PARTIDA:#
CODIGO: E.311.110.150
H/HOMBRE: 418.32
UNIDAD: M3
CANT. DE LA PARTIDA:71.42
EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES,ZANJAS, UOTROS, HASTA PROFUNDIDADES COMPRENDIDAS ENTRE 0,00
Y 1,50 M
1.00
5.86
RENDIMIENTO:13.317
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
UNID
CANTIDAD
COSTO
TOTAL
CANT.
9.00
0.25
9.00
PRECIO
20,429.82
129,000,000.00
34,770.00
C.O.P.
0.010000
0.002000
0.010000
PARTIDA
CANTIDAD
71.42
DEL
NUM.
0.50
9.00
0.25
PRESUPUESTO
PRECIO UNITARIO
154,274.10
TOTAL
11,018,256.22
A.P.V. Software
Telf. 753-9479
Preparado Por :
BONO
16,100.00
16,100.00
16,100.00
69,467.98
5,216.49
TOT JORNAL
24,828.42
372,280.32
11,558.65
408,667.39 (2)
Utilidad ................
Para :
PARTIDA #
JORNAL
49,656.84
41,364.48
46,234.58
TOTAL
1,838.68
64,500.00
3,129.30
E.311.110.150
I.V.A.
SUBTOTALC .........
116,739.32
121,955.81
18,293.37
140,249.18
14,024.92
154,274.10
154,274.10
SON CIENTO CINCUENTA Y CUATRO MIL DOSCIENTOS SETENTA Y CUATRO BOLIVARES CON 10/100 CTMS
CODIGO: E.311.110.300
UNIDAD: M3
H/HOMBRE: 8.97
CANT. DE LA PARTIDA:1.15
EXCAVACION EN TIERRA A MANO PARA ASIENTO DE FUNDACIONES,ZANJAS, UOTROS, HASTA PROFUNDIDADES COMPRENDIDAS ENTRE 1,50
Y 3,00 M
1.00
7.80
RENDIMIENTO:10.176
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
UNID
DESCRIPCION
CANTIDAD
COSTO
TOTAL
CANT.
0.25
9.00
9.00
PRECIO
129,000,000.00
20,429.82
34,770.00
C.O.P.
0.002000
0.010000
0.010000
TOTAL
64,500.00
1,838.68
3,129.30
69,467.98
6,826.65
3- M A N O D E O B R A
NUM.
9.00
0.25
0.50
COD.
DESCRIPCION
OBRERO DE PRIMERA
1
38 CHOFER DE 3a (HASTA 3 TON)
CAPORAL
3
PARTIDA
CANTIDAD
1.15
DEL
PRESUPUESTO
PRECIO UNITARIO
201,893.48
Preparado Por :
PARTIDA #
E.311.110.300
TOT JORNAL
372,280.32
11,558.65
24,828.42
408,667.39 (2)
Para :
BONO
16,100.00
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
JORNAL
41,364.48
46,234.58
49,656.84
I.V.A.
SUBTOTALB .........
152,772.94
159,599.59
23,939.94
183,539.53
18,353.95
201,893.48
201,893.48
SON DOSCIENTOS UN MIL OCHOCIENTOS NOVENTA Y TRES BOLIVARES CON 48/100 CTMS
CODIGO: E.313.110.000
UNIDAD: M3
H/HOMBRE: 60.16
CANT. DE LA PARTIDA:60.16
CARGA A MANO DE MATERIAL PROVENIENTE DE LAS EXCAVACIONES PARA EL ASIENTO DE FUNDACIONES,ZANJAS U OTROS
1.00
1.00
RENDIMIENTO:56.817
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
UNID
DESCRIPCION
CANTIDAD
COSTO
TOTAL
COD.
DESCRIPCION
246 PALA REDONDA MANGO CORTO
254 PICO
288 CARRETILLA PARA CONSTRUCCION
PRECIO
20,429.82
34,770.00
155,535.08
C.O.P.
0.010000
0.010000
1.000000
TOTAL
817.19
2,086.20
622,140.32
625,043.71
11,001.00
3- M A N O D E O B R A
NUM.
0.25
6.00
COD.
DESCRIPCION
CAPORAL
3
OBRERO DE PRIMERA
1
PARTIDA
CANTIDAD
60.16
DEL
PRESUPUESTO
PRECIO UNITARIO
35,999.95
TOTAL
2,165,756.99
E.313.110.000
TOT JORNAL
12,414.21
248,186.88
260,601.09 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
49,656.84
41,364.48
I.V.A.
SUBTOTALB .........
17,457.46
28,458.46
4,268.77
32,727.23
3,272.72
35,999.95
0.00
35,999.95
SON TREINTA Y CINCO MIL NOVECIENTOS NOVENTA Y NUEVE BOLIVARES CON 95/100 CTMS
CODIGO: E.317.000.000
UNIDAD: M3
H/HOMBRE: 14.08
CANT. DE LA PARTIDA:11.26
COMPACTACION DE RELLENOS CON APISONADORES DE PERCUSION, CORRESPONDIEN-TES A LOS ASIENTOS, FUNDACIONES, ZANJAS U
OTROS
1.00
1.25
RENDIMIENTO:41.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
552 AGUA
UNID
M3
DESCRIPCION
CANTIDAD
0.02000
COSTO
1,375.00
TOTAL
27.50
27.50
27.50
2- E Q U I P O S
COD.
507
74
333
166
DESCRIPCION
CANT.
1.00
3.00
3.00
0.50
PRECIO
125,000.00
155,535.08
20,200.00
118,000.00
C.O.P.
1.000000
0.003500
0.010000
0.008000
TOTAL
125,000.00
1,633.12
606.00
472.00
127,711.12
3,114.91
3- M A N O D E O B R A
NUM.
0.25
6.00
COD.
DESCRIPCION
CAPORAL
3
OBRERO DE PRIMERA
1
PARTIDA
CANTIDAD
11.26
DEL
PRESUPUESTO
PRECIO UNITARIO
34,578.29
A.P.V. Software
Telf. 753-9479
Preparado Por :
E.317.000.000
BONO
16,100.00
16,100.00
TOT JORNAL
12,414.21
248,186.88
260,601.09 (2)
Para :
PARTIDA #
JORNAL
49,656.84
41,364.48
I.V.A.
SUBTOTALB .........
24,192.21
27,334.62
4,100.19
31,434.81
3,143.48
34,578.29
34,578.29
SON TREINTA Y CUATRO MIL QUINIENTOS SETENTA Y OCHO BOLIVARES CON 29/100 CTMS
CODIGO: E.323.000.125
UNIDAD: M3
H/HOMBRE: 13.21
CANT. DE LA PARTIDA:4.37
CONCRETO DE Fc 250 kgf/cm2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LACONSTRUCCION DE BASES Y ESCALONES. INCLUYE
TRANSPORTE DEL CEMENTO Y A-GREGADOS HASTA 50 km Y EXC. EL REF MET. Y EL ENCOFRADO (PREMEZCLADO)
1.00
3.02
RENDIMIENTO:23.820
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
UNID
LITRO
M3
M3
M3
CANTIDAD
1.00000
1.05000
1.05000
1.05000
COSTO
5,361.63
50,000.00
465,000.00
44,000.00
TOTAL
5,361.63
52,500.00
488,250.00
46,200.00
592,311.63
592,311.63
2- E Q U I P O S
COD.
DESCRIPCION
CANT.
2.00
4.00
1.00
3.00
PRECIO
2,520,000.00
1,750,000.00
5,364,021.92
20,429.82
C.O.P.
0.003000
0.003500
0.003471
0.010000
TOTAL
15,120.00
24,500.00
18,618.52
612.89
58,851.41
2,470.67
3- M A N O D E O B R A
COD.
28
5
2
1
NUM.
1.00
2.00
2.00
4.00
DESCRIPCION
MAESTRO DE OBRAS DE 2a
ALBAIL DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
4.37
DEL
PRESUPUESTO
PRECIO UNITARIO
837,576.20
TOTAL
3,660,207.99
E.323.000.125
TOT JORNAL
61,468.86
111,091.52
88,583.62
165,457.92
426,601.92 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
67,333.27
662,115.57
99,317.34
761,432.91
76,143.29
837,576.20
837,576.20
SON OCHOCIENTOS TREINTA Y SIETE MIL QUINIENTOS SETENTA Y SEIS BOLIVARES CON 20/100 CTMS
CODIGO: E.323.000.S/C
UNIDAD: M3
H/HOMBRE: 0.09
CANT. DE LA PARTIDA:0.06
CONCRETO DE Fc 250 kgf/cm2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA ANCLAJE DE POSTE DE MALLA EM CNACHA, INCLUYE
TRANSPORTE DEL CEMENTO Y A-GREGADOS HASTA 50 km Y EXCLUYE EL REF METALICO Y EL ENCOFRADO (PREMEZ.
1.00
1.50
RENDIMIENTO:50.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
9036
4232
4233
4234
DESCRIPCION
UNID
M3
M3
LITRO
M3
CANTIDAD
1.05000
1.05000
1.00000
1.05000
COSTO
465,000.00
50,000.00
5,361.63
44,000.00
TOTAL
488,250.00
52,500.00
5,361.63
46,200.00
592,311.63
592,311.63
2- E Q U I P O S
COD.
DESCRIPCION
CANT.
3.00
1.00
2.00
4.00
1.00
PRECIO
20,429.82
1,500,000.00
2,520,000.00
1,750,000.00
5,364,021.92
C.O.P.
0.010000
1.000000
0.003000
0.003500
0.003471
TOTAL
612.89
1,500,000.00
15,120.00
24,500.00
18,618.52
1,558,851.41
31,177.03
3- M A N O D E O B R A
COD.
28
5
2
1
NUM.
1.00
2.00
2.00
4.00
DESCRIPCION
MAESTRO DE OBRAS DE 2a
ALBAIL DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
0.06
DEL
PRESUPUESTO
PRECIO UNITARIO
829,291.28
A.P.V. Software
Telf. 753-9479
Preparado Por :
E.323.000.S/C
BONO
16,100.00
16,100.00
16,100.00
16,100.00
TOT JORNAL
61,468.86
111,091.52
88,583.62
165,457.92
426,601.92 (2)
Para :
PARTIDA #
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
32,077.57
655,566.23
98,334.93
753,901.16
75,390.12
829,291.28
829,291.28
SON OCHOCIENTOS VEINTINUEVE MIL DOSCIENTOS NOVENTA Y UNO BOLIVARES CON 28/100 CTMS
CODIGO: E.324.000.125
UNIDAD: M3
H/HOMBRE: 6.16
CANT. DE LA PARTIDA:1.54
CONCRETO DE FC 250 KGF/CM2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE PEDESTALES.
1.00
4.00
RENDIMIENTO:25.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
4231
4232
4233
4234
DESCRIPCION
UNID
M3
M3
LITRO
M3
CANTIDAD
1.05000
1.05000
1.00000
1.05000
COSTO
465,000.00
50,000.00
5,361.63
44,000.00
TOTAL
488,250.00
52,500.00
5,361.63
46,200.00
592,311.63
592,311.63
2- E Q U I P O S
COD.
DESCRIPCION
CANT.
2.00
4.00
1.00
3.00
PRECIO
2,520,000.00
1,750,000.00
5,364,021.92
20,429.82
C.O.P.
0.003000
0.003500
0.003471
0.010000
TOTAL
15,120.00
24,500.00
18,618.52
612.89
58,851.41
2,354.06
3- M A N O D E O B R A
COD.
28
5
2
1
NUM.
1.00
2.00
2.00
4.00
DESCRIPCION
MAESTRO DE OBRAS DE 2a
ALBAIL DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
1.54
DEL
PRESUPUESTO
PRECIO UNITARIO
833,408.35
TOTAL
1,283,448.86
E.324.000.125
TOT JORNAL
61,468.86
111,091.52
88,583.62
165,457.92
426,601.92 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
64,155.14
658,820.83
98,823.12
757,643.95
75,764.40
833,408.35
833,408.35
SON OCHOCIENTOS TREINTA Y TRES MIL CUATROCIENTOS OCHO BOLIVARES CON 35/100 CTMS
CODIGO: E.328.000.125
UNIDAD: M3
H/HOMBRE: 79.20
CANT. DE LA PARTIDA:81.00
CONCRETO DE Fc 250 kgf/cm2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASE DE PAVIMENTO (PREMEZCLADO)
1.00
0.98
RENDIMIENTO:32.550
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
4233
4232
4231
4234
DESCRIPCION
UNID
LITRO
M3
M3
M3
CANTIDAD
1.00000
1.05000
1.05000
1.05000
COSTO
5,361.63
50,000.00
465,000.00
44,000.00
TOTAL
5,361.63
52,500.00
488,250.00
46,200.00
592,311.63
592,311.63
2- E Q U I P O S
COD.
DESCRIPCION
CANT.
2.00
4.00
1.00
3.00
PRECIO
2,520,000.00
1,750,000.00
5,364,021.92
20,429.82
C.O.P.
0.003000
0.003500
0.003471
0.010000
TOTAL
15,120.00
24,500.00
18,618.52
612.89
58,851.41
1,808.03
3- M A N O D E O B R A
COD.
28
5
2
1
NUM.
0.50
1.00
1.00
3.00
DESCRIPCION
MAESTRO DE OBRAS DE 2a
ALBAIL DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
81.00
DEL
PRESUPUESTO
PRECIO UNITARIO
788,850.91
TOTAL
63,896,923.71
A.P.V. Software
Telf. 753-9479
Preparado Por :
E.328.000.125
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
88,550.00
TOT JORNAL
30,734.43
55,545.76
44,291.81
124,093.44
254,665.44 (2)
Para :
PARTIDA #
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
29,477.91
623,597.56
93,539.63
717,137.19
71,713.72
788,850.91
788,850.91
SON SETECIENTOS OCHENTA Y OCHO MIL OCHOCIENTOS CINCUENTA BOLIVARES CON 91/100 CTMS
CODIGO: E.341.010.110
UNIDAD: M2
H/HOMBRE: 108.33
CANT. DE LA PARTIDA:39.00
ENCOFRADO DE MADERA, RECTO, ACAB.CORRIENTE, EN CABEZALES DE PILOTES,BASES Y ESCALONES, PEDESTALES, VIGAS DE RIOSTRA,
TIRANTES,FUNDACIONES DE PARED,LOSAS DE FUNDACION,VIGAS DE FUNDACION Y BASES DE PAVIMENTO
1.00
2.78
RENDIMIENTO:19.560
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
41
69
42
1709
DESCRIPCION
UNID
M3
KG
M3
%
CANTIDAD
0.00360
0.25000
0.00500
0.01000
COSTO
1,600,000.00
4,500.00
3,500,000.00
24,385.00
TOTAL
5,760.00
1,125.00
17,500.00
243.85
24,628.85
24,628.85
2- E Q U I P O S
COD.
245
250
251
164
240
80
84
230
236
DESCRIPCION
CANT.
1.00
1.00
1.00
1.00
1.00
1.00
0.33
1.00
1.00
PRECIO
19,553.00
31,894.73
59,800.00
64,241.22
65,000.00
47,220.00
5,023,000.00
34,964.91
24,875.00
C.O.P.
0.010000
0.010000
0.010000
0.010000
0.010000
0.120000
0.002500
0.010000
0.010000
TOTAL
195.53
318.95
598.00
642.41
650.00
5,666.40
4,143.98
349.65
248.75
12,813.67
655.10
3- M A N O D E O B R A
COD.
9
7
6
2
1
NUM.
0.25
1.00
1.00
2.00
2.00
DESCRIPCION
MAESTRO CARPINTERO DE 1a
CARPINTERO DE 1a
CARPINTERO DE 2a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
39.00
DEL
PRESUPUESTO
PRECIO UNITARIO
103,050.73
TOTAL
4,018,978.47
E.341.010.110
TOT JORNAL
15,367.22
55,545.76
49,656.84
88,583.62
82,728.96
291,882.40 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
49,656.84
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
56,179.08
81,463.03
12,219.45
93,682.48
9,368.25
103,050.73
103,050.73
10
CODIGO: E.351.110.210
UNIDAD: KGF
H/HOMBRE: 13.32
CANT. DE LA PARTIDA:142.70
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZOFy 4200 kgf/cm2, UTILIZANDO CABILLA IGUAL O MENOR
DEL No.3 PARA INFRA-ESTRUCTURA. (RAT 2100, D <= 3/8").
1.00
0.09
RENDIMIENTO:450.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
51
58
65
878
DESCRIPCION
UNID
KG
KG
KG
BS/KG
CANTIDAD
0.30000
1.05000
0.01000
1.15000
COSTO
2,300.00
1,988.00
5,000.00
100.00
TOTAL
690.00
2,087.40
50.00
115.00
2,942.40
2,942.40
2- E Q U I P O S
COD.
348
249
56
57
230
DESCRIPCION
CANT.
3.00
3.00
1.00
1.00
3.00
PRECIO
116,640.00
74,782.60
37,800,000.00
2,338,700.00
34,964.91
C.O.P.
0.010000
0.010000
0.003500
0.003500
0.010000
TOTAL
3,499.20
2,243.48
132,300.00
8,185.45
1,048.95
147,277.08
327.28
3- M A N O D E O B R A
COD.
12
11
2
1
MAESTRO CABILLERO
CABILLERO DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
142.70
NUM.
0.25
2.00
1.00
2.00
DESCRIPCION
DEL
PRESUPUESTO
PRECIO UNITARIO
6,810.71
A.P.V. Software
Telf. 753-9479
Preparado Por :
10
E.351.110.210
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
971,888.32
84,525.00
TOT JORNAL
15,367.22
111,091.52
44,291.81
82,728.96
253,479.51 (2)
Para :
PARTIDA #
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
2,114.28
5,383.96
807.59
6,191.55
619.16
6,810.71
6,810.71
11
CODIGO: E.351.120.210
UNIDAD: KGF
H/HOMBRE: 64.17
CANT. DE LA PARTIDA:360.98
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO Fy 4200 kgf/cm2, UTILIZANDO CABILLA No.4 A No.7, PARA
INFRAESTRUCTURA. (RAT 2100, D = 1/2" a 7/8").
1.00
0.18
RENDIMIENTO:285.870
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
59
60
61
62
65
878
DESCRIPCION
UNID
KG
KG
KG
KG
KG
BS/KG
CANTIDAD
0.27500
0.27500
0.27500
0.27500
0.05000
1.15000
COSTO
1,550.97
1,555.12
1,527.34
1,505.19
2,600.00
100.00
TOTAL
426.52
427.66
420.02
413.93
130.00
115.00
1,933.12
1,933.12
2- E Q U I P O S
COD.
348
249
56
57
230
DESCRIPCION
CANT.
4.00
4.00
1.00
1.00
3.00
PRECIO
116,640.00
74,782.60
37,800,000.00
2,338,700.00
34,964.91
C.O.P.
0.010000
0.010000
0.003500
0.003500
0.010000
TOTAL
4,665.60
2,991.30
132,300.00
8,185.45
1,048.95
149,191.30
521.89
3- M A N O D E O B R A
COD.
12
10
11
2
1
MAESTRO CABILLERO
CABILLERO DE 2a
CABILLERO DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
360.98
NUM.
1.00
1.00
2.00
3.00
3.00
DESCRIPCION
DEL
PRESUPUESTO
PRECIO UNITARIO
11,069.94
TOTAL
3,996,026.94
11
E.351.120.210
TOT JORNAL
61,468.86
49,656.84
111,091.52
132,875.43
124,093.44
479,186.09 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
49,656.84
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
6,295.93
8,750.94
1,312.64
10,063.58
1,006.36
11,069.94
11,069.94
12
CODIGO: E.351.200.250
UNIDAD: KGF
H/HOMBRE: 25.38
CANT. DE LA PARTIDA:725.22
0.03
RENDIMIENTO:750.820
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
52 MALLA ELECTROSOLDADA 4"x4" (ROLLO=120 M2) 1.98 K/M2
65 ALAMBRE LISO GALVANIZADO CAL 18
878 TRANSPORTE URBANO DE ACERO HASTA 8 TONELADAS
UNID
KG
KG
BS/KG
CANTIDAD
1.10000
0.00500
1.10500
COSTO
2,372.47
2,600.00
100.00
TOTAL
2,609.72
13.00
110.50
2,733.22
2,733.22
2- E Q U I P O S
CANT.
4.00
3.00
COD.
DESCRIPCION
249 ALICATE CRESCENT 7"
230 CINTA METRICA 3 MTS. ACERO MARCA TAJIMA
PRECIO
74,782.60
34,964.91
C.O.P.
0.010000
0.010000
TOTAL
2,991.30
1,048.95
4,040.25
5.38
3- M A N O D E O B R A
COD.
12
11
2
1
MAESTRO CABILLERO
CABILLERO DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
725.22
NUM.
0.50
1.00
1.00
1.00
DESCRIPCION
DEL
PRESUPUESTO
PRECIO UNITARIO
4,549.99
TOTAL
3,299,743.75
12
E.351.200.250
56,350.00
TOT JORNAL
30,734.43
55,545.76
44,291.81
41,364.48
171,936.48 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
858.23
3,596.83
539.52
4,136.35
413.64
4,549.99
4,549.99
SON CUATRO MIL QUINIENTOS CUARENTA Y NUEVE BOLIVARES CON 99/100 CTMS
13
CODIGO: E.362.120.000
UNIDAD: KG
H/HOMBRE: 1.38
CANT. DE LA PARTIDA:40.98
0.03
RENDIMIENTO:950.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
655
837
2495
1739
878
DESCRIPCION
UNID
GALON
KG
KG
UND
BS/KG
CANTIDAD
0.01000
0.05000
1.10000
0.00900
1.00000
COSTO
98,700.00
8,640.00
7,228.04
30,701.75
100.00
TOTAL
987.00
432.00
7,950.84
276.32
100.00
9,746.16
9,746.16
2- E Q U I P O S
COD.
62
233
295
97
DESCRIPCION
CANT.
1.00
1.00
1.00
1.00
PRECIO
220,000.00
140,000.00
52,631.57
2,496,000.00
C.O.P.
0.003500
0.005000
1.000000
0.035000
TOTAL
770.00
700.00
52,631.57
87,360.00
141,461.57
148.91
3- M A N O D E O B R A
COD.
29
22
1
69
NUM.
1.00
1.00
1.00
1.00
DESCRIPCION
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
SOLDADOR DE 1a
PARTIDA
CANTIDAD
40.98
DEL
PRESUPUESTO
PRECIO UNITARIO
13,593.13
A.P.V. Software
Telf. 753-9479
Preparado Por :
13
E.362.120.000
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
557,046.47
64,400.00
TOT JORNAL
70,848.48
49,656.84
41,364.48
55,545.76
217,415.56 (2)
Para :
PARTIDA #
JORNAL
70,848.48
49,656.84
41,364.48
55,545.76
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
850.49
10,745.56
1,611.83
12,357.39
1,235.74
13,593.13
13,593.13
SON TRECE MIL QUINIENTOS NOVENTA Y TRES BOLIVARES CON 13/100 CTMS
14
CODIGO: E.362.130.000
UNIDAD: KGF
H/HOMBRE: 15.33
CANT. DE LA PARTIDA:533.40
SUMINISTRO, CONFECCION Y COLOCACION DE ESTRUCTURA METALICA SIMPLE EN CORREAS CON CONDUVEN DE 100 X 100 MM, INCLUYE
TRANSPORTE DE LOS ELEMENTOS HASTA 50 KMS.
1.00
0.03
RENDIMIENTO:1,392.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
1739
2453
655
837
878
DESCRIPCION
UNID
UND
KG
GALON
KG
BS/KG
CANTIDAD
0.00900
1.05000
0.01000
0.05000
1.05000
COSTO
30,701.75
7,889.02
98,700.00
8,640.00
100.00
TOTAL
276.32
8,283.47
987.00
432.00
105.00
10,083.79
10,083.79
2- E Q U I P O S
COD.
97
62
233
472
CANT.
1.00
1.00
1.00
1.00
DESCRIPCION
PRECIO
2,496,000.00
220,000.00
140,000.00
31,125,292.00
C.O.P.
0.035000
0.003500
0.005000
0.004530
TOTAL
87,360.00
770.00
700.00
140,997.57
229,827.57
165.11
3- M A N O D E O B R A
COD.
69
29
22
1
2
NUM.
1.00
1.00
1.00
1.00
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
AYUDANTE
PARTIDA
CANTIDAD
533.40
DEL
PRESUPUESTO
PRECIO UNITARIO
13,851.40
TOTAL
7,388,336.76
14
E.362.130.000
80,500.00
TOT JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
44,291.81
261,707.37 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
44,291.81
I.V.A.
SUBTOTALB .........
700.82
10,949.72
1,642.46
12,592.18
1,259.22
13,851.40
13,851.40
SON TRECE MIL OCHOCIENTOS CINCUENTA Y UNO BOLIVARES CON 40/100 CTMS
15
CODIGO: E.362.130.S/C
UNIDAD: KG
H/HOMBRE: 356.97
CANT. DE LA PARTIDA:4,685.17
SUMINISTRO, CONFECCION Y COLOCACION DE ESTRUCTURA METALICA SIMPLE EN CERCHAS,INCLUYE TRANSPORTE DE LOS ELEMENTOS
HASTA 50 KMS.
1.00
0.08
RENDIMIENTO:525.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
655
837
1739
2442
878
DESCRIPCION
UNID
GALON
KG
UND
KG
BS/KG
CANTIDAD
0.01000
0.05000
0.00900
1.00000
1.00000
COSTO
98,700.00
8,640.00
30,701.75
6,866.40
100.00
TOTAL
987.00
432.00
276.32
6,866.40
100.00
8,661.72
8,661.72
2- E Q U I P O S
COD.
97
62
233
472
CANT.
1.00
1.00
1.00
1.00
DESCRIPCION
PRECIO
2,496,000.00
220,000.00
140,000.00
31,125,292.00
C.O.P.
0.035000
0.003500
0.005000
0.004530
TOTAL
87,360.00
770.00
700.00
140,997.57
229,827.57
437.77
3- M A N O D E O B R A
COD.
69
29
2
22
1
NUM.
1.00
1.00
1.00
1.00
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
AYUDANTE
PINTOR DE 2a
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
4,685.17
DEL
PRESUPUESTO
PRECIO UNITARIO
13,861.44
Preparado Por :
PARTIDA #
15
E.362.130.S/C
80,500.00
TOT JORNAL
55,545.76
70,848.48
44,291.81
49,656.84
41,364.48
261,707.37 (2)
Para :
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
64,943,202.84
A.P.V. Software
Telf. 753-9479
JORNAL
55,545.76
70,848.48
44,291.81
49,656.84
41,364.48
I.V.A.
SUBTOTALB .........
1,858.17
10,957.66
1,643.65
12,601.31
1,260.13
13,861.44
13,861.44
SON TRECE MIL OCHOCIENTOS SESENTA Y UNO BOLIVARES CON 44/100 CTMS
16
CODIGO: E.362.150.009
UNIDAD: KG
H/HOMBRE: 3.87
CANT. DE LA PARTIDA:20.72
SUMINISTRO, COLOCACION Y CONFECCION DE MENSULA DE LAMINA DE 100 X 100DE ESPESOR 1/4" PARA UNION DE CERCHAS. SEGUN
DETALLE DEL PLANO (E.3).
1.00
0.19
RENDIMIENTO:150.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
1739 OXIGENO INDUSTRIAL (BOMBONA-VOLUMEN NETO) Cap=06 M3
655 FONDO MINIO NARANJA
PLANCHA DE ANCLAJE DE 0.50 X 0.50 MTS.
UNID
UND
GALON
PZA
KG
%
CANTIDAD
0.00900
0.01000
1.00000
0.05000
0.05000
COSTO
30,701.75
98,700.00
4,090.91
8,640.00
5,786.23
TOTAL
276.32
987.00
4,090.91
432.00
289.31
6,075.54
6,075.54
2- E Q U I P O S
COD.
DESCRIPCION
472 SOLDADORA LINCOLN SA-400
97 ESMERIL PORTATIL 7" BOSCH 8500rpm 2300W MOD.1753
567 HERRAMIENTAS MENORES
CANT.
1.00
1.00
1.00
PRECIO
31,125,292.00
2,496,000.00
1,114,245.51
C.O.P.
0.004530
0.035000
0.008185
TOTAL
140,997.57
87,360.00
9,120.10
237,477.67
1,583.18
3- M A N O D E O B R A
COD.
29
22
1
69
NUM.
0.50
1.00
1.00
1.00
DESCRIPCION
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
SOLDADOR DE 1a
PARTIDA
CANTIDAD
20.72
DEL
PRESUPUESTO
PRECIO UNITARIO
15,412.50
A.P.V. Software
Telf. 753-9479
Preparado Por :
16
E.362.150.009
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
319,347.00
56,350.00
TOT JORNAL
35,424.24
49,656.84
41,364.48
55,545.76
181,991.32 (2)
Para :
PARTIDA #
JORNAL
70,848.48
49,656.84
41,364.48
55,545.76
I.V.A.
SUBTOTALB .........
4,525.07
12,183.79
1,827.57
14,011.36
1,401.14
15,412.50
15,412.50
17
CODIGO: E.362.150.010
UNIDAD: UND
H/HOMBRE: 102.40
CANT. DE LA PARTIDA:48.00
SUMINISTRO Y COLOCACION DE RIGIDIZADORES DE CERCHAS SEGUN DETALLES DELPLANO (E.3). DE 40 X 125 X 6 MM.
1.00
2.13
RENDIMIENTO:15.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
837
1739
655
1570
DESCRIPCION
UNID
PZA
KG
UND
GALON
%
CANTIDAD
1.00000
0.05000
0.00900
0.01000
0.05000
COSTO
15,000.00
8,640.00
30,701.75
98,700.00
16,695.32
TOTAL
15,000.00
432.00
276.32
987.00
834.77
17,530.09
17,530.09
2- E Q U I P O S
CANT.
1.00
1.00
1.00
COD.
DESCRIPCION
472 SOLDADORA LINCOLN SA-400
97 ESMERIL PORTATIL 7" BOSCH 8500rpm 2300W MOD.1753
567 HERRAMIENTAS MENORES
PRECIO
31,125,292.00
2,496,000.00
1,114,245.51
C.O.P.
0.004530
0.035000
0.008185
TOTAL
140,997.57
87,360.00
9,120.10
237,477.67
15,831.84
3- M A N O D E O B R A
COD.
69
29
22
1
NUM.
1.00
1.00
1.00
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
48.00
DEL
PRESUPUESTO
PRECIO UNITARIO
110,340.90
TOTAL
5,296,363.20
17
E.362.150.010
64,400.00
TOT JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
217,415.56 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
53,864.08
87,226.01
13,083.90
100,309.91
10,030.99
110,340.90
110,340.90
SON CIENTO DIEZ MIL TRESCIENTOS CUARENTA BOLIVARES CON 90/100 CTMS
18
CODIGO: E.362.150.011
UNIDAD: KG
H/HOMBRE: 24.29
CANT. DE LA PARTIDA:130.10
SUMINISTRO, CONFECCION Y COLOCACION DE CARTELA DE ESPESOR 6 MM, SEGUNDETALLES DEL PLANO E.1
1.00
0.19
RENDIMIENTO:150.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
837
1739
655
1709
DESCRIPCION
UNID
PZA
KG
UND
GALON
%
CANTIDAD
1.00000
0.05000
0.00900
0.01000
0.05000
COSTO
4,090.91
8,640.00
30,701.75
98,700.00
5,786.23
TOTAL
4,090.91
432.00
276.32
987.00
289.31
6,075.54
6,075.54
2- E Q U I P O S
CANT.
1.00
0.60
1.00
COD.
DESCRIPCION
97 ESMERIL PORTATIL 7" BOSCH 8500rpm 2300W MOD.1753
567 HERRAMIENTAS MENORES
472 SOLDADORA LINCOLN SA-400
PRECIO
2,496,000.00
1,114,245.51
31,125,292.00
C.O.P.
0.035000
0.008185
0.004530
TOTAL
87,360.00
5,472.06
140,997.57
233,829.63
1,558.86
3- M A N O D E O B R A
COD.
69
29
22
1
NUM.
1.00
0.50
1.00
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
130.10
DEL
PRESUPUESTO
PRECIO UNITARIO
15,381.73
TOTAL
2,001,163.07
18
E.362.150.011
56,350.00
TOT JORNAL
55,545.76
35,424.24
49,656.84
41,364.48
181,991.32 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
4,525.07
12,159.47
1,823.92
13,983.39
1,398.34
15,381.73
15,381.73
SON QUINCE MIL TRESCIENTOS OCHENTA Y UNO BOLIVARES CON 73/100 CTMS
19
CODIGO: E.362.150.012
UNIDAD: UND
1.40
H/HOMBRE: 2.80
CANT. DE LA PARTIDA:2.00
RENDIMIENTO:20.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
837
1739
655
1709
DESCRIPCION
UNID
PZA
KG
UND
GALON
%
CANTIDAD
1.00000
0.05000
0.00900
0.01000
0.05000
COSTO
15,000.00
8,640.00
30,701.75
98,700.00
16,695.32
TOTAL
15,000.00
432.00
276.32
987.00
834.77
17,530.09
17,530.09
2- E Q U I P O S
COD.
DESCRIPCION
472 SOLDADORA LINCOLN SA-400
97 ESMERIL PORTATIL 7" BOSCH 8500rpm 2300W MOD.1753
567 HERRAMIENTAS MENORES
CANT.
1.00
1.00
1.00
PRECIO
31,125,292.00
2,496,000.00
1,114,245.51
C.O.P.
0.004530
0.035000
0.008185
TOTAL
140,997.57
87,360.00
9,120.10
237,477.67
11,873.88
3- M A N O D E O B R A
COD.
69
29
22
1
NUM.
1.00
0.50
1.00
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
2.00
DEL
PRESUPUESTO
PRECIO UNITARIO
80,127.62
A.P.V. Software
Telf. 753-9479
Preparado Por :
19
E.362.150.012
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
160,255.24
56,350.00
TOT JORNAL
55,545.76
35,424.24
49,656.84
41,364.48
181,991.32 (2)
Para :
PARTIDA #
JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
33,938.02
63,341.99
9,501.30
72,843.29
7,284.33
80,127.62
80,127.62
20
CODIGO: E.362.150.013
UNIDAD: KG
H/HOMBRE: 20.77
CANT. DE LA PARTIDA:129.79
SUMINISTRO, TRANSPORTE Y COLOCACION DE PLACA BASE DE COLUMNA DE 0.40 X0.40 X UN ESPESOR DE 1.3 CMS.
1.00
0.16
RENDIMIENTO:150.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
655
837
1739
1813
1570
DESCRIPCION
PERFORACIONES DE 5/8"
ENERGIA Y VARIOS
FONDO MINIO NARANJA
ELECTRODOS E-6011 3,25 MM-1/8"X350MM (0,016 KGS/KG)
OXIGENO INDUSTRIAL (BOMBONA-VOLUMEN NETO) Cap=06 M3
LAMINA ACERO E=10mm D=2.40 x 1.20 Mts (230.4 KG/M)
TRANSPORTE DE MATERIALES ( 5%)
UNID
UND
%
GALON
KG
UND
KG
%
CANTIDAD
4.00000
0.00170
0.01000
0.05000
0.00900
1.05000
0.05000
COSTO
1,000.00
4,000.00
98,700.00
8,640.00
30,701.75
1,592.52
7,374.27
TOTAL
4,000.00
6.80
987.00
432.00
276.32
1,672.15
368.71
7,742.98
7,742.98
2- E Q U I P O S
COD.
DESCRIPCION
472 SOLDADORA LINCOLN SA-400
97 ESMERIL PORTATIL 7" BOSCH 8500rpm 2300W MOD.1753
CANT.
1.00
1.00
PRECIO
31,125,292.00
2,496,000.00
C.O.P.
0.004530
0.035000
TOTAL
140,997.57
87,360.00
228,357.57
1,522.38
3- M A N O D E O B R A
COD.
69
29
22
1
NUM.
1.00
0.50
0.50
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
129.79
DEL
PRESUPUESTO
PRECIO UNITARIO
16,660.90
TOTAL
2,162,418.21
20
E.362.150.013
48,300.00
TOT JORNAL
55,545.76
35,424.24
24,828.42
41,364.48
157,162.90 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
3,905.31
13,170.67
1,975.60
15,146.27
1,514.63
16,660.90
16,660.90
21
CODIGO: E.362.150.014
UNIDAD: KG
H/HOMBRE: 9.73
CANT. DE LA PARTIDA:60.84
SUMINISTRO, Y COLOCACION DE PLANCHA DE FIJACION DE 300 X 250 X 13 MM,PARA FIJACION DE COLUMANS METALICAS A LA CERCHA.
1.00
0.16
RENDIMIENTO:150.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
655
837
1739
1813
1570
DESCRIPCION
PERFORACIONES DE 5/8"
ENERGIA Y VARIOS
FONDO MINIO NARANJA
ELECTRODOS E-6011 3,25 MM-1/8"X350MM (0,016 KGS/KG)
OXIGENO INDUSTRIAL (BOMBONA-VOLUMEN NETO) Cap=06 M3
LAMINA ACERO E=10mm D=2.40 x 1.20 Mts (230.4 KG/M)
TRANSPORTE DE MATERIALES ( 5%)
UNID
UND
%
GALON
KG
UND
KG
%
CANTIDAD
4.00000
0.00170
0.01000
0.05000
0.00900
1.05000
0.05000
COSTO
1,000.00
4,000.00
98,700.00
8,640.00
30,701.75
1,592.52
7,374.27
TOTAL
4,000.00
6.80
987.00
432.00
276.32
1,672.15
368.71
7,742.98
7,742.98
2- E Q U I P O S
COD.
DESCRIPCION
472 SOLDADORA LINCOLN SA-400
97 ESMERIL PORTATIL 7" BOSCH 8500rpm 2300W MOD.1753
CANT.
1.00
1.00
PRECIO
31,125,292.00
2,496,000.00
C.O.P.
0.004530
0.035000
TOTAL
140,997.57
87,360.00
228,357.57
1,522.38
3- M A N O D E O B R A
COD.
69
29
22
1
NUM.
1.00
0.50
0.50
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
60.84
DEL
PRESUPUESTO
PRECIO UNITARIO
16,660.90
TOTAL
1,013,649.16
21
E.362.150.014
48,300.00
TOT JORNAL
55,545.76
35,424.24
24,828.42
41,364.48
157,162.90 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
I.V.A.
SUBTOTALB .........
3,905.31
13,170.67
1,975.60
15,146.27
1,514.63
16,660.90
16,660.90
22
CODIGO: E.362.150.015
UNIDAD: KG
H/HOMBRE: 2.13
CANT. DE LA PARTIDA:8.45
0.25
RENDIMIENTO:95.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
1739
1281
655
837
1570
DESCRIPCION
UNID
UND
KG
GALON
KG
%
CANTIDAD
0.00900
1.10000
0.01000
0.05000
0.05000
COSTO
30,701.75
2,064.39
98,700.00
8,640.00
3,966.15
TOTAL
276.32
2,270.83
987.00
432.00
198.31
4,164.46
4,164.46
2- E Q U I P O S
COD.
DESCRIPCION
472 SOLDADORA LINCOLN SA-400
97 ESMERIL PORTATIL 7" BOSCH 8500rpm 2300W MOD.1753
CANT.
1.00
1.00
PRECIO
31,125,292.00
2,496,000.00
C.O.P.
0.004530
0.035000
TOTAL
140,997.57
87,360.00
228,357.57
2,403.76
3- M A N O D E O B R A
COD.
69
29
22
1
NUM.
1.00
0.50
0.50
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
8.45
DEL
PRESUPUESTO
PRECIO UNITARIO
16,109.16
A.P.V. Software
Telf. 753-9479
Preparado Por :
22
E.362.150.015
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
136,122.40
48,300.00
TOT JORNAL
55,545.76
35,424.24
24,828.42
41,364.48
157,162.90 (2)
Para :
PARTIDA #
JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
I.V.A.
SUBTOTALB .........
6,166.29
12,734.51
1,910.18
14,644.69
1,464.47
16,109.16
16,109.16
23
CODIGO: E.362.410.008
UNIDAD: KG
H/HOMBRE: 150.61
CANT. DE LA PARTIDA:533.40
SUMINISTRO, CONFECCION Y COLOCACION DE ESTRUCTURAS METALICAS PARA APOYAR CERCHA EN COLUMNAS CON CONDUVEN 100 X 100
MM.
1.00
0.28
RENDIMIENTO:170.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
655
833
837
1739
1740
1570
DESCRIPCION
UNID
GALON
KG
KG
UND
UND
%
CANTIDAD
0.01000
1.10000
0.05000
0.00900
0.00900
0.05000
COSTO
98,700.00
1,892.00
8,640.00
30,701.75
120,000.00
4,856.52
TOTAL
987.00
2,081.20
432.00
276.32
1,080.00
242.83
5,099.35
5,099.35
2- E Q U I P O S
COD.
62
97
233
472
CANT.
1.00
1.00
1.00
1.00
DESCRIPCION
PRECIO
220,000.00
2,496,000.00
140,000.00
31,125,292.00
C.O.P.
0.003500
0.035000
0.005000
0.004530
TOTAL
770.00
87,360.00
700.00
140,997.57
229,827.57
1,351.93
3- M A N O D E O B R A
COD.
69
29
22
2
1
NUM.
1.00
1.00
1.00
1.00
2.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
533.40
DEL
PRESUPUESTO
PRECIO UNITARIO
16,592.51
TOTAL
8,850,444.83
23
E.362.410.008
96,600.00
TOT JORNAL
55,545.76
70,848.48
49,656.84
44,291.81
82,728.96
303,071.85 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
55,545.76
70,848.48
49,656.84
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
6,665.33
13,116.61
1,967.49
15,084.10
1,508.41
16,592.51
0.00
16,592.51
SON DIECISEIS MIL QUINIENTOS NOVENTA Y DOS BOLIVARES CON 51/100 CTMS
24
CODIGO: E.362.410.012
UNIDAD: KG
H/HOMBRE: 178.57
CANT. DE LA PARTIDA:1,302.05
S/T/C DE ESTRCUTURAS METALICAS EN COLUMNAS CON CONDUVEN DE 200 X 200 MM, INCLUYE TRANSPORTE DE LOS ELEMENTOS HASTA
50 KM.
1.00
0.14
RENDIMIENTO:350.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
837
1739
655
1740
1570
DESCRIPCION
UNID
KG
KG
UND
GALON
UND
%
CANTIDAD
1.10000
0.05000
0.00900
0.01000
0.00900
0.05000
COSTO
4,200.00
8,640.00
30,701.75
98,700.00
120,000.00
7,395.32
TOTAL
4,620.00
432.00
276.32
987.00
1,080.00
369.77
7,765.09
7,765.09
2- E Q U I P O S
COD.
97
62
233
472
DESCRIPCION
CANT.
1.00
1.00
1.00
1.00
PRECIO
2,496,000.00
220,000.00
140,000.00
31,125,292.00
C.O.P.
0.035000
0.003500
0.005000
0.004530
TOTAL
87,360.00
770.00
700.00
140,997.57
229,827.57
656.65
3- M A N O D E O B R A
COD.
69
29
22
1
2
NUM.
1.00
1.00
1.00
2.00
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
AYUDANTE
PARTIDA
CANTIDAD
1,302.05
DEL
PRESUPUESTO
PRECIO UNITARIO
14,748.87
Preparado Por :
PARTIDA #
24
E.362.410.012
96,600.00
TOT JORNAL
55,545.76
70,848.48
49,656.84
82,728.96
44,291.81
303,071.85 (2)
Para :
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
19,203,766.18
A.P.V. Software
Telf. 753-9479
JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
44,291.81
I.V.A.
SUBTOTALB .........
3,237.44
11,659.18
1,748.88
13,408.06
1,340.81
14,748.87
14,748.87
SON CATORCE MIL SETECIENTOS CUARENTA Y OCHO BOLIVARES CON 87/100 CTMS
25
CODIGO: E.362.420.012
UNIDAD: KG
H/HOMBRE: 45.56
CANT. DE LA PARTIDA:460.32
SUMINISTRO,TRANSPORTE Y COLOCACION DE ESTRUCTURA METALICA SIMPLE EN VIGAS CON CONDUVEN DE 200 X 200 MM, INCLUYE
TRANSPORTE DE LOS ELEMENTOS HASTA 50 KM.
1.00
0.10
RENDIMIENTO:485.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
655 FONDO MINIO NARANJA
837
1739
1740
1570
UNID
GALON
KG
KG
UND
UND
%
CANTIDAD
0.01000
1.10000
0.05000
0.00900
0.01500
0.05000
COSTO
98,700.00
4,500.00
8,640.00
30,701.75
120,000.00
8,445.32
TOTAL
987.00
4,950.00
432.00
276.32
1,800.00
422.27
8,867.59
8,867.59
2- E Q U I P O S
COD.
62
233
472
97
CANT.
1.00
1.00
1.00
1.00
DESCRIPCION
PRECIO
220,000.00
140,000.00
31,125,292.00
2,496,000.00
C.O.P.
0.003500
0.005000
0.004530
0.035000
TOTAL
770.00
700.00
140,997.57
87,360.00
229,827.57
473.87
3- M A N O D E O B R A
COD.
69
29
22
1
2
NUM.
1.00
1.00
1.00
2.00
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
OBRERO DE PRIMERA
AYUDANTE
PARTIDA
CANTIDAD
460.32
DEL
PRESUPUESTO
PRECIO UNITARIO
14,772.36
TOTAL
6,800,012.76
25
E.362.420.012
96,600.00
TOT JORNAL
55,545.76
70,848.48
49,656.84
82,728.96
44,291.81
303,071.85 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
55,545.76
70,848.48
49,656.84
41,364.48
44,291.81
I.V.A.
SUBTOTALB .........
2,336.30
11,677.76
1,751.66
13,429.42
1,342.94
14,772.36
14,772.36
SON CATORCE MIL SETECIENTOS SETENTA Y DOS BOLIVARES CON 36/100 CTMS
26
CODIGO: E.362.510.000
UNIDAD: KGF
H/HOMBRE: 117.92
CANT. DE LA PARTIDA:2,211.00
SUMINISTRO, CONFECCION Y COLOCACION DE ESTRUCTURAS METALICA DE CORREAS CON CONDUVEN DE 120 X 60 MM, INCLUYE
TRASPORTE HASTA 50 KM
1.00
0.05
RENDIMIENTO:750.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
655
837
1739
1908
1570
DESCRIPCION
UNID
GALON
KG
UND
KG
%
CANTIDAD
0.01000
0.05000
0.00900
1.10000
0.05000
COSTO
98,700.00
8,640.00
30,701.75
7,382.51
9,816.08
TOTAL
987.00
432.00
276.32
8,120.76
490.80
10,306.88
10,306.88
2- E Q U I P O S
COD.
62
233
472
590
DESCRIPCION
CANT.
2.00
1.00
1.00
1.00
PRECIO
220,000.00
140,000.00
31,125,292.00
513,533.00
C.O.P.
0.003500
0.005000
0.004530
0.002700
TOTAL
1,540.00
700.00
140,997.57
1,386.54
144,624.11
192.83
3- M A N O D E O B R A
COD.
69
29
22
2
1
NUM.
1.00
1.00
1.00
1.00
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
PINTOR DE 2a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
2,211.00
DEL
PRESUPUESTO
PRECIO UNITARIO
14,927.54
TOTAL
33,004,790.94
A.P.V. Software
Telf. 753-9479
Preparado Por :
26
E.362.510.000
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
80,500.00
TOT JORNAL
55,545.76
70,848.48
49,656.84
44,291.81
41,364.48
261,707.37 (2)
Para :
PARTIDA #
JORNAL
55,545.76
70,848.48
49,656.84
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
1,300.72
11,800.43
1,770.06
13,570.49
1,357.05
14,927.54
14,927.54
27
CODIGO: E.362.S/C.019
UNIDAD: UND
H/HOMBRE: 37.82
CANT. DE LA PARTIDA:32.00
SUMINISTRO Y COLOCACION DE BARRAS ROSCADAS DE 7/8 DE PULGADAS X 510 MM (PERNOS DE FIJACION DE LA PLANCHA DE LAS
COLUMAS), INCLUYE TUERCAS Y ARANDELAS.
1.00
1.18
RENDIMIENTO:20.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
655
62
837
1739
DESCRIPCION
UNID
GALON
KG
KG
UND
CANTIDAD
0.01000
4.93000
0.01000
0.00900
COSTO
98,700.00
1,505.19
8,640.00
30,701.75
TOTAL
987.00
7,420.59
86.40
276.32
8,770.31
8,770.31
2- E Q U I P O S
COD.
DESCRIPCION
97 ESMERIL PORTATIL 7" BOSCH 8500rpm 2300W MOD.1753
567 HERRAMIENTAS MENORES
CANT.
1.00
0.60
PRECIO
2,496,000.00
1,083,226.51
C.O.P.
0.035000
0.008133
TOTAL
87,360.00
5,285.93
92,645.93
4,632.30
3- M A N O D E O B R A
NUM.
1.00
0.25
2.00
COD.
DESCRIPCION
29 MAESTRO DE OBRAS DE 1a
22 PINTOR DE 2a
OBRERO DE PRIMERA
1
PARTIDA
CANTIDAD
32.00
DEL
PRESUPUESTO
PRECIO UNITARIO
52,740.19
TOTAL
1,687,686.08
27
E.362.S/C.019
52,325.00
TOT JORNAL
70,848.48
10,345.18
68,940.80
150,134.46 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
70,848.48
41,380.70
34,470.40
I.V.A.
SUBTOTALB .........
28,289.24
41,691.85
6,253.78
47,945.63
4,794.56
52,740.19
52,740.19
SON CINCUENTA Y DOS MIL SETECIENTOS CUARENTA BOLIVARES CON 19/100 CTMS
28
CODIGO: E.362.S/C.030
UNIDAD: KG
H/HOMBRE: 64.35
CANT. DE LA PARTIDA:337.82
SUMINISTRO, TRASNPORTE Y COLOCACION DE REFUERZO METALICO EN PORTICOS CON CRUCES DE SAN ANDRES CON PERFIL CONDUVEN
DE 100 X 100 MM.
1.00
0.19
RENDIMIENTO:420.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
82
79
837
1739
2451
DESCRIPCION
UNID
GALON
GALON
KG
UND
KG
CANTIDAD
0.01000
0.01000
0.00500
0.00900
1.10000
COSTO
152,880.00
13,596.49
8,640.00
30,701.75
7,113.27
TOTAL
1,528.80
135.96
43.20
276.32
7,824.60
9,808.88
9,808.88
2- E Q U I P O S
CANT.
1.00
2.00
1.00
COD.
DESCRIPCION
552 EQUIPO DE OXIACETILENO C/ACCESORIOS HARRIS
62 ANDAMIO TUBULAR 2,15 x 2,00 x 1,50 m.
472 SOLDADORA LINCOLN SA-400
PRECIO
1,645,000.00
220,000.00
31,125,292.00
C.O.P.
0.003500
0.003500
0.004530
TOTAL
5,757.50
1,540.00
140,997.57
148,295.07
353.08
3- M A N O D E O B R A
COD.
29
69
68
23
2
1
NUM.
1.00
1.00
1.00
1.00
2.00
4.00
DESCRIPCION
MAESTRO DE OBRAS DE 1a
SOLDADOR DE 1a
SOLDADOR DE 2a
PINTOR DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
337.82
DEL
PRESUPUESTO
PRECIO UNITARIO
18,335.77
TOTAL
6,194,189.82
28
E.362.S/C.030
TOT JORNAL
70,848.48
55,545.76
49,030.32
55,545.76
88,583.62
165,457.92
485,011.86 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
70,848.48
55,545.76
49,030.32
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
4,332.72
14,494.68
2,174.20
16,668.88
1,666.89
18,335.77
18,335.77
SON DIECIOCHO MIL TRESCIENTOS TREINTA Y CINCO BOLIVARES CON 77/100 CTMS
29
CODIGO: E.362.S/C.031
UNIDAD: KG
H/HOMBRE: 259.65
CANT. DE LA PARTIDA:1,006.16
0.26
RENDIMIENTO:310.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
1739
1284
82
79
837
1570
DESCRIPCION
UNID
UND
KG
GALON
GALON
KG
%
CANTIDAD
0.00900
1.10000
0.01000
0.01000
0.00500
0.05000
COSTO
30,701.75
2,500.00
152,880.00
13,596.49
8,640.00
4,734.28
TOTAL
276.32
2,750.00
1,528.80
135.96
43.20
236.71
4,970.99
4,970.99
2- E Q U I P O S
COD.
DESCRIPCION
552 EQUIPO DE OXIACETILENO C/ACCESORIOS HARRIS
62 ANDAMIO TUBULAR 2,15 x 2,00 x 1,50 m.
472 SOLDADORA LINCOLN SA-400
CANT.
1.00
2.00
2.00
PRECIO
1,645,000.00
220,000.00
31,125,292.00
C.O.P.
0.003500
0.003500
0.004530
TOTAL
5,757.50
1,540.00
281,995.15
289,292.65
933.20
3- M A N O D E O B R A
COD.
29
69
68
2
1
23
NUM.
1.00
1.00
1.00
2.00
4.00
1.00
DESCRIPCION
MAESTRO DE OBRAS DE 1a
SOLDADOR DE 1a
SOLDADOR DE 2a
AYUDANTE
OBRERO DE PRIMERA
PINTOR DE 1a
PARTIDA
CANTIDAD
1,006.16
DEL
PRESUPUESTO
PRECIO UNITARIO
14,894.52
Preparado Por :
PARTIDA #
29
E.362.S/C.031
TOT JORNAL
70,848.48
55,545.76
49,030.32
88,583.62
165,457.92
55,545.76
485,011.86 (2)
Para :
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
TOTAL
14,986,270.24
A.P.V. Software
Telf. 753-9479
JORNAL
70,848.48
55,545.76
49,030.32
44,291.81
41,364.48
55,545.76
I.V.A.
SUBTOTALB .........
5,870.13
11,774.32
1,766.15
13,540.47
1,354.05
14,894.52
14,894.52
SON CATORCE MIL OCHOCIENTOS NOVENTA Y CUATRO BOLIVARES CON 52/100 CTMS
30
CODIGO: E.362.S/C.032
UNIDAD: KG
H/HOMBRE: 46.37
CANT. DE LA PARTIDA:86.95
0.53
RENDIMIENTO:150.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
79
837
1739
1102
82
DESCRIPCION
UNID
GALON
KG
UND
M
GALON
CANTIDAD
0.01000
0.00500
0.00900
1.00000
0.01000
COSTO
13,596.49
8,640.00
30,701.75
3,671.00
152,880.00
TOTAL
135.96
43.20
276.32
3,671.00
1,528.80
5,655.28
5,655.28
2- E Q U I P O S
CANT.
1.00
1.00
2.00
COD.
DESCRIPCION
472 SOLDADORA LINCOLN SA-400
552 EQUIPO DE OXIACETILENO C/ACCESORIOS HARRIS
62 ANDAMIO TUBULAR 2,15 x 2,00 x 1,50 m.
PRECIO
31,125,292.00
1,645,000.00
220,000.00
C.O.P.
0.004530
0.003500
0.003500
TOTAL
140,997.57
5,757.50
1,540.00
148,295.07
988.63
3- M A N O D E O B R A
COD.
29
69
68
23
2
1
NUM.
1.00
1.00
1.00
1.00
2.00
4.00
DESCRIPCION
MAESTRO DE OBRAS DE 1a
SOLDADOR DE 1a
SOLDADOR DE 2a
PINTOR DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
86.95
DEL
PRESUPUESTO
PRECIO UNITARIO
23,751.02
TOTAL
2,065,151.19
30
E.362.S/C.032
TOT JORNAL
70,848.48
55,545.76
49,030.32
55,545.76
88,583.62
165,457.92
485,011.86 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
70,848.48
55,545.76
49,030.32
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
12,131.60
18,775.51
2,816.33
21,591.84
2,159.18
23,751.02
23,751.02
SON VEINTITRES MIL SETECIENTOS CINCUENTA Y UNO BOLIVARES CON 02/100 CTMS
31
CODIGO: E.390.S/C.001
UNIDAD: M2
H/HOMBRE: 158.11
CANT. DE LA PARTIDA:549.00
SUMINISTRO E INSTALCION DE CUBIERTA DE TECHO CENTROLAM VERSION SS50HD GALVANIZADO DE ESPESOR 0.60 MM.
1.00
0.29
RENDIMIENTO:200.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
288
1570
DESCRIPCION
CENTROLAM CURVO AR
GANCHO P/LAMINA TECHO C/ARANDELA ASFALTICA Y MET. 2x1
TRANSPORTE DE MATERIALES ( 5%)
UNID
M2
PIEZA
%
CANTIDAD
1.10000
5.00000
0.05000
COSTO
125,000.00
350.87
139,254.35
TOTAL
137,500.00
1,754.35
6,962.72
146,217.07
146,217.07
2- E Q U I P O S
COD.
DESCRIPCION
391 CAMIONETA PICK-UP LUV SINCRONICA (CABINA SENCILLA)
567 HERRAMIENTAS MENORES
62 ANDAMIO TUBULAR 2,15 x 2,00 x 1,50 m.
CANT.
0.50
2.00
4.00
PRECIO
73,000,000.00
1,114,245.51
220,000.00
C.O.P.
0.002500
0.008185
0.003500
TOTAL
91,250.00
18,240.20
3,080.00
112,570.20
562.85
3- M A N O D E O B R A
COD.
29
2
1
38
75
NUM.
1.00
2.00
4.00
1.00
1.00
DESCRIPCION
MAESTRO DE OBRAS DE 1a
AYUDANTE
OBRERO DE PRIMERA
CHOFER DE 3a (HASTA 3 TON)
MONTADOR
PARTIDA
CANTIDAD
549.00
DEL
PRESUPUESTO
PRECIO UNITARIO
195,822.61
TOTAL
107,506,612.89
A.P.V. Software
Telf. 753-9479
Preparado Por :
31
E.390.S/C.001
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
TOT JORNAL
70,848.48
88,583.62
165,457.92
46,234.58
55,545.76
426,670.36 (2)
Para :
PARTIDA #
JORNAL
70,848.48
44,291.81
41,364.48
46,234.58
55,545.76
I.V.A.
SUBTOTALB .........
8,020.56
154,800.48
23,220.07
178,020.55
17,802.06
195,822.61
195,822.61
SON CIENTO NOVENTA Y CINCO MIL OCHOCIENTOS VEINTIDOS BOLIVARES CON 61/100 CTMS
32
CODIGO: E.411.011.015
UNIDAD: M2
H/HOMBRE: 86.40
CANT. DE LA PARTIDA:60.00
CONSTRUCCION DE PAREDES DE BLOQUES HUECOS DE ARCILLA, ACABADO CORRIEN-TE, E= 15 CMS. NO INCLUYE MACHONES,DINTELES Y
BROCALES
1.00
1.44
RENDIMIENTO:26.596
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
5
14
28
552
1
963
1398
1563
DESCRIPCION
UNID
SACO
M3
PIEZA
M3
SACO
BS/SC
PIEZA
M3
CANTIDAD
0.03400
0.02910
16.90000
0.00680
0.34020
0.34020
16.90000
0.02910
COSTO
3,201.75
84,450.00
2,290.00
1,375.00
15,500.00
321.00
140.00
466.00
TOTAL
108.86
2,457.50
38,701.00
9.35
5,273.10
109.20
2,366.00
13.56
49,038.57
49,038.57
2- E Q U I P O S
COD.
62
74
230
236
237
239
246
247
304
DESCRIPCION
CANT.
2.00
2.00
1.00
1.00
1.00
2.00
3.00
1.00
2.00
PRECIO
220,000.00
155,535.08
34,964.91
24,875.00
46,500.00
30,412.28
20,429.82
22,723.68
8,964.00
C.O.P.
0.003500
0.003500
0.010000
0.010000
0.010000
0.010000
0.010000
0.010000
0.010000
TOTAL
1,540.00
1,088.75
349.65
248.75
465.00
608.25
612.89
227.24
179.28
5,319.81
200.02
3- M A N O D E O B R A
COD.
1
2
5
28
NUM.
2.00
1.00
1.00
0.50
DESCRIPCION
OBRERO DE PRIMERA
AYUDANTE
ALBAIL DE 1a
MAESTRO DE OBRAS DE 2a
PARTIDA
CANTIDAD
60.00
DEL
PRESUPUESTO
PRECIO UNITARIO
100,429.89
TOTAL
6,025,793.40
32
E.411.011.015
72,450.00
TOT JORNAL
82,728.96
44,291.81
55,545.76
30,734.43
213,300.96 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
41,364.48
44,291.81
55,545.76
61,468.86
I.V.A.
SUBTOTALB .........
30,152.63
79,391.22
11,908.68
91,299.90
9,129.99
100,429.89
100,429.89
33
CODIGO: E.412.202.001
UNIDAD: M2
H/HOMBRE: 240.00
CANT. DE LA PARTIDA:120.00
CONSTRUCCION DE REVESTIMIENTO EXTERIOR EN PAREDES CON MORTERO A BASEDE CAL,ACABADO RUSTICO,INCLUYE FRISO BASE
1.00
2.00
RENDIMIENTO:20.317
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
1
14
552
5
2
1563
963
DESCRIPCION
UNID
SACO
M3
M3
SACO
SACO
M3
BS/SC
CANTIDAD
0.16850
0.05500
0.00650
0.17320
0.10580
0.01900
0.34170
COSTO
15,500.00
84,400.00
1,375.00
3,263.15
26,712.00
466.00
321.00
TOTAL
2,611.75
4,642.00
8.94
565.18
2,826.13
8.85
109.69
10,772.54
10,772.54
2- E Q U I P O S
COD.
230
388
247
304
237
236
74
246
239
DESCRIPCION
CANT.
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
2.00
PRECIO
34,964.91
4,620,000.00
22,723.68
8,964.00
46,500.00
24,875.00
155,535.08
20,429.82
30,412.28
C.O.P.
0.010000
0.005000
0.010000
0.010000
0.010000
0.010000
0.003500
0.010000
0.010000
TOTAL
349.65
23,100.00
227.24
179.28
465.00
248.75
544.37
204.30
608.25
25,926.84
1,276.12
3- M A N O D E O B R A
COD.
1
28
5
2
NUM.
1.00
0.25
1.00
1.00
DESCRIPCION
OBRERO DE PRIMERA
MAESTRO DE OBRAS DE 2a
ALBAIL DE 1a
AYUDANTE
PARTIDA
CANTIDAD
120.00
DEL
PRESUPUESTO
PRECIO UNITARIO
51,839.33
TOTAL
6,220,719.60
33
E.412.202.001
52,325.00
TOT JORNAL
41,364.48
15,367.22
55,545.76
44,291.81
156,569.27 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
41,364.48
61,468.86
55,545.76
44,291.81
I.V.A.
SUBTOTALB .........
28,931.04
40,979.70
6,146.96
47,126.66
4,712.67
51,839.33
51,839.33
SON CINCUENTA Y UN MIL OCHOCIENTOS TREINTA Y NUEVE BOLIVARES CON 33/100 CTMS
34
CODIGO: E.412.210.007
UNIDAD: M2
H/HOMBRE: 97.43
3.09
CANT. DE LA PARTIDA:31.52
RENDIMIENTO:11.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
1
552
14
4
2
963
1563
DESCRIPCION
UNID
SACO
M3
M3
SACO
SACO
M2
BS/SC
M3
CANTIDAD
0.15750
0.01000
0.01350
0.15000
0.07000
1.05000
0.15750
0.01350
COSTO
15,500.00
1,375.00
84,400.00
15,788.40
26,712.00
22,727.27
321.00
466.00
TOTAL
2,441.25
13.75
1,139.40
2,368.26
1,869.84
23,863.63
50.56
6.29
31,752.98
31,752.98
2- E Q U I P O S
COD.
237
74
246
239
236
230
388
389
304
DESCRIPCION
CANT.
1.00
2.00
3.00
2.00
1.00
1.00
1.00
1.00
2.00
PRECIO
46,500.00
155,535.08
20,429.82
30,412.28
24,875.00
34,964.91
4,620,000.00
589,600.00
8,964.00
C.O.P.
0.010000
0.003500
0.010000
0.010000
0.010000
0.010000
0.005000
0.003000
0.010000
TOTAL
465.00
1,088.75
612.89
608.25
248.75
349.65
23,100.00
1,768.80
179.28
28,421.37
2,583.76
3- M A N O D E O B R A
COD.
28
5
2
1
NUM.
0.25
1.00
1.00
2.00
DESCRIPCION
MAESTRO DE OBRAS DE 2a
ALBAIL DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
31.52
DEL
PRESUPUESTO
PRECIO UNITARIO
129,152.20
TOTAL
4,070,877.34
34
E.412.210.007
68,425.00
TOT JORNAL
15,367.22
55,545.76
44,291.81
82,728.96
197,933.75 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
67,759.86
102,096.60
15,314.49
117,411.09
11,741.11
129,152.20
129,152.20
SON CIENTO VEINTINUEVE MIL CIENTO CINCUENTA Y DOS BOLIVARES CON 20/100 CTMS
35
CODIGO: E.416.012.150
UNIDAD: M2
H/HOMBRE: 950.40
CANT. DE LA PARTIDA:540.00
1.76
RENDIMIENTO:25.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
9
1
552
963
1563
DESCRIPCION
UNID
M3
SACO
M3
BS/SC
M3
CANTIDAD
0.04790
0.42000
0.00840
0.42000
0.04790
COSTO
84,400.00
15,500.00
1,375.00
321.00
466.00
TOTAL
4,042.76
6,510.00
11.55
134.82
22.32
10,721.45
10,721.45
2- E Q U I P O S
COD.
74
246
239
236
230
251
304
DESCRIPCION
CANT.
1.00
2.00
2.00
1.00
1.00
1.00
2.00
PRECIO
155,535.08
20,429.82
30,412.28
24,875.00
34,964.91
28,500.00
3,300.00
C.O.P.
0.003500
0.010000
0.010000
0.010000
0.010000
0.010000
0.010000
TOTAL
544.37
408.60
608.25
248.75
349.65
285.00
66.00
2,510.62
100.42
3- M A N O D E O B R A
COD.
29
5
2
1
NUM.
0.50
2.00
1.00
2.00
DESCRIPCION
MAESTRO DE OBRAS DE 1a
ALBAIL DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
540.00
DEL
PRESUPUESTO
PRECIO UNITARIO
65,506.34
TOTAL
35,373,423.60
A.P.V. Software
Telf. 753-9479
Preparado Por :
35
E.416.012.150
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
88,550.00
TOT JORNAL
35,424.24
111,091.52
44,291.81
82,728.96
273,536.53 (2)
Para :
PARTIDA #
JORNAL
70,848.48
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
40,961.80
51,783.67
7,767.55
59,551.22
5,955.12
65,506.34
65,506.34
SON SESENTA Y CINCO MIL QUINIENTOS SEIS BOLIVARES CON 34/100 CTMS
36
CODIGO: E.435.100.060
UNIDAD: ML
H/HOMBRE: 120.00
1.82
CANT. DE LA PARTIDA:66.00
RENDIMIENTO:22.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
837
1740
1818
1642
DESCRIPCION
UNID
KG
UND
M
CILIN
CANTIDAD
0.05000
0.00900
1.00000
0.00900
COSTO
8,640.00
120,000.00
70,000.00
650,000.00
TOTAL
432.00
1,080.00
70,000.00
5,850.00
77,362.00
77,362.00
2- E Q U I P O S
CANT.
1.00
1.00
COD.
DESCRIPCION
62 ANDAMIO TUBULAR 2,15 x 2,00 x 1,50 m.
472 SOLDADORA LINCOLN SA-400
PRECIO
220,000.00
31,125,292.00
C.O.P.
0.003500
0.004530
TOTAL
770.00
140,997.57
141,767.57
6,443.98
3- M A N O D E O B R A
COD.
1
2
29
69
NUM.
2.00
1.00
1.00
1.00
DESCRIPCION
OBRERO DE PRIMERA
AYUDANTE
MAESTRO DE OBRAS DE 1a
SOLDADOR DE 1a
PARTIDA
CANTIDAD
66.00
DEL
PRESUPUESTO
PRECIO UNITARIO
160,477.38
TOTAL
10,591,507.08
A.P.V. Software
Telf. 753-9479
Preparado Por :
36
E.435.100.060
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
80,500.00
TOT JORNAL
82,728.96
44,291.81
70,848.48
55,545.76
253,415.01 (2)
Para :
PARTIDA #
JORNAL
41,364.48
44,291.81
70,848.48
55,545.76
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
43,053.61
126,859.59
19,028.94
145,888.53
14,588.85
160,477.38
160,477.38
SON CIENTO SESENTA MIL CUATROCIENTOS SETENTA Y SIETE BOLIVARES CON 38/100 CTMS
37
CODIGO: E.435.100.070
UNIDAD: ML
H/HOMBRE: 48.55
1.38
CANT. DE LA PARTIDA:35.20
RENDIMIENTO:29.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
389
837
1739
1740
DESCRIPCION
UNID
M
KG
UND
UND
CANTIDAD
1.10000
0.05000
0.00900
0.00900
COSTO
60,221.61
8,640.00
30,701.75
120,000.00
TOTAL
66,243.77
432.00
276.32
1,080.00
68,032.09
68,032.09
2- E Q U I P O S
COD.
233
472
97
48
DESCRIPCION
CANT.
1.00
1.00
1.00
1.00
PRECIO
140,000.00
31,125,292.00
2,496,000.00
52,814,456.14
C.O.P.
0.005000
0.004530
0.035000
0.003147
TOTAL
700.00
140,997.57
87,360.00
166,207.09
395,264.66
13,629.82
3- M A N O D E O B R A
COD.
69
29
1
38
NUM.
1.00
1.00
2.00
1.00
DESCRIPCION
SOLDADOR DE 1a
MAESTRO DE OBRAS DE 1a
OBRERO DE PRIMERA
CHOFER DE 3a (HASTA 3 TON)
PARTIDA
CANTIDAD
35.20
DEL
PRESUPUESTO
PRECIO UNITARIO
144,908.76
TOTAL
5,100,788.35
37
E.435.100.070
80,500.00
TOT JORNAL
55,545.76
70,848.48
82,728.96
46,234.58
255,357.78 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
55,545.76
70,848.48
41,364.48
46,234.58
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
32,890.47
114,552.38
17,182.86
131,735.24
13,173.52
144,908.76
144,908.76
SON CIENTO CUARENTA Y CUATRO MIL NOVECIENTOS OCHO BOLIVARES CON 76/100 CTMS
38
CODIGO: E.435.S/C
UNIDAD: KG
H/HOMBRE: 8.03
CANT. DE LA PARTIDA:30.10
SUMINISTRO Y COLOCACION DE CAJON METALICO DE LAMINA DE 140 X 100 X 120x 1/4" SEGUN DETALLES DEL PLANO E. 3
1.00
0.27
RENDIMIENTO:150.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
837
1740
1642
2873
DESCRIPCION
UNID
KG
UND
CILIN
PZA
CANTIDAD
0.05000
0.00900
0.00900
1.10000
COSTO
8,640.00
120,000.00
650,000.00
103,859.64
TOTAL
432.00
1,080.00
5,850.00
114,245.60
121,607.60
121,607.60
2- E Q U I P O S
CANT.
1.00
1.00
COD.
DESCRIPCION
62 ANDAMIO TUBULAR 2,15 x 2,00 x 1,50 m.
472 SOLDADORA LINCOLN SA-400
PRECIO
220,000.00
31,125,292.00
C.O.P.
0.003500
0.004530
TOTAL
770.00
140,997.57
141,767.57
945.12
3- M A N O D E O B R A
COD.
1
2
29
69
NUM.
2.00
1.00
1.00
1.00
DESCRIPCION
OBRERO DE PRIMERA
AYUDANTE
MAESTRO DE OBRAS DE 1a
SOLDADOR DE 1a
PARTIDA
CANTIDAD
30.10
DEL
PRESUPUESTO
PRECIO UNITARIO
163,017.07
TOTAL
4,906,813.81
38
E.435.S/C
80,500.00
TOT JORNAL
82,728.96
44,291.81
70,848.48
55,545.76
253,415.01 (2)
Para :
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
PARTIDA #
JORNAL
41,364.48
44,291.81
70,848.48
55,545.76
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
6,314.53
128,867.25
19,330.09
148,197.34
14,819.73
163,017.07
163,017.07
SON CIENTO SESENTA Y TRES MIL DIECISIETE BOLIVARES CON 07/100 CTMS
39
CODIGO: E.461.000.201
UNIDAD: M2
0.44
H/HOMBRE: 63.03
CANT. DE LA PARTIDA:142.80
RENDIMIENTO:58.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
75
79
1320
1321
958
952
UNID
GALON
GALON
PIEZA
PIEZA
ROLLO
KG
DESCRIPCION
0710004
CANTIDAD
0.05000
0.00800
0.00500
0.00500
0.00500
0.00500
COSTO
80,910.00
19,990.00
3,024.00
1,850.00
3,920.00
16,200.00
TOTAL
4,045.50
159.92
15.12
9.25
19.60
81.00
4,330.39
4,330.39
2- E Q U I P O S
COD.
227
228
284
274
275
234
233
DESCRIPCION
CANT.
2.00
2.00
2.00
2.00
2.00
2.00
2.00
PRECIO
6,338.00
13,942.00
4,607.00
12,900.00
39,850.00
17,999.00
90,930.00
C.O.P.
0.010000
0.010000
0.010000
0.010000
0.010000
0.010000
0.005000
TOTAL
126.76
278.84
92.14
258.00
797.00
359.98
909.30
2,822.02
48.66
3- M A N O D E O B R A
COD.
24
23
2
22
MAESTRO PINTOR
PINTOR DE 1a
AYUDANTE
PINTOR DE 2a
PARTIDA
CANTIDAD
142.80
NUM.
0.20
1.00
1.00
1.00
DESCRIPCION
DEL
PRESUPUESTO
PRECIO UNITARIO
18,731.17
TOTAL
2,674,811.08
39
E.461.000.201
51,520.00
TOT JORNAL
12,293.77
55,545.76
44,291.81
49,656.84
161,788.18 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
49,656.84
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
10,428.20
14,807.25
2,221.09
17,028.34
1,702.83
18,731.17
0.00
18,731.17
SON DIECIOCHO MIL SETECIENTOS TREINTA Y UNO BOLIVARES CON 17/100 CTMS
40
CODIGO: E.461.000.401
UNIDAD: M2
0.35
H/HOMBRE: 90.19
CANT. DE LA PARTIDA:257.68
RENDIMIENTO:75.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
958
952
75
79
1320
1321
DESCRIPCION
TIRRO 3M A= 1"
ESTOPA NACIONAL ROLLO DE 12.5 KG.
PINTURA ESMALTE KEM LUSTRAL
SOLVENTE UNIVERSAL (THINNER)
LIJA 3-M GRANO 80 PLIEGO 9 x 11"
LIJA 3-M GRANO 150 PLIEGO 9 x 11"
0710004
UNID
ROLLO
KG
GALON
GALON
PIEZA
PIEZA
CANTIDAD
0.00500
0.00500
0.05550
0.00800
0.00500
0.00500
COSTO
4,696.80
15,552.00
88,970.00
13,596.49
1,520.00
1,601.96
TOTAL
23.48
77.76
4,937.84
108.77
7.60
8.01
5,163.46
5,163.46
2- E Q U I P O S
COD.
284
274
275
234
233
227
228
DESCRIPCION
CANT.
2.00
2.00
2.00
2.00
2.00
2.00
2.00
PRECIO
9,060.00
16,900.00
37,356.00
14,700.00
163,950.00
6,338.00
13,942.00
C.O.P.
0.010000
0.010000
0.010000
0.010000
0.005000
0.010000
0.010000
TOTAL
181.20
338.00
747.12
294.00
1,639.50
126.76
278.84
3,605.42
48.07
3- M A N O D E O B R A
COD.
24
23
22
2
MAESTRO PINTOR
PINTOR DE 1a
PINTOR DE 2a
AYUDANTE
PARTIDA
CANTIDAD
257.68
NUM.
0.50
1.00
1.00
1.00
DESCRIPCION
DEL
PRESUPUESTO
PRECIO UNITARIO
17,939.35
TOTAL
4,622,611.71
40
E.461.000.401
56,350.00
TOT JORNAL
30,734.43
55,545.76
49,656.84
44,291.81
180,228.84 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
49,656.84
44,291.81
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
8,969.77
14,181.30
2,127.20
16,308.50
1,630.85
17,939.35
0.00
17,939.35
SON DIECISIETE MIL NOVECIENTOS TREINTA Y NUEVE BOLIVARES CON 35/100 CTMS
41
CODIGO: E.512.211.013
UNIDAD: M
H/HOMBRE: 45.23
I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA.DIAMETRO 1/2 plg (13 mm).
1.00
0.54
CANT. DE LA PARTIDA:84.00
RENDIMIENTO:75.150
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
250
255
260
UNID
M
PIEZA
PIEZA
PIEZA
DESCRIPCION
1104001
1103001
1102001
CANTIDAD
1.05000
0.33000
0.33000
0.33000
COSTO
3,584.00
1,140.00
720.00
824.99
TOTAL
3,763.20
376.20
237.60
272.25
4,649.25
4,649.25
2- E Q U I P O S
COD.
91
320
77
249
238
261
76
DESCRIPCION
CANT.
1.00
1.00
2.00
2.00
1.00
1.00
1.00
PRECIO
385,105.27
5,000.00
41,825.00
74,782.60
60,546.00
36,587.71
837,562.00
C.O.P.
0.003000
1.000000
0.010000
0.010000
0.010000
0.010000
0.010000
TOTAL
1,155.32
5,000.00
836.50
1,495.65
605.46
365.88
8,375.62
17,834.43
237.32
3- M A N O D E O B R A
COD.
18
17
2
1
NUM.
0.50
1.00
1.00
1.00
DESCRIPCION
MAESTRO ELECTRICISTA
ELECTRICISTA DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
84.00
DEL
PRESUPUESTO
PRECIO UNITARIO
17,028.24
TOTAL
1,430,372.16
41
E.512.211.013
56,350.00
TOT JORNAL
30,734.43
55,545.76
44,291.81
41,364.48
171,936.48 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
8,574.49
13,461.06
2,019.16
15,480.22
1,548.02
17,028.24
17,028.24
42
CODIGO: E.512.211.019
UNIDAD: M
H/HOMBRE: 55.42
I.E. TUBERIA DE HIERRO GALVANIZADO, SIN ROSCA, TIPO EMT, EMBUTIDA.DIAMETRO 3/4 plg (19 mm).
1.00
0.58
CANT. DE LA PARTIDA:95.00
RENDIMIENTO:67.168
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
251
256
261
UNID
M
PIEZA
PIEZA
PIEZA
DESCRIPCION
CANTIDAD
1.05000
0.33000
0.33000
0.33000
COSTO
4,051.00
1,200.00
1,200.00
1,523.06
TOTAL
4,253.55
396.00
396.00
502.61
5,548.16
5,548.16
2- E Q U I P O S
COD.
249
238
261
76
91
320
77
DESCRIPCION
CANT.
2.00
1.00
1.00
1.00
1.00
1.00
2.00
PRECIO
74,782.60
60,546.00
36,587.71
837,562.00
385,105.27
5,000.00
41,825.00
C.O.P.
0.010000
0.010000
0.010000
0.010000
0.003000
1.000000
0.010000
TOTAL
1,495.65
605.46
365.88
8,375.62
1,155.32
5,000.00
836.50
17,834.43
265.52
3- M A N O D E O B R A
COD.
18
17
2
1
NUM.
0.50
1.00
1.00
1.00
DESCRIPCION
MAESTRO ELECTRICISTA
ELECTRICISTA DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
95.00
DEL
PRESUPUESTO
PRECIO UNITARIO
19,490.02
TOTAL
1,851,551.90
42
E.512.211.019
56,350.00
TOT JORNAL
30,734.43
55,545.76
44,291.81
41,364.48
171,936.48 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
9,593.45
15,407.13
2,311.07
17,718.20
1,771.82
19,490.02
19,490.02
43
CODIGO: E.521.222.013
UNIDAD: M
0.04
H/HOMBRE: 6.31
CANT. DE LA PARTIDA:167.00
RENDIMIENTO:850.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
946
947
UNID
M
ROLLO
ROLLO
DESCRIPCION
1409007
CANTIDAD
1.10000
0.00100
0.00500
COSTO
1,224.00
22,585.29
3,247.40
TOTAL
1,346.40
22.59
16.24
1,385.23
1,385.23
2- E Q U I P O S
COD.
66
238
261
249
265
252
102
103
104
DESCRIPCION
CANT.
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
PRECIO
935,000.00
60,546.00
36,587.71
74,782.60
21,880.00
42,904.34
183,571.00
202,285.00
8,844,640.00
C.O.P.
0.003000
0.010000
0.010000
0.010000
0.010000
0.010000
0.005000
0.005000
0.002500
TOTAL
2,805.00
605.46
365.88
1,495.65
437.60
429.04
917.86
1,011.43
22,111.60
30,179.52
35.51
3- M A N O D E O B R A
COD.
18
17
2
1
NUM.
0.25
1.00
1.00
2.00
DESCRIPCION
MAESTRO ELECTRICISTA
ELECTRICISTA DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
167.00
DEL
PRESUPUESTO
PRECIO UNITARIO
2,906.50
A.P.V. Software
Telf. 753-9479
Preparado Por :
43
E.521.222.013
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
485,385.50
68,425.00
TOT JORNAL
15,367.22
55,545.76
44,291.81
82,728.96
197,933.75 (2)
Para :
PARTIDA #
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
876.89
2,297.63
344.64
2,642.27
264.23
2,906.50
2,906.50
44
CODIGO: E.521.222.030
UNIDAD: M
0.04
H/HOMBRE: 14.47
CANT. DE LA PARTIDA:350.00
RENDIMIENTO:600.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
1409007
947 TAPE NEGRO # 33 (COBRA)
(61 KG/KM)
1054 CABLE THW # 10 AWG
UNID
ROLLO
M
CANTIDAD
0.00500
1.10000
COSTO
3,047.40
2,167.20
TOTAL
15.24
2,383.92
2,399.16
2,399.16
2- E Q U I P O S
COD.
252
102
265
66
261
249
DESCRIPCION
CANT.
1.00
1.00
2.00
0.50
1.00
1.00
PRECIO
44,912.28
229,463.00
21,880.00
935,000.00
36,587.71
74,782.60
C.O.P.
0.010000
0.005000
0.010000
0.003000
0.010000
0.010000
TOTAL
449.12
1,147.32
437.60
1,402.50
365.88
747.83
4,550.25
7.58
3- M A N O D E O B R A
COD.
18
17
2
1
NUM.
0.10
1.00
1.00
1.00
DESCRIPCION
MAESTRO ELECTRICISTA
ELECTRICISTA DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
350.00
DEL
PRESUPUESTO
PRECIO UNITARIO
4,212.21
TOTAL
1,474,273.50
44
E.521.222.030
49,910.00
TOT JORNAL
6,146.89
55,545.76
44,291.81
41,364.48
147,348.94 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
923.07
3,329.81
499.47
3,829.28
382.93
4,212.21
4,212.21
45
CODIGO: E.461.000.401
UNIDAD: PZA
H/HOMBRE: 2.56
I.E. CAJETIN METALICO, SALIDA 1/2", PROFUNDIDAD 1 1/2", CUADRADO4" X 4" (10.2 X 10.2 cm).
1.00
0.43
CANT. DE LA PARTIDA:6.00
RENDIMIENTO:45.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
333
1
9
1570
DESCRIPCION
UNID
PIEZA
SACO
M3
%
CANTIDAD
1.00000
0.00540
0.00080
0.05000
COSTO
3,078.00
15,500.00
84,400.00
3,229.22
TOTAL
3,078.00
83.70
67.52
161.46
3,390.68
3,390.68
2- E Q U I P O S
COD.
249
238
261
230
CANT.
2.00
2.00
1.00
2.00
DESCRIPCION
ALICATE
SEGUETA AJUSTABLE STANLEY
JUEGO DE ATORNILLADORES PLANOS
CINTA METRICA 3 MTS.
PRECIO
2,639.00
6,572.00
6,290.00
4,500.00
C.O.P.
0.010000
0.010000
0.010000
0.010000
TOTAL
52.78
131.44
62.90
90.00
337.12
7.49
3- M A N O D E O B R A
COD.
18
4
17
2
NUM.
0.20
0.20
1.00
1.00
DESCRIPCION
MAESTRO ELECTRICISTA
ALBAIL DE 2a
ELECTRICISTA DE 1a
AYUDANTE
PARTIDA
CANTIDAD
6.00
DEL
PRESUPUESTO
PRECIO UNITARIO
17,120.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
45
E.461.000.401
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
102,720.00
38,640.00
TOT JORNAL
12,293.77
9,931.37
55,545.76
44,291.81
122,062.71 (2)
Para :
PARTIDA #
JORNAL
61,468.86
49,656.84
55,545.76
44,291.81
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
10,135.43
13,533.60
2,030.04
15,563.64
1,556.36
17,120.00
17,120.00
46
CODIGO: E.531.311.010
UNIDAD: PZA
H/HOMBRE: 6.40
I.E. CAJETIN METALICO, SALIDA 3/4 plg, PROFUNDIDAD 1 1/2 plg,CUADRADOS 4 X 4 plg (10.2 X 10.2 cm).
1.00
0.40
CANT. DE LA PARTIDA:16.00
RENDIMIENTO:40.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
333 CAJETIN CUADRADO DE 4"x4"(HUECOS 1/2" 3/4") 1403001
EMENTO PORTLAND GRIS (un saco es 0,028 m3) vencemos
1
ARENA LAVADA
9
UNID
PIEZA
SACO
M3
CANTIDAD
1.00000
0.00540
0.00080
COSTO
3,493.56
15,500.00
84,400.00
TOTAL
3,493.56
83.70
67.52
3,644.78
3,644.78
2- E Q U I P O S
COD.
230
261
54
233
DESCRIPCION
CANT.
1.00
1.00
1.00
1.00
PRECIO
33,426.00
34,952.00
86,625.00
90,930.00
C.O.P.
0.010000
0.010000
0.003000
0.005000
TOTAL
334.26
349.52
259.88
454.65
1,398.31
34.96
3- M A N O D E O B R A
COD.
AYUDANTE
2
17 ELECTRICISTA DE 1a
PARTIDA
CANTIDAD
16.00
NUM.
1.00
1.00
DESCRIPCION
DEL
PRESUPUESTO
PRECIO UNITARIO
16,471.38
A.P.V. Software
Telf. 753-9479
Preparado Por :
46
E.531.311.010
BONO
16,100.00
16,100.00
Totales .........................(1)
TOTAL
263,542.08
32,200.00
TOT JORNAL
44,291.81
55,545.76
99,837.57 (2)
Para :
PARTIDA #
JORNAL
44,291.81
55,545.76
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
9,341.11
13,020.85
1,953.13
14,973.98
1,497.40
16,471.38
16,471.38
SON DIECISEIS MIL CUATROCIENTOS SETENTA Y UNO BOLIVARES CON 38/100 CTMS
47
CODIGO: E.531.410.010
UNIDAD: PZA
1.64
H/HOMBRE: 1.64
CANT. DE LA PARTIDA:1.00
RENDIMIENTO:11.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
UNID
PZA
DESCRIPCION
INTERRUPTOR BLIINDADO DE 2P 60 A
CANTIDAD
1.00000
COSTO
25,000.00
TOTAL
25,000.00
25,000.00
25,000.00
2- E Q U I P O S
COD.
66
261
249
265
DESCRIPCION
CANT.
1.00
1.00
1.00
1.00
PRECIO
935,000.00
36,587.71
74,782.60
21,880.00
C.O.P.
0.003000
0.010000
0.010000
0.010000
TOTAL
2,805.00
365.88
747.83
218.80
4,137.51
376.14
3- M A N O D E O B R A
NUM.
0.25
1.00
1.00
COD.
DESCRIPCION
18 MAESTRO ELECTRICISTA
17 ELECTRICISTA DE 1a
OBRERO DE PRIMERA
1
PARTIDA
CANTIDAD
1.00
DEL
PRESUPUESTO
PRECIO UNITARIO
80,425.41
A.P.V. Software
Telf. 753-9479
Preparado Por :
47
E.531.410.010
BONO
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
80,425.41
36,225.00
TOT JORNAL
15,367.22
55,545.76
41,364.48
112,277.46 (2)
Para :
PARTIDA #
JORNAL
61,468.86
55,545.76
41,364.48
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
38,201.26
63,577.40
9,536.61
73,114.01
7,311.40
80,425.41
80,425.41
48
CODIGO: E.551.120.812
UNIDAD: PZA
H/HOMBRE: 9.00
CANT. DE LA PARTIDA:1.00
I.E. TABLERO METALICO CONVERTIBLE, EMBUTIDO, CON PUERTA, 2F + N, 8 CIRCUITOS, BARRAS DE 125 AMP. NO INCLUYE BREAKERS.
1.00
9.00
RENDIMIENTO:2.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
188 TABLERO RESIDENCIAL 8 CIRCUITOS 125 A. BIEMCA
UNID
PIEZA
CANTIDAD
1.00000
COSTO
68,974.29
TOTAL
68,974.29
68,974.29
68,974.29
2- E Q U I P O S
COD.
68
78
99
233
230
261
DESCRIPCION
CANT.
0.50
0.50
0.50
1.00
1.00
1.00
PRECIO
2,950,000.00
440,800.00
995,900.00
25,725.00
4,500.00
6,290.00
C.O.P.
0.005000
0.010000
0.005000
0.005000
0.010000
0.010000
TOTAL
7,375.00
2,204.00
2,489.75
128.63
45.00
62.90
12,305.28
6,152.64
3- M A N O D E O B R A
NUM.
0.25
1.00
1.00
COD.
DESCRIPCION
18 MAESTRO ELECTRICISTA
17 ELECTRICISTA DE 1a
AYUDANTE
2
PARTIDA
CANTIDAD
1.00
DEL
PRESUPUESTO
PRECIO UNITARIO
367,153.12
A.P.V. Software
Telf. 753-9479
Preparado Por :
48
E.551.120.812
BONO
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
367,153.12
36,225.00
TOT JORNAL
15,367.22
55,545.76
44,291.81
115,204.79 (2)
Para :
PARTIDA #
JORNAL
61,468.86
55,545.76
44,291.81
I.V.A.
SUBTOTALB .........
215,112.69
290,239.62
43,535.94
333,775.56
33,377.56
367,153.12
367,153.12
SON TRESCIENTOS SESENTA Y SIETE MIL CIENTO CINCUENTA Y TRES BOLIVARES CON 12/100 CTMS
49
CODIGO: E.562.210.030
UNIDAD: PZA
H/HOMBRE: 3.42
CANT. DE LA PARTIDA:2.00
I.E. INTERRUPTOR TERMOMAGNETICO (BREAKER) CON GANCHOS, 2 POLOS,10 kA ICC, 120/240V, CAP. 30 A.
1.00
1.71
RENDIMIENTO:11.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
1671 BREAKER HQC 2P 30A 120/240V 10KA (ATORNILLABLE)
UNID
PIEZA
CANTIDAD
1.00000
COSTO
46,540.00
TOTAL
46,540.00
46,540.00
46,540.00
2- E Q U I P O S
COD.
101
54
261
265
DESCRIPCION
CANT.
1.00
1.00
1.00
1.00
PRECIO
657,000.00
105,300.00
36,587.71
21,880.00
C.O.P.
0.003000
0.003000
0.010000
0.010000
TOTAL
1,971.00
315.90
365.88
218.80
2,871.58
261.05
3- M A N O D E O B R A
NUM.
1.00
1.00
0.35
COD.
DESCRIPCION
17 ELECTRICISTA DE 1a
AYUDANTE
2
18 MAESTRO ELECTRICISTA
PARTIDA
CANTIDAD
2.00
DEL
PRESUPUESTO
PRECIO UNITARIO
111,281.96
A.P.V. Software
Telf. 753-9479
Preparado Por :
49
E.562.210.030
BONO
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
222,563.92
37,835.00
TOT JORNAL
55,545.76
44,291.81
21,514.10
121,351.67 (2)
Para :
PARTIDA #
JORNAL
55,545.76
44,291.81
61,468.86
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
41,168.88
87,969.93
13,195.49
101,165.42
10,116.54
111,281.96
111,281.96
SON CIENTO ONCE MIL DOSCIENTOS OCHENTA Y UNO BOLIVARES CON 96/100 CTMS
50
CODIGO: E.582.320.012
UNIDAD: PZA
H/HOMBRE: 41.31
CANT. DE LA PARTIDA:16.00
SUMINISTRO Y COLOCACION DE REFLECTOR DE ALUMINIO REPUJADO, ARTICULABLEPARA LA ILUMINACION DE AREA EXTERIOR, MODELO
R-15 DE OBRA-LUX O SIMILAR.DE 400 WATS
1.00
2.58
RENDIMIENTO:10.000
FECHA :SEP-2007
1- M A T E R I A L E S
UNID
UND
%
COD.
DESCRIPCION
2499 REFLECTOR DE ALUMINIO HASTA 500W/220V
1566 TRANSPORTE DE MATERIALES (10%)
CANTIDAD
1.00000
0.10000
COSTO
115,740.00
115,740.00
TOTAL
115,740.00
11,574.00
127,314.00
127,314.00
2- E Q U I P O S
COD.
230
249
261
264
265
233
DESCRIPCION
CANT.
2.00
2.00
1.00
1.00
1.00
2.00
PRECIO
34,964.91
74,782.60
36,587.71
4,237.00
21,880.00
140,000.00
C.O.P.
0.010000
0.010000
0.010000
0.010000
0.010000
0.005000
TOTAL
699.30
1,495.65
365.88
42.37
218.80
1,400.00
4,222.00
422.20
3- M A N O D E O B R A
COD.
18
17
2
1
NUM.
0.25
1.00
1.00
1.00
DESCRIPCION
MAESTRO ELECTRICISTA
ELECTRICISTA DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
16.00
DEL
PRESUPUESTO
PRECIO UNITARIO
235,941.97
TOTAL
3,775,071.52
50
E.582.320.012
52,325.00
TOT JORNAL
15,367.22
55,545.76
44,291.81
41,364.48
156,569.27 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
58,779.19
186,515.39
27,977.31
214,492.70
21,449.27
235,941.97
235,941.97
SON DOSCIENTOS TREINTA Y CINCO MIL NOVECIENTOS CUARENTA Y UNO BOLIVARES CON 97/100 CTMS
51
CODIGO: E.592.200.000
UNIDAD: PZA
H/HOMBRE: 20.00
5.00
CANT. DE LA PARTIDA:4.00
RENDIMIENTO:1.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
ALTOPARLANTE
UNID
PZA
DESCRIPCION
CANTIDAD
1.00000
COSTO
700,000.00
TOTAL
700,000.00
700,000.00
700,000.00
2- E Q U I P O S
COD.
DESCRIPCION
538 EQUIPO # 1 PARA INSTALACION ELECTRICA
272 ESCALERA EXTENSIBLE ALUMINIO 16 TRAMOS
CANT.
1.00
1.00
PRECIO
5,749,945.62
280,000.00
C.O.P.
0.005535
0.010000
TOTAL
31,825.95
2,800.00
34,625.95
34,625.95
3- M A N O D E O B R A
NUM.
0.50
1.00
1.00
COD.
DESCRIPCION
18 MAESTRO ELECTRICISTA
17 ELECTRICISTA DE 1a
AYUDANTE
2
PARTIDA
CANTIDAD
4.00
DEL
PRESUPUESTO
PRECIO UNITARIO
1,545,111.72
TOTAL
6,180,446.88
51
E.592.200.000
40,250.00
TOT JORNAL
30,734.43
55,545.76
44,291.81
130,572.00 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
61,468.86
55,545.76
44,291.81
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
486,806.24
1,221,432.19
183,214.83
1,404,647.02
140,464.70
1,545,111.72
1,545,111.72
SON UN MILLON QUINIENTOS CUARENTA Y CINCO MIL CIENTO ONCE BOLIVARES CON 72/100 CTMS
52
CODIGO: E.801.200.000
UNIDAD: M3
H/HOMBRE: 347.48
CANT. DE LA PARTIDA:54.00
CONSTRUCCION DE BASES Y SUB-BASES DE PIEDRA PICADA,INCLUYENDO EL TRANSPORTE DEL MATERIAL HASTA UNA DISTANCIA DE 50
KMS.
1.00
6.43
RENDIMIENTO:20.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
PIEDRA PICADA (TAMAO MAXIMO 1") (FERRETERIA)
7
1570 TRANSPORTE DE MATERIALES ( 5%)
UNID
M3
%
CANTIDAD
1.05000
0.05000
COSTO
88,000.00
92,400.00
TOTAL
92,400.00
4,620.00
97,020.00
97,020.00
2- E Q U I P O S
CANT.
4.00
4.00
COD.
DESCRIPCION
74 CARRETILLA RUEDA DE GOMA CAP= 55 Lts
246 PALA REDONDA MANGO CORTO
PRECIO
155,535.08
20,429.82
C.O.P.
0.003500
0.010000
TOTAL
2,177.49
817.19
2,994.68
149.73
3- M A N O D E O B R A
NUM.
9.00
0.25
COD.
DESCRIPCION
OBRERO DE PRIMERA
1
28 MAESTRO DE OBRAS DE 2a
PARTIDA
CANTIDAD
54.00
DEL
PRESUPUESTO
PRECIO UNITARIO
216,193.20
TOTAL
11,674,432.80
52
E.801.200.000
TOT JORNAL
372,280.32
15,367.22
387,647.54 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
41,364.48
61,468.86
I.V.A.
SUBTOTALB .........
73,733.98
170,903.71
25,635.56
196,539.27
19,653.93
216,193.20
216,193.20
SON DOSCIENTOS DIECISEIS MIL CIENTO NOVENTA Y TRES BOLIVARES CON 20/100 CTMS
53
CODIGO: E.808.820.000
UNIDAD: PZA
H/HOMBRE: 26.00
CANT. DE LA PARTIDA:2.00
SUMINISTRO,TRANSPORTE Y COLOCACION DE TORRES PARA CANCHA DE BASKETBALL FORMADAS POR TUBOS DE 4 PULGADAS, TABLERO Y
CESTAS COMPLETAMENTE TERMINADAS, SEGUN DETALLES DEL PLANO.
1.00
13.00
RENDIMIENTO:4.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
1570
DESCRIPCION
UNID
JGO
%
CANTIDAD
1.00000
0.05000
COSTO
2,000,000.00
2,000,000.00
TOTAL
2,000,000.00
100,000.00
2,100,000.00
2,100,000.00
2- E Q U I P O S
COD.
DESCRIPCION
567 HERRAMIENTAS MENORES
62 ANDAMIO TUBULAR 2,15 x 2,00 x 1,50 m.
280 ESCALERA TIPO TIJERA DE ALUMINIO 12 TRAMOS
CANT.
1.00
2.00
1.00
PRECIO
1,114,245.51
220,000.00
240,000.00
C.O.P.
0.008185
0.003500
0.005000
TOTAL
9,120.10
1,540.00
1,200.00
11,860.10
2,965.03
3- M A N O D E O B R A
COD.
29
5
2
1
NUM.
0.50
1.00
1.00
4.00
DESCRIPCION
MAESTRO DE OBRAS DE 1a
ALBAIL DE 1a
AYUDANTE
OBRERO DE PRIMERA
PARTIDA
CANTIDAD
2.00
DEL
PRESUPUESTO
PRECIO UNITARIO
3,018,597.27
TOTAL
6,037,194.54
53
E.808.820.000
TOT JORNAL
35,424.24
55,545.76
44,291.81
165,457.92
300,719.73 (2)
Para :
PARTIDA #
BONO
16,100.00
16,100.00
16,100.00
16,100.00
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
70,848.48
55,545.76
44,291.81
41,364.48
I.V.A.
SUBTOTALB .........
283,277.87
2,386,242.90
357,936.44
2,744,179.34
274,417.93
3,018,597.27
3,018,597.27
SON TRES MILLONES DIECIOCHO MIL QUINIENTOS NOVENTA Y SIETE BOLIVARES CON 27/100 CTMS
54
CODIGO: E.808.860.000
UNIDAD: M2
H/HOMBRE: 288.00
CANT. DE LA PARTIDA:540.00
PINTURA ESPECIAL PARA CANCHA DE USOS MULTIPLES, INCLUE LINEAS DE MARCATORIAS, SEGUN DETALLES.
1.00
0.53
RENDIMIENTO:90.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
1321 LIJA 3-M GRANO 150 PLIEGO 9 x 11"
958 TIRRO 3M A= 1"
952 ESTOPA NACIONAL ROLLO DE 12.5 KG.
78
1368
1320
0710004
PINTURA PARA CANCHA
SELLADOR ANTIALCALINO 927
PASTA PROFESIONAL MARCA DOMINO (MASTIQUE P/PINTOR)
LIJA 3-M GRANO 80 PLIEGO 9 x 11"
UNID
PIEZA
ROLLO
KG
CU
GALON
GALON
PIEZA
CANTIDAD
0.00500
0.00500
0.00500
0.05000
0.02500
0.03490
0.00500
COSTO
1,601.96
4,696.80
15,552.00
100,000.00
79,270.00
43,460.00
1,520.00
TOTAL
8.01
23.48
77.76
5,000.00
1,981.75
1,516.75
7.60
8,615.35
8,615.35
2- E Q U I P O S
COD.
227
228
234
233
284
274
275
DESCRIPCION
CANT.
2.00
2.00
2.00
2.00
2.00
2.00
2.00
PRECIO
6,338.00
13,942.00
17,999.00
163,950.00
8,010.00
12,540.00
37,356.00
C.O.P.
0.010000
0.010000
0.010000
0.005000
0.010000
0.010000
0.010000
TOTAL
126.76
278.84
359.98
1,639.50
160.20
250.80
747.12
3,563.20
39.59
3- M A N O D E O B R A
COD.
23
22
2
1
24
PINTOR DE 1a
PINTOR DE 2a
AYUDANTE
OBRERO DE PRIMERA
MAESTRO PINTOR
PARTIDA
CANTIDAD
540.00
NUM.
1.00
1.00
1.00
2.00
1.00
DESCRIPCION
DEL
PRESUPUESTO
PRECIO UNITARIO
26,424.06
Preparado Por :
PARTIDA #
54
E.808.860.000
96,600.00
TOT JORNAL
55,545.76
49,656.84
44,291.81
82,728.96
61,468.86
293,692.23 (2)
Para :
BONO
16,100.00
16,100.00
16,100.00
16,100.00
16,100.00
Totales .........................(1)
TOTAL
14,268,992.40
A.P.V. Software
Telf. 753-9479
JORNAL
55,545.76
49,656.84
44,291.81
41,364.48
61,468.86
I.V.A.
SUBTOTALB .........
SUBTOTALC .........
12,233.64
20,888.58
3,133.29
24,021.87
2,402.19
26,424.06
26,424.06
55
CODIGO: E.903.142.020
UNIDAD: M3xKM
H/HOMBRE: 30.32
CANT. DE LA PARTIDA:1,203.20
TRANSPORTE URBANO EN CAMIONES, DE CUALQUIER TIPO DE MATERIAL PROVE-NIENTE DE LA PREPARACION DEL SITIO, MEDIDO EN
ESTADO SUELTO A DISTAN-CIAS COMPRENDIDAS A 20 KMS.
1.00
0.03
RENDIMIENTO:635.000
FECHA :SEP-2007
1- M A T E R I A L E S
COD.
DESCRIPCION
UNID
CANTIDAD
COSTO
TOTAL
CANT.
1.00
PRECIO
338,000,000.00
C.O.P.
0.002309
PARTIDA
CANTIDAD
1,203.20
DEL
NUM.
1.00
1.00
PRESUPUESTO
PRECIO UNITARIO
2,263.44
TOTAL
2,723,371.01
32,200.00
780,442.00
1,229.04
TOT JORNAL
50,314.97
44,291.81
94,606.78 (2)
Utilidad ................
Para :
PARTIDA #
BONO
16,100.00
16,100.00
Totales .........................(1)
A.P.V. Software
Telf. 753-9479
Preparado Por :
JORNAL
50,314.97
44,291.81
TOTAL
780,442.00
55
E.903.142.020
I.V.A.
SUBTOTALC .........
560.24
1,789.28
268.39
2,057.67
205.77
2,263.44
2,263.44
SON DOS MIL DOSCIENTOS SESENTA Y TRES BOLIVARES CON 44/100 CTMS