OTC103702
OptiX BWS 1600G Equipment
Commissioning Guide
ISSUE1.0
Table of Contents
Table of Contents
Course Description .......................................................................................................................1
Introduction to Course .................................................................................................................1
Course Target ..............................................................................................................................1
Relevant Documents....................................................................................................................1
System Commissioning................................................................................................................4
Part 1 Overhead and Order Wire Commissioning .......................................................................4
Task 1 Supervisory Channel Commissioning ......................................................................4
Task 2 Configuration of Order Wire .....................................................................................4
Part 2 Optical Power Commissioning ..........................................................................................5
Task 1 Commissioning the Optical Power of Combined Signals .........................................5
Task 2 OTU Optical Power Commissioning.........................................................................6
Task 3 VMUX Optical Power Commissioning......................................................................8
Task 4 OADM Optical Power Commissioning .....................................................................8
Part 3 Wavelength Management ..............................................................................................11
Step 1 Creating Optical Fiber Connection .........................................................................11
Step 2 E2E Wavelength Management ...............................................................................11
Part 4 Feature Function Commissioning ..................................................................................12
Task 1 .Wavelength Protection Group ...............................................................................12
Task 3 .ALC........................................................................................................................12
Task 4 .APR .......................................................................................................................12
Task 5 .APE .......................................................................................................................12
Part 5 Clock Transparent Transmission Configuration and Commissioning ............................13
Part 6 Bit Error Code Test ........................................................................................................14
Course Description
Course Description
Introduction to Course
This course targets the following products:
OptiX BWS 1600G V100R001
OptiX BWS 320G V300R004
This course serves to guide trainees to commission and deploy Huaweis OptiX
BWS 1600G V100R001 III-type (4010G), V-type (402.5G) and 320GV3R4.
Course Target
At the end of this course, you will be able to
!
Relevant Documents
!
Cabinet
"
Sub-rack
"
Optical fiber
"
Cable
"
"
"
System Commissioning
System Commissioning
Part 1 Overhead and Order Wire Commissioning
Task 1 Supervisory Channel Commissioning
The typical output optical power of SC1 (SC2/TC1/TC2) is (-3~-6) dBm with the
receiving sensitivity of -48dBm. The insertion loss between TM interface and IN
interface on the FIU board is less than 1.2dB; the insertion loss between the RM
and OUT is less than 0.8dB. With the help of an optical power meter, measure the
attenuation of the supervisory signal after it passes the board and line.
System Commissioning
Each OAU/OBU input power should be 0.5dB to 1.0dB higher than the
value calculated by the formula.
Table 2-1
Input optical power index of the optical amplification board
(single-wavelength)
Nominal
input
optical
power
(dBm)
Nominal
input
optical
power
(dBm)
Nominal
input
optical
power
(dBm)
32-wave
length
system
40wavelength
system
80wavelength
system
Minimum
input
optical
power
(dBm)
Maximum
input
optical
power
(dBm)
PA
-32
-3
-18
-19
-22
20
BA
-19
+1
-14
-15
-18
19
PA
-32
-3
-18
-19
-22
19
BA
-19
+1
-14
-15
-18
19
PA
-22
+7
-8
-9
-12
10
BA
-19
+1
-18
-15
-18
19
PA
-22
+7
-8
-9
-12
10
BA
-19
+1
-14
-15
-18
19
OBU01
-19
-15
-16
-19
20
OBU03
-22
-3
-18
-19
-22
23
Board
name
Board
module
Gain
(dB)
OAU-CG
OAU-LG
OAU-CR
OAU-LR
System Commissioning
At DWDM side
For OTM, add a fixed attenuator of 5dB between D40 and the receiving optical
amplifier; For LWF or LWC of ORP, add no fixed attenuator between D40 and the
receiving OTU. If the receiving optical interface is LWC of ORA, add a fixed
attenuator of 10dB between D32 and OTU.
For OADM, add a fixed attenuator of 5dB between the cascaded MR2s at the
boundary of east and west. For LWF or LWC of ORP, add no fixed attenuator
between MR2 and OTU. If the receiving optical interface is LWC of ORA, add a
fixed attenuator of 10dB between MR2 and OUT.
At the customer side, the fixed attenuator is added at the receiving optical
interface of the sending OTU, normally 5dB for LWF, 10dB for ORP as LWC and
15dB for ORA as LWC. For the unusual case of abutting LWC customer side, add
5dB for ORP and 10dB for ORA.
Table 2-2 Requirement for input optical power of respective OTU boards
Output optical
power (dBm)
Debugging
range of
receiving
optical
power
(dBm)
-5~-1
-12~-6
Receiving
sensitivity (dBm)
Overload
point (dBm)
ORP: -18
ORP:0
ORA:-25
ORA:-9
RWC01/02
ORP:-18
ORP:0
-2~3
-12~-6
RWC06/07
ORA:-25
ORA:-9
-10~-3
-20~-14
ORP:-18
ORP:0
TWC
LWC
DWDMside
-12~-6
-5~-1
ORA:-25
6
-20~-14
ORA:-9
-20~-14
Customer
side
System Commissioning
-2~3(long
distance)
-18
-3
ORP:-18
ORP:0
TRC
OCU
LWF
-12~-6
-3~-10(short
distance)
-12~-6
-5~-1
ORA:-25
ORA:-9
TWF
-14
-5~-1
-10~-4
RWF
-17
-2~3
-12~-6
TRF
-17
-5~-1
-12~-6
DWDMside
-17
-5~-1
-12~-6
Customer
side
-18
-3
-9~-3
DWDMside
-17
-5~-1
Customer
side
-14
-2~3
-17
-5~-1
-12~-6
ORP:-18
ORP:0
-10~2(electric
absorption)
-12~-6
LRF
DWDMside
ORA:-9
LDG
-20~-14
1310:-11.5~-3
-12~-6
850:-17
850: 0
850:-9.5~0
-12~-6
ORP:-18
ORP:-3
-10~2(electric
absorption)
-12~-6
ORA:-9
-20~-14
-10~7(directly
debugging)
-3
-10~-4
-12~-6
ORP:-18
ORP:0
-10~2(electric
absorption)
-12~-6
ORA:-25
ORA:-9
-10~7(directly
debugging)
-18
-3
-48
-3
-18
DWDMside
LWM
Customer
side
-10~-4
1310:-3
ORA:-25
Customer
side
-12~-6
1310:-19
DWDMside
LWX
-12~-6
-10~7(directly
debugging)
ORA:-25
Customer
side
-20~-14
-20~-14
-10~-3
-12~-6
-7~0
-45~-15
SC1/SC2
TC1/TC2
System Commissioning
Operation instruction
Find the channel with the maximum and minimum optical power (or
signal-to-noise ratio) in the spectrogram measured, then adjust the
VOA of the corresponding V40 channel to make the optical power (or
signal-to-noise ratio) close to the average value;
Repeat Step 4 until the biggest difference of the optical power (or
signal-to-noise ratio) in all the channels is within 4dB (or 2dB);
When the above steps are done, usually the total input and output
optical power of respective amplifier stages will not change obviously
and the commissioning is completed.
The board position relation of the VOA and optical amplification board is
one-to-one corresponding from left to right.
System Commissioning
MVOAd1
MVOm5
MVOAm3
OBU
OAU
M
R
2
M
R
2
DCM
MVOAd2
MVOAm6
OBU
OAU
DCM
MVOAm1
MVOAm2
ADD1 ADD2
Fig1
Configuration of the adjustable attenuator for 400G OADM station with OBU board
System Commissioning
MVOAd1
OAU
EVOA
BA
PA
ADD1 ADD2
MVOAm3
MVOAm4
DCM
DCM
M
R
2
M
R
2
DCM
MVOAm1
DCM
MVOAm2
ADD1 ADD2
EVOA
BA
OAU
MVOAd2
PA
Fig2 Configuration of adjustable attenuator for 1600G OADM station without OBU boards
10
System Commissioning
11
System Commissioning
Task 3 .ALC
Step 1 Configuring ALC protocol channel:
Step 2 Configuring ALC link:
Step 3 Querying ALC link information:
Step 4 Complete ALC link information
Step 5 Starting ALC adjustment
Step 6 Commissioning methods
Task 4 .APR
Step 1 reating APR pair
Step 2 Commissioning methods
Task 5 .APE
Step 1 Configuring APE pair
Step 2 Setting wavelength monitoring standardization
Step 3 Saving APE standard power curve
Step 4 Starting APE adjustment
12
System Commissioning
13
System Commissioning
OUT
TWC
RWC
Analyzer
RWC
IN
WPA
WBA
TWC
D32
MPI-R point
RWC
TWC
RWC
Variable attenuation
D32
Fig3
14
WPA
Variable attenuation
WBA
M32
TWC