Lautan Berkat Aba

Your Trusted Partne

MAINTENANCE SCHEDULE
CUSTOMER
ENGINE TYPE
SUBJECT

: PLTD SKADAU - PONTIANAK


: S16R -PTA
: TOP OVERHAUL (TOH)

NO

JOB ITEMS

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Prepair tools, check around


Drain Water
Drain Oil
Close Valve oil fuel
Remove Exhaust manifold
Remove Mechanism valve
Remove Fuel system
Remove Cylinder Head
Remove Fuel pipes
Dismantle cylinder head
Cleaning Piston dan Crank case up side
Check and cleaning oli pan
Cleaning Exhaust manifold
Lapping valve
Reassembling cylinder head
Check and cleaning valve mechanism
Dismantle dan adjust injector nozle
Installing cylinder head
Installing Rocker case and valve mechanism
Installing exhaust manifold and insulator
Cleanning Pin Radiator
Installing cover radiator
Adjust valve and timing injection
Refill water radiator
Change oil, fuel ,water sparator and air filter
Refill Lubrication oil
Running no load

28 Check Safety device and parameter engine


29 Load test
30 Monitoring unit

DAYS
3
4

Note : * Waktu pekerjaan tersebut diasumsikan part ready semua


* Tidak adanya job tambahan diluar TOH

kat Abadi
Trusted Partner

DULE

Remark

Up to condition
Up to condition

Lautan Berkat Aba

Your Trusted Partne

MAINTENANCE SCHEDULE
CUSTOMER
ENGINE TYPE
SUBJECT
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
18
19
20
21
22
23
24
25

: PLTD SKADAU - PONTIANAK


: S6R -PTA
: TOP OVERHAUL (TOH)
JOB ITEMS

Drain Water
Drain Oil
Close Valve oil fuel
Remove Exhaust manifold
Remove Mechanism valve
Remove Fuel system
Remove Cylinder Head
Remove Piston and Con-rod
Remove Cylinder liner
Remove Fuel pipes
Remove Oil Cooler
Remove Injection pump drive
Remove Turbo charger
Remove Water pump
Remove Oil pump
Remove Fan Radiator and Fan drive
Remove Generator
Remove flywheel
Remove Timing gear case, Timing gear
Remove Rear plate
Remove Damper,Front case, front plate
Remove Main cup
Dismantle cylinder head
Dismantle piston and con-rod
Overhaul oil cooler
Overhaul Injection pump drive
Overhaul Turbocharger
Overhaul Water pump
Overhaul oil pump
Overhaul Injector nozle
Overhaul Fan Drive

DAYS
5
6

26 Check and cleaning Crank case


27 Check and cleaning Crank shaft
28 Check and cleaning oli pan
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

Overhaul and adjust injector nozzle


Lapping valve
Reassembling cylinder head
Check and cleaning valve mechanism
Installing Cylinder Liner
Installing Crankshaft
Installing Piston and con-rod
Installing Rear plate, timing gear
Installing Timing gear case, Fly wheel
Installing Front plate, front case,damper
Installing cylinder head
Installing Rocker case and valve mechanism
Installing Injector nozle
Installing Injection pump drive
Installing Injection pump
Installing Turbocharger
Installing Fan Drive
Installing Fan Radiator
Installing oil pump
Installing water pump
Installing oil, fuel and water pipe
Installing exhaust manifold and insulator
Cleanning Pin Radiator
Installing cover radiator
Couple generator
Adjust valve and timing injection
Refill water radiator
Change oil, fuel ,water sparator and air filter
Refill Lubrication oil
Running no load
Check Safety device and parameter engine
Load test
Monitoring unit

Note : * Waktu pekerjaan tersebut diasumsikan part ready semua


* Tidak adanya job tambahan diluar GOH

kat Abadi
Trusted Partner

DULE

DAYS
7

10

REMARK

LAUTAN BERKAT ABADI


SCHEDULE MAJOR OVER HAUL (MOH) AT PLTD PASANG KAYU
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

JOB ITEMS
Drain Water
Drain Oil
Close Valve oil fuel
Remove Exhaust manifold
Remove Mechanism valve
Remove Fuel system
Remove Cylinder Head
Remove Piston and Con-rod
Remove Cylinder liner
Remove Fuel pipes
Remove Oil Cooler
Remove Injection pump drive
Remove Turbo charger
Remove Water pump
Remove Oil pump
Remove Fan Radiator and Fan drive
Overhaul cylinder head
Overhaul piston and con-rod
Overhaul oil cooler
Overhaul Injection pump drive
Overhaul Turbocharger
Overhaul Water pump
Overhaul oil pump
Overhaul Injector nozle
Overhaul Fan Drive
Check and cleaning Crank case
Check and cleaning Crank pin
Check and cleaning oli pan
Lapping valve
Reassembling cylinder head
Check and cleaning valve mechanism
Installing Cylinder Liner
Installing Ring piston and con-rod
Installing cylinder head
Installing Rocker case and valve mechanism
Installing Injector nozle
Installing Injection pump drive
Installing Injection pump
Installing Turbocharger
Installing Fan Drive

DAYS
1

41
42
43
44
45
46
47
48
49
50
51
52

Installing Fan Radiator


Installing oil pump
Installing water pump
Installing oil, fuel and water pipe
Installing exhaust manifold and insulator
Cleanning Pin Radiator
Installing cover radiator
Adjust valve and timing injection
Refill water radiator
Change oil, fuel ,water sparator and air filter
Refill Lubrication oil
Running no load

53 Check Safety device and parameter engine


54 Load test
55 Monitoring unit
Note : * Waktu pekerjaan tersebut diasumsikan part ready semua
* Tidak adanya job tambahan diluar MOH

PASANG KAYU
DAYS
8

10

11

12

13

14

15