NO.
1
2
3
4
5
6
7
8
9
UPAH
1 HARI 8 JAM
(Rp)
60,000.00
70,000.00
80,000.00
90,000.00
90,000.00
60,000.00
80,000.00
60,000.00
70,000.00
0%
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
PEKERJA
TUKANG BATU/GALI
KEPALA TUKANG BATU
TUKANG KAYU
KEPALA TUKANG KAYU
TUKANG CAT / PELITUR
KEPALA TUKANG CAT / PELITUR
TUKANG BESI BETON
KEPALA TUKANG BESI BETON
TUKANG BESI PROFIL
KEPALA TUKANG BESI PROFIL
MANDOR
60,000.00
70,000.00
80,000.00
70,000.00
80,000.00
70,000.00
80,000.00
80,000.00
80,000.00
80,000.00
80,000.00
90,000.00
NO.
JENIS BAHAN
SAT
A.
1
2
3
4
Data 1
4
HARGA (Rp)
Data 2
5
Rata-Rata
4
KETERANGAN
5
45,000.00
80,000.00
120,000.00
135,000.00
45,000.00
80,000.00
120,000.00
135,000.00
45,000.00
80,000.00
120,000.00
135,000.00
Sirtu
Pasir Pasang
Pasir Beton
Pasir Aspal
Abu Batu
m3
m3
m3
m3
m3
158,000.00
195,000.00
205,000.00
141,000.00
155,000.00
158,000.00
195,000.00
205,000.00
141,000.00
155,000.00
158,000.00
195,000.00
205,000.00
141,000.00
155,000.00
10
11
12
13
14
Kerikil
Batu Gosok ( Apung )
Batu Pecah 1 - 2
Batu Pecah 2 - 3
Batu Pecah 3 - 5
m3
kg
m3
m3
m3
153,000.00
17,000.00
203,000.00
184,000.00
175,000.00
153,000.00
17,000.00
203,000.00
184,000.00
175,000.00
153,000.00
17,000.00
203,000.00
184,000.00
175,000.00
1,800.00 kg/m3
15
16
17
18
19
Batu
Batu
Batu
Batu
Batu
Pecah 5 - 7
Pecah 7 - 10
Pecah 10 - 15
Belah Pondasi
Bronjong (untuk Bronjong)
m3
m3
m3
m3
m3
145,000.00
135,000.00
130,000.00
140,000.00
127,000.00
145,000.00
135,000.00
130,000.00
140,000.00
127,000.00
145,000.00
135,000.00
130,000.00
140,000.00
127,000.00
1,450.00
1,450.00
1,450.00
1,500.00
1,500.00
20
21
22
23
Batu
Batu
Batu
Batu
m3
m2
bh
bh
122,000.00
105,000.00
15,000.00
48,000.00
122,000.00
105,000.00
15,000.00
48,000.00
122,000.00
105,000.00
15,000.00
48,000.00
24
25
26
27
Batu Telor
Batako Kecil 8 x 10 x 20
Batako Besar 8 x 20 x 30
Con Block 8 x 20 x 40
m3
bh
bh
bh
152,000.00
900.00
1,800.00
3,200.00
152,000.00
900.00
1,800.00
3,200.00
152,000.00
900.00
1,800.00
3,200.00
28
29
bh
bh
600.00
500.00
600.00
500.00
600.00
500.00
30
31
32
bh
m2
m2
2,700.00
45,000.00
56,000.00
2,700.00
45,000.00
56,000.00
2,700.00
45,000.00
56,000.00
33
34
m2
m2
40,000.00
45,000.00
40,000.00
45,000.00
40,000.00
45,000.00
35
36
37
m'
kg
kg
21,000.00
62,500.00
70,000.00
21,000.00
62,500.00
70,000.00
21,000.00
62,500.00
70,000.00
38
39
Semen Warna
Kapur Pasang / Kapur Tembok
kg
m3
10,000.00
90,000.00
10,000.00
90,000.00
10,000.00
90,000.00
40
41
42
m3
m3
m3
90,000.00
120,000.00
875,000.00
90,000.00
120,000.00
875,000.00
90,000.00
120,000.00
875,000.00
43
44
Beton K - 225
Beton K - 250
m3
m3
958,000.00
970,500.00
958,000.00
970,500.00
958,000.00
970,500.00
45
46
47
48
Beton
Beton
Beton
Beton
275
300
350
400
m3
m3
m3
m3
978,500.00
1,015,000.00
1,029,000.00
1,085,000.00
978,500.00
1,015,000.00
1,029,000.00
1,085,000.00
978,500.00
1,015,000.00
1,029,000.00
1,085,000.00
49
50
51
52
53
Beton K - 450
Beton K - 500
Biaya Pompa Ready Mix
Material Agregat Kelas A
Material Agregat Kelas B
m3
m3
m3
m3
m3
1,148,208.00
1,200,000.00
86,000.00
155,000.00
129,000.00
1,148,208.00
1,200,000.00
86,000.00
155,000.00
129,000.00
1,148,208.00
1,200,000.00
86,000.00
155,000.00
129,000.00
54
55
56
57
58
59
60
Urugan Pilihan
Gorong - Gorong
Gorong - Gorong
Gorong - Gorong
Gorong - Gorong
Gorong - Gorong
Air
m3
m'
m'
m'
m'
m'
lt
80,000.00
103,000.00
285,000.00
400,000.00
628,000.00
1,027,000.00
10.00
80,000.00
103,000.00
285,000.00
400,000.00
628,000.00
1,027,000.00
10.00
80,000.00
103,000.00
285,000.00
400,000.00
628,000.00
1,027,000.00
10.00
B.
28,600.00
17,000.00
17,000.00
500.00
630.00
28,600.00
17,000.00
17,000.00
500.00
630.00
28,600.00
17,000.00
17,000.00
500.00
630.00
5
6
7
8
9
1
2
3
4
5
Paku
Paku
Paku
Paku
Paku
K
K
K
K
Beton
Beton
Beton
Beton
Beton
1 s/d 3 cm
4 s/d 7 cm
8 s/d 12 cm
Beton 2 s/d 5 cm
Kait Lengkap
20 - 30
cm
- 75 cm
- 95 cm
- 120 c
6
7
8
9
10
Paku Cacing
Besi Begel Kuda - Kuda
Duk Angker
Angker Mur Baut dia. 19 mm panjang 60 cm
Mur Baut HTB dia. 10 mm s/d 16 mm ( 5 cm )
kg
kg
kg
bh
bh
30,000.00
12,000.00
2,800.00
26,000.00
6,500.00
30,000.00
12,000.00
2,800.00
26,000.00
6,500.00
30,000.00
12,000.00
2,800.00
26,000.00
6,500.00
11
12
bh
bh
4,000.00
1,500.00
4,000.00
1,500.00
4,000.00
1,500.00
C.
1
bt
17,100.00
17,100.00
17,100.00
bt
bt
m3
23,500.00
45,900.00
1,500,000.00
23,500.00
45,900.00
1,500,000.00
23,500.00
45,900.00
1,500,000.00
2
3
4
Bambu dia. 7 - 10 cm
Bambu Gombong
Kayu Terentang
1,400.00
1,400.00
1,400.00
1,400.00
kg/m3
kg/m3
kg/m3
kg/m3
1,450.00 kg/m3
1,450.00 kg/m3
1,450.00 kg/m3
kg/m3
kg/m3
kg/m3
kg/m3
kg/m3
5
6
m3
m3
5,087,000.00
4,250,000.00
5,087,000.00
4,250,000.00
5,087,000.00
4,250,000.00
7
8
9
10
11
Kayu
Kayu
Kayu
Kayu
Kayu
m3
m3
m3
m3
m3
4,250,000.00
5,450,000.00
5,950,000.00
5,670,000.00
6,960,000.00
4,250,000.00
5,450,000.00
5,950,000.00
5,670,000.00
6,960,000.00
4,250,000.00
5,450,000.00
5,950,000.00
5,670,000.00
6,960,000.00
12
13
14
15
16
Kayu
Kayu
Kayu
Kayu
Kayu
m3
m3
m3
m3
m3
9,400,000.00
10,400,000.00
2,400,000.00
17,000,000.00
14,800,000.00
9,400,000.00
10,400,000.00
2,400,000.00
17,000,000.00
14,800,000.00
9,400,000.00
10,400,000.00
2,400,000.00
17,000,000.00
14,800,000.00
17
18
19
20
21
m3
m3
bt
bt
m'
9,500,000.00
650,000.00
13,000.00
22,000.00
4,200.00
9,500,000.00
650,000.00
13,000.00
22,000.00
4,200.00
9,500,000.00
650,000.00
13,000.00
22,000.00
4,200.00
22
23
24
25
26
m'
m'
m'
m'
m'
5,800.00
11,000.00
15,000.00
25,900.00
83,000.00
5,800.00
11,000.00
15,000.00
25,900.00
83,000.00
5,800.00
11,000.00
15,000.00
25,900.00
83,000.00
27
28
29
30
m'
batang
batang
batang
54,000.00
2,400.00
4,000.00
8,000.00
54,000.00
2,400.00
4,000.00
8,000.00
54,000.00
2,400.00 4,000,000.00
4,000.00 6,666,666.67
8,000.00 6,666,666.67
D.
1
2
3
13,500.00
223,000.00
147,000.00
13,500.00
223,000.00
147,000.00
13,500.00
223,000.00
147,000.00
4
5
6
7
kg
kg
kg
ml
39,000.00
47,000.00
46,975.00
77,000.00
39,000.00
47,000.00
46,975.00
77,000.00
39,000.00
47,000.00
46,975.00
77,000.00
8
9
bh
bh
27,500.00
7,500.00
27,500.00
7,500.00
27,500.00
7,500.00
10
11
12
Kape Kayu
Soligneum
Plintcoat
bh
lt
kg
5,000.00
8,000.00
32,000.00
5,000.00
8,000.00
32,000.00
5,000.00
8,000.00
32,000.00
13
14
Kwas 3"
Oker
bh
kg
10,000.00
25,000.00
10,000.00
25,000.00
10,000.00
25,000.00
15
16
17
kg
ltr
kg
27,000.00
15,000.00
80,000.00
27,000.00
15,000.00
80,000.00
27,000.00
15,000.00
80,000.00
18
19
kg
lt
25,000.00
12,000.00
25,000.00
12,000.00
25,000.00
12,000.00
20
21
22
Thiner A
Thiner B
Minyak Tanah
lt
lt
lt
21,500.00
20,000.00
12,500.00
21,500.00
20,000.00
12,500.00
21,500.00
20,000.00
12,500.00
23
24
Ampelas
Dempul Kayu Cap Kucing
lbr
kg
10,600.00
20,500.00
10,600.00
20,500.00
10,600.00
20,500.00
25
26
27
28
kg
kg
kg
kg
22,000.00
30,000.00
40,000.00
40,000.00
22,000.00
30,000.00
40,000.00
40,000.00
22,000.00
30,000.00
40,000.00
40,000.00
29
30
31
32
kg
kg
kg
kg
78,000.00
35,000.00
34,000.00
34,000.00
78,000.00
35,000.00
34,000.00
34,000.00
78,000.00
35,000.00
34,000.00
34,000.00
E.
1
2
3
4
5
6
m2
lbr
m2
lbr
lbr
lbr
12,000.00
48,000.00
15,000.00
60,000.00
68,000.00
90,000.00
12,000.00
48,000.00
15,000.00
60,000.00
68,000.00
90,000.00
12,000.00
48,000.00
15,000.00
60,000.00
68,000.00
90,000.00
F.
1
2
3
4
5
lbr
lbr
lbr
lbr
lbr
53,000.00
62,100.00
40,000.00
78,000.00
75,000.00
53,000.00
62,100.00
40,000.00
78,000.00
75,000.00
53,000.00
62,100.00
40,000.00
78,000.00
75,000.00
6
7
8
9
10
m2
m2
m2
m2
lbr
15,000.00
18,000.00
32,000.00
46,000.00
125,000.00
15,000.00
18,000.00
32,000.00
46,000.00
125,000.00
15,000.00
18,000.00
32,000.00
46,000.00
125,000.00
11
12
13
14
15
lbr
lbr
lbr
lbr
lbr
150,000.00
205,000.00
239,000.00
88,000.00
107,000.00
150,000.00
205,000.00
239,000.00
88,000.00
107,000.00
150,000.00
205,000.00
239,000.00
88,000.00
107,000.00
16
17
18
lbr
lbr
lbr
63,000.00
80,000.00
98,000.00
63,000.00
80,000.00
98,000.00
63,000.00
80,000.00
98,000.00
40,000.00 /5 liter
30x30
19
20
Melamin TIK 4 mm
Formika 120 x 240
lbr
lbr
110,000.00
132,000.00
110,000.00
132,000.00
110,000.00
132,000.00
21
lbr
87,000.00
87,000.00
87,000.00
G.
1
2
bh
bh
1,700.00
1,300.00
1,700.00
1,300.00
1,700.00
1,300.00
Tegel PC 30 x 30
Plin Tegel 15 x 30
Tegel Warna 20 x 20
Plin Tegel Warna 10 x 20
Tegel Warna 30 x 30
bh
bh
bh
bh
bh
2,200.00
2,200.00
2,100.00
1,900.00
2,600.00
2,200.00
2,200.00
2,100.00
1,900.00
2,600.00
2,200.00
2,200.00
2,100.00
1,900.00
2,600.00
8
9
10
11
12
bh
bh
bh
bh
bh
2,100.00
1,500.00
2,300.00
2,300.00
446.00
2,100.00
1,500.00
2,300.00
2,300.00
446.00
2,100.00
1,500.00
2,300.00
2,300.00
446.00
44,600.00 /dus
13
14
15
16
17
bh
bh
bh
bh
bh
517.00
870.00
970.00
2,144.00
3,360.00
517.00
870.00
970.00
2,144.00
3,360.00
517.00
870.00
970.00
2,144.00
3,360.00
51,700.00
43,500.00
48,500.00
53,600.00
84,000.00
18
19
20
21
22
Keramik 20
Keramik 30
Keramik 30
Stairnosing
Stairnosing
bh
bh
bh
m2
m2
3,700.00
8,400.00
8,000.00
10,000.00
13,300.00
3,700.00
8,400.00
8,000.00
10,000.00
13,300.00
3,700.00
8,400.00
8,000.00
10,000.00
13,300.00
23
24
25
26
Granit
Granit
Granit
Granit
m2
m2
m2
m2
1,867,200.00
1,570,600.00
1,373,200.00
1,273,900.00
1,867,200.00
1,570,600.00
1,373,200.00
1,273,900.00
1,867,200.00
1,570,600.00
1,373,200.00
1,273,900.00
27
28
29
30
Granito
Granito
Granito
Granito
m2
m2
m2
m2
272,000.00
195,000.00
312,600.00
277,400.00
272,000.00
195,000.00
312,600.00
277,400.00
272,000.00
195,000.00
312,600.00
277,400.00
31
Bata Karawang
bh
2,500.00
2,500.00
2,500.00
H.
1
2
m'
m'
40,000.00
44,000.00
40,000.00
44,000.00
40,000.00
44,000.00
3
4
Gravel U 40 cm
Buis Beton dia. 20 cm (1 m')
m'
m'
57,600.00
61,750.00
57,600.00
61,750.00
57,600.00
61,750.00
5
6
7
m'
m'
m'
74,750.00
100,000.00
115,000.00
74,750.00
100,000.00
115,000.00
74,750.00
100,000.00
115,000.00
8
9
m'
m'
150,800.00
186,700.00
150,800.00
186,700.00
150,800.00
186,700.00
10
11
12
m'
stk
stk
240,100.00
7,200.00
9,700.00
240,100.00
7,200.00
9,700.00
240,100.00
7,200.00
9,700.00
13
14
stk
stk
11,300.00
16,000.00
11,300.00
16,000.00
11,300.00
16,000.00
15
Injuk
kg
10,000.00
10,000.00
10,000.00
I.
1
kg
9,000.00
9,000.00
9,000.00
2
3
4
5
6
kg
kg
kg
kg
m2
10,000.00
14,000.00
7,000.00
9,000.00
127,000.00
10,000.00
14,000.00
7,000.00
9,000.00
127,000.00
10,000.00
14,000.00
7,000.00
9,000.00
127,000.00
7
8
9
10
11
12
13
14
15
Bondex
IWF Ex. DN SII
IWF Ex. Jepang
Besi Profil DN SII
Besi Profil Ex. Luar Negeri
Besi C Lip Chanel
Ongkos Galpanis Besi
Kawat Beton
Kawat Duri
m2
kg
kg
kg
kg
kg
kg
kg
m'
107,000.00
12,000.00
12,000.00
10,000.00
11,000.00
10,000.00
3,400.00
25,000.00
3,800.00
107,000.00
12,000.00
12,000.00
10,000.00
11,000.00
10,000.00
3,400.00
25,000.00
3,800.00
107,000.00
12,000.00
12,000.00
10,000.00
11,000.00
10,000.00
3,400.00
25,000.00
3,800.00
16
17
18
19
20
Kawat
Kawat
Kawat
Kawat
Kawat
m'
kg
kg
kg
kg
2,000.00
19,000.00
17,000.00
17,000.00
22,000.00
2,000.00
19,000.00
17,000.00
17,000.00
22,000.00
2,000.00
19,000.00
17,000.00
17,000.00
22,000.00
21
22
23
24
25
Wiremesh M8
Wiremesh M6
Seng Plat BJLS 30 lebar 60 cm ( 180 m )
Seng Plat BJLS 30 lebar 90 cm ( 180 m )
Plat Besi Tipis 1 mm
kg
kg
lbr
lbr
kg
8,300.00
8,300.00
29,000.00
44,000.00
16,000.00
8,300.00
8,300.00
29,000.00
44,000.00
16,000.00
8,300.00
8,300.00
29,000.00
44,000.00
16,000.00
26
27
28
29
30
kg
kg
kg
kg
m
21,000.00
13,000.00
13,000.00
13,000.00
21,000.00
13,000.00
13,000.00
13,000.00
21,000.00
13,000.00
13,000.00
13,000.00
m2
40,000.00
40,000.00
40,000.00
3
4
5
6
7
J.
1
Alam
Alam
Alam
Alam
Tile
Tile
Tile
Tile
Ukuran
Ukuran
Ukuran
Ukuran
40
40
60
60
x
x
x
x
40
40
60
60
Polis
Unpolis
Polis
Unpolis
Pengikat
Bronjong 4 mm
Bronjong 3 mm
Tembaga
Las listrik
0,5 mm
2 mm s/d 5 mm
6 mm s/d 10 mm
10 mm ke atas
BAHAN KACA
Kaca Polos 2 mm ( ASAHI )
/dus
/dus
/dus
/dus
/dus
74,000.00 /dus
84,000.00 /dus
80,000.00 /dus
2
3
m2
m2
51,000.00
95,000.00
51,000.00
95,000.00
51,000.00
95,000.00
4
5
6
7
8
Kaca
Kaca
Kaca
Kaca
Kaca
m2
m2
m2
m2
m2
120,000.00
131,000.00
144,000.00
537,000.00
3,100,000.00
120,000.00
131,000.00
144,000.00
537,000.00
3,100,000.00
120,000.00
131,000.00
144,000.00
537,000.00
3,100,000.00
Rayband 5 mm ( ASAHI )
Rayband 8 mm ( ASAHI )
Rayband 12 mm ( ASAHI )
Patri Lokal Terpasang ( ASAHI )
Patri Ex.Luar Negeri Terpasang
9
10
bh
bh
38,000.00
24,000.00
38,000.00
24,000.00
38,000.00
24,000.00
K.
1
lbr
23,000.00
23,000.00
23,000.00
Atap
Atap
Atap
Atap
Atap
lbr
lbr
lbr
lbr
bh
38,000.00
72,000.00
38,000.00
49,000.00
960.00
38,000.00
72,000.00
38,000.00
49,000.00
960.00
38,000.00
72,000.00
38,000.00
49,000.00
960.00
2
3
4
5
6
7
8
9
10
11
bh
bh
bh
bh
bh
1,100.00
1,300.00
4,000.00
4,200.00
6,000.00
1,100.00
1,300.00
4,000.00
4,200.00
6,000.00
1,100.00
1,300.00
4,000.00
4,200.00
6,000.00
12
13
14
15
16
m2
m2
bh
bh
bh
62,000.00
53,000.00
1,100.00
2,700.00
2,200.00
62,000.00
53,000.00
1,100.00
2,700.00
2,200.00
62,000.00
53,000.00
1,100.00
2,700.00
2,200.00
17
18
19
20
bh
lbr
lbr
bh
4000
60,000.00
50,000.00
4000
60,000.00
50,000.00
4,000.00
60,000.00
50,000.00
0.00
L.
1
2
BAHAN
Lempengan Besi Baja Profil Desain Galvanis
Tiang Penyangga Besi st. 32 Galvanis
m
bh
133,333.33
400,000.00
133,333.33
400,000.00
133,333.33
400,000.00
3
4
kg
kg
23,500.00
9,500,000.00
23,500.00
9,500,000.00
23,500.00
9,500,000.00
5
6
7
bh
bh
bh
57,500.00
2,600.00
2,600.00
57,500.00
2,600.00
2,600.00
57,500.00
2,600.00
2,600.00
M.
N.
800,000.00 /batang
bh
bh
bh
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
Bak KM Fiber 60 x 60
Bak Teraso WC 30 x 40
bh
bh
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
Bak KM Teraso 60 x 60
bh
n/a
n/a
#VALUE!
ALAT TUKANG
1
2
Palu 0.5 kg
Cangkul
bh
bh
50,000.00
45,000.00
50,000.00
45,000.00
50,000.00
45,000.00
3
4
5
6
Singkup
Sekrop
Pengki
Linggis
bh
bh
bh
bh
55,100.00
55,100.00
11,000.00
48,000.00
55,100.00
55,100.00
11,000.00
48,000.00
55,100.00
55,100.00
11,000.00
48,000.00
7
8
9
10
bh
bh
m
bh
80,000.00
25,000.00
1,700.00
70,000.00
80,000.00
25,000.00
1,700.00
70,000.00
80,000.00
25,000.00
1,700.00
70,000.00
O.
1
2
3
4
5
6
7
8
BAHAN PERPIPAAN
Besi Pipa Untuk Hydrant
Besi Pipa Untuk Hydrant
Besi Pipa Untuk Hydrant
Besi Pipa Untuk Hydrant
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok dia 0,5"
Kran Tembok dia 1"
bt
bt
bt
bt
bh
bh
bh
bh
230,000.00
268,000.00
367,000.00
411,000.00
200,000.00
150,000.00
25,000.00
50,000.00
230,000.00
268,000.00
367,000.00
411,000.00
200,000.00
150,000.00
25,000.00
50,000.00
230,000.00
268,000.00
367,000.00
411,000.00
200,000.00
150,000.00
25,000.00
50,000.00
9
10
11
12
13
bh
bh
unit
unit
unit
240,000.00
25,000.00
900,000.00
650,000.00
115,000.00
240,000.00
25,000.00
900,000.00
650,000.00
115,000.00
240,000.00
25,000.00
900,000.00
650,000.00
115,000.00
14
15
16
17
18
unit
unit
bh
unit
lbr
95,000.00
700,000.00
950,000.00
650,000.00
350,000.00
95,000.00
700,000.00
950,000.00
650,000.00
350,000.00
95,000.00
700,000.00
950,000.00
650,000.00
350,000.00
19
20
21
bh
bh
bh
250,000.00
400,000.00
950,000.00
250,000.00
400,000.00
950,000.00
250,000.00
400,000.00
950,000.00
ltr
m3
ltr
15,000.00
600,000.00
12,000.00
15,000.00
600,000.00
12,000.00
15,000.00
600,000.00
12,000.00
BSP
BSP
BSP
BSP
dia.
dia.
dia.
dia.
P.
1
2
3
Minyak Tanah
Kayu bakar dari kayu-kayu karet
Minyak Solar
1"
1,25"
1,5"
2"
4
5
Bensin Premium
Plus Oil
6
7
Q.
1
ltr
ltr
ltr
15 Kg
12,000.00
20,000.00
12,000.00
20,000.00
12,000.00
20,000.00
25,000.00
150,000.00
25,000.00
150,000.00
25,000.00
150,000.00
m'
1,687.50
1,687.50
1,687.50
2
3
4
5
6
Pipa
Pipa
Pipa
Pipa
Pipa
PVC
PVC
PVC
PVC
PVC
dia.
dia.
dia.
dia.
dia.
25
32
40
50
63
m'
m'
m'
m'
m'
2,312.50
3,125.00
4,062.50
6,325.00
8,000.00
2,312.50
3,125.00
4,062.50
6,325.00
8,000.00
2,312.50
3,125.00
4,062.50
6,325.00
8,000.00
9,250.00
12,500.00
16,250.00
25,300.00
32,000.00
/batang
/batang
/batang
/batang
/batang
7
8
9
10
11
Pipa
Pipa
Pipa
Pipa
Pipa
PVC
PVC
PVC
PVC
PVC
dia.
dia.
dia.
dia.
dia.
75 mm ( 3")
90 mm ( 4")
110 mm ( 5")
140 mm ( 6")
160 mm (8")
m'
m'
m'
m'
m'
8,775.00
11,725.00
17,500.00
28,400.00
30,000.00
8,775.00
11,725.00
17,500.00
28,400.00
30,000.00
8,775.00
11,725.00
17,500.00
28,400.00
30,000.00
35,100.00
46,900.00
70,000.00
113,600.00
120,000.00
/batang
/batang
/batang
/batang
/batang
12
13
14
15
16
Pipa
Pipa
Pipa
Pipa
Pipa
PVC
PVC
PVC
PVC
PVC
dia.
dia.
dia.
dia.
dia.
200
225
250
315
355
m'
m'
m'
m'
m'
57,700.00
72,575.00
83,750.00
130,000.00
196,825.00
57,700.00
72,575.00
83,750.00
130,000.00
196,825.00
57,700.00
72,575.00
83,750.00
130,000.00
196,825.00
230,800.00
290,300.00
335,000.00
520,000.00
787,300.00
/batang
/batang
/batang
/batang
/batang
17
18
19
20
21
m'
m'
m'
unit
unit
239,625.00
239,625.00
239,625.00
958,500.00 /batang
408,325.00
408,325.00
408,325.00 1,633,300.00 /batang
650,450.00
650,450.00
650,450.00 2,601,800.00 /batang
179,853,300.00 179,853,300.00 179,853,300.00
335,170,000.00 335,170,000.00 335,170,000.00
22
23
24
25
Ground
Ground
Ground
Ground
unit
unit
unit
unit
26
27
28
29
Bend
Bend
Bend
Bend
63 mm
75 mm
90 mm
110 mm
bh
bh
bh
bh
63,200.00
113,100.00
119,200.00
176,900.00
63,200.00
113,100.00
119,200.00
176,900.00
63,200.00
113,100.00
119,200.00
176,900.00
30
31
bh
bh
412,100.00
759,900.00
412,100.00
759,900.00
412,100.00
759,900.00
32
33
34
bh
bh
bh
948,900.00
1,361,000.00
1,640,100.00
948,900.00
1,361,000.00
1,640,100.00
948,900.00
1,361,000.00
1,640,100.00
35
36
bh
bh
2,409,900.00
4,000.00
2,409,900.00
4,000.00
2,409,900.00
4,000.00
37
38
39
bh
bh
bh
57,100.00
95,000.00
106,600.00
57,100.00
95,000.00
106,600.00
57,100.00
95,000.00
106,600.00
40
41
bh
bh
146,100.00
347,700.00
146,100.00
347,700.00
146,100.00
347,700.00
42
43
44
bh
bh
bh
595,600.00
865,900.00
1,096,200.00
595,600.00
865,900.00
1,096,200.00
595,600.00
865,900.00
1,096,200.00
45
46
bh
bh
1,492,900.00
1,848,900.00
1,492,900.00
1,848,900.00
1,492,900.00
1,848,900.00
47
48
49
50
Bend
Bend
Bend
Bend
22,5
22,5
22,5
22,5
0
0
0
0
all
all
all
all
socket
socket
socket
socket
dia.
dia.
dia.
dia.
63 mm
75 mm
90 mm
110 mm
bh
bh
bh
bh
52,200.00
87,300.00
100,000.00
130,200.00
52,200.00
87,300.00
100,000.00
130,200.00
52,200.00
87,300.00
100,000.00
130,200.00
51
52
53
54
55
Bend
Bend
Bend
Bend
Bend
22,5
22,5
22,5
22,5
22,5
0
0
0
0
0
all
all
all
all
all
socket
socket
socket
socket
socket
dia.
dia.
dia.
dia.
dia.
160
200
225
250
285
mm
mm
mm
mm
mm
bh
bh
bh
bh
bh
299,900.00
499,400.00
747,300.00
923,100.00
1,247,800.00
299,900.00
499,400.00
747,300.00
923,100.00
1,247,800.00
299,900.00
499,400.00
747,300.00
923,100.00
1,247,800.00
56
57
58
59
60
61
62
63
64
bh
bh
bh
bh
bh
bh
bh
bh
bh
1,519,800.00
4,400.00
12,100.00
13,700.00
63,700.00
68,100.00
167,000.00
178,500.00
178,500.00
1,519,800.00
4,400.00
12,100.00
13,700.00
63,700.00
68,100.00
167,000.00
178,500.00
178,500.00
1,519,800.00
4,400.00
12,100.00
13,700.00
63,700.00
68,100.00
167,000.00
178,500.00
178,500.00
65
66
67
68
69
Tee
Tee
Tee
Tee
Tee
all
all
all
all
all
Socket
Socket
Socket
Socket
Socket
dia.
dia.
dia.
dia.
dia.
75
75
90
90
90
bh
bh
bh
bh
bh
129,100.00
167,500.00
189,500.00
165,900.00
204,300.00
129,100.00
167,500.00
189,500.00
165,900.00
204,300.00
129,100.00
167,500.00
189,500.00
165,900.00
204,300.00
70
71
72
73
74
Tee
Tee
Tee
Tee
Tee
all
all
all
all
all
Socket
Socket
Socket
Socket
Socket
dia.
dia.
dia.
dia.
dia.
90 x 75
90 x 90
110 x 63
110 x 75
110 x 90
bh
bh
bh
bh
bh
232,900.00
232,900.00
266,400.00
280,700.00
329,700.00
232,900.00
232,900.00
266,400.00
280,700.00
329,700.00
232,900.00
232,900.00
266,400.00
280,700.00
329,700.00
75
76
77
78
79
Tee
Tee
Tee
Tee
Tee
all
all
all
all
all
Socket
Socket
Socket
Socket
Socket
dia.
dia.
dia.
dia.
dia.
110
160
160
160
160
110
63
75
90
110
bh
bh
bh
bh
bh
309,300.00
471,400.00
483,500.00
547,800.00
568,700.00
309,300.00
471,400.00
483,500.00
547,800.00
568,700.00
309,300.00
471,400.00
483,500.00
547,800.00
568,700.00
80
81
82
bh
bh
bh
643,900.00
951,600.00
987,400.00
643,900.00
951,600.00
987,400.00
643,900.00
951,600.00
987,400.00
mm
mm
mm
mm
mm
Reservoir
Reservoir
Reservoir
Reservoir
90
90
90
90
0
0
0
0
all
all
all
all
(
(
(
(
(
1")
1,1/4")
1,1/2")
2")
2,5")
mm (10")
mm (12")
mm
mm
mm
200 m3
300 m3
500 m3
1000 m3
socket
socket
socket
socket
dia.
dia.
dia.
dia.
x
x
x
x
x
63
75
32
50
63
x
x
x
x
x
6,750.00 /batang
83
84
bh
bh
1,148,400.00
1,309,900.00
1,148,400.00
1,309,900.00
1,148,400.00
1,309,900.00
85
86
87
88
89
bh
bh
bh
bh
bh
2,681,500.00
3,207,200.00
3,752,800.00
5,362,300.00
6,000.00
2,681,500.00
3,207,200.00
3,752,800.00
5,362,300.00
6,000.00
2,681,500.00
3,207,200.00
3,752,800.00
5,362,300.00
6,000.00
90
91
92
93
94
Reducer
Reducer
Reducer
Reducer
Reducer
all
all
all
all
all
Socket
Socket
Socket
Socket
Socket
dia.
dia.
dia.
dia.
dia.
63 x 32
63 x 50
90 x 50
90 x 63
110 x 63
bh
bh
bh
bh
bh
18,700.00
13,700.00
44,000.00
63,700.00
92,300.00
18,700.00
13,700.00
44,000.00
63,700.00
92,300.00
18,700.00
13,700.00
44,000.00
63,700.00
92,300.00
95
96
97
98
99
Reducer
Reducer
Reducer
Reducer
Reducer
all
all
all
all
all
Socket
Socket
Socket
Socket
Socket
dia.
dia.
dia.
dia.
dia.
110
160
200
250
315
bh
bh
bh
bh
bh
107,700.00
180,200.00
322,500.00
587,900.00
755,500.00
107,700.00
180,200.00
322,500.00
587,900.00
755,500.00
107,700.00
180,200.00
322,500.00
587,900.00
755,500.00
bh
bh
bh
bh
bh
143,400.00
183,500.00
325,200.00
533,500.00
924,700.00
143,400.00
183,500.00
325,200.00
533,500.00
924,700.00
143,400.00
183,500.00
325,200.00
533,500.00
924,700.00
Flange
Flange
Flange
Flange
Flange
105
106
107
108
109
bh
bh
bh
bh
bh
1,057,100.00
1,826,900.00
45,600.00
52,200.00
136,800.00
1,057,100.00
1,826,900.00
45,600.00
52,200.00
136,800.00
1,057,100.00
1,826,900.00
45,600.00
52,200.00
136,800.00
110
111
112
113
bh
bh
bh
bh
277,400.00
2,700.00
4,400.00
22,000.00
277,400.00
2,700.00
4,400.00
22,000.00
277,400.00
2,700.00
4,400.00
22,000.00
114
115
116
117
bh
bh
bh
bh
39,500.00
5,400.00
14,800.00
24,100.00
39,500.00
5,400.00
14,800.00
24,100.00
39,500.00
5,400.00
14,800.00
24,100.00
118
119
m'
m'
18,700.00
27,200.00
18,700.00
27,200.00
18,700.00
27,200.00
108,800.00 /batang
120
121
122
m'
m'
m'
38,400.00
78,425.00
96,025.00
38,400.00
78,425.00
96,025.00
38,400.00
78,425.00
96,025.00
153,600.00 /batang
313,700.00 /batang
384,100.00 /batang
123
124
m'
m'
122,700.00
160,050.00
122,700.00
160,050.00
122,700.00
160,050.00
490,800.00 /batang
640,200.00 /batang
125
126
127
m'
bh
bh
233,400.00
473,100.00
987,400.00
233,400.00
473,100.00
987,400.00
233,400.00
473,100.00
987,400.00
933,600.00 /batang
128
129
bh
bh
685,200.00
1,370,900.00
685,200.00
1,370,900.00
685,200.00
1,370,900.00
130
131
132
bh
bh
bh
188,400.00
342,800.00
864,200.00
188,400.00
342,800.00
864,200.00
188,400.00
342,800.00
864,200.00
133
134
bh
bh
1,217,600.00
1,452,800.00
1,217,600.00
1,452,800.00
1,217,600.00
1,452,800.00
135
136
137
138
Accessories
Accessories
Accessories
Accessories
bh
bh
bh
bh
2,433,600.00
5,258,500.00
8,752,600.00
11,380,100.00
2,433,600.00
5,258,500.00
8,752,600.00
11,380,100.00
2,433,600.00
5,258,500.00
8,752,600.00
11,380,100.00
139
140
141
m'
m'
bh
64,000.00
80,000.00
25,000.00
64,000.00
80,000.00
25,000.00
m
m
m
m
m2
m2
bh
bh
bh
200,000.00
275,000.00
110,000.00
225,000.00
200,000.00
210,000.00
175,000.00
225,000.00
325,000.00
200,000.00
275,000.00
110,000.00
225,000.00
200,000.00
210,000.00
175,000.00
225,000.00
325,000.00
200,000.00
275,000.00
110,000.00
225,000.00
200,000.00
210,000.00
175,000.00
225,000.00
325,000.00
10
11
12
13
14
Mistar
Mistar
Papan
Papan
Papan
bh
bh
bh
bh
bh
450,000.00
650,000.00
1,000,000.00
300,000.00
750,000.00
450,000.00
650,000.00
1,000,000.00
300,000.00
750,000.00
450,000.00
650,000.00
1,000,000.00
300,000.00
750,000.00
15
16
17
18
19
bh
bh
bh
bh
bh
750,000.00
200,000.00
1,425,000.00
1,700,000.00
2,550,000.00
750,000.00
200,000.00
1,425,000.00
1,700,000.00
2,550,000.00
750,000.00
200,000.00
1,425,000.00
1,700,000.00
2,550,000.00
20
21
22
bh
bh
bh
2,000,000.00
2,550,000.00
3,100,000.00
2,000,000.00
2,550,000.00
3,100,000.00
2,000,000.00
2,550,000.00
3,100,000.00
S.
BAHAN MEKANIKAL
1
2
3
4
5
6
7
8
9
1
2
3
GI
GI
GI
GI
dia.
dia.
dia.
dia.
dia.
90
110
160
200
250
100
101
102
103
104
R.
Socket
Socket
Socket
Socket
Socket
x
x
x
x
x
90
110
160
200
225
Gate
Gate
Gate
Gate
Valve
Valve
Valve
Valve
dia.
dia.
dia.
dia.
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
4
5
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
6
7
8
9
10
Kabel
Kabel
Kabel
Kabel
Kabel
NYM
NYM
NYM
NYM
NYM
3
4
2
3
4
x
x
x
x
x
2.5 Prima
2.5 Prima
4 Prima
4 Prima
4 Prima
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
11
12
13
14
15
Kabel
Kabel
Kabel
Kabel
Kabel
NYM
NYM
NYM
NYM
NYM
2
3
4
2
3
x
x
x
x
x
6 Prima
6 Prima
6 Prima
10 Prima
10 Prima
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
16
17
18
19
20
Kabel
Kabel
Kabel
Kabel
Kabel
NYM 4 x 10 Prima
NYM 4 x 16 Prima
NYY 2 x 4 Prima
NYY 3 x 4 Prima
NYY 4 x 4 Prima
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
21
22
23
24
25
Kabel
Kabel
Kabel
Kabel
Kabel
NYY
NYY
NYY
NYY
NYY
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
26
27
28
29
30
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
31
32
33
34
Skring
Skring
Skring
MCB 1
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
#VALUE!
35
36
37
38
MCB 3 PAS
Tahanan 50 A Merk FUJI
Tahanan 100 A Merk FUJI
Saklar Broco Tunggal Standard
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
#VALUE!
39
40
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
41
42
43
bh
bh
15,000.00
30,000.00
15,000.00
30,000.00
#VALUE!
15,000.00
30,000.00
44
45
bh
bh
34,000.00
75,000.00
34,000.00
75,000.00
34,000.00
75,000.00
46
47
48
bh
bh
bh
54,000.00
150,000.00
200,000.00
54,000.00
150,000.00
200,000.00
54,000.00
150,000.00
200,000.00
49
50
bh
bh
160,000.00
325,000.00
160,000.00
325,000.00
160,000.00
325,000.00
51
52
53
bh
kg
ttk
27,000.00
40,000.00
225,000.00
27,000.00
40,000.00
225,000.00
27,000.00
40,000.00
225,000.00
54
Pentanahan Panel
ttk
100,000.00
100,000.00
100,000.00
T.
1
2
3
bh
bh
bh
137,500.00
113,500.00
125,000.00
137,500.00
113,500.00
125,000.00
137,500.00
113,500.00
125,000.00
4
5
6
7
8
unit
unit
bh
bh
bh
225,000.00
200,000.00
275,000.00
200,000.00
150,000.00
225,000.00
200,000.00
275,000.00
200,000.00
150,000.00
225,000.00
200,000.00
275,000.00
200,000.00
150,000.00
2
3
4
2
3
x
x
x
x
x
6 Prima
6 Prima
6 Prima
10 Prima
10 Prima
n/a
n/a
9
10
11
12
13
14
15
16
17
bh
bh
bh
bh
bh
ps
bh
bh
ps
70,000.00
75,000.00
200,000.00
40,000.00
45,000.00
27,000.00
12,000.00
7,000.00
15,000.00
70,000.00
75,000.00
200,000.00
40,000.00
45,000.00
27,000.00
12,000.00
7,000.00
15,000.00
70,000.00
75,000.00
200,000.00
40,000.00
45,000.00
27,000.00
12,000.00
7,000.00
15,000.00
18
19
20
21
22
ps
bh
bh
bh
bh
25,000.00
27,000.00
25,000.00
27,000.00
12,000.00
25,000.00
27,000.00
25,000.00
27,000.00
12,000.00
25,000.00
27,000.00
25,000.00
27,000.00
12,000.00
23
24
25
ps
ps
bh
30,000.00
25,000.00
10,000.00
30,000.00
25,000.00
10,000.00
30,000.00
25,000.00
10,000.00
U.
ton
kg
kg
kg
1,284,000.00
10,322.58
9,000.00
10,000.00
1,284,000.00
10,322.58
9,000.00
10,000.00
unit
unit
135,000.00
210,000.00
135,000.00
210,000.00
1
2
3
4
V.
1
2
1,284,000.00
10,322.58 1,600,000.00 /drum
9,000.00
10,000.00
135,000.00
210,000.00
3
4
unit
unit
280,000.00
600,000.00
280,000.00
600,000.00
280,000.00
600,000.00
5
6
7
8
9
unit
unit
unit
unit
unit
825,000.00
3,600,000.00
5,200,000.00
19,000,000.00
11,000,000.00
825,000.00
3,600,000.00
5,200,000.00
19,000,000.00
11,000,000.00
825,000.00
3,600,000.00
5,200,000.00
19,000,000.00
11,000,000.00
10
11
###
3,200,000.00
###
3,200,000.00
###
3,200,000.00
W
1
STANDARD RATA - RATA SEWA ALAT BERAT, KENDARAAN, TRUCK DAN LAINNYA
Asphal Finisher
jam
122,400.00
122,400.00
122,400.00
2
3
4
5
6
jam
jam
jam
jam
jam
n/a
n/a
3,391,400.00
3,391,400.00
50,000.00
50,000.00
220,000.00
220,000.00
52,800.00
52,800.00
7
8
9
10
11
jam
jam
jam
jam
jam
n/a
12
13
14
15
16
Draklint
Dump Truck 3 - 4 m3
Dump Truck 5 Ton 125 HP
Excavator 80 - 100 HP
Excavator Backhoe ( Long )
jam
jam
jam
jam
jam
n/a
17
18
19
20
jam
jam
jam
jam
n/a
21
22
23
24
jam
jam
jam
jam
25
26
Pick UP
Pneumatic Drill Hammer
jam
jam
n/a
n/a
27
28
29
jam
jam
jam
n/a
n/a
n/a
#VALUE!
192,000.00
#VALUE!
30
31
jam
jam
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
32
33
34
Stone Crusher
Tamper, Viberator Plate
Tandem Roller 6 - 8 Ton
jam
jam
jam
396,000.00
26,400.00
191,600.00
396,000.00
26,400.00
191,600.00
396,000.00
26,400.00
191,600.00
35
36
jam
jam
94,400.00
81,600.00
94,400.00
81,600.00
94,400.00
81,600.00
37
38
39
jam
jam
jam
n/a
n/a
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
#VALUE!
40
41
Truck 3/4
Truck Fuso
jam
jam
n/a
n/a
n/a
n/a
#VALUE!
#VALUE!
42
43
44
jam
jam
jam
n/a
46,200.00
18,600.00
300,600.00
n/a
46,200.00
18,600.00
300,600.00
#VALUE!
46,200.00
18,600.00
300,600.00
#VALUE!
122,200.00
135,500.00
250,000.00
#VALUE!
122,200.00
135,500.00
250,000.00
#VALUE!
n/a
n/a
122,200.00
135,500.00
250,000.00
n/a
n/a
n/a
250,000.00
218,100.00
28,000.00
250,000.00
218,100.00
28,000.00
48,700.00
n/a
48,700.00
n/a
208,000.00
38,300.00
208,000.00
38,300.00
n/a
n/a
20,700.00
81,600.00
220,000.00
#VALUE!
250,000.00
218,100.00
28,000.00
48,700.00
#VALUE!
208,000.00
38,300.00
#VALUE!
#VALUE!
n/a
192,000.00
#VALUE!
3,391,400.00
50,000.00
220,000.00
52,800.00
192,000.00
20,700.00
81,600.00
220,000.00
20,700.00
81,600.00
220,000.00
10
JENIS PEKERJAAN
HARGA SATUAN
PEKERJAAN PERSIAPAN
1 m' Pagar sementara dari kayu tinggi 2 m
128,290.00
2
3
193,860.00
159,040.00
4
5
97,140.00
994,010.00
6
7
510,870.00
10,500.00
8
9
48,460.00
567,580.00
10
11
12
243,730.00
95,670.00
115,340.00
13
14
859,980.00
429,990.00
15
16
1 m Bongkaran lantai
1 m Menurunkan atap genteng/sirap
240,900.00
3,300.00
17
18
19
20
PEKERJAAN TANAH
Menggali 1 m3 tanah biasa sedalam 1 meter
3,300.00
64,650.00
3,512,400.00
244,650.00
47,250.00
2
3
58,050.00
69,030.00
4
5
6
62,880.00
95,400.00
76,050.00
7
8
3,450.00
20,700.00
9
10
34,500.00
19,350.00
11
12
23,010.00
20,960.00
13
14
31,800.00
25,350.00
15
16
34,500.00
162,900.00
17
18
252,390.00
207,920.00
19
20
70,350.00
206,850.00
1
2
670,320.00
628,400.00
3
4
599,330.00
578,890.00
5
6
550,880.00
405,060.00
7
8
508,670.00
488,270.00
9
10
11
1
300,570.00
1,657,860.00
658,170.00
692,870.00
2
3
Membuat 1 m3 beton mutu f'c = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
Membuat 1 m3 beton mutu f'c = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
724,770.00
749,910.00
4
5
Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Membuat 1 m3 beton mutu f'c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
643,580.00
779,470.00
6
7
Membuat 1 m3 beton mutu f'c = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
Membuat 1 m3 beton mutu f'c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
807,970.00
828,920.00
NO
JENIS PEKERJAAN
HARGA SATUAN
3
8
9
Membuat 1 m3 beton mutu f'c = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
Membuat 1 m3 beton mutu f'c = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
843,280.00
995,920.00
10
11
Membuat 1 m3 beton mutu f'c = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
Membuat 1 m3 beton mutu f'c = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
875,630.00
1,102,160.00
12
13
Membuat 1 m3 beton mutu f'c = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48
Membuat 1 m3 beton kedap air dengan strorox - 100
949,460.00
665,020.00
14
15
73,410.00
91,330.00
16
17
#VALUE!
87,270.00
18
19
83,170.00
91,250.00
20
21
22
85,720.00
88,970.00
212,960.00
23
24
217,460.00
300,960.00
25
26
#VALUE!
206,060.00
27
28
51,980.00
2,543,750.00
29
30
3,055,800.00
5,212,500.00
31
32
4,080,950.00
3,894,490.00
33
34
3,726,250.00
3,842,600.00
35
36
47,770.00
67,120.00
1
2
20,050.00
22,350.00
3
4
5
6
7
8
#VALUE!
#VALUE!
9
10
#VALUE!
#VALUE!
11
12
#VALUE!
#VALUE!
13
14
15
16
17
14,250.00
27,690.00
18
19
28,500.00
33,120.00
20
21
Memasang 1 m' rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120, dinding partisi
Memasang 1 m' rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60, plafon
35,670.00
49,920.00
28,030.00
727,080.00
22,680.00
#VALUE!
12,220.00
49,920.00
237,930.00
PEKERJAAN DINDING
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
208,270.00
2
3
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
197,230.00
189,620.00
4
5
6
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP :
185,940.00
185,210.00
171,410.00
7
8
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP
100,240.00
94,910.00
9
10
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP
91,910.00
48,020.00
11
12
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP
Memasang 1 m2 dinding bata merah ukuran (5 x11 x 22) tebal 1/2 bata, campuran spesi 1 PC : 8 PP
89,100.00
87,020.00
NO
JENIS PEKERJAAN
HARGA SATUAN
13
14
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 KP
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM
85,870.00
#VALUE!
15
16
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal V2 bata, campuran spesi 1 KP : 1 SM
Memasang 1 m2 dinding HB/CB 20 , campuran spesi 1 PC : 3 PP
#VALUE!
256,620.00
17
18
257,620.00
#VALUE!
19
20
#VALUE!
#VALUE!
21
22
#VALUE!
#VALUE!
23
24
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
Memasang 1 m2 dinding bata berongga ekspose ukuran (5x11x24) cm, campuran spesi 1 PC : 3 PP
#VALUE!
#VALUE!
1
2
PEKERJAAN PLESTERAN
Membuat 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm
Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
53,550.00
47,730.00
3
4
45,250.00
43,530.00
5
6
42,600.00
41,830.00
7
8
41,430.00
41,020.00
9
10
42,580.00
40,680.00
11
12
13
14
63,880.00
51,370.00
15
16
17
58,220.00
57,040.00
55,960.00
18
19
#VALUE!
27,160.00
20
21
39,520.00
#VALUE!
22
23
#VALUE!
33,720.00
24
25
19,490.00
9,330.00
26
27
41,310.00
24,760.00
#VALUE!
#VALUE!
PEKERJAAN LANTAI
Memasang 1 m2 lantai ubin PC abu-abu ukuran (40 x 40) cm
#VALUE!
2
3
4
#VALUE!
#VALUE!
#VALUE!
5
6
#VALUE!
#VALUE!
7
8
#VALUE!
89,290.00
9
10
#VALUE!
#VALUE!
11
12
#VALUE!
#VALUE!
13
14
#VALUE!
#VALUE!
15
16
17
#VALUE!
#VALUE!
#VALUE!
18
19
#VALUE!
#VALUE!
20
21
#VALUE!
#VALUE!
22
23
23,640.00
#VALUE!
NO
JENIS PEKERJAAN
HARGA SATUAN
24
25
#VALUE!
#VALUE!
26
27
#VALUE!
#VALUE!
28
29
#VALUE!
#VALUE!
30
31
#VALUE!
#VALUE!
32
33
170,370.00
178,260.00
34
35
#VALUE!
208,430.00
36
37
38
199,460.00
#VALUE!
#VALUE!
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
187,190.00
#VALUE!
181,890.00
54
55
#VALUE!
#VALUE!
56
57
#VALUE!
#VALUE!
58
59
60
61
62
63
Memasang 1 m' plint Vinyl karet ukuran (15 x 30) cm dengan perekat
Memasang 1 m' plint kayu kelas II tebal 2Cm, Lebar 10 Cm
22,350.00
22,940.00
#VALUE!
#VALUE!
1,553,550.00
#VALUE!
#VALUE!
#VALUE!
KL. I
PEKERJAAN LANGIT-LANGIT
Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
#VALUE!
178,090.00
#VALUE!
#VALUE!
209,460.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
35,800.00
24,400.00
2
3
4
5
6
38,390.00
#VALUE!
7
8
35,490.00
#VALUE!
#VALUE!
23,200.00
9
10
1
PEKERJAAN KAYU
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
#VALUE!
#VALUE!
150,680.00
12,484,750.00
2
3
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II
8,650,250.00
9,034,020.00
4
5
6
Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas gudang sementara.
Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I
Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II
275,370.00
731,500.00
416,040.00
7
8
Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II
Membuat 1 m2 daun pintu kayu lapis (teakwood) rangkap, rangka tertutup kayu kelas II (lebar sampai
760,940.00
480,800.00
9
10
602,890.00
854,640.00
11
12
589,850.00
687,820.00
NO
JENIS PEKERJAAN
HARGA SATUAN
3
13
14
15
16
17
18
474,800.00
94,360.00
19
20
108,000.00
109,820.00
21
22
23
24
199,970.00
311,030.00
25
26
27
#VALUE!
258,100.00
51,710.00
28
7,706,200.00
13,555,150.00
8,467,950.00
334,800.00
98,910.00
99,460.00
65,750.00
1
2
39,610.00
#VALUE!
3
4
28,810.00
76,020.00
5
6
#VALUE!
72,820.00
7
8
#VALUE!
#VALUE!
9
10
#VALUE!
#VALUE!
11
12
13
54,840.00
#VALUE!
#VALUE!
14
15
#VALUE!
#VALUE!
16
17
#VALUE!
#VALUE!
18
19
#VALUE!
#VALUE!
20
21
#VALUE!
#VALUE!
22
23
#VALUE!
#VALUE!
24
25
#VALUE!
#VALUE!
26
27
28
#VALUE!
#VALUE!
#VALUE!
29
30
#VALUE!
703,210.00
31
32
#VALUE!
#VALUE!
33
34
35
36
37
38
41,020.00
33,060.00
39
40
41
24,040.00
#VALUE!
#VALUE!
42
66,580.00
81,770.00
#VALUE!
#VALUE!
#VALUE!
NO.
1
INDEKS
HARGA
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
UPAH (Rp)
JUMLAH HARGA
(Rp)
2.000
PEKERJAAN PERSIAPAN
1
22,000.00
27,500.00
27,500.00
1,250.00
6,250.00
6,250.00
1,025.00
0.005 m
205,000.00
1,025.00
0.009 m
Koral Beton
122,000.00
1,098.00
1,098.00
0.072 m
Kayu 5/7
650,000.00
46,800.00
46,800.00
0.060 kg
17,000.00
1,020.00
1,020.00
0.400 ltr
Residu
8,000.00
3,200.00
0.400 Oh
60,000.00
0.200 Oh
Tukang kayu
70,000.00
0.020 Oh
Kepala tukang
80,000.00
0.020 Oh
Mandor
90,000.00
3,200.00
24,000.00
14,000.00
24,000.00
1,600.00
1,800.00
1,600.00
Jumlah
0%
Jumlah
128,290.00
22,000.00
27,500.00
1,250.00
3,125.00
27,500.00
3,125.00
50,000.00
60,000.00
60,000.00
1,025.00
205,000.00
1,025.00
0.009 m
Koral Beton
122,000.00
1,098.00
1,098.00
0.072 m
Kayu 5/7
650,000.00
46,800.00
46,800.00
0.060 kg
17,000.00
1,020.00
1,020.00
0.450 ltr
Cat menie
22,000.00
9,900.00
0.200 Oh
60,000.00
0.400 Oh
Tukang kayu
70,000.00
0.020 Oh
Kepala tukang
80,000.00
0.020 Oh
Mandor
90,000.00
9,900.00
12,000.00
28,000.00
12,000.00
1,600.00
1,800.00
1,600.00
Jumlah
0%
Jumlah
1,800.00
193,868.00
Dibulatkan
193,860.00
28,000.00
193,868.00
Keuntungan Maksimal
Kawat berduri
22,000.00
22,000.00
1,250.00
2,500.00
22,000.00
2,500.00
3,800.00
95,000.00
95,000.00
0.005 m
205,000.00
1,025.00
1,025.00
0.009 m
Koral Beton
122,000.00
1,098.00
1,098.00
0.060 kg
17,000.00
1,020.00
0.200 Oh
60,000.00
0.300 Oh
Tukang kayu
70,000.00
0.020 Oh
Kepala tukang
80,000.00
0.020 Oh
Mandor
90,000.00
1,020.00
12,000.00
21,000.00
12,000.00
1,600.00
1,800.00
1,600.00
Jumlah
21,000.00
1,800.00
159,043.00
Keuntungan Maksimal
0%
Jumlah
159,043.00
Dibulatkan
4
128,293.00
Dibulatkan
1,800.00
128,293.00
Keuntungan Maksimal
14,000.00
159,040.00
650,000.00
4,550.00
4,550.00
0.120 m
650,000.00
78,000.00
78,000.00
0.020 kg
17,000.00
340.00
0.100 Oh
60,000.00
340.00
6,000.00
6,000.00
NO.
1
INDEKS
SATUAN
2.000
KEBUTUHAN
HARGA
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
UPAH (Rp)
JUMLAH HARGA
(Rp)
0.100 Oh
Tukang kayu
70,000.00
0.010 Oh
Kepala tukang
80,000.00
7,000.00
800.00
0.005 Oh
Mandor
90,000.00
450.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
7,000.00
800.00
450.00
97,140.00
0%
97,140.00
97,140.00
NO.
1
5
INDEKS
HARGA
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
UPAH (Rp)
JUMLAH HARGA
(Rp)
2.000
22,000.00
27,500.00
27,500.00
### 432,000.00
432,000.00
0.080 kg
17,000.00
1,360.00
1,360.00
1.100 kg
Besi strip
13,000.00
14,300.00
14,300.00
35.000 kg
1,250.00
43,750.00
43,750.00
0.150 m
Pasir pasang
195,000.00
29,250.00
29,250.00
0.100 m
205,000.00
20,500.00
20,500.00
0.150 m
Koral Beton
122,000.00
18,300.00
18,300.00
600.00
18,000.00
18,000.00
30.000 bh
Semen PC @ 50 kg
0.250 lbr
44,000.00
11,000.00
11,000.00
0.200 bh
25,000.00
5,000.00
5,000.00
0.080 m
51,000.00
4,080.00
4,080.00
0.150 bh
Kunci tanam
45,000.00
6,750.00
6,750.00
0.060 lbr
62,100.00
3,726.00
2.000 Oh
60,000.00
1.000 Oh
Tukang batu
70,000.00
2.000 Oh
Tukang kayu
70,000.00
0.300 Oh
Kepala tukang
0.050 Oh
Mandor
3,726.00
###
70,000.00
120,000.00
140,000.00
80,000.00
###
24,000.00
90,000.00
4,500.00
Jumlah
0%
Jumlah
994,010.00
37,400.00
37,400.00
650,000.00 136,500.00
22,000.00
136,500.00
17,000.00
5,100.00
5,100.00
1,250.00
13,125.00
13,125.00
6,150.00
0.030 m
205,000.00
6,150.00
0.050 m
122,000.00
6,100.00
6,100.00
50,000.00
75,000.00
75,000.00
0.250 lbr
Koral Beton
Atap seng gelombang bjls 20 uk. 0,914 x
1,829 (m)
Seng plat BJLS 27 uk. 0.9 x 1.83 (m)
44,000.00
11,000.00
1.000 Oh
60,000.00
2.000 Oh
Tukang kayu
70,000.00
0.200 Oh
Kepala tukang
80,000.00
0.050 Oh
Mandor
90,000.00
1.500 lbr
11,000.00
60,000.00
###
16,000.00
4,500.00
Jumlah
60,000.00
140,000.00
16,000.00
4,500.00
510,875.00
Keuntungan Maksimal
0%
Jumlah
510,875.00
Dibulatkan
510,870.00
60,000.00
6,000.00
0.050 Oh
Mandor
90,000.00
4,500.00
Jumlah
6,000.00
4,500.00
10,500.00
Keuntungan Maksimal
0%
Jumlah
10,500.00
Dibulatkan
8
4,500.00
994,016.00
Dibulatkan
24,000.00
994,016.00
Keuntungan Maksimal
70,000.00
10,500.00
650,000.00
23,400.00
23,400.00
0.080 kg
17,000.00
1,360.00
1,360.00
650,000.00
0.00
0.300 Oh
Tukang kayu
70,000.00
0.030 Oh
Mandor
90,000.00
0.00
21,000.00
2,700.00
21,000.00
2,700.00
NO.
1
INDEKS
2.000
HARGA
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
UPAH (Rp)
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
JUMLAH HARGA
(Rp)
48,460.00
0%
48,460.00
48,460.00
NO.
1
9
INDEKS
HARGA
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
UPAH (Rp)
JUMLAH HARGA
(Rp)
2.000
27,500.00
27,500.00
650,000.00 120,900.00
22,000.00
120,900.00
17,000.00
5,100.00
5,100.00
1,250.00
22,500.00
22,500.00
6,150.00
0.030 m
205,000.00
6,150.00
0.050 m
122,000.00
6,100.00
6,100.00
50,000.00
75,000.00
75,000.00
1.350 lbr
Koral Beton
Atap seng gelombang bjls 20 uk. 0,914 x
1,829 (m)
Tripleks uk. 1,22 x 2,44 (m), tebal 4 mm
62,100.00
83,835.00
1.000 Oh
60,000.00
2.000 Oh
Tukang kayu
70,000.00
0.200 Oh
Kepala tukang
80,000.00
0.050 Oh
Mandor
90,000.00
1.500 lbr
83,835.00
60,000.00
###
16,000.00
4,500.00
Jumlah
0%
Jumlah
567,580.00
1.250 btg
17,100.00
21,375.00
0.186 m
Tali ijuk
10,000.00
1,860.00
1.000 Oh
60,000.00
2.000 Oh
Tukang kayu
70,000.00
0.200 Oh
Kepala tukang
80,000.00
0.050 Oh
Mandor
90,000.00
21,375.00
1,860.00
60,000.00
###
16,000.00
4,500.00
60,000.00
140,000.00
16,000.00
4,500.00
243,735.00
Keuntungan Maksimal
0%
Jumlah
243,735.00
Dibulatkan
243,730.00
130,000.00
19,500.00
19,500.00
0.090 m
153,000.00
13,770.00
13,770.00
0.010 m
Pasir pasang
195,000.00
1,950.00
1.000 Oh
60,000.00
0.005 Oh
Mandor
90,000.00
1,950.00
60,000.00
450.00
Jumlah
60,000.00
450.00
95,670.00
Keuntungan Maksimal
0%
Jumlah
95,670.00
Dibulatkan
95,670.00
130,000.00
35,750.00
35,750.00
0.030 m
153,000.00
4,590.00
4,590.00
0.050 m
120,000.00
6,000.00
1.000 Oh
60,000.00
60,000.00
0.100 Oh
Mandor
90,000.00
9,000.00
6,000.00
Jumlah
60,000.00
9,000.00
115,340.00
Keuntungan Maksimal
0%
Jumlah
115,340.00
Dibulatkan
13
Jumlah
12
4,500.00
567,585.00
Dibulatkan
11
16,000.00
567,585.00
Keuntungan Maksimal
10
60,000.00
140,000.00
115,340.00
60,000.00
###
Mandor
90,000.00
59,940.00
Jumlah
Keuntungan Maksimal
Jumlah
800,040.00
59,940.00
859,980.00
0%
859,980.00
NO.
1
INDEKS
2.000
Dibulatkan
HARGA
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
UPAH (Rp)
JUMLAH HARGA
(Rp)
8
859,980.00
NO.
1
14
INDEKS
HARGA
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
UPAH (Rp)
JUMLAH HARGA
(Rp)
2.000
60,000.00
###
0.333 Oh
Mandor
90,000.00
29,970.00
Jumlah
0%
Jumlah
429,990.00
1 m Bongkaran lantai
2.000 Oh
60,000.00
###
0.100 Oh
Mandor
90,000.00
9,000.00
Jumlah
0%
Jumlah
240,900.00
0.200 Oh
60,000.00
0.100 Oh
Mandor
90,000.00
12,000.00
9,000.00
2,400.00
900.00
3,300.00
Keuntungan Maksimal
0%
Jumlah
3,300.00
Dibulatkan
3,300.00
60,000.00
0.100 Oh
Mandor
90,000.00
12,000.00
9,000.00
Jumlah
2,400.00
900.00
3,300.00
Keuntungan Maksimal
0%
Jumlah
3,300.00
Dibulatkan
3,300.00
Tukang kayu
70,000.00
17,500.00
4,375.00
0.025 Oh
Kepala tukang
80,000.00
1.000 Oh
60,000.00
2,000.00
60,000.00
60,000.00
0.050 Oh
Mandor
90,000.00
4,500.00
Jumlah
50.00
225.00
64,650.00
Keuntungan Maksimal
0%
Jumlah
64,650.00
Dibulatkan
64,650.00
Tukang kayu
70,000.00
###
2,520,000.00
0.600 Oh
Kepala tukang
80,000.00
4.000 Oh
60,000.00
48,000.00
###
960,000.00
0.200 Oh
Mandor
90,000.00
18,000.00
Jumlah
28,800.00
3,600.00
3,512,400.00
Keuntungan Maksimal
0%
Jumlah
3,512,400.00
Dibulatkan
20
Jumlah
19
900.00
240,900.00
Dibulatkan
18
240,000.00
240,900.00
Keuntungan Maksimal
17
429,990.00
Dibulatkan
16
29,970.00
429,990.00
Keuntungan Maksimal
15
400,020.00
3,512,400.00
Tukang kayu
70,000.00
0.025 Oh
Kepala tukang
80,000.00
2.000 Oh
60,000.00
17,500.00
2,000.00
###
0.050 Oh
Mandor
90,000.00
4,500.00
Jumlah
Keuntungan Maksimal
Jumlah
4,375.00
50.00
240,000.00
225.00
244,650.00
0%
244,650.00
NO.
1
INDEKS
2.000
Dibulatkan
HARGA
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
UPAH (Rp)
JUMLAH HARGA
(Rp)
8
244,650.00
HARGA
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
PEKERJAAN TANAH
1
OH
Pekerja
60,000.00
0.025
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
2
OH
Pekerja
60,000.00
0.045
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
3
OH
Pekerja
60,000.00
0.067
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
4
OH
Pekerja
60,000.00
0.032
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
5
OH
Pekerja
60,000.00
0.060
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
6
OH
Pekerja
60,000.00
0.045
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
7
0%
0.050
OH
Pekerja
60,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
8
OH
Pekerja
60,000.00
0.010
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
9
OH
Pekerja
60,000.00
0.050
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
10
OH
Pekerja
60,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
11
OH
Pekerja
60,000.00
0.022
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
12
OH
Pekerja
60,000.00
0.011
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
13
OH
Pekerja
60,000.00
0.020
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
0%
14
OH
Pekerja
60,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
15
OH
Pekerja
60,000.00
0.050
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
16
m3
Pasir urug
120,000.00 144,000.00
0.300
OH
Pekerja
60,000.00
0.010
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
17
m3
Kapur padam
0.400
Pasir pasang
0.948
m3
Tanah liat
0.800
OH
Pekerja
60,000.00
0.400
OH
Tukang batu
70,000.00
0.040
OH
Kepala tukang
80,000.00
0.080
OH
Mandor
90,000.00
90,000.00
12,150.00
195,000.00
78,000.00
80,000.00
75,840.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
18
m3
Kapur padam
90,000.00
22,320.00
1.240
Tanah liat
80,000.00
99,200.00
0.800
OH
Pekerja
60,000.00
0.400
OH
Tukang batu
70,000.00
0.040
OH
Kepala tukang
80,000.00
0.080
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
19
kg
Ijuk
10,000.00
0.150
OH
Pekerja
60,000.00
60,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
20
m3
Sirtu
158,000.00 189,600.00
0.250
OH
Pekerja
60,000.00
0.025
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
0%
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
45,000.00
45,000.00
2,250.00
2,250.00
47,250.00
0%
0.00
47,250.00
47,250.00
54,000.00
54,000.00
4,050.00
4,050.00
58,050.00
0%
0.00
58,050.00
58,050.00
63,000.00
63,000.00
6,030.00
6,030.00
69,030.00
0%
0.00
69,030.00
69,030.00
60,000.00
2,880.00
60,000.00
2,880.00
62,880.00
0%
0.00
62,880.00
62,880.00
90,000.00
90,000.00
5,400.00
5,400.00
95,400.00
0%
0.00
95,400.00
95,400.00
72,000.00
72,000.00
4,050.00
4,050.00
76,050.00
0%
0.00
76,050.00
76,050.00
3,000.00
3,000.00
450.00
450.00
3,450.00
0%
0.00
3,450.00
3,450.00
19,800.00
900.00
19,800.00
900.00
20,700.00
0%
0.00
20,700.00
20,700.00
30,000.00
30,000.00
4,500.00
4,500.00
34,500.00
0%
0.00
34,500.00
34,500.00
18,000.00
18,000.00
1,350.00
1,350.00
19,350.00
0%
0.00
19,350.00
19,350.00
21,000.00
21,000.00
2,010.00
2,010.00
23,010.00
0%
0.00
23,010.00
23,010.00
20,000.00
960.00
20,000.00
960.00
20,960.00
0%
0.00
20,960.00
20,960.00
30,000.00
30,000.00
1,800.00
1,800.00
31,800.00
0%
0.00
31,800.00
31,800.00
24,000.00
24,000.00
1,350.00
1,350.00
25,350.00
0%
0.00
25,350.00
25,350.00
30,000.00
30,000.00
4,500.00
4,500.00
34,500.00
0%
0.00
34,500.00
34,500.00
144,000.00
18,000.00
18,000.00
900.00
900.00
162,900.00
0%
0.00
162,900.00
162,900.00
sasi tanah.
12,150.00
78,000.00
75,840.00
48,000.00
48,000.00
28,000.00
28,000.00
3,200.00
3,200.00
7,200.00
7,200.00
252,390.00
0%
0.00
252,390.00
252,390.00
22,320.00
99,200.00
48,000.00
48,000.00
28,000.00
28,000.00
3,200.00
3,200.00
7,200.00
7,200.00
207,920.00
0%
0.00
207,920.00
207,920.00
60,000.00
9,000.00
9,000.00
1,350.00
1,350.00
70,350.00
0%
0.00
70,350.00
70,350.00
189,600.00
15,000.00
2,250.00
15,000.00
2,250.00
206,850.00
0%
0.00
206,850.00
206,850.00
HARGA
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN (Rp)
PEKERJAAN PONDASI
1
M3
202.000
Kg
Portland Cement
0.485
Pasir Pasang
1.500
OH
Pekerja
60,000.00
0.750
OH
Tukang batu
70,000.00
0.075
OH
Kepala tukang
80,000.00
0.075
OH
Mandor
90,000.00
###
1,250.00
###
168,000.00
252,500.00
94,575.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
2
M3
163.000
Kg
Portland Cement
0.520
Pasir Pasang
1.500
OH
Pekerja
60,000.00
0.750
OH
Tukang batu
70,000.00
0.075
OH
Kepala tukang
80,000.00
0.075
OH
Mandor
90,000.00
###
1,250.00
###
168,000.00
203,750.00
101,400.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
3
M3
136.000
Kg
Portland Cement
0.544
Pasir Pasang
1.500
OH
Pekerja
60,000.00
0.750
OH
Tukang batu
70,000.00
0.075
OH
Kepala tukang
80,000.00
0.075
OH
Mandor
90,000.00
###
1,250.00
###
168,000.00
170,000.00
106,080.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
4
m3
117.000
kg
Portland Cement
Pasir Pasang
0.561
###
1,250.00
###
168,000.00
146,250.00
109,395.00
1.500
OH
Pekerja
60,000.00
0.750
OH
Tukang batu
70,000.00
0.075
OH
Kepala tukang
80,000.00
0.075
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
5
m3
91.000
kg
Portland Cement
0.584
Pasir Pasang
1.500
OH
Pekerja
60,000.00
0.750
OH
Tukang batu
70,000.00
0.075
OH
Kepala tukang
80,000.00
0.075
OH
Mandor
90,000.00
###
1,250.00
###
168,000.00
113,750.00
113,880.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
6
m3
0.170
###
Kapur
0.170
Portland Cement
0.340
Pasir Pasang
1.500
OH
Pekerja
60,000.00
0.750
OH
Tukang batu
70,000.00
0.075
OH
Kepala tukang
80,000.00
0.075
OH
Mandor
90,000.00
168,000.00
90,000.00
15,300.00
1,250.00
212.50
###
66,300.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
7
m3
61.000
kg
Portland Cement
0.147
Kapur padam
0.492
m3
Pasir Pasang
1.500
OH
Pekerja
60,000.00
0.750
OH
Tukang batu
70,000.00
0.075
OH
Kepala tukang
80,000.00
0.075
OH
Mandor
90,000.00
###
168,000.00
1,250.00
76,250.00
90,000.00
13,230.00
###
95,940.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
8
m3
41.000
kg
Portland Cement
0.131
Kapur padam
0.523
m3
Pasir Pasang
1.500
OH
Pekerja
60,000.00
0.750
OH
Tukang batu
70,000.00
0.075
OH
Kepala tukang
80,000.00
0.075
OH
Mandor
90,000.00
###
1,250.00
90,000.00
###
168,000.00
51,250.00
11,790.00
101,985.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
9
m3
###
168,000.00
###
51,840.00
0.432
0.780
OH
Pekerja
60,000.00
0.390
OH
Tukang batu
70,000.00
0.039
OH
Kepala tukang
80,000.00
0.039
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
10
Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
0.480
m3
194.000
kg
Portland Cement
0.312
Pasir beton
###
63,960.00
0.468
m3
Kerikil
###
71,604.00
126.000
kg
Besi beton
1.800
kg
3.400
0.850
###
1,250.00
67,200.00
242,500.00
7,000.00
882,000.00
Kawat beton
25,000.00
45,000.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.085
OH
Kepala tukang
80,000.00
0.170
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
11
m3
###
194.000
kg
Portland Cement
0.312
Pasir beton
###
63,960.00
0.468
Kerikil
###
71,604.00
1,250.00
63,000.00
242,500.00
2.400
OH
Pekerja
60,000.00
0.800
OH
Tukang batu
70,000.00
0.080
OH
Kepala tukang
80,000.00
0.119
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
168,000.00
252,500.00
94,575.00
90,000.00
90,000.00
52,500.00
52,500.00
6,000.00
6,000.00
6,750.00
6,750.00
670,325.00
670,325.00
670,320.00
168,000.00
203,750.00
101,400.00
90,000.00
90,000.00
52,500.00
52,500.00
6,000.00
6,000.00
6,750.00
6,750.00
628,400.00
628,400.00
628,400.00
168,000.00
170,000.00
106,080.00
90,000.00
90,000.00
52,500.00
52,500.00
6,000.00
6,000.00
6,750.00
6,750.00
599,330.00
599,330.00
599,330.00
168,000.00
146,250.00
109,395.00
3.26
90,000.00
90,000.00
52,500.00
52,500.00
6,000.00
6,000.00
6,750.00
6,750.00
578,895.00
578,895.00
578,890.00
168,000.00
113,750.00
113,880.00
90,000.00
90,000.00
52,500.00
52,500.00
6,000.00
6,000.00
6,750.00
6,750.00
550,880.00
550,880.00
550,880.00
168,000.00
15,300.00
212.50
66,300.00
90,000.00
90,000.00
52,500.00
52,500.00
6,000.00
6,000.00
6,750.00
6,750.00
405,062.50
405,062.50
405,060.00
168,000.00
76,250.00
13,230.00
95,940.00
90,000.00
90,000.00
52,500.00
52,500.00
6,000.00
6,000.00
6,750.00
6,750.00
508,670.00
508,670.00
508,670.00
168,000.00
51,250.00
11,790.00
101,985.00
90,000.00
90,000.00
52,500.00
52,500.00
6,000.00
6,000.00
6,750.00
6,750.00
488,275.00
488,275.00
488,270.00
168,000.00
51,840.00
46,800.00
46,800.00
27,300.00
27,300.00
3,120.00
3,120.00
3,510.00
3,510.00
300,570.00
300,570.00
300,570.00
204,000.00
59,500.00
59,500.00
6,800.00
6,800.00
15,300.00
15,300.00
1,657,864.00
1,657,864.00
1,657,860.00
63,000.00
242,500.00
63,960.00
71,604.00
144,000.00
144,000.00
56,000.00
56,000.00
6,400.00
6,400.00
10,710.00
10,710.00
658,174.00
658,174.00
658,170.00
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA,
SATUAN (Rp)
PEKERJAAN BETON
1
Membuat 1 m3 beton mutu f'c = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
247.000
kg
Portland Cement
869.000
kg
Pasir Beton
146.43
999.000
kg
126.90
215.000
Liter
Air
1,250.00
10.00
1.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
0.028
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
2
Membuat 1 m3 beton mutu f'c = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
276.000
kg
Portland Cement
828.000
kg
Pasir Beton
146.43
1,012.000
kg
126.90
215.000
Liter
Air
1,250.00
10.00
1.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
0.028
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
3
Membuat 1 m3 beton mutu f'c = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
299.000
kg
Portland Cement
799.000
kg
Pasir Beton
146.43
1,017.000
kg
126.90
215.000
Liter
Air
1,250.00
10.00
1.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
0.028
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
4
Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 MPa (K 100), slump (3-6) cm,
230.000
kg
Portland Cement
1,250.00
893.000
kg
Pasir Beton
146.43
1,027.000
kg
126.90
w/c = 0,87
200.000
Liter
Air
10.00
1.200
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.060
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
5
Membuat 1 m3 beton mutu f'c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
326.000
kg
Portland Cement
760.000
kg
Pasir Beton
146.43
kg
126.90
1,029.000
215.000
Liter
Air
1,250.00
10.00
1.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
0.028
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
6
Membuat 1 m3 beton mutu f'c = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
352.000
kg
Portland Cement
731.000
kg
Pasir Beton
146.43
1,031.000
kg
126.90
215.000
Liter
Air
1,250.00
10.00
1.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
0.028
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
7
Membuat 1 m3 beton mutu f'c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
371.000
kg
Portland Cement
698.000
kg
Pasir Beton
146.43
1,047.000
kg
126.90
215.000
Liter
Air
1,250.00
10.00
1.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
0.028
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
Membuat 1 m3 beton mutu f'c = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
384.000
kg
Portland Cement
692.000
kg
Pasir Beton
146.43
1,039.000
kg
126.90
215.000
Liter
Air
1,250.00
10.00
1.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
0.028
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
9
Membuat 1 m3 beton mutu f'c = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
406.000
kg
Portland Cement
684.000
kg
Pasir Beton
146.43
kg
126.90
1,026.000
215.000
Liter
Air
1,250.00
10.00
1.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
0.028
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
10
Membuat 1 m3 beton mutu f'c = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
413.000
kg
Portland Cement
681.000
Pasir Beton
146.43
126.90
1,021.000
215.000
m3
Liter
Air
1,250.00
10.00
1.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
0.028
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
11
Membuat 1 m3 beton mutu f'c = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
439.000
kg
Portland Cement
670.000
kg
Pasir Beton
146.43
1,006.000
kg
126.90
215.000
Liter
Air
1,250.00
10.00
2.100
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.105
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
12
Membuat 1 m3 beton mutu f'c = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48
448.000
kg
Portland Cement
667.000
kg
Pasir Beton
146.43
1,000.000
kg
126.90
215.000
Liter
Air
1,250.00
10.00
2.100
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.105
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
13
kg
Portland Cement
0.480
Pasir Beton
146.43
0.800
m/
KR (Kerikil 2cm/3cm)
126.90
1.200
kg
Strorox-100
210.000
3
3
Liter
Air
1,250.00
10.00
2.100
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.105
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
14
64,000.00
0.060
OH
Pekerja
60,000.00
0.030
OH
Tukang batu
70,000.00
0.003
OH
Kepala tukang
80,000.00
0.003
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
15
80,000.00
0.070
OH
Pekerja
60,000.00
0.035
OH
Tukang batu
70,000.00
0.004
OH
Kepala tukang
80,000.00
0.004
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
16
0.080
OH
Pekerja
n.a
60,000.00
0.040
OH
Tukang batu
70,000.00
0.004
OH
Kepala tukang
80,000.00
0.004
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
17
kg
7,000.00
0.150
kg
Kawat beton
25,000.00
0.070
OH
Pekerja
60,000.00
0.070
OH
Tukang besi
70,000.00
0.007
OH
Kepala tukang
80,000.00
0.004
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
18
kg
7,000.00
0.100
kg
Kawat beton
25,000.00
0.050
OH
Pekerja
60,000.00
0.050
OH
Tukang besi
70,000.00
0.005
OH
Kepala tukang
80,000.00
0.003
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
19
kg
0.050
kg
Kawat beton
25,000.00
8,300.00
0.025
OH
Pekerja
60,000.00
0.025
OH
Tukang besi
70,000.00
0.025
OH
Kepala tukang
80,000.00
0.001
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
20
m3
650,000.00
0.300
kg
0.100
Liter
Paku 5 cm - 10 cm
0.520
OH
Pekerja
60,000.00
0.260
OH
Tukang kayu
70,000.00
0.026
OH
Kepala tukang
80,000.00
0.026
OH
Mandor
90,000.00
Minyak bekisting
17,000.00
8,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
21
m3
0.300
kg
Paku 5 cm - 10 cm
0.100
Liter
0.520
OH
Pekerja
60,000.00
0.260
OH
Tukang kayu
70,000.00
0.026
OH
Kepala tukang
80,000.00
0.026
OH
Mandor
90,000.00
Minyak bekisting
650,000.00
17,000.00
8,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
22
m3
0.400
kg
Paku 5 cm-12 cm
17,000.00
0.200
Liter
Minyak bekisting
8,000.00
0.015
0.350
Lbr
2.000
Batang
22,000.00
0.660
OH
Pekerja
60,000.00
0.330
OH
Tukang kayu
70,000.00
0.033
OH
Kepala tukang
80,000.00
0.033
OH
Mandor
90,000.00
650,000.00
1,500,000.00
125,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
23
0.400
kg
Paku 5 cm-12 cm
0.200
Liter
Minyak bekisting
0.018
m3
0.350
Lbr
Multipleks tebal 9 mm
2.000
Batang
0.660
0.330
650,000.00
17,000.00
8,000.00
1,500,000.00
125,000.00
22,000.00
OH
Pekerja
60,000.00
OH
Tukang kayu
70,000.00
0.033
OH
Kepala tukang
80,000.00
0.033
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
24
m3
0.400
kg
Paku 5 cm-12 cm
17,000.00
0.200
Liter
Minyak bekisting
8,000.00
0.015
0.350
Lbr
6.000
Batang
0.660
OH
Multipleks tebal 9 mm
Dolken kayu galam, (8-10) cm, panjang 4
m
Pekerja
0.330
OH
Tukang kayu
70,000.00
0.033
OH
Kepala tukang
80,000.00
0.033
OH
Mandor
90,000.00
650,000.00
1,500,000.00
125,000.00
22,000.00
60,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
25
m3
0.400
kg
Paku 5 cm -12 cm
0.200
Liter
Minyak bekisting
0.020
650,000.00
17,000.00
8,000.00
1,500,000.00
0.350
Lbr
3.000
Batang
125,000.00
4.000
Buah
0.660
OH
Pekerja
60,000.00
0.330
OH
Tukang kayu
70,000.00
0.033
OH
Kepala tukang
80,000.00
0.033
OH
Mandor
90,000.00
22,000.00
n.a
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
26
m3
0.400
kg
Paku 5 cm-12 cm
17,000.00
0.150
Liter
Minyak bekisting
8,000.00
0.015
650,000.00
1,500,000.00
0.350
Lbr
2.000
Batang
0.660
OH
Plywood tebal 9 mm
Dolken kayu galam, (8-10) cm, panjang 4
m
Pekerja
0.330
OH
Tukang kayu
70,000.00
0.033
OH
Kepala tukang
80,000.00
0.033
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
125,000.00
22,000.00
60,000.00
Jumlah
Dibulatkan
27
m3
650,000.00
0.600
kg
Batang
0.150
OH
Paku 5 cm-12 cm
Dolken kayu galam (kaso), (8-10) cm, p 4
m
Pekerja
17,000.00
0.500
0.050
OH
Tukang kayu
70,000.00
0.005
OH
Kepala tukang
80,000.00
0.008
OH
Mandor
90,000.00
22,000.00
60,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
28
m3
650,000.00
1.500
kg
Paku 5 cm-12 cm
17,000.00
0.400
Liter
Minyak bekisting
8,000.00
157.500
kg
7,000.00
2.250
kg
Kawat beton
336.000
kg
Portland Cement
0.540
m3
Pasir Beton
205,000.00
0.810
m3
Kerikil 2/3
184,000.00
5.300
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
1.300
OH
Tukang kayu
70,000.00
1.050
OH
Tukang besi
70,000.00
0.262
OH
Kepala tukang
80,000.00
0.265
OH
Mandor
90,000.00
25,000.00
1,250.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
29
m3
650,000.00
2.000
kg
Paku 5 cm-12cm
17,000.00
0.600
Liter
Minyak bekisting
8,000.00
210.000
kg
7,000.00
3.000
kg
Kawat beton
336.000
kg
Portland Cement
0.540
Pasir Beton
205,000.00
0.810
m3
Kerikil 2/3
184,000.00
5.650
OH
Pekerja
60,000.00
0.275
OH
Tukang batu
70,000.00
1.560
OH
Tukang kayu
70,000.00
1.400
OH
Tukang besi
70,000.00
0.323
OH
Kepala tukang
80,000.00
0.283
OH
Mandor
90,000.00
25,000.00
1,250.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
30
m3
4.000
kg
Paku 5 cm - 12 cm
2.000
Liter
Minyak bekisting
315.000
kg
4.500
kg
Kawat beton
336.000
kg
Portland Cement
0.540
Pasir Beton
0.810
Kerikil 2/3
0.150
m3
3.500
Lembar
20.000
Batang
650,000.00
17,000.00
8,000.00
7,000.00
25,000.00
1,250.00
205,000.00
184,000.00
1,500,000.00
7.050
OH
Multipleks 9 mm
Dolken kayu galam, (8-10) cm, panjang 4
m
Pekerja
125,000.00
0.275
OH
Tukang batu
70,000.00
1.650
OH
Tukang kayu
70,000.00
2.100
OH
Tukang besi
70,000.00
0.403
OH
Kepala tukang
80,000.00
0.353
OH
Mandor
90,000.00
22,000.00
60,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
31
m3
3.200
kg
Paku 5 cm-12 cm
17,000.00
1.600
Liter
Minyak bekisting
8,000.00
210.000
kg
7,000.00
3.000
kg
Kawat beton
336.000
kg
Portland Cement
0.540
m3
Pasir Beton
205,000.00
0.810
m3
Kerikil 2/3
184,000.00
0.140
2.800
Lembar
16.000
Batang
650,000.00
25,000.00
1,250.00
1,500,000.00
6.350
OH
Multipleks 9 mm
Dolken kayu galam, (8-10) cm, panjang 4
m
Pekerja
0.275
OH
Tukang batu
70,000.00
1.650
OH
Tukang kayu
70,000.00
1.400
OH
Tukang besi
70,000.00
0.333
OH
Kepala tukang
80,000.00
0.318
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
125,000.00
22,000.00
60,000.00
32
m3
3.200
kg
Paku 5 cm-12 cm
17,000.00
1.600
Liter
Minyak bekisting
8,000.00
157.500
kg
2.250
kg
Kawat beton
336.000
kg
Portland Cement
0.540
Pasir Beton
0.810
Kerikil 2/3
0.120
m3
2.800
Lembar
32.000
Batang
650,000.00
7,000.00
25,000.00
1,250.00
205,000.00
184,000.00
1,500,000.00
5.300
OH
Plywood 9 mm
Dolken kayu galam, (8-10) cm, panjang 4
m
Pekerja
125,000.00
0.275
OH
Tukang batu
70,000.00
1.300
OH
Tukang kayu
70,000.00
1.050
OH
Tukang besi
70,000.00
0.265
OH
Kepala tukang
80,000.00
0.265
OH
Mandor
90,000.00
22,000.00
60,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
33
m3
3.200
kg
Paku 5 cm-12 cm
17,000.00
1.600
Liter
Minyak bekisting
8,000.00
157.500
kg
7,000.00
2.250
kg
Kawat beton
336.000
kg
Portland Cement
0.540
m3
Pasir Beton
205,000.00
0.810
m3
Kerikil 2/3
184,000.00
0.160
2.800
Lembar
24.000
Batang
650,000.00
25,000.00
1,250.00
1,500,000.00
5.300
OH
Plywood 9 mm
Dolken kayu galam, (8-10) cm, panjang 4
m
Pekerja
125,000.00
0.275
OH
Tukang batu
70,000.00
1.300
OH
Tukang kayu
70,000.00
1.050
OH
Tukang besi
70,000.00
0.262
OH
Kepala tukang
80,000.00
0.265
OH
Mandor
90,000.00
22,000.00
60,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
34
m3
3.000
kg
Paku 5 cm - 12 cm
1.200
Liter
Minyak bekisting
650,000.00
17,000.00
8,000.00
210.000
kg
3.000
kg
Kawat beton
336.000
kg
Portland Cement
0.540
Pasir Beton
0.810
Kerikil 2/3
0.105
m3
2.500
Lembar
14.000
Batang
7,000.00
25,000.00
1,250.00
205,000.00
184,000.00
1,500,000.00
5.650
OH
Plywood 9 mm
Dolken kayu galam, (8-10) cm, panjang 4
m
Pekerja
0.275
OH
Tukang batu
70,000.00
1.560
OH
Tukang kayu
70,000.00
1.400
OH
Tukang besi
70,000.00
Kepala tukang
80,000.00
Mandor
90,000.00
0.323 OH
0.283
OH
125,000.00
22,000.00
60,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
35
m3
0.010
kg
Paku 5 cm-12 cm
3.000
kg
0.045
kg
Kawat beton
4.000
kg
Portland Cement
0.006
Pasir Beton
205,000.00
0.009
m3
Kerikil 2/3
184,000.00
0.180
OH
Pekerja
60,000.00
0.020
OH
Tukang batu
70,000.00
0.020
OH
Tukang kayu
70,000.00
0.020
OH
Tukang besi
70,000.00
0.006
OH
Kepala tukang
80,000.00
0.009
OH
Mandor
90,000.00
650,000.00
17,000.00
7,000.00
25,000.00
1,250.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
36
m3
650,000.00
0.020
kg
Paku 5 cm-12 cm
3.600
kg
0.050
kg
Kawat beton
5.500
kg
Portland Cement
0.009
Pasir Beton
205,000.00
0.015
Kerikil 2/3
184,000.00
0.297
OH
Pekerja
60,000.00
0.033
OH
Tukang batu
70,000.00
0.033
OH
Tukang kayu
70,000.00
0.033
OH
Tukang besi
70,000.00
17,000.00
7,000.00
25,000.00
1,250.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
HARGA
BAHAN (Rp)
UPAH (Rp)
JUMLAH HARGA
(Rp)
308,750.00
127,246.43
127,246.43
126,769.66
126,769.66
2,150.00
2,150.00
99,000.00
99,000.00
19,250.00
19,250.00
2,240.00
2,240.00
7,470.00
7,470.00
692,876.08
692,876.08
692,870.00
345,000.00
121,242.86
121,242.86
128,419.31
128,419.31
2,150.00
2,150.00
99,000.00
99,000.00
19,250.00
19,250.00
2,240.00
2,240.00
7,470.00
7,470.00
724,772.17
724,772.17
724,770.00
mp (3-6) cm,
373,750.00
373,750.00
116,996.43
116,996.43
129,053.79
129,053.79
2,150.00
2,150.00
99,000.00
99,000.00
19,250.00
19,250.00
2,240.00
2,240.00
7,470.00
7,470.00
749,910.22
749,910.22
749,910.00
w/c = 0,87
287,500.00
287,500.00
130,760.71
130,760.71
130,322.76
130,322.76
2,000.00
2,000.00
72,000.00
72,000.00
14,000.00
14,000.00
1,600.00
1,600.00
5,400.00
5,400.00
643,583.47
643,583.47
643,580.00
407,500.00
111,285.71
111,285.71
130,576.55
130,576.55
2,150.00
2,150.00
99,000.00
99,000.00
19,250.00
19,250.00
2,240.00
2,240.00
7,470.00
7,470.00
779,472.27
779,472.27
779,470.00
440,000.00
107,039.29
107,039.29
130,830.34
130,830.34
2,150.00
2,150.00
99,000.00
99,000.00
19,250.00
19,250.00
2,240.00
2,240.00
7,470.00
7,470.00
807,979.63
807,979.63
807,970.00
463,750.00
102,207.14
102,207.14
132,860.69
132,860.69
2,150.00
2,150.00
99,000.00
99,000.00
19,250.00
19,250.00
2,240.00
2,240.00
7,470.00
7,470.00
828,927.83
828,927.83
828,920.00
480,000.00
101,328.57
101,328.57
131,845.52
131,845.52
2,150.00
2,150.00
99,000.00
99,000.00
19,250.00
19,250.00
2,240.00
2,240.00
7,470.00
7,470.00
843,284.09
843,284.09
843,280.00
507,500.00
100,157.14
100,157.14
130,195.86
130,195.86
2,150.00
2,150.00
99,000.00
99,000.00
198,000.00
19,250.00
19,250.00
38,500.00
2,240.00
2,240.00
4,480.00
7,470.00
7,470.00
14,940.00
995,923.00
995,923.00
995,920.00
516,250.00
99,717.86
99,717.86
129,561.38
129,561.38
2,150.00
2,150.00
99,000.00
99,000.00
19,250.00
19,250.00
2,240.00
2,240.00
7,470.00
7,470.00
875,639.24
875,639.24
875,630.00
548,750.00
98,107.14
98,107.14
127,657.93
127,657.93
2,150.00
2,150.00
126,000.00
126,000.00
252,000.00
24,500.00
24,500.00
49,000.00
2,800.00
2,800.00
5,600.00
9,450.00
9,450.00
18,900.00
1,102,165.07
-
1,102,165.07
1,102,160.00
560,000.00
97,667.86
97,667.86
126,896.55
126,896.55
2,150.00
2,150.00
126,000.00
126,000.00
24,500.00
24,500.00
2,800.00
2,800.00
9,450.00
9,450.00
949,464.41
949,464.41
949,460.00
500,000.00
500,000.00
70.29
70.29
101.52
101.52
2,100.00
2,100.00
126,000.00
126,000.00
24,500.00
24,500.00
2,800.00
2,800.00
9,450.00
9,450.00
665,021.80
665,021.80
665,020.00
67,200.00
67,200.00
3,600.00
3,600.00
2,100.00
2,100.00
240.00
240.00
270.00
270.00
73,410.00
73,410.00
73,410.00
84,000.00
84,000.00
4,200.00
4,200.00
2,450.00
2,450.00
320.00
320.00
360.00
360.00
91,330.00
91,330.00
91,330.00
#VALUE!
#VALUE!
4,800.00
4,800.00
2,800.00
2,800.00
320.00
320.00
360.00
360.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
73,500.00
73,500.00
3,750.00
3,750.00
4,200.00
4,200.00
4,900.00
4,900.00
560.00
560.00
360.00
360.00
87,270.00
87,270.00
87,270.00
73,500.00
73,500.00
2,500.00
2,500.00
3,000.00
3,000.00
3,500.00
3,500.00
400.00
400.00
270.00
270.00
83,170.00
83,170.00
83,170.00
84,660.00
84,660.00
1,250.00
1,250.00
1,500.00
1,500.00
1,750.00
1,750.00
2,000.00
2,000.00
90.00
90.00
91,250.00
91,250.00
91,250.00
26,000.00
26,000.00
5,100.00
5,100.00
800.00
800.00
31,200.00
31,200.00
18,200.00
18,200.00
2,080.00
2,080.00
2,340.00
2,340.00
85,720.00
85,720.00
85,720.00
29,250.00
29,250.00
5,100.00
5,100.00
800.00
800.00
31,200.00
31,200.00
18,200.00
18,200.00
2,080.00
2,080.00
2,340.00
2,340.00
88,970.00
88,970.00
88,970.00
26,000.00
26,000.00
6,800.00
6,800.00
1,600.00
1,600.00
22,500.00
22,500.00
43,750.00
43,750.00
44,000.00
44,000.00
39,600.00
39,600.00
23,100.00
23,100.00
2,640.00
2,640.00
2,970.00
2,970.00
212,960.00
212,960.00
212,960.00
26,000.00
26,000.00
6,800.00
6,800.00
1,600.00
1,600.00
27,000.00
27,000.00
43,750.00
43,750.00
44,000.00
44,000.00
39,600.00
39,600.00
23,100.00
23,100.00
2,640.00
2,640.00
2,970.00
2,970.00
217,460.00
-
217,460.00
217,460.00
26,000.00
26,000.00
6,800.00
6,800.00
1,600.00
1,600.00
22,500.00
22,500.00
43,750.00
43,750.00
132,000.00
132,000.00
39,600.00
39,600.00
23,100.00
23,100.00
2,640.00
2,640.00
2,970.00
2,970.00
300,960.00
300,960.00
300,960.00
19,500.00
19,500.00
6,800.00
6,800.00
1,600.00
1,600.00
30,000.00
30,000.00
43,750.00
43,750.00
66,000.00
66,000.00
#VALUE!
#VALUE!
39,600.00
39,600.00
23,100.00
23,100.00
2,640.00
2,640.00
2,970.00
2,970.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
19,500.00
19,500.00
6,800.00
6,800.00
1,200.00
1,200.00
22,500.00
22,500.00
43,750.00
43,750.00
44,000.00
44,000.00
39,600.00
39,600.00
23,100.00
23,100.00
2,640.00
2,640.00
2,970.00
2,970.00
206,060.00
206,060.00
206,060.00
17,160.00
17,160.00
10,200.00
10,200.00
11,000.00
11,000.00
9,000.00
9,000.00
3,500.00
3,500.00
400.00
400.00
720.00
720.00
51,980.00
51,980.00
51,980.00
130,000.00
130,000.00
25,500.00
25,500.00
3,200.00
3,200.00
1,102,500.00
1,102,500.00
56,250.00
56,250.00
420,000.00
420,000.00
110,700.00
110,700.00
149,040.00
149,040.00
318,000.00
318,000.00
19,250.00
19,250.00
91,000.00
91,000.00
73,500.00
73,500.00
20,960.00
20,960.00
23,850.00
23,850.00
2,543,750.00
2,543,750.00
2,543,750.00
175,500.00
175,500.00
34,000.00
34,000.00
4,800.00
4,800.00
1,470,000.00
1,470,000.00
75,000.00
75,000.00
420,000.00
420,000.00
110,700.00
110,700.00
149,040.00
149,040.00
339,000.00
339,000.00
19,250.00
19,250.00
109,200.00
109,200.00
98,000.00
98,000.00
25,840.00
25,840.00
25,470.00
25,470.00
3,055,800.00
-
3,055,800.00
3,055,800.00
260,000.00
260,000.00
68,000.00
68,000.00
16,000.00
16,000.00
2,205,000.00
2,205,000.00
112,500.00
112,500.00
420,000.00
420,000.00
110,700.00
110,700.00
149,040.00
149,040.00
225,000.00
225,000.00
437,500.00
437,500.00
440,000.00
440,000.00
423,000.00
423,000.00
19,250.00
19,250.00
115,500.00
115,500.00
147,000.00
147,000.00
32,240.00
32,240.00
31,770.00
31,770.00
5,212,500.00
5,212,500.00
5,212,500.00
208,000.00
208,000.00
54,400.00
54,400.00
12,800.00
12,800.00
1,470,000.00
1,470,000.00
75,000.00
75,000.00
420,000.00
420,000.00
110,700.00
110,700.00
149,040.00
149,040.00
210,000.00
210,000.00
350,000.00
350,000.00
352,000.00
352,000.00
381,000.00
381,000.00
19,250.00
19,250.00
115,500.00
115,500.00
98,000.00
98,000.00
26,640.00
26,640.00
28,620.00
28,620.00
4,080,950.00
4,080,950.00
4,080,950.00
208,000.00
208,000.00
54,400.00
54,400.00
12,800.00
12,800.00
1,102,500.00
1,102,500.00
56,250.00
56,250.00
420,000.00
420,000.00
110,700.00
110,700.00
149,040.00
149,040.00
180,000.00
180,000.00
350,000.00
350,000.00
704,000.00
704,000.00
318,000.00
318,000.00
19,250.00
19,250.00
91,000.00
91,000.00
73,500.00
73,500.00
21,200.00
21,200.00
23,850.00
23,850.00
3,894,490.00
3,894,490.00
3,894,490.00
156,000.00
156,000.00
54,400.00
54,400.00
12,800.00
12,800.00
1,102,500.00
1,102,500.00
56,250.00
56,250.00
420,000.00
420,000.00
110,700.00
110,700.00
149,040.00
149,040.00
240,000.00
240,000.00
350,000.00
350,000.00
528,000.00
528,000.00
318,000.00
318,000.00
19,250.00
19,250.00
91,000.00
91,000.00
73,500.00
73,500.00
20,960.00
20,960.00
23,850.00
23,850.00
3,726,250.00
3,726,250.00
3,726,250.00
162,500.00
162,500.00
51,000.00
51,000.00
9,600.00
9,600.00
1,470,000.00
1,470,000.00
75,000.00
75,000.00
420,000.00
420,000.00
110,700.00
110,700.00
149,040.00
149,040.00
157,500.00
157,500.00
312,500.00
312,500.00
308,000.00
308,000.00
339,000.00
339,000.00
19,250.00
19,250.00
109,200.00
109,200.00
98,000.00
98,000.00
25,840.00
25,840.00
25,470.00
25,470.00
3,842,600.00
3,842,600.00
3,842,600.00
1,300.00
1,300.00
170.00
170.00
21,000.00
21,000.00
1,125.00
1,125.00
5,000.00
5,000.00
1,230.00
1,230.00
1,656.00
1,656.00
10,800.00
10,800.00
1,400.00
1,400.00
1,400.00
1,400.00
1,400.00
1,400.00
480.00
480.00
810.00
810.00
47,771.00
47,771.00
47,770.00
1,950.00
1,950.00
340.00
340.00
25,200.00
25,200.00
1,250.00
1,250.00
6,875.00
6,875.00
1,845.00
1,845.00
2,760.00
2,760.00
17,820.00
17,820.00
2,310.00
2,310.00
2,310.00
2,310.00
2,310.00
2,310.00
800.00
800.00
1,350.00
1,350.00
67,120.00
67,120.00
67,120.00
HARGA
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN (Rp)
PEKERJAAN BESI
1
Kg
Besi profil
10,000.00
0.060
OH
Pekerja
60,000.00
0.060
OH
70,000.00
0.006
OH
Kepala tukang
80,000.00
0.003
OH
Mandor
90,000.00
11,500.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
2
Kg
12,000.00
0.060
OH
Pekerja
60,000.00
0.060
OH
70,000.00
0.006
OH
Kepala tukang
80,000.00
0.003
OH
Mandor
90,000.00
13,800.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
3
Liter
Solar
12,000.00
12,000.00
0.100
Liter
Minyak pelumas
25,000.00
2,500.00
0.100
OH
Pekerja
60,000.00
0.100
OH
70,000.00
0.001
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
0.800
Jam
Sewa alat
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
4
Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
15.000
Kg
10,000.00
150,000.00
32.800
Kg
13,000.00
426,400.00
0.050
Kg
kawat las
22,000.00
1,100.00
1.050
OH
Pekerja
60,000.00
1.050
OH
70,000.00
0.105
OH
Kepala tukang
80,000.00
0.052
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
5
Kg
22,000.00
8,800.00
0.300
Liter
Solar
12,000.00
3,600.00
0.040
Liter
Minyak pelumas
25,000.00
1,000.00
0.040
OH
Pekerja
60,000.00
0.020
OH
70,000.00
0.002
OH
Kepala tukang
80,000.00
0.002
OH
Mandor
90,000.00
0.170
Jam
Sewa alat
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
6
n/a
#VALUE!
4.522
n/a
#VALUE!
n/a
#VALUE!
20.000
Cm
Pengelasan
0.650
OH
Pekerja
60,000.00
0.650
OH
70,000.00
0.065
OH
Kepala tukang
80,000.00
0.032
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
7
M2
n/a
1.200
OH
Pekerja
60,000.00
1.200
OH
70,000.00
0.120
OH
Kepala tukang
80,000.00
0.006
OH
Mandor
90,000.00
#VALUE!
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
8
M2
Pintu lipat
0.440
OH
Pekerja
n/a
60,000.00
0.440
OH
Tukang
70,000.00
0.044
OH
Kepala tukang
80,000.00
0.022
OH
Mandor
90,000.00
#VALUE!
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
9
M2
Sunscreen alluminium
n/a
0.080
OH
Pekerja
60,000.00
0.800
OH
Tukang
70,000.00
0.080
OH
Kepala tukang
80,000.00
0.004
OH
Mandor
90,000.00
#VALUE!
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
10
m2
n/a
1.000
OH
Pekerja
60,000.00
1.000
OH
70,000.00
0.100
OH
Kepala tukang
80,000.00
0.050
OH
Mandor
90,000.00
#VALUE!
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
11
Profil alluminium
n/a
#VALUE!
2.000
Buah
Skrup fixer
n/a
#VALUE!
0.060
Tube
Sealant
n/a
#VALUE!
0.043
OH
Pekerja
60,000.00
0.043
OH
70,000.00
0.004
OH
Kepala tukang
80,000.00
0.002
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
12
m'
Profil alluminium
n/a
#VALUE!
14.600
m'
Alluminium strip
n/a
#VALUE!
0.085
OH
Pekerja
60,000.00
0.085
OH
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.004
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
13
Pintu alluminium
4.500
Profil kaca
0.270
Tube
Sealant
0.085
OH
Pekerja
60,000.00
0.085
OH
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
14
m2
0.350
OH
Pe kerja
60,000.00
0.350
OH
Tukang
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
15
kg
Besi strip
27.080
cm
Pengelasan
1.670
OH
Pekerja
60,000.00
1.670
OH
Tukang Las
70,000.00
0.167
OH
Kepala tukang
80,000.00
0.083
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
16
m2
Kawat nyamuk
11.110
cm
Pengelasan
1.716
kg
0.100
OH
Pe kerja
60,000.00
0.100
OH
Tukang
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
17
m2
Buah
7.000
Besi strip
0.200
OH
Pekerja
60,000.00
0.200
OH
Tukang
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.001
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
18
m'
Seng plat
0.015
kg
Paku 1 cm - 2,5 cm
0.019
m3
0.200
OH
Pekerja
60,000.00
0.200
OH
Tukang
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.010
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
19
Memasang 1 m' talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
1.050
Seng plat
0.010
kg
Paku 1 cm -2,5 cm
0.500
kg
Besi strip
0.150
OH
Pekerja
60,000.00
0.300
OH
Tukang
70,000.00
0.030
OH
Kepala tukang
80,000.00
0.008
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
20
Memasang 1 m' rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120, dinding partisi
3.500
1 x rangka
ls
0.250
OH
Pekerja
60,000.00
0.250
OH
Tukang
70,000.00
0.025
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
21
Memasang 1 m' rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60, plafon
4.000
1 x rangka
ls
0.350
OH
Pekerja
60,000.00
0.350
OH
Tukang
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
11,500.00
3,600.00
3,600.00
4,200.00
4,200.00
480.00
480.00
270.00
270.00
20,050.00
20,050.00
20,050.00
13,800.00
3,600.00
3,600.00
4,200.00
4,200.00
480.00
480.00
270.00
270.00
22,350.00
22,350.00
22,350.00
12,000.00
2,500.00
6,000.00
6,000.00
7,000.00
7,000.00
80.00
80.00
450.00
450.00
28,030.00
28,030.00
28,030.00
150,000.00
426,400.00
1,100.00
63,000.00
63,000.00
73,500.00
73,500.00
8,400.00
8,400.00
4,680.00
4,680.00
727,080.00
-
727,080.00
727,080.00
8,800.00
3,600.00
1,000.00
2,400.00
2,400.00
1,400.00
1,400.00
160.00
160.00
180.00
180.00
5,140.00
22,680.00
22,680.00
22,680.00
#VALUE!
#VALUE!
#VALUE!
39,000.00
39,000.00
45,500.00
45,500.00
5,200.00
5,200.00
2,880.00
2,880.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
72,000.00
72,000.00
84,000.00
84,000.00
9,600.00
9,600.00
540.00
540.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
26,400.00
26,400.00
30,800.00
30,800.00
3,520.00
3,520.00
1,980.00
1,980.00
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
#VALUE!
4,800.00
4,800.00
56,000.00
56,000.00
6,400.00
6,400.00
360.00
360.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
60,000.00
60,000.00
70,000.00
70,000.00
8,000.00
8,000.00
4,500.00
4,500.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
2,580.00
2,580.00
3,010.00
3,010.00
344.00
344.00
189.00
189.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5,100.00
5,100.00
5,950.00
5,950.00
680.00
680.00
378.00
378.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5,100.00
5,100.00
5,950.00
5,950.00
720.00
720.00
450.00
450.00
12,220.00
12,220.00
12,220.00
-
21,000.00
21,000.00
24,500.00
24,500.00
2,800.00
2,800.00
1,620.00
1,620.00
49,920.00
49,920.00
49,920.00
-
100,200.00
100,200.00
116,900.00
116,900.00
13,360.00
13,360.00
7,470.00
7,470.00
237,930.00
237,930.00
237,930.00
-
6,000.00
6,000.00
7,000.00
7,000.00
800.00
800.00
450.00
450.00
14,250.00
14,250.00
14,250.00
12,000.00
12,000.00
14,000.00
14,000.00
1,600.00
1,600.00
90.00
90.00
27,690.00
27,690.00
27,690.00
-
12,000.00
12,000.00
14,000.00
14,000.00
1,600.00
1,600.00
900.00
900.00
28,500.00
28,500.00
28,500.00
-
9,000.00
9,000.00
21,000.00
21,000.00
2,400.00
2,400.00
720.00
720.00
33,120.00
33,120.00
33,120.00
-
15,000.00
15,000.00
17,500.00
17,500.00
2,000.00
2,000.00
1,170.00
1,170.00
35,670.00
-
35,670.00
35,670.00
-
21,000.00
21,000.00
24,500.00
24,500.00
2,800.00
2,800.00
1,620.00
1,620.00
49,920.00
49,920.00
49,920.00
HARGA
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
PEKERJAAN DINDING
1
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
140.000
43.500
Buah
Bata merah
600.00
84,000.00
1,250.00
54,375.00
195,000.00
15,600.00
kg
Portland Cement
0.080
Pasir pasang
0.600
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.030
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
2
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
140.000
32.950
Buah
Bata merah
600.00
84,000.00
1,250.00
41,187.50
195,000.00
17,745.00
kg
Portland Cement
0.091
Pasir pasang
0.600
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.030
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
3
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
140.000
26.550
Buah
Bata merah
600.00
84,000.00
1,250.00
33,187.50
195,000.00
18,135.00
kg
Portland Cement
0.093
Pasir pasang
0.600
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.030
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
4
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
140.000
22.200
0.102
Buah
Bata merah
kg
Portland Cement
Pasir pasang
600.00
84,000.00
1,250.00
27,750.00
195,000.00
19,890.00
0.600
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.030
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
5
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP
140.000
18.500
Buah
Bata merah
600.00
84,000.00
1,250.00
23,125.00
195,000.00
23,790.00
kg
Portland Cement
0.122
Pasir pasang
0.600
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.030
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
6
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP :
140.000
10.080
Buah
Bata merah
600.00
84,000.00
1,250.00
12,600.00
195,000.00
18,037.50
2,475.00
kg
Portland Cement
0.093
Pasir pasang
0.028
Kapur padam
90,000.00
0.600
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.030
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
7
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP
70.000
Buah
18.950
kg
Portland Cement
0.038
Pasir pasang
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Bata merah
600.00
42,000.00
1,250.00
23,687.50
195,000.00
7,410.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
0%
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP
70.000
Buah
14.370
kg
Portland Cement
0.040
Pasir pasang
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Bata merah
600.00
42,000.00
1,250.00
17,962.50
195,000.00
7,800.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
9
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP
70.000
Buah
11.500
kg
Portland Cement
0.043
Pasir pasang
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Bata merah
600.00
42,000.00
1,250.00
14,375.00
195,000.00
8,385.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
10
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP
70.000
Buah
Bata merah
600.00
42,000.00
1,250.00
12,100.00
195,000.00
8,775.00
9.680
kg
Portland Cement
0.045
Pasir pasang
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
11
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP
70.000
Buah
Bata merah
600.00
42,000.00
1,250.00
10,400.00
195,000.00
9,555.00
8.320
kg
Portland Cement
0.049
Pasir pasang
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
12
Memasang 1 m2 dinding bata merah ukuran (5 x11 x 22) tebal 1/2 bata, campuran spesi 1 PC : 8 PP
70.000
Buah
Bata merah
600.00
42,000.00
1,250.00
8,125.00
195,000.00
9,750.00
6.500
kg
Portland Cement
0.050
Pasir pasang
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
13
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 KP :
70.000
Buah
Bata merah
600.00
42,000.00
1,250.00
5,625.00
195,000.00
9,750.00
Kapur padam
90,000.00
1,350.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
4.500
kg
Portland Cement
0.050
Pasir pasang
0.015
0.300
0.100
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
14
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM :
70.000
Buah
Bata merah
0.018
0.018
Semen merah
Pasir pasang
0.018
0.300
OH
0.100
600.00
n.a
42,000.00
#VALUE!
195,000.00
3,510.00
Kapur padam
90,000.00
1,620.00
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
15
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal V2 bata, campuran spesi 1 KP : 1 SM
70.000
Buah
0.014
0.028
Bata merah
Semen merah
Pasir pasang
600.00
n.a
195,000.00
42,000.00
#VALUE!
5,460.00
0.014
m3
Kapur padam
90,000.00
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
1,260.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
16
Buah
HB/CB 20
3,200.00
40,000.00
30.320
kg
Portland Cement
1,250.00
37,900.00
0.728
Pasir pasang
0.280
kg
Besi angkur =8 mm
0.350
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
195,000.00 141,960.00
8,727.00
2,443.56
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
17
Buah
HB20
3,200.00
40,000.00
1,250.00
30,325.00
24.260
kg
Portland Cement
0.772
m3
Pasir pasang
0.280
kg
Besi angkur =8 mm
0.350
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
195,000.00 150,540.00
8,727.00
2,443.56
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
18
Buah
22.740
kg
Portland Cement
0.550
m3
Pasir pasang
0.280
kg
Besi angkur =8 mm
0.320
OH
Pekerja
60,000.00
0.120
OH
Tukang batu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.016
OH
Mandor
90,000.00
Jumlah
HB15
n.a
#VALUE!
1,250.00
28,425.00
195,000.00 107,250.00
8,727.00
2,443.56
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
19
Buah
18.200
kg
HB 15
Portland Cement
n.a
#VALUE!
0.582
m3
Pasir pasang
0.280
kg
Besi angkur =8 mm
0.320
OH
Pekerja
60,000.00
0.120
OH
Tukang batu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.016
OH
Mandor
90,000.00
1,250.00
22,750.00
195,000.00 113,490.00
8,727.00
2,443.56
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
20
Buah
15.160
kg
Portland Cement
Pasir pasang
0.364
HB 10
n.a
#VALUE!
1,250.00
18,950.00
195,000.00
70,980.00
8,727.00
2,443.56
0.280
kg
Besi angkur =8 mm
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
21
Buah
12.130
kg
Portland Cement
0.388
Pasir pasang
0.280
kg
Besi angkur =8 mm
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
HB 10
n.a
#VALUE!
1,250.00
15,162.50
195,000.00
75,660.00
8,727.00
2,443.56
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
22
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
30.000
Buah
Terawang (roster)
14.000
kg
Portland Cement
n.a
#VALUE!
1,250.00
17,500.00
0.032
m3
Pasir pasang
0.300
OH
Pekerja
195,000.00
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
6,240.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
23
Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
30.000
Buah
Terawang (roster)
11.000
kg
Portland Cement
0.035
Pasir pasang
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
n.a
#VALUE!
1,250.00
13,750.00
195,000.00
6,825.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
24
Memasang 1 m2 dinding bata berongga ekspose ukuran (5x11x24) cm, campuran spesi 1 PC : 3 PP
70.000
Buah
14.000
kg
Portland Cement
0.032
Pasir pasang
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
n.a
#VALUE!
1,250.00
17,500.00
195,000.00
6,240.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
0%
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
, campuran spesi 1 PC : 2 PP
84,000.00
54,375.00
15,600.00
36,000.00
36,000.00
14,000.00
14,000.00
1,600.00
1,600.00
2,700.00
2,700.00
208,275.00
0%
208,275.00
208,270.00
, campuran spesi 1 PC : 3 PP
84,000.00
41,187.50
17,745.00
36,000.00
36,000.00
14,000.00
14,000.00
1,600.00
1,600.00
2,700.00
2,700.00
197,232.50
0%
197,232.50
197,230.00
, campuran spesi 1 PC : 4 PP
84,000.00
33,187.50
18,135.00
36,000.00
36,000.00
14,000.00
14,000.00
1,600.00
1,600.00
2,700.00
2,700.00
189,622.50
0%
189,622.50
189,620.00
, campuran spesi 1 PC : 5 PP
84,000.00
27,750.00
19,890.00
36,000.00
36,000.00
14,000.00
14,000.00
1,600.00
1,600.00
2,700.00
2,700.00
185,940.00
0%
185,940.00
185,940.00
, campuran spesi 1 PC : 6 PP
84,000.00
23,125.00
23,790.00
36,000.00
36,000.00
14,000.00
14,000.00
1,600.00
1,600.00
2,700.00
2,700.00
185,215.00
0%
185,215.00
185,210.00
a, campuran spesi 1 PC : 3 KP : 10 PP
84,000.00
12,600.00
18,037.50
2,475.00
36,000.00
36,000.00
14,000.00
14,000.00
1,600.00
1,600.00
2,700.00
2,700.00
171,412.50
0%
171,412.50
171,410.00
a, campuran spesi 1 PC : 2 PP
42,000.00
23,687.50
7,410.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
100,247.50
0%
100,247.50
100,240.00
a, campuran spesi 1 PC : 3 PP
42,000.00
17,962.50
7,800.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
94,912.50
0%
94,912.50
94,910.00
a, campuran spesi 1 PC : 4 PP
42,000.00
14,375.00
8,385.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
91,910.00
0%
91,910.00
91,910.00
a, campuran spesi 1 PC : 5 PP
42,000.00
12,100.00
8,775.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
48,025.00
0%
48,025.00
48,020.00
a, campuran spesi 1 PC : 6 PP
42,000.00
10,400.00
9,555.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
89,105.00
0%
89,105.00
89,100.00
ampuran spesi 1 PC : 8 PP
42,000.00
8,125.00
9,750.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
87,025.00
0%
87,025.00
87,020.00
a, campuran spesi 1 PC : 3 KP : 10 PP
42,000.00
5,625.00
9,750.00
1,350.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
85,875.00
0%
85,875.00
85,870.00
a, campuran spesi 1 KP : 1 SM : 1 PP
42,000.00
#VALUE!
3,510.00
1,620.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
a, campuran spesi 1 KP : 1 SM : 2 PP
42,000.00
#VALUE!
5,460.00
1,260.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
40,000.00
37,900.00
141,960.00
2,443.56
21,000.00
21,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,620.00
1,620.00
256,623.56
0%
256,623.56
256,620.00
40,000.00
30,325.00
150,540.00
2,443.56
21,000.00
21,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,620.00
1,620.00
257,628.56
0%
257,628.56
257,620.00
#VALUE!
28,425.00
107,250.00
2,443.56
19,200.00
19,200.00
8,400.00
8,400.00
960.00
960.00
1,440.00
1,440.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
22,750.00
113,490.00
2,443.56
19,200.00
19,200.00
8,400.00
8,400.00
960.00
960.00
1,440.00
1,440.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
18,950.00
70,980.00
2,443.56
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
15,162.50
75,660.00
2,443.56
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
puran spesi 1 PC : 3 PP
#VALUE!
17,500.00
6,240.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
puran spesi 1 PC : 4 PP
#VALUE!
13,750.00
6,825.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
ampuran spesi 1 PC : 3 PP
#VALUE!
17,500.00
6,240.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
HARGA
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN
(Rp)
PEKERJAAN PLESTERAN
1
Kg
Portland Cement
0.016
Pasir Pasang
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
1,250.00
19,380.00
195,000.00
3,120.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
2
Kg
Portland Cement
0.020
Pasir Pasang
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
1,250.00
12,780.00
195,000.00
3,900.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
3
Kg
Portland Cement
0.023
M3
Pasir Pasang
1,250.00
9,720.00
195,000.00
4,485.00
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
4
Kg
Portland Cement
0.024
Pasir Pasang
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
1,250.00
7,800.00
195,000.00
4,680.00
Jumlah
Keuntungan Maksimal
Jumlah
0%
Dibulatkan
5
Kg
Portland Cement
0.026
Pasir Pasang
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
1,250.00
6,480.00
195,000.00
5,070.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
6
kg
Portland Cement
0.027
Pasir Pasang
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
1,250.00
5,520.00
195,000.00
5,265.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
7
kg
Portland Cement
0.028
m3
Pasir Pasang
1,250.00
4,920.00
195,000.00
5,460.00
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
8
kg
Portland Cement
0.029
Pasir Pasang
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
1,250.00
4,320.00
195,000.00
5,655.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
9
kg
Portland Cement
0.003
Kapur Padam
1,250.00
7,200.00
90,000.00
270.00
0.013
m3
Pasir Pasang
0.360
OH
Pekerja
195,000.00
60,000.00
0.120
OH
Tukang batu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
2,535.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
10
kg
Portland Cement
0.005
1,250.00
3,750.00
Kapur Padam
0.020
90,000.00
450.00
Pasir Pasang
0.360
OH
Pekerja
195,000.00
60,000.00
3,900.00
0.120
OH
Tukang batu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
11
m3
Semen Merah
0.009
n.a
#VALUE!
Kapur Padam
0.009
Pasir Pasang
0.360
OH
Pekerja
60,000.00
0.120
OH
Tukang batu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
90,000.00
810.00
195,000.00
1,755.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
12
m3
Semen Merah
0.007
n.a
#VALUE!
Kapur Padam
0.015
Pasir Pasang
0.360
OH
Pekerja
60,000.00
0.120
OH
Tukang batu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
90,000.00
630.00
195,000.00
2,925.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
13
kg
Portland Cement
Pasir Pasang
1,250.00
17,040.00
195,000.00
5,265.00
0.400
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.022
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
14
kg
Portland Cement
0.031
Pasir Pasang
0.260
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
1,250.00
12,960.00
195,000.00
6,045.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
15
kg
Portland Cement
0.032
m3
Pasir Pasang
1,250.00
10,400.00
195,000.00
6,240.00
0.400
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.022
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
16
kg
Portland Cement
0.035
Pasir Pasang
0.400
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.022
OH
Mandor
90,000.00
1,250.00
8,640.00
195,000.00
6,825.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
17
kg
Portland Cement
0.036
Pasir Pasang
0.400
OH
Pekerja
60,000.00
0.200
OH
Tukang batu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.022
OH
Mandor
90,000.00
1,250.00
7,360.00
195,000.00
7,020.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
18
m3
Semen Merah
0.009
n.a
#VALUE!
Kapur Padam
0.018
Pasir Pasang
0.440
OH
Pekerja
60,000.00
0.220
OH
Tukang batu
70,000.00
0.022
OH
Kepala tukang
80,000.00
0.022
OH
Mandor
90,000.00
90,000.00
810.00
195,000.00
3,510.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
19
kg
Portland Cement
0.026
Pasir Pasang
0.150
OH
Pekerja
60,000.00
0.075
OH
Tukang batu
70,000.00
0.008
OH
Kepala tukang
80,000.00
0.008
OH
Mandor
90,000.00
1,250.00
6,480.00
195,000.00
5,070.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
20
kg
Portland Cement
0.013
m3
Pasir Pasang
1,250.00
625.00
195,000.00
2,535.00
0.080
OH
Pekerja
60,000.00
0.400
OH
Tukang batu
70,000.00
0.040
OH
Kepala tukang
80,000.00
0.004
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
21
kg
Portland Cement
1,250.00
15.000
kg
Batu granit
0.450
OH
Pekerja
60,000.00
0.225
OH
Tukang batu
70,000.00
0.023
OH
Kepala tukang
80,000.00
0.023
OH
Mandor
90,000.00
n.a
12,500.00
#VALUE!
Jumlah
Keuntungan Maksimal
Jumlah
0%
Dibulatkan
22
kg
Portland Cement
1,250.00
15.000
kg
Batu teraso
0.450
OH
Pekerja
60,000.00
0.225
OH
Tukang batu
70,000.00
0.023
OH
Kepala tukang
80,000.00
0.023
OH
Mandor
90,000.00
n.a
12,500.00
#VALUE!
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
23
kg
Portland Cement
0.006
Pasir Pasang
0.300
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
1,250.00
5,400.00
195,000.00
1,170.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
24
kg
Portland Cement
0.150
OH
Pekerja
60,000.00
1,250.00
0.075
OH
Tukang batu
70,000.00
0.008
OH
Kepala tukang
80,000.00
0.008
OH
Mandor
90,000.00
3,885.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
25
kg
Portland Cement
1,250.00
0.070
OH
Pekerja
60,000.00
0.035
OH
Tukang batu
70,000.00
0.004
OH
Kepala tukang
80,000.00
0.004
OH
Mandor
90,000.00
2,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
26
kg
Portland Cement
0.012
m3
Pasir Pasang
1,250.00
7,925.00
195,000.00
2,340.00
0.300
OH
Pekerja
60,000.00
0.150
OH
Tukang batu
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.015
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
27
Membuat 1 m2 acian
3.250
kg
Portland Cement
1,250.00
0.200
OH
Pekerja
60,000.00
0.100
OH
Tukang batu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.010
OH
Mandor
90,000.00
4,062.50
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
0%
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
19,380.00
3,120.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
53,550.00
0%
53,550.00
53,550.00
12,780.00
3,900.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
47,730.00
0%
47,730.00
47,730.00
9,720.00
4,485.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
45,255.00
0%
45,255.00
45,250.00
7,800.00
4,680.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
43,530.00
0%
43,530.00
43,530.00
6,480.00
5,070.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
42,600.00
0%
42,600.00
42,600.00
5,520.00
5,265.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
41,835.00
0%
41,835.00
41,830.00
4,920.00
5,460.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
41,430.00
0%
41,430.00
41,430.00
4,320.00
5,655.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
41,025.00
0%
41,025.00
41,020.00
7,200.00
270.00
2,535.00
21,600.00
21,600.00
8,400.00
8,400.00
960.00
960.00
1,620.00
1,620.00
42,585.00
0%
42,585.00
42,580.00
3,750.00
450.00
3,900.00
21,600.00
21,600.00
8,400.00
8,400.00
960.00
960.00
1,620.00
1,620.00
40,680.00
0%
40,680.00
40,680.00
#VALUE!
810.00
1,755.00
21,600.00
21,600.00
8,400.00
8,400.00
960.00
960.00
1,620.00
1,620.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
630.00
2,925.00
21,600.00
21,600.00
8,400.00
8,400.00
960.00
960.00
1,620.00
1,620.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
17,040.00
5,265.00
24,000.00
24,000.00
14,000.00
14,000.00
1,600.00
1,600.00
1,980.00
1,980.00
63,885.00
0%
63,885.00
63,880.00
12,960.00
6,045.00
15,600.00
15,600.00
14,000.00
14,000.00
1,600.00
1,600.00
1,170.00
1,170.00
51,375.00
0%
51,375.00
51,370.00
10,400.00
6,240.00
24,000.00
24,000.00
14,000.00
14,000.00
1,600.00
1,600.00
1,980.00
1,980.00
58,220.00
0%
58,220.00
58,220.00
8,640.00
6,825.00
24,000.00
24,000.00
14,000.00
14,000.00
1,600.00
1,600.00
1,980.00
1,980.00
57,045.00
0%
57,045.00
57,040.00
7,360.00
7,020.00
24,000.00
24,000.00
14,000.00
14,000.00
1,600.00
1,600.00
1,980.00
1,980.00
55,960.00
0%
55,960.00
55,960.00
#VALUE!
810.00
3,510.00
26,400.00
26,400.00
15,400.00
15,400.00
1,760.00
1,760.00
1,980.00
1,980.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
6,480.00
5,070.00
9,000.00
9,000.00
5,250.00
5,250.00
640.00
640.00
720.00
720.00
27,160.00
0%
27,160.00
27,160.00
625.00
2,535.00
4,800.00
4,800.00
28,000.00
28,000.00
3,200.00
3,200.00
360.00
360.00
39,520.00
0%
39,520.00
39,520.00
12,500.00
#VALUE!
27,000.00
27,000.00
15,750.00
15,750.00
1,840.00
1,840.00
2,070.00
2,070.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
12,500.00
#VALUE!
27,000.00
27,000.00
15,750.00
15,750.00
1,840.00
1,840.00
2,070.00
2,070.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
5,400.00
1,170.00
18,000.00
18,000.00
7,000.00
7,000.00
800.00
800.00
1,350.00
1,350.00
33,720.00
0%
33,720.00
33,720.00
3,885.00
9,000.00
9,000.00
5,250.00
5,250.00
640.00
640.00
720.00
720.00
19,495.00
0%
19,495.00
19,490.00
2,000.00
4,200.00
4,200.00
2,450.00
2,450.00
320.00
320.00
360.00
360.00
9,330.00
0%
9,330.00
9,330.00
7,925.00
2,340.00
18,000.00
18,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,350.00
1,350.00
41,315.00
0%
41,315.00
41,310.00
4,062.50
12,000.00
12,000.00
7,000.00
7,000.00
800.00
800.00
900.00
900.00
24,762.50
0%
24,762.50
24,760.00
HARGA
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA,
SATUAN (Rp)
BAHAN (Rp)
PEKERJAAN LANTAI
1
Buah
9.800
kg
Portland Cement
0.045
Pasir pasang
0.250
OH
Pekerja
60,000.00
0.125
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Ubin abu-abu
n/a
#VALUE!
1,250.00
12,250.00
195,000.00
8,775.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
2
Buah
10.000
kg
Portland Cement
0.045
Pasir pasang
0.250
OH
Pekerja
60,000.00
0.125
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Ubin abu-abu
n/a
#VALUE!
1,250.00
12,500.00
195,000.00
8,775.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
3
Buah
10.400
kg
Portland Cement
0.045
Pasir pasang
0.270
OH
Pekerja
60,000.00
0.135
OH
Tukang batu
70,000.00
0.014
OH
Kepala tukang
80,000.00
0.014
OH
Mandor
90,000.00
Ubin abu-abu
n/a
#VALUE!
1,250.00
13,000.00
195,000.00
8,775.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
4
Buah
9.800
kg
Portland Cement
0.045
Pasir pasang
Ubin warna
n/a
#VALUE!
1,250.00
12,250.00
195,000.00
8,775.00
1.300
kg
Semen warna
10,000.00
0.250
OH
Pekerja
60,000.00
0.125
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
13,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
5
Buah
10.000
kg
Portland Cement
0.045
Pasir pasang
195,000.00
8,775.00
1.500
kg
Semen warna
10,000.00
15,000.00
0.260
OH
Pekerja
60,000.00
0.130
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Ubin warna
n/a
#VALUE!
1,250.00
12,500.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
6
Buah
Ubin warna
10.400
kg
Portland Cement
0.045
m3
Pasir pasang
1.620
kg
0.270
n/a
#VALUE!
1,250.00
13,000.00
195,000.00
8,775.00
Semen warna
10,000.00
16,200.00
OH
Pekerja
60,000.00
0.135
OH
Tukang batu
70,000.00
0.014
OH
Kepala tukang
80,000.00
0.014
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
7
Buah
9.800
kg
Ubin teraso
Portland Cement
0.045
m3
Pasir pasang
1.300
kg
0.250
0.125
n/a
#VALUE!
1,250.00
12,250.00
195,000.00
8,775.00
Semen warna
10,000.00
13,000.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
8
Buah
Ubin teraso
2,200.00
26,114.00
10.000
kg
Portland Cement
1,250.00
12,500.00
0.045
Pasir pasang
195,000.00
8,775.00
1.500
kg
Semen warna
10,000.00
15,000.00
0.260
OH
Pekerja
60,000.00
0.130
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
9
Buah
9.800
kg
Portland Cement
0.045
Pasir pasang
Ubin granit
n/a
#VALUE!
1,250.00
12,250.00
195,000.00
8,775.00
13,000.00
1.300
kg
Semen warna
10,000.00
0.250
OH
Pekerja
60,000.00
0.125
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
10
Buah
10.000
kg
Portland Cement
0.045
Pasir pasang
195,000.00
8,775.00
1.500
kg
Semen warna
10,000.00
15,000.00
0.260
OH
Pekerja
60,000.00
0.130
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Ubin granit
n/a
#VALUE!
1,250.00
12,500.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
11
Buah
9.800
kg
n/a
#VALUE!
1,250.00
12,250.00
0.045
m3
Pasir pasang
195,000.00
8,775.00
1.300
kg
Semen warna
10,000.00
13,000.00
0.250
OH
Pekerja
60,000.00
0.125
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
12
Buah
10.000
kg
Portland Cement
0.045
m3
Pasir pasang
1.500
kg
0.260
n/a
#VALUE!
1,250.00
12,500.00
195,000.00
8,775.00
Semen warna
10,000.00
15,000.00
OH
Pekerja
60,000.00
0.130
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
13
Buah
9.600
kg
0.045
m3
Pasir pasang
1.500
kg
0.240
0.120
n/a
#VALUE!
1,250.00
12,000.00
195,000.00
8,775.00
Semen warna
10,000.00
15,000.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.012
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
14
Buah
9.800
kg
Portland Cement
0.045
Pasir pasang
n/a
#VALUE!
1,250.00
12,250.00
195,000.00
8,775.00
13,000.00
1.300
kg
Semen warna
10,000.00
0.250
OH
Pekerja
60,000.00
0.125
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
15
Buah
10.000
kg
Portland Cement
Pasir pasang
0.045
n/a
#VALUE!
1,250.00
12,500.00
195,000.00
8,775.00
15,000.00
1.500
kg
Semen warna
10,000.00
0.260
OH
Pekerja
60,000.00
0.130
OH
Tukang batu
70,000.00
0.013
OH
Kepala tukang
80,000.00
0.013
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
16
Buah
1.650
kg
Portland Cement
0.004
Pasir pasang
0.090
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Plint Ubin
n/a
#VALUE!
1,250.00
2,062.50
195,000.00
780.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
17
Buah
1.240
kg
Portland Cement
0.003
Pasir pasang
0.090
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Plint Ubin
n/a
#VALUE!
1,250.00
1,550.00
195,000.00
585.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
18
Plint Ubin
1.240 kg
Portland Cement
0.003 m
Pasir pasang
n/a
#VALUE!
1,250.00
1,550.00
195,000.00
585.00
0.090 OH
Pekerja
60,000.00
0.090 OH
Tukang batu
70,000.00
0.009 OH
Kepala tukang
80,000.00
0.005 OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
19
1.140 kg
Portland Cement
0.003 m
Pasir pasang
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
1,000.00
0.100 kg
Semen warna
10,000.00
0.090 OH
Pekerja
60,000.00
0.090 OH
Tukang batu
70,000.00
0.009 OH
Kepala tukang
80,000.00
0.005 OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
20
1.140 kg
Portland Cement
0.003 m
Pasir pasang
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
0.100 kg
Semen warna
10,000.00
1,000.00
0.090 OH
Pekerja
60,000.00
0.090 OH
Tukang batu
70,000.00
0.009 OH
Kepala tukang
80,000.00
0.005 OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
21
1.140 kg
Portland Cement
0.003 m3
Pasir pasang
0.100 kg
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
Semen warna
10,000.00
1,000.00
0.090 OH
Pekerja
60,000.00
0.090 OH
Tukang batu
70,000.00
0.009 OH
Kepala tukang
80,000.00
0.005 OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
22
Buah
1.140
kg
Portland Cement
0.003
m3
Pasir pasang
0.100
kg
0.090
2,200.00
7,766.00
1,250.00
1,425.00
195,000.00
585.00
Semen warna
10,000.00
1,000.00
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
23
Buah
1.140
kg
Portland Cement
0.003
m3
Pasir pasang
0.100
Kg
0.090
0.090
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
Semen warna
10,000.00
1,000.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
24
Buah
1.140
kg
Portland Cement
0.003
Pasir pasang
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
1,000.00
0.100
kg
Semen warna
10,000.00
0.090
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
25
Buah
1.140
kg
Portland Cement
0.003
Pasir pasang
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
0.100
kg
Semen warna
10,000.00
0.090
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
1,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
26
Buah
1.140
kg
Portland Cement
0.003
Pasir pasang
195,000.00
585.00
0.100
kg
Semen warna
10,000.00
1,000.00
0.090
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
n/a
#VALUE!
1,250.00
1,425.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
27
Buah
1.140
kg
Portland Cement
0.003
m3
Pasir pasang
0.100
Kg
0.090
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
Semen warna
10,000.00
1,000.00
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
28
Buah
1.140
kg
0.003
m3
Pasir pasang
0.100
kg
0.090
0.090
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
Semen warna
10,000.00
1,000.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
29
Buah
1.140
kg
0.003
m3
Pasir pasang
0.100
kg
0.090
0.090
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
Semen warna
10,000.00
1,000.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
30
Buah
1.140
kg
Portland Cement
0.003
Pasir pasang
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
1,000.00
0.100
kg
Semen warna
10,000.00
0.090
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.009
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
31
m3
n/a
#VALUE!
0.100
kg
Semen warna
10,000.00
0.360
OH
Pekerja
60,000.00
0.180
OH
Tukang batu
70,000.00
0.018
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
1,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
32
Buah
8.190
kg
Portland Cement
0.045
Pasir pasang
2.750
kg
Semen warna
970.00
51,410.00
1,250.00
10,237.50
195,000.00
8,775.00
10,000.00
27,500.00
0.700
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
33
Buah
8.190
kg
Portland Cement
0.045
Pasir pasang
517.00
54,802.00
1,250.00
10,237.50
195,000.00
8,775.00
32,000.00
3.200
kg
Semen warna
10,000.00
0.700
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
34
Buah
Ubin keramik
n/a
#VALUE!
8.190
kg
Portland Cement
0.045
Pasir pasang
195,000.00
8,775.00
1.620
kg
Semen warna
10,000.00
16,200.00
0.700
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
1,250.00
10,237.50
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
35
Buah
Ubin keramik
10.000
kg
Portland Cement
0.045
m3
Pasir pasang
1.500
kg
0.700
8,400.00
99,708.00
1,250.00
12,500.00
195,000.00
8,775.00
Semen warna
10,000.00
15,000.00
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
36
Buah
Ubin keramik
10.400
kg
Portland Cement
0.045
m3
Pasir pasang
1.620
kg
0.700
3,360.00
89,040.00
1,250.00
13,000.00
195,000.00
8,775.00
Semen warna
10,000.00
16,200.00
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
37
Buah
Ubin keramik
9.800
kg
Portland Cement
0.045
m3
Pasir pasang
4.370
kg
1.050
0.525
n/a
#VALUE!
1,250.00
12,250.00
195,000.00
8,775.00
Semen warna
10,000.00
43,700.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.053
OH
Kepala tukang
80,000.00
0.053
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
38
Buah
14.150
kg
Portland Cement
Pasir pasang
0.039
Mosaik
n/a
#VALUE!
1,250.00
17,687.50
195,000.00
7,605.00
20,000.00
2.000
kg
Semen warna
10,000.00
0.700
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
39
Buah
1.140
kg
Portland Cement
0.003
Pasir pasang
970.00
5,141.00
1,250.00
1,425.00
195,000.00
585.00
0.025
kg
Semen warna
10,000.00
0.090
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
250.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
40
Buah
517.00
5,480.20
1,250.00
1,425.00
1.140
kg
Portland Cement
0.003
Pasir pasang
195,000.00
585.00
0.050
kg
Semen warna
10,000.00
500.00
0.090
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
41
Buah
0.570
kg
Portland Cement
0.002
m3
Pasir pasang
0.013
kg
0.090
n/a
#VALUE!
1,250.00
712.50
195,000.00
292.50
Semen warna
10,000.00
130.00
OH
Pekerja
60,000.00
0.090
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
42
Buah
1.140
kg
Internal cove
Portland Cement
0.003
m3
Pasir pasang
0.100
kg
0.750
0.750
n/a
#VALUE!
1,250.00
1,425.00
195,000.00
585.00
Semen warna
10,000.00
1,000.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.075
OH
Kepala tukang
80,000.00
0.038
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
43
Buah
8.190
kg
Portland Cement
1,373,200.00
1,455,592.00
1,250.00
10,237.50
0.045
Pasir pasang
195,000.00
8,775.00
0.650
kg
Semen warna
10,000.00
6,500.00
0.700
0.350
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
Marmer
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
44
m2
Karpet
n/a
#VALUE!
0.350
kg
Lem
34,000.00
0.170
OH
Pekerja
60,000.00
0.170
OH
Tukang kayu
70,000.00
0.017
OH
Kepala tukang
80,000.00
0.009
OH
Mandor
90,000.00
11,900.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
45
m2
Underlayer/rubber corrugated
0.350
kg
Lem
n/a
34,000.00
#VALUE!
0.120
OH
Pekerja
60,000.00
0.120
OH
Tukang kayu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.006
OH
Mandor
90,000.00
11,900.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
46
m2
Parquet
n/a
#VALUE!
0.600
kg
Lem
34,000.00
0.700
OH
Pekerja
60,000.00
0.350
OH
Tukang kayu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
20,400.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
47
m2
Gymfloor
n/a
#VALUE!
0.600
kg
Lem
34,000.00
0.700
OH
Pekerja
60,000.00
0.350
OH
Tukang kayu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
20,400.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
48
Buah
Porselen
517.00
44,462.00
1,250.00
11,625.00
195,000.00
3,510.00
Semen warna
10,000.00
15,000.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.050
OH
Kepala tukang
80,000.00
0.050
OH
Mandor
90,000.00
9.300
kg
Portland Cement
0.018
Pasir pasang
1.500
kg
1.000
0.500
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
49
Buah
Porselin
9.300
kg
Portland Cement
0.018
Pasir pasang
n/a
#VALUE!
1,250.00
11,625.00
195,000.00
3,510.00
27,500.00
2.750
kg
Semen warna
10,000.00
0.900
OH
Pekerja
60,000.00
0.450
OH
Tukang batu
70,000.00
0.045
OH
Kepala tukang
80,000.00
0.045
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
50
Buah
Porselin
9.300
kg
Portland Cement
0.018
Pasir pasang
n/a
#VALUE!
1,250.00
11,625.00
195,000.00
3,510.00
1.940
kg
Semen warna
10,000.00
0.900
OH
Pekerja
60,000.00
0.450
OH
Tukang batu
70,000.00
0.045
OH
Kepala tukang
80,000.00
0.045
OH
Mandor
90,000.00
19,400.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
51
Buah
Keramik artistik
9.300
kg
Portland Cement
0.018
Pasir pasang
195,000.00
3,510.00
2.750
kg
Semen warna
10,000.00
27,500.00
0.900
OH
Pekerja
60,000.00
0.450
OH
Tukang batu
70,000.00
0.045
OH
Kepala tukang
80,000.00
0.045
OH
Mandor
90,000.00
970.00
51,410.00
1,250.00
11,625.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
52
Buah
Keramik artistik
9.300
kg
Portland Cement
0.018
m3
Pasir pasang
2.900
kg
0.900
n/a
#VALUE!
1,250.00
11,625.00
195,000.00
3,510.00
Semen warna
10,000.00
29,000.00
OH
Pekerja
60,000.00
0.450
OH
Tukang batu
70,000.00
0.045
OH
Kepala tukang
80,000.00
0.045
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
53
Buah
Keramik
870.00
46,110.00
1,250.00
11,625.00
195,000.00
3,510.00
Semen warna
10,000.00
27,500.00
OH
Pekerja
60,000.00
OH
Tukang batu
70,000.00
0.045
OH
Kepala tukang
80,000.00
0.045
OH
Mandor
90,000.00
9.300
kg
Portland Cement
0.018
Pasir pasang
2.750
kg
0.900
0.450
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
54
Keramik
3,360.00
89,040.00
9.300
Buah
kg
Portland Cement
1,250.00
11,625.00
0.018
PS
195,000.00
3,510.00
1.940
kg
Semen warna
10,000.00
19,400.00
0.900
OH
Pekerja
60,000.00
0.450
OH
Tukang batu
70,000.00
0.045
OH
Kepala tukang
80,000.00
0.045
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
55
m2
3.003
Buah
12.440
Marmer
1,373,200.00
Paku 12 cm
n/a
#VALUE!
kg
Portland Cement
0.025
Pasir pasang
0.650
kg
Semen warna
1.300
OH
Pekerja
60,000.00
0.650
OH
Tukang batu
70,000.00
0.065
OH
Kepala tukang
80,000.00
0.065
OH
Mandor
90,000.00
1,455,592.00
1,250.00
15,550.00
195,000.00
4,875.00
10,000.00
6,500.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
56
Buah
12.440
kg
Portland Cement
0.025
m3
Pasir pasang
2.750
kg
1.000
n/a
#VALUE!
1,250.00
15,550.00
195,000.00
4,875.00
Semen warna
10,000.00
27,500.00
OH
Pekerja
60,000.00
0.500
OH
Tukang batu
70,000.00
0.050
OH
Kepala tukang
80,000.00
0.050
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
57
m2
Batu paras
n/a
#VALUE!
11.750
kg
Portland Cement
0.035
m3
Pasir pasang
1,250.00
14,687.50
195,000.00
6,825.00
0.700
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
58
m2
105,000.00
115,500.00
11.750
kg
Portland Cement
0.035
m3
Pasir pasang
1,250.00
14,687.50
195,000.00
6,825.00
0.700
OH
Pekerja
60,000.00
0.350
OH
Tukang batu
70,000.00
0.035
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
59
Buah
KL. I
Vinyl
n/a
n/a
#VALUE!
0.350
kg
Lem vinyl
0.150
OH
Pekerja
60,000.00
#VALUE!
0.150
OH
Tukang
70,000.00
0.015
OH
Kepala tukang
80,000.00
0.008
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
60
Wall paper
n/a
#VALUE!
0.250
kg
Lem
n/a
#VALUE!
0.350
OH
Pekerja
60,000.00
0.175
OH
Tukang
70,000.00
0.017
OH
Kepala tukang
80,000.00
0.002
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
61
5.000
kg
Floor hardener
0.120
OH
Pekerja
n/a
60,000.00
#VALUE!
0.120
OH
Tukang
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.006
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
62
Memasang 1 m' plint Vinyl karet ukuran (15 x 30) cm dengan perekat
1.760
Buah
Vinyl karet
n/a
#VALUE!
0.080
kg
Lem vinyl
n/a
#VALUE!
0.080
OH
Pekerja
60,000.00
0.080
OH
Tukang
70,000.00
0.008
OH
Kepala tukang
80,000.00
0.004
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
63
m3
5,950,000.00
17,850.00
0.050
kg
Paku /skrup 5 cm
17,000.00
850.00
0.120
OH
Pekerja
60,000.00
0.120
OH
Tukang kayu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.006
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
#VALUE!
12,250.00
8,775.00
15,000.00
15,000.00
8,750.00
8,750.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,500.00
8,775.00
15,000.00
15,000.00
8,750.00
8,750.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
13,000.00
8,775.00
16,200.00
16,200.00
9,450.00
9,450.00
1,120.00
1,120.00
1,260.00
1,260.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,250.00
8,775.00
13,000.00
15,000.00
15,000.00
8,750.00
8,750.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,500.00
8,775.00
15,000.00
15,600.00
15,600.00
9,100.00
9,100.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
13,000.00
8,775.00
16,200.00
16,200.00
16,200.00
9,450.00
9,450.00
1,120.00
1,120.00
1,260.00
1,260.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,250.00
8,775.00
13,000.00
15,000.00
15,000.00
8,750.00
8,750.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
26,114.00
12,500.00
8,775.00
15,000.00
15,600.00
15,600.00
9,100.00
9,100.00
1,040.00
1,040.00
1,170.00
1,170.00
89,299.00
89,299.00
89,290.00
#VALUE!
12,250.00
8,775.00
13,000.00
15,000.00
15,000.00
8,750.00
8,750.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,500.00
8,775.00
15,000.00
15,600.00
15,600.00
9,100.00
9,100.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,250.00
8,775.00
13,000.00
15,000.00
15,000.00
8,750.00
8,750.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,500.00
8,775.00
15,000.00
15,600.00
15,600.00
9,100.00
9,100.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,000.00
8,775.00
15,000.00
14,400.00
14,400.00
8,400.00
8,400.00
960.00
960.00
1,080.00
1,080.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,250.00
8,775.00
13,000.00
15,000.00
15,000.00
8,750.00
8,750.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
#VALUE!
12,500.00
8,775.00
15,000.00
15,600.00
15,600.00
9,100.00
9,100.00
1,040.00
1,040.00
1,170.00
1,170.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
2,062.50
780.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,550.00
585.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,550.00
585.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
7,766.00
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
23,646.00
23,646.00
23,640.00
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
5,400.00
5,400.00
6,300.00
6,300.00
720.00
720.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,000.00
21,600.00
21,600.00
12,600.00
12,600.00
1,440.00
1,440.00
1,620.00
1,620.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
51,410.00
10,237.50
8,775.00
27,500.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
170,372.50
170,372.50
170,370.00
54,802.00
10,237.50
8,775.00
32,000.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
178,264.50
178,264.50
178,260.00
#VALUE!
10,237.50
8,775.00
16,200.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
99,708.00
12,500.00
8,775.00
15,000.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
208,433.00
208,433.00
208,430.00
89,040.00
13,000.00
8,775.00
16,200.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
199,465.00
199,465.00
199,460.00
#VALUE!
12,250.00
8,775.00
43,700.00
63,000.00
63,000.00
36,750.00
36,750.00
4,240.00
4,240.00
4,770.00
4,770.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
17,687.50
7,605.00
20,000.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5,141.00
1,425.00
585.00
250.00
5,400.00
5,400.00
6,300.00
6,300.00
2,800.00
2,800.00
450.00
450.00
22,351.00
22,351.00
22,350.00
5,480.20
1,425.00
585.00
500.00
5,400.00
5,400.00
6,300.00
6,300.00
2,800.00
2,800.00
450.00
450.00
22,940.20
22,940.20
22,940.00
#VALUE!
712.50
292.50
130.00
5,400.00
5,400.00
6,300.00
6,300.00
2,800.00
2,800.00
450.00
450.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,425.00
585.00
1,000.00
45,000.00
45,000.00
52,500.00
52,500.00
6,000.00
6,000.00
3,420.00
3,420.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,455,592.00
10,237.50
8,775.00
6,500.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
1,553,554.50
1,553,554.50
1,553,550.00
#VALUE!
11,900.00
10,200.00
10,200.00
11,900.00
11,900.00
1,360.00
1,360.00
810.00
810.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
11,900.00
7,200.00
7,200.00
8,400.00
8,400.00
960.00
960.00
540.00
540.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
20,400.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
#VALUE!
20,400.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
44,462.00
11,625.00
3,510.00
15,000.00
60,000.00
60,000.00
35,000.00
35,000.00
4,000.00
4,000.00
4,500.00
4,500.00
178,097.00
178,097.00
178,090.00
#VALUE!
11,625.00
3,510.00
27,500.00
54,000.00
54,000.00
31,500.00
31,500.00
3,600.00
3,600.00
4,050.00
4,050.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
11,625.00
3,510.00
19,400.00
54,000.00
54,000.00
31,500.00
31,500.00
3,600.00
3,600.00
4,050.00
4,050.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
51,410.00
11,625.00
3,510.00
27,500.00
54,000.00
54,000.00
31,500.00
31,500.00
3,600.00
3,600.00
4,050.00
4,050.00
187,195.00
187,195.00
187,190.00
#VALUE!
11,625.00
3,510.00
29,000.00
54,000.00
54,000.00
31,500.00
31,500.00
3,600.00
3,600.00
4,050.00
4,050.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
46,110.00
11,625.00
3,510.00
27,500.00
54,000.00
54,000.00
31,500.00
31,500.00
3,600.00
3,600.00
4,050.00
4,050.00
181,895.00
181,895.00
181,890.00
89,040.00
11,625.00
3,510.00
19,400.00
54,000.00
54,000.00
31,500.00
31,500.00
3,600.00
3,600.00
4,050.00
4,050.00
216,725.00
216,725.00
216,720.00
1,455,592.00
#VALUE!
15,550.00
4,875.00
6,500.00
78,000.00
78,000.00
45,500.00
45,500.00
5,200.00
5,200.00
5,850.00
5,850.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
15,550.00
4,875.00
27,500.00
60,000.00
60,000.00
35,000.00
35,000.00
4,000.00
4,000.00
4,500.00
4,500.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
14,687.50
6,825.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
115,500.00
14,687.50
6,825.00
42,000.00
42,000.00
24,500.00
24,500.00
2,800.00
2,800.00
3,150.00
3,150.00
209,462.50
209,462.50
209,460.00
#VALUE!
#VALUE!
9,000.00
9,000.00
10,500.00
10,500.00
1,200.00
1,200.00
720.00
720.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
21,000.00
21,000.00
12,250.00
12,250.00
1,360.00
1,360.00
180.00
180.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
7,200.00
7,200.00
8,400.00
8,400.00
960.00
960.00
540.00
540.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
4,800.00
4,800.00
5,600.00
5,600.00
640.00
640.00
360.00
360.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
17,850.00
850.00
7,200.00
7,200.00
8,400.00
8,400.00
960.00
960.00
540.00
540.00
35,800.00
35,800.00
35,800.00
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA
HARGA,
SATUAN (Rp) BAHAN (Rp)
5
PEKERJAAN LANGIT-LANGIT
1
m2
Asbes semen
15,000.00
16,500.000
0.010
kg
Paku tripleks
28,600.00
286.000
0.030
OH
Pekerja
60,000.00
0.070
OH
Tukang kayu
70,000.00
0.007
OH
Kepala tukang
80,000.00
0.004
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
2
Lembar
Akustik
n/a
#VALUE!
0.050
kg
Paku tripleks
28,600.00
0.120
OH
Pekerja
60,000.00
0.120
OH
Tukang kayu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.006
OH
Mandor
90,000.00
1,430.000
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
3
Lembar
0.050
kg
Akustik
Paku tripleks
n/a
28,600.00
#VALUE!
0.120
OH
Pekerja
60,000.00
0.120
OH
Tukang kayu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.006
OH
Mandor
90,000.00
1,430.000
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
4
Lembar
Akustik
90,000.00
135,000.000
1,430.000
0.050
kg
Paku tripleks
28,600.00
0.100
OH
Pekerja
60,000.00
0.100
OH
Tukang kayu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
5
Lembar
Tripleks
62,100.00
23,287.500
0.030
kg
Paku tripleks
28,600.00
858.000
0.100
OH
Pekerja
60,000.00
0.100
OH
Tukang kayu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
6
Kayu papan
n/a
#VALUE!
0.010
kg
Paku tripleks
28,600.00
0.800
OH
Pekerja
60,000.00
0.800
OH
Tukang kayu
70,000.00
0.080
OH
Kepala tukang
80,000.00
0.040
OH
Mandor
90,000.00
286.000
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
7
Lembar
Gypsum board
60,000.00
21,840.000
3,300.000
0.110
kg
Paku skrup
30,000.00
0.100
OH
Pekerja
60,000.00
0.050
OH
Tukang kayu
70,000.00
0.005
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
8
m'
n/a
#VALUE!
0.150
kg
Tepung gypsum
n/a
#VALUE!
0.060
OH
Pekerja
60,000.00
0.060
OH
Tukang kayu
70,000.00
0.006
OH
Kepala tukang
80,000.00
0.003
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
9
m'
n/a
#VALUE!
0.150
kg
Kawat diameter 4 mm
n/a
#VALUE!
1.050
Buah
Ramset
n/a
#VALUE!
1.500
Lembar
0.500
0.500
Akustik 60 cm x 120 cm
60,000.00
OH
Pekerja
60,000.00
OH
Tukang besi
70,000.00
0.050
OH
Kepala tukang
80,000.00
0.025
OH
Mandor
90,000.00
90,000.000
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
10
m'
15,000.00
15,750.000
0.010
kg
Paku
28,600.00
286.000
0.050
OH
Pekerja
60,000.00
0.050
OH
Tukang kayu
70,000.00
0.005
OH
Kepala tukang
80,000.00
0.003
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
0%
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
16,500.00
286.00
1,800.00
1,800.00
4,900.00
4,900.00
560.00
560.00
360.00
360.00
24,406.00
0%
24,406.00
24,400.00
#VALUE!
1,430.00
7,200.00
7,200.00
8,400.00
8,400.00
960.00
960.00
540.00
540.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,430.00
7,200.00
7,200.00
8,400.00
8,400.00
960.00
960.00
540.00
540.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
135,000.00
1,430.00
6,000.00
6,000.00
7,000.00
7,000.00
800.00
800.00
450.00
450.00
150,680.00
0%
150,680.00
150,680.00
23,287.50
858.00
6,000.00
6,000.00
7,000.00
7,000.00
800.00
800.00
450.00
450.00
38,395.50
0%
38,395.50
38,390.00
#VALUE!
286.00
48,000.00
48,000.00
56,000.00
56,000.00
6,400.00
6,400.00
3,600.00
3,600.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
21,840.00
3,300.00
6,000.00
6,000.00
3,500.00
3,500.00
400.00
400.00
450.00
450.00
35,490.00
0%
35,490.00
35,490.00
#VALUE!
#VALUE!
3,600.00
3,600.00
4,200.00
4,200.00
480.00
480.00
270.00
270.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
90,000.00
30,000.00
30,000.00
35,000.00
35,000.00
4,000.00
4,000.00
2,250.00
2,250.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
15,750.00
286.00
3,000.00
3,000.00
3,500.00
3,500.00
400.00
400.00
270.00
270.00
23,206.00
0%
23,206.00
23,200.00
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA
HARGA,
SATUAN (Rp) BAHAN (Rp)
5
PEKERJAAN KAYU
1
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
1.100
M3
Balok kayu
9,400,000.00 10,340,000.00
1.250
Kg
Paku 10 cm
17,000.00
21,250.00
1.000
Kg
Lem kayu
34,000.00
34,000.00
7.000
OH
Pekerja
60,000.00
21.000
OH
Tukang kayu
70,000.00
2.100
OH
Kepala tukang
80,000.00
0.350
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
2
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
1.200
M3
Balok kayu
5,670,000.00
6,804,000.00
1.250
Kg
Paku 10 cm
17,000.00
21,250.00
1.000
Kg
Lem kayu
34,000.00
34,000.00
6.000
OH
Pekerja
60,000.00
18.000
OH
Tukang kayu
70,000.00
1.800
OH
Kepala tukang
80,000.00
0.300
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
3
M3
Papan kayu
6,960,000.00
278,400.00
0.050
Kg
Paku 5 cm - 7 cm
17,000.00
850.00
0.350
1.050
OH
Pekerja
60,000.00
OH
Tukang kayu
70,000.00
0.105
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
4
Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas gudang sementara.
0.040
M3
Papan kayu
4,250,000.00
170,000.00
0.050
Kg
Paku 5 cm - 7 cm
17,000.00
850.00
0.350
OH
Pekerja
60,000.00
1.050
OH
Tukang kayu
70,000.00
0.105
OH
Kepala tukang
80,000.00
0.018
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
5
m3
Papan kayu
10,400,000.00
416,000.00
0.500
kg
Lem kayu
34,000.00
17,000.00
1.000
OH
Pekerja
60,000.00
3.000
OH
Tukang kayu
70,000.00
0.300
OH
Kepala tukang
80,000.00
0.050
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
6
Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II
0.024
m3
Papan kayu
6,960,000.00
167,040.00
0.300
kg
0.800
OH
Lem kayu
34,000.00
10,200.00
Pekerja
60,000.00
2.400
OH
Tukang kayu
70,000.00
0.240
OH
Kepala tukang
80,000.00
0.040
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
7
Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II
0.064
m3
Papan kayu
6,960,000.00
445,440.00
0.500
kg
Lem kayu
34,000.00
17,000.00
1.000
3.000
OH
Pekerja
60,000.00
OH
Tukang kayu
70,000.00
0.300
OH
Kepala tukang
80,000.00
0.050
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
8
Membuat 1 m2 daun pintu kayu lapis (teakwood) rangkap, rangka tertutup kayu kelas II (lebar samp
0.025
m3
Papan kayu
6,960,000.00
174,000.00
0.030
kg
Paku 1 cm - 2,5 cm
28,600.00
858.00
0.500
kg
34,000.00
17,000.00
80,000.00
80,000.00
OH
Lem kayu
Teakwood tebal 4 mm Ukuran (90 x 220)
cm
Pekerja
1.000
Lembar
0.700
2.100
OH
Tukang kayu
70,000.00
0.210
OH
Kepala tukang
80,000.00
0.035
OH
Mandor
90,000.00
60,000.00
Jumlah
Keuntungan Maksimal
Jumlah
0%
Dibulatkan
9
m3
Papan kayu
10,400,000.00
266,240.00
0.030
kg
Paku 1 cm - 2,5 cm
28,600.00
858.00
0.500
kg
1.000
Lembar
34,000.00
17,000.00
80,000.00
80,000.00
OH
Lem kayu
Teakwood tebal 4 mm Ukuran (90 x 220)
cm
Pekerja
0.800
2.400
OH
Tukang kayu
70,000.00
0.240
OH
Kepala tukang
80,000.00
0.040
OH
Mandor
90,000.00
60,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
10
m3
Papan kayu
10,400,000.00
624,000.00
0.150
kg
0.670
OH
Paku 1 cm - 2,5 cm
28,600.00
4,290.00
Pekerja
60,000.00
2.000
OH
Tukang kayu
70,000.00
0.200
OH
Kepala tukang
80,000.00
0.335
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
11
m3
Papan kayu
10,400,000.00
260,000.00
0.030
kg
Paku 1 cm - 2,5 cm
28,600.00
858.00
0.300
kg
1.000
Lembar
34,000.00
10,200.00
80,000.00
80,000.00
OH
Lem kayu
Teakwood tebal 4 mm ukuran (90 x 220)
cm
Pekerja
0.800
2.400
OH
Tukang kayu
70,000.00
0.240
OH
Kepala tukang
80,000.00
0.040
OH
Mandor
90,000.00
60,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
12
m3
Papan kayu
10,400,000.00
260,000.00
0.030
kg
Paku 1 cm - 2,5 cm
28,600.00
858.00
0.800
kg
34,000.00
27,200.00
1.000
Lembar
80,000.00
80,000.00
0.500
Lembar
Lem kayu
Teakwood tebal 4 mm ukuran (90 x 220)
cm
Formika
132,000.00
66,000.00
0.850
OH
Pekerja
60,000.00
2.550
OH
Tukang kayu
70,000.00
0.255
OH
Kepala tukang
80,000.00
0.043
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
13
m3
5,670,000.00
6,237,000.00
15.000
kg
12,000.00
180,000.00
5.600
kg
Paku 12 cm
17,000.00
95,200.00
4.000
OH
Pekerja
60,000.00
12.000
OH
Tukang kayu
70,000.00
1.200
OH
Kepala tukang
80,000.00
0.200
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
14
m3
9,400,000.00 11,280,000.00
15.000
kg
12,000.00
180,000.00
5.600
kg
Paku 12 cm
17,000.00
95,200.00
6.700
OH
Pekerja
60,000.00
20.100
OH
Tukang kayu
70,000.00
2.010
OH
Kepala tukang
80,000.00
0.335
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
15
m3
5,670,000.00
6,237,000.00
15.000
kg
12,000.00
180,000.00
3.000
kg
Paku 12 cm
17,000.00
51,000.00
6.700
OH
Pekerja
60,000.00
20.100
OH
Tukang kayu
70,000.00
2.010
OH
Kepala tukang
80,000.00
0.335
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
16
m3
Kaso-kaso (5 x 7) cm
5,450,000.00
76,300.00
0.036
Reng (2 x 3) cm
6,666,666.67
240,000.00
0.250
kg
Paku 5 cm dan 10 cm
17,000.00
4,250.00
0.100
OH
Pekerja
60,000.00
0.100
OH
Tukang kayu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
17
m3
Kaso-kaso (5 x 7) cm
5,450,000.00
76,300.00
0.057
Reng (3 x 4) cm
6,666,666.67
380,000.00
0.250
kg
Paku 5 cm dan 10 cm
17,000.00
4,250.00
0.100
OH
Pekerja
60,000.00
0.100
OH
Tukang kayu
70,000.00
0.010
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
18
m3
Kayu kelas II
5,450,000.00
76,300.00
0.057
kg
Paku 5 cm sampai 10 cm
17,000.00
969.00
0.120
OH
Pekerja
60,000.00
0.120
OH
Tukang kayu
70,000.00
0.012
OH
Kepala tukang
80,000.00
0.006
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
19
0.015
4,250,000.00
65,450.00
0.200
kg
Paku 7 cm - 10 cm
17,000.00
3,400.00
0.150
OH
Pekerja
60,000.00
0.300
OH
Tukang kayu
70,000.00
0.030
OH
Kepala tukang
80,000.00
0.075
OH
Mandor
90,000.00
Kaso-kaso (5 x 7) cm
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
20
Kaso-kaso (5 x 7) cm
4,250,000.00
69,275.00
4,250.00
0.250
kg
Paku 7 cm- 10 cm
17,000.00
0.200
OH
Pekerja
60,000.00
0.300
OH
Tukang kayu
70,000.00
0.030
OH
Kepala tukang
80,000.00
0.010
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
0%
Dibulatkan
21
Memasang 1 m1
0.011
0.100
kg
0.100
0.200
Papan kayu
6,960,000.00
75,168.00
Paku 5 cm dan 7 cm
17,000.00
1,700.00
OH
Pekerja
60,000.00
OH
Tukang kayu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
22
Memasang 1 m1
0.011
m3
Papan kayu
6,960,000.00
76,560.00
0.050
kg
Paku 5 cm dan 7 cm
17,000.00
850.00
0.100
OH
Pekerja
60,000.00
0.200
OH
Tukang kayu
70,000.00
0.020
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
23
m3
Balok kayu
5,450,000.00
152,600.00
0.150
kg
Paku 5 cm dan 7 cm
17,000.00
2,550.00
0.150
OH
Pekerja
60,000.00
0.450
OH
Tukang kayu
70,000.00
0.045
OH
Kepala tukang
80,000.00
0.008
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
24
m3
5,450,000.00
0.150
kg
0.860
Lembar
0.560
kg
Paku 5 cm dan 10 cm
Teakwood t= 4 mm, Ukuran 120 cm x 240
cm
Lem kayu
0.150
OH
Pekerja
60,000.00
0.450
OH
Tukang kayu
70,000.00
0.045
OH
Kepala tukang
80,000.00
0.008
OH
Mandor
90,000.00
152,600.00
17,000.00
2,550.00
107,000.00
92,020.00
34,000.00
19,040.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
25
0%
0.028
m3
0.150
kg
Paku 5 cm dan 10 cm
5,450,000.00
152,600.00
17,000.00
2,550.00
0.860
Lembar
0.560
kg
Lem kayu
34,000.00
0.200
OH
Pekerja
60,000.00
0.600
OH
Tukang kayu
70,000.00
0.060
OH
Kepala tukang
80,000.00
0.010
OH
Mandor
90,000.00
#VALUE!
19,040.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
26
m3
Papan kayu
10,400,000.00
72,800.00
0.100
kg
Paku 5 cm dan 10 cm
17,000.00
1,700.00
0.150
kg
Paku skrup 10 cm
30,000.00
4,500.00
0.600
OH
Pekerja
60,000.00
1.800
OH
Tukang kayu
70,000.00
0.180
OH
Kepala tukang
80,000.00
0.030
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
27
Lembar
Teakwood tebal 4 mm
107,000.00
42,800.00
0.050
kg
28,600.00
1,430.00
0.025
OH
Pekerja
60,000.00
0.075
OH
Tukang kayu
70,000.00
0.008
OH
Kepala tukang
80,000.00
0.001
OH
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
28
m2
Bilik bambu
0.014
m3
Kaso-kaso (5 x 7) cm
0.012
kg
Paku
0.003
0.100
OH
Pekerja
60,000.00
0.050
OH
Tukang kayu
70,000.00
0.005
OH
Kepala tukang
80,000.00
0.005
OH
Mandor
90,000.00
18,000.00
27,000.00
1,500,000.00
21,000.00
17,000.00
204.00
2,400,000.00
7,200.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
0%
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
10,340,000.00
21,250.00
34,000.00
420,000.00
420,000.00
1,470,000.00
1,470,000.00
168,000.00
168,000.00
31,500.00
31,500.00
12,484,750.00
0%
0.00
12,484,750.00
12,484,750.00
6,804,000.00
21,250.00
34,000.00
360,000.00
360,000.00
1,260,000.00
1,260,000.00
144,000.00
144,000.00
27,000.00
27,000.00
8,650,250.00
0%
8,650,250.00
8,650,250.00
278,400.00
850.00
21,000.00
21,000.00
73,500.00
73,500.00
8,400.00
8,400.00
1,620.00
1,620.00
9,034,020.00
0%
9,034,020.00
9,034,020.00
170,000.00
850.00
21,000.00
21,000.00
73,500.00
73,500.00
8,400.00
8,400.00
1,620.00
1,620.00
275,370.00
0%
275,370.00
275,370.00
416,000.00
17,000.00
60,000.00
60,000.00
210,000.00
210,000.00
24,000.00
24,000.00
4,500.00
4,500.00
731,500.00
0%
731,500.00
731,500.00
167,040.00
10,200.00
48,000.00
48,000.00
168,000.00
168,000.00
19,200.00
19,200.00
3,600.00
3,600.00
416,040.00
0%
416,040.00
416,040.00
445,440.00
17,000.00
60,000.00
60,000.00
210,000.00
210,000.00
24,000.00
24,000.00
4,500.00
4,500.00
760,940.00
0%
760,940.00
760,940.00
42,000.00
147,000.00
147,000.00
16,800.00
16,800.00
3,150.00
3,150.00
480,808.00
0%
480,808.00
480,800.00
266,240.00
858.00
17,000.00
80,000.00
48,000.00
48,000.00
168,000.00
168,000.00
19,200.00
19,200.00
3,600.00
3,600.00
602,898.00
0%
602,898.00
602,890.00
624,000.00
4,290.00
40,200.00
40,200.00
140,000.00
140,000.00
16,000.00
16,000.00
30,150.00
30,150.00
854,640.00
0%
854,640.00
854,640.00
260,000.00
858.00
10,200.00
80,000.00
48,000.00
48,000.00
168,000.00
168,000.00
19,200.00
19,200.00
3,600.00
3,600.00
589,858.00
0%
589,858.00
589,850.00
260,000.00
858.00
27,200.00
80,000.00
66,000.00
51,000.00
51,000.00
178,500.00
178,500.00
20,400.00
20,400.00
3,870.00
3,870.00
687,828.00
0%
687,828.00
687,820.00
ng 6 meter
6,237,000.00
180,000.00
95,200.00
240,000.00
240,000.00
840,000.00
840,000.00
96,000.00
96,000.00
18,000.00
18,000.00
7,706,200.00
0%
7,706,200.00
7,706,200.00
11,280,000.00
180,000.00
95,200.00
402,000.00
402,000.00
1,407,000.00
1,407,000.00
160,800.00
160,800.00
30,150.00
30,150.00
13,555,150.00
0%
13,555,150.00
13,555,150.00
6,237,000.00
180,000.00
51,000.00
402,000.00
402,000.00
1,407,000.00
1,407,000.00
160,800.00
160,800.00
30,150.00
30,150.00
8,467,950.00
0%
8,467,950.00
8,467,950.00
76,300.00
240,000.00
4,250.00
6,000.00
6,000.00
7,000.00
7,000.00
800.00
800.00
450.00
450.00
334,800.00
0%
334,800.00
334,800.00
76,300.00
380,000.00
4,250.00
6,000.00
6,000.00
7,000.00
7,000.00
800.00
800.00
450.00
450.00
474,800.00
0%
474,800.00
474,800.00
76,300.00
969.00
7,200.00
7,200.00
8,400.00
8,400.00
960.00
960.00
540.00
540.00
94,369.00
0%
94,369.00
94,360.00
65,450.00
3,400.00
9,000.00
9,000.00
21,000.00
21,000.00
2,400.00
2,400.00
6,750.00
6,750.00
108,000.00
0%
108,000.00
108,000.00
69,275.00
4,250.00
12,000.00
12,000.00
21,000.00
21,000.00
2,400.00
2,400.00
900.00
900.00
109,825.00
0%
109,825.00
109,820.00
75,168.00
1,700.00
6,000.00
6,000.00
14,000.00
14,000.00
1,600.00
1,600.00
450.00
450.00
98,918.00
0%
98,918.00
98,910.00
76,560.00
850.00
6,000.00
6,000.00
14,000.00
14,000.00
1,600.00
1,600.00
450.00
450.00
99,460.00
0%
99,460.00
99,460.00
152,600.00
2,550.00
9,000.00
9,000.00
31,500.00
31,500.00
3,600.00
3,600.00
720.00
720.00
199,970.00
0%
199,970.00
199,970.00
152,600.00
2,550.00
92,020.00
19,040.00
9,000.00
9,000.00
31,500.00
31,500.00
3,600.00
3,600.00
720.00
720.00
311,030.00
0%
311,030.00
311,030.00
152,600.00
2,550.00
#VALUE!
19,040.00
12,000.00
12,000.00
42,000.00
42,000.00
4,800.00
4,800.00
900.00
900.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
72,800.00
1,700.00
4,500.00
36,000.00
36,000.00
126,000.00
126,000.00
14,400.00
14,400.00
2,700.00
2,700.00
258,100.00
0%
258,100.00
258,100.00
42,800.00
1,430.00
1,500.00
1,500.00
5,250.00
5,250.00
640.00
640.00
90.00
90.00
51,710.00
0%
51,710.00
51,710.00
27,000.00
21,000.00
204.00
7,200.00
6,000.00
6,000.00
3,500.00
3,500.00
400.00
400.00
450.00
450.00
65,754.00
0%
65,754.00
65,750.00
NO
INDEKS
SATUAN
KEBUTUHAN
HARGA
HARGA,
SATUAN (Rp) BAHAN (Rp)
5
bh
960.00
0.150
Oh
Pekerja
60,000.00
0.075
Oh
Tukang kayu
70,000.00
0.008
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
24,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
2
bh
0.150
Oh
Pekerja
n/a
60,000.00
#VALUE!
0.075
Oh
Tukang kayu
70,000.00
0.008
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
3
bh
1,100.00
0.150
Oh
Pekerja
60,000.00
0.075
Oh
Tukang kayu
70,000.00
0.008
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
13,200.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
4
bh
Genteng bubung
4,000.00
20,000.00
8.000
kg
Semen portland
1,250.00
10,000.00
0.032
kg
Pasir pasang
195,000.00
6,240.00
0.400
Oh
Pekerja
60,000.00
0.200
Oh
Tukang kayu
70,000.00
0.020
Oh
Kepala tukang
80,000.00
0.002
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
5
bh
Genteng bubung
n/a
#VALUE!
8.000
kg
Semen portland
0.032
kg
Pasir pasang
0.400
Oh
Pekerja
60,000.00
0.200
Oh
Tukang kayu
70,000.00
0.020
Oh
Kepala tukang
80,000.00
0.002
Oh
Mandor
90,000.00
1,250.00
10,000.00
195,000.00
6,240.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
6
bh
Genteng bubung
4,200.00
16,800.00
8.000
kg
Semen portland
0.032
kg
Pasir pasang
1,250.00
10,000.00
195,000.00
6,240.00
0.400
Oh
Pekerja
60,000.00
0.200
Oh
Tukang kayu
70,000.00
0.020
Oh
Kepala tukang
80,000.00
0.002
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
7
lbr
n/a
#VALUE!
0.050
kg
17,000.00
0.140
Oh
Pekerja
60,000.00
0.067
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
850.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
8
lbr
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.075
Oh
Tukang kayu
70,000.00
0.008
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
Jumlah
n/a
#VALUE!
3,600.00
Keuntungan Maksimal
Jumlah
Dibulatkan
9
lbr
0.120
kg
Paku asbes
n/a
30,000.00
#VALUE!
0.140
Oh
Pekerja
60,000.00
0.075
Oh
Tukang kayu
70,000.00
0.008
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
10
lbr
n/a
#VALUE!
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.075
Oh
Tukang kayu
70,000.00
0.008
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
11
lbr
49,000.00
36,750.00
0.120
kg
Paku asbes
30,000.00
3,600.00
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
12
lbr
n/a
#VALUE!
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
13
lbr
n/a
#VALUE!
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
14
lbr
n/a
#VALUE!
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
15
lbr
n/a
#VALUE!
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
16
lbr
0.120
kg
Paku asbes
n/a
30,000.00
#VALUE!
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
17
lbr
n/a
#VALUE!
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
18
lbr
n/a
#VALUE!
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
19
lbr
0.120
kg
Paku asbes
n/a
30,000.00
#VALUE!
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
20
lbr
n/a
#VALUE!
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
21
lbr
n/a
#VALUE!
0.120
kg
Paku asbes
30,000.00
0.140
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.007
Oh
Mandor
90,000.00
3,600.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
22
lbr
n/a
#VALUE!
6.000
bh
n/a
#VALUE!
0.084
Oh
Pekerja
60,000.00
0.125
Oh
Tukang kayu
70,000.00
0.013
Oh
Kepala tukang
80,000.00
0.004
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
23
lbr
n/a
#VALUE!
6.000
bh
n/a
0.084
Oh
Pekerja
60,000.00
0.125
Oh
Tukang kayu
70,000.00
0.013
Oh
Kepala tukang
80,000.00
0.004
Oh
Mandor
90,000.00
#VALUE!
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
24
lbr
n/a
#VALUE!
6.000
bh
n/a
#VALUE!
0.084
Oh
Pekerja
60,000.00
0.125
Oh
Tukang kayu
70,000.00
0.013
Oh
Kepala tukang
80,000.00
0.004
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
25
1.200
lbr
Nok paten 92 cm
n/a
#VALUE!
6.000
bh
n/a
#VALUE!
0.084
Oh
Pekerja
60,000.00
0.125
Oh
Tukang kayu
70,000.00
0.013
Oh
Kepala tukang
80,000.00
0.004
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
26
lbr
n/a
#VALUE!
6.000
bh
n/a
0.084
Oh
Pekerja
60,000.00
0.125
Oh
Tukang kayu
70,000.00
0.013
Oh
Kepala tukang
80,000.00
0.004
Oh
Mandor
90,000.00
#VALUE!
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
27
lbr
n/a
#VALUE!
6.000
bh
n/a
#VALUE!
0.084
Oh
Pekerja
60,000.00
0.125
Oh
Tukang kayu
70,000.00
0.013
Oh
Kepala tukang
80,000.00
0.004
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
28
lbr
Nok paten 92 cm
n/a
#VALUE!
6.000
bh
n/a
#VALUE!
0.100
Oh
Pekerja
60,000.00
0.150
Oh
Tukang kayu
70,000.00
0.013
Oh
Kepala tukang
80,000.00
0.004
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
29
lbr
n/a
#VALUE!
6.000
bh
0.100
Oh
Pekerja
n/a
60,000.00
#VALUE!
0.150
Oh
Tukang kayu
70,000.00
0.013
Oh
Kepala tukang
80,000.00
0.004
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
30
bh
Genteng beton
62,000.00
682,000.00
0.030
kg
Paku biasa
17,000.00
510.00
0.200
Oh
Pekerja
60,000.00
0.100
Oh
Tukang kayu
70,000.00
0.010
Oh
Kepala tukang
80,000.00
0.010
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
31
bh
Genteng aspal
n/a
#VALUE!
0.350
lbr
Plywood 6 mm
0.030
kg
0.500
bh
Plastic Aerator
0.200
Oh
Pekerja
60,000.00
0.300
Oh
Tukang kayu
70,000.00
0.030
Oh
Kepala tukang
80,000.00
0.500
Oh
Mandor
90,000.00
17,000.00
n/a
510.00
#VALUE!
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
32
bh
Genteng metal
n/a
#VALUE!
0.200
kg
17,000.00
0.200
Oh
Pekerja
60,000.00
0.100
Oh
Tukang kayu
70,000.00
0.010
Oh
Kepala tukang
80,000.00
0.010
Oh
Mandor
90,000.00
3,400.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
33
30.000
bh
Sirap kayu
1,100.00
33,000.00
0.200
kg
17,000.00
3,400.00
0.166
Oh
Pekerja
60,000.00
0.250
Oh
Tukang kayu
70,000.00
0.025
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
34
bh
0.050
kg
10.800
kg
Semen portland
0.032
m3
Pasir pasang
1.000
kg
0.166
0.250
6,000.00
21,000.00
17,000.00
850.00
1,250.00
13,500.00
195,000.00
6,240.00
Semen warna
10,000.00
10,000.00
Oh
Pekerja
60,000.00
Oh
Tukang kayu
70,000.00
0.025
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
35
bh
n/a
#VALUE!
0.050
kg
0.004
m3
0.125
Oh
Pekerja
60,000.00
0.250
Oh
Tukang kayu
70,000.00
0.025
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
17,000.00
850.00
4,250,000.00
14,875.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
36
bh
n/a
#VALUE!
0.050
kg
17,000.00
0.250
Oh
Pekerja
60,000.00
0.150
Oh
Tukang kayu
70,000.00
0.015
Oh
Kepala tukang
80,000.00
0.013
Oh
Mandor
90,000.00
850.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
37
lbr
29,000.00
11,600.00
0.050
kg
17,000.00
850.00
0.050
kg
17,000.00
850.00
0.125
Oh
Pekerja
60,000.00
0.250
Oh
Tukang kayu
70,000.00
0.025
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
38
lbr
29,000.00
20,300.00
0.020
kg
17,000.00
340.00
0.120
Oh
Pekerja
60,000.00
0.060
Oh
Tukang kayu
70,000.00
0.006
Oh
Kepala tukang
80,000.00
0.006
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
39
lbr
29,000.00
8,700.00
0.020
kg
17,000.00
340.00
0.150
Oh
Pekerja
60,000.00
0.070
Oh
Tukang kayu
70,000.00
0.007
Oh
Kepala tukang
80,000.00
0.006
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
40
lbr
n/a
#VALUE!
0.020
kg
n/a
#VALUE!
0.150
Oh
Pekerja
60,000.00
0.750
Oh
Tukang kayu
70,000.00
0.080
Oh
Kepala tukang
80,000.00
0.006
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
41
bh
Nok standar 40 x 18
n/a
#VALUE!
0.040
kg
n/a
0.100
Oh
Pekerja
60,000.00
1.000
Oh
Tukang kayu
70,000.00
0.100
Oh
Kepala tukang
80,000.00
0.050
Oh
Mandor
90,000.00
#VALUE!
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
42
m2
Aluminium foil
n/a
#VALUE!
0.150
Oh
Pekerja
60,000.00
0.050
Oh
Tukang kayu
70,000.00
0.005
Oh
Kepala tukang
80,000.00
0.008
Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
24,000.00
9,000.00
9,000.00
5,250.00
5,250.00
640.00
640.00
720.00
720.00
39,610.00
0%
0.00
39,610.00
39,610.00
#VALUE!
9,000.00
9,000.00
5,250.00
5,250.00
640.00
640.00
720.00
720.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
13,200.00
9,000.00
9,000.00
5,250.00
5,250.00
640.00
640.00
720.00
720.00
28,810.00
0%
0.00
28,810.00
28,810.00
20,000.00
10,000.00
6,240.00
24,000.00
24,000.00
14,000.00
14,000.00
1,600.00
1,600.00
180.00
180.00
76,020.00
0%
0.00
76,020.00
76,020.00
#VALUE!
10,000.00
6,240.00
24,000.00
24,000.00
14,000.00
14,000.00
1,600.00
1,600.00
180.00
180.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
16,800.00
10,000.00
6,240.00
24,000.00
24,000.00
14,000.00
14,000.00
1,600.00
1,600.00
180.00
180.00
72,820.00
0%
0.00
72,820.00
72,820.00
#VALUE!
850.00
8,400.00
8,400.00
4,690.00
4,690.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
5,250.00
5,250.00
640.00
640.00
720.00
720.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
5,250.00
5,250.00
640.00
640.00
720.00
720.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
5,250.00
5,250.00
640.00
640.00
720.00
720.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
36,750.00
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
54,840.00
0%
0.00
54,840.00
54,840.00
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5,040.00
5,040.00
8,750.00
8,750.00
1,040.00
1,040.00
360.00
360.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5,040.00
5,040.00
8,750.00
8,750.00
1,040.00
1,040.00
360.00
360.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5,040.00
5,040.00
8,750.00
8,750.00
1,040.00
1,040.00
360.00
360.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5,040.00
5,040.00
8,750.00
8,750.00
1,040.00
1,040.00
360.00
360.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5,040.00
5,040.00
8,750.00
8,750.00
1,040.00
1,040.00
360.00
360.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5,040.00
5,040.00
8,750.00
8,750.00
1,040.00
1,040.00
360.00
360.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
6,000.00
6,000.00
10,500.00
10,500.00
1,040.00
1,040.00
360.00
360.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
6,000.00
6,000.00
10,500.00
10,500.00
1,040.00
1,040.00
360.00
360.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
682,000.00
510.00
12,000.00
12,000.00
7,000.00
7,000.00
800.00
800.00
900.00
900.00
703,210.00
0%
0.00
703,210.00
703,210.00
#VALUE!
510.00
#VALUE!
12,000.00
12,000.00
21,000.00
21,000.00
2,400.00
2,400.00
45,000.00
45,000.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,400.00
12,000.00
12,000.00
7,000.00
7,000.00
800.00
800.00
900.00
900.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
33,000.00
3,400.00
9,960.00
9,960.00
17,500.00
17,500.00
2,000.00
2,000.00
720.00
720.00
66,580.00
0%
0.00
66,580.00
66,580.00
21,000.00
850.00
13,500.00
6,240.00
10,000.00
9,960.00
9,960.00
17,500.00
17,500.00
2,000.00
2,000.00
720.00
720.00
81,770.00
0%
0.00
81,770.00
81,770.00
#VALUE!
850.00
14,875.00
7,500.00
7,500.00
17,500.00
17,500.00
2,000.00
2,000.00
720.00
720.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
850.00
15,000.00
15,000.00
10,500.00
10,500.00
1,200.00
1,200.00
1,170.00
1,170.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
11,600.00
850.00
850.00
7,500.00
7,500.00
17,500.00
17,500.00
2,000.00
2,000.00
720.00
720.00
41,020.00
0%
0.00
41,020.00
41,020.00
20,300.00
340.00
7,200.00
7,200.00
4,200.00
4,200.00
480.00
480.00
540.00
540.00
33,060.00
0%
0.00
33,060.00
33,060.00
8,700.00
340.00
9,000.00
9,000.00
4,900.00
4,900.00
560.00
560.00
540.00
540.00
24,040.00
0%
0.00
24,040.00
24,040.00
#VALUE!
#VALUE!
9,000.00
9,000.00
52,500.00
52,500.00
6,400.00
6,400.00
540.00
540.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
6,000.00
6,000.00
70,000.00
70,000.00
8,000.00
8,000.00
4,500.00
4,500.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
#VALUE!
9,000.00
9,000.00
3,500.00
3,500.00
400.00
400.00
720.00
720.00
#VALUE!
0%
#VALUE!
#VALUE!
#VALUE!
HARGA
NO.
INDEKS
SATUAN
KEBUTUHAN
HARGA,
SATUAN
(Rp)
BAHAN (Rp)
6.000 %
3.300 Oh
60,000.00
1.100 Oh
Tukang batu
70,000.00
0.001 Oh
Kepala tukang
80,000.00
0.160 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
2
6.000 kg
Semen PC @ 50 kg
0.010 m
Pasir pasang
1.000 Oh
60,000.00
1.500 Oh
Tukang batu
70,000.00
1.500 Oh
Kepala tukang
80,000.00
0.160 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
3
7.000 bh
6.000 kg
Semen PC @ 50 kg
0.010 m
Pasir pasang
1.000 Oh
60,000.00
1.500 Oh
Tukang batu
70,000.00
0.300 Oh
Kepala tukang
80,000.00
0.110 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
4
Urinoir terasso
6.000 kg
Semen PC @ 50 kg
0.010 m
Pasir pasang
1.000 Oh
60,000.00
1.000 Oh
Tukang batu
70,000.00
0.100 Oh
Kepala tukang
80,000.00
0.100 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
5
Wastafel
6.000 kg
Semen PC @ 50 kg
0.010 m
Pasir pasang
1.200 Oh
60,000.00
1.450 Oh
Tukang batu
70,000.00
0.150 Oh
Kepala tukang
80,000.00
0.100 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
6
1.800 Oh
60,000.00
2.700 Oh
Tukang batu
70,000.00
0.540 Oh
Kepala tukang
80,000.00
0.110 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
7
3.000 Oh
60,000.00
4.500 Oh
Tukang batu
70,000.00
0.900 Oh
Kepala tukang
80,000.00
0.900 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
0%
120.000 kg
Semen PC @ 50 kg
Pasir pasang
0.300 m
360.000 bh
Porcelaint uk. 11 cm x 11 cm
6.000 kg
Semen putih
6.000 Oh
60,000.00
3.000 Oh
Tukang batu
70,000.00
0.300 Oh
Kepala tukang
80,000.00
0.300 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
9
120.000 kg
Semen PC @ 50 kg
0.300 m
Pasir pasang
4.400 m
6.000 kg
Semen putih
60,000.00
6.000 Oh
70,000.00
3.000 Oh
Tukang batu
80,000.00
0.300 Oh
Kepala tukang
90,000.00
0.300 Oh
Mandor
Jumlah
0%
Keuntungan Maksimal
10%
Jumlah
Dibulatkan
10
Besi beton
10.760 m
10.000 %
2.300 Oh
60,000.00
3.200 Oh
Tukang batu
70,000.00
0.700 Oh
Kepala tukang
80,000.00
0.700 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
11
Besi beton
0.800 m
1,115.000 bh
10.000 %
Porcelaint uk. 11 cm x 11 cm
3.500 Oh
60,000.00
4.500 Oh
Tukang batu
70,000.00
0.900 Oh
Kepala tukang
80,000.00
0.900 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
12
0.075 Oh
Tukang batu
0.075 Oh
Kepala tukang
0.250 Oh
Mandor
Jumlah
Keuntungan Maksimal
10%
Jumlah
Dibulatkan
13
3.920 kg
Semen PC @ 50 kg
0.056 m
Pasir pasang
0.024 m
0.140 Oh
60,000.00
0.070 Oh
Tukang batu
70,000.00
0.007 Oh
Kepala tukang
80,000.00
0.007 Oh
Mandor
90,000.00
13.000 bh
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
14
25.000 bh
1.100 bh
10.300 kg
Semen PC @ 50 kg
0.061 m
Pasir pasang
0.069 m
0.380 Oh
60,000.00
0.190 Oh
Tukang batu
70,000.00
0.019 Oh
Kepala tukang
80,000.00
0.019 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
15
44.000 kg
Semen PC @ 50 kg
0.070 m
Pasir pasang
0.070 m
1.600 kg
Besi beton
0.060 m
3.200 Oh
60,000.00
1.105 Oh
Tukang batu
70,000.00
0.002 Oh
Kepala tukang
80,000.00
0.016 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
16
Semen PC @ 50 kg
0.130 m
Pasir pasang
0.020 m
2.600 kg
Besi beton
0.090 m
1.420 Oh
60,000.00
0.473 Oh
Tukang batu
70,000.00
0.047 Oh
Kepala tukang
80,000.00
0.071 Oh
Mandor
90,000.00
77.000 kg
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
17
114.000 kg
Semen PC @ 50 kg
0.184 m
Pasir pasang
0.033 m
4.850 kg
Besi beton
0.120 m
2.160 Oh
60,000.00
0.720 Oh
Tukang batu
70,000.00
0.072 Oh
Kepala tukang
80,000.00
0.108 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
18
0.054 Oh
60,000.00
0.090 Oh
Tukang batu
70,000.00
0.009 Oh
Kepala tukang
80,000.00
0.027 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
19
35.000 %
0.054 Oh
60,000.00
0.090 Oh
Tukang batu
70,000.00
0.009 Oh
Kepala tukang
80,000.00
0.027 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
20
0.054 Oh
60,000.00
0.090 Oh
Tukang batu
70,000.00
0.009 Oh
Kepala tukang
80,000.00
0.027 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
21
Jumlah
0.108 Oh
60,000.00
0.180 Oh
Tukang batu
70,000.00
0.018 Oh
Kepala tukang
80,000.00
0.005 Oh
Mandor
90,000.00
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
22
0.108 Oh
60,000.00
0.180 Oh
Tukang batu
70,000.00
0.018 Oh
Kepala tukang
80,000.00
0.005 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
23
0.135 Oh
60,000.00
0.225 Oh
Tukang batu
70,000.00
0.023 Oh
Kepala tukang
80,000.00
0.007 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
24
0.036 Oh
60,000.00
0.060 Oh
Tukang batu
70,000.00
0.006 Oh
Kepala tukang
80,000.00
0.002 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
25
0.036 Oh
60,000.00
0.060 Oh
Tukang batu
70,000.00
0.006 Oh
Kepala tukang
80,000.00
0.002 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
26
0.036 Oh
60,000.00
0.060 Oh
Tukang batu
70,000.00
0.006 Oh
Kepala tukang
80,000.00
0.002 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
27
0.036 Oh
60,000.00
0.060 Oh
Tukang batu
70,000.00
0.006 Oh
Kepala tukang
80,000.00
0.002 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
28
0.081 Oh
60,000.00
0.135 Oh
Tukang batu
70,000.00
0.135 Oh
Kepala tukang
80,000.00
0.004 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
29
0.081 Oh
60,000.00
0.135 Oh
Tukang batu
70,000.00
0.135 Oh
Kepala tukang
80,000.00
0.004 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
Jumlah
0%
Dibulatkan
30
0.081 Oh
60,000.00
0.135 Oh
Tukang batu
70,000.00
0.135 Oh
Kepala tukang
80,000.00
0.004 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
30
0.025 bh
seal tape
0.010 Oh
60,000.00
0.100 Oh
Tukang batu
70,000.00
0.010 Oh
Kepala tukang
80,000.00
0.005 Oh
mandor
90,000.00
Jumlah
Keuntungan Maksimal
0%
Jumlah
Dibulatkan
31
Floor drain
0.010 Oh
60,000.00
0.100 Oh
Tukang batu
70,000.00
0.010 Oh
Kepala tukang
80,000.00
0.005 Oh
Mandor
90,000.00
Jumlah
Keuntungan Maksimal
10%
Jumlah
Dibulatkan
32
0.002 kg
Semen putih
0.100 Oh
Tukang batu
70,000.00
0.010 Oh
Kepala tukang
80,000.00
Jumlah
Keuntungan Maksimal
10%
Jumlah
Dibulatkan
33
Galian tanah
2.038 m
Urugan kembali
0.360 m
3.567 m
0.056 m
0.130 m
0.020 m
2.600 m
0.600 m'
Jumlah
Keuntungan Maksimal
10%
Jumlah
Dibulatkan
34
Galian tanah
3.050 m
Urugan kembali
0.540 m
5.351 m
0.084 m
0.200 m
0.030 m
3.900 m
0.600 m'
Jumlah
Keuntungan Maksimal
10%
Jumlah
Dibulatkan
35
Galian tanah
4.076 m
Urugan kembali
0.720 m
7.134 m
0.112 m
0.260 m
0.040 m
5.200 m
0.600 m'
Jumlah
Keuntungan Maksimal
10%
Jumlah
Dibulatkan
36
Galian Tanah
2.488 m
Urugan Kembali
2.512 m
0.384 m
0.600 m'
Jumlah
Keuntungan Maksimal
Jumlah
Dibulatkan
10%
HARGA
UPAH (Rp)
JUMLAH HARGA
(Rp)
7.00
198,000.00
198,000.00
77,000.00
77,000.00
80.00
80.00
14,400.00
14,400.00
289,480.00
0%
289,480.00
289,480.00
-
60,000.00
60,000.00
105,000.00
105,000.00
120,000.00
120,000.00
14,400.00
14,400.00
299,400.00
0%
299,400.00
299,400.00
-
60,000.00
60,000.00
105,000.00
105,000.00
24,000.00
24,000.00
9,900.00
9,900.00
198,900.00
0%
198,900.00
198,900.00
-
60,000.00
60,000.00
70,000.00
70,000.00
8,000.00
8,000.00
9,000.00
9,000.00
147,000.00
0%
147,000.00
147,000.00
-
72,000.00
72,000.00
101,500.00
101,500.00
12,000.00
12,000.00
9,000.00
9,000.00
194,500.00
0%
194,500.00
194,500.00
-
108,000.00
108,000.00
189,000.00
189,000.00
43,200.00
43,200.00
9,900.00
9,900.00
350,100.00
0%
350,100.00
350,100.00
-
180,000.00
180,000.00
315,000.00
315,000.00
72,000.00
72,000.00
81,000.00
81,000.00
648,000.00
0%
648,000.00
648,000.00
360,000.00
360,000.00
210,000.00
210,000.00
24,000.00
24,000.00
27,000.00
27,000.00
621,000.00
0%
621,000.00
621,000.00
-
360,000.00
360,000.00
420,000.00
420,000.00
240,000.00
240,000.00
27,000.00
27,000.00
1,047,000.00
0%
10%
138,000.00
138,000.00
224,000.00
224,000.00
56,000.00
56,000.00
63,000.00
63,000.00
481,000.00
481,000.00
481,000.00
-
210,000.00
210,000.00
315,000.00
315,000.00
72,000.00
72,000.00
81,000.00
81,000.00
678,000.00
0%
678,000.00
678,000.00
-
315,000.00
315,000.00
72,000.00
72,000.00
81,000.00
81,000.00
468,000.00
10%
46,800.00
514,800.00
514,800.00
-
8,400.00
8,400.00
4,900.00
4,900.00
560.00
560.00
630.00
630.00
14,490.00
0%
14,490.00
14,490.00
-
22,800.00
22,800.00
13,300.00
13,300.00
1,520.00
1,520.00
1,710.00
1,710.00
39,330.00
0%
39,330.00
39,330.00
-
192,000.00
192,000.00
77,350.00
77,350.00
120.00
120.00
1,440.00
1,440.00
270,910.00
0%
270,910.00
270,910.00
-
85,200.00
85,200.00
33,110.00
33,110.00
3,760.00
3,760.00
6,390.00
6,390.00
128,460.00
0%
128,460.00
128,460.00
-
129,600.00
129,600.00
50,400.00
50,400.00
5,760.00
5,760.00
9,720.00
9,720.00
195,480.00
0%
195,480.00
195,480.00
-
3,240.00
3,240.00
6,300.00
6,300.00
720.00
720.00
2,430.00
2,430.00
12,690.00
0%
12,690.00
12,690.00
-
3,240.00
3,240.00
6,300.00
6,300.00
720.00
720.00
2,430.00
2,430.00
12,690.00
0%
12,690.00
12,690.00
-
3,240.00
3,240.00
6,300.00
6,300.00
720.00
720.00
2,430.00
2,430.00
12,690.00
0%
12,690.00
12,690.00
-
6,480.00
6,480.00
12,600.00
12,600.00
1,440.00
1,440.00
486.00
486.00
21,006.00
0%
21,006.00
21,000.00
-
6,480.00
6,480.00
12,600.00
12,600.00
1,440.00
1,440.00
486.00
486.00
21,006.00
0%
21,006.00
21,000.00
-
8,100.00
8,100.00
15,750.00
15,750.00
1,800.00
1,800.00
612.00
612.00
26,262.00
0%
26,262.00
26,260.00
-
2,160.00
2,160.00
4,200.00
4,200.00
480.00
480.00
162.00
162.00
7,002.00
0%
7,002.00
7,000.00
-
2,160.00
2,160.00
4,200.00
4,200.00
480.00
480.00
162.00
162.00
7,002.00
0%
7,002.00
7,000.00
2,160.00
2,160.00
4,200.00
4,200.00
480.00
480.00
162.00
162.00
7,002.00
0%
7,002.00
7,000.00
-
2,160.00
2,160.00
4,200.00
4,200.00
480.00
480.00
162.00
162.00
7,002.00
0%
7,002.00
7,000.00
-
4,860.00
4,860.00
9,450.00
9,450.00
10,800.00
10,800.00
369.00
369.00
25,479.00
0%
25,479.00
25,470.00
-
4,860.00
4,860.00
9,450.00
9,450.00
10,800.00
10,800.00
369.00
369.00
25,479.00
0%
25,479.00
25,470.00
4,860.00
4,860.00
9,450.00
9,450.00
10,800.00
10,800.00
369.00
369.00
25,479.00
0%
25,479.00
25,470.00
-
600.00
600.00
7,000.00
7,000.00
800.00
800.00
450.00
450.00
8,850.00
0%
8,850.00
8,850.00
-
600.00
600.00
7,000.00
7,000.00
800.00
800.00
450.00
450.00
8,850.00
10%
885.00
9,735.00
9,730.00
-
7,000.00
7,000.00
800.00
800.00
7,800.00
10%
780.00
8,580.00
8,580.00
-
10%
10%
10%
10%