Rev
Renjith.P
E.Koyess
S.Sayegh
Prepared by
Reviewed by
Approved by
16.02.2014
16.02.2014
16.02.2014
Signature:
Date:
Page 2 of 97
TABLE OF CONTENTS
1.
2.
3.
3.1
3.1.1
3.2
3.2.1
3.3
3.3.1
3.3.2
3.3.3
3.3.4
4.
4.1
4.2
4.3
5.
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
6.
SCOPE:................................................................................................................................ 3
REFERENCES: ................................................................................................................... 3
EXPLANATION OF TERMS AS PER CLAUSE 4 OF 62305-2:......................................... 3
Damage and Loss ................................................................................................................. 3
Source of Damage ................................................................................................................ 3
Type of damage .................................................................................................................... 4
Type of loss .......................................................................................................................... 4
Risk and Risk Components ...................................................................................................4
Risk...................................................................................................................................... 4
Composition of Risk Components Related to a Structure as Per Clause 4.3 of IEC 62305-2 .5
Risk Components For A Structure Due To Flashes To The Struture...................................... 5
Risk Components For A Structure Due To Flashes Near The Structure.................................6
Risk management: ................................................................................................................ 6
Basic Procedure:................................................................................................................... 6
Tolerable Risk (RT).............................................................................................................. 7
Specific Procedure to Evaluate the Need of Protection.......................................................... 7
The Results Summary........................................................................................................... 8
Administration Building: For Detail Refer Attachment 3 ...................................................... 8
Administration Substation Building (CTAS): For Detail Refer Attachment 4 ....................... 8
Mosque: For Detail Refer Attachment 5 ............................................................................... 9
Workshop Building: For Detail Refer Attachment 6 ........................................................... 10
Washdown Area : For Detail Refer Attachment 7 ............................................................... 10
Driver Reception Building: For Detail Refer Attachment 8 ................................................. 11
Gate Complex Building: For Detail Refer Attachment 9 ..................................................... 12
Quayside Amenities Building: For Detail Refer Attachment 10 ......................................... 13
ATTACHMENTS .............................................................................................................. 14
1.
Page 3 of 97
SCOPE:
This document explores the necessity of lightning protection system for the Container
Terminal -1 buildings under the Design & Build package of the New Port Project as per contract
NPP/0026. The software FURSE STRIKE RISK version 5.0 will be used in this project to
calculate all types of risk and compare it with the tolerable values based on IEC 62305.
2.
REFERENCES:
DPCT-TCC-RPT-GEN-00004
Basis of Design
NPP0026-TCC-SPC-EL-00001
Electrical Specification
IEC 62305-1
IEC 62305-2
IEC 62305-3
3.
3.1
3.2
Page 4 of 97
Type of damage
A lightning flash may cause damage depending on the characteristics of the object to be
protected. Some of the most important characteristics are: type of construction, contents and
application, type of service and protection measures provided.
For practical application of this risk assessment, it is useful to distinguish between three basic
types of damage which can appear as the consequence of lightning flashes. They
D1: Injury to living beings
D2: Physical damage
D3: Failure of electrical and electronic systems
3.3
3.3.1 Risk
The Risk R is the value of a probable average annual loss. For each type of loss which may
appear in a structure or in a service, the relevant risk will be evaluated.
The risks to be evaluated in a structure may be as follows:
R1: Risk of loss of human life
R2: Risk of loss of service to the public
R3: Risk of loss of cultural heritage
R4: Risk of loss of economic value
Page 5 of 97
The evaluate risks, R, the relevant risk components will be defined and calculated. For the D &
B buildings, in general the risk component R1, R2 & R4 is considered for all the buildings. Risk
R3 (cultural heritage) is to be considered only for the Mosque.
Each risk, R, is the sum of risk components. When calculating a risk, the risk components may
be grouped according to the source of damage and type of damage.
Risk components to be considered for each type of loss in a structure are listed below:
R1: Risk of loss of human life:
R1 = RA + RB + RC + RM + RU + RV + RW + RZ
RC, RM, RW and RZ are not applicable as they are applicable only for structures with risk of
explosion and for hospitals with life-saving electrical equipment or other structures when failure
of internal systems immediately endangers human life.
RU, RV and RW are the risk components to be considered due to the flashes to a line connected
to the structure. In this case, all D & B buildings are is not connected to overhead line and only
connected through cables, thus the risk components are not applicable.
Therefore, R1 = RA + RB
R2: Risk of loss of service to the public:
R2 = RB + RC + RM + RV + RW + RZ
= RB + RC + RM
R3: Risk of loss of cultural heritage:
R3 = RB + RV
R4: Risk of loss of economic value:
R4 = RB + RC + RM + RV + RW + RZ
= RB + RC + RM
The above risk components equations corresponding to each type of loss are based on Page51, Table-3 of IEC 62305-2
Page 6 of 97
RA: Component related to injury to living beings caused by touch and step voltages in the zones up
to 3 m outside the structure. Loss of type L1 and, in the case of Loss of type L1 and, in the case of
structures holding livestock, loss of type L4 with possible loss of animals may also arise.
RB: Component related to Physical damage caused by dangerous sparking inside the structure
triggering fire or explosion, which may also endanger the environment. All type of loss (L1, L2, L3
and L4) may arise.
RC: Component related to failure of internal systems caused by LEMP (Lightning Electromagnetic
Impulse). Loss of type L2 and L4 could occur in all cases along with type L1 in the case of structures
with risk of explosion and hospitals or other structures where failure of internal system immediately
endangers human life.
3.3.4 Risk Components For A Structure Due To Flashes Near The Structure
RM: Component related to failure of internal systems caused by LEMP (Lightning Electromagnetic
impulse). Loss of type L2 and L4 could occur in all cases along with type L1 in case of structures
with risk of explosion and hospitals or other structures where failure of internal system immediately
endangers human life.
4. RISK MANAGEMENT:
4.1
Basic Procedure:
The decision to protect a structure or a service against lightning, as well as the protection of
selection of protection measures, will be performed according to IEC 62305-2. The following
procedure will be applied:
Identification of the object to be protected and its characteristics
Identification of all the types of loss in the object and the relevant corresponding risk R
(R1 to R4)
Evaluation of risk R for each type of loss (R1 to R4)
Evaluation of need of protection, by comparison of risk R1, R2 and R3 for a structure
with the tolerable risk RT
Evaluation of cost effectiveness of protection by comparison of the costs of total loss
with and without protection measures. In this case, the assessment of components of
risk R4 for a structure will be performed in order to evaluate such costs.
4.2
Page 7 of 97
4.3
As per IEC 62305-1, the following risks will be considered in the evaluation of the need of
protection against lightning for a structure:
Risks R1, R2 and R3
Besides the need for lightning protection for the object to be protected, it may be useful to
evaluate the economic benefits of providing protection measures in order to reduce the
economic loss L4.
In this case, the risk R4 of loss of economic values will be assessed. The assessment risk R4
allows the evaluation of the cost of the economic loss with and without the adopted protection
measures.
For each risk to be considered, the following steps will be taken:
Identification of the components RX which make up the risk,
Calculation of the identified risk components RX,
Calculation of the total risk R,
Comparison of the risk R with tolerable value RT.
If R RT, lightning protection is not necessary.
If R > RT protection measures will be adopted in order to reduce R RT for all risks to which the
object is subjected.
In D & B buildings, protection level shall be level four, therefore level four protection will
be considered and all risks will be calculated based on that consideration and it will be proved
that all the calculated risks are less than the tolerable risks values.
Attachment- 3 -10 shows the calculation report and the results.
Page 8 of 97
Type of Risk
Risk
Calculated
Value
Tolerable
Value
Result
R1
8.9429E-06
1.0E-05
Safe
R2
4.2585E-07
1.0E-03
Safe
R3
2.1293E-08
1.0E-03
Safe
R4
2.3679E-03
1.0E-03
Safe
Conclusion: - As per the calculation R1, R2 and R4 is less than tolerable risk RT (As per table-7,
clause 5.4, Page 59 of IEC 62305-2). Hence the Lightning protection for the building is not
required.
However as an additional precautionary measure LPS Class IV will be provided for
Administration & Amenities Building. Lightning protection will be provided through a system of
meshed conductors spaced 20m x 20m (Refer page 31, table-2 of IEC 62305-3), and down
conductors spaced at 20m (Refer page 39, table-4 of IEC 62305-3).Down conductor will be
provided on the wall of the building and will be connected to the earth ring and dedicated earth
electrodes. The lightning protection layout (DPCT-DD-EL-CT-GLP-00004) will be developed
accordingly.
5.2
Type of Risk
Risk
Calculated
Value
Tolerable
Value
Result
R1
8.5252E-06
1.0E-05
Safe
R2
8.8749E-07
1.0E-03
Safe
R3
1.0283E-08
1.0E-03
Safe
Page 9 of 97
R4
4.8979E-06
1.0E-03
Safe
Conclusion: - As per the calculation R1, R2 and R4 is less than tolerable risk RT (As per table-7,
clause 5.4, Page 59 of IEC 62305-2). Hence the Lightning protection for the building is not
required.
However as an additional precautionary measure LPS Class IV will be provided for
Administration Substation Building. Lightning protection will be provided through a system of
meshed conductors spaced 20m x 20m (Refer page 31, table-2 of IEC 62305-3), and down
conductors spaced at 20m (Refer page 39, table-4 of IEC 62305-3).Down conductor will be
provided on the wall of the building and will be connected to the earth ring and dedicated earth
electrodes. The lightning protection layout (DPCT-DD-EL-CT-GLP-00050) will be developed
accordingly.
5.3
Type of Risk
Risk
Calculated
Value
Tolerable
Value
Result
R1
1.9645E-07
1.0E-05
Safe
R2
1.298E-05
1.0E-03
Safe
R3
6.1391E-09
1.0E-03
Safe
R4
1.5313E-06
1.0E-03
Safe
Conclusion: - As per the calculation R1, R2 and R4 is less than tolerable risk RT (As per table7, clause 5.4, Page 59 of IEC 62305-2). Hence the Lightning protection for the building is
not required.
However as an additional precautionary measure LPS Class IV will be provided for
Mosque. Lightning protection will be provided through a system of meshed conductors spaced
20m x 20m (Refer page 31, table-2 of IEC 62305-3), and down conductors spaced at 20m
(Refer page 39, table-4 of IEC 62305-3).Down conductor will be provided on the wall of the
building and will be connected to the earth ring and dedicated earth electrodes. The lightning
protection layout (DPCT-DD-EL-CT-GLP-00044) will be developed accordingly.
5.4
Page 10 of 97
Type of Risk
Risk
Calculated
Value
Tolerable
Value
Result
R1
8.442E-06
1.0E-05
Safe
R2
1.5906E-05
1.0E-03
Safe
R3
3.15E-09
1.0E-03
Safe
R4
2.2143E-05
1.0E-03
Safe
Conclusion: - As per the calculation R1, R2 and R4 is less than tolerable risk RT (As per table7, clause 5.4, Page 59 of IEC 62305-2). Hence the Lightning protection for the building is
not required.
However as an additional precautionary measure LPS Class IV will be provided for
Workshop Building. Lightning protection will be provided by bonding the roof metallic structures
(metallic structures as air-termination component Refer page-35,caluse 5.2.5, & table-3 of
IEC 62305-3) and provide bonding to the meshed conductors spaced 20m x 20m (Refer page
31, table-2 of IEC 62305-3), at the concrete roof area and down conductors spaced at 20m
(Refer page 39, table-4 of IEC 62305-3).Down conductor will be provided on the wall of the
structure / building and will be connected to the earth ring and dedicated earth electrodes. The
lightning protection layout (DPCT-DD-EL-CT-GLP-00024) will be developed accordingly.
5.5
Type of Risk
Risk
Calculated
Value
Tolerable
Value
Result
R1
2.2491E-06
1.0E-05
Safe
R2
3.9656E-05
1.0E-03
Safe
R3
1.6784E-08
1.0E-03
Safe
Page 11 of 97
structure
R4
8.1449E-05
1.0E-03
Safe
Type of Risk
Risk
Calculated
Value
Tolerable
Value
Result
R1
6.0522E-06
1.0E-05
Safe
R2
9.1465E-05
1.0E-03
Safe
R3
9.0331E-08
1.0E-03
Safe
R4
3.1639E-04
1.0E-03
Safe
Conclusion: - As per the calculation R1, R2 and R4 is less than tolerable risk RT (As per table-7,
clause 5.4, Page 59 of IEC 62305-2). Hence the Lightning protection for the building is not
required.
However as an additional precautionary measure LPS Class IV will be provided for
Reefer & RTG Wash-down Area Buildings. Lightning protection will be provided by bonding the
roof metallic structures (metallic structures as air-termination component Refer page35,caluse 5.2.5, & table-3 of IEC 62305-3) and provide bonding to the meshed conductors
spaced 20m x 20m (Refer page 31, table-2 of IEC 62305-3), at the concrete roof area and
down conductors spaced at 20m (Refer page 39, table-4 of IEC 62305-3).Down conductor will
be provided on the wall of the structure / building and will be connected to the earth ring and
dedicated earth electrodes. The lightning protection layout (DPCT-DD-EL-CT-GLP-00029) will be
developed accordingly.
5.6
Type of Risk
Risk
Calculated
Value
Tolerable
Value
Result
R1
3.9309E-06
1.0E-05
Safe
R2
1.2426E-05
1.0E-03
Safe
Page 12 of 97
structure
Loss of cultural heritage in the
structure
R3
2.3398E-08
1.0E-03
Safe
R4
1.4251E-05
1.0E-03
Safe
Conclusion: - As per the calculation R1, R2 and R4 is less than tolerable risk RT (As per table7, clause 5.4, Page 59 of IEC 62305-2). Hence the Lightning protection for the building is
not required.
However as an additional precautionary measure LPS Class IV will be provided for
Driver Reception Building. Lightning protection will be provided through a system of meshed
conductors spaced 20m x 20m (Refer page 31, table-2 of IEC 62305-3), and down conductors
spaced at 20m (Refer page 39, table-4 of IEC 62305-3).Down conductor will be provided on the
wall of the building and will be connected to the earth ring and dedicated earth electrodes. The
lightning protection layout (DPCT-DD-EL-CT-GLP-00035) will be developed accordingly.
5.7
Type of Risk
Risk
Calculated
Value
Tolerable
Value
Result
R1
1.3092E-06
1.0E-05
Safe
R2
1.7168E-05
1.0E-03
Safe
R3
1.5585E-07
1.0E-03
Safe
R4
1.7324E-05
1.0E-03
Safe
Tolerable
Value
Result
Type of Risk
Risk
Calculated
Value
Page 13 of 97
R1
6.2225E-07
1.0E-05
Safe
R2
8.768E-06
1.0E-03
Safe
R3
3.7039E-09
1.0E-03
Safe
R4
8.8421E-06
1.0E-03
Safe
Conclusion: - As per the calculation R1, R2 and R4 is less than tolerable risk RT (As per table7, clause 5.4, Page 59 of IEC 62305-2). Hence the Lightning protection for the building is
not required.
However as an additional precautionary measure LPS Class IV will be provided for Gate
complex structures and Gate Manager Facilities Buildings. Lightning protection will be provided
by bonding the roof metallic structures (metallic structures as air-termination component Refer
page-35,caluse 5.2.5, & table-3 of IEC 62305-3) and provide bonding to the meshed conductors
spaced 20m x 20m (Refer page 31, table-2 of IEC 62305-3), at the concrete roof area and
down conductors spaced at 20m (Refer page 39, table-4 of IEC 62305-3).Down conductor will
be provided on the wall of the structure / building and will be connected to the earth ring and
dedicated earth electrodes. The lightning protection layout (DPCT-DD-EL-CT-GLP-00009 & DPCTDD-EL-CT-GLP-00056) will be developed accordingly.
5.8
Type of Risk
Risk
Calculated
Value
Tolerable
Value
Result
R1
1.6572E-06
1.0E-05
Safe
R2
3.943E-05
1.0E-03
Safe
R3
9.8643E-08
1.0E-03
Safe
R4
3.9628E-05
1.0E-03
Safe
Page 14 of 97
Conclusion: - As per the calculation R1, R2 and R4 is less than tolerable risk RT (As per table7, clause 5.4, Page 59 of IEC 62305-2). Hence the Lightning protection for the building is
not required.
However as an additional precautionary measure LPS Class IV will be provided for
Quayside & Amenities Building North & South. Lightning protection will be provided through a
system of meshed conductors spaced 20m x 20m (Refer page 31, table-2 of IEC 62305-3), and
down conductors spaced at 20m (Refer page 39, table-4 of IEC 62305-3).Down conductor will
be provided on the wall of the building and will be connected to the earth ring and dedicated
earth electrodes. The lightning protection layout (DPCT-DD-EL-CT-GLP-00014 & DPCT-DDEL-CT-GLP-00018) will be developed accordingly
6. ATTACHMENTS
Attachment 1:- Isokeraunic Map (Map showing thunderstorm days per year throughout the
world)
Attachment 2:- Mesh type air termination system on flat roof structure. (Extract from IEC 623053)
Attachment 3:- LIGHTNING RISK CALCULATION for Administration & Amenities Building.
Attachment 4:- LIGHTNING RISK CALCULATION for Administration Substation Building.
Attachment 5:- LIGHTNING RISK CALCULATION for Mosque Building.
Attachment 6:- LIGHTNING RISK CALCULATION for Workshop Building.
Attachment 7:- LIGHTNING RISK CALCULATION for Wash-down Area Buildings.
Attachment 8:- LIGHTNING RISK CALCULATION for Driver Reception Building.
Attachment 9:- LIGHTNING RISK CALCULATION for Gate area Buildings.
Attachment 10:- LIGHTNING RISK CALCULATION for Quayside Amenities Building.
Attachment 1:- Isokeraunic Map (Map showing thunderstorm days per year throughout the world)
29
Figure 3.6: World Thunderstorm days map (BS EN 62305-2 Figure NK.2)
NPP0026-TCC-CAL-EL-00001
www.furse.com
REV. A
Page 15 of 97
Attachment 2:- Mesh type air termination system on flat roof structure. (Extract from IEC 62305-3)
62305-3 IEC:2006
187
IEC 2142/05
IEC 2143/05
Key
w Mesh size
NOTE
--``,`,`,`,,`````,``,,`,`,,`,```-`-`,,`,,`,`,,`---
NPP0026-TCC-CAL-EL-00001
Copyright International Electrotechnical Commission
Provided by IHS under license with IEC
No reproduction or networking permitted without license from IHS
REV. A
Licensee=Oman/5940240038, User=Matuszewski, Leszek
Not for Resale, 01/19/2010 03:47:44 MST
Page 16 of 97
Attachment 3 - ADMINISTRATION
AMENITITES
BUILDING
File: Administration&and
Amenities Building.src
Project title:
Project address:
Project ref:
Calculation ref:
Calculation notes:
Project author:
Created:
15 February 2014
Modified:
15 February 2014
Case details
Case name:
Case title:
Created:
05 February 2014
Modified:
10 February 2014
Case notes:
R1_T
8.9429E-06
R2_T
4.2585E-07
R3_T
2.1293E-08
R4_T
2.3679E-03
REV. A
Page 1 of 11
Page 17 of 97
LPL IV
Imax
100.00kA
97.00%
Probability that lightning current parameters are smaller than the maximum
value defined above
16.00kA
84.00%
Probability that lightning current parameters are greater than the minimum
value defined above
60.00m
16.67kA
Maximum peak current of equipotential bonding SPD's for each of 'n' lines
defined (based upon simple current division concept)
Imin
ISPD
NOTE: The worst case surge that could be expected on a two-wire telephone or data line is
2.5kA (10/350 s) per line (Category D test to BS EN 61643-21) to earth or 5 kA (10/350 s)
per pair.
Line 1
Line 2
Line 3
Environment
Ng
Cd
Ce
1.00
0.50
Location factor
0.10
Environmental factor
Rho
3.00 W m
REV. A
Page 2 of 11
Page 18 of 97
21,287.71 m
236,679.06 m
10.74 m
19.40 m
36.72 m
66.86 m
2,814.58 m
3,031.09 m
3,464.10 m
9,309.77 m
Structures
Primary structure
Structure ID:
Lb
Wb
Hb
56.40 m
21.80 m
19.60 m
Secondary structures
REV. A
Page 3 of 11
Page 19 of 97
Lines
Line 1
LV Cables Incomer 1
KS3 (L1)
PSPD (L1)
0.02
0.03
PSPDc (L1)
1.00
Ct (L1)
Cdc (L1)
Uw (L1)
Lc (L1)
Hc (L1)
1.00
0.25
2.50 kV
65.00 m
Length of line 1
0.00 m
Line 2
LV Cable Incomer 2
KS3 (L2)
PSPD (L2)
1.00
0.03
PSPDc (L2)
1.00
Ct (L2)
Cdc (L2)
Uw (L2)
Lc (L2)
Hc (L2)
1.00
0.25
2.50 kV
70.00 m
Length of line 2
0.00 m
Line 3
LV Cable Incomer 3
KS3 (L3)
PSPD (L3)
1.00
0.03
PSPDc (L3)
1.00
Ct (L3)
Cdc (L3)
Uw (L3)
Lc (L3)
Hc (L3)
1.00
0.25
2.50 kV
80.00 m
Length of line 3
0.00 m
REV. A
Page 4 of 11
Page 20 of 97
Zones
Factor
Zone 1
Zone 2
rp
2.0E-01
5.0E-01
rf
1.0E-02
1.0E-02
ra / ru
1.0E-02
1.0E-02
hz1
hz4
Lt1
1.0E-04
0.0E00
Lf1
4.2E-01
4.2E-01
Lo1
0.0E00
0.0E00
Lf2
1.0E-01
1.0E-01
Lo2
0.0E00
1.0E-02
Lf3
1.0E-02
1.0E-02
Lt4
0.0E00
0.0E00
Lf4
2.0E-01
2.0E-01
Lo4
1.0E-02
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
0.010644
0.226035
0.000003
0.000005
0.000009
0.000281
0.000303
0.000346
REV. A
Page 5 of 11
Page 21 of 97
Zone 1
Zone 2
PA
Zone 3
Zone 4
Zone 5
Zone 6
PB
0.2
PC (L1)
PC (L2)
PC (L3)
PC
KS1
KS2
Zone 8
Zone 9
Zone 10
NA
KS4 (L1)
0.6
KS4 (L2)
0.6
KS4 (L3)
0.6
KMS (L1)
1.2E-02
NA
KMS (L2)
6.0E-01
NA
KMS (L3)
6.0E-01
NA
PMS (L1)
1.0E-04
NA
PMS (L2)
1.08E00
NA
PMS (L3)
1.08E00
NA
PM (L1)
1.0E-04
NA
PM (L2)
1.0E00
NA
PM (L3)
1.0E00
NA
PM
1.0E00
NA
PLD (L1)
6.0E-01
PLD (L2)
6.0E-01
PLD (L3)
6.0E-01
PLI (L1)
2.0E-02
PLI (L2)
2.0E-02
PLI (L3)
2.0E-02
PU (L1)
3.0E-02
PU (L2)
3.0E-02
PU (L3)
3.0E-02
PV (L1)
3.0E-02
PV (L2)
3.0E-02
PV (L3)
3.0E-02
PW (L1)
6.0E-01
Zone 7
REV. A
Page 6 of 11
Page 22 of 97
PW (L2)
6.0E-01
PW (L3)
6.0E-01
PZ (L1)
2.0E-02
PZ (L2)
2.0E-02
PZ (L3)
2.0E-02
Zone 1
Zone 2
LA
1.0E-06
0.0E00
LB
4.2E-03
4.2E-03
LC
0.0E00
0.0E00
LM
0.0E00
0.0E00
LU
1.0E-06
0.0E00
LV
4.2E-03
4.2E-03
LW
0.0E00
0.0E00
LZ
0.0E00
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
LB
2.0E-04
5.0E-04
LC
0.0E00
1.0E-02
LM
0.0E00
1.0E-02
LV
2.0E-04
5.0E-04
LW
0.0E00
1.0E-02
LZ
0.0E00
1.0E-02
Zone 1
Zone 2
LB
1.0E-05
2.5E-05
LV
1.0E-05
2.5E-05
REV. A
Page 7 of 11
Page 23 of 97
Zone 1
Zone 2
LA
0.0E00
0.0E00
LB
4.0E-04
1.0E-03
LC
1.0E-02
0.0E00
LM
1.0E-02
0.0E00
LU
0.0E00
0.0E00
LV
4.0E-04
1.0E-03
LW
1.0E-02
0.0E00
LZ
1.0E-02
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
RA
0.0E00
0.0E00
RB
8.9408E-06
0.0E00
RC
0.0E00
0.0E00
RM
0.0E00
0.0E00
RU (L1)
0.0E00
0.0E00
RU (L2)
0.0E00
0.0E00
RU (L3)
0.0E00
0.0E00
RV (L1)
3.3827E-10
0.0E00
RV (L2)
6.1107E-10
0.0E00
RV (L3)
1.1567E-09
0.0E00
RW (L1)
0.0E00
0.0E00
RW (L2)
0.0E00
0.0E00
RW (L3)
0.0E00
0.0E00
RZ (L1)
0.0E00
0.0E00
RZ (L2)
0.0E00
0.0E00
RZ (L3)
0.0E00
0.0E00
Zone 3
Zone 4
REV. A
Page 8 of 11
Page 24 of 97
Zone 1
Zone 2
RB
4.2575E-07
0.0E00
RC
0.0E00
0.0E00
RM
0.0E00
0.0E00
RV (L1)
1.6108E-11
0.0E00
RV (L2)
2.9098E-11
0.0E00
RV (L3)
5.5079E-11
0.0E00
RW (L1)
0.0E00
0.0E00
RW (L2)
0.0E00
0.0E00
RW (L3)
0.0E00
0.0E00
RZ (L1)
0.0E00
0.0E00
RZ (L2)
0.0E00
0.0E00
RZ (L3)
0.0E00
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
RB
2.1288E-08
0.0E00
RV (L1)
8.054E-13
0.0E00
RV (L2)
1.4549E-12
0.0E00
RV (L3)
2.754E-12
0.0E00
Zone 3
REV. A
Page 9 of 11
Page 25 of 97
Zone 1
Zone 2
RA
0.0E00
0.0E00
RB
8.5151E-07
0.0E00
RC
1.0644E-04
0.0E00
RM
2.2604E-03
0.0E00
RU (L1)
0.0E00
0.0E00
RU (L2)
0.0E00
0.0E00
RU (L3)
0.0E00
0.0E00
RV (L1)
3.2216E-11
0.0E00
RV (L2)
5.8197E-11
0.0E00
RV (L3)
1.1016E-10
0.0E00
RW (L1)
1.6108E-08
0.0E00
RW (L2)
2.9098E-08
0.0E00
RW (L3)
5.5079E-08
0.0E00
RZ (L1)
5.5755E-08
0.0E00
RZ (L2)
5.9652E-08
0.0E00
RZ (L3)
6.7446E-08
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
8.9429E-06
4.2585E-07
2.1293E-08
2.3679E-03
8.9408E-06
Risk of loss of human life in the structure due to flashes to the structure (S1)
4.2575E-07
Risk of loss of service to the public in the structure due to flashes to the structure (S1)
2.1288E-08
Risk of loss of cultural heritage in the structure due to flashes to the structure (S1)
1.0729E-04
Risk of loss of economic value in the structure due to flashes to the structure (S1)
2.106E-09
Risk of loss of human life in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R2_I
1.0029E-10
Risk of loss of service to the public in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R3_I
5.0143E-12
Risk of loss of cultural heritage in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R4_I
2.2606E-03
Risk of loss of economic value in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
REV. A
Page 10 of 11
Page 26 of 97
0.E00
Risk of loss of human life in the structure due to injury to living beings (D1)
0.E00
Risk of loss of service to the public in the structure due to injury to living beings (D1)
0.E00
Risk of loss of cultural heritage in the structure due to injury to living beings (D1)
0.E00
Risk of loss of economic value in the structure due to injury to living beings (D1)
8.9429E-06
Risk of loss of human life in the structure due to physical damage (D2)
4.2585E-07
Risk of loss of service to the public in the structure due to physical damage (D2)
8.9429E-06
Risk of loss of cultural heritage in the structure due to physical damage (D2)
8.5171E-07
Risk of loss of economic value in the structure due to physical damage (D2)
0.E00
Risk of loss of human life in the structure due to failure of internal systems (D3)
0.E00
Risk of loss of service to the public in the structure due to failure of internal systems (D3)
0.E00
Risk of loss of cultural heritage in the structure due to failure of internal systems (D3)
2.3671E-03
Risk of loss of economic value in the structure due to failure of internal systems (D3)
REV. A
Page 11 of 11
Page 27 of 97
Attachment 4 - ADMINISTRATION
SUBSTATION
File: Administration
Substation.src (CTAS)
Project title:
Project address:
Project ref:
Calculation ref:
Calculation notes:
Project author:
Created:
13 February 2014
Modified:
13 February 2014
Case details
Case name:
Case title:
Substation (CTAS)
Created:
08 February 2014
Modified:
12 February 2014
Case notes:
R1_T
8.5252E-06
R2_T
8.8749E-07
R3_T
1.0283E-08
R4_T
4.8979E-06
REV. A
Page 1 of 11
Page 28 of 97
LPL IV
Imax
100.00kA
97.00%
Probability that lightning current parameters are smaller than the maximum
value defined above
16.00kA
84.00%
Probability that lightning current parameters are greater than the minimum
value defined above
60.00m
16.67kA
Maximum peak current of equipotential bonding SPD's for each of 'n' lines
defined (based upon simple current division concept)
Imin
ISPD
NOTE: The worst case surge that could be expected on a two-wire telephone or data line is
2.5kA (10/350 s) per line (Category D test to BS EN 61643-21) to earth or 5 kA (10/350 s)
per pair.
Line 1
Environment
Ng
Cd
Ce
1.00
0.25
Location factor
0.50
Environmental factor
Rho
3.00 W m
REV. A
Page 2 of 11
Page 29 of 97
4,111.87 m
212,368.93 m
127.22 m
127.22 m
40.62 m
295.05 m
4,330.13 m
4,330.13 m
2,165.06 m
10,825.32 m
Structures
Primary structure
Structure ID:
Lb
Wb
Hb
21.30 m
10.30 m
8.85 m
Secondary structures
REV. A
Page 3 of 11
Page 30 of 97
Lines
Line 1
KS3 (L1)
PSPD (L1)
0.00
0.00
PSPDc (L1)
0.00
Ct (L1)
Cdc (L1)
Uw (L1)
Lc (L1)
Hc (L1)
0.20
0.25
6.00 kV
100.00 m
Length of line 1
0.00 m
Line 2
KS3 (L2)
PSPD (L2)
0.00
0.00
PSPDc (L2)
0.00
Ct (L2)
Cdc (L2)
Uw (L2)
Lc (L2)
Hc (L2)
0.20
0.25
6.00 kV
100.00 m
Length of line 2
0.00 m
Line 3
KS3 (L3)
PSPD (L3)
0.00
0.00
PSPDc (L3)
0.00
Ct (L3)
Cdc (L3)
Uw (L3)
Lc (L3)
Hc (L3)
1.00
0.25
2.50 kV
50.00 m
Length of line 3
0.00 m
REV. A
Page 4 of 11
Page 31 of 97
Zones
Factor
Zone 1
Zone 2
rp
5.0E-01
5.0E-01
rf
1.0E-02
1.0E-02
ra / ru
1.0E-02
1.0E-04
hz1
hz4
20
Lt1
0.0E00
0.0E00
Lf1
3.3E-01
3.3E-01
Lo1
1.0E-01
1.0E-01
Lf2
1.0E-01
1.0E-01
Lo2
1.0E-02
1.0E-02
Lf3
1.0E-02
1.0E-01
Lt4
0.0E00
0.0E00
Lf4
2.0E-01
5.0E-01
Lo4
1.0E-02
1.0E-02
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
0.001028
0.211341
0.000006
0.000006
0.000010
0.000433
0.000433
0.001083
REV. A
Page 5 of 11
Page 32 of 97
Zone 1
Zone 2
PA
Zone 3
Zone 4
Zone 5
Zone 6
PB
0.2
PC (L1)
0.003
PC (L2)
0.003
PC (L3)
0.003
PC
8.97302700000002E-03
KS1
KS2
Zone 8
Zone 9
Zone 10
NA
KS4 (L1)
0.25
KS4 (L2)
0.25
KS4 (L3)
0.6
KMS (L1)
5.0E-05
NA
KMS (L2)
5.0E-05
NA
KMS (L3)
1.2E-04
NA
PMS (L1)
1.0E-04
NA
PMS (L2)
1.0E-04
NA
PMS (L3)
1.0E-04
NA
PM (L1)
1.0E-04
NA
PM (L2)
1.0E-04
NA
PM (L3)
1.0E-04
NA
PM
2.9997E-04
NA
PLD (L1)
1.0E-01
PLD (L2)
1.0E-01
PLD (L3)
6.0E-01
PLI (L1)
4.0E-03
PLI (L2)
4.0E-03
PLI (L3)
2.0E-02
PU (L1)
3.0E-03
PU (L2)
3.0E-03
PU (L3)
3.0E-03
PV (L1)
3.0E-03
PV (L2)
3.0E-03
PV (L3)
3.0E-03
PW (L1)
3.0E-03
Zone 7
REV. A
Page 6 of 11
Page 33 of 97
PW (L2)
3.0E-03
PW (L3)
3.0E-03
PZ (L1)
3.0E-03
PZ (L2)
3.0E-03
PZ (L3)
3.0E-03
Zone 1
Zone 2
LA
0.0E00
0.0E00
LB
3.3E-03
3.3E-03
LC
1.0E-01
1.0E-01
LM
1.0E-01
1.0E-01
LU
0.0E00
0.0E00
LV
3.3E-03
3.3E-03
LW
1.0E-01
1.0E-01
LZ
1.0E-01
1.0E-01
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
LB
5.0E-04
5.0E-04
LC
1.0E-02
1.0E-02
LM
1.0E-02
1.0E-02
LV
5.0E-04
5.0E-04
LW
1.0E-02
1.0E-02
LZ
1.0E-02
1.0E-02
Zone 1
Zone 2
LB
5.0E-05
5.0E-04
LV
5.0E-05
5.0E-04
REV. A
Page 7 of 11
Page 34 of 97
Zone 1
Zone 2
LA
0.0E00
0.0E00
LB
2.0E-02
2.5E-03
LC
1.0E-02
1.0E-02
LM
1.0E-02
1.0E-02
LU
0.0E00
0.0E00
LV
2.0E-02
2.5E-03
LW
1.0E-02
1.0E-02
LZ
1.0E-02
1.0E-02
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
RA
0.0E00
0.0E00
RB
6.7846E-07
0.0E00
RC
9.224E-07
0.0E00
RM
6.3396E-06
0.0E00
RU (L1)
0.0E00
0.0E00
RU (L2)
0.0E00
0.0E00
RU (L3)
0.0E00
0.0E00
RV (L1)
6.2973E-11
0.0E00
RV (L2)
6.2973E-11
0.0E00
RV (L3)
1.0053E-10
0.0E00
RW (L1)
1.9083E-09
0.0E00
RW (L2)
1.9083E-09
0.0E00
RW (L3)
3.0462E-09
0.0E00
RZ (L1)
1.28E-07
0.0E00
RZ (L2)
1.28E-07
0.0E00
RZ (L3)
3.2171E-07
0.0E00
Zone 3
Zone 4
REV. A
Page 8 of 11
Page 35 of 97
Zone 1
Zone 2
RB
1.028E-07
0.0E00
RC
9.224E-08
0.0E00
RM
6.3396E-07
0.0E00
RV (L1)
9.5414E-12
0.0E00
RV (L2)
9.5414E-12
0.0E00
RV (L3)
1.5231E-11
0.0E00
RW (L1)
1.9083E-10
0.0E00
RW (L2)
1.9083E-10
0.0E00
RW (L3)
3.0462E-10
0.0E00
RZ (L1)
1.28E-08
0.0E00
RZ (L2)
1.28E-08
0.0E00
RZ (L3)
3.2171E-08
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
RB
1.028E-08
0.0E00
RV (L1)
9.5414E-13
0.0E00
RV (L2)
9.5414E-13
0.0E00
RV (L3)
1.5231E-12
0.0E00
Zone 3
REV. A
Page 9 of 11
Page 36 of 97
Zone 1
Zone 2
RA
0.0E00
0.0E00
RB
4.1119E-06
0.0E00
RC
9.224E-08
0.0E00
RM
6.3396E-07
0.0E00
RU (L1)
0.0E00
0.0E00
RU (L2)
0.0E00
0.0E00
RU (L3)
0.0E00
0.0E00
RV (L1)
3.8166E-10
0.0E00
RV (L2)
3.8166E-10
0.0E00
RV (L3)
6.0925E-10
0.0E00
RW (L1)
1.9083E-10
0.0E00
RW (L2)
1.9083E-10
0.0E00
RW (L3)
3.0462E-10
0.0E00
RZ (L1)
1.28E-08
0.0E00
RZ (L2)
1.28E-08
0.0E00
RZ (L3)
3.2171E-08
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
8.5252E-06
8.8749E-07
1.0283E-08
4.8979E-06
1.6009E-06
Risk of loss of human life in the structure due to flashes to the structure (S1)
1.9504E-07
Risk of loss of service to the public in the structure due to flashes to the structure (S1)
1.028E-08
Risk of loss of cultural heritage in the structure due to flashes to the structure (S1)
4.2041E-06
Risk of loss of economic value in the structure due to flashes to the structure (S1)
6.9244E-06
Risk of loss of human life in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R2_I
6.9245E-07
Risk of loss of service to the public in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R3_I
3.4314E-12
Risk of loss of cultural heritage in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R4_I
6.9379E-07
Risk of loss of economic value in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
REV. A
Page 10 of 11
Page 37 of 97
0.E00
Risk of loss of human life in the structure due to injury to living beings (D1)
0.E00
Risk of loss of service to the public in the structure due to injury to living beings (D1)
0.E00
Risk of loss of cultural heritage in the structure due to injury to living beings (D1)
0.E00
Risk of loss of economic value in the structure due to injury to living beings (D1)
6.7868E-07
Risk of loss of human life in the structure due to physical damage (D2)
1.0283E-07
Risk of loss of service to the public in the structure due to physical damage (D2)
6.7868E-07
Risk of loss of cultural heritage in the structure due to physical damage (D2)
4.1132E-06
Risk of loss of economic value in the structure due to physical damage (D2)
7.8466E-06
Risk of loss of human life in the structure due to failure of internal systems (D3)
7.8466E-07
Risk of loss of service to the public in the structure due to failure of internal systems (D3)
0.E00
Risk of loss of cultural heritage in the structure due to failure of internal systems (D3)
7.8466E-07
Risk of loss of economic value in the structure due to failure of internal systems (D3)
REV. A
Page 11 of 11
Page 38 of 97
Attachment 5 - MOSQUE
File: Mosque.src
Project title:
MOSQUE
Project address:
Project ref:
Calculation ref:
Calculation notes:
Project author:
Created:
15 February 2014
Modified:
15 February 2014
Case details
Case name:
Mosque
Case title:
Mosque
Created:
08 February 2014
Modified:
15 February 2014
Case notes:
R1_T
1.9645E-07
R2_T
1.298E-05
R3_T
6.1391E-09
R4_T
1.5313E-06
REV. A
Page 1 of 10
Page 39 of 97
File: Mosque.src
LPL IV
Imax
100.00kA
97.00%
Probability that lightning current parameters are smaller than the maximum
value defined above
16.00kA
84.00%
Probability that lightning current parameters are greater than the minimum
value defined above
60.00m
25.00kA
Maximum peak current of equipotential bonding SPD's for each of 'n' lines
defined (based upon simple current division concept)
Imin
ISPD
NOTE: The worst case surge that could be expected on a two-wire telephone or data line is
2.5kA (10/350 s) per line (Category D test to BS EN 61643-21) to earth or 5 kA (10/350 s)
per pair.
Line 1
Line 2
Environment
Ng
Cd
Ce
1.00
0.25
Location factor
0.00
Environmental factor
Rho
3.00 W m
REV. A
Page 2 of 10
Page 40 of 97
File: Mosque.src
4,897.27 m
14,144.74 m
215,191.79 m
55.29 m
37.97 m
93.25 m
2,598.08 m
2,165.06 m
4,763.14 m
Structures
Primary structure
Structure ID:
Lb
Wb
Hb
18.50 m
18.50 m
9.36 m
Secondary structures
Structure No
Minaret - Cylindrical
Cda
Da
Ha
0.25
2.20 m
22.00 m
REV. A
Page 3 of 10
Page 41 of 97
File: Mosque.src
Lines
Line 1
Main LV Incomer
KS3 (L1)
PSPD (L1)
0.00
0.03
PSPDc (L1)
1.00
Ct (L1)
Cdc (L1)
Uw (L1)
Lc (L1)
Hc (L1)
1.00
0.25
1.50 kV
60.00 m
Length of line 1
0.00 m
Line 2
UPS DB Incomer
KS3 (L2)
PSPD (L2)
0.00
0.03
PSPDc (L2)
1.00
Ct (L2)
Cdc (L2)
Uw (L2)
Lc (L2)
Hc (L2)
1.00
0.25
1.50 kV
50.00 m
Length of line 2
0.00 m
REV. A
Page 4 of 10
Page 42 of 97
File: Mosque.src
Zones
Factor
Zone 1
Zone 2
rp
5.0E-01
5.0E-01
rf
1.0E-02
1.0E-02
ra / ru
1.0E-02
1.0E-02
hz1
hz4
Lt1
1.0E-04
0.0E00
Lf1
8.0E-02
8.0E-02
Lo1
0.0E00
0.0E00
Lf2
1.0E-01
1.0E-01
Lo2
1.0E-02
1.0E-02
Lf3
1.0E-02
1.0E-02
Lt4
0.0E00
0.0E00
Lf4
2.0E-01
2.0E-01
Lo4
1.0E-03
1.0E-03
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
0.001224
0.003536
0.213967
0.000014
0.000009
0.000000
0.000000
REV. A
Page 5 of 10
Page 43 of 97
File: Mosque.src
Zone 1
Zone 2
PA
0.00001
0.00001
Zone 3
Zone 4
Zone 5
Zone 6
PB
0.2
PC (L1)
PC (L2)
PC
KS1
KS2
Zone 8
Zone 9
Zone 10
NA
KS4 (L1)
KS4 (L2)
KMS (L1)
2.0E-04
NA
KMS (L2)
2.0E-04
NA
PMS (L1)
1.0E-04
NA
PMS (L2)
1.0E-04
NA
PM (L1)
1.0E-04
NA
PM (L2)
1.0E-04
NA
PM
1.9999E-04
NA
PLD (L1)
8.0E-01
PLD (L2)
8.0E-01
PLI (L1)
4.0E-02
PLI (L2)
4.0E-02
PU (L1)
3.0E-02
PU (L2)
3.0E-02
PV (L1)
3.0E-02
PV (L2)
3.0E-02
PW (L1)
8.0E-01
PW (L2)
8.0E-01
PZ (L1)
4.0E-02
PZ (L2)
4.0E-02
Zone 7
REV. A
Page 6 of 10
Page 44 of 97
File: Mosque.src
Zone 1
Zone 2
LA
1.0E-06
0.0E00
LB
8.0E-04
8.0E-04
LC
0.0E00
0.0E00
LM
0.0E00
0.0E00
LU
1.0E-06
0.0E00
LV
8.0E-04
8.0E-04
LW
0.0E00
0.0E00
LZ
0.0E00
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
LB
5.0E-04
5.0E-04
LC
1.0E-02
1.0E-02
LM
1.0E-02
1.0E-02
LV
5.0E-04
5.0E-04
LW
1.0E-02
1.0E-02
LZ
1.0E-02
1.0E-02
Zone 1
Zone 2
LB
2.5E-05
2.5E-05
LV
2.5E-05
2.5E-05
Zone 1
Zone 2
LA
0.0E00
0.0E00
LB
1.0E-03
1.0E-03
LC
1.0E-03
1.0E-03
LM
1.0E-03
1.0E-03
LU
0.0E00
0.0E00
LV
1.0E-03
1.0E-03
LW
1.0E-03
1.0E-03
LZ
1.0E-03
1.0E-03
REV. A
Page 7 of 10
Page 45 of 97
File: Mosque.src
Zone 1
Zone 2
RA
0.0E00
0.0E00
RB
1.9589E-07
0.0E00
RC
0.0E00
0.0E00
RM
0.0E00
0.0E00
RU (L1)
4.1465E-18
0.0E00
RU (L2)
2.8475E-18
0.0E00
RV (L1)
3.3172E-10
0.0E00
RV (L2)
2.278E-10
0.0E00
RW (L1)
0.0E00
0.0E00
RW (L2)
0.0E00
0.0E00
RZ (L1)
0.0E00
0.0E00
RZ (L2)
0.0E00
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
RB
1.2243E-07
0.0E00
RC
1.2243E-05
0.0E00
RM
4.2791E-07
0.0E00
RV (L1)
2.0733E-10
0.0E00
RV (L2)
1.4237E-10
0.0E00
RW (L1)
1.1057E-07
0.0E00
RW (L2)
7.5933E-08
0.0E00
RZ (L1)
0.0E00
0.0E00
RZ (L2)
0.0E00
0.0E00
Zone 3
Zone 1
Zone 2
RB
6.1216E-09
0.0E00
RV (L1)
1.0366E-11
0.0E00
RV (L2)
7.1187E-12
0.0E00
Zone 3
REV. A
Page 8 of 10
Page 46 of 97
File: Mosque.src
Zone 1
Zone 2
RA
0.0E00
0.0E00
RB
2.4486E-07
0.0E00
RC
1.2243E-06
0.0E00
RM
4.2791E-08
0.0E00
RU (L1)
0.0E00
0.0E00
RU (L2)
0.0E00
0.0E00
RV (L1)
4.1465E-10
0.0E00
RV (L2)
2.8475E-10
0.0E00
RW (L1)
1.1057E-08
0.0E00
RW (L2)
7.5933E-09
0.0E00
RZ (L1)
0.0E00
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
1.9645E-07
1.298E-05
6.1391E-09
1.5313E-06
1.9589E-07
Risk of loss of human life in the structure due to flashes to the structure (S1)
1.2366E-05
Risk of loss of service to the public in the structure due to flashes to the structure (S1)
6.1216E-09
Risk of loss of cultural heritage in the structure due to flashes to the structure (S1)
1.4692E-06
Risk of loss of economic value in the structure due to flashes to the structure (S1)
5.5952E-10
Risk of loss of human life in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R2_I
6.1477E-07
Risk of loss of service to the public in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R3_I
1.7485E-11
Risk of loss of cultural heritage in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R4_I
6.2141E-08
Risk of loss of economic value in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
REV. A
Page 9 of 10
Page 47 of 97
File: Mosque.src
6.994E-18
Risk of loss of human life in the structure due to injury to living beings (D1)
0.E00
Risk of loss of service to the public in the structure due to injury to living beings (D1)
0.E00
Risk of loss of cultural heritage in the structure due to injury to living beings (D1)
0.E00
Risk of loss of economic value in the structure due to injury to living beings (D1)
1.9645E-07
Risk of loss of human life in the structure due to physical damage (D2)
1.2278E-07
Risk of loss of service to the public in the structure due to physical damage (D2)
1.9645E-07
Risk of loss of cultural heritage in the structure due to physical damage (D2)
2.4556E-07
Risk of loss of economic value in the structure due to physical damage (D2)
0.E00
Risk of loss of human life in the structure due to failure of internal systems (D3)
1.2858E-05
Risk of loss of service to the public in the structure due to failure of internal systems (D3)
0.E00
Risk of loss of cultural heritage in the structure due to failure of internal systems (D3)
1.2858E-06
Risk of loss of economic value in the structure due to failure of internal systems (D3)
REV. A
Page 10 of 10
Page 48 of 97
Attachment 6 - WORKSHOP
BUILDING
File: Workshop.src
Project title:
WORKSHOP
Project address:
Project ref:
Calculation ref:
Calculation notes:
Project author:
Created:
15 February 2014
Modified:
15 February 2014
Case details
Case name:
Workshop
Case title:
Workshop
Created:
08 February 2014
Modified:
10 February 2014
Case notes:
R1_T
8.442E-06
R2_T
1.5906E-05
R3_T
3.15E-09
R4_T
2.2143E-05
REV. A
Page 1 of 7
Page 49 of 97
File: Workshop.src
LPL IV
Imax
100.00kA
97.00%
Probability that lightning current parameters are smaller than the maximum
value defined above
16.00kA
84.00%
Probability that lightning current parameters are greater than the minimum
value defined above
60.00m
50.00kA
Maximum peak current of equipotential bonding SPD's for each of 'n' lines
defined (based upon simple current division concept)
Imin
ISPD
NOTE: The worst case surge that could be expected on a two-wire telephone or data line is
2.5kA (10/350 s) per line (Category D test to BS EN 61643-21) to earth or 5 kA (10/350 s)
per pair.
Line 1
Environment
Ng
Cd
Ce
1.00
0.25
Location factor
0.10
Environmental factor
Rho
3.00 W m
6,300.00 m
7,670.90 m
0.00 m
0.00 m
2,165.06 m
2,165.06 m
REV. A
Page 2 of 7
Page 50 of 97
File: Workshop.src
Structures
Primary structure
Structure ID:
Ad
Hb
Am
6,300.00 m
17.20 m
7,670.90 m
Secondary structures
Lines
Line 1
KS3 (L1)
PSPD (L1)
0.00
0.03
PSPDc (L1)
1.00
Ct (L1)
Cdc (L1)
Uw (L1)
Lc (L1)
Hc (L1)
1.00
0.25
1.50 kV
50.00 m
Length of line 1
0.00 m
Zones
Factor
Zone 1
Zone 2
rp
2.0E-01
5.0E-01
rf
1.0E-02
1.0E-02
ra / ru
1.0E-02
1.0E-02
hz1
20
hz4
20
Lt1
1.0E-04
0.0E00
Lf1
6.7E-01
6.7E-01
Lo1
0.0E00
0.0E00
Lf2
1.0E-01
1.0E-01
Lo2
1.0E-02
1.0E-02
Lf3
1.0E-02
1.0E-02
Lt4
0.0E00
0.0E00
Lf4
5.0E-01
5.0E-01
Lo4
1.0E-02
1.0E-02
Zone 3
Zone 4
Zone 5
Zone 6
REV. A
Zone 7
Zone 8
Zone 9
Zone 10
Page 3 of 7
Page 51 of 97
File: Workshop.src
Factor
Zone 1
Zone 2
PA
Zone 3
Zone 4
Zone 5
Zone 6
PB
0.2
PC (L1)
PC
KS1
0.25
KS2
0.6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 9
Zone 10
NA
KS4 (L1)
KMS (L1)
3.0E-05
NA
PMS (L1)
1.0E-04
NA
PM (L1)
1.0E-04
NA
PM
1.0E-04
NA
PLD (L1)
8.0E-01
PLI (L1)
4.0E-02
PU (L1)
3.0E-02
PV (L1)
3.0E-02
PW (L1)
8.0E-01
PZ (L1)
4.0E-02
Zone 1
Zone 2
LA
1.0E-06
0.0E00
LB
2.68E-02
6.7E-03
LC
0.0E00
0.0E00
LM
0.0E00
0.0E00
LU
1.0E-06
0.0E00
LV
2.68E-02
6.7E-03
LW
0.0E00
0.0E00
LZ
0.0E00
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
REV. A
Zone 7
Zone 8
Page 4 of 7
Page 52 of 97
File: Workshop.src
Zone 1
Zone 2
LB
2.0E-04
5.0E-04
LC
1.0E-02
1.0E-02
LM
1.0E-02
1.0E-02
LV
2.0E-04
5.0E-04
LW
1.0E-02
1.0E-02
LZ
1.0E-02
1.0E-02
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
LB
1.0E-05
2.5E-05
LV
1.0E-05
2.5E-05
Zone 1
Zone 2
LA
0.0E00
0.0E00
LB
2.0E-02
2.5E-03
LC
1.0E-02
1.0E-02
LM
1.0E-02
1.0E-02
LU
0.0E00
0.0E00
LV
2.0E-02
2.5E-03
LW
1.0E-02
1.0E-02
LZ
1.0E-02
1.0E-02
Zone 1
Zone 2
RA
0.0E00
0.0E00
RB
8.442E-06
0.0E00
RC
0.0E00
0.0E00
RM
0.0E00
0.0E00
RU (L1)
0.0E00
0.0E00
RV (L1)
0.0E00
0.0E00
RW (L1)
0.0E00
0.0E00
RZ (L1)
0.0E00
0.0E00
Zone 3
Zone 4
REV. A
Page 5 of 7
Page 53 of 97
File: Workshop.src
Zone 1
Zone 2
RB
6.3E-08
0.0E00
RC
1.575E-05
0.0E00
RM
6.0959E-09
0.0E00
RV (L1)
0.0E00
0.0E00
RW (L1)
0.0E00
0.0E00
RZ (L1)
8.6603E-08
0.0E00
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
Zone 2
RB
3.15E-09
0.0E00
RV (L1)
0.0E00
0.0E00
Zone 3
Zone 1
Zone 2
RA
0.0E00
0.0E00
RB
6.3E-06
0.0E00
RC
1.575E-05
0.0E00
RM
6.0959E-09
0.0E00
RU (L1)
0.0E00
0.0E00
RV (L1)
0.0E00
0.0E00
RW (L1)
0.0E00
0.0E00
RZ (L1)
8.6603E-08
0.0E00
Zone 3
8.442E-06
1.5906E-05
3.15E-09
2.2143E-05
REV. A
Page 6 of 7
Page 54 of 97
File: Workshop.src
8.442E-06
Risk of loss of human life in the structure due to flashes to the structure (S1)
1.5813E-05
Risk of loss of service to the public in the structure due to flashes to the structure (S1)
3.15E-09
Risk of loss of cultural heritage in the structure due to flashes to the structure (S1)
2.205E-05
Risk of loss of economic value in the structure due to flashes to the structure (S1)
0.E00
Risk of loss of human life in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R2_I
9.2698E-08
Risk of loss of service to the public in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R3_I
0.E00
Risk of loss of cultural heritage in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
R4_I
9.2698E-08
Risk of loss of economic value in the structure due to flashes influencing, but not
striking the structure (S2, S3, S4)
0.E00
Risk of loss of human life in the structure due to injury to living beings (D1)
0.E00
Risk of loss of service to the public in the structure due to injury to living beings (D1)
0.E00
Risk of loss of cultural heritage in the structure due to injury to living beings (D1)
0.E00
Risk of loss of economic value in the structure due to injury to living beings (D1)
8.442E-06
Risk of loss of human life in the structure due to physical damage (D2)
6.3E-08
Risk of loss of service to the public in the structure due to physical damage (D2)
8.442E-06
Risk of loss of cultural heritage in the structure due to physical damage (D2)
6.3E-06
Risk of loss of economic value in the structure due to physical damage (D2)
0.E00
Risk of loss of human life in the structure due to failure of internal systems (D3)
1.5843E-05
Risk of loss of service to the public in the structure due to failure of internal systems (D3)
0.E00
Risk of loss of cultural heritage in the structure due to failure of internal systems (D3)
1.5843E-05
Risk of loss of economic value in the structure due to failure of internal systems (D3)
REV. A
Page 7 of 7
Page 55 of 97
Project title:
Project address:
Project ref:
Calculation ref:
Calculation notes:
Project author:
Created:
15 February 2014
Modified:
15 February 2014
Case details
Case name:
Case title:
Created:
08 February 2014
Modified:
10 February 2014
Case notes:
R1_T
2.2491E-06
R2_T
3.9656E-05
R3_T
1.6784E-08
R4_T
8.1449E-05
REV. A
Page 1 of 7
Page 56 of 97
LPL IV
Imax
100.00kA
97.00%
Probability that lightning current parameters are smaller than the maximum
value defined above
16.00kA
84.00%
Probability that lightning current parameters are greater than the minimum
value defined above
60.00m
50.00kA
Maximum peak current of equipotential bonding SPD's for each of 'n' lines
defined (based upon simple current division concept)
Imin
ISPD
NOTE: The worst case surge that could be expected on a two-wire telephone or data line is
2.5kA (10/350 s) per line (Category D test to BS EN 61643-21) to earth or 5 kA (10/350 s)
per pair.
Line 1
Environment
Ng
Cd
Ce
1.00
0.25
Location factor
0.50
Environmental factor
Rho
3.00 W m
6,693.59 m
242,038.70 m
134.23 m
134.23 m
4,330.13 m
4,330.13 m
REV. A
Page 2 of 7
Page 57 of 97
Structures
Primary structure
Structure ID:
Lb
Wb
Hb
74.60 m
14.60 m
7.50 m
Secondary structures
Lines
Line 1
KS3 (L1)
PSPD (L1)
0.02
0.03
PSPDc (L1)
1.00
Ct (L1)
Cdc (L1)
Uw (L1)
Lc (L1)
Hc (L1)
1.00
0.25
1.50 kV
100.00 m
Length of line 1
0.00 m
Zones
Factor
Zone 1
rp
5.0E-01
rf
1.0E-02
ra / ru
1.0E-02
hz1
hz4
50
Lt1
1.0E-04
Lf1
6.7E-01
Lo1
0.0E00
Lf2
1.0E-01
Lo2
1.0E-02
Lf3
1.0E-02
Lt4
0.0E00
Lf4
5.0E-01
Lo4
1.0E-02
Zone 2
Zone 3
Zone 4
Zone 5
Zone 6
REV. A
Zone 7
Zone 8
Zone 9
Zone 10
Page 3 of 7
Page 58 of 97
Factor
Zone 1
PA
Zone 2
Zone 3
Zone 4
Zone 5
Zone 6
PB
0.2
PC (L1)
PC
KS1
KS2
Zone 7
Zone 8
Zone 9
Zone 10
Zone 9
Zone 10
KS4 (L1)
KMS (L1)
2.0E-02
PMS (L1)
9.0E-03
PM (L1)
9.0E-03
PM
9.0E-03
PLD (L1)
8.0E-01
PLI (L1)
4.0E-02
PU (L1)
3.0E-02
PV (L1)
3.0E-02
PW (L1)
8.0E-01
PZ (L1)
4.0E-02
Zone 1
LA
1.0E-06
LB
6.7E-03
LC
0.0E00
LM
0.0E00
LU
1.0E-06
LV
6.7E-03
LW
0.0E00
LZ
0.0E00
Zone 2
Zone 3
Zone 4
Zone 5
Zone 6
REV. A
Zone 7
Zone 8
Page 4 of 7
Page 59 of 97
Zone 1
LB
5.0E-04
LC
1.0E-02
LM
1.0E-02
LV
5.0E-04
LW
1.0E-02
LZ
1.0E-02
Zone 2
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 3
Zone 4
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 5
Zone 6
Zone 7
Zone 8
Zone 9
Zone 10
Zone 1
LB
5.0E-05
LV
5.0E-05
Zone 2
Zone 1
LA
0.0E00
LB
1.25E-01
LC
1.0E-02
LM
1.0E-02
LU
0.0E00
LV
1.25E-01
LW
1.0E-02
LZ
1.0E-02
Zone 2
Zone 1
RA
0.0E00
RB
2.2424E-06
RC
0.0E00
RM
0.0E00
RU (L1)
0.0E00
RV (L1)
6.7453E-09
RW (L1)
0.0E00
RZ (L1)
0.0E00
Zone 2
Zone 3
Zone 4
REV. A
Page 5 of 7
Page 60 of 97