN :
Kunci Tanam Kamar Mandi

1.0000

bh

65,000.00

Jumlah Bahan

65,000.00
65,000.00

UPAH :
Pekerja

0.0050

Oh

60,000.00

300.00

Tukang Kayu

0.5000

Oh

72,500.00

36,250.00

Kepala Tukang

0.0500

Oh

80,000.00

4,000.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

105,790.00

Keuntungan Max. 10 %

A.15.04

240.00
40,790.00

10,579.00

Jumlah Total

116,369.00

Dibulatkan

116,300.00

PEMASANGAN 1 BUAH PASANG KUNCI SILINDER


BAHAN :
Kunci Silinder

1.0000

Jumlah Bahan

bh

150,000.00

150,000.00
150,000.00

69 dari 124

6=(3x5)

UPAH :
Pekerja

0.0050

Oh

60,000.00

300.00

Tukang Kayu

0.5000

Oh

72,500.00

36,250.00

0.0500

Oh

80,000.00

4,000.00

0.00030

Oh

80,000.00

Kepala Tukang
Mandor
Jumlah Pekerja

24.00
40,574.00

Jumlah Bahan + Pekerja

190,574.00

Keuntungan Max. 10 %

19,057.40

Jumlah Total

209,631.40

Dibulatkan

209,600.00

70 dari 124

A.15.05

PEMASANGAN 1 BUAH ENGSEL PINTU

6=(3x5)

BAHAN :
Engsel pIntu

1.0000

bh

20,000.00

Jumlah Bahan

20,000.00
20,000.00

UPAH :
Pekerja

0.0150

Oh

60,000.00

900.00

Tukang Kayu

0.1500

Oh

72,500.00

10,875.00

0.0150

Oh

80,000.00

1,200.00

0.00080

Oh

80,000.00

Kepala Tukang
Mandor

13,039.00

Jumlah Bahan + Pekerja

33,039.00

Keuntungan Max. 10 %

A.15.06,a

64.00

Jumlah Pekerja

3,303.90

Jumlah Total

36,342.90

Dibulatkan

36,300.00

1 BUAH PASANG ENGSEL JENDELA UNILON


BAHAN :
Engsel Jendela unilon

1.0000

ps

21,000.00

Jumlah Bahan

21,000.00
21,000.00

UPAH :
Pekerja

0.0100

Oh

60,000.00

600.00

Tukang Kayu

0.1000

Oh

72,500.00

7,250.00

0.0100

Oh

80,000.00

800.00

0.00050

Oh

80,000.00

Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

29,690.00

Keuntungan Max. 10 %

A.15.07

40.00
8,690.00

2,969.00

Jumlah Total

32,659.00

Dibulatkan

32,600.00

PEMASANGAN 1 BUAH ENGSEL ANGIN


BAHAN :
Engsel Angin

1.0000

Bh

Jumlah Bahan

UPAH :
Pekerja

0.1000

Oh

60,000.00

6,000.00

Tukang Kayu

0.2000

Oh

72,500.00

14,500.00

0.0200

Oh

80,000.00

1,600.00

0.00050

Oh

80,000.00

Kepala Tukang
Mandor

22,140.00

Jumlah Bahan + Pekerja

22,140.00

Keuntungan Max. 10 %

A.15.08

40.00

Jumlah Pekerja

2,214.00

Jumlah Total

24,354.00

Dibulatkan

24,300.00

PEMASANGAN 1 BUAH SPRING KNIP


BAHAN :
Spring Knip

1.0000

Bh

Jumlah Bahan

0
-

UPAH :
Pekerja

0.0150

Oh

60,000.00

900.00

Tukang Kayu

0.1500

Oh

72,500.00

10,875.00

0.0150

Oh

80,000.00

1,200.00

0.00800

Oh

80,000.00

Kepala Tukang
Mandor

13,615.00

Jumlah Bahan + Pekerja

13,615.00

Keuntungan Max. 10 %

A.15.09

640.00

Jumlah Pekerja

1,361.50

Jumlah Total

14,976.50

Dibulatkan

14,900.00

PEMASANGAN 1 BUAH KAIT ANGIN


BAHAN :
Kait Angin

1.0000

Jumlah Bahan

Bh

13,000.00

13,000.00
13,000.00

71 dari 124

6=(3x5)

UPAH :
Pekerja

0.0150

Oh

60,000.00

900.00

Tukang Kayu

0.1500

Oh

72,500.00

10,875.00

0.0150

Oh

80,000.00

1,200.00

0.00800

Oh

80,000.00

Kepala Tukang
Mandor

13,615.00

Jumlah Bahan + Pekerja

26,615.00

Keuntungan Max. 10 %

A.15.10

640.00

Jumlah Pekerja

2,661.50

Jumlah Total

29,276.50

Dibulatkan

29,200.00

PEMASANGAN 1 BUAH DOOR CLOSER


BAHAN :
Door Closer

1.0000

Set

230,000.00

Jumlah Bahan

230,000.00
230,000.00

UPAH :
Pekerja

0.0500

Oh

60,000.00

3,000.00

Tukang Kayu

0.5000

Oh

72,500.00

36,250.00

0.0500

Oh

80,000.00

4,000.00

0.00300

Oh

80,000.00

Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

273,490.00

Keuntungan Max. 10 %

A.15.10,a

240.00
43,490.00

27,349.00

Jumlah Total

300,839.00

Dibulatkan

300,800.00

1 BUAH PASANG TARIKAN PINTU


BAHAN :
Tarikan Pintu ( satu set 2 ps )

1.0000

ps

85,000.00

Jumlah Bahan

85,000.00
85,000.00

UPAH :
Pekerja

0.0500

Oh

60,000.00

3,000.00

Tukang Kayu

0.5000

Oh

72,500.00

36,250.00

0.0500

Oh

80,000.00

4,000.00

0.00250

Oh

80,000.00

Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

128,450.00

Keuntungan Max. 10 %

A.15.11

200.00
43,450.00

12,845.00

Jumlah Total

141,295.00

Dibulatkan

141,200.00

PEMASANGAN 1 BUAH KUNCI SELOT


BAHAN :
Kunci Selot

1.0000

bh

15,000.00

Jumlah Bahan

15,000.00
15,000.00

UPAH :
Pekerja

0.0200

Oh

60,000.00

1,200.00

Tukang Kayu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

0.001

Oh

80,000.00

Mandor

17,380.00

Jumlah Bahan + Pekerja

32,380.00

Keuntungan Max. 10 %

A.14.08.a

80.00

Jumlah Pekerja

3,238.00

Jumlah Total

35,618.00

Dibulatkan

35,600.00

1 BUAH PASANG KUNCI SELOT PINTU/ ESPAGNYOLETE


BAHAN :
Kunci Selot Pintu/ Espagnyolete

1.0000

bh

90,000.00

Jumlah Bahan

90,000.00
90,000.00

UPAH :
Pekerja

0.0200

Oh

60,000.00

1,200.00

Tukang Kayu

0.2000

Oh

72,500.00

14,500.00

Kepala Tukang

0.0200

Oh

80,000.00

1,600.00

72 dari 124

2
Mandor

0.00100

Oh

6=(3x5)
80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

107,380.00

Keuntungan Max. 10 %

A.14.08.b

80.00
17,380.00

10,738.00

Jumlah Total

118,118.00

Dibulatkan

118,100.00

1 BUAH PASANG KUNCI SELOT JENDELA


BAHAN :
Kunci Selot Jendela

1.0000

bh

15,000.00

Jumlah Bahan

15,000.00
15,000.00

UPAH :
Pekerja

0.0200

Oh

60,000.00

1,200.00

Tukang Kayu

0.2000

Oh

72,500.00

14,500.00

0.0200

Oh

80,000.00

1,600.00

0.00100

Oh

80,000.00

Kepala Tukang
Mandor

17,380.00

Jumlah Bahan + Pekerja

32,380.00

Keuntungan Max. 10 %

A.15.12

80.00

Jumlah Pekerja

3,238.00

Jumlah Total

35,618.00

Dibulatkan

35,600.00

PEMASANGAN 1 M2 KACA, TEBAL 3 MM


BAHAN :
Kaca

1.1000

m2

70,000.00

Jumlah Bahan

77,000.00
77,000.00

UPAH :
Pekerja

0.0150

Oh

60,000.00

900.00

Tukang Kayu

0.1500

Oh

72,500.00

10,875.00

Kepala Tukang

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0008

Oh

80,000.00

13,039.00

Jumlah Bahan + Pekerja

90,039.00

Keuntungan Max. 10 %

A.16.01

64.00

Jumlah Pekerja

9,003.90

Jumlah Total

99,042.90

Dibulatkan

99,000.00

1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI


BAHAN :
Meni kayu

0.2000

kg

31,000.00

Plamir kayu

0.1500

kg

23,000.00

3,450.00

Cat Dasar

0.1700

kg

80,000.00

13,600.00

Cat Penutup

0.3500

kg

80,000.00

28,000.00

Kwas 3"

0.0100

bh

14,000.00

140.00

Minyak cat terpentin

0.0300

ltr

14,000.00

420.00

Ampelas

0.2000

lbr

4,000.00

Jumlah Bahan

6,200.00

800.00
52,610.00

UPAH :
Pekerja

0.0700

Oh

60,000.00

4,200.00

Tk. Cat

0.0090

Oh

72,500.00

652.50

Kep. tukang cat

0.0060

Oh

80,000.00

480.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

58,182.50

Keuntungan Max. 10 %

A.16.02

240.00
5,572.50

5,818.25

Jumlah

64,000.75

Dibulatkan

64,000.00

1 M2 PLITURAN BIDANG KAYU (BIASA)


BAHAN :
Plitur

0.1500

kg

90,000.00

13,500.00

Plitur jadi

0.3720

kg

90,000.00

33,480.00

Ampelas kayu

2.0000

lbr

4,000.00

Jumlah Bahan

8,000.00
54,980.00

73 dari 124

6=(3x5)

UPAH :
Pekerja

0.0400

Oh

60,000.00

2,400.00

Tk. Cat/Plitur

0.0600

Oh

72,500.00

4,350.00

Kep. tukang cat/plitur

0.0160

Oh

80,000.00

1,280.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

63,250.00

Keuntungan Max. 10 %

A.16.02,a

240.00
8,270.00

6,325.00

Jumlah

69,575.00

Dibulatkan

69,500.00

1 M2 PLITURAN BIDANG KAYU (BIASA)


BAHAN :
Dempul plitur (dempul kasar)

0.0300

kg

6,500.00

195.00

Wood Filer (INFRA)

0.2000

kg

63,000.00

12,600.00

Oker warna

0.0200

kg

47,000.00

940.00

Batu Apung (gosok)

0.1000

kg

17,000.00

1,700.00

Sirlak ex India

0.2000

kg

90,000.00

18,000.00

Kwas 3"

0.0100

bh

14,000.00

140.00

Spirtus

0.2000

ltr

14,000.00

2,800.00

Ampelas kayu

0.1000

lbr

4,000.00

Jumlah Bahan

400.00
36,775.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

15,000.00

Tk. Cat/Plitur

0.0285

Oh

72,500.00

2,066.25

Kep. tukang cat/plitur

0.0040

Oh

80,000.00

320.00

Mandor

0.0020

Oh

80,000.00

160.00

Jumlah Pekerja

17,546.25

Jumlah Bahan + Pekerja

54,321.25

Keuntungan Max. 10 %

5,432.13

Jumlah Total

59,753.38

Dibulatkan

59,700.00

74 dari 124

1
A.16.03

6=(3x5)

1 M2 VERNIS BIDANG KAYU (BIASA)


BAHAN :
Vernis

0.1500

kg

Dempul

0.0500

kg

37,000.00

Ampelas kayu

0.1000

lbr

4,000.00

Jumlah Bahan

1,850.00
400.00
2,250.00

UPAH :
Pekerja

0.1600

Oh

60,000.00

9,600.00

Tk. Cat/Plitur

0.1600

Oh

72,500.00

11,600.00

Kep. tukang cat/plitur

0.0160

Oh

80,000.00

1,280.00

Mandor

0.0030

Oh

80,000.00

22,720.00

Jumlah Bahan + Pekerja

24,970.00

Keuntungan Max. 10 %

A.16.04

240.00

Jumlah Pekerja

2,497.00

Jumlah

27,467.00

Dibulatkan

27,400.00

PENGIKISAN/PENGEROKAN PERMUKAAN CAT LAMA


BAHAN :
Soda api

0.0500

kg

Jumlah Bahan

UPAH :
Pekerja

0.1500

Oh

60,000.00

Mandor

0.0030

Oh

80,000.00

240.00

Jumlah Pekerja

9,240.00

Jumlah Bahan + Pekerja

9,240.00

Keuntungan Max. 10 %

A.16.05

9,000.00

924.00

Jumlah Total

10,164.00

Dibulatkan

10,100.00

PENCUCIAN BIDANG PERMUKAAN TEMBOK YANG PERNAH DI CAT


BAHAN :
Soda api

0.0500

kg

Jumlah Bahan

UPAH :
Pekerja

0.1500

Oh

60,000.00

Mandor

0.0030

Oh

80,000.00

240.00

Jumlah Pekerja

9,240.00

Jumlah Bahan + Pekerja

9,240.00

Keuntungan Max. 10 %

A.16.06

9,000.00

924.00

Jumlah Total

10,164.00

Dibulatkan

10,100.00

PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
BAHAN :
Cat menie

0.2000

kg

31,000.00

Palamuur

0.1500

kg

23,000.00

3,450.00

Cat dasar

0.1700

kg

65,000.00

11,050.00

Cat peutup

0.2600

kg

65,000.00

16,900.00

Kuas

0.0100

bh

14,000.00

140.00

Pengencer

0.0300

kg

14,000.00

420.00

Ampelas

0.2000

lbr

4,000.00

Jumlah Bahan

6,200.00

800.00
38,960.00

UPAH :
Pekerja

0.0700

Oh

60,000.00

4,200.00

Tukang cat

0.0090

Oh

72,500.00

652.50

Kepala tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja

240.00
5,572.50

Jumlah Bahan + Pekerja

44,532.50

Keuntungan Max. 10 %

4,453.25

Jumlah Total

48,985.75

Dibulatkan

48,900.00
75 dari 124

1
A.16.07

6=(3x5)

PENGECATAN 1 M2 BIDANG KAYU BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP)
BAHAN :
Cat menie

0.2000

kg

31,000.00

Palamuur

0.1500

kg

23,000.00

3,450.00

Cat dasar

0.1700

kg

65,000.00

11,050.00

Cat peutup

0.3500

kg

65,000.00

22,750.00

Kuas

0.0100

bh

14,000.00

140.00

Pengencer

0.0300

kg

14,000.00

420.00

Ampelas

0.2000

lbr

4,000.00

Jumlah Bahan

6,200.00

800.00
44,810.00

UPAH :
Pekerja

0.0700

Oh

60,000.00

4,200.00

Tukang cat

0.1050

Oh

72,500.00

7,612.50

Kepala tukang

0.0040

Oh

80,000.00

320.00

Mandor

0.0030

Oh

80,000.00

12,372.50

Jumlah Bahan + Pekerja

57,182.50

Keuntungan Max. 10 %

A.16.08

240.00

Jumlah Pekerja

5,718.25

Jumlah Total

62,900.75

Dibulatkan

62,900.00

PELEBURAN 1M2 BIDANG KAYU DENGAN POLITUR


BAHAN :
Politur

0.0150

ltr

90,000.00

1,350.00

Politur Jadi

0.3720

ltr

90,000.00

33,480.00

Ampelas

2.0000

lbr

4,000.00

Jumlah Bahan

8,000.00
42,830.00

UPAH :
Pekerja

0.0400

Oh

60,000.00

2,400.00

Tukang cat

0.0600

Oh

72,500.00

4,350.00

Kepala tukang

0.0160

Oh

80,000.00

1,280.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

51,100.00

Keuntungan Max. 10 %

A.16.09

240.00
8,270.00

5,110.00

Jumlah Total

56,210.00

Dibulatkan

56,200.00

PELEBURAN 1M2 BIDANG KAYU DENGAN CAT RESIDU DAN TER


BAHAN :
Residu atau ter

0.0350

ltr

3,500.00

Jumlah Bahan

122.50
122.50

UPAH :
Pekerja

0.1000

Oh

60,000.00

Mandor

0.0060

Oh

80,000.00

480.00

Jumlah Pekerja

6,480.00

Jumlah Bahan + Pekerja

6,602.50

Keuntungan Max. 10 %

A.16.10

6,000.00

660.25

Jumlah Total

7,262.75

Dibulatkan

7,200.00

PENGECATAN 1M2 TEMBOK BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
BAHAN :
Plamuur

0.1000

kg

19,000.00

1,900.00

Cat dasar

0.1000

kg

65,000.00

6,500.00

Cat penutup

0.2600

kg

21,000.00

Jumlah Bahan

5,460.00
13,860.00

UPAH :
Pekerja

0.0200

Oh

60,000.00

1,200.00

Tukang cat

0.0630

Oh

72,500.00

4,567.50

Kepala tukang

0.0063

Oh

80,000.00

504.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja

240.00
6,511.50

76 dari 124

6=(3x5)

Jumlah Bahan + Pekerja

20,371.50

Keuntungan Max. 10 %

A.16.11

2,037.15

Jumlah Total

22,408.65

Dibulatkan

22,400.00

PENGECATAN 1M2 TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
BAHAN :
Cat dasar

0.1200

kg

65,000.00

Cat penutup

0.1800

kg

21,000.00

Jumlah Bahan

7,800.00
3,780.00
11,580.00

UPAH :
Pekerja

0.0280

Oh

60,000.00

1,680.00

Tukang cat

0.0420

Oh

72,500.00

3,045.00

Kepala tukang

0.0042

Oh

80,000.00

336.00

Mandor

0.0030

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

16,881.00

Keuntungan Max. 10 %

A.16.12

240.00
5,301.00

1,688.10

Jumlah Total

18,569.10

Dibulatkan

18,500.00

PEMASANGAN 1M2 WALLPAPER


BAHAN :
Wall paper

1.2000

m2

68,000.00

81,600.00

Lem

0.2000

kg

65,000.00

13,000.00

Jumlah Bahan

94,600.00

UPAH :
Pekerja

0.0200

Oh

60,000.00

1,200.00

Tukang cat

0.2000

Oh

72,500.00

14,500.00

Kepala tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0025

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

112,100.00

Keuntungan Max. 10 %

A.16.13

200.00
17,500.00

11,210.00

Jumlah Total

123,310.00

Dibulatkan

123,300.00

PENGECATAN 1M2 PERMUKAAN BAJA DENGAN MENIE BESI


BAHAN :
Menie besi

0.1000

m2

31,000.00

Kwas

0.0100

kg

12,000.00

Jumlah Bahan

3,100.00
120.00
3,220.00

UPAH :
Pekerja

0.0200

Oh

60,000.00

1,200.00

Tukang cat

0.2000

Oh

72,500.00

14,500.00

Kepala tukang

0.0200

Oh

80,000.00

1,600.00

Mandor

0.0025

Oh

80,000.00

17,500.00

Jumlah Bahan + Pekerja

20,720.00

Keuntungan Max. 10 %

A.16.14

200.00

Jumlah Pekerja

2,072.00

Jumlah Total

22,792.00

Dibulatkan

22,700.00

PENGECATAN 1M2 PERMUKAAN BAJA DENGAN MENIE BESI DENGAN PERANCAH


BAHAN :
Menie besi

0.1000

kg

31,000.00

3,100.00

Pengencer

0.0100

ltr

28,000.00

280.00

Kwas

0.0100

bh

12,000.00

120.00

Perancah kayu

0.0020

m3

2,500,000.00

5,000.00

Jumlah Bahan

8,500.00

UPAH :
Pekerja

0.2500

Oh

60,000.00

15,000.00

Tukang cat

0.2250

Oh

72,500.00

16,312.50

Kepala tukang

0.0225

Oh

80,000.00

1,800.00

77 dari 124

2
Mandor

4
0.0075

Oh

6=(3x5)
80,000.00

33,712.50

Jumlah Bahan + Pekerja

42,212.50

Keuntungan Max. 10 %

A.16.15

600.00

Jumlah Pekerja

4,221.25

Jumlah Total

46,433.75

Dibulatkan

46,400.00

1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x)


BAHAN :
Cat tembok Sanlex / Sekelas Sanlex

0.1750

kg

18,000.00

3,150.00

Plamir tembok

0.1600

kg

19,000.00

3,040.00

Rol cat

0.0100

bh

30,000.00

300.00

Ampelas

0.5000

lbr

4,000.00

2,000.00

Jumlah Bahan

8,490.00

UPAH :
Pekerja

0.1040

Oh

60,000.00

6,240.00

Tk. cat

0.0182

Oh

72,500.00

1,319.50

Kep. tukang cat

0.0090

Oh

80,000.00

720.00

Mandor

0.0045

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

17,129.50

Keuntungan Max. 10 %

A.16.16

360.00
8,639.50

1,712.95

Jumlah

18,842.45

Dibulatkan

18,800.00

1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (2x)


BAHAN :
Cat tembok Sanlex / Sekelas Sanlex

0.1333

kg

18,000.00

2,399.40

Plamir tembok

0.1600

kg

19,000.00

3,040.00

Rol cat

0.0100

bh

30,000.00

300.00

Ampelas

0.5000

lbr

4,000.00

2,000.00

Jumlah Bahan

7,739.40

UPAH :
Pekerja

0.2000

Oh

60,000.00

12,000.00

Tk. cat

0.0280

Oh

72,500.00

2,030.00

Kep. tukang cat

0.0150

Oh

80,000.00

1,200.00

Mandor

0.0090

Oh

Jumlah Pekerja

15,230.00

Jumlah Bahan + Pekerja

22,969.40

Keuntungan Max. 10 %

A.17.01

2,296.94

Jumlah

25,266.34

Dibulatkan

25,200.00

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK


BAHAN :
Kloset duduk/monoblok

1.0000

Perlengkapan

0.0600 harga kloset

unit

2,250,000.00
2,250,000.00

Jumlah Bahan

2,250,000.00
135,000.00
2,385,000.00

UPAH :
Pekerja

3.3000

Oh

60,000.00

198,000.00

Tukang Batu

1.1000

Oh

72,500.00

79,750.00

Kepala Tukang

0.0010

Oh

80,000.00

80.00

Mandor

0.1600

Oh

80,000.00

12,800.00

Jumlah Pekerja

290,630.00

Jumlah Bahan + Pekerja

2,675,630.00

Keuntungan Max. 10 %

A.17.02

267,563.00

Jumlah Total

2,943,193.00

Dibulatkan

2,943,100.00

MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN


BAHAN :
Kloset Jongkok porselen

1.0000

unit

200,000.00

200,000.00

Semen Portland

6.0000

kg

1,500.00

9,000.00

Pasir Pasang

0.0100

142,000.00

1,420.00

78 dari 124

2
Bata Merah

4
7.0000

bh

6=(3x5)
650.00

Jumlah Bahan

4,550.00
214,970.00

UPAH :
Pekerja

1.0000

Oh

60,000.00

60,000.00

Tukang Batu

1.5000

Oh

72,500.00

108,750.00

Kepala Tukang

0.1500

Oh

80,000.00

12,000.00

Mandor

0.1600

Oh

80,000.00

193,550.00

Jumlah Bahan + Pekerja

408,520.00

Keuntungan Max. 10 %

A.17.03

12,800.00

Jumlah Pekerja

40,852.00

Jumlah Total

449,372.00

Dibulatkan

449,300.00

MEMASANG 1 BUAH KLOSET JONGKOK TERASO


BAHAN :
Kloset Jongkok

1.0000

unit

120,000.00

120,000.00

Semen Portland

6.0000

kg

1,500.00

9,000.00

Pasir Pasang

0.0100

142,000.00

1,420.00

Bata Merah

7.0000

bh

650.00

Jumlah Bahan

4,550.00
134,970.00

UPAH :
Pekerja

1.0000

Oh

60,000.00

60,000.00

Tukang Batu

1.5000

Oh

72,500.00

108,750.00

Kepala Tukang

0.1500

Oh

80,000.00

12,000.00

Mandor

0.0500

Oh

80,000.00

184,750.00

Jumlah Bahan + Pekerja

319,720.00

Keuntungan Max. 10 %

A.17.04

4,000.00

Jumlah Pekerja

31,972.00

Jumlah Total

351,692.00

Dibulatkan

351,600.00

MEMASANG 1 BUAH URINOIR


BAHAN :
Urinoir

1.0000

unit

2,350,000.00

2,350,000.00

Perlengkapan

0.3000

hrg urinoir

2,350,000.00

705,000.00

Semen Portland

6.0000

kg

1,500.00

9,000.00

Pasir Pasang

0.0100

142,000.00

Jumlah Bahan

1,420.00
3,065,420.00

UPAH :
Pekerja

1.0000

Oh

60,000.00

60,000.00

Tukang Batu

1.0000

Oh

72,500.00

72,500.00

Kepala Tukang

0.1000

Oh

80,000.00

8,000.00

Mandor

0.0500

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

3,209,920.00

Keuntungan Max. 10 %

A.17.05

4,000.00
144,500.00

320,992.00

Jumlah Total

3,530,912.00

Dibulatkan

3,530,900.00

MEMASANG 1 BUAH WASTAFEL


BAHAN :
Wastafel

1.2000

Perlengkapan

0.1200 hrg wastafel

unit

900,000.00

1,080,000.00

900,000.00

Semen Abu-abu

6.0000

108,000.00

kg

1,500.00

Pasir Pasang

0.0100

9,000.00

142,000.00

Jumlah Bahan

1,420.00
1,198,420.00

UPAH :
Pekerja

1.2000

Oh

60,000.00

72,000.00

Tukang Batu

1.4500

Oh

72,500.00

105,125.00

Kepala Tukang

0.1500

Oh

80,000.00

12,000.00

Mandor

0.0600

Oh

80,000.00

Jumlah Pekerja

4,800.00
193,925.00

Jumlah Bahan + Pekerja

1,392,345.00
79 dari 124

6=(3x5)

Keuntungan Max. 10 %

A.17.06

139,234.50

Jumlah Total

1,531,579.50

Dibulatkan

1,531,500.00

MEMASANG 1 BUAH BAK MANDI TRASO VOLUME 0,3 M3


BAHAN :
Bak Teraso

1.0000

unit

375,000.00

Perlengkapan

0.1200

harga bak

375,000.00

Jumlah Bahan

375,000.00
45,000.00
420,000.00

UPAH :
Pekerja

2.1000

Oh

60,000.00

126,000.00

Tukang Batu

0.7500

Oh

72,500.00

54,375.00

Kepala Tukang

0.0700

Oh

80,000.00

5,600.00

Mandor

0.1100

Oh

80,000.00

194,775.00

Jumlah Bahan + Pekerja

614,775.00

Keuntungan Max. 10 %

A.17.07

8,800.00

Jumlah Pekerja

61,477.50

Jumlah Total

676,252.50

Dibulatkan

676,200.00

MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3


BAHAN :
Bak Fibreglass

1.0000

unit

260,000.00

Perlengkapan

0.1200

hrg bak

260,000.00

Jumlah Bahan

260,000.00
31,200.00
291,200.00

UPAH :
Pekerja

3.0000

Oh

60,000.00

180,000.00

Tukang Batu

4.5000

Oh

72,500.00

326,250.00

Kepala Tukang

0.0500

Oh

80,000.00

4,000.00

Mandor

0.9000

Oh

80,000.00

72,000.00

Jumlah Pekerja

582,250.00

Jumlah Bahan + Pekerja

873,450.00

Keuntungan Max. 10 %

A.17.08

87,345.00

Jumlah Total

960,795.00

Dibulatkan

960,700.00

MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3


BAHAN :
Batu Bata

150.0000

bh

650.00

97,500.00

Semen Portland

120.0000

kg

1,500.00

180,000.00

Pasir Pasang

0.3000

142,000.00

42,600.00

Porselen (11x11)cm

4.3560

m2

65,000.00

283,140.00

Semen warna

6.0000

kg

8,500.00

Jumlah Bahan

51,000.00
654,240.00

UPAH :
Pekerja

6.0000

Oh

60,000.00

360,000.00

Tukang Batu

3.0000

Oh

72,500.00

217,500.00

Kepala Tukang

0.3000

Oh

80,000.00

24,000.00

Mandor

0.0300

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

1,258,140.00

Keuntungan Max. 10 %

A.17.09

2,400.00
603,900.00

125,814.00

Jumlah Total

1,383,954.00

Dibulatkan

1,383,900.00

MEMASANG 1 M' PIPA BETON DIA. 15-20 CM


BAHAN :
Pipa tanah dia. 15 - 20 cm

1.1000

bh

55,000.00

60,500.00

22.0000

bh

650.00

14,300.00

Semen Portland

3.9200

kg

1,500.00

5,880.00

Pasir Pasang

0.0560

m3

142,000.00

7,952.00

Pasir Urug

0.0240

m3

107,000.00

Bata Merah

Jumlah Bahan

2,568.00
91,200.00

UPAH :
80 dari 124

6=(3x5)

Pekerja

0.1400

Oh

60,000.00

8,400.00

Tukang Batu

0.0700

Oh

72,500.00

5,075.00

Kepala Tukang

0.0070

Oh

80,000.00

560.00

Mandor

0.0070

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

105,795.00

Keuntungan Max. 10 %

A.17.10

560.00
14,595.00

10,579.50

Jumlah Total

116,374.50

Dibulatkan

116,300.00

MEMASANG 1 M' PIPA BETON DIA. 30-100 CM


BAHAN :
Pipa tanah dia. 30

1.1000

bh

70,000.00

77,000.00

Bata Merah

22.0000

bh

650.00

14,300.00

Semen Portland

10.3000

kg

1,500.00

15,450.00

Pasir Pasang

0.0610

m3

142,000.00

8,662.00

Pasir Urug

0.0690

m3

107,000.00

Jumlah Bahan

7,383.00
122,795.00

UPAH :
Pekerja

0.3800

Oh

60,000.00

22,800.00

Tukang Batu

0.1900

Oh

72,500.00

13,775.00

Kepala Tukang

0.0190

Oh

80,000.00

1,520.00

Mandor

0.0190

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

162,410.00

Keuntungan Max. 10 %

A.17.11

1,520.00
39,615.00

16,241.00

Jumlah Total

178,651.00

Dibulatkan

178,600.00

Memasang 1 Buah Bak Kontrol, Pas. Batu Bata ukuran (30X30) Tinggi 35 CM
BAHAN :
Batu Bata

40.0000

bh

650.00

26,000.00

Semen Portland

44.0000

kg

1,500.00

66,000.00

Pasir Pasang

0.0700

m3

142,000.00

9,940.00

Pasir Beton

0.0600

m3

168,400.00

10,104.00

Batu Kerikil

0.0700

m3

222,700.00

15,589.00

Baja Tulangan

1.6000

kg

11,000.00

Jumlah Bahan

17,600.00
145,233.00

UPAH :
Pekerja

2.1600

Oh

60,000.00

129,600.00

Tukang Batu

0.7200

Oh

72,500.00

52,200.00

Kepala Tukang

0.0720

Oh

80,000.00

5,760.00

Mandor

0.0110

Oh

80,000.00

188,440.00

Jumlah Bahan + Pekerja

333,673.00

Keuntungan Max. 10 %

A.17.12

880.00

Jumlah Pekerja

33,367.30

Jumlah Total

367,040.30

Dibulatkan

367,000.00

Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran (45X45) Tinggi 50 CM
BAHAN :
Batu Bata

70.0000

bh

650.00

45,500.00

Semen Portland

77.0000

kg

1,500.00

115,500.00

Pasir Pasang

0.1300

m3

142,000.00

18,460.00

Pasir Beton

0.0900

m3

168,400.00

15,156.00

Batu Kerikil

0.0200

m3

222,700.00

4,454.00

Baja Tulangan

2.6000

kg

11,000.00

28,600.00

Jumlah Bahan

227,670.00

UPAH :
Pekerja

3.2000

Oh

60,000.00

192,000.00

Tukang Batu

1.1500

Oh

72,500.00

83,375.00

Kepala Tukang

0.0110

Oh

80,000.00

880.00

Mandor

0.0160

Oh

80,000.00

1,280.00

81 dari 124

6=(3x5)

Jumlah Pekerja

277,535.00

Jumlah Bahan + Pekerja

505,205.00

Keuntungan Max. 10 %

A.17.13

50,520.50

Jumlah Total

555,725.50

Dibulatkan

555,700.00

Memasang 1 Buah Bak Kontrol Pas. Batu Bata ukuran (60X60) Tinggi 65 CM
BAHAN :
Batu Bata

123.0000

bh

650.00

79,950.00

Semen Portland

114.0000

kg

1,500.00

171,000.00

Pasir Pasang

0.1840

m3

142,000.00

26,128.00

Pasir Beton

0.1200

m3

168,400.00

20,208.00

Batu Kerikil

0.0330

m3

222,700.00

7,349.10

Baja Tulangan

4.8500

kg

11,000.00

53,350.00

Jumlah Bahan

357,985.10

UPAH :
Pekerja

3.2000

Oh

60,000.00

192,000.00

Tukang Batu

1.1500

Oh

72,500.00

83,375.00

Kepala Tukang

0.0110

Oh

80,000.00

880.00

Mandor

0.0160

Oh

80,000.00

1,280.00

Jumlah Pekerja

277,535.00

Jumlah Bahan + Pekerja

635,520.10

Keuntungan Max. 10 %

A.17.14

63,552.01

Jumlah Total

699,072.11

Dibulatkan

699,000.00

MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5"


BAHAN :
Pipa Galvanis

1.2000

m1

28,333.33

Perlengkapan

0.3500

hrg pipa

28,333.33

Jumlah Bahan

34,000.00
9,916.67
43,916.67

UPAH :
Pekerja

0.0540

Oh

60,000.00

3,240.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0270

Oh

80,000.00

2,160.00

Jumlah Pekerja

12,645.00

Jumlah Bahan + Pekerja

56,561.67

Keuntungan Max. 10 %

A.17.15

5,656.17

Jumlah Total

62,217.83

Dibulatkan

62,200.00

MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"


BAHAN :
Pipa Galvanis

1.2000

m1

31,666.67

Perlengkapan

0.3500

hrg pipa

31,666.67

Jumlah Bahan

38,000.00
11,083.33
49,083.33

UPAH :
Pekerja

0.0540

Oh

60,000.00

3,240.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0270

Oh

80,000.00

2,160.00

Jumlah Pekerja

12,645.00

Jumlah Bahan + Pekerja

61,728.33

Keuntungan Max. 10 %

A.17.16

6,172.83

Jumlah Total

67,901.17

Dibulatkan

67,900.00

MEMASANG 1 M' PIPA GALVANIS DIAMETER 1"


BAHAN :
Pipa Galvanis

1.2000

m1

35,833.33

43,000.00

Perlengkapan

0.3500

hrg pipa

35,833.33

12,541.67

Jumlah Bahan

55,541.67

UPAH :
82 dari 124

6=(3x5)

Pekerja

0.0540

Oh

60,000.00

3,240.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0270

Oh

80,000.00

2,160.00

Jumlah Pekerja

12,645.00

Jumlah Bahan + Pekerja

68,186.67

Keuntungan Max. 10 %

A.17.17

6,818.67

Jumlah Total

75,005.33

Dibulatkan

75,000.00

MEMASANG 1 M' PIPA GALVANIS DIAMETER 1 1/2"


BAHAN :
Pipa Galvanis

1.2000

m1

44,166.67

53,000.00

Perlengkapan

0.3500

hrg pipa

44,166.67

15,458.33

Jumlah Bahan

68,458.33

UPAH :
Pekerja

0.0540

Oh

60,000.00

3,240.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0270

Oh

80,000.00

2,160.00

Jumlah Pekerja

12,645.00

Jumlah Bahan + Pekerja

81,103.33

Keuntungan Max. 10 %

A.17.18

8,110.33

Jumlah Total

89,213.67

Dibulatkan

89,200.00

MEMASANG 1 M' PIPA GALVANIS DIAMETER 2"


BAHAN :
Pipa Galvanis

1.2000

m1

54,166.67

65,000.00

Perlengkapan

0.3500

hrg pipa

54,166.67

18,958.33

Jumlah Bahan

83,958.33

UPAH :
Pekerja

0.0540

Oh

60,000.00

3,240.00

Tukang Batu

0.0900

Oh

72,500.00

6,525.00

Kepala Tukang

0.0090

Oh

80,000.00

720.00

Mandor

0.0270

Oh

80,000.00

2,160.00

Jumlah Pekerja

12,645.00

Jumlah Bahan + Pekerja

96,603.33

Keuntungan Max. 10 %

A.17.19

9,660.33

Jumlah Total

106,263.67

Dibulatkan

106,200.00

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"


BAHAN :
Pipa PVC

1.2000

m1

8,750.00

Perlengkapan

0.3500

hrg pipa

8,750.00

Jumlah Bahan

10,500.00
3,062.50
13,562.50

UPAH :
Pekerja

0.0360

Oh

60,000.00

2,160.00

Tukang Batu

0.0600

Oh

72,500.00

4,350.00

Kepala Tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0020

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

20,712.50

Keuntungan Max. 10 %

A.17.20

160.00
7,150.00

2,071.25

Jumlah Total

22,783.75

Dibulatkan

22,700.00

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 3/4"


BAHAN :
Pipa PVC

1.2000

m1

12,500.00

Perlengkapan

0.3500

hrg pipa

12,500.00

Jumlah Bahan

15,000.00
4,375.00
19,375.00

UPAH :
83 dari 124

6=(3x5)

Pekerja

0.0360

Oh

60,000.00

2,160.00

Tukang Batu

0.0600

Oh

72,500.00

4,350.00

Kepala Tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0020

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

26,525.00

Keuntungan Max. 10 %

A.17.21

160.00
7,150.00

2,652.50

Jumlah Total

29,177.50

Dibulatkan

29,100.00

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 1"


BAHAN :
Pipa PVC

1.2000

m1

16,250.00

Perlengkapan

0.3500

hrg pipa

16,250.00

Jumlah Bahan

19,500.00
5,687.50
25,187.50

UPAH :
Pekerja

0.0360

Oh

60,000.00

2,160.00

Tukang Batu

0.0600

Oh

72,500.00

4,350.00

Kepala Tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0020

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

32,337.50

Keuntungan Max. 10 %

A.17.22

160.00
7,150.00

3,233.75

Jumlah Total

35,571.25

Dibulatkan

35,500.00

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 1 1/2"


BAHAN :
Pipa PVC

1.2000

m1

28,750.00

34,500.00

Perlengkapan

0.3500

hrg pipa

28,750.00

10,062.50

Jumlah Bahan

44,562.50

UPAH :
Pekerja

0.0360

Oh

60,000.00

2,160.00

Tukang Batu

0.0600

Oh

72,500.00

4,350.00

Kepala Tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0020

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

51,712.50

Keuntungan Max. 10 %

A.17.23

160.00
7,150.00

5,171.25

Jumlah Total

56,883.75

Dibulatkan

56,800.00

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 2"


BAHAN :
Pipa PVC

1.2000

m1

41,250.00

49,500.00

Perlengkapan

0.3500

hrg pipa

41,250.00

14,437.50

Jumlah Bahan

63,937.50

UPAH :
Pekerja

0.0360

Oh

60,000.00

2,160.00

Tukang Batu

0.0600

Oh

72,500.00

4,350.00

Kepala Tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0020

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

71,087.50

Keuntungan Max. 10 %

A.17.24

160.00
7,150.00

7,108.75

Jumlah Total

78,196.25

Dibulatkan

78,100.00

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 2 1/2"


BAHAN :
Pipa PVC

1.2000

m1

52,500.00

63,000.00

Perlengkapan

0.3500

hrg pipa

52,500.00

18,375.00

Jumlah Bahan

81,375.00

UPAH :
84 dari 124

6=(3x5)

Pekerja

0.0360

Oh

60,000.00

2,160.00

Tukang Batu

0.0600

Oh

72,500.00

4,350.00

Kepala Tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0020

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

88,525.00

Keuntungan Max. 10 %

A.17.25

160.00
7,150.00

8,852.50

Jumlah Total

97,377.50

Dibulatkan

97,300.00

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 3"


BAHAN :
Pipa PVC

1.2000

m1

77,500.00

Perlengkapan

0.3500

hrg pipa

77,500.00

Jumlah Bahan

93,000.00
27,125.00
120,125.00

UPAH :
Pekerja

0.0360

Oh

60,000.00

2,160.00

Tukang Batu

0.0600

Oh

72,500.00

4,350.00

Kepala Tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0020

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

127,275.00

Keuntungan Max. 10 %

A.17.26

160.00
7,150.00

12,727.50

Jumlah Total

140,002.50

Dibulatkan

140,000.00

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 4"


BAHAN :
Pipa PVC

1.2000

m1

120,000.00

Perlengkapan

0.3500

hrg pipa

120,000.00

Jumlah Bahan

144,000.00
42,000.00
186,000.00

UPAH :
Pekerja

0.0360

Oh

60,000.00

2,160.00

Tukang Batu

0.0600

Oh

72,500.00

4,350.00

Kepala Tukang

0.0060

Oh

80,000.00

480.00

Mandor

0.0020

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

193,150.00

Keuntungan Max. 10 %

A.17.27

160.00
7,150.00

19,315.00

Jumlah Total

212,465.00

Dibulatkan

212,400.00

PEMASANGAN 1 BH BAK CUCI PIRING STAILES STEEL


BAHAN :
Bak Cuci Stainless Steel

1.0000

unit

265,000.00

Water drain + asesories

1.0000

bh

42,000.00

Jumlah Bahan

265,000.00
42,000.00
307,000.00

UPAH :
Pekerja

0.0300

Oh

60,000.00

1,800.00

Tukang Batu

0.3000

Oh

72,500.00

21,750.00

Kepala Tukang

0.0300

Oh

80,000.00

2,400.00

Mandor

0.0015

Oh

80,000.00

120.00

85 dari 124

6=(3x5)

Jumlah Pekerja

26,070.00

Jumlah Bahan + Pekerja

333,070.00

Keuntungan Max. 10 %

A.17.28

33,307.00

Jumlah Total

366,377.00

Dibulatkan

366,300.00

PEMASANGAN 1 BH KRAN DIAMETER 0,75' ATAU 0,5"


BAHAN :
Kran Air

1.0000

bh

37,000.00

Seal tape

0.0250

bh

4,500.00

Jumlah Bahan

37,000.00
112.50
37,112.50

UPAH :
Pekerja

0.0100

Oh

60,000.00

600.00

Tukang Batu

0.4000

Oh

72,500.00

29,000.00

Kepala Tukang

0.0400

Oh

80,000.00

3,200.00

Mandor

0.0050

Oh

80,000.00

33,200.00

Jumlah Bahan + Pekerja

70,312.50

Keuntungan Max. 10 %

A.17.29

400.00

Jumlah Pekerja

7,031.25

Jumlah Total

77,343.75

Dibulatkan

77,300.00

PEMASANGAN 1 BH FLOOR DRAIN


BAHAN :
Floordrain

1.0000

bh

42,000.00

Jumlah Bahan

42,000.00

42,000.00

UPAH :
Pekerja

0.0100

Oh

60,000.00

600.00

Tukang Batu

0.1000

Oh

72,500.00

7,250.00

Kepala Tukang

0.0100

Oh

80,000.00

800.00

Mandor

0.0005

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

50,690.00

Keuntungan Max. 10 %

An.Mj.01

40.00
8,690.00

5,069.00

Jumlah Total

55,759.00

Dibulatkan

55,700.00

1 BUAH MEJA SISWA DOBLE


BAHAN :
Kayu untuk Mebeulair ( kayu lokal )

0.0494

2,500,000.00

123,422.25

Politur ( A.16,02,a )

2.0020

m2

54,321.25

108,751.14

Jumlah Bahan

232,173.39

UPAH :
Pekerja

1.0000

Oh

60,000.00

60,000.00

Tukang Kayu

3.0000

Oh

72,500.00

217,500.00

Kepala Tukang

0.3000

Oh

80,000.00

24,000.00

Mandor

0.1500

Oh

80,000.00

313,500.00

Jumlah Bahan + Pekerja

545,673.39

Keuntungan Max. 10 %

An.Kr.02

12,000.00

Jumlah Pekerja

54,567.34

Jumlah Total

600,240.73

Dibulatkan

600,240.00

1 BUAH KURSI SISWA


BAHAN :
Kayu untuk Mebeulair ( kayu lokal )

0.011

2,500,000.00

27,449.63

Politur ( A.16,02,a )

0.526

m2

54,321.25

28,594.71

Jumlah Bahan

56,044.33

UPAH :
Pekerja

0.500

Oh

60,000.00

30,000.00

Tukang Kayu

1.500

Oh

72,500.00

108,750.00

Kepala Tukang

0.150

Oh

80,000.00

12,000.00

Mandor

0.075

Oh

80,000.00

6,000.00

86 dari 124

6=(3x5)

Jumlah Pekerja

156,750.00

Jumlah Bahan + Pekerja

212,794.33

Keuntungan Max. 10 %

An.RSK .03

21,279.43

Jumlah Total

234,073.76

Dibulatkan

234,070.00

1 BUAH RAK SURAT KABAR


BAHAN :
Kayu Lokal Kls II

0.025

2,500,000.00

Politur ( A.16,02,a )

1.244

m2

54,321.25

Jumlah Bahan

62,000.00
67,575.64
129,575.64

UPAH :
Pekerja

0.500

Oh

60,000.00

30,000.00

Tukang Kayu

1.500

Oh

72,500.00

108,750.00

Kepala Tukang

0.150

Oh

80,000.00

12,000.00

Mandor

0.075

Oh

80,000.00

156,750.00

Jumlah Bahan + Pekerja

286,325.64

Keuntungan Max. 10 %

An.RB.04

6,000.00

Jumlah Pekerja

28,632.56

Jumlah Total

314,958.20

Dibulatkan

314,950.00

1 BUAH RAK BUKU / LOKER TYPE A


BAHAN :
Kayu Lokal Kls II

0.168

2,500,000.00

420,750.00

Politur ( A.16,02,a )

8.416

m2

54,321.25

457,156.78

Jumlah Bahan

877,906.78

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

1,191,406.78

Keuntungan Max. 10 %

An.RB.05

12,000.00
313,500.00

119,140.68

Jumlah Total

1,310,547.45

Dibulatkan

1,310,540.00

1 BUAH RAK MAJALAH / LOKER TYPE B


BAHAN :
Kayu Lokal Kls II

0.055

2,500,000.00

137,000.00

Politur ( A.16,02,a )

2.452

m2

54,321.25

133,190.27

Jumlah Bahan

270,190.27

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

313,500.00

Jumlah Bahan + Pekerja

583,690.27

Keuntungan Max. 10 %

An.RB.05.a

12,000.00

Jumlah Pekerja

58,369.03

Jumlah Total

642,059.30

Dibulatkan

642,050.00

1 RAK BUKU DUA MUKA


BAHAN :
Kayu Lokal Kls II
Politur ( A.16,02,a )

0.233

2,500,000.00

583,200.00

19.440

m2

54,321.25

1,056,005.10

Jumlah Bahan

1,639,205.10

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

12,000.00

87 dari 124

6=(3x5)

Jumlah Pekerja

313,500.00

Jumlah Bahan + Pekerja

1,952,705.10

Keuntungan Max. 10 %

An.LM.06

195,270.51

Jumlah Total

2,147,975.61

Dibulatkan

2,147,970.00

1 BUAH LEMARI PINTU KAYU TYPE A


BAHAN :
Kayu Lokal Kls II

0.160

2,500,000.00

398,750.00

Triplex 4 mm

2.700

m2

70,000.00

189,000.00

Politur ( A.16,02,a )

7.723

m2

54,321.25

419,523.01

Engsel lemari

2.000

bh

12,500.00

25,000.00

Slot

2.000

bh

4,500.00

9,000.00

Kunci

1.000

bh

15,000.00

15,000.00

Tarikan pintu lemari

2.000

bh

12,500.00

Jumlah Bahan

25,000.00
1,081,273.01

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

1,394,773.01

Keuntungan Max. 10 %

An.Lk.07

12,000.00
313,500.00

139,477.30

Jumlah Total

1,534,250.32

Dibulatkan

1,534,250.00

1 BUAH LEMARI PINTU KACA TYPE B


BAHAN :
Kayu Lokal Kls II

0.149

2,500,000.00

372,500.00

Triplex 4 mm

2.160

m2

70,000.00

151,200.00

Kaca polos 5 mm

1.100

m2

80,000.00

88,000.00

Politur ( A.16,02,a )

7.212

m2

54,321.25

391,764.86

Engsel lemari

2.000

bh

12,500.00

25,000.00

Slot

2.000

bh

4,500.00

9,000.00

Kunci

1.000

bh

15,000.00

15,000.00

Tarikan pintu lemari

2.000

bh

12,500.00

Jumlah Bahan

25,000.00
1,077,464.86

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

1,390,964.86

Keuntungan Max. 10 %

An.Lk.07.a

12,000.00
313,500.00

139,096.49

Jumlah Total

1,530,061.34

Dibulatkan

1,530,060.00

1 BUAH LEMARI BUKU


BAHAN :
Kayu Lokal Kls II

0.148

2,500,000.00

369,600.00

Triplex 4 mm

2.160

m2

70,000.00

151,200.00

Kaca polos 5 mm

1.508

m2

80,000.00

120,640.00

13.808

m2

54,321.25

750,067.82

Kunci

2.000

bh

15,000.00

30,000.00

Tarikan pintu lemari

4.000

bh

12,500.00

Politur ( A.16,02,a )

Jumlah Bahan

50,000.00
1,471,507.82

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

12,000.00

88 dari 124

6=(3x5)

Jumlah Pekerja

313,500.00

Jumlah Bahan + Pekerja

1,785,007.82

Keuntungan Max. 10 %

An.Mjg.08

178,500.78

Jumlah Total

1,963,508.60

Dibulatkan

1,963,500.00

1 BUAH MEJA GURU


BAHAN :
Kayu untuk Mebeulair ( kayu lokal )

0.050

2,500,000.00

124,500.00

Politur ( A.16,02,a )

2.490

m2

54,321.25

135,259.91

Engsel

2.000

bh

9,500.00

19,000.00

Kunci

1.000

bh

15,000.00

15,000.00

Tarikan pintu lemari

2.000

bh

12,500.00

Jumlah Bahan

25,000.00
318,759.91

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

313,500.00

Jumlah Bahan + Pekerja

632,259.91

Keuntungan Max. 10 %

An.Krg.09

12,000.00

Jumlah Pekerja

63,225.99

Jumlah Total

695,485.90

Dibulatkan

695,480.00

1 BUAH KURSI GURU


BAHAN :
Kayu untuk Mebeulair ( kayu lokal )

0.010

2,500,000.00

25,290.00

Jok

1.000

bh

80,000.00

80,000.00

Politur ( A.16,02,a )

0.657

m2

54,321.25

Jumlah Bahan

35,689.06
140,979.06

UPAH :
Pekerja

0.500

Oh

60,000.00

30,000.00

Tukang Kayu

1.500

Oh

72,500.00

108,750.00

Kepala Tukang

0.150

Oh

80,000.00

12,000.00

Mandor

0.075

Oh

80,000.00

156,750.00

Jumlah Bahan + Pekerja

297,729.06

Keuntungan Max. 10 %

An.Mjbc.10

6,000.00

Jumlah Pekerja

29,772.91

Jumlah Total

327,501.97

Dibulatkan

327,500.00

1 BUAH MEJA SISWA SINGLE


BAHAN :
Kayu untuk Mebeulair ( kayu lokal )

0.025

2,500,000.00

Politur ( A.16,02,a )

1.504

m2

54,321.25

Jumlah Bahan

63,000.00
81,699.16
144,699.16

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

313,500.00

Jumlah Bahan + Pekerja

458,199.16

Keuntungan Max. 10 %

An.Mjbc.10.a

12,000.00

Jumlah Pekerja

45,819.92

Jumlah Total

504,019.08

Dibulatkan

504,010.00

1 BUAH MEJA BACA INDIVIDU


BAHAN :
Kayu untuk Mebeulair ( kayu lokal )

0.049

2,500,000.00

123,000.00

Politur ( A.16,02,a )

3.164

m2

54,321.25

171,872.44

Jumlah Bahan

294,872.44

UPAH :
89 dari 124

6=(3x5)

Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

12,000.00

Jumlah Pekerja

313,500.00

Jumlah Bahan + Pekerja

608,372.44

Keuntungan Max. 10 %

60,837.24

Jumlah Total

669,209.68

Dibulatkan

669,200.00

An.MK.10.b 1 BUAH MEJA KELOMPOK


BAHAN :
Kayu untuk Mebeulair ( kayu lokal )

0.053

2,500,000.00

Politur ( A.16,02,a )

2.267

m2

54,321.25

Jumlah Bahan

132,000.00
123,168.00
255,168.00

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

313,500.00

Jumlah Bahan + Pekerja

568,668.00

Keuntungan Max. 10 %

56,866.80

Jumlah Total

625,534.80

Dibulatkan
MP

12,000.00

Jumlah Pekerja

625,530.00

1 BUAH MEJA PENGOLAHAN


BAHAN :
Kayu untuk Mebeulair ( kayu lokal )

0.050

2,500,000.00

124,500.00

Politur ( A.16,02,a )

2.490

m2

54,321.25

135,259.91

Engsel

2.000

bh

9,500.00

19,000.00

Kunci

1.000

bh

15,000.00

15,000.00

Tarikan pintu lemari

2.000

bh

12,500.00

Jumlah Bahan

25,000.00
318,759.91

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

3.000

Oh

72,500.00

217,500.00

Kepala Tukang

0.300

Oh

80,000.00

24,000.00

Mandor

0.150

Oh

80,000.00

313,500.00

Jumlah Bahan + Pekerja

632,259.91

Keuntungan Max. 10 %

An.Pt.11

12,000.00

Jumlah Pekerja

63,225.99

Jumlah Total

695,485.90

Dibulatkan

695,480.00

1 UNIT PAPAN TULIS


BAHAN :
Kayu untuk Mebeulair ( kayu lokal )

0.022

2,500,000.00

55,250.00

Formika 1,20 x 2,40

1.000

lbr

275,000.00

275,000.00

Plat Gantungan
Paku uril
Politur ( A.16,02,a )

3.000

bh

3,500.00

10,500.00

17.000

bh

300.00

5,100.00

0.066

m2

54,321.25

Jumlah Bahan

3,585.20
349,435.20

UPAH :
Pekerja

1.000

Oh

60,000.00

60,000.00

Tukang Kayu

2.500

Oh

72,500.00

181,250.00

Kepala Tukang

0.250

Oh

80,000.00

20,000.00

Mandor

0.050

Oh

80,000.00

4,000.00

Jumlah Pekerja

265,250.00

Jumlah Bahan + Pekerja

614,685.20

Keuntungan Max. 10 %

61,468.52

Jumlah Total

676,153.72

Dibulatkan

676,150.00
90 dari 124

91 dari 124

6=(3x5)

BESI

LINK
D
D
D
D
D
D

DIA
DIA
DIA
DIA
DIA
DIA

UKURAN BERAT/M
6
0.22
8
0.395
10
0.617
12
0.89
13
1
16
1.56

PONDASI SETEMPAT P2 1,75 X 1,75

Sampel Vol Beton

0.6125

SAT
KG
KG
KG
KG
KG
KG

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

3.0625
m'
3.68
3.68

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0
0

0
0

0
0

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

1.79

0.2

PONDASI SETEMPAT P2 135 X135

Sampel Vol Beton

0.3645

0.06
0.25
jml dia/LEBAR
15
13
15
13

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

1.8225
m'
2.95
2.95

0.06
0.25
jml dia/LEBAR
8
13
8
13

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0
0

0
0

0
0

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

1.54

0.2

berat
1
1
0
0

berat
1
1
0
0

PONDASI SETEMPAT P3 0,90 X 0,90

Sampel Vol Beton


Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.81
m'
1.67
1.67

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0
0

0
0

0
0

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

1.29

0.2

S 1 20 X 35

Sampel Vol Beton

0.162

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.35
m'
14.65
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.94
0.94

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.2

S 2 20 X 30

Sampel Vol Beton

0.2

0.2

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.3
m'
17.03
0

Besi U 24 sumbu x

0.84

0.06
0.25
jml dia/LEBAR
4
13
4
13

14.29
jml dia/LEBAR
8
13
0
13
72.00

0
0.7

8.00
0

1
1
0
0

berat
1
1
0.395
0

14.29

16.67
jml dia/LEBAR
6
13
0
13
84.00

berat

8.00

berat
1
1
0.395

Besi U 24 sumbu y

0.84

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.2

0.6

S 3 15 X 25

Sampel Vol Beton


Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.25
m'
27.03
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.64
0.64

134.00

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.15

0.5

K 1 25 X 25

Sampel Vol Beton

0.15

0.25

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.25
m'
17.41
17.41

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.84
0.84

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.5

0
16.67

26.67
jml dia/LEBAR
4
13
0
13

8.00
0

0
0.5

berat
1
1
0.395
0

26.67

16.00
jml dia/LEBAR
4
16
4
13
92.00

8.00
0
16.00

berat
1.56
1
0.395
0

K 2 25 X 25

Sampel Vol Beton


Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.25
m'
17.41
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.84
0.84

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.5

K 3 20 X 20

Sampel Vol Beton

0.25

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.2
m'
26.41
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.64
0.64

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.4

K 4 12 X 30

Sampel Vol Beton


Besi U 32 sumbu x
Besi U 32 sumbu y

0.2

0.12
=
=

0.3
m'
27.78
27.78

16.00
jml dia/LEBAR
8
13
0
13
92.00

0
0.5

8.00
0

143.00

0.4

1
1
0.395
0

16.00

25.00
jml dia/LEBAR
8
13
0
13

berat

8.00
0

berat
1
1
0.395
0

25.00

27.78
jml dia/LEBAR
4
13
0
0

berat
1
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.68
0

159.00

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.24

0.6

8.89
jml dia/LEBAR
8
16
2
10

B 1 25/45

Sampel Vol Beton


Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.45
m'
9.70
-

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

1.16
9.61

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

B 1a 25/45 + 7/25

Sampel Vol Beton

0.25

0.25
0.07

51.00

2
0.66

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.45
0.25
m'
9.67
9.67

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

1.16
9.61

51.00

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

57.14
0.28

2.00
327.00

8
0
27.78

8
12

berat
1.56
0.617
0.395
0.89

8.89

8.89
57.14
jml dia/LEBAR
8
16
2
10

0.395
0

berat
1.56
0.617

8
0

0.395
0

10
8

0.617
0.395

BEKISTING
BEKISTING

=
=

0
0

0.66
0.26

8.89
57.14

HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING
9

B 2 20/35

Sampel Vol Beton


Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.35
m'
15.07
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.86
15.01

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

B 3 20/30

Sampel Vol Beton

0.2

0.2

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.3
m'
17.45
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.76
17.39

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

14.29
jml dia/LEBAR
8
13
0
0
82.00

2
0.46

8
0

2
0.36

1
0
0.395
0

14.29

16.67
jml dia/LEBAR
5
13
0
0
96.00

berat

8
0
16.67

berat
1
0
0.395
0

B 4 15/25

Sampel Vol Beton

14
1

15
1

0.15

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.25
m'
27.45
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.64
27.39

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

26.67
jml dia/LEBAR
4
13
0
0
153.00

2
0.26

8
0

berat
1
0
0.395
0

26.67

RB 1 15/25
Sampel Vol Beton

0.15

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.25
m'
27.45
0

26.67
jml dia/LEBAR
4
13
0
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.64
-

153.00

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.15

0.5

8
0

berat
1
0
0.395
0

26.67

RB 2 12/20
Sampel Vol Beton

0.12

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.2
m'
42.45
0

Besi U 24 sumbu x

0.48

41.67
jml dia/LEBAR
4
13
0
0
239.00

berat
1
0
0.395

15
1

15
1

15

Besi U 24 sumbu y

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.12

0
0.4

41.67

BL 1 12/40
Sampel Vol Beton

0.12

Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.4
m'
21.61
0

20.83
jml dia/LEBAR
6
13
0
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.88
-

120.00

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.12

0.8

8
0

berat
1
0
0.395
0

20.83

BL 2 12/30
Sampel Vol Beton
Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.3
m'
28.56
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.88
-

159.00

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.12

0.6

BL 3 12/15

0.12

27.78
jml dia/LEBAR
4
13
0
0

8
0
27.78

berat
1
0
0.395
0

Sampel Vol Beton


Besi U 32 sumbu x
Besi U 32 sumbu y

=
=

0.15
m'
56.34
0

Besi U 24 sumbu x
Besi U 24 sumbu y

=
=

0.38
-

278.00

BEKISTING
HASIL PERHITUNGAN
BESI U 32
BESI U 24
TOTAL BESI
BEKISTING

0.12

0.3

DAFTAR BERAT BESI


NO
JENIS BESI
D 19
D 16
D 13
12
10
8
6

0.12

55.56
jml dia/LEBAR
4
12
0
0

8
0

berat
0.89
0
0.395
0

55.56

BERAT / M'KET:
2.225
1.560
1.000
0.892
0.617
0.395
0.222

LISTPLANG T = 8 CM 1 lapis tulangan Jarak 15 lisplang


`
URAIAN

NO
1

VOL

LISTPLANG T = 8 CM KET
1 :
LEBAR
DASAR HITUNG
(m)
(m)
3

(P X L X T)

0.08

TINGGI
(M)

PANJANG
(m)

0.5

25.00

VOLUME NETT
VOLUME BEKISTING
NO

URAIAN

KET
Penjelasan LEBAR
DASAR HITUNG
(m)

TINGGI
(M)

PANJANG
(m)

VOLUME BEKISTING

VOLUME PEMBESIAN
NO

URAIAN

0.50

25

LISTPLANG T = 8 CM 1KET
KETERANGAN
Panjang TulJumlah Tul diameter Tul
DASAR HITUNG
(m)
(BH)
(mm)
3

TULANGAN MEMANJANG
TULANGAN Melintang

25.00
0.50

3.00
100.00

10.000
10.000

JUMLAH U 24
VOL BETON
BEKISTING
PEMBESIAN U 39
PEMBESIAN U 24
PEMBESIAN TOTAL
PLAT DAK T 10 2 lapis jarak 12.5 CM
`
NO

URAIAN

VOL

PLAT DAK T 10 2 lap KET :


LEBAR
DASAR HITUNG
(m)
(m)
3

(P X L X T)

3.57

TINGGI
(M)

PANJANG
(m)

0.125

2.33

VOLUME NETT
VOLUME BEKISTING
NO

URAIAN

VOLUME BEKISTING

VOLUME PEMBESIAN
NO

URAIAN

KET
Penjelasan LEBAR
DASAR HITUNG
(m)
3

3.57

TINGGI
(M)

PANJANG
(m)

2.3343

PLAT DAK T 10 2 lapi KET


KETERANGAN
Panjang TulJumlah Tul diameter Tul
DASAR HITUNG
(m)
(BH)
(mm)

Tulangan memanjang
Tulangan melintang

3.67
2.33

29.00
19.00

10.000
10.000

JUMLAH U 24
VOL BETON
BEKISTING
PEMBESIAN U 39
PEMBESIAN U 24
PEMBESIAN TOTAL

PLAT LANTAI 12 2 lapis jarak 15 CM


`
NO

URAIAN

VOL

PLAT LANTAI 12 2 la KET :


LEBAR
DASAR HITUNG
(m)
(m)
3

(P X L X T)

TINGGI
(M)

PANJANG
(m)

3.57

0.12

2.33

VOLUME NETT
VOLUME BEKISTING
NO

URAIAN

KET
Penjelasan LEBAR
DASAR HITUNG
(m)
3

VOLUME BEKISTING

VOLUME PEMBESIAN
NO

URAIAN

TINGGI
(M)

PANJANG
(m)

3.57

2.3343

PLAT LANTAI 12 2 lap KET


KETERANGAN
Panjang TulJumlah Tul diameter Tul
DASAR HITUNG
(m)
(BH)
(mm)
3

Tulangan memanjang lapis bawah


Tulangan memanjang lapis Atas
Tulangan melintang lapis bawah
Tulangan melintang lapis Atas

3.67
3.67
2.33
2.33

24.00
24.00
16.00
16.00

10.000
10.000
10.000
10.000

JUMLAH U 24
VOL BETON
BEKISTING
PEMBESIAN U 39
PEMBESIAN U 24
PEMBESIAN TOTAL
PLAT LANTAI 15 2 lapis jarak 25 CM
`
URAIAN

NO
1

VOL

PLAT LANTAI 15 2 la KET :


LEBAR
DASAR HITUNG
(m)
(m)
3

(P X L X T)

TINGGI
(M)

PANJANG
(m)

1.20

0.15

5.56

VOLUME NETT
VOLUME BEKISTING
NO

URAIAN

KET
Penjelasan LEBAR
DASAR HITUNG
(m)
3

VOLUME BEKISTING

VOLUME PEMBESIAN
NO

URAIAN

TINGGI
(M)

PANJANG
(m)

1.20

5.5555

PLAT LANTAI 15 2 lap KET


KETERANGAN
Panjang TulJumlah Tul diameter Tul
DASAR HITUNG
(m)
(BH)
(mm)
3

Tulangan memanjang lapis bawah melintang


Tulangan memanjang lapis bawah menamjang
Tulangan melintang lapis Atas melintang
Tulangan melintang lapis Atas memanjang

5.66
1.30
5.66
1.30

6.00
23.00
6.00
23.00

10.000
10.000
10.000
10.000

JUMLAH U 24
VOL BETON
BEKISTING
PEMBESIAN U 39
PEMBESIAN U 24
PEMBESIAN TOTAL

1.00
TOTAL
55.2
55.2
110.4
0
0
0
1.432
###
###
1.43

M3
SAT
KG
KG

KG/M3
KG/M3
KG/M3
M2/M3

0.60
TOTAL
23.6
23.6
47.2
0
0
0
1.232

M3
SAT
KG
KG

78.65
78.65
2.05

KG/M3
KG/M3
KG/M3
M2/M3

0.04

0.06

3.19
3.19

3.509

0.27
TOTAL
6.68
6.68
13.36
0
0
0
1.032

M3
SAT
KG
KG

49.29
49.29
3.81

KG/M3
KG/M3
KG/M3
M2/M3

1.00
TOTAL
117.166
0
117.17
26.7336
0
26.734
12.86

M3
SAT
KG
KG

###
26.73
###
12.86

1.00
TOTAL
102.16
0
102.16
27.8712

KG/M3
KG/M3
KG/M3
M2/M3

M3
SAT
KG
KG

0.11

14.2857

0.39

16.6667

0
27.871
13.33
###
27.87
###
13.33

1.00
TOTAL
108.107
0
108.11
33.8752
0
33.875
17.33
###
33.88
###
17.33

1.00
TOTAL
108.638
69.64
178.28
30.53
0
30.526
16.00
###
30.53
###
16.00

KG/M3
KG/M3
KG/M3
M2/M3

0.40

M3
SAT
KG
KG

KG/M3
KG/M3
KG/M3
M2/M3

26.6667

0.52

M3
SAT
KG
KG

KG/M3
KG/M3
KG/M3
M2/M3

1.76

0.48

1.00
TOTAL
139.28
0
139.28
30.5256
0
30.526
16.00
###
30.53
###
16.00

1.00
TOTAL
211.28
0
211.28
36.1504
0
36.15
20.00
###
36.15
###
20.00

1.00
TOTAL
111.111
0

M3
SAT
KG
KG

KG/M3
KG/M3
KG/M3
M2/M3

1.09

OK
0.48

M3
SAT
KG
KG

KG/M3
KG/M3
KG/M3
M2/M3

M3
SAT
KG
KG

0.60

111.11
42.7074
0
42.707
23.33
###
42.71
###
23.33

1.00
TOTAL
121.042
0
121.04
23.3682
17.1038
40.472
5.87
###
40.47
###
5.87

1.00
1.00
TOTAL
120.668
11.9314
132.6
23.3682
0
23.368
70.5143
36.1662
106.68

KG/M3
KG/M3
KG/M3
M2/M3

OK
0.70

M3
SAT
KG
KG

0.17

OK

KG/M3
KG/M3
KG/M3
M2/M3

M3
M3
SAT
KG
KG
KG

KG

0.18

0.37

130.05
5.87
14.86
20.72

KG

OK
###
###
###
20.72

1.00
TOTAL
120.526
0
120.53
27.8554
0
27.855
6.57

KG/M3
KG/M3
KG/M3
M2/M3

0.62

M3
SAT
KG
KG

0.12

0.27

OK
###
27.86
###
6.57

1.00
TOTAL
87.2333
0
87.233
28.8192
0
28.819
6.00

KG/M3
KG/M3
KG/M3
M2/M3

0.20

M3
SAT
KG
KG

0.22

OK
87.23
28.82
###
6.00

KG/M3
KG/M3
KG/M3
M2/M3

0.18

1.00
TOTAL
109.787
0
109.79
38.6784
0
38.678
6.93

M3
SAT
KG
KG

0.09

0.19

0.06

0.14

OK
###
38.68
###
6.93

1.00
TOTAL
109.787
0
109.79
38.6784
0
38.678
17.33
###
38.68
###
17.33

1.00
TOTAL
169.787
0
169.79
45.3144

KG/M3
KG/M3
KG/M3
M2/M3

0.21

M3
SAT
KG
KG

KG/M3
KG/M3
KG/M3
M2/M3

M3
SAT
KG
KG

0.52

0
45.314
21.67
###
45.31
###
21.67

KG/M3
KG/M3
KG/M3
M2/M3

1.00
TOTAL
129.68
0
129.68
41.712
0
41.712
19.17

M3
SAT
KG
KG

###
41.71
###
19.17

KG/M3
KG/M3
KG/M3
M2/M3

1.00
TOTAL
114.231
0
114.23
55.2684
0
55.268
20.00
###
55.27
###
20.00

OK

0.34

OK

M3
SAT
KG
KG

KG/M3
KG/M3
KG/M3
M2/M3

OK

1.00
TOTAL
200.555
0
200.55
41.7278
0
41.728
23.33
###
41.73
###
23.33

M3
SAT
KG
KG

KG/M3
KG/M3
KG/M3
M2/M3

0.09

OK

Jml Unit
(bh)

VOL
(M3)

SATUAN

10

1.0000 M3

1.0000 M3
Jml Unit
(bh)

VOL
(M2)

SATUAN

3.78

3.78

10

12.5000 m2
12.5000 m2
Berat/m
(m)

VOL
(Kg)

SATUAN

10

0.617
0.617
-

46.2750
30.8500
77.1250
-

Kg
Kg
Kg

1.0000
12.5000

m3
m2/m3
kg/m3

80.9813

kg/m3

80.9813

kg/m3

Jml Unit
(bh)

VOL
(M3)

SATUAN

10

1.042 M3

1.042 M3
Jml Unit
(bh)
8

VOL
(M2)

SATUAN

9.000

10

8.333 m2
8.333 m2
Berat/m
(m)

VOL
(Kg)

SATUAN

12.5000

0.375

9.000

0.617
0.617
-

10

65.6673
27.3650
93.0323
-

Kg
Kg
Kg

1.0417
8.0000

m3
m2/m3
kg/m3

93.7752

kg/m3

93.7752

kg/m3

Jml Unit
(bh)

VOL
(M3)

SATUAN

10

1.0000 M3

1.0000 M3
Jml Unit
(bh)

VOL
(M2)

SATUAN

10

8.3335 m2
8.3335 m2
Berat/m
(m)

VOL
(Kg)

SATUAN

10

0.24

0.617
0.617
0.617
0.617
-

54.3454
54.3454
23.0442
23.0442
154.7791
-

Kg
Kg
Kg

1.0000
8.3333

m3
m2/m3
kg/m3

162.5158

kg/m3

162.5158

kg/m3

0.25

baru
Jml Unit
(bh)

VOL
(M3)

SATUAN

10

1.0000 M3

10
10
10.0489

1.0000 M3
Jml Unit
(bh)

VOL
(M2)

SATUAN

10

6.6666 m2
6.6666 m2
Berat/m
(m)

VOL
(Kg)

SATUAN

10

0.617
0.617
0.617
0.617
-

20.9367
20.9367
20.9367
20.9367
-

22.62

83.7466
-

Kg
Kg
Kg

1.0000
6.6667

m3
m2/m3
kg/m3

87.9349

kg/m3

87.9349

kg/m3

0.2

HARGA SATUAN PEKERJAAN

NO.

URAIAN

JUMLAH

A.01.01

PEMBUATAN 1 M2 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER

362,000.00

A.01.02

PEMBUATAN 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER

429,900.00

A.01.03

PEMBUATANV1 M2 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1.8 METER

287,500.00

A.01.04

PENGUKURAN DAN PEMASANGAN 1 M1 BOUWPLANK

A.01.05

PEMBUATAN 1 M2 KANTOR SEMENTARA LANTAI PLESTERAN

1,371,000.00

A.01.06

PEMBUATAN 1 M2 GEDUNG SEMEN DAN PERALATAN

1,052,900.00

A.01.07

PEMBUATAN 1 M2 RUMAH JAGA (KONSTRUKSI KAYU)

1,261,200.00

A.01.09

PEMBERSIHAN 1 M2 LAPANGAN DAN PERATAAN

A.01.08

PEMBUATAN 1 M2 PEMBUATAN BEDENG PEKERJA

A.01.11

PEMBUATAN 1 BUAH KOTAK ADUKAN UKURAN 40CM X 50CM X 25CM

550,600.00

A.01.10

PEMBUATAN 1 M2 STEIGER/PERANCAH DARI BAMBU

272,000.00

A.01.12

PEMBUATAN 1M2 JALAN SEMENTARA

118,800.00

A.01.13

PEMBONGKARAN 1 M3 BETON BERTULANG

938,600.00

A.01.14

PEMBONGKARAN 1 M3 DINDING TEMBOK BATA

469,000.00

A.01.15

PEMASANGAN 1 M2 PAGAR KAWAT JARING GALVANIS PANJANG 240 CM

A.01.16

PEMASANGAN 1 M2 PANEL BETON PRACETAK 5X50X213 CM

A.02.01

PENGGALIAN 1 M3 TANAH BIASA SEDALAM 1 METER

51,700.00

A.02.02

PENGGALIAN 1 M3 TANAH BIASA SEDALAM 2 METER

63,300.00

A.02.03

MENGGALI 1 M3 TANAH BIASA SEDALAM 3 METER

75,100.00

A.02.04

MENGGALI 1 M3 TANAH KERAS SEDALAM 1 METER

68,800.00

A.02.05

MENGGALI 1 M3 TANAH CADAS SEDALAM 1 METER

104,200.00

A.02.06

MENGGALI 1 M3 TANAH LUMPUR SEDALAM 1 METER

A.02.07

1 M2 PEKERJAAN STRIPING TANAH TEBING SETINGGI 1 METER

A.02.08

PEMBUANGAN 1 M3 TANAH SEJAUH 30 METER

22,600.00

A.02.09

PENGURUGAN 1 M3 KEMBALI GALIAN TANAH

37,400.00

A.02.10

PEMADATAN TANAH 1 M3 TANAH ( PER 20 CM)

A.02.11

PENGURUGAN 1 M3 PASIR URUG

161,900.00

A.02.12

PEMASANGAN 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 3 PP : 7 TL

216,200.00

A.02.13

PEMASANGAN 1 M2 LAPISAN IJUK TEBAL 10 CM UNTUK BIDANG RESAPAN

182,800.00

A.02.14

PENGURUGAN 1 M3 SIRTU PADAT

177,100.00

A.03.01

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 3 PP

782,300.00

A.03.02

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 4 PP

723,400.00

A.03.03

PEMASANGAN 1 M3 BATU BELAH MORTAR TIPE N (UNTUK MUTU PP TERTENTU SETARA DENGAN CAMPURAN 1 PC:4

870,800.00

A.03.04

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 5 PP

682,600.00

A.03.05

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 6 PP

653,900.00

A.03.06

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 8 PP

614,600.00

A.03.07

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 1 KP : 2PP

453,800.00

A.03.08

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 1 KP : 10 PP

565,100.00

A.03.09

PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1/4 SP : 1 KP : 4 PP

534,300.00

A.03.10

PEMASANGAN 1 M3 AANSTAMPING BATU KOSONG

A.03.11

PEMASANGAN 1 M3 PONDASI SIKLOP 60% BETON CAMPURAN 1 SP : 2 PB : 3 KR

63,000.00

11,000.00
1,148,700.00

9,800.00
540,200.00

83,100.00
3,700.00

37,400.00

341,500.00
2,449,900.00

DAN 40 % BATU BELAH


A.03.12

PEMASANGAN 1 M3 PONDASI SUMURAN DIAMETER 100 CM

807,700.00

A.03.13

PEMASANGAN 1 M3 BATU BRONJONG TIPE D BENTUK I L = 2 M, B = 1 M, T = 0.5 M LUBANG HEXAGONAL 100 X 120

789,800.00

A.04.01

MEMBUAT 1 M3 BETON MUTU f'c = 7,4 Mpa (K 100), SLUMP (12 2) CM, W/C = 0.87

856,200.00

A.04.02

MEMBUAT 1 M3 BETON MUTU f'c = 9,8 Mpa (K 125), SLUMP (12 2) CM, W/C = 0.78

901,000.00

118 dari 124

A.04.03

MEMBUAT 1 M3 BETON MUTU f'c = 12,2 Mpa (K 150), SLUMP (12 2) CM, W/C = 0.72

936,000.00

A.04.04

MEMBUAT 1 M3 LANTAI KERJA BETON MUTU f'c = 7,2 Mpa (K 100), SLUMP (3-6) CM, W/C = 0.87

797,200.00

A.04.05

MEMBUAT 1 M3 BETON MUTU f'c = 14,5 Mpa (K 175), SLUMP (12 2) CM, W/C = 0.66

977,600.00

A.04.06

MEMBUAT 1 M3 BETON MUTU f'c = 16,9 Mpa (K 200), SLUMP (12 2) CM, W/C = 0.61

1,017,000.00

A.04.07

MEMBUAT 1 M3 BETON MUTU f'c = 19,3 Mpa (K 225), SLUMP (12 2) CM, W/C = 0.58

1,046,900.00

A.04.08

MEMBUAT 1 M3 BETON MUTU f'c = 21,7 Mpa (K 250), SLUMP (12 2) CM, W/C = 0.56

1,066,100.00

A.04.09

MEMBUAT 1 M3 BETON MUTU f'c = 24,0 Mpa (K 275), SLUMP (12 2) CM, W/C = 0.53

1,099,000.00

A.04.10

MEMBUAT 1 M3 BETON MUTU f'c = 26,4 Mpa (K 300), SLUMP (12 2) CM, W/C = 0.52

1,109,200.00

A.04.11

MEMBUAT 1 M3 BETON MUTU f'c = 28,8 Mpa (K 325), SLUMP (12 2) CM, W/C = 0.49

1,186,200.00

A.04.12

MEMBUAT 1 M3 BETON MUTU f'c = 31,2 Mpa (K 350), SLUMP (12 2) CM, W/C = 0.48

1,199,500.00

A.04.13

MEMBUAT 1 M3 BETON KEDAP AIR DENGAN STROROK - 100

1,123,700.00

A.04.14

PEMBESIAN 1 Kg DENGAN BESI POLOS ATAU BESI ULIR

A.04.15

PEMASANGAN 1 M2 BEKISTING UNTUK PONDASI

169,000.00

A.04.16

PEMASANGAN 1 M2 BEKISTING UNTUK SLOOF

181,700.00

A.04.17

PEMASANGAN 1 M2 BEKISTING UNTUK KOLOM

508,400.00

A.04.18

PEMASANGAN 1 M2 BEKISTING UNTUK BALOK

542,500.00

A.04.19

PEMASANGAN 1 M2 BEKISTING UNTUK LANTAI

959,300.00

A.04.20

PEMASANGAN 1 M2 BEKISTING UNTUK DINDING

603,000.00

A.04.21

PEMASANGAN 1 M2 BEKISTING UNTUK TANGGA

454,100.00

A.04.22

PEMASANGAN 1 M2 JEMBATAN/TANGGA PENGECORAN

A.05.01

MEMBUAT 1 M3 PONDASI BETON BERTULANG (157.5000 kg BESI + BEKISTNG)

3,956,000.00

A.05.02

MEMBUAT 1 M3 SLOOF BETON BERTULANG (200 kg BESI + BEKISTNG)

4,897,100.00

A.05.03

MEMBUAT 1 M3 KOLOM BETON BERTULANG (300 kg BESI + BEKISTNG)

9,968,300.00

A.05.04

MEMBUAT 1 M3 BALOK BETON BERTULANG (200 kg BESI + BEKISTNG)

7,750,200.00

A.05.05

MEMBUAT 1 M3 KOLOM BETON BERTULANG (150 kg BESI + BEKISTNG)

8,518,900.00

A.05.06

MEMBUAT 1 M3 DINDING BETON BERTULANG (150 kg BESI + BEKISTNG)

7,638,400.00

A.05.07

MEMBUAT 1 M3 DINDING BETON BERTULANG (2000 kg BESI + BEKISTNG)

7,043,000.00

A.05.08

MEMBUAT 1 M1 KOLOM PRAKTIS BETON BERTULANG (11 X 11) CM

81,800.00

A.05.09

MEMBUAT 1 M1 RING BALOK BETON BERTULANG (11 X 11) CM

97,000.00

A.05.10

MEMBUAT 1 M1 RING BALOK BETON BERTULANG (10 X 15) CM

97,000.00

A.06.01

PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 8 CM BETON f'c 14.5 Mpa (K 175) SLUMP (12 2)CM

78,200.00

A.06.02

PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 10 CM BETON f'c 14.5 Mpa (K 175) SLUMP (12 2)CM

94,900.00

A.06.03

PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 12 CM BETON f'c 14.5 Mpa (K 175) SLUMP (12 2)CM

105,700.00

A.06.04

PEMBUATAN 1 M2 LAHAN PRODUKSI TEBAL 15 CM BETON f'c 14.5 Mpa (K 175) SLUMP (12 2)CM

146,600.00

A.07.01

1 KG PEK. KONSTRUKSI BESI PROFIL

29,700.00

A.07.02

1 KG PEKERJAAN RANGKA KUDA-KUDA BAJA IWF

31,000.00

A.07.03

PENGERJAAN 100 KG PEKERJAAN PERAKITAN

A.07.04

PEMBUATAN 1 M2 PINTU BESI PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU

A.07.05

PENGERJAAN 10 CM PENGELASAN DENGAN LAS LISTRIK

A.07.06

1 M2 PEMASANGAN ROLLING DOOR BESI

922,900.00

A.07.07

1 M2 PEMASANGAN ROLLING DOOR ALUMINIUM

439,400.00

A.07.08

PEMASANGAN 1 M2 RANGKA BESI HOLLOW 1 X 40.40.2MM, MODUL 60 X 120CM, PLAFON

198,500.00

A.08.01

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 2PP

244,300.00

A.08.02

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 3PP

228,600.00

A.08.03

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 4PP

218,300.00

A.08.04

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps

212,600.00

A.08.05

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 6PP

222,800.00

A.08.06

PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 3KP : 10 PP

193,400.00

A.08.07

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps

117,200.00

A.08.08

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps

109,900.00

A.08.09

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps

105,700.00

A.08.10

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps

103,000.00

A.08.11

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 6 Ps

101,400.00

A.08.12

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 8 Ps

98,500.00

A.08.13

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 SP : 3 KP : 10 PP

96,500.00

A.08.14

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 SP : 1 KP : 1 PP

84,400.00

A.08.15

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 SP : 1 KP : 2 PP

A.08.16

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.20) CAMP 1 PC : 3 PS

266,900.00

A.08.17

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.20) CAMP 1 PC : 4 PS

263,800.00

14,100.00

270,400.00

43,000.00

119 dari 124

1,010,100.00
29,600.00

85,600.00

A.08.18

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.15) CAMP 1 PC : 3 PS

214,900.00

A.08.19

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.15) CAMP 1 PC : 4 PS

212,400.00

A.08.20

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.10) CAMP 1 PC : 3 PS

163,300.00

A.08.21

1 M2 PASANGAN DINDING HOLLOW BLOCK/CONE BLOCK (HB/CB.10) CAMP 1 PC : 4 PS

162,100.00

A.08.22

1 M2 PASANGAN DINDING ROSTER/TERAWANG (12X11X24) KERAMIK CAMP 1 PC : 3 PS

1,208,500.00

A.08.23

1 M2 PASANGAN DINDING ROSTER/TERAWANG (12X11X24) KERAMIK CAMP 1 PC : 4 PS

1,208,500.00

A.08.24

1 M2 PASANGAN DINDING BATA BERONGGA EKSPOSE (12X11X24) CAMP 1 PC : 3 PS

1,208,500.00

A.09.01

1 M2 PASANGAN PLESTERAN 1 Pc : 1 Ps, TEBAL 15 MM + ACIAN

62,400.00

A.09.02

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIAN

54,300.00

A.09.03

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIAN

50,800.00

A.09.04

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN

48,400.00

A.09.05

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN

47,000.00

A.09.06

1 M2 PASANGAN PLESTERAN 1 Pc : 6 Ps, TEBAL 15 MM + ACIAN

45,900.00

A.09.07

1 M2 PASANGAN PLESTERAN 1 Pc : 7 Ps, TEBAL 15 MM + ACIAN

45,200.00

A.09.08

1 M2 PASANGAN PLESTERAN 1 Pc : 8 PP, TEBAL 15 MM + ACIAN

44,600.00

A.09.09

1 M2 PASANGAN PLESTERAN 1 Pc : 1/2Kp : 3 PP, TEBAL 15 MM + ACIAN

47,700.00

A.09.10

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Kp : 8 PP, TEBAL 15 MM + ACIAN

44,400.00

A.09.11

1 M2 PASANGAN PLESTERAN 1 Pc : 1 Kp : 1 PP, TEBAL 15 MM + ACIAN

38,100.00

A.09.12

1 M2 PASANGAN PLESTERAN 1 Pc : 1 Kp : 2 PP, TEBAL 15 MM + ACIAN

38,900.00

A.09.13

1 M2 PASANGAN PLESTERAN 1 Pc : 1 PP, TEBAL 20 MM + ACIAN

72,700.00

A.09.14

1 M2 PASANGAN PLESTERAN 1 Pc : 3 PP, TEBAL 20 MM + ACIAN

57,900.00

A.09.15

1 M2 PASANGAN PLESTERAN 1 Pc : 4 PP, TEBAL 20 MM + ACIAN

64,700.00

A.09.16

1 M2 PASANGAN PLESTERAN 1 Pc : 5 PP, TEBAL 20 MM + ACIAN

62,900.00

A.09.17

1 M2 PASANGAN PLESTERAN 1 Pc : 6 PP, TEBAL 20 MM + ACIAN

61,300.00

A.09.18

1 M2 PASANGAN PLESTERAN 1 Pc : 1 Kp : 2 PP, TEBAL 20 MM + ACIAN

49,600.00

A.09.19

PEMASANGAN 1 M2 BERAPEN 1 SP : 5 PP TEBAL 15 CM

29,900.00

A.09.20

1 M2 PASANGAN PLESTERAN SKONING 1 Pc : 3 PP, LEBAR 10 MM

43,900.00

A.09.21

1 M2 PASANGAN PLESTERAN CIPRAT, 1 Pc : 2 Ps

38,000.00

A.09.22

PEMASANGAN 1 M2 FINISING SIAR PASANGAN BATA MERAH

22,400.00

A.09.23

PEMASANGAN 1 M2 FINISHING SIAR PASANGAN CONBLOCK EKSPOSE

10,700.00

120 dari 124

A.09.24

1 M2 PASANGAN PLESTERAN SIAR PASANGAN BATU KALI CAMPURAN 1 Pc : 2 PP

46,700.00

A.09.25

1 M2 ACIAN PC

28,200.00

A.10.01

PASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN 40CM X 40CM

51,900.00

A.10.02

PASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN 30CM X 30CM

60,700.00

A.10.03

PASANG 1 M2 LANTAI UBIN PC ABU-ABU UKURAN 20CM X 20CM

55,200.00

A.10.04

PEMASANGAN 1 M2 LANTAI UBIN WARNA UKURAN 40 X 40 CM

64,100.00

A.10.05

PEMASANGAN 1 M2 LANTAI UBIN WARNA UKURAN 30 X 30 CM

67,300.00

A.10.06

PEMASANGAN 1 M2 LANTAI UBIN WARNA UKURAN 20 X 20 CM

70,300.00

A.10.07

PEMASANGAN 1 M2 LANTAI UBIN TERASO UKURAN 40 X 40 CM

64,100.00

A.10.08

PEMASANGAN 1 M2 LANTAI UBIN TERASO UKURAN 30 X 30 CM

67,300.00

A.10.09

PEMASANGAN 1 M2 LANTAI UBIN GRANIT UKURAN 40X40 CM

A.10.10

PEMASANGAN 1 M2 LANTAI UBIN GRANIT UKURAN 30X30 CM

A.10.11

PEMASANGAN 1 M2 LANTAI UBIN TERALUK MARMER UKURAN 60X60 CM

143,000.00

A.10.12

PEMASANGAN 1 M2 LANTAI UBIN TERALUK MARMER UKURAN 40X40 CM

142,700.00

A.10.13

PEMASANGAN 1 M2 LANTAI UBIN TERALUK MARMER 30X30 CM

146,000.00

A.10.14

PEMASANGAN 1 M' PLINT UBIN PC ABU-ABU UKURAN 15 CM X 20 CM

41,000.00

A.10.15

PEMASANGAN 1 M' PLINT UBIN PC ABU-ABU UKURAN 10 CM X 30 CM

32,200.00

A.10.16

PEMASANGAN 1 M' PLINT UBIN WARNA UKURAN 10 CM X 20 CM

43,500.00

A.10.17

PEMASANGAN 1 M' PLINT UBIN WARNA UKURAN 10 CM X 30 CM

31,800.00

A.10.18

PEMASANGAN 1 M' PLINT UBIN WARNA UKURAN 10 CM X 40 CM

31,800.00

A.10.19

PEMASANGAN 1 M' PLINT UBIN TERASO UKURAN 10 X 30 CM

17,600.00

A.10.20

PEMASANGAN 1 M' PLINT UBIN TERASO UKURAN 10 X 40 CM

17,600.00

A.10.21

PEMASANGAN 1 M' PLINT UBIN GRANIT UKURAN 10 X 40 CM

17,600.00

A.10.22

PEMASANGAN 1 M' PLINT UBIN GRANIT UKURAN 10 X 30 CM

17,600.00

A.10.23

PEMASANGAN 1 M' PLINT UBIN TERALUX KERANG UKURAN 10 X 40 CM

17,600.00

A.10.24

PEMASANGAN 1 M' PLINT UBIN TERALUX KERANG UKURAN 10 X 30 CM

17,600.00

A.10.25

PEMASANGAN 1 M' PLINT UBIN TERALUX MARMER UKURAN 10 X 60 CM

17,600.00

A.10.26

PEMASANGAN 1 M' PLINT UBIN TERALUX MARMER UKURAN 10 X 40 CM

16,800.00

A.10.27

PEMASANGAN 1 M2 LANTAI TERASO COR DITEMPAT, TEBAL 3CM

A.10.28

PEMASANGAN 1 M2 LANTAI KERAMIK ARTISTIK 10CM X 20CM

179,700.00

A.10.29

PEMASANGAN 1 M2 LANTAI KERAMIK ARTISTIK 10CM X 10CM ATAU 5CM X 20 CM

130,700.00

A.10.30

1 M2 PASANG LANTAI KERAMIK 33 X 33 CM

230,900.00

A.10.31

PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 30 X 30 CM

194,900.00

A.10.32

PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 20 X 20 CM

192,200.00

A.10.33

PEMASANGAN 1 M2 LANTAI KERAMIK UKURAN 10 X 33 CM UNTUK VARIASI/BORDER

184,500.00

A.10.34

PEMASANGAN 1 M' PLINT KERAMIK UKURAN 10 X 20 CM

19,600.00

A.10.35

PEMASANGAN 1 M' PLINT KERAMIK UKURAN 10 X 10 CM

19,400.00

A.10.36

PEMASANGAN 1 M' PLINT KERAMIK UKURAN 5 X 20 CM

A.10.37

PEMASANGAN 1 M' PLINT INTERNAL COVE ARTISTIK 5 X 5 X 20 CM

142,900.00

A.10.38

PEMASANGAN 1 M2 LANTAI MARMER UKURAN 100X100 CM

730,000.00

A.11.01

PEMASANGAN 1 M2 LANTAI KARPET

A.11.02

PEMASANGAN 1 M2 UNDERLAYER (PELAPIS BAWAH KARPET)

A.11.03

1 M2 PASANG LANTAI PARQUET KAYU

A.11.04

1 M2 PASANG LANTAI KAYU GYMFLOOR

A.11.05

1 M2 PASANG DINDING PORSLEN 11 X 11 CM

146,800.00

A.11.06

1 M2 PASANG DINDING PORSLEN 10 X 20 CM

205,800.00

A.11.07

1 M2 PASANG DINDING PORSLEN 20 X 20 CM

139,500.00

A.11.08

PEMASANGAN 1 M2 DINDING KERAMIK ARTISTIK 10 X 20 CM

147,000.00

A.11.09

PEMASANGAN 1 M2 DINDING KERAMIK ARTISTIK 5 X 20 CM

148,400.00

A.11.10

PEMASANGAN 1 M2 DINDING KERAMIK 10 X 20 CM

147,000.00

675,100.00
67,300.00

30,700.00

17,900.00

37,800.00
27,100.00
764,000.00
3,917,800.00

121 dari 124

A.11.11

PEMASANGAN 1 M2 DINDING KERAMIK 20 X 20 CM

212,100.00

A.11.12

PEMASANGAN 1 M2 DINDING MARMER 100 X 100 CM

783,000.00

A.11.13

1 M2 PASANGAN DINDING BATU TEMPEL HITAM

347,100.00

A.11.14

PEMASANGAN 1 M2 LANTAI VYNIL UKURAN 30 CM X 30 CM

48,900.00

A.11.15

PEMASANGAN 1 M2 WALLPAPER LEBAR 50 CM

56,600.00

A.11.16

1 M1 PASANG PLINT VYNIL 15 CM X 30 CM

12,700.00

A.11.17

PEMASANGAN 1 M1 PLINT KAYU 2 X 10 CM

64,100.00

A.12.01

PEMASANGAN 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM, DAN 6 MM

25,600.00

A.12.02

PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (30 X30) CM

20,100.00

A.12.03

PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (30 X60) CM

20,100.00

A.12.04

PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (60 X120) CM

272,700.00

A.12.05

PEMASANGAN 1 M2 LANGIT-LANGIT TRIPLEKS UKURAN (120 X 240) CM, TEBAL 3 MM, 4MM & 6 MM

45,400.00

A.12.06

PEMASANGAN 1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm

44,700.00

A.12.07

PEMASANGAN 1 M2 LANGIT-LANGIT AKUSTIK UKURAN (60 X120) CM BERIKUT RANGKA ALUMUNIUM

79,400.00

A.12.08

PEMASANGAN 1 M' LIST LANGIT LANGIT KAYU PROFIL

12,800.00

A.13.01

PEMASANGAN 1 M2 ATAP GENTENG PALENTONG KECIL

85,200.00

A.13.02

PEMASANGAN 1 M2 ATAP GENTENG KODOK GLAZUR

16,500.00

A.13.03

PEMASANGAN 1 M2 ATAP GENTENG PALENTONG BESAR/SUPER

16,500.00

A.13.04

1 M1 PASANG BUBUNG GENTENG PALENTONG

81,700.00

A.13.05

PEMASANGAN 1 M2 BUBUNG GENTENG KODOK GLAZUR

78,300.00

A.13.06

PEMASANGAN 1 M2 BUBUNG GENTENG PALENTONG BESAR

62,400.00

A.13.07

PEMASANGAN 1 M2 ROOF LIGHT FIBERGLASS 90 X 180

16,900.00

A.13.08

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0.92 x 2.5 m x 5 mm

74,900.00

A.13.09

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0.92 x 2.25 m x 5 mm

85,900.00

A.13.10

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0.92 x 2.00 m x 5 mm

75,400.00

A.13.11

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0.92 x 1.80 m x 5 mm

101,800.00

A.13.12

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05 x 3.00 m x 4 mm

89,400.00

A.13.13

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05 x 2.70 m x 4 mm

19,300.00

A.13.14

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0.92 x 2.00 m x 5 mm

19,300.00

A.13.15

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 0.92 x 1.80 m x 5 mm

19,300.00

A.13.16

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05 x 3.00 m x 4 mm

19,300.00

A.13.17

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05 x 2.70 m x 4 mm

19,300.00

A.13.18

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05 x 2.40 m x 4 mm

60,400.00

A.13.19

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05 x 2.10 m x 4 mm

67,000.00

A.13.20

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05 x 1.05 m x 4 mm

80,900.00

A.13.21

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.05 x 3.00 m x 6 mm

19,300.00

A.13.22

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.08 x 2.70 m x 6 mm

19,300.00

A.13.23

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.08 x 2.40 m x 6 mm

19,300.00

A.13.24

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.08 x 2.10 m x 6 mm

19,300.00

A.13.25

PEMASANGAN 1 M2 ATAP ASBES GELOMBANG 1.08 x 1.80 m x 6 mm

A.13.26

PEMASANGAN 1 M1 BUBUNG STEL GELOMBANG , 0.92 m

182,000.00

A.13.27

PEMASANGAN 1 M1 BUBUNG STEL GELOMBANG ,1.05 m

17,000.00

A.13.28

PEMASANGAN 1 M1 BUBUNG STEL GELOMBANG ,1.08 m

A.13.29

1 M2 PASANG ATAP GENTENG BETON

126,300.00

A.13.30

PEMASANGAN 1 M' NOK GENTENG BETON

104,100.00

A.13.31

PEMASANGAN 1 M2 ATAP SENG GELOMBANG

46,600.00

A.13.32

PEMASANGAN 1 M1 NOK ATAP SENG

29,900.00

A.13.33

PEMASANGAN 1 M2 ATAP ALUMUNIUM

77,200.00

122 dari 124

19,300.00

17,000.00

A.13.34

PEMASANGAN 1 M1 NOK ALUMINIUM

A.13.35

PEMASANGAN 1 M1 ALUMINIUM FOIL/SISALATION

99,500.00

A.14.01

PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN KUSEN JENDELA KAYU KELAS 1

A.14.02

PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II ATAU III

A.14.03

1 M2 PASANGAN PINTU KLAMP KAYU KAYU LOKAL KLS II

272,600.00

A.14.04

PEMBUATAN DAN PEMASANGAN 1 M2 PINTU KLEMP STANDAR, KAYU KELAS II

272,600.00

A.14.05

PEMBUATAN DAN PEMASANGAN 1 M2 PINTU KLEMP SEDERHANA, KAYU KELAS III

272,600.00

A.14.06

PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL, KAYU KELAS I ATAU II

941,600.00

A.14.07

PEMBUATAN DAN PEMASANGAN 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS 1 DAN 2

A.14.08

1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATI

A.14.09

PEMBUATAN 1 M2 DAUN PINTU PLYWOOD RANGKAP, RANGKA KAYU KLS II TERTUTUP

A.14.10

PEMBUATAN 1 M2 PINTU PLYWOOD RANGKAP, RANGKA EXPOSE KAYU KLS I ATAU II

A.14.11

PEMASANGAN 1 M2 JALUSI KUSEN, KAYU KELAS I ATAU II

A.14.12

PEMASANGAN 1 M2 TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I

A.14.13

PEMASANGAN 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU KELAS II

A.14.14

1 M3 PASANG KONSTRUKSI KUDA - KUDA KONVENSIONAL KAYU KELAS I, II, DAN III BENTANG 6 M

16,305,000.00

A.14.15

PEMASANGAN 1 M3 KONSTRUKSI KUDA - KUDA EXPOSE, KAYU LOKAL KLS I

18,532,400.00

A.14.16

1 M3 PASANG KONSTRUKSI GORDENG KAYU KELAS II

A.14.17

PEMASANGAN 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU LOKAL KLS II

A.14.18

PEMASANGAN 1 M2 RANGKA ATAP GENTENG BETON, KAYU LOKAL KLS II

A.14.19

PEMASANGAN 1 M2 ATAP SIRAP KAYU

A.14.20

1 M2 PASANG RANGKA ATAP SIRAP KAYU LOKAL KLS II

69,400.00

A.14.21

1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU LOKAL KLS II atau III

84,200.00

A.14.22

1 M2 PASANG RANGKA LANGIT - LANGIT (60 x 60) cm, KAYU LOKAL KLS II atau III

A.14.23

1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, Kayu Kelas I atau Kelas II

187,100.00

A.14.24

1 M1 PASANG LISPLANK UKURAN (3 x 30) cm Kelas I atau Kelas II

189,000.00

A.14.25

1 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER

510,300.00

A.14.26

1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER

503,400.00

A.14.27

PEMASANGAN 1 M2 DINDING LAMBRISERING DARI PAPAN KAYU KELAS I

308,300.00

A.14.28

PEMASANGAN 1 M2 DINDING LAMBRISERING DARI PLYWOOD UKURAN (120X240) CM

A.14.29

PEMASANGAN 1 M2 DINDING BILIK, RANGKA KAYU RANGKA KAYU KELAS III ATAU IV

A.14.30

PEMASANGAN 1 M2 RANGKA DINDING PEMISAH (60 X 120 CM ) KAYU KAYU LOKAL KLS II

151,900.00

A.14.31

PEMASANGAN 1 M2 RANGKA BESI HOLLOW 1 X 40.40.2MM, MODUL 60 X 120CM, DINDING PARTISI

168,400.00

A.15.01

PEMASANGAN 1 BUAH KUNCI TANAM ANTIK

57,300.00

A.15.02

PEMASANGAN 1 BUAH KUNCI TANAM BIASA

177,300.00

A.15.03

PEMASANGAN 1 BUAH KUNCI TANAM KAMAR MANDI

116,300.00

A.15.04

PEMASANGAN 1 BUAH PASANG KUNCI SILINDER

209,600.00

A.15.05

PEMASANGAN 1 BUAH ENGSEL PINTU

36,300.00

A.15.06

PEMASANGAN 1 BUAH ENGSEL JENDELA KUPU-KUPU

23,800.00

A.15.07

PEMASANGAN 1 BUAH ENGSEL ANGIN

24,300.00

A.15.08

PEMASANGAN 1 BUAH SPRING KNIP

14,900.00

A.15.09

PEMASANGAN 1 BUAH KAIT ANGIN

A.15.10

PEMASANGAN 1 BUAH DOOR CLOSER

15,000.00
16,920,200.00
6,288,100.00

632,100.00
1,298,000.00
494,500.00
528,100.00
1,145,100.00
801,600.00
682,700.00

5,636,400.00
61,200.00
59,200.00
929,100.00

89,500.00

83,700.00
59,600.00

29,200.00
300,800.00

A.15.11

PEMASANGAN 1 BUAH KUNCI SELOT

A.15.12

PEMASANGAN 1 M2 KACA, TEBAL 3 MM

35,600.00
99,000.00

A.15.13

PEMASANGAN 1 M2 KACA, TEBAL 5 MM

111,100.00

A.15.14

PEMASANGAN1 M2 KACA, TEBAL 8 MM

294,500.00

A.16.01

1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI

64,000.00

A.16.02

1 M2 PLITURAN BIDANG KAYU (BIASA)

69,500.00

A.16.03

1 M2 VERNIS BIDANG KAYU (BIASA)

27,400.00

A.16.04

PENGIKISAN/PENGEROKAN PERMUKAAN CAT LAMA

A.17.01

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK

A.17.02

MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN

A.17.03

MEMASANG 1 BUAH KLOSET JONGKOK TERASO

A.17.04

MEMASANG 1 BUAH URINOIR

3,530,900.00

A.17.05

MEMASANG 1 BUAH WASTAFEL

1,531,500.00

A.17.06

MEMASANG 1 BUAH BAK MANDI TRASO VOLUME 0,3 M3

A.17.07

MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3

A.17.08

MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3

10,100.00
2,943,100.00
449,300.00
351,600.00

123 dari 124

676,200.00
960,700.00
1,383,900.00

A.17.09

MEMASANG 1 M' PIPA BETON DIA. 15-20 CM

116,300.00

A.17.10

MEMASANG 1 M' PIPA BETON DIA. 30-100 CM

178,600.00

A.17.11

Memasang 1 Buah Bak Kontrol, Pas. Batu Bata ukuran (30X30) Tinggi 35 CM

367,000.00

A.17.12

Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran (45X45) Tinggi 50 CM

555,700.00

A.17.13

Memasang 1 Buah Bak Kontrol Pas. Batu Bata ukuran (60X60) Tinggi 65 CM

699,000.00

A.17.14

MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5"

62,200.00

A.17.15

MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"

67,900.00

A.17.16

MEMASANG 1 M' PIPA GALVANIS DIAMETER 1"

75,000.00

A.17.17

MEMASANG 1 M' PIPA GALVANIS DIAMETER 1 1/2"

A.17.18

MEMASANG 1 M' PIPA GALVANIS DIAMETER 2"

A.17.19

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"

22,700.00

A.17.20

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 3/4"

29,100.00

A.17.21

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 1"

35,500.00

A.17.22

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 1 1/2"

56,800.00

A.17.23

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 2"

78,100.00

A.17.24

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 2 1/2"

A.17.25

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 3"

140,000.00

A.17.26

PEMASANGAN 1 M' PIPA PVC TIPE AW DIAMETER 4"

212,400.00

A.17.27

PEMASANGAN 1 BH BAK CUCI PIRING STAILES STEEL

366,300.00

A.17.28

PEMASANGAN 1 BH KRAN DIAMETER 0,75' ATAU 0,5"

77,300.00

A.17.29

PEMASANGAN 1 BH FLOOR DRAIN

55,700.00

89,200.00
106,200.00

124 dari 124

97,300.00